HomeMy WebLinkAboutPost Bid Bulletin 1CORNELL UNIVERSITY OLIN HALL 103, 105, 107 FACILITIES CONTRACTS LAB RENOVATION 121 HUMPHREYS SERVICE BUILDING ITHACA, NEW YORK 14853-3701 POST BID BULLETIN NO. 1 September 30, 2020 This Post Bid Bulletin contains changes to the requirements of the Contract Documents and Specifications. Such changes are to be incorporated into the Construction Documents and shall apply to the work with the same meaning and force as if they had been included in the original document. Wherever this Post Bid Bulletin modifies a portion of a paragraph of the specifications or a portion of any Drawing, the remainder of the Paragraph or Drawing shall remain in force. NOTE: Provisions of all Contract Documents apply. Thank you for your recent bid for the above referenced project. All bids received exceeded the Owner’s Construction Budget. Please see the revisions below for you to respond with a revised bid amount. Please email the responses to Facilities Contracts (FacilitiesContracts@cornell.edu) no later than 2:00PM on October 7, 2020 to aid Cornell in its review and approval process. Item 1. Drawing A-101, Keyed Renovation Note 6 DELETE Keyed Renovation Note 6 REPLACE with Paint all metal surfaces in rooms 103 and 105 color PT-1 (electrostatic process is not required). This includes all laboratory casework, tall cabinets, table frames, and fume hoods (interior and exterior). Item 2. DELETE drawing M-001 in its entirety and REPLACE with drawing M-001R1, attached. Item 3. DELETE drawing M-101 in its entirety and REPLACE with drawing M-101R1, attached. Item 4. DELETE drawing M-401 in its entirety and REPLACE with drawing M-401R1, attached. Item 5. DELETE drawing M-501 in its entirety and REPLACE with drawing M-501R1, attached. Attachments: Drawings: M-001R1, M-101R1, M-401R1, M-501R1 ****END OF POST BID BULLETIN**** OLIN HALL 103, 105, 107 LAB RENOVATION Post Bid Bulletin No. 1 September 30, 2020 Page 2 REVISED BASE BID $ IN THE SPACE ABOVE, PROVIDE A REVISED BASE BID FOR THE ABOVE STATED MODIFICATIONS. Company Signature Printed Name and Title Date CORN E LL U N I V E RSI TYFOU N D E D 5681 AD FACILITIES ENGINEERING ARCHIVE BAR CODEARCH/STRUCT: CIVIL/ENV: ELECTRICAL: MECHANICAL: DATE: FACILITY: DESIGN: DRAWN: WWW.FCS.CORNELL.EDU IT IS A VIOLATION OF NEW YORK STATE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT OR ENGINEER, TO ALTER THIS DOCUMENT IN ANY WAY. IF THIS DOCUMENT IS ALTERED, THE ALTERING ARCHITECT OR ENGINEER SHALL AFFIX TO SUCH DOCUMENT THEIR SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. WARNING REVISIONS ARCHITECTURAL, STRUCTURAL, CIVIL, ENVIRONMENTAL, MECHANICAL, AND ELECTRICAL ENGINEERING 201 HUMPHREYS SERVICE BLDG ITHACA, NEW YORK 14853-3701 113 HO PLAZA ITHACA, NEW YORK OLIN HALL - 103 YU LAB M-001R1 12672497 SCOPE OF WORK, GENERAL NOTES, SUBMITTAL SCHEDULE, AND SYMBOL LEGENDS E. KOLACKI TRF 2024 AUGUST 10, 2020 MECHANICAL ABBREVIATIONS BCU BLOWER COIL UNIT CHWR CHILLED WATER RETURN CHWS CHILLED WATER SUPPLY CC CLEAN CONDENSATE CO CLEAN OUT CS CLEAN STEAM CD CONDENSATE DRAIN EA EXHAUST AIR EAG EXHAUST AIR GRILLE FD FIRE DAMPER GWR GLYCOL HEATING RETURN GWS GLYCOL HEATING SUPPLY HPR HIGH PRESSURE STEAM RETURN HPS HIGH PRESSURE STEAM SUPPLY HWR HOT WATER HEATING RETURN HWS HOT WATER HEATING SUPPLY LPC LOW