Loading...
HomeMy WebLinkAboutOlin Hall 103, 105, 107 Lab Renovation Drawings_INDEXEDCB CBCB CB CB CB CB CB CB CB CB CB CB CB CB CB CB CB CB CB CB CB CB CB CB CB CB CB CB CBCB CB CB CB CB CB 191920202021212121202020201919 191920202021212121202020201919 191920202021212121202020201919 191920202021212121202020201919 1919202020212121212020202019191919 212020202021 2121212121212121212121212121 PAVED PARKING PAVED PARKING UNPAVED PARKING UNPAVED PARKING SS S SIGN 2024 OLIN HALL CAMPUS ROAD HOY ROADEXTERIOR ELEVATION 1 X-100 X-100 1 1 INTERIOR ELEVATION 1 X-100 SECTION MARKER 1 X-100 ENLARGED DETAIL CONSTRUCTION KEYED NOTE DEMOLITION KEYED NOTE DRAWING REVISION NOTE LINETYPE: TO BE PROVIDED / NEW LINETYPE: DEMOLITION / TO BE RELOCATED LINETYPE: EXISTING TO REMAIN # # # 1 1 1 11 APPLICABLE CODES 2020 NYS BUILDING CODE 2020 NYS EXISTING BUILDING CODE 2020 NYS FIRE CODE 2020 NYS PLUMBING CODE 2020 NYS MECHANICAL CODE 2020 NYS ENERGY CONSERVATION CODE 2009 ICC A117.1 ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES 2010 AMERICANS WITH DISABILITY ACT (ADA) PROJECT SUMMARY THIS PROJECT INCLUDES THE RENOVATION OF ABOUT 1,700 SF OF WET LABORATORY SPACES. ALTERATION LEVEL 2: LEVEL 2 ALTERATIONS INCLUDE THE RECONFIGURATION OF SPACE, THE ADDITION OR ELIMINATION OF ANY DOOR OR WINDOW, THE RECONFIGURATION OR EXTENTION OF ANY SYSTEM, OR THE INSTALLATION OF ANY ADDITIONAL EQUIPMENT. AN EXISTING BUILDING OR PORTION THEREOF SHALL NOT BE ALTERED SUCH THAT THE BUILDING BECOMES LESS SAFE THAN ITS EXISTING CONDITIONS. BUILDING LIMITATIONS CONSTRUCTION CLASSIFICATION:IIA CLASSIFICATION OF HAZARDS:MAQ IN PROGRESS HIGH-RISE BUILDING:NO EXTINGUISHING REQUIREMENT:THE EXISTING BUILDING IS FULLY SPRINKLERED. OCCUPANCY OF AREA OF WORK OCCUPANCY CLASSIFICATION:BUSINESS (B / HIGHER EDUCATION LABORATORY) AREA OF WORK T-001 TITLE SHEET ARCHITECTURAL A-001 CODE COMPLIANCE PLAN, GENERAL NOTES, AND ABBREVIATIONS A-101 PLANS AND 3D OVERVIEWS A-102 EQUIPMENT SCHEDULE AND PLATFORM DETAILS FIRE PROTECTION FP-001 FIRE PROTECTION SCOPE OF WORK, GENERAL NOTES, AND SCHEDULES FP-101 PARTIAL FIRST FLOOR DEMOLITION AND CONSTRUCTION PLANS PLUMBING P-001 SCOPE OF WORK, GENERAL NOTES, SCHEDULES, AND SYMBOL LEGENDS P-101 PARTIAL FIRST FLOOR DEMOLITION AND CONSTRUCTION PLANS P-401 PROCESS GAS PIPING SCHEMATIC DETAIL MECHANICAL M-001 SCOPE OF WORK, GENERAL NOTES, SUBMITTAL SCHEDULE, AND SYMBOL LEGENDS M-101 PARTIAL FIRST FLOOR DEMOLITION AND CONSTRUCTION PLANS M-102 PARTIAL FOURTH FLOOR CONSTRUCTION PLAN M-401 SEQUENCE OF OPERATION AND CONTROL GRAPHICS M-501 SCHEDULES, DETAILS, AND ELEVATIONS ELECTRICAL E-001 GENERAL NOTES AND SYMBOL LEGENDS E-101 POWER, DATA, LIGHTING, AND FIRE ALARM PARTIAL FIRST FLOOR PLANCORNE LL U N I V E R SI TYFOUN D E D 5681AD CORN E LL U N I V E R SI TYFOU N D E D 5681 AD FACILITIES ENGINEERING ARCHIVE BAR CODEITHACA, NEW YORK ARCH/STRUCT: CIVIL/ENV: ELECTRICAL: MECHANICAL: DATE: FACILITY: DESIGN: DRAWN: WWW.FCS.CORNELL.EDU IT IS A VIOLATION OF NEW YORK STATE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT OR ENGINEER, TO ALTER THIS DOCUMENT IN ANY WAY. IF THIS DOCUMENT IS ALTERED, THE ALTERING ARCHITECT OR ENGINEER SHALL AFFIX TO SUCH DOCUMENT THEIR SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. WARNING REVISIONS ARCHITECTURAL, STRUCTURAL, CIVIL, ENVIRONMENTAL, MECHANICAL, AND ELECTRICAL ENGINEERING 201 HUMPHREYS SERVICE BLDG ITHACA, NEW YORK 14853-3701 Cornell University 113 HO PLAZA OLIN HALL - 103 YU LAB T-001 12672497 TITLE SHEET FE DESIGN NH 2024 AUGUST 11, 2020 OLIN HALL - 103 YU LAB BUILDING CODE SUMMARYGENERAL SYMBOLS LEGEND DRAWING INDEX PROJECT SCOPE THE PURPOSE OF THIS PROJECT IS TO RENOVATE THREE ADJACENT WET LABORATORY SPACES (ROOMS 103, 105 AND 107) IN OLIN HALL. THE MAJORITY OF DEMOLITION AND NEW WORK TAKES PLACE IN ROOM 103, WHILE EXISTING CONDITIONS IN 105 AND 107 LARGELY REMAIN WITH SOME UPGRADES AS IDENTIFIED IN THIS SET OF DOCUMENTS. PERSPECTIVE VIEWSITE LOCATION -OLIN HALL KEY PLAN -FIRST FLOOR 1 06/09/20 ISSUED FOR DD REVIEW 2 07/09/20 ISSUED FOR 90% REVIEW 3 08/11/20 ISSUED FOR CONSTRUCTION CB CB CBCB CB CB CB CB CB CB CB OLIN HALL 103, 105, 107 LAB RENOVATION CB CB CB CB CB CB CB CB CB CB CB OLIN HALL 103, 105, 107 LAB RENOVATION WALL -EXISTINGWALL -METAL STUD/ GWBWALL -CONCRETEWALL -CMUWALL -BRICKITEMS FOR DEMOLITIONDOOR/ WALL -EXISTINGDOOR/ WALL -NEWDOOR/ WALL -DEMOLITIONTAG -DOORTAG -WINDOWTAG -WALLTAG -ROOM #CENTER LINEPHOTO REFERENCELEVEL MARKERCOLUMN GRID MARKERELEVATION MARKERELEVATION CHANGE ARROWSBREAK LINESYMBOLS0' -0"1011tX-XX2B00UACL1NameElevationA1011110DNUP1-HOUR FIRE SEPARATION2-HOUR FIRE SEPARATIONABBREVIATIONSA&AND@ATACTACOUSTICAL CEILING TILEALTALTERNATEALUMALUMINUMAVGAVERAGEAFFABOVE FINISH FLOORBBDBOARDBLDGBUILDINGBODBOTTOM OF DECKBSMTBASEMENTCCGCORNER GUARDSCJCONTROL JOINTCLGCEILINGCLCENTER LINECLRCLEARCMUCONCRETE MASONRY UNITCOLCOLUMNCONCCONCRETECONFCONFERENCECONTCONTINUOUSCORRCORRIDORCPTCARPETCRSCOURSE(S)CTCERAMIC TILEDDEMODEMOLITIONDFDRINKING FOUNTAINDIADIAMETERDIMDIMENSIONDNDOWNDODOOR OPENINGDWGDRAWINGEEAEACHEJEXPANSION JOINTELECELECTRICELEVELEVATION/ ELEVATOREPDMRUBBER ROOF MEMBRANEEQEQUALEX'GEXISTINGEXTEXTERIORFFDFLOOR DRAINFDNFOUNDATIONFECFIRE EXTINGUISHER CABINETFFEFINISH FLOOR ELEVATIONFRPFIBER REINFORCED POLYESTERFTFOOT/FEETFTGFOOTINGGGAGAGEGALVGALVANIZEDGCGENERAL CONTRACTORGENGENERALGLGLASSGWBGYPSUM WALL BOARDHHCHANDICAPPEDHTHEIGHTHMHOLLOW METALHRHOURHVACHEATING, VENTILATING & ACJJANJANITORLLAVLAVATORYLB/#POUNDLGMFLIGHT GAGE METAL FRAMINGMMFRMANUFACTURERMATMATERIALMAXMAXIMUMMEZZMEZZANINEMINMINIMUMMOMASONRY OPENINGMTLMETALNNANOT APPLICABLENICNOT IN CONTRACTNRNOT RATEDNTSNOT TO SCALEOOCON CENTERODOUTSIDE DIAMETEROPNGOPENINGOSBORIENTER STRAND BOARDP+/-PLUS OR MINUSPSFPOUNDS PER SQUARE FOOTPSIPOUNDS PER SQUARE INCHPTPRESSURE TREATEDQQTYQUANTITYRRRISERRCPREFLECTED CEILING PLANRDROOF DRAINREFREFRIGERATORREQREQUIREDREVREVISIONROROUGH OPENINGRTUROOF TOP UNITSSHTGSHEATHINGSIMSIMILARSFSQUARE FOOT/ FEETSSSTAINLESS STEELSTLSTEELSTDSTANDARDTTTREADT&GTONGUE & GROOVETELTELEPHONETEMPTEMPERATURETOSTOP OF STEELTVTELEVISIONTYPTYPICALUUEVUNEVEN DOORS W/ VISION PANELUEFUNEVEN FLUSH DOOR VVCTVINYL COMPOSITION TILEVIFVERIFY IN FIELDWW/OWITHOUTWDWOODAREA OF WORKCOMMON PATH OF EGRESS: 42 FEET(IBC 1006.1.2: MAX 100' WITH SPRINKLER SYSTEM)TRAVEL DISTANCE TO EXIT: 114 FEET(IBC 1017.2: MAX 300' WITH SPRINKLER SYSTEM)OLIN B-CA1ESTABLISHED CONTROL AREA 2015 OLIN 1-CA12020 MODIFICATION OF ESTABLISHED CONTROL AREA 2014OLIN 1-CA2ESTABLISHED CONTROL AREA 2014 APPLICABLE CODES2020 NYS BUILDING CODE2020 NYS EXISTING BUILDING CODE2020 NYS FIRE CODE2020 NYS PLUMBING CODE2020 NYS MECHANICAL CODE2020 NYS ENERGY CONSERVATION CODE2009 ICC A117.1 ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES2010 AMERICANS WITH DISABILITY ACT (ADA)PROJECT SUMMARYTHIS PROJECT INCLUDES THE RENOVATION OF ABOUT 1,700 SF OF WET LABORATORY SPACES. ALTERATION LEVEL 2: LEVEL 2 ALTERATIONS INCLUDE THE RECONFIGURATION OF SPACE, THE ADDITION OR ELIMINATION OF ANY DOOR OR WINDOW, THE RECONFIGURATION OR EXTENTION OF ANY SYSTEM, OR THE INSTALLATION