HomeMy WebLinkAboutADD 1_Thurston Ave Bathroom Reno_6-3-2020CORNELL UNIVERSITY THURSTON AVENUE 534 FACILITIES CONTRACTS ZETA PSI BATHROOM 121 HUMPHREYS SERVICE BUILDING RENOVATIONS ITHACA, NEW YORK 14853-3701 ADDENDUM NO. 1 June 3, 2020 This Addendum contains changes to the requirements of the Contract Documents and Specifications. Such changes are to be incorporated into the Construction Documents and shall apply to the work with the same meaning and force as if they had been included in the original document. Wherever this Addendum modifies a portion of a paragraph of the specifications or a portion of any Drawing, the remainder of the Paragraph or Drawing shall remain in force. NOTE: Provisions of all Contract Documents apply. Item 1. Drawing G-001 ADD Note L Where waterproof membrane is indicated in drawings, comply with ANSI A108.13, TCNA Recommendations, and manufacturer's written instructions to produce waterproof membrane of uniform thickness that is bonded securely to substrate. Allow waterproof membrane to cure and verify by testing that it is watertight before installing tile or setting materials over it. Provide flood testing per ASTM D5957 “Flood Testing Horizontal Waterproofing Installations”. Flood the area being tested with potable water to a minimum depth of 1” to a maximum depth of 4” at the low point of the test area. The mean water depth should not exceed 2 1/2”. Flood tests should be conducted within a time range of 24 –72 hours, with the time for testing to begin when the water has reached its maximum test depth. If repairs are made to the waterproofing system, conduct additional flood testing to ensure that complete waterproof integrity is achieved. Item 2. Drawing G-003, General Notes, PRODUCTS, INSTALLATION (Bottom of last column) DELETE Note A. in its entirety. REPLACE with FURNISH ALL PRODUCTS EXCEPT ITEMS NOTED AS OWNER-PROVIDED. CONTRACTOR SHALL RECEIVE AND INSTALL ALL OWNER-PROVIDED PRODUCTS IN ADDITION TO CONTRACTOR-PROVIDED PRODUCTS. Item 3. Drawing A-101, Note P.1. DELETE in its entirety. REPLACE with OWNER TO PROVIDE TOILETS AND FAUCETS. CONNECT TO EXISTING ROUGH-IN PIPING. THURSTON AVENUE 534, ZETA PSI BATHROOM RENOVATIONS Addendum No. 1 June 3, 2020 Page 2 Item 4. Drawing A-101, Note P.3 DELETE in its entirety. REPLACE with OWNER TO PROVIDE TOILETS AND FAUCETS. PROVIDE ASSOCIATED MATERIAL AND PIPING. PROVIDE DOMESTIC WATER, SANITARY WASTE AND VENT ROUGH-IN PIPING AND CONNECT TO EXISTING RESPECTIVE SYSTEMS. Item 5. Drawing A-102 ADD Note DF.1 to Detail 1/A-102, Toilet/Shower Room 20020 Item 6. Drawing A-102, Note P.1 DELETE in its entirety. REPLACE with OWNER TO PROVIDE TOILETS AND FAUCETS. CONNECT TO EXISTING ROUGH-IN PIPING. Item 7. Drawing A-103 DELETE in its entirety REPLACE with revised Drawing A-103, attached. Item 8. Drawing A-701, General Finish Notes ADD W. Contractor shall remove all existing finishes complete at areas indicated in the room finish schedule to receive new finishes on A-701. Provide surface preparation as required by product manufacturer for surfaces to receive new finishes. Item 