PRESSURE CONDENSATE LPS LOW PRESSURE STEAM MU MAKE UP WATER MPC MEDIUM PRESSURE CONDENSATE MPS MEDIUM PRESSURE STEAM NG NATURAL GAS PCWR PROCESS CHILLED WATER RETURN PCWS PROCESS CHILLED WATER SUPPLY HG REFRIGERANT HOT GAS RL REFRIGERANT LIQUID RS REFRIGERANT SUCTION RAG RETURN AIR GRILLE SA SUPPLY AIR SAD SUPPLY AIR DIFFUSER VD VOLUME DAMPER MECHANICAL SYMBOLOGY AIRFLOW BALANCE VALVE BALL VALVE BOTTOM PIPE CONNECTION CAP OR PLUG CHECK VALVE DIRECTION OF FLOW DUCT AIRFLOW DUCT DOWN (EXHAUST OR RETURN) DUCT DOWN (SUPPLY) FLANGE CONNECTION MANUAL AIRVENT PIPE DOWN PIPE UP PIPING REDUCER (CONCENTRIC) PIPING REDUCER (ECCENTRIC) PRESSURE GAUGE PRESSURE OR TEMPERATURE PETES PLUG RECTANGULAR ELBOW RECTANGULAR ELBOW WITH TURNING VANES STANDARD BRANCH DUCT STEAM TRAP SUPPLY THROUGH NEXT FLOOR OR ROOF TEMPERATURE WELL THERMOMETER THERMOMETER (DIAL) TOP PIPE CONNECTION UNION CONNECTION VACUUM BREAKER VOLUME DAMPER IN DUCT CONTROL SYMBOLOGY 2-WAY CONTROL VALVE, DIGITAL 2-WAY CONTROL VALVE, PNEUMATIC ADDRESSABLE OUTPUT MODULE (FIRE ALARM INTERFACE) AIRFLOW CONTROL VALVE (VENTURI OR VORTEX SHEDDING) BINARY POINT CARBON DIOXIDE SENSOR DIFFERENTIAL PRESSURE SENSOR DIFFERENTIAL PRESSURE SENSOR FLOW ELEMENT (METER) FLOW SENSOR MODULATING NETWORK COMMUNICATION POINT, BACnet MSTP OCCUPANCY SENSOR OPEN/CLOSE OPPOSED BLADE CONTROL DAMPER PARALLEL BLADE CONTROL DAMPER PRESSURE SENSOR PRESSURE SWITCH ROOM TEMPERATURE SENSOR WITH ADJUSTABLE THERMOSTAT ROOM TEMPERATURE SENSOR WITH OCCUPANCY OVERRIDE ROOM TEMPERATURE SENSOR WITH ON/OFF SWITCH ROOM TEMPERATURE SENSOR WITH VISUAL DISPLAY SINGLE POINT SENSOR SMOKE DETECTOR SPEED COMMAND START/STOP STATIC PRESSURE SENSOR SWITCH TEMPERATURE SENSOR TEMPERATURE SENSOR TEMPERATURE SENSOR WITH ADJUSTABLE SETPOINT GENERAL DRAWING SYMBOLOGY DEMOLISHED WORK EXISTING PIPING TO REMAIN EXISTING TO REMAIN EXISTING WORK TO REMAIN NEW WORK POINT OF CONNECTION POINT OF DISCONNECTION CONTROL ABBREVIATIONS AI ANALOG INPUT AO ANALOG OUTPUT AV ANALOG VALUE BI BINARY INPUT BO BINARY OUTPUT BV BINARY VALUE F.L. FAIL LAST N.C. NORMALLY CLOSED N.O. NORMALLY OPEN VFD VARIABLE FREQUENCY DRIVE MECHANICAL SCOPE OF WORK 1.0 ROOMS 103 AND 105 - REPLACE FUME HOOD EXHAUST AIR VALVES AND GENERAL EXHAUST AIR VALVES. 2.0 ROOMS 103 AND 105 - PROVIDE DIRECT DIGITAL CONTROLS AS REQUIRED TO CONNECT TO THE EXISTING BUILDING AUTOMATION AND CONTROL SYSTEM. 3.0 ROOMS 103 AND 105 - PROVIDE VENTILATION SHUTOFF SWITCH 4.0 ROOMS 103 AND 105 - PROVIDE PROCESS EXHAUST AIR VALVES AND DUCT DROPS TO LAB EQUIPMENT. 6.0 ROOMS 103 AND 105 - REBALANCE EXISTING AIR TERMIMALS AND VALVES TO MEET REVISED AIRFLOW SCHEDULE. MECHANICAL GENERAL NOTES 1.0 ALL DUCT DIMENSIONS INDICATED ARE IN INCHES, AND ARE INSIDE FREE AND CLEAR DIMENSIONS. 2.0 PNEUMATIC TERMINATIONS: IF COPPER: DEMO BACK TO MAIN AND PROVIDED SOLDERED END CAP IF POLY: DEMO BACK TO MAIN AND PROVIDE BRASS PLUG DO NOT USE SHEETMETAL SCREW OR BEND OVER END OF COPPER TUBE. 3.0 INSTALL EQUIPMENT TO ENSURE PROPER ACCESS TO CONTROL DEVICES AND WITH SUFFICIENT SPACE TO PERFORM ROUTINE MAINTENANCE AND REPAIR. EQUIPMENT THAT IS NOT INSTALLED WITH THIS REQUIREMENT IN MIND SHALL BE RELOCATED AT NO EXPENSE TO THE UNIVERSITY UNTIL DEFICIENCIES ARE CORRECTED. 