OF ANY ADDITIONAL EQUIPMENT.AN EXISTING BUILDING OR PORTION THEREOF SHALL NOT BE ALTERED SUCH THAT THE BUILDING BECOMES LESS SAFE THAN ITS EXISTING CONDITIONS.BUILDING LIMITATIONSCONSTRUCTION CLASSIFICATION:IIACLASSIFICATION OF HAZARDS:MAQ IN PROGRESSHIGH-RISE BUILDING:NOEXTINGUISHING REQUIREMENT:THE EXISTING BUILDING IS FULLY SPRINKLERED. OCCUPANCY OF AREA OF WORKOCCUPANCY CLASSIFICATION:BUSINESS (B / HIGHER EDUCATION LABORATORY)CORNELLUNIVER S I T Y F O U NDED5681ADFACILITIESENGINEERINGARCHIVE BAR CODEITHACA, NEW YORKARCH/STRUCT:CIVIL/ENV:ELECTRICAL:MECHANICAL:DATE:FACILITY:DESIGN:DRAWN:WWW.FCS.CORNELL.EDUIT IS A VIOLATION OF NEW YORK STATE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT OR ENGINEER, TO ALTER THIS DOCUMENT IN ANY WAY. IF THIS DOCUMENT IS ALTERED, THE ALTERING ARCHITECT OR ENGINEER SHALL AFFIX TO SUCH DOCUMENT THEIR SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.WARNINGREVISIONSARCHITECTURAL, STRUCTURAL, CIVIL, ENVIRONMENTAL, MECHANICAL, AND ELECTRICAL ENGINEERING201 HUMPHREYS SERVICE BLDGITHACA, NEW YORK 14853-3701113 HO PLAZAOLIN HALL - 103YU LABA-00112672497CODECOMPLIANCEPLAN, GENERALNOTES, ANDABBREVIATIONSN.HACHMANNNH2024AUGUST 11, 2020GENERAL NOTES1.0 DESIGN, CONSTRUCTION AND SAFETY SHALL CONFORM TO ALL LOCAL, STATE ANDOWNER SPECIFIC CODES, INCLUDING (BUT NOT LIMITED TO) THE NEW YORK STATEUNIFORM FIRE PROTECTION AND BUILDING CODE, LATEST REVISION, THE NFPA 101LIFE SAFETY CODE, LATEST REVISION, ANSI A117.1 - LATEST REVISION, OSHA, ANDANY OTHER CODES GOVERNED BY THE JURISDICTION IN WHICH THIS PROJECT ISBEING CONSTRUCTED.2.0 THIS CONTRACT REQUIRES COMPLETE, FINISHED WORKABLE PROJECT OF THEAREAS INDICATED BY THE CONTRACT DOCUMENTS, AND SHALL INCLUDE ALLMATERIALS AND LABOR NECESSARY TO COMPLETE, REGARDLESS OF WHETHER ORNOT ALL WORK OR EACH ITEM IS SPECIFICALLY INDICATED ON ANY OTHERPORTION OF THE DRAWINGS AND / OR NOTES.3.0 WHERE MATERIALS REFERENCED ON DRAWINGS, OR NECESSARY TO COMPLETETHE WORK OF THIS CONTRACT ARE NOT SPECIFIED HEREIN, PROVIDE BESTQUALITY MATERIALS. WHERE MATERIALS ARE INTENDED TO MATCH EXISTING,PROVIDE CLOSEST POSSIBLE MATCH, SUBJECT TO OWNER'S APPROVAL. ALL ITEMSAND WORK ON DRAWINGS ARE NEW, UNLESS INDICATED EXISTING. ALL WORKWHICH HAS BEEN DAMAGED SHALL BE REPAIRED OR REPLACED AT NO COST TOTHE OWNER. WHERE ITEMS CAN NOT BE REPAIRED TO A ""NEW CONDITION"", ORWHERE THE STRUCTURAL INTEGRITY HAS BEEN AFFECTED, ITEMS SHALL BEREPLACED AT NO COST TO THE OWNER.4.0 CONTRACTOR IS RESPONSIBLE TO VERIFY ALL SITE, FIELD AND BUILDINGCONDITIONS PRIOR TO SUBMITTING BIDS AND COMMENCING WORK. IF THERE AREANY DISCREPANCIES BETWEEN DRAWINGS AND FIELD CONDITIONS, NOTIFY THEPROJECT MANAGER, WHO WILL REQUEST CLARIFICATION FROM THEARCHITECT/ENGINEER AND PROVIDE CLARIFICATION IN WRITING.5.0 WHERE EXISTING CONSTRUCTION OR ITEMS HAVE BEEN INFILLED, REMOVED AND /OR DISTURBED FOR INSTALLATION OF NEW WORK, CAUSING THE EXPOSURE OFUNFINISHED AND/OR DAMAGED SURFACES RESULTING SURFACES AND INFILLEDSURFACES SHALL BE RECONSTRUCTED WITH MATERIALS TO MATCH FINISHEDAREAS. ALL ABANDONED OPENINGS (i.e. DUCT/PIPE REMOVALS, ETC.) AT WALLS,ROOF OR FLOOR TO BE INFILLED SOLID.6.0 WORK IS REQUIRED IN VARIOUS PORTIONS OF THE FACILITY TO EXECUTE WORK OFOTHER TRADES (i.e. ELECTRICAL, MECHANICAL). ALTHOUGH NOT NECESSARILYSHOWN ON DRAWINGS, WORK IS REQUIRED IN THESE AREAS CONSISTING OFREMOVAL / REPLACEMENT OF CEILINGS, WALLS, FINISHES, PAVEMENT AND OTHERCONSTRUCTION AS NECESSARY TO PERFORM WORK AND RESTORE THESESPACES OR AREAS TO ORIGINAL CONDITION.7.0 GENERAL CONTRACTOR IS TO COORDINATE WORK OF ALL TRADES. SCHEDULEWORK PROGRESS THROUGHOUT THE ENTIRE PROJECT TO PREVENT CONFLICTSAND INTERFERENCES. OBTAIN ALL NECESSARY INFORMATION SUCH AS SIZES,LOCATIONS, TEMPLATES, LAYOUT, DIMENSIONS AND ALL OTHER INFORMATIONNECESSARY FOR A PROPER AND WELL COORDINATED INSTALLATION. PRIOR TOINSTALLATION OF ITEMS, VERIFY AND CONFIRM WITH EACH CONTRACTOR EXACTLOCATION OF ALL ITEMS.8.0 ALL PENETRATIONS (EXISTING OR NEW) THROUGH FLOORS AND FULL HEIGHTWALLS - IN AREA OF WORK TO BE FIRE STOPPED. ALL GAPS AND JOINTS AT RATEDFLOORS, ROOFS AND WALLS TO BE FIRE & SMOKE STOPPED. GAPS AND JOINTSINCLUDE (BUT ARE NOT LIMITED TO) TOP OF WALL TO FLOOR OR ROOF DECK, WALLTO BEAMS, AND CONTROL OR EXPANSION JOINTS. FIRE STOPPING INCLUDES BOTHFORM OR PACKING MATERIAL AND THE FILL, VOID OR CAVITY MATERIAL. PROVIDEAND INSTALL LABELING REQUIRED BY CODE. LABELS SHALL INCLUDEPENETRATION TYPE WITH UL LISTING USED, MATERIAL USED, DATE INSTALL ANDNAME OF INSTALLER.9.0 JOBSITE WILL BE CLEANED DAILY AND DEBRIS REMOVED TO CONTAINERS OR TOVEHICLE WHICH WILL REMOVE DEBRIS FROM CAMPUS. CONTAINERS WILL BEREMOVED AS SOON AS FULL OR WHEN THE PROJECT HAS PROGRESSED TO APOINT THAT A CONTAINER IS NO LONGER REQUIRED.10.0 CONTRACTOR IS RESPONSIBLE FOR PROTECTING ALL AREAS USED TO BRINGSUPPLIES AND EQUIPMENT INTO THE PROJECT AREA. ANY DAMAGE TO AREASOUTSIDE THE PROJECT AREA INCLUDING BUT NOT LIMITED TO THE LOBBY ANDCORRIDOR SHALL BE REPAIRED AT NO COST TO THE OWNER.SCALE:1/16" = 1'-0"2FIRST FLOOR CODE COMPLIANCE PLAN0' 8'16' 32'SCALE: 1/16"=1'-0"SCALE:1" = 40'-0"1FIRST FLOOR CONTROL AREASBUILDING CODE SUMMARY0' 20' 40' 80'SCALE: 1"=40'-0"1 06/09/20 ISSUED FOR DD REVIEW2 07/09/20 ISSUED FOR 90% REVIEW3 08/11/20 ISSUED FOR CONSTRUCTION CBCBCBCB CBCBCBCBCBCBCB OLIN HALL 103,105, 107 LABRENOVATION UP UP DN UP UP DN UP UPDN UP DN UP DN DN 2 4 7 3 5 5 5 5 6 2 77 2 A-102 571 SF EXG EXG 107 EXG PT-1 559 SF EXG EXG 105 EXG PT-1 543 SF EXG EXG 103 EXG PT-1 1 11 2 3 5 4 76 22 33 44 6 77 8 1212 12 11 14 13 13 9 101010 A-102 1 9' - 0"9' - 0"9' - 0" ROOM NUMBER CEILING FINISH WALL FINISH FLOOR FINISH WALL BASE ROOM AREA CORN E LL U N I V E R SI TYFOU N D E D 5681 AD FACILITIES ENGINEERING ARCHIVE BAR CODEITHACA, NEW YORK ARCH/STRUCT: CIVIL/ENV: ELECTRICAL: MECHANICAL: DATE: FACILITY: DESIGN: DRAWN: WWW.FCS.CORNELL.EDU IT IS A VIOLATION OF NEW YORK STATE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT OR ENGINEER, TO ALTER THIS DOCUMENT IN ANY WAY. IF THIS DOCUMENT IS ALTERED, THE ALTERING ARCHITECT OR ENGINEER SHALL AFFIX TO SUCH DOCUMENT THEIR SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. WARNING REVISIONS ARCHITECTURAL, STRUCTURAL, CIVIL, ENVIRONMENTAL, MECHANICAL, AND ELECTRICAL ENGINEERING 201 HUMPHREYS SERVICE BLDG ITHACA, NEW YORK 14853-3701 113 HO PLAZA OLIN HALL - 103 YU LAB A-101 12672497 PLANS AND 3D OVERVIEWS N.HACHMANN NH 2024 AUGUST 11, 2020 A-101 KEYED RENOVATION NOTES 1 IN WORK AREA INSPECT EXISTING PARTITONS UP TO DECK. USE APPROPRIATE FIRE-STOPPING MATERIAL TO FILL IN ANY OPEN PENETRATIONS TO CONFIRM FIRE RATING IN WORK AREA AS INDICATED ON CODE COMPLIANCE PLAN. 2 PATCH ALL HOLES IN WALLS AND TO MATCH ADJACENT SURFACE AND PREPARE FOR PAINTING 3 TOUCH UP PAINT IN ALL ROOMS WITH PT-1. ASSUME 25% OF WALL AREA. 4 PAINT MISCELLANEOUS PIPING AND CONDUIT TO MATCH ADJACENT SURFACE. 5 PAINT DOOR FRAME PT-2 6 ELECTROSTATICALLY PAINT ALL METAL SURFACES IN ROOMS 103 AND 105 COLOR PT-1. THIS INCLUDES ALL LABORATORY CASEWORK, TALL CABINETS. FUME HOODS, AND TABLES 7 REINSTALL SUSPENDED CEILING SYSTEM AFTER THE COMPLETION OF MECHANICAL, ELECTRICAL, AND PLUMBING WORK. REPLACE ANY DAMAGED PIECES WITH NEW ACOUSTICAL CEILING PANELS AND GRID TO MATCH EXISTING. 