9. Attached is the PreBid sign-in sheet for Contractors reference only. Item 10. RFI Questions and Clarifications See attached RFI Log (Items 1 – 3) Attachments: Drawing A-103, Revised 06.02.2020 Pre-bid Sign-in sheet RFI Log (Items 1 – 3) ****END OF ADDENDUM**** REMOVE EXISTING CURB AND FRAMED OPENING -FINISH FLUSH WITH RAISED SHOWER LEVEL AND ADJACENT FINISHES STAIR 3005 3006 CORRIDOR 30040 DP.1 DP.1 DP.1 DP.1 DP.1 DP.1 DP.1 DP.3 EXISTING 3/4" H&C EXISTING 4" VENT UP EXISTING 4" VENT DN DW.2 DE.1 DE.3 DE.4 DF.1 DME.1 ABOVE DW.4 DW.5 DE.5 SO REMOVE SOLID SURFACE SHELF (TYP AT SECOND AND THIRD FLOORS) 2 3 LAV-3 WC-1 WC-1 FD-1 HB-1 SH-2 SH-2 EX FD CMT ACCENT WALL ABOVE SOLID SURFACE SHELF TTD TTD RH (x3) MR (72X36) STAIR 3005 3006 CORRIDOR 30040 TOILET / SHOWER ROOM 30020 EHD P.1 P.1 P.1 P.6 P.5 P.1 P.1 P.4 P.1 P.1 EXISTING 3/4" H&C EXISTING 4" VENT UP EXISTING 4" VENT DN P-102 1 P-102 2 PROVIDE TRAP PRIMER VALVE EF-5 O.2 A-43010 11 SHELF CT-1 CT-1 PFT-1PFT-1 CT-2 (ABOVE AND BELOW SINKS) SSM-2 AT THIS WALL ELEVATION HB-1 NEW SOLID SURFACE SHELF TO MATCH COUNTERTOP (TYP AT SECOND AND THIRD FLOOR TOILET ROOMS) TPTN TPTNTYP2'-10"1 1 Beardsley Design Associates Architecture, Engineering, Landscape Architecture, D.P.C. ©Filename:Project Number: Drawn By: Designed By: Reviewed By: WARNING Any alterations to this document not conforming to section 7307. New York State Education Law are strictly prohibited. 320 West Main Street Malone, NY 12953 518.483.1585 5789 Widewaters Pkwy Dewitt, NY 13214 315.472.6980 64 South Street Auburn, NY 13021 315.253.7301 AUBURN MALONE SYRACUSE no. revision description by date 6/3/2020 8:21:52 AMC:\Projects\BEAR-A-19100-V2018_nhavrish.rvtARCHITECTURE Cornell UniversityA-103 04.15.2020 THIRD FLOOR PLANZeta Psi Bathroom Renovations534 Thurston Avenue Ithaca, NY 14850NRH/DJW 19100 MAR NRH 2020 PLAN NORTH0'2'1'4'6' SCALE : 1/2" = 1'-0" 1 ADDENDUM 1 06.02.2020 SCALE:1/2" = 1'-0"1 THIRD FLOOR PLAN DEMOLITION SCALE:1/2" = 1'-0"2 THIRD FLOOR PLAN Dx = DEMOLITION KEYNOTE P = PLUMBING E = EQUIPMENT KEYED NOTES LOCATED WITHIN A SPACE SHALL APPLY THROUGHOUT THE SPACE UNLESS OTHERWISE INDICATED. KEYED NOTES DE.1 REMOVE TOILET PARTITIONS AND ACCESSORIES COMPLETE. DE.3 REMOVE ALL TOILET ACCESSORIES, COMPLETE, INCLUDING, BUT NOT LIMITED TO, MIRRORS, GRAB BARS, TOILET SEAT COVER DISPENSERS, TOILET TISSUE DISPENSER, PAPER TOWEL DISPENSERS, ELECTRIC HAND DRYERS, SHOWER CURTAINS, ROBE HOOKS, ETC...AND TURN OVER TO OWNER DE.4 REMOVE LIGHT FIXTURES, WALL OUTLETS, SWITCHES, CONDUIT, RACEWAY, ETC. TO PROVIDE NEW FINISH THROUGHOUT SPACE. SALVAGE OUTLETS, SWITCHES, BOXES, AND CONDUIT FOR REUSE IN SAME LOCATION. REINSTALL IN SAME LOCATION AND RECESS WIRING IN NEW FURRING AS INDICATED IN PLANS. REMOVE FIRE ALARM EQUIPMENT AND SALVAGE FOR REINSTALLATION IN SAME LOCATION. SELECTIVELY REMOVE CEILING FINISH TO PROVIDE RECESSED WIRING TO NEW LIGHT FIXTURES AND REINSTALLED FIRE ALARM EQUIPMENT. DE.5 REMOVE RADIATOR AND SALVAGE TO OWNER FOR REFINISHING. PROVIDE ALL NECESSARY ACCESSORIES, PIPING, FITTINGS, AND PIPE WRAP TO REINSTALL FOLLOWING REFINISHING