4.0 ALL SYSTEM TESTING SHALL BE CONDUCTED PRIOR TO INSULATION, FIREPROOFING, AND ENCLOSURE IN SHAFTS. ANY RESTORATION WORK REQUIRED AS A RESULT OF DISTURBING FINISHES OR STRUCTURE IN ORDER TO ACCESS SYSTEMS REQUIRING REPAIR SHALL BE AT NO COST TO THE UNIVERSITY. 5.0 CUTTING AND PATCHING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING, FITTING, AND PATCHING TO COMPLETE THE WORK. WHERE EXISTING CONSTRUCTION IS REMOVED, CAUSING AN EXPOSURE OF UNFINISHED AND/OR DAMAGED SURFACES, RESULTING SURFACES SHALL BE RECONSTRUCTED WITH MATERIALS TO MATCH FINISHED AREAS. 6.0 ANY FIRESTOPPING DISTURBED DURING THE COURSE OF WORK SHALL BE REPAIRED TO MAINTAIN A 2-HOUR FIRE RATING. 7.0 TESTING AND BALANCING: THE CONTRACTOR SHALL BALANCE ALL AIR SYSTEMS AS INDICATED. SUBMIT RESULTS OF TESTING AND BALANCING ON STANDARD TAB CONTRACTOR'S FORMS TO THE ENGINEER FOR REVIEW. SYSTEMS SHALL BE BALANCED TO WITHIN +/- 10% OF DESIGN VALUES. FINAL BALANCING SHALL OCCUR AFTER ALL LEAKS IN THE BUILDING ENVELOPE HAVE BEEN IDENTIFIED AND SEALED. 8.0 SEAL ALL PIPE, GRILLE, DIFFUSER, DUCT, CONDUIT PENETRATIONS WITH APPROPRIATE MATERIALS (CAULK, FOAM, ETC,) THAT ARE IMPENETRABLE TO THE CONTAINED ORGANISMS AND WITHSTAND REPEATED DECONTAMINATIONS WITH CLEANING AGENTS. MECHANICAL SUBMITTAL SCHEDULE SECTION TITLE REQUIRED 230523 GENERAL DUTY VALVES FOR HVAC PIPING PRODUCT DATA 230529 HANGERS & SUPPORTS FOR HVAC PRODUCT DATA 230553 IDENTIFICATION FOR HVAC COMPONENTS PRODUCT DATA 230593 TESTING, ADJUSTING & BALANCING FOR HVAC QUALIFICATIONS, INSPECTION AND TEST REPORTS 230700 HVAC INSULATION PRODUCT DATA 230719 HVAC PIPING & EQUIPMENT INSULATION PRODUCT DATA 230900 INSTRUMENTATION & CONTROL FOR HVAC PRODUCT DATA, MANUFACTURERS INSTRUCTIONS, O&M 230920 ANALOG LABORATORY CONTROL PRODUCT DATA, MANUFACTURERS INSTRUCTIONS, O&M 232113 HYDRONIC PIPING PRODUCT DATA 233113 METAL DUCTS PRODUCT DATA 233300 AIR DUCT ACCESSORIES PRODUCT DATA 233600 AIR TERMINAL UNITS PRODUCT DATA, MANUFACTURERS INSTRUCTIONS, O&M 1 06/09/20 ISSUED FOR DD REVIEW 2 07/09/20 ISSUED FOR 90% REVIEW 3 08/10/20 ISSUED FOR CONSTRUCTION 4 09/29/20 ISSUE FOR ADDENDUM NO. 3 4 EMPTY CONTROLS ENCLOSURE (E) 103 Room 105 Room 107 Room 101 Room 109 Room 12ø SA(E)24ø SA(E)12ø SA(E)2 3 2 3 3 FUME HOOD CONTROL PANEL (E) EMPTY CONTROLS ENCLOSURE (E)12ø12" EA RISER TO PENTHOUSE EF-10 (E) 12" EA RISER TO PENTHOUSE EF-13 (E) 12" EA RISER TO PENTHOUSE EF-4 (E)12ø3 SAV-103 (E) 4 1 SAV-105 (E)1 4 103 Room 105 Room 107 Room 101 Room 109 Room 1 1 24ø SA(E)12ø SA(E)12ø SA(E)12ø SA(E)EAV-103-1 EAV-103-3 EAV-103-2 2 3 EAV-105-1 EAV-105-3 EAV-105-2 5 4 4 5 RHC-103 (E) RHC-105 (E)26x10 SA(E)26x10 SA(E)14x8 SA(E) 14x8 SA(E) SG-103-1 (E) 450 CFM SG-103-2 (E)SG-103-3 (E) 450 CFM450 CFM 175 CFM 777 SG-103-1 (E) 450 CFM SG-105-2 (E) SG-105-3 (E) 450 CFM 450 CFM 7 7 7 SG-107-2 (E) SG-107-1 (E) SG-107-3 (E)7 493 CFM EG-103 (E)365 CFM 2" HWS 2" HWR 2" HWR 12" EA RISER TO PENTHOUSE EF-10 (E) 12" EA RISER TO PENTHOUSE EF-13 (E) 2" HWS 2 1/2" HWS 2 1/2" HWR 2" HWS 2" HWR EAV-107-2 (E) EAV-107-1 (E) 12" EA RISER TO PENTHOUSE EF-4 (E)8ø12ø2 M-501R1 VD VD 9 4ø5ø 75 CFM 6ø EG-105 (E) 125 CFM 12ø 12ø8øSAV-107 (E) RHC-107 (E) 2 VD 4ø 10 50 CFM 10 75 CFM 10 75 CFM 4ø SAV-103 (E) 4 SAV-105 (E) 4 6 6 4 4 4 4 4 4 4 4 CORN E LL U N I V E RSI TYFOU N D E D 5681 AD FACILITIES ENGINEERING ARCHIVE BAR CODEARCH/STRUCT: CIVIL/ENV: ELECTRICAL: MECHANICAL: DATE: FACILITY: DESIGN: DRAWN: WWW.FCS.CORNELL.EDU IT IS A VIOLATION OF NEW YORK STATE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT OR ENGINEER, TO ALTER THIS DOCUMENT IN ANY WAY. IF THIS DOCUMENT IS ALTERED, THE ALTERING ARCHITECT OR ENGINEER SHALL AFFIX TO SUCH DOCUMENT THEIR SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. WARNING REVISIONS ARCHITECTURAL, STRUCTURAL, CIVIL, ENVIRONMENTAL, MECHANICAL, AND ELECTRICAL ENGINEERING 201 HUMPHREYS SERVICE BLDG ITHACA, NEW YORK 14853-3701 113 HO PLAZA ITHACA, NEW YORK OLIN HALL - 103 YU LAB M-101R1 12672497 PARTIAL FIRST FLOOR DEMOLITION AND CONSTRUCTION PLANS E. KOLACKI TRF 2024 AUGUST 10, 2020 # 0' 2' 4' 8' SCALE: 1/4"=1'-0" M-101 KEYED DEMOLITION NOTES 1 EXISTING PNEUMATIC SUPPLY AIR VALVE AND ASSOCIATED CONTROLS. EXISTING SUPPLY AIR DUCTWORK, VALVE, AND REHEAT COIL TO REMAIN. 2 DISCONNECT AND REMOVE EXISTING FUME HOOD EXHAUST AIR VALVE. EXISTING EXHAUST DUCTWORK AND FUME HOOD TO REMAIN FOR RECONNECTION. 3 DISCONNECT AND REMOVE EXISTING GENERAL LAB EXHAUST AIR VALVE AND ASSOCIATED EXHAUST DUCTWORK, AND ACCESSORIES. EXISTING EXHAUST DUCT MAIN TO REMAIN FOR RECONNECTION. RETAIN AND CLEAN EXISTING EXHAUST GRILLE FOR REINSTALLATION. #M-101 KEYED RENOVATION NOTES 1 RE-USE EMPTY CONTROLS ENCLOSURE FOR RENOVATION BUILDING AUTOMATION CONTROLS. 2 PROVIDE PROCESS EXHAUST AIR VALVE ABOVE CEILING. 3 4" PROCESS EXHAUST AIR DUCT DROP BELOW CEILING. SUPPORT DUCT FROM UTILITY RACK. PROVIDE CONNECTION FOR 1" INSIDE DIAMETER BRAIDED HOSE AND NW25 PORT. PROCESS EXHAUST TO SERVE GLOVE BOX REGENERATION GAS DISCHARGE AND PURGE GAS DISCHARGE EXHAUST. 4 PROVIDE NEW FUME HOOD EXHAUST AIR VALVE AND CONNECT TO DDC CONTROLS. PROVIDE NEW FUME HOOD CONTROLLER AND SASH POSITION SENSORS. 5 PROVIDE NEW GENERAL EXHAUST AIR VALVE. CONNECT TO DDC CONTROLS. 6 PROVIDE MANUAL VENTILATION SHUTOFF SWITCH, BASIS OF DESIGN PILLA ELECTRICAL ST120. SWITCH SHALL BE LABELED "VENTILATION SYSTEM EMERGENCY SHUTOFF". CONNECT TO CONTROLS OF ALL SUPPLY AND EXHAUST AIR VALVES SERVING 330. CONTROL CONTRACTOR TO PROVIDE LOW VOLTAGE CONTROL WIRE ALONG WALL SURFACE INSIDE ROOM 330. SURFACE RACEWAY SHALL BE WIREMOLD 700. FIRESTOP CONDUIT PENETRATION IN WALL AND MAINTAIN WALL RATING. 7 REBALANCE EXISTING SUPPLY AIR GRILLES TO VALUES SPECIFIED AND AS REQUIRED TO MEET THE SPACE AIRFLOW SCHEDULED ON M-501. 9 5" PROCESS EXHAUST AIR DROP BELOW CEILING TO 12" ABOVE FINISH FLOOR. SUPPORT DUCT FROM UTILITY RACK. PROVIDE THREE (3) CONNECTIONS FOR 1" INSIDE DIAMETER BRAIDED HOSE AND NW25 PORT. PROCESS EXHAUST TO SERVE VACUUM PUMP EXHAUST. COORDINATE FINAL DUCT DROP LOCATION WITH OWNER. 10 4" PROCESS EXHAUST AIR DROP BELOW CEILING TO 12" ABOVE FINISH FLOOR. SUPPORT ON WALL. PROVIDE CONNECTION FOR 1" INSIDE DIAMETER BRAIDED HOSE AND NW25 PORT. PROCESS EXHAUST TO SERVE VACUUM PUMP EXHAUST. COORDINATE FINAL DUCT DROP LOCATION WITH OWNER. SCALE:1/4" = 1'-0"1 PARTIAL FIRST FLOOR MECHANICAL DEMOLITION PLAN SCALE:1/4" = 1'-0"2 PARTIAL FIRST FLOOR MECHANICAL CONSTRUCTION PLAN 1 06/09/20 ISSUED FOR DD REVIEW 2 07/09/20 ISSUED FOR 90% REVIEW 3 08/10/20 ISSUED FOR CONSTRUCTION 4 09/29/20 ISSUE FOR ADDENDUM NO. 3 4 4 N.C. AO REHEAT COILAO SAV-103 (E) FTR-103 SASH POSITION SENSOR 6' FUME HOOD (E) FUME HOOD MONITOR EAV-103-1 FLOW AIAO COMMAND FROM AHU-2 (E) SEQUENCE OF OPERATION SYSTEM