8 AT LOCATION OF REMOVED CASEWORK, REPAIR FLOOR AND FINISH TO MATCH EXISTING ADJACENT FINISH. 9 UNISTRUT PLATFORM SYSTEM. BOTTOM AT 7'-6" AFF. AT LIGHT FIXTURE LOCATION, CONTINUE VERTICALS TO DECK WITHOUT HORIZONTAL P1101 AT CEILING LEVEL. 10 REINSTALL SUSPENDED CEILING SYSTEM AND ALL ASSOCIATED CONSTRUCTION AFTER COMPLETION OF MEPFP WORK. REPLACE ANY DAMAGED CEILING PIECES WITH NEW ACOUSTICAL CEILING PANELS AND GRID TO MATCH EXISTING. 11 FURNISH AND INSTALL ADA SINK CABINET. BASIS OF DESIGN MODEL: MOTT "KNEE SPACE SINK CABINET", 48"W x 24"D x 31-3/4"H, WHITE, ADA COMPATIBLE, WITH 1" BLACK EPOXY RESIN COUNTER. COORDINATE WITH PLUMBING SCOPE. 12 SEE MECHANICAL, ELECTRICAL, PLUMBING AND FIRE PROTECTION DRAWING FOR SCOPE INFORMATION 13 RELOCATED TABLE BY OWNER 14 REPURPOSED TABLE BY OWNER # A-101 KEYED DEMOLITION NOTES 1 HAZARDOUS MATERIALS ARE NOT EXPECTED. ALERT OWNER IF ENCOUNTERING SUSPICIOUS MATERIAL. OWNER WILL PERFORM REMOVAL OF ASBESTOS AND PCB CONTAINING MATERIAL. 2 REMOVE EXISTING CABINETRY WHERE NOTED. COORDINATE WITH MEPFP DRAWINGS. 3 CUT COUNTERTOP AND REMOVE EXISTING SINK CABINET. TURN OVER TO OWNER. COORDINATE WITH MEPFP DRAWINGS. 4 CAREFULLY REMOVE WALL MOUNTED ITEMS AND TURN OVER TO OWNER. 5 CAREFULLY REMOVE EXISTING FURNISHING. STORE AND REINSTALL IN NEW LOCATION FOLLOWING COMPLETION OF NEW CONSTRUCTION WORK. 6 REMOVE DOOR AND HARDWARE COMPLETELY. PATCH HOLES IN FRAME AND PREPARE FOR PAINITING. 7 CAREFULLY REMOVE THE PORTION OF THE EXISTING SUSPENDED CEILING SYSTEM AS REQUIRED TO INSTALL UNISTRUT CLOUD AND TO PERFORM MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE PROTECTION WORK. SALVAGE FOR REINSTALLATION AFTER COMPLETION OF MEPFP WORK. # 0' 2' 4' 8' SCALE: 1/4"=1'-0" SCALE:1/8" = 1'-0"1 PARTIAL FIRST FLOOR DEMOLITION PLAN SCALE:1/4" = 1'-0"3 PARTIAL FIRST FLOOR PLAN SCALE:1/8" = 1'-0"2 PARTIAL FIRST FLOOR RCP EXG EXISTING TO REMAIN PT-1 PAINT -INTERIOR WALLS AND METAL SURFACES: BENJAMIN MOORE, COLOR: 912 "LINEN WHITE" INTERIOR WALLS: EGGSHELL METAL SURFACES: SEMI-GLOSS ELECTROSTATIC PT-2 PAINT -DOOR FRAMES -MATCH EXISTING COLOR BENJAMIN MOORE, COLOR: XXXX "XXX", SEMI-GLOSS FINISH LEGEND (BASIS-OF-DESIGN PRODUCTS) 0' 4' 8'16' SCALE: 1/8"=1'-0" 1 06/09/20 ISSUED FOR DD REVIEW 2 07/09/20 ISSUED FOR 90% REVIEW 3 08/11/20 ISSUED FOR CONSTRUCTION SUBMITTAL REGISTRY SECTION DESCRIPTION REQUIRED SUBMITTALS 05 50 00 - METAL FABRICATIONS UNISTRUT PLATFORM SYSTEM PRODUCT DATA, SHOP DRAWINGS 07 84 13 - PENETRATION FIRESTOPPING WALL AND FLOOR PENETRATION FIRESTOPPING PRODUCT DATA 07 92 00 - SEALANTS PRODUCT DATA 09 91 23 - INTERIOR PAINTING LATEX PAINT FOR WALLS PRODUCT DATA 09 91 23 - INTERIOR PAINTING ELECTROSTATIC PAINTING FOR METAL CABINETRY PRODUCT DATA 12 35 53 - LABORATORY CASEWORK ADA SINK CABINET AND EPOXY RESIN STEPPED SINK PRODUCT DATA, SHOP DRAWINGS SCALE:NO SCALE53D OVERVIEW FROM SOUTHWEST SCALE: NO SCALE 4 3D OVERVIEW FROM NORTHEAST CB CB CBCB CB CB CB CB CB CB CB OLIN HALL 103, 105, 107 LAB RENOVATION 2A-1023"9' - 0"3' - 1"2' - 3"1' - 10"1' - 10"10"1' - 4"10"1'-0".2' - 0"2' - 0"1' - 2 1/2"2' - 3"2' - 3"2' - 3"10"1' - 4"10"12' - 0"3' - 0"EXISTING CONCRETE ENCASED STEEL BEAM ABOVEEXISTING CONCRETE ENCASED STEEL BEAM ABOVE2ND FLOOR14' -0"10"1' - 4"10"MODIFY EXISTING SUSPENDED CEILING GRID AND PANELS AS REQUIRED TO INSTALL PLATFORM SYSTEM9' - 0"7' - 6"UNISTRUT P1000, TYP.CONSTRUCT PLATFORM SYSTEM WITH UNISTRUT P1000 SERIES AND CONNECTIONS AS REQUIRED FOR ASSEMBLY. SELECT HOLEPATTERN AS REQUIRED BY CONNECTIONS.USE UNISTRUT P1001 AT CEILING LEVEL.UNISTRUT P100114 GA. SHEET METAL (316 STAINLESS). DEBURR ALL EDGES.CONNECT TO UNISTRUT FRAMEUNISTRUT P1000, TYP.UNISTRUT P1049 U-FITTINGEXISTING SLAB ON DECKSECURE EACH UNISTRUT SUPPORT DIRECTLY TO DECK ABOVE WITH TWO (2) ½ IN. DIAMETER EXPANSION ANCHORS, POWER STUD SD2+ BY POWERS/DEWALT. PROVIDE A MINIMUM 2½ INCH OF EMBEDMENT AND INSTALL PER MANUFACTURER REQUIREMENTS INCLUDING MINIMUM EDGE DISTANCE.1ST FLOOR0' -0"2ND FLOOR14' -0"9' - 0"7' - 6"A-1023CORNELLUNIVER S I T Y F O U NDED5681ADFACILITIESENGINEERINGARCHIVE BAR CODEITHACA, NEW YORKARCH/STRUCT:CIVIL/ENV:ELECTRICAL:MECHANICAL:DATE:FACILITY:DESIGN:DRAWN:WWW.FCS.CORNELL.EDUIT IS A VIOLATION OF NEW YORK STATE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT OR ENGINEER, TO ALTER THIS DOCUMENT IN ANY WAY. IF THIS DOCUMENT IS ALTERED, THE ALTERING ARCHITECT OR ENGINEER SHALL AFFIX TO SUCH DOCUMENT THEIR SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.WARNINGREVISIONSARCHITECTURAL, STRUCTURAL, CIVIL, ENVIRONMENTAL, MECHANICAL, AND ELECTRICAL ENGINEERING201 HUMPHREYS SERVICE BLDGITHACA, NEW YORK 14853-3701113 HO PLAZAOLIN HALL - 103YU LABA-10212672497EQUIPMENTSCHEDULE ANDPLATFORMDETAILSN.HACHMANNNH2024AUGUST 11, 20200' 2' 4' 8'SCALE: 1/4"=1'-0"1 06/09/20 ISSUED FOR DD REVIEW2 07/09/20 ISSUED FOR 90% REVIEW3 08/11/20 ISSUED FOR CONSTRUCTIONSCALE:1/2" = 1'-0"1SUSPENDED PLATFORM PLAN 103SCALE:1 1/2" = 1'-0"3PLATFORM DETAILSCALE:1/2" = 1'-0"2SECTION AT PLATFORMSCALE:NO SCALE43D ROOM 103CBCBCBCB CBCBCBCBCBCBCB OLIN HALL 103,105, 107 LABRENOVATION CORN E LL U N I V E RSI TYFOU N D E D 5681 AD FACILITIES ENGINEERING ARCHIVE BAR CODEARCH/STRUCT: CIVIL/ENV: ELECTRICAL: MECHANICAL: DATE: FACILITY: DESIGN: DRAWN: WWW.FCS.CORNELL.EDU IT IS A VIOLATION OF NEW YORK STATE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT OR ENGINEER, TO ALTER THIS DOCUMENT IN ANY WAY. IF THIS DOCUMENT IS ALTERED, THE ALTERING ARCHITECT OR ENGINEER SHALL AFFIX TO SUCH DOCUMENT THEIR SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. WARNING REVISIONS ARCHITECTURAL, STRUCTURAL, CIVIL, ENVIRONMENTAL, MECHANICAL, AND ELECTRICAL ENGINEERING 201 HUMPHREYS SERVICE BLDG ITHACA, NEW YORK 14853-3701 113 HO PLAZA ITHACA, NEW YORK OLIN HALL - 103 YU LAB FP-001 12672497 FIRE PROTECTION SCOPE OF WORK, GENERAL NOTES, AND SCHEDULES T. JORDAN TRF 2024 AUGUST 11, 2020 FIRE PROTECTION GENERAL NOTES 1.0 IT IS THE INTENT OF THESE DRAWINGS TO PROVIDE MODIFICATIONS TO THE WET FIRE PROTECTION SPRINKLER SYSTEMS FOR THE PROTECTION OF OLIN HALL LABS 103, 105, AND 107. 2.0 PRIOR TO ALTERATIONS, THE SPRINKLER CONTRACTOR SHALL FIELD VERIFY EXTENT OF ALTERATION AND NEW WORK, WITH REGARD TO EXISTING CONDITIONS AT PIPE PENETRATIONS THROUGH FLOORS, WALLS, CEILINGS AND SOFFITS. 3.0 ALL SPRINKLER COMPONENTS SHALL BE UNDERWRITER'S LABORATORIES (UL) AND FACTORY MUTUAL (FM) APPROVED. 4.0 THE DRAWINGS ARE DIAGRAMMATIC AND INDICATE ONLY THE GENERAL ARRANGEMENT OF THE ITEMS INCLUDED IN THE FIRE PROTECTION WORK. AS SUCH, CONTRACTOR SHALL PROVIDE A COMPLETE SPRINKLER SYSTEM IN STRICT ACCORDANCE WITH THE REQUIREMENTS OF FM GLOBAL STANDARDS, THE NFPA 13-INSTALLATION OF FIRE PROTECTION SYSTEMS, THE NEW YORK STATE BUILDING CODES, THE NEW YORK STATE FIRE CODES, LOCAL CODES, AND GOVERNING AUTHORITIES. THE DESIGN OF FIRE PROTECTION SYSTEMS TO WITHSTAND SEISMIC EVENTS SHALL BE IN ACCORDANCE WITH THE CRITERIA DEVELOPED BY THE NFPA. 5.0 CONTRACTOR SHALL REQUEST SPRINKLER SYSTEM SHUTDOWNS THROUGH CORNELL CUSTOMER SERVICE (607.255.5322) A MINIMUM OF TEN (10) DAYS PRIOR TO THE SHUTDOWN DATE. THE CONTRACTOR SHALL BEAR THE COST OF THE UTILITY SHUTDOWN. NOTIFY THE OWNER'S REPRESENTATIVE TO COORDINATE BUILDING FUNCTIONS WITH THE BUILDING COORDINATOR. 