BY OWNER. DF.1 REMOVE TILE FLOOR COMPLETE TO SUBSTRATE DME.1 REMOVE EXHAUST FAN, INCLUDING BUT NOT LIMITED TO, GRILLE, FAN, MOUNTING HARDWARE AND ACCESSORIES. DISCONNECT EXISTING FAN FROM BRANCH CIRCUIT. DP.1 REMOVE FIXTURE AND TRIM. EXISTING ROUGH-IN PIPING WILL REMAIN FOR CONNECTION TO NEW FIXTURE. DP.3 EXISTING FLOOR DRAIN BODY WILL REMAIN. REMOVE FLOOR DRAIN STRAINER AND VERIFY SIZE , MAKE AND MODEL OF EXISTING STRAINER HEAD. DW.2 REMOVE WALL CONSTRUCTION AS INDICATED. COORDINATE EXTENT WITH RECONSTRUCTION PLAN. AT LOCATIONS OF NEW LAVATORIES PROVIDE SELECTIVE WALL DEMOLITION TO FOR INSTALLATION OF NEW VENT AND SUPPLY PIPING DW.4 REMOVE SOLID SURFACE WALL PANELS THROUGHOUT, COMPLETE. PREPARE RESULTING SURFACE TO ACCEPT NEW FINISH. DW.5 REMOVE CERAMIC TILE WAINSCOT, COMPLETE (± 60" AFF) O.2 REMOVE SIGNAGE FROM DOOR LEAF, REFINISH AND STAIN EXISTING DOOR PANEL. REPAINT EXISTING FRAMES. REPAIR AND/OR RESTORE EXISTING HARDWARE AS REQUIRED TO PROVIDE FULL FUNCTIONALITY. PROVIDE NEW MOP PLATE (FINISH TO MATCH EXISTING HARDWARE) ON INTERIOR SIDE OF DOOR PANEL. PROVIDE NEW "RESTROOM" SIGNAGE AT CORRIDOR PER SIGNAGE DETAILS. P.1 PROVIDE FIXTURE AND TRIM. CONNECT TO EXISTING ROUGH-IN PIPING. P.4 PROVIDE FLOOR DRAIN STRAINER AND CONNECT TO EXISTING FLOOR DRAIN BODY. INSTALL STRAINER FLUSH WITH FINISHED FLOOR. P.5 PROVIDE FLOOR DRAIN AND TRAP. PROVIDE ROUGH-IN PIPING AND CONNECT TO EXISTING WASTE PIPING. PROVIDE TRAP PRIMER VALVE AND TRAP PRIMER LINE. P.6 PROVIDE HOSE BIBB. PROVIDE ROUGH-IN PIPING AND CONNECT TO EXISTING DOMESTIC HOT AND COLD WATER PIPING. SO SALVAGE TO OWNER 1 PROJECT: Thurston Avenue 534 Zeta Psi Bathroom Renovations DATE: May 21, 2020 Zoom Meeting PRE-BID MEETING 10:30AM Name Firm E-Mail Address Telephone Fax # Kevin Gunn F.E. Jones Construction kgunn@fejones.com Don Matthews W. L. Kline, Inc.don@wlkline.com Wendy Hackett Facilities Contracts wjh6@cornell.edu Chris Morelli LeChase Construction chris.morelli@lechase.com Mike Muldoon Streeter Associates mmuldoon@streeterassociates.com Jason Maxian Andrew R. Mancini Jason@armoggi.com Nicolette Havrish Beardsley Associates nhavrish@beardsley.com Mike Stewart Cornell SCL mts96@cornell.edu Kelly Davis Cornell eBuilder kmu2@cornell.edu Breanna Brann Facilities Contracts beb99@cornell.edu Date: June 3, 2020 RFI Form RFI/Page/ Response Dwg./Spec./Rep.Section/Design Team Index Number Paragraph/Topi c RFI Response 1 A103 Are we to assume similar demo notes for the third floor plan (A-103) as shown on the second floor plan (A-102?)? See Addendum No. 1, Item 7. 2 A101, A102, A103 The specifications call for the Owner to furnish the toilets and faucets, the plans call for the contractor to provide them. Who is furnishing the plumbing fixtures? See Addendum No. 1, Items 2, 3, 4 and 6. 3 A701 The finish schedule on A-701 shows all spaces to receive new PFT-2 Tile Floors. The demo notes for the Base Bid work don't have us removing Tile floors in those Spaces. Please Clarify what spaces receive new Tile Floors. See Addendum No. 1, Item 8. PROJECT: THURSTON AVENUE 534, ZETA PSI BATHROOM RENOVATIONS