DESCRIPTION EXISTING: SUPPLY AIR VALVES (SAV-103 (E), SAV-105 (E)) EXHAUST FANS (EF-10, EF-13) FUME HOODS DUCT MOUNTED RE-HEAT COILS AND BASEBOARD HEATING ROOM TEMPERATURE SENSORS ROOM OCCUPANCY SENSORS TO BE PROVIDED: FUME HOOD EXHAUST AIR VALVES (EAV-103-1, EAV-105-1) GENERAL EXHAUST AIR VALVES (EAV-103-2, EAV-105-2) PROCESS EXHAUST AIR VALVES (EAV-103-3, EAV-105-3) GENERAL ALL SETPOINTS SHALL BE ADJUSTABLE. REFER TO M-501R1 FOR CONTROL POINTS SCHEDULE. LABORATORY AIR CHANGE RATES ARE BASED ON TOTAL EXHAUST AIR FLOW FROM THE SPACE. THIS LABORATORY IS CURRENTLY SERVED BY AN EXISTING AUTOMATED LOGIC CONTROL SYSTEM. EXISTING POINTS ARE TO BE RE-UTILIZED FOR THE NEW SEQUENCE OF OPERATION WHERE FEASIBLE. THE BASIS OF DESIGN MAXIMUM AIRFLOWS ARE DESIGNED TO MAINTAIN A 100 FPM FACE VELOCITY AT THE FUME HOOD. HOWEVER, IT MAY BE POSSIBLE TO OPERATE THE FUME HOODS WITH A FACE VELOCITY OF 80 FPM. THIS WILL BE DETERMINED AT THE TIME OF FUME HOOD CERTIFICATION. THE BACS CONTRACTOR WILL BE RESPONSIBLE FOR BEING ON-SITE DURING FUME HOOD CERTIFICATION, AND RE-PROGRAM AS NEEDED TO RESET THE AIRFLOW SETPOINTS BASED ON THE CERTIFICATION PROCESS. SETPOINTS SPACE TEMPERATURE SETPOINTS: OCCUPIED:WINTER 72 °F, SUMMER 75°F +/-1.5 °F OCCUPIED SETBACK:WINTER 72 °F, SUMMER 75°F +/-3 °F UNOCCUPIED:WINTER 72 °F, SUMMER 75°F +/-6 °F AIRFLOW SETPOINTS ARE DETAILED IN THE AIRFLOW SCHEDULE, SEE M-501R1. DOWNSTREAM STATIC PRESSURE SETPOINT: DETERMINE DURING TESTING AND BALANCING EFFORTS. LABORATORY AIRFLOW CONTROL AIR VALVE POSITIONS SHALL BE BASED ON CONSTANT VOLUME AIRFLOW RATES SCHEDULES ON M-501R1. LAB VENTILATION SHUTOFF CONTROL THE LAB VENTILATION SHUTOFF CONTROL SWITCH IS MOUNTED OUTSIDE OF THE 330 LAB NEXT TO THE DOOR AS SHOWN ON PLAN. WHEN THIS SWITCH IS ENGAGED, ALL SUPPLY AND EXHAUST AIR VALVES THAT SERVE LAB 330 SHUT CLOSED AND THE LASER FAN AND THE POWER TO THE LASER IS DISENGAGED. AN ALARM SHALL BE GENERATED AT THE USER WORKSTATION. RESET OF THE AIRFLOW, LASER FAN AND LASER POWER TO NORMAL OPERATION SHALL BE MANUALLY ENGAGED AT THE USER WORKSTATION. EXISTING ZONE TEMPERATURE CONTROL TEMPERATURE SETPOINTS AND EXISTING CONTROL SEQUENCE SHALL REMAIN. EXISTING EXHAUST FAN CONTROL THE EXHAUST FAN SHALL BE ENABLED AT ALL TIMES AND RUN AT CONSTANT SPEED. EXISTING HEATING LOAD SHED UPON A STEAM LOAD SHED 1,2,3, OR 4 INPUT, THE ZONE SHALL INDEX TO UNOCCUPIED MODE, BUT SHALL BE RESETTABLE TO OCCUPIED MODE UPON OCCUPANCY. UPON A STEAM LOAD SHED 5 OR 6 INPUT, THE ZONE SHALL INDEX TO UNOCCUPIED MODE AIR CHANGE RATES, AND THE SPACE TEMPERATURE SETPOINT SHALL BE 60°F. LAB 103 AI SASH POSITION AI (FACE VELOCITY) BI (ALARM) BO (HOOD SETBACK COMMAND) EAV-103-2 FLOW AIAO COMMAND EF-10 (E) EAV-103-3 FLOW AIAO COMMAND N.C.REHEAT COILAO SAV-105 (E) FTR-105 SASH POSITION SENSOR 6' FUME HOOD (E) FUME HOOD MONITOR EAV-105-1 FLOW AIAO COMMAND LAB 105 AI SASH POSITION AI (FACE VELOCITY) BI (ALARM) BO (HOOD SETBACK COMMAND) EAV-105-2 FLOW AIAO COMMAND EAV-105-3 FLOW AIAO COMMAND OPEN TO ADJACENT LAB OPEN TO ADJACENT LAB 107 EF-13 (E) SA TO BUILDING S BI LAB VENTILATION SHUTOFF SWITCH S BI LAB VENTILATION SHUTOFF SWITCH CORN E LL U N I V E RSI TYFOU N D E D 5681 AD FACILITIES ENGINEERING ARCHIVE BAR CODEARCH/STRUCT: CIVIL/ENV: ELECTRICAL: MECHANICAL: DATE: FACILITY: DESIGN: DRAWN: WWW.FCS.CORNELL.EDU IT