6.0 COORDINATE THE EXACT LOCATION OF SPRINKLERS, EQUIPMENT, AND DEVICES WITH ARCHITECTURAL, MECHANICAL, ELECTRICAL AND ALL OTHER TRADES DRAWINGS PRIOR TO ROUGH-IN AND INSTALLATION. 7.0 AFTER ALL WORK HAS BEEN COMPLETED, ACCEPTANCE TESTING SHALL BE SCHEDULED THROUGH EH&S, AND SHALL BE WITNESSED BY EH&S AND CITY OF ITHACA REPRESENTATIVES. 8.0 HYDROSTATIC TEST SHALL BE PERFORMED AT SYSTEM PRESSURE, FOR A PERIOD OF 2-HOURS. A REPRESENTATIVE OF ENVIRONMENTAL HEALTH AND SAFETY SHALL WITNESS HYDROSTATIC TESTING OF THE NEW PIPING INSTALLATIONS AND ALTERATIONS. THE AUTHORITY HAVING JURISDICTION (ITHACA FIRE DEPARTMENT) REQUIRES THAT ONE OF THEIR REPRESENTATIVES WITNESSES HYDROSTATIC TESTING AND FLUSHING. ADVANCE NOTICE AND SCHEDULING IS REQUIRED THROUGH EH&S. 9.0 ANY FIRESTOPPING DISTURBED DURING THE COURSE OF WORK SHALL BE REPAIRED TO MAINTAIN A 2-HOUR FIRE RATING. 10.0 SPRINKLER PROTECTION CANNOT BE REMOVED FOR MORE THAN ONE WORK SHIFT UNLESS TEMPORARY HEAT DETECTION IS INSTALLED, TIED TO THE FIRE ALARM, AND TESTED WITH ENVIRONMENTAL HEALTH AND SAFETY. FIRE PROTECTION SCOPE OF WORK 1.0 REPLACE EXISTING SPRINKLER HEADS IN ROOMS 103, 105, AND 107 AS REQUIRED TO REMOVE AND REINSTALL DROP CEILING. FIRE PROTECTION DEVICE SCHEDULE & SPECIFICATIONS DESCRIPTION MANF BOD MODEL BOD TEMP RATING (F) RESPONSE NPT THREAD (IN) ORIFICE K FACTOR FINISH WORKING PRESSURE (PSIG) APPROVALS LISTINGS REMARKS SEMI-RECESSED RELIABLE F156 100 STANDARD 1/2" 1/2" 5.6 BRASS 7 UL AND FM SIN 1314 1 06/09/20 ISSUED FOR DD REVIEW 2 07/09/20 ISSUED FOR 90% REVIEW 3 08/11/20 ISSUED FOR CONSTRUCTION CB CB CBCB CB CB CB CB CB CB CB OLIN HALL 103, 105, 107 LAB RENOVATION 1 (TYP FOR 8) 1 (TYP FOR 8) 1 (TYP FOR 8) 107 Room 105 Room 103 Room 1 (TYP FOR 8) 1 (TYP FOR 8) 1 (TYP FOR 8) 107 Room 105 Room 103 Room CORN E LL U N I V E RSI TYFOU N D E D 5681 AD FACILITIES ENGINEERING ARCHIVE BAR CODEARCH/STRUCT: CIVIL/ENV: ELECTRICAL: MECHANICAL: DATE: FACILITY: DESIGN: DRAWN: WWW.FCS.CORNELL.EDU IT IS A VIOLATION OF NEW YORK STATE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT OR ENGINEER, TO ALTER THIS DOCUMENT IN ANY WAY. IF THIS DOCUMENT IS ALTERED, THE ALTERING ARCHITECT OR ENGINEER SHALL AFFIX TO SUCH DOCUMENT THEIR SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. WARNING REVISIONS ARCHITECTURAL, STRUCTURAL, CIVIL, ENVIRONMENTAL, MECHANICAL, AND ELECTRICAL ENGINEERING 201 HUMPHREYS SERVICE BLDG ITHACA, NEW YORK 14853-3701 113 HO PLAZA ITHACA, NEW YORK OLIN HALL - 103 YU LAB FP-101 12672497 PARTIAL FIRST FLOOR DEMOLITION AND CONSTRUCTION PLANS T. JORDAN TRF 2024 AUGUST 11, 2020 FP-101 KEYED DEMOLITION NOTES 1 NTING SPRINKLER BRANCH PIPING TO REMAIN FOR RECONNECTION. COORDINATE WITH ARCHITECTURAL DRAWINGS FOR CEILING REMOVAL. REFER TO FIRE PROTECTION GENERAL NOTE 10 ON FP-001 FOR REQUIREMENTS TO MAINTAIN BUILDING SAFETY DURING SPRINKLER SYSTEM SHUTDOWNS AND SPRINKLER HEAD REMOVAL. FP-101 KEYED RENOVATION NOTES 1 PROVIDE SPRINKLER HEAD IN EXISTING LOCATION AND CONNECT TO EXISTING SPRINKLER BRANCH PIPING. COORDINATE WITH ARCHITECTURAL DRAWINGS FOE CEILING REINSTALLATION. REFER TO SCHEDULE ON DRAWING FP-001 FOR SPRINKLER SPECIFICATIONS. 1 06/09/20 ISSUED FOR DD REVIEW 2 07/09/20 ISSUED FOR 90% REVIEW 3 08/11/20 ISSUED FOR CONSTRUCTION # # 0' 2' 4' 8' SCALE: 1/4"=1'-0" SCALE:1/4" = 1'-0"2 PARTIAL FIRST FLOOR FIRE PROTECTION CONSTRUCTION PLAN SCALE:1/4" = 1'-0"1 PARTIAL FIRST FLOOR FIRE PROTECTION DEMOLITION PLAN CB CB CBCB CB CB CB CB CB CB CB OLIN HALL 103, 105, 107 LAB RENOVATION CORN E LL U N I V E RSI TYFOU N D E D 5681 AD FACILITIES ENGINEERING ARCHIVE BAR CODEARCH/STRUCT: CIVIL/ENV: ELECTRICAL: MECHANICAL: DATE: FACILITY: DESIGN: DRAWN: WWW.FCS.CORNELL.EDU IT IS A VIOLATION OF NEW YORK STATE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT OR ENGINEER, TO ALTER THIS DOCUMENT IN ANY WAY. IF THIS DOCUMENT IS ALTERED, THE ALTERING ARCHITECT OR ENGINEER SHALL AFFIX TO SUCH DOCUMENT THEIR SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. WARNING REVISIONS ARCHITECTURAL, STRUCTURAL, CIVIL, ENVIRONMENTAL, MECHANICAL, AND ELECTRICAL ENGINEERING 201 HUMPHREYS SERVICE BLDG ITHACA, NEW YORK 14853-3701 113 HO PLAZA ITHACA, NEW YORK OLIN HALL - 103 YU LAB P-001 12672497 SCOPE OF WORK, GENERAL NOTES, SCHEDULES, AND SYMBOL LEGENDS E. LEPORE TRF 2024 AUGUST 11, 2020 PLUMBING SUBMITTAL SCHEDULE SECTION REQUIRED TITLE 220523 GENERAL DUTY VALVES FOR PLUMBING PIPING PRODUCT DATA 220529 HANGERS & SUPPORTS FOR PLUMBING PRODUCT DATA 220553 ID FOR PIPING AND EQUIPMENT PRODUCT DATA 220719 PLUMBING PIPING INSULATION PRODUCT DATA 221000 PLUMBING PIPING PRODUCT DATA 223000 PLUMBING PIPING ACCESSORIES PRODUCT DATA, MANUFACTURERS INSTRUCTIONS, O&M 224500 LABORATORY PLUMBING FIXTURES AND TRIM PRODUCT DATA 226313 SPECIALTY GAS PIPING FOR LAB FACILITIES PRODUCT DATA,TESTING 226653 LAB WASTE & LAB VENT PIPING PRODUCT DATA,TESTING PLUMBING SCOPE OF WORK 1.0 LAB 103 - PARTIAL PIPING REMOVALS TO CONCIDE WITH LAB CASEWORK DEMOLITION. 2.0 LAB 103 AND 105 - PROVIDE COMPRESSED AIR SERVICES TO RESEARCH EQUIPMENT. 3.0 LAB 103 AND 105 - PROVIDE CYLINDER GAS PIPING DISTRIBUTION AND ACCESSORIES AS REQUIRED TO SUPPORT RESEARCH EQUIPMENT NEEDS. 4.0 LAB 107 - PROVIDE AN ADA ACCESSIBLE LAB SINK FAUCET AND EYWASH. PLUMBING FIXTURE SCHEDULE & SPEC TAG COMPONENTS MANUFACTURER MODEL DESCRIPTION MATERIAL FINISH / COLOR COLD WATER HOT WATER WASTE / SANITARY VENT STANDARDS LS-107 FAUCET WATER SAVER L412VB-BH MIXING BRASS CHROME PLATED 1/2" 1/2" 1-1/2" 1-1/2" ADA COMPLIANT EW-107 EMERGENCY EYEWASH BRADLEY S19274HDB SWING-DOWN BRASS CHROME PLATED 1/2" 1/2"ADA COMPLIANT PIPING SPECIFICATIONS: 1. SOLDER FILLER METALS: ASTM B32, LEAD-FREE ALLOYS. INCLUDE WATER FLUSHABLE FLUX ACCORDING TO ASTM B813. 2. DIELECTRIC FITTINGS: USE FLANGES OR COUPLINGS. UNIONS ARE UNACCEPTABLE. 3. INSTALL PLUMBING SYSTEMS TO FACILITATE SERVICE, MAINTENANCE AND REPAIR OR REPLACEMENT OF COMPONENTS. 4. ALL WASTE PIPING SHALL BE PITCHED AT 1/8" PER FOOT. ALL SUPPLY PIPING SHALL BE PITCHED BACK TOWARDS AIR COMPRESSOR. 5. PROVIDE PIPE LABELS AND DIRECTIONAL ARROWS ON ALL NEW PIPING SYSTEMS. LABELS SHALL BE PRINTED PLASTIC WITH CONTACT-TYPE, PERMANENT ADHESIVE BACKING. 6. ALL PIPING AND INSULATION SYSTEMS EXPOSED TO VIEW SHALL BE CLEANED AND PAINTED TO MATCH SURROUNDING SURFACES. CLEAN PIPES WELL WITH DETERGENT, WHEN DRY WIPE DOWN WITH MINERAL SPIRITS OR SIMILAR SOLVENT, THEN PRIME WITH A RED OXIDE PRIMER. TOP COAT WITH RUSTOLEUM OR OTHER ENAMEL DESIGNED PAINT SPECIFIED FOR USE WITH METAL OR PLASTICS. 7. PROCESS GAS PIPING SHALL BE MANUFACTURED CLEANED, PURGED, AND SEALED ACCORDING TO CGA G-4.1 OR SWAGELOK SC-11. 8. PROCESS GAS PIPE TESTING: PERFORM HELIUM LEAK TEST. PLUMBING PIPING SCHEDULE AND SPECIFICATIONS PIPE SERVICE ABBREVIATION MATERIAL FITTINGS JOINT INSULATION MATERIAL JACKET VAPOR RETARDER FINISH DOMESTIC COLD WATER DCW DOMESTIC HOT WATER DHW NITROGEN N2 ASTM A269 316L STAINLESS STEEL ASTM A162 316L STAINLESS STEEL COMPRESSION N/A N/A N/A N/A N/A NITROGEN/HYDROGEN N2/H2 ASTM A269 316L STAINLESS STEEL ASTM A162 316L STAINLESS STEEL COMPRESSION N/A N/A N/A N/A N/A COMPRESSED AIR CA N/A N/A N/A N/A N/A 1 06/09/20 ISSUED FOR DD REVIEW 2 07/09/20 ISSUED FOR 90% REVIEW 3 08/11/20 ISSUED FOR CONSTRUCTION PIPING ACCESSORIES SCHEDULE AND SPECIFICATIONS TAG DEVICE BOD MANUFACTURER MODEL CAPACITY SPECIFICATIONS AF1-103 COMPRESSED AIR FILTER INGERSOLL RAND FA40IH 22 SCFM GRADE H, PARTICLE REMOVAL DOWN TO 0.01 MICRON INCLUDING WATER AND AEROSOLS, DISCHARGE OIL CONTENT 0.01 PPM G-1 TUBE FITTING SWAGELOK SS-400-1-4 N/A STAINLESS STEEL, MALE CONNECTOR, WITH 1/4" TUBE OD END AND 1/4" MALE NPT END MV-107 MIXING VALVE BRADLEY S19-2000 1.5 GPM MINIMUM FLOW ROUGH BRASS, ANSI Z358.1 COMPLIANT, ASSE 1071 CERTIFIED, FACTORY SETPOINT 85 DEG F. PRV1-103 PRESSURE REDUCING VALVE SWAGELOK KPR1DFC412A20000 100 PSIG INLET STAINLESS STEEL, 0-25 PSIG OUTLET RANGE, PCTFE SEAT, 1/4" FNPT. SET OUTLET PRESSURE AT 8 PSIG. PRV2-103 PRESSURE REDUCING VALVE SWAGELOK KPR1FJF412A20000 500 PSIG INLET STAINLESS STEEL, 0-100 PSIG OUTLET RANGE, PCTFE SEAT, 1/4" FNPT. REFER TO P-401 FOR OUTLET PRESSURE. PRV3-103 PRESSURE REDUCING VALVE SWAGELOK KPR1JRA412A20000 3600 PSIG INLET STAINLESS STEEL, 0-500 PSIG OUTLET RANGE, PCTFE SEAT, 1/4" FNPT. REFER TO P-401 FOR OUTLET PRESSURE. V-1 SHUT-OFF BALL VALVE(WATER/AIR SERVICE) WATTS B6000-SS 300 PSIG WOG MSS SP-110, 2-PIECE, STANDARD PORT, BRONZE BODY, 316 SS BALL & STEM, PTFE OR TFE SEAT V-2 SHUT-OFF BALL VALVE (PROCESS GAS) SWAGELOK SS-45S8 2500 PSIG STAINLESS STEEL, 1-PIECE, 1/2" SWAGELOK TUBE FITTING ENDS. PLUMBING GENERAL NOTES 1.0 DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL ARRANGEMENT OF SYSTEMS AND WORK INCLUDED IN THE CONTRACT. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS. IF DIMENSIONS OR CONDITIONS ARE FOUND TO BE IN CONFLICT WITH THE DRAWINGS, THE CONTRACTOR SHALL IMMEDIATELY REFER THE CONFLICT TO THE ENGINEER. 2.0 UTILITY SHUTDOWNS: SHUTDOWN OF ANY BUILDING UTILITY SYSTEM SHALL BE COORDINATED WITH CUSTOMER SERVICE AT PH: 607-255-5322. THE CONTRACTOR SHALL BEAR THE COST OF THE UTILITY SHUTDOWN. SCHEDULE WORK TEN DAYS IN ADVANCE AND NOTIFY THE OWNER'S REPRESENTATIVE TO COORDINATE BUILDING FUNCTIONS WITH THE BUILDING COORDINATOR. 3.0 WORK IS REQUIRED IN VARIOUS PORTIONS OF THE FACILITY TO EXECUTE WORK OF OTHER TRADES (EG ELECTRICAL, MECHANICAL). ALTHOUGH NOT NECESSARILY SHOWN ON DRAWINGS, WORK IS REQUIRED IN THESE AREAS CONSISTING OF REMOVAL / REPLACEMENT OF CEILINGS, WALLS, FINISHES, PAVEMENT AND OTHER CONSTRUCTION AS NECESSARY TO PERFORM WORK AND RESTORE THESE SPACES OR AREAS TO ORIGINAL CONDITION. 4.0 ALL PENETRATIONS THROUGH FULL HEIGHT WALLS ARE TO BE FIRESTOPPED IN ACCORDANCE WITH UL STANDARDS. ALL GAPS AND JOINTS AT RATED FLOORS, ROOFS AND WALLS ARE TO BE FIRE AND SMOKE STOPPED. CAPS AND JOINTS INCLUDE (BUT ARE NOT LIMITED TO) TOP OF WALL TO FLOOR OR ROOF DECK, WALL TO BEAMS, AND CONTROL OR EXPANSION JOINTS. FIRESTOPPING INCLUDES BOTH FORM OR PACKING MATERIAL AND THE FILL, VOID OR CAVITY MATERIAL. 5.0 INSTALL EQUIPMENT TO ENSURE PROPER ACCESS TO CONTROL DEVICES AND WITH SUFFICIENT SPACE TO PERFORM ROUTINE MAINTENANCE AND REPAIR. EQUIPMENT THAT IS NOT INSTALLED WITH THIS REQUIREMENT IN MIND SHALL BE RELOCATED AT NO EXPENSE TO THE UNIVERSITY UNTIL DEFICIENCIES ARE CORRECTED. 6.0 ALL SYSTEM TESTING SHALL BE CONDUCTED PRIOR TO INSULATION, FIREPROOFING, AND ENCLOSURE IN SHAFTS. ANY RESTORATION WORK REQUIRED AS A RESULT OF DISTURBING FINISHES OR STRUCTURE IN ORDER TO ACCESS SYSTEMS REQUIRING REPAIR SHALL BE AT NO COST TO THE UNIVERSITY. 7.0 VERIFY FINAL EQUIPMENT/FIXTURE LOCATIONS FOR ROUGHING-IN. 8.0 ANY FIRESTOPPING DISTURBED DURING THE COURSE OF WORK SHALL BE REPAIRED TO MAINTAIN A 2-HOUR FIRE RATING. 9.0 THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO FORM A COMPLETE, FUNCTIONING SYSTEM. ITEMS NOT SPECIFICALLY MENTIONED, BUT WHICH ARE INHERENTLY NECESSARY TO MAKE A COMPLETE WORKING INSTALLATION SHALL BE PROVIDED. 10.0 GAS CANISTERS PROVIDED BY OTHERS. THEY ARE SHOWN FOR INFORMATION AND COORDINATION PURPOSES ONLY. CB CB CBCB CB CB CB CB CB CB CB OLIN HALL 103, 105, 107 LAB RENOVATION 1 1/2" DCW1/2" NG1/2" DHW2 2 3 ADA ACCESSIBLE FUME HOOD WITH TELESCOPING BASE STAND AND FLEXIBLE PLUMBING SERVICES (E)1/2" CA107 Room 105 Room 103 Room 101 Room 4 N2 1/2" CA 8 8 2 1 1 1/4" CA 1 1/4" ROR 1 1/4" ROS 1 1/4" PCWR 1 1/4" PCWS LS-107 3 ADA ACCESSIBLE FUME HOOD WITH TELESCOPING BASE STAND AND FLEXIBLE PLUMBING SERVICES (E) 107 Room 109 Room 105 Room 103 Room 101 Room 4 5 GAS PURIFIER 6 N2 6 N2 N2 H2 N2 H2 N2 H2 N2 7 N2 1/2" N21/2" N2 1/2" N2/H2 GLOVE BOX (EXG) CA EVAPORATOR GLOVE BOX AF1-103 PRV1-1038 PSIG N2 (65 PSIG) 8CA N2 9 N2 N2 EW-107 10 MV-107 CORN E LL U N I V E RSI TYFOU N D E D 5681 AD FACILITIES ENGINEERING ARCHIVE BAR CODEARCH/STRUCT: CIVIL/ENV: ELECTRICAL: MECHANICAL: DATE: FACILITY: DESIGN: DRAWN: WWW.FCS.CORNELL.EDU IT IS A VIOLATION OF NEW YORK STATE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT OR ENGINEER, TO ALTER THIS DOCUMENT IN ANY WAY. IF THIS DOCUMENT IS ALTERED, THE ALTERING ARCHITECT OR ENGINEER SHALL AFFIX TO SUCH DOCUMENT THEIR SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. WARNING REVISIONS ARCHITECTURAL, STRUCTURAL, CIVIL, ENVIRONMENTAL, MECHANICAL, AND ELECTRICAL ENGINEERING 201 HUMPHREYS SERVICE BLDG ITHACA, NEW YORK 14853-3701 113 HO PLAZA ITHACA, NEW YORK OLIN HALL - 103 YU LAB P-101 12672497 PARTIAL FIRST FLOOR DEMOLITION AND CONSTRUCTION PLANS E. LEPORE TRF 2024 AUGUST 11, 2020 SCALE:1/4" = 1'-0"1 PARTIAL FIRST FLOOR PLUMBING DEMOLITION PLAN SCALE:1/4" = 1'-0"2 PARTIAL FIRST FLOOR PLUMBING CONSTRUCTION PLAN P-101 KEYED RENOVATION NOTES 1 CONNECT TO EXISTING COMPRESSED AIR SUPPLY ABOVE CEILING AS TO PROVIDE COMPRESSED AIR TO PLASMA CLEANER. ROUTE PIPING DOWN ALONG WALL WITH AIR FILTER, PRESSURE REDUCING VALVE, AND SHUTOFF. TERMINATE WITH 1/4" SWADGELOCK QUICK CONNECT FITTING. 1/4" FLEXIBLE TUBING AND CONNECTION TO PLASMA CUTTER BY OTHERS. 2 PROVIDE 1/2" NITROGEN PIPING CONNECTION ON UTILITY RACK WITH PRESSURE REDUCING VALVE AND SHUTOFF FOR SPIN PROCESSOR. TERMINATE WITH 1/2" SWADGELOCK QUICK CONNECT FITTING. CONNECTION TO SPIN PROCESSOR BY OTHERS. REFER TO AND COORDINATE WITH ARCHITECTURAL DRAWINGS FOR UTILITY RACK AND LOCATION. 3 PROVIDE ADA ACCESSIBLE LAB SINK FAUCET. CONNECT TO EXISTING DOMESTIC COLD, DOMESTIC HOT, AND LAB WASTE/VENT PIPING. REFER TO AND COORDINATE WITH ARCHITECTURAL DRAWINGS FOR ADA COMPLIANT SINK BASE/CABINET. 4 GAS CYLINDERS PROVIDED BY OWNER. REFER TO ARCHITECTURAL DRAWINGS FOR CYLINDER RACK. PROVIDE NITROGEN DISTRIBUTION PIPING FROM CYLINDER TO THERMAL EVAPORATOR. 5 OWNER PROVIDED PROCESS GAS PRE-MIX (95% NITROGEN, 5% HYDROGEN). PIPE GAS PER SCHEMATIC P-401. ROUTE PIPING UP TO WITHIN UTILITY RACK. REFER TO AND COORDINATE WITH ARCHITECTURAL DRAWINGS FOR UTILITY RACK AND LOCATION. 