IS A VIOLATION OF NEW YORK STATE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT OR ENGINEER, TO ALTER THIS DOCUMENT IN ANY WAY. IF THIS DOCUMENT IS ALTERED, THE ALTERING ARCHITECT OR ENGINEER SHALL AFFIX TO SUCH DOCUMENT THEIR SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. WARNING REVISIONS ARCHITECTURAL, STRUCTURAL, CIVIL, ENVIRONMENTAL, MECHANICAL, AND ELECTRICAL ENGINEERING 201 HUMPHREYS SERVICE BLDG ITHACA, NEW YORK 14853-3701 113 HO PLAZA ITHACA, NEW YORK OLIN HALL - 103 YU LAB M-401R1 12672497 SEQUENCE OF OPERATION AND CONTROL GRAPHICS E. KOLACKI TRF 2024 AUGUST 10, 2020 SCALE:NO SCALE1BUILDING AUTOMATION AND CONTROL SYSTEM 1 06/09/20 ISSUED FOR DD REVIEW 2 07/09/20 ISSUED FOR 90% REVIEW 3 08/10/20 ISSUED FOR CONSTRUCTION 4 09/29/20 ISSUE FOR ADDENDUM NO. 3 4 4 *REHEAT CONTROL VALVE REPLACEMENT SCOPE REMOVED 1ST FLOOR 0' -0" 2ND FLOOR 14' -0" 1ST FLOOR 0' -0" 2ND FLOOR 14' -0" GLOVE BOX (EXG)4ø5ø CORN E LL U N I V E RSI TYFOU N D E D 5681 AD FACILITIES ENGINEERING ARCHIVE BAR CODEARCH/STRUCT: CIVIL/ENV: ELECTRICAL: MECHANICAL: DATE: FACILITY: DESIGN: DRAWN: WWW.FCS.CORNELL.EDU IT IS A VIOLATION OF NEW YORK STATE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT OR ENGINEER, TO ALTER THIS DOCUMENT IN ANY WAY. IF THIS DOCUMENT IS ALTERED, THE ALTERING ARCHITECT OR ENGINEER SHALL AFFIX TO SUCH DOCUMENT THEIR SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. WARNING REVISIONS ARCHITECTURAL, STRUCTURAL, CIVIL, ENVIRONMENTAL, MECHANICAL, AND ELECTRICAL ENGINEERING 201 HUMPHREYS SERVICE BLDG ITHACA, NEW YORK 14853-3701 113 HO PLAZA ITHACA, NEW YORK OLIN HALL - 103 YU LAB M-501R1 12672497 SCHEDULES, DETAILS, AND ELEVATIONS E. KOLACKI TRF 2024 AUGUST 10, 2020 AIR VALVE SCHEDULE & SPECS TAG # SERVES SUP EXH BASIS OF DESIGN SIZE DESIGN CFM ΔPT @ MAX DESIGN CFM REHEAT COIL TAG DAMPER POSITIONMANF MODEL MAX MIN EAV-103-1 LAB 103 FUME HOOD X ACCUVALVE AVC6210-03-W 10"1056 120 0.30 N/A N.O. EAV-103-3 LAB 103 PROCESS X ACCUVALVE AVC6406-03-W 8" 650 80 0.30 N/A N.O. EAV-103-2 LAB 103 GENERAL X ACCUVALVE AVC6408-03-W 8" 650 80 0.30 N/A N.O. EAV-105-1 LAB 105 FUME HOOD X ACCUVALVE AVC6210-03-W 10"1056 120 0.30 N/A N.O. EAV-105-3 LAB 105 PROCESS X ACCUVALVE AVC6406-03-W 8" 254 30 0.30 N/A N.O. EAV-105-2 LAB 105 GENERAL X ACCUVALVE AVC6406-03-W 8" 254 30 0.30 N/A N.O. AIRFLOW SCHEDULE LAB ROOM DIMENSIONS EXHAUST AIR SUPPLY AIR AREA (SF) HEIGHT (FT)EXHAUST POINT VALVE OCC SASH OPEN 100 FPM OCC SASH CLOSED UNOCC SASH FULL UNOCC SASH OPEN UNOCC SASH CLOSED SUPPLY POINT OCC SASH OPEN 100 FPM OCC SASH CLOSED UNOCC SASH FULL UNOCC SASH OPEN UNOCC SASH CLOSED XFER ALL MODES (CFM) 103 542 9 6' FUME HOOD (EXISTING TO REMAIN) EAV-103-1 785 CFM 785 CFM 785 CFM 785 CFM 785 CFM SAV-103 (E) 1350 CFM 1350 CFM 1350 CFM 1350 CFM 1350 CFM -100 CFM GENERAL EXHAUST EAV-103-2 365 CFM 365 CFM 365 CFM 365 CFM 365 CFM PROCESS EXHAUST EAV-103-3 300 CFM 300 CFM 300 CFM 300 CFM 300 CFM TOTAL LAB 1450 CFM 1450 CFM 1450 CFM 1450 CFM 1450 CFM EF-10 (EXISTING TO REMAIN)1450 CFM 1450 CFM 1450 CFM 1450 CFM 1450 CFM 105 559 9 6' FUME HOOD (EXISTING TO REMAIN) EAV-105-1 785 CFM 785 CFM 785 CFM 785 CFM 785 CFM SAV-105 (E) 1350 CFM 1350 CFM 1350 CFM 1350 CFM 1350 CFM -100 CFM GENERAL EXHAUST EAV-105-2 540 CFM 540 CFM 540 CFM 540 CFM 540 CFM PROCESS EXHAUST EAV-105-3 125 CFM 125 