6 PROVIDE 1/2" NITROGEN AND 1/2" NITROGEN/HYDROGEN MIX TURRET CONNECTION ON UTILITY RACK TO SERVE GAS PURIFIER. 7 1/2" NITROGEN DROP TO THERMAL EVAPORATOR. 8 CONNECT TO EXISTING COMPRESSED AIR SUPPLY ABOVE CEILING AS REQUIRED TO PROVIDE 1/2" COMPRESSED AIR CONNECTIONS ON UTILITY RACK WITH SHUTOFFS IN LOCATIONS SHOWN FOR GENERAL LAB USE. TERMINATE WITH 1/2" SWADGELOCK QUICK CONNECT FITTING. REFER TO AND COORDINATE WITH ARCHITECTURAL DRAWINGS FOR UTILITY RACK AND LOCATION. 9 OWNER PROVIDED PROCESS GAS NITROGEN. PIPE GAS PER SCHEMATIC P-401. ROUTE PIPING UP TO WITHIN UTILITY RACK. REFER TO AND COORDINATE WITH ARCHITECTURAL DRAWINGS FOR UTILITY RACK AND LOCATION. 10 PROVIDE ADA ACCESSIBLE EYEWASH AND MIXING VALVE. CONNECT TO EXISTING DOMESTIC COLD AND HOT WATER PIPING. REFER TO AND COORDINATE WITH ARCHITECTURAL DRAWINGS FOR ADA COMPLIANT SINK BASE/CABINET. # # 1 06/09/20 ISSUED FOR DD REVIEW 2 07/09/20 ISSUED FOR 90% REVIEW 3 08/11/20 ISSUED FOR CONSTRUCTION 0' 2' 4' 8' SCALE: 1/4"=1'-0" P-101 KEYED DEMOLITION NOTES 1 DISCONNECT AND REMOVE DOMESTIC COLD, DOMESTIC HOT, COMPRESSED AIR, AND NATURAL GAS PIPING DROPS WITHIN CHASE ALONG WALL. VALVE AND CAP PIPING ABOVE CEILING. REMOVE EXISTING PROCESS COOLING SUPPLY AND RETURN DROP EXPOSED ALONG WALL. 2 DISCONNECT AND REMOVE DOMESTIC COLD AND HOT WATER SUPPLY SERVING LAB SINK. REMOVE BRANCH PIPING BACK TO MAINS ABOVE CEILING. REMOVE LAB WASTE PIPING DOWN TO FLOOR BELOW. REMOVE WASTE BRANCH PIPING BACK TO MAIN TO ELIMINATE DEAD LEG. 3 DISCONNECT AND REMOVE EXISTING LAB SINK. EXISTING DOMESTIC COLD, DOMESTIC HOT, AND LAB WASTE SERVICES TO REMAIN FOR RECCONNECTION. 4 DISCONNECT AND REMOVE EXISTING PIPING DROPS ALONG WALL. VALVE AND CAP PIPING ABOVE CEILING. CB CB CBCB CB CB CB CB CB CB CB OLIN HALL 103, 105, 107 LAB RENOVATION N2 FIRST FLOOR LAB 103 N2 228 SCF 228 SCF N2/H2 228 SCF 111 222 3 1/2" N2 1/2" N2/H2 4 1/2" N2 N2 OUTLET 1/4"5 GAS SERVICES TO SPIN PROCESSOR 44 0-100 PSIG 0-100 PSIG 0-100 PSIG 0-100 PSIG 0-100 PSIG N2/H2 OUTLET 1/4"N2 OUTLET 1/4"5 GAS SERVICES TO GAS PURIFIERN2/H2 OUTLET 1/4"N2 OUTLET 1/4"5 GAS SERVICES TO GAS PURIFIER G-1 G-1 G-1 G-1 G-1 PRV2-103 PRV1-103 PRV2-103 PRV1-103 PRV2-103 65 PSIG 1/2" N2 1/2" N2/H2 1/2" N2 1/2" N2/H2 85 PSIG 85 PSIG 5 PSIG 5 PSIG V-2 V-2 V-2 V-2 V-2 V-2 V-2 V-2PRV3-103 PRV3-103 PRV3-103 FIRST FLOOR LAB 105 N2 228 SCF 1 2 V-2 PRV3-103 1/2" N2 N2 OUTLET 1/4"5 GAS SERVICES TO THERMAL EVAPORATOR 0-100 PSIG G-1 PRV2-103 29 PSIG V-2 6 CORN E LL U N I V E RSI TYFOU N D E D 5681 AD FACILITIES ENGINEERING ARCHIVE BAR CODEARCH/STRUCT: CIVIL/ENV: ELECTRICAL: MECHANICAL: DATE: FACILITY: DESIGN: DRAWN: WWW.FCS.CORNELL.EDU IT IS A VIOLATION OF NEW YORK STATE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT OR ENGINEER, TO ALTER THIS DOCUMENT IN ANY WAY. IF THIS DOCUMENT IS ALTERED, THE ALTERING ARCHITECT OR ENGINEER SHALL AFFIX TO SUCH DOCUMENT THEIR SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. WARNING REVISIONS ARCHITECTURAL, STRUCTURAL, CIVIL, ENVIRONMENTAL, MECHANICAL, AND ELECTRICAL ENGINEERING 201 HUMPHREYS SERVICE BLDG ITHACA, NEW YORK 14853-3701 113 HO PLAZA ITHACA, NEW YORK OLIN HALL - 103 YU LAB P-401 12672497 PROCESS GAS PIPING SCHEMATIC DETAIL T. FISHER TRF 2024 AUGUST 11, 2020 SCALE:12" = 1'-0"1 PROCESS GAS PIPING SCHEMATIC P-401 KEYED RENOVATION NOTES 1 PROVIDE 30-INCH STAINLESS STEEL FLEX HOSE OR PIGTAIL CONNECTION TO CYLINDERS. 2 INSTALL ALL REGULATORS AND MANUAL SHUTOFF VALVES ON WALL USING UNISTRUT. 3 GAS PIPING IS TO RUN EXPOSED WITHIN SPACE, SUPPORTED FROM UNISTRUT FRAME. CUSHION CLAMPS ARE TO BE USED FOR ALL GAS PIPING SUPPORTS. SEE ARCHITECTURAL DRAWINGS FOR FURTHER INFORMATION ON UNISTRUT FRAMING SYSTEM. 4 GAS PIPING DROPS ARE TO BE SUPPORTED FROM UNISTRUT PIPING RACK. CUSHION CLAMPS ARE TO BE USED FOR ALL GAS PIPING SUPPORTS. SEE ARCHITECTURAL DRAWINGS FOR FURTHER INFORMATION ON UNISTRUT FRAMING SYSTEM. 5 GAS SERVICE TO EXPERIMENT. PROVIDE SWAGE TUBE FITTING. FINAL CONNECTION TO EQUIPMENT BY RESEARCHER. MOUNT AT 4-FEET ABOVE FINISHED FLOOR. 6 ROUTE PIPING ABOVE CEILING. DROP ALONG WALL AND SUPPORT PIPING FROM WALL USING UNISTRUT. 1 06/09/20 ISSUED FOR DD REVIEW 2 07/09/20 ISSUED FOR 90% REVIEW 3 08/11/20 ISSUED FOR CONSTRUCTION # CB CB CBCB CB CB CB CB CB CB CB OLIN HALL 103, 105, 107 LAB RENOVATION CORN E LL U N I V E RSI TYFOU N D E D 5681 AD FACILITIES ENGINEERING ARCHIVE BAR CODEARCH/STRUCT: CIVIL/ENV: ELECTRICAL: MECHANICAL: DATE: FACILITY: DESIGN: DRAWN: WWW.FCS.CORNELL.EDU IT IS A VIOLATION OF NEW YORK STATE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT OR ENGINEER, TO ALTER THIS DOCUMENT IN ANY WAY. IF THIS DOCUMENT IS ALTERED, THE ALTERING ARCHITECT OR ENGINEER SHALL AFFIX TO SUCH DOCUMENT THEIR SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. WARNING REVISIONS ARCHITECTURAL, STRUCTURAL, CIVIL, ENVIRONMENTAL, MECHANICAL, AND ELECTRICAL ENGINEERING 201 HUMPHREYS SERVICE BLDG ITHACA, NEW YORK 14853-3701 113 HO PLAZA ITHACA, NEW YORK OLIN HALL - 103 YU LAB M-001 12672497 SCOPE OF WORK, GENERAL NOTES, SUBMITTAL SCHEDULE, AND SYMBOL LEGENDS E. KOLACKI TRF 2024 AUGUST 11, 2020 MECHANICAL ABBREVIATIONS BCU BLOWER COIL UNIT CHWR CHILLED WATER RETURN CHWS CHILLED WATER SUPPLY CC CLEAN CONDENSATE CO CLEAN OUT CS CLEAN STEAM CD CONDENSATE DRAIN EA EXHAUST AIR EAG EXHAUST AIR GRILLE FD FIRE DAMPER GWR GLYCOL HEATING RETURN GWS GLYCOL HEATING SUPPLY HPR HIGH PRESSURE STEAM RETURN HPS HIGH PRESSURE STEAM SUPPLY HWR HOT WATER HEATING RETURN HWS HOT WATER HEATING SUPPLY LPC LOW PRESSURE CONDENSATE LPS LOW PRESSURE STEAM MU MAKE UP WATER MPC MEDIUM PRESSURE CONDENSATE MPS MEDIUM PRESSURE STEAM NG NATURAL GAS PCWR PROCESS CHILLED WATER RETURN PCWS PROCESS CHILLED WATER SUPPLY HG REFRIGERANT HOT GAS RL REFRIGERANT LIQUID RS REFRIGERANT SUCTION RAG RETURN AIR GRILLE SA SUPPLY AIR SAD SUPPLY AIR DIFFUSER VD VOLUME DAMPER MECHANICAL SYMBOLOGY AIRFLOW BALANCE VALVE BALL VALVE BOTTOM PIPE CONNECTION CAP OR PLUG CHECK VALVE DIRECTION OF FLOW DUCT AIRFLOW DUCT DOWN (EXHAUST OR RETURN) DUCT DOWN (SUPPLY) FLANGE CONNECTION MANUAL AIRVENT PIPE DOWN PIPE UP PIPING REDUCER (CONCENTRIC) PIPING REDUCER (ECCENTRIC) PRESSURE GAUGE PRESSURE OR TEMPERATURE PETES PLUG RECTANGULAR ELBOW RECTANGULAR ELBOW WITH TURNING VANES STANDARD BRANCH DUCT STEAM TRAP SUPPLY THROUGH NEXT FLOOR OR ROOF TEMPERATURE WELL THERMOMETER THERMOMETER (DIAL) TOP PIPE CONNECTION UNION CONNECTION VACUUM BREAKER VOLUME DAMPER IN DUCT CONTROL SYMBOLOGY 2-WAY CONTROL VALVE, DIGITAL 2-WAY CONTROL VALVE, PNEUMATIC ADDRESSABLE OUTPUT MODULE (FIRE ALARM INTERFACE) AIRFLOW CONTROL VALVE (VENTURI OR VORTEX SHEDDING) BINARY POINT CARBON DIOXIDE SENSOR DIFFERENTIAL PRESSURE SENSOR DIFFERENTIAL PRESSURE SENSOR FLOW ELEMENT (METER) FLOW SENSOR MODULATING NETWORK COMMUNICATION POINT, BACnet MSTP OCCUPANCY SENSOR OPEN/CLOSE OPPOSED BLADE CONTROL DAMPER PARALLEL BLADE CONTROL DAMPER PRESSURE SENSOR PRESSURE SWITCH ROOM TEMPERATURE SENSOR WITH ADJUSTABLE THERMOSTAT ROOM TEMPERATURE SENSOR WITH OCCUPANCY OVERRIDE ROOM TEMPERATURE SENSOR WITH ON/OFF SWITCH ROOM TEMPERATURE SENSOR WITH VISUAL DISPLAY SINGLE POINT SENSOR SMOKE DETECTOR SPEED COMMAND START/STOP STATIC PRESSURE SENSOR SWITCH TEMPERATURE SENSOR TEMPERATURE SENSOR TEMPERATURE SENSOR WITH ADJUSTABLE SETPOINT GENERAL DRAWING SYMBOLOGY DEMOLISHED WORK EXISTING PIPING TO REMAIN EXISTING TO REMAIN EXISTING WORK TO REMAIN NEW WORK POINT OF CONNECTION POINT OF DISCONNECTION CONTROL ABBREVIATIONS AI ANALOG INPUT AO ANALOG OUTPUT AV ANALOG VALUE BI BINARY INPUT BO BINARY OUTPUT BV BINARY VALUE F.L. FAIL LAST N.C. NORMALLY CLOSED N.O. NORMALLY OPEN VFD VARIABLE FREQUENCY DRIVE MECHANICAL SCOPE OF WORK 1.0 ROOMS 103 AND 105 - REPLACE REHEAT COIL CONTROLS VALVES, SUPPLY AIR VALVES, FUME HOOD EXHAUST AIR VALVES, AND GENERAL EXHAUST AIR VALVES. 2.0 ROOMS 103 AND 105 - PROVIDE DIRECT DIGITAL CONTROLS AS REQUIRED TO CONNECT TO THE EXISTING BUILDING AUTOMATION AND CONTROL SYSTEM. 3.0 ROOMS 103, 105, AND 107 - PROVIDE VENTILATION SHUTOFF SWITCH 4.0 ROOMS 103 AND 105 - PROVIDE PROCESS EXHAUST AIR VALVES AND DUCT DROPS TO LAB EQUIPMENT. 5.0 MECHANICAL ROOM 4P0UA - PROVIDE BYPASS AIR VALVES FOR EXHAUST AIR SYSTEMS SERVING LABS 103 AND 105. 6.0 ROOMS 103, 105, AND 107 - REBALANCE EXISTING AIR TERMIMALS TO MEET REVISED AIRFLOW SCHEDULE. MECHANICAL GENERAL NOTES 1.0 ALL DUCT DIMENSIONS INDICATED ARE IN INCHES, AND ARE INSIDE FREE AND CLEAR DIMENSIONS. 2.0 PNEUMATIC TERMINATIONS: IF COPPER: DEMO BACK TO MAIN AND PROVIDED SOLDERED END CAP IF POLY: DEMO BACK TO MAIN AND PROVIDE BRASS PLUG DO NOT USE SHEETMETAL SCREW OR BEND OVER END OF COPPER TUBE. 3.0 INSTALL EQUIPMENT TO ENSURE PROPER ACCESS TO CONTROL DEVICES AND WITH SUFFICIENT SPACE TO PERFORM ROUTINE MAINTENANCE AND REPAIR. EQUIPMENT THAT IS NOT INSTALLED WITH THIS REQUIREMENT IN MIND SHALL BE RELOCATED AT NO EXPENSE TO THE UNIVERSITY UNTIL DEFICIENCIES ARE CORRECTED. 4.0 ALL SYSTEM TESTING SHALL BE CONDUCTED PRIOR TO INSULATION, FIREPROOFING, AND ENCLOSURE IN SHAFTS. ANY RESTORATION WORK REQUIRED AS A RESULT OF DISTURBING FINISHES OR STRUCTURE IN ORDER TO ACCESS SYSTEMS REQUIRING REPAIR SHALL BE AT NO COST TO THE UNIVERSITY. 5.0 CUTTING AND PATCHING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING, FITTING, AND PATCHING TO COMPLETE THE WORK. WHERE EXISTING CONSTRUCTION IS REMOVED, CAUSING AN EXPOSURE OF UNFINISHED AND/OR DAMAGED SURFACES, RESULTING SURFACES SHALL BE RECONSTRUCTED WITH MATERIALS TO MATCH FINISHED AREAS. 6.0 ANY FIRESTOPPING DISTURBED DURING THE COURSE OF WORK SHALL BE REPAIRED TO MAINTAIN A 2-HOUR FIRE RATING. 7.0 TESTING AND BALANCING: THE CONTRACTOR SHALL BALANCE ALL AIR SYSTEMS AS INDICATED. SUBMIT RESULTS OF TESTING AND BALANCING ON STANDARD TAB CONTRACTOR'S FORMS TO THE ENGINEER FOR REVIEW. SYSTEMS SHALL BE BALANCED TO WITHIN +/- 10% OF DESIGN VALUES. FINAL BALANCING SHALL OCCUR AFTER ALL LEAKS IN THE BUILDING ENVELOPE HAVE BEEN IDENTIFIED AND SEALED. 8.0 SEAL ALL PIPE, GRILLE, DIFFUSER, DUCT, CONDUIT PENETRATIONS WITH APPROPRIATE MATERIALS (CAULK, FOAM, ETC,) THAT ARE IMPENETRABLE TO THE CONTAINED ORGANISMS AND WITHSTAND REPEATED DECONTAMINATIONS WITH CLEANING AGENTS. MECHANICAL SUBMITTAL SCHEDULE SECTION TITLE REQUIRED 230523 GENERAL DUTY VALVES FOR HVAC PIPING PRODUCT DATA 230529 HANGERS & SUPPORTS FOR HVAC PRODUCT DATA 230553 IDENTIFICATION FOR HVAC COMPONENTS PRODUCT DATA 230593 TESTING, ADJUSTING & BALANCING FOR HVAC QUALIFICATIONS, INSPECTION AND TEST REPORTS 230700 HVAC INSULATION PRODUCT DATA 230719 HVAC PIPING & EQUIPMENT INSULATION PRODUCT DATA 230900 INSTRUMENTATION & CONTROL FOR HVAC PRODUCT DATA, MANUFACTURERS INSTRUCTIONS, O&M 230920 ANALOG LABORATORY CONTROL PRODUCT DATA, MANUFACTURERS INSTRUCTIONS, O&M 232113 HYDRONIC PIPING PRODUCT DATA 233113 METAL DUCTS PRODUCT DATA 233300 AIR DUCT ACCESSORIES PRODUCT DATA 233600 AIR TERMINAL UNITS PRODUCT DATA, MANUFACTURERS INSTRUCTIONS, O&M 1 06/09/20 ISSUED FOR DD REVIEW 2 07/09/20 ISSUED FOR 90% REVIEW 3 08/11/20 ISSUED FOR CONSTRUCTION CB CB CBCB CB CB CB CB CB CB CB OLIN HALL 103, 105, 107 LAB RENOVATION EMPTY CONTROLS ENCLOSURE (E) 103 Room 105 Room 107 Room 101 Room 109 Room 1 12ø SA(E)1 1 24ø SA(E)12ø SA(E)2 3 3 2 3 3 FUME HOOD CONTROL PANEL (E) EMPTY CONTROLS ENCLOSURE (E)12ø12" EA RISER TO PENTHOUSE EF-10 (E) 12" EA RISER TO PENTHOUSE EF-13 (E) 12" EA RISER TO PENTHOUSE EF-4 (E)12ø103 Room 105 Room 107 Room 101 Room 109 Room 1 1 24ø SA(E)12ø SA(E)12ø SA(E)12ø SA(E)SAV-103 SAV-105 EAV-103-1 EAV-103-3 EAV-103-2 2 3 EAV-105-1 EAV-105-3 EAV-105-2 5 4 4 5 RHC-103 (E) RHC-105 (E)26x10 SA(E)26x10 SA(E)14x8 SA(E) 14x8 SA(E) SG-103-1 (E) 360 CFM SG-103-2 (E)SG-103-3 (E) 360 CFM360 CFM 6 175 CFM 777 SG-103-1 (E) 320 CFM SG-105-2 (E) SG-105-3 (E) 320 CFM 320 CFM 7 7 7 SG-107-2 (E) SG-107-1 (E) 493 CFM 493 CFM 7 7 SG-107-3 (E)7 493 CFM EG-103 (E)240 CFM 8 2" HWS 2" HWR 2" HWR 8 12" EA RISER TO PENTHOUSE EF-10 (E) 12" EA RISER TO PENTHOUSE EF-13 (E) 2" HWS 2 1/2" HWS 2 1/2" HWR 2" HWS 2" HWR EAV-107-2 (E) EAV-107-1 (E) 12" EA RISER TO PENTHOUSE EF-4 (E) 6 8ø12ø2 M-501 VD VD 9 4ø5ø 75 CFM 6ø EG-105 (E) 150 CFM 12ø 12ø8øSAV-107 (E) RHC-107 (E) 2 VD 4ø 10 50 CFM 10 75 CFM 10 75 CFM 4ø CORN E LL U N I V E RSI TYFOU N D E D 5681 AD FACILITIES ENGINEERING ARCHIVE BAR CODEARCH/STRUCT: CIVIL/ENV: ELECTRICAL: MECHANICAL: DATE: FACILITY: DESIGN: DRAWN: WWW.FCS.CORNELL.EDU IT IS A VIOLATION OF NEW YORK STATE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT OR ENGINEER, TO ALTER THIS DOCUMENT IN ANY WAY. IF THIS DOCUMENT IS ALTERED, THE ALTERING ARCHITECT OR ENGINEER SHALL AFFIX TO SUCH DOCUMENT THEIR SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. WARNING REVISIONS ARCHITECTURAL, STRUCTURAL, CIVIL, ENVIRONMENTAL, MECHANICAL, AND ELECTRICAL ENGINEERING 201 HUMPHREYS SERVICE BLDG ITHACA, NEW YORK 14853-3701 113 HO PLAZA ITHACA, NEW YORK OLIN HALL - 103 YU LAB M-101 12672497 PARTIAL FIRST FLOOR DEMOLITION AND CONSTRUCTION PLANS E. KOLACKI TRF 2024 AUGUST 11, 2020 # 0' 2' 4' 8' SCALE: 1/4"=1'-0" M-101 KEYED DEMOLITION NOTES 1 DISCONNECT AND REMOVE EXISTING PNUEMATIC AIR VALVE AND ASSOCIATED CONTROLS. EXISTING SUPPLY AIR DUCTWORK AND REHEAT COIL TO REMAIN FOR RECONNECTION. 2 DISCONNECT AND REMOVE EXISTING FUME HOOD EXHAUST AIR VALVE. EXISTING EXHAUST DUCTWORK AND FUME HOOD TO REMAIN FOR RECONNECTION. 3 DISCONNECT AND REMOVE EXISTING GENERAL LAB EXHAUST AIR VALVE AND ASSOCIATED EXHAUST DUCTWORK, AND ACCESSORIES. EXISTING EXHAUST DUCT MAIN TO REMAIN FOR RECONNECTION. RETAIN AND CLEAN EXISTING EXHAUST GRILLE FOR REINSTALLATION. #M-101 KEYED RENOVATION NOTES 1 RE-USE EMPTY CONTROLS ENCLOSURE FOR RENOVATION BUILDING AUTOMATION CONTROLS. 2 PROVIDE PROCESS EXHAUST AIR VALVE ABOVE CEILING. 3 4" PROCESS EXHAUST AIR DUCT DROP BELOW CEILING. SUPPORT DUCT FROM UTILITY RACK. PROVIDE CONNECTION FOR 1" INSIDE DIAMETER BRAIDED HOSE AND NW25 PORT. PROCESS EXHAUST TO SERVE GLOVE BOX REGENERATION GAS DISCHARGE AND PURGE GAS DISCHARGE EXHAUST. 4 PROVIDE NEW FUME HOOD EXHAUST AIR VALVE AND CONNECT TO DDC CONTROLS. PROVIDE NEW FUME HOOD CONTROLLER AND SASH POSITION SENSORS. 5 PROVIDE NEW GENERAL EXHAUST AIR VALVE. CONNECT TO DDC CONTROLS. 6 PROVIDE SUPPLY AIR VALVE AND CONNECT TO EXISTING SUPPLY AIR DUCTWORK ABOVE CEILING. PROVIDE ALL REQUIRED DUCT TRANSITIONS. 7 REBALANCE EXISTING SUPPLY AIR GRILLES TO VALUES SPECIFIED AND AS REQUIRED TO MEET THE SPACE AIRFLOW SCHEDULED ON M-501. 8 REPLACE EXISTING PNUEMATIC CONTROL VALVE SERVING REHEAT COIL. REFER TO DETAIL 1/M-501 AND CONTROL VALVE SCHEDULE ON M-501. 9 5" PROCESS EXHAUST AIR DROP BELOW CEILING TO 12" ABOVE FINISH FLOOR. SUPPORT DUCT FROM UTILITY RACK. PROVIDE THREE (3) CONNECTIONS FOR 1" INSIDE DIAMETER BRAIDED HOSE AND NW25 PORT. PROCESS EXHAUST TO SERVE VACUUM PUMP EXHAUST. COORDINATE FINAL DUCT DROP LOCATION WITH OWNER. 10 4" PROCESS EXHAUST AIR DROP BELOW CEILING TO 12" ABOVE FINISH FLOOR. SUPPORT ON WALL. PROVIDE CONNECTION FOR 1" INSIDE DIAMETER BRAIDED HOSE AND NW25 PORT. PROCESS EXHAUST TO SERVE VACUUM PUMP EXHAUST. COORDINATE FINAL DUCT DROP LOCATION WITH OWNER. SCALE:1/4" = 1'-0"1 PARTIAL FIRST FLOOR MECHANICAL DEMOLITION PLAN SCALE:1/4" = 1'-0"2 PARTIAL FIRST FLOOR MECHANICAL CONSTRUCTION PLAN 1 06/09/20 ISSUED FOR DD REVIEW 2 07/09/20 ISSUED FOR 90% REVIEW 3 08/11/20 ISSUED FOR CONSTRUCTION CB CB CBCB CB CB CB CB CB CB CB OLIN HALL 103, 105, 107 LAB RENOVATION 1 EF-10 (E) 1 EF-13 (E) 12" EA RISER FROM LAB 103 (E) 12" EA RISER FROM LAB 105 (E)CORN E LL U N I V E RSI TYFOU N D E D 5681 AD FACILITIES ENGINEERING ARCHIVE BAR CODEARCH/STRUCT: CIVIL/ENV: ELECTRICAL: MECHANICAL: DATE: FACILITY: DESIGN: DRAWN: WWW.FCS.CORNELL.EDU IT IS A VIOLATION OF NEW YORK STATE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT OR ENGINEER, TO ALTER THIS DOCUMENT IN ANY WAY. IF THIS DOCUMENT IS ALTERED, THE ALTERING ARCHITECT OR ENGINEER SHALL AFFIX TO SUCH DOCUMENT THEIR SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. WARNING REVISIONS ARCHITECTURAL, STRUCTURAL, CIVIL, ENVIRONMENTAL, MECHANICAL, AND ELECTRICAL ENGINEERING 201 HUMPHREYS SERVICE BLDG ITHACA, NEW YORK 14853-3701 113 HO PLAZA ITHACA, NEW YORK OLIN HALL - 103 YU LAB M-102 12672497 PARTIAL FOURTH FLOOR CONSTRUCTION PLAN E. KOLACKI TRF 2024 AUGUST 11, 2020 SCALE:1/4" = 1'-0"1 PARTIAL FOURTH FLOOR MECHANICAL CONSTRUCTION PLAN M-102 KEYED RENOVATION NOTES 1 MODIFY EXISTING EXHAUST BYPASS AIR DUCTWORK AS REQUIRED TO PROVIDE BYPASS AIR VALVE IN RISER. REFER TO CONTROLS DRAWING M-501 FOR BUILDING AUTOMATION AND CONTROL CONNECTIONS. 1 06/09/20 ISSUED FOR DD REVIEW 2 07/09/20 ISSUED FOR 90% REVIEW 3 08/11/20 ISSUED FOR CONSTRUCTION 0' 2' 4' 8' SCALE: 1/4"=1'-0" # CB CB CBCB CB CB CB CB CB CB CB OLIN HALL 103, 105, 107 LAB RENOVATION N.C. F AI FLOW AO MOD AO COMMAND T AI REHEAT COILAO SAV-103 FTR-103 SASH POSITION SENSOR 6' FUME HOOD (E) FUME HOOD MONITOR EAV-103-1 FLOW AIAO COMMAND FROM AHU-2 (E) SEQUENCE OF OPERATION SYSTEM DESCRIPTION EXISTING: EXHAUST FANS (EF-10, EF-4, EF-13) FUME HOODS WITH EXHAUST AIR VALVES (EAV-107-1, EAV-107-2) BYPASS EXHAUST AIR VALVES (BAV-107) SUPPLY AIR VALVE (SAV-107) DUCT MOUNTED RE-HEAT COILS AND BASEBOARD HEATING ROOM TEMPERATURE SENSORS ROOM OCCUPANCY SENSORS TO BE PROVIDED: FUME HOOD EXHAUST AIR VALVES (EAV-103-1, EAV-105-1) GENERAL EXHAUST AIR VALVES (EAV-103-2, EAV-105-2) PROCESS EXHAUST AIR VALVES (EAV-103-3, EAV-105-3) BYPASS EXHAUST AIR VALVES (BAV-103, BAV-105) SUPPLY AIR VALVES (SAV-103, SAV-105) REHEAT COIL CONTROL VALVE (CV-103) GENERAL ALL SETPOINTS SHALL BE ADJUSTABLE. REFER TO M-501 FOR CONTROL POINTS SCHEDULE. LABORATORY AIR CHANGE RATES ARE BASED ON TOTAL EXHAUST AIR FLOW FROM THE SPACE. THIS LABORATORY IS CURRENTLY SERVED BY AN EXISTING AUTOMATED LOGIC CONTROL SYSTEM. EXISTING POINTS ARE TO BE RE-UTILIZED FOR THE NEW SEQUENCE OF OPERATION WHERE FEASIBLE. THE BASIS OF DESIGN MAXIMUM AIRFLOWS ARE DESIGNED TO MAINTAIN A 100 FPM FACE VELOCITY AT THE FUME HOOD. HOWEVER, IT MAY BE POSSIBLE TO OPERATE THE FUME HOODS WITH A FACE VELOCITY OF 80 FPM. THIS WILL BE DETERMINED AT THE TIME OF FUME HOOD CERTIFICATION. THE BAGS CONTRACTOR WILL BE RESPONSIBLE FOR BEING ON-SITE DURING FUME HOOD CERTIFICATION, AND RE-PROGRAM AS NEEDED TO RESET THE AIRFLOW SETPOINTS BASED ON THE CERTIFICATION PROCESS. SETPOINTS SPACE TEMPERATURE SETPOINTS: OCCUPIED:WINTER 72 °F, SUMMER 75°F +/-1.5 °F OCCUPIED SETBACK:WINTER 72 °F, SUMMER 75°F +/-3 °F UNOCCUPIED:WINTER 72 °F, SUMMER 75°F +/-6 °F AIRFLOW SETPOINTS ARE DETAILED IN THE AIRFLOW SCHEDULE, SEE M-501. DOWNSTREAM STATIC PRESSURE SETPOINT: DETERMINE DURING TESTING AND BALANCING EFFORTS. LABORATORY AIRFLOW CONTROL AIR VALVE POSITIONS SHALL BE BASED ON MODE. UNDER NORMAL CONTROL, ROOM OCCUPANCY SHALL BE DETERMINED VIA ROOM OCCUPANCY SENSORS. WHEN THE ROOM IS OCCUPIED, THE BACS SHALL SEND AN OCCUPIED COMMAND TO THE FUME HOOD MONITORS. THE FUME HOOD EXHAUST AIR VALVES SHALL MODULATE BETWEEN THE MINIMUM AND MAXIMUM POSITIONS AS NEEDED TO MAINTAIN THE FACE VELOCITY SETPOINT BASED ON THE SASH POSITION. THE SUPPLY AIR VALVE SHALL MODULATE AS NEEDED TO MAINTAIN THE SPACE AT 100 CFM NEGATIVE. WHEN THE ROOM IS UNOCCUPIED, AND THE SASHES ARE AT OR BELOW 18-INCHES, THE BACS SHALL SEND AN UNOCCUPIED COMMAND TO THE FUME HOOD MONITORS. THE FUME HOOD EXHAUST AIR VALVES SHALL MODULATE BETWEEN MINIMUM AND MAXIMUM UNOCCUPIED POSITIONS AS NEEDED TO MAINTAIN A 65 FPM FACE VELOCITY SETPOINT BASED ON THE SASH POSITION. THE SUPPLY AIR VALVE SHALL MODULATE AS NEEDED TO MAINTAIN THE SPACE AT 100 CFM NEGATIVE. WHEN THE ROOM IS UNOCCUPIED AND ANY OF THE FUME HOOD SASHES ARE ABOVE 18- INCHES, THE BACS SHALL NOT SEND THE SPACE UNOCCUPIED COMMAND TO THOSE PARTICULAR FUME HOOD EXHAUST AIR VALVES. THE FUME HOOD EXHAUST AIR VALVES WHOSE SASHES ARE ABOVE 18-INCHES SHALL MAINTAIN THE OCCUPIED SASH OPEN AIRFLOW SETPOINT. THE BACS WILL SEND THE UNOCCUPIED COMMAND TO THOSE FUME HOODS WHOSE SASHES ARE AT OR BELOW 18-INCHES AND THE FUME HOOD EXHAUST AIR VALVES WHOSE SASHES ARE AT 18-INCHES OR BELOW SHALL MODULATE TO MAINTAIN A 65 FPM FACE VELOCITY SETPOINT. THE SUPPLY AIR VALVE SHALL MODULATE AS NEEDED TO MAINTAIN THE SPACE AT 100 CM NEGATIVE. ZONE TEMPERATURE CONTROL TEMPERATURE SETPOINTS SHALL BE DETERMINED BASED ON A COMBINATION OF PROGRAMMED SCHEDULE AND SPACE OCCUPANCY SENSORS. OCCUPIED HEATING: IF THE SPACE IS OCCUPIED DURING THE SCHEDULED OCCUPIED PERIOD AND THE SPACE TEMPERATURE FALLS BELOW THE OCCUPIED HEATING TEMPERATURE SETPOINT, THE BASEBOARD RADIATION CONTROL VALVE SHALL MODULATE TO MAINTAIN THE SPACE TEMPERATURE SETPOINT. IF THE SPACE TEMPERATURE IS NOT AT SETPOINT WITH THE BASE BOARD RADIATION CONTROL VALVE FULLY OPEN, THE REHEAT CONTROL VALVE SHALL MODULATE TO MAINTAIN THE SPACE TEMPERATURE SETPOINT. WHEN THE SPACE TEMPERATURE IS AT SETPOINT, THE BASEBOARD RADIATION AND REHEAT COIL CONTROL VALVES SHALL BE CLOSED. OCCUPIED SETBACK: IF THE SPACE BECOMES UNOCCUPIED DURING THE SCHEDULED OCCUPIED PERIOD, THE ABOVE OCCUPIED HEATING SEQUENCE SHALL APPLY, BUT THE SPACE SHALL BE MAINTAINED AT THE OCCUPIED SETBACK TEMPERATURE SETPOINT. UNOCCUPIED HEATING: IF THE SPACE IS UNOCCUPIED DURING THE SCHEDULED UNOCCUPIED PERIOD AND THE SPACE TEMPERATURE FALLS BELOW