CFM 125 CFM 125 CFM 125 CFM TOTAL LAB 1450 CFM 1450 CFM 1450 CFM 1450 CFM 1450 CFM EF-13 (EXISTING TO REMAIN)1450 CFM 1450 CFM 1450 CFM 1450 CFM 1450 CFM HVAC PIPE AND FITTING SCHEDULE AND SPECIFICATIONS PIPE SERVICE ABBREVIATION PIPE SIZE MATERIAL FITTINGS JOINT INSULATION CONTROL VALVE SCHEDULE & SPEC TAG BOD MANF BOD VALVE MODEL SERVICE VALVE TYPE VALVE SIZE (IN)CV ACTUATOR MODEL CONTROL CAPACITY (GPM)MAX PD (PSIG) FAIL POS DUCT SCHEDULE AND SPECIFICATIONS SERVICE PRESSURE CLASS SEAL CLASS LEAKAGE CLASS DUCT MATERIAL LINING DUCT INSULATION SUPPLY, RECTANGULAR, CONCEALED (ABOVE CEILING) 4" POS A 6" POS/NEG G90 GALVANIZED NONE MIN R-6, TYPE A WITH VAPOR RETARDER SUPPLY, ROUND, CONCEALED (ABOVE CEILING) 4" POS A 3" POS/NEG G90 GALVANIZED NONE MIN R-6, TYPE A WITH VAPOR RETARDER EXHAUST, ROUND, GENERAL AND PROCESS 4" NEG A 3" POS/NEG G90 GALVANIZED NONE NONE EXHAUST, ROUND, FUME HOOD EXHAUST 4" NEG A 3" POS/NEG 316 STAINLESS STEEL, WELDED NONE NONE SCALE: NO SCALE 1 REHEAT COIL PIPING DETAIL 1 06/09/20 ISSUED FOR DD REVIEW 2 07/09/20 ISSUED FOR 90% REVIEW 3 08/10/20 ISSUED FOR CONSTRUCTION 4 09/29/20 ISSUE FOR ADDENDUM NO. 3 SCALE:1/4" = 1'-0"2 PROCESS EXHAUST AIR ELEVATION 1. ALL DUCTWORK AND ACCESSORIES SHALL BE FABRICATED AND INSTALLED IN COMPLIANCE WITH THE LATEST ISSUE OF SMACNA'S HVAC DUCT CONSTRUCTION STANDARDS -METAL AND FLEXIBLE. 2. CONSTRUCT TEES, BENDS, AND ELBOWS WITH RADIUS OF NOT LESS THAN 1.0 TIMES THE WIDTH OF DUCT ON CENTER LINES. 3. WHERE RECTANGULAR ELBOWS ARE USED, PROVIDE AIR FOIL TYPE TURNING VANES 4. INCREASE DUCT SIZES GRADUALLY, AND IN COMPLIANCE WITH FIGURE 4-7 OF SMACNA'S HVAC DUCT CONSTRUCTION STANDARDS -METAL AND FLEXIBLE. 5. BRANCH CONNECTIONS SHALL BE MADE WITH A 45 DEGREE ENTRY. STRAIGHT TEES ARE NOT ACCEPTABLE. 6. SEALANTS AND GASKETS: SURFACE BURNING CHARACTERISTICS SHALL BE A MAXIMUM FLAME-SPREAD INDEX OF 25, AND MAXIMUM SMOKE-DEVELOPED INDEX OF 50 WHEN TESTED TO UL 723. 7. ALL MANUAL BALANCING DAMPERS SHALL BE PROVIDED WITH LOCKING HAND QUADRANT. 8. ACCESS DOORS SHALL BE GALVANIZED SHEETMETAL WITH INSULATION FILL AND THICKNESS AS INDICATED FOR DUCT PRESSURE CLASS. 9. ACCESS DOORS SHALL BE INSTALLED IN THE FOLLOWING LOCATIONS: BOTH SIDES OF DUCT COILS IN ORDER TO RESET OR REINSTALL FUSIBLE LINKS, AND AS INDICATED. 10. INSTALL VOLUME DAMPERS AT POINTS ON SUPPLY AND EXHAUST SYSTEMS WHERE BRANCHES EXTEND FROM LARGER DUCTS. 11. PAINT ALL DUCTWORK EXPOSED TO VIEW IN OCCUPIED AREAS TO MATCH SURROUNDING FINISH. 12. REMOVE SURFACE CONTAMINANTS AND DEPOSITS FROM DUCTWORK AND EQUIPMENT PRIOR TO TESTING AND BALANCING. 13. LEAK TESTING OF DUCTWORK SHALL BE IN ACCORDANCE WITH SMACNA'S HVAC AIR DUCT LEAKAGE TEST MANUAL. 14. ALL DUCTS DESIGNED TO OPERATE AT STATIC PRESSURES IN EXCESS OF 3-INCHES WG (POS OR NEG) SHALL BE TESTED. TEST SHALL BE WITNESSED BY A DESIGNATED CORNELL REPRESENTATIVE AND THE PROJECT ENGINEER OF RECORD. 25% OF DUCTS DESIGNED TO OPERATE AT STATIC PRESSURES 3-INCHES AND BELOW SHALL BE TESTED. ACCEPTANCE CRITERIA: INTERIOR SUPPLY, RETURN AND GENERAL EXHAUST: 5% SYSTEM LEAKAGE TESTED AT 1.25 TIMES THE EXPECTED OPERATING STATIC PRESSURE. ACCEPTANCE CRITERIA: INTERIOR LABORATORY EXHAUST SYSTEMS: 2% SYSTEM LEAKAGE TESTED AT 1.25 TIMES THE EXPECTED OPERATING STATIC PRESSURE. AN AIR DUCT LEAKAGE TEST SUMMARY SHALL BE SUBMITTED TO THE ENGINEER FOR APPROVAL PRIOR TO FINAL PROJECT ACCEPTANCE. 15. ALL INSULATION AND ADHESIVE SHALL HAVE A MAXIMUM FLAME-SPREAD INDEX OF 25 AND A MAXIMUM SMOKE-DEVELOPED INDEX OF 50 WHEN TESTED IN ACCORDANCE WITH ASTM E84. 16. INSULATION TYPE A: MINERAL FIBERGLASS BLANKET, ASTM C553 TYPE I, ASTM C1136 TYPE I FACTORY APPLIED FSK JACKET, K-VALUE BETWEEN 0.22 -0.29 BTU-IN/HR-FT²-˚F @ 75 ˚F, 0.75 PCF 1. OCCUPIED SASH OPEN MODE: FUME HOOD EXHAUST AIRFLOW REPRESENTS A 100 FPM FACE VELOCITY AT 18-INCH SASH HEIGHT. 2. COORDINATE WITH CORNELL EH&S DURING FUME HOOD TESTING AND CERTIFICATION. REDUCTION IN THE FUME HOOD FACE VELOCITY TO 80 FPM MAY BE POSSIBLE. CONTROL AND ALARM POINTS SCHEDULE LAB 105 HARDWARE POINTS SOFTWARE POINTS SHOW ON GRAPHIC NOTESBI BO AI AO AV BV SCH TREND ALARM BACS EMCS DESCRIPTION EAV-103-1, AIRFLOW (CFM)X X X EAV-103-1, AIRFLOW SETPOINT (CFM)X X 10% DEVIATION FROM SETPOINT EAV-103-1, FUME HOOD UNOCC COMMAND X X EAV-103-1, VALVE POSTION COMMAND (CFM)X X SERVES NEW EXHAUST VALVE ON EXISTING FUME HOOD EAV-103-2, AIRFLOW (CFM)X X X EAV-103-2, AIRFLOW SETPOINT (CFM)X X EAV-103-2, VALVE POSITION COMMAND (CFM)X X EAV-103-3, AIRFLOW (CFM)X X X SERVES NEW PROCESS EXHAUST VALVE EAV-103-3, AIRFLOW SETPOINT (CFM)X X SERVES NEW PROCESS EXHAUST VALVE EAV-103-3, VALVE POSITION COMMAND (CFM)X X 10% DEVIATION FROM SETPOINT SERVES NEW PROCESS EXHAUST VALVE EAV-105-1, AIRFLOW (CFM)X X X EAV-105-1, AIRFLOW SETPOINT (CFM) EAV-105-1, FUME HOOD UNOCC COMMAND X X EAV-105-1, VALVE POSITION COMMAND (CFM)X X SERVES NEW EXHAUST VALVE ON EXISTING FUME HOOD EAV-105-2, AIRFLOW (CFM)X X X EAV-105-2, AIRFLOW SETPOINT (CFM)X X EAV-105-2, VALVE POSITION COMMAND (CFM)X X EAV-105-3, AIRFLOW (CFM)X X X SERVES NEW PROCESS EXHAUST VALVE EAV-105-3, AIRFLOW SETPOINT (CFM)X X SERVES NEW PROCESS EXHAUST VALVE EAV-105-3, VALVE POSITION COMMAND (CFM)X X 10% DEVIATION FROM SETPOINT X SERVES NEW PROCESS EXHAUST VALVE LAB 103 FUME HOOD SASH POSITION X X X SASH OPEN (18") FOR 24 CONTINUOUS HOURS OR MORE X PROVIDE SASH SENSOR ON EXISTING FUME HOOD LAB 103 FUME HOOD STATUS (ALARM)X X X LOW FACE VELOCITY X SERVES EXISTING FUME HOOD LAB 103 FUME HOOD VELOCITY (FPM)X X PROVIDE NEW FUME HOOD MONITOR ON EXISTING FUME HOOD LAB 103 VENTILATION SHUTOFF SWITCH X X X LAB 105 FUME HOOD SASH POSITION X X X SASH OPEN (18") FOR 24 CONTINUOUS HOURS OR MORE X PROVIDE SASH SENSOR ON EXISTING FUME HOOD LAB 105 FUME HOOD STATUS (ALARM)X X X LOW FACE VELOCITY X SERVES EXISTING FUME HOOD LAB 105 FUME HOOD VELOCITY (FPM)X X PROVIDE NEW FUME HOOD MONITOR ON EXISTING FUME HOOD LAB 105 VENTILATION SHUTOFF SWITCH X X X 1. THE AIRFLOW DEVICES SHALL BE CALIBRATED AT THE FACTORY TO THE FULL RANGE OF RECOMMENDED AIRFLOWS. ACTUAL AIRFLOWS WILL BE SET IN SOFTWARE. 2. SETPOINTS REPRESENT FUME HOOD FACE VELOCITY AT 100 FPM. FINAL SETPOINTS WILL BE ADJUSTED IF FACE VELOCITIES ARE REDUCED TO 80 FPM AS A RESULT OF FUME HOOD TESTING AND CERTIFICATION. 3. ACCEPTABLE MANUFACTURERS: ACCUTROL 4. CONFIGURATION: PRESSURE INDEPENDENT WITH TIGHT SHUTOFF. 5. HOOD EXHAUST VALVE BODY: 20 GA 304 STAINLESS STEEL. 6. INSTALLATION: LEVEL AND PLUMB, PER NFPA 90A, SMACNA DUCT CONSTRUCTION STANDARDS, AND MANUFACTURERS RECOMMENCED INSTRUCTIONS. 4 4 *REHEAT CONTROL VALVE REPLACEMENT REMOVED *REHEAT CONTROL VALVE REPLACEMENT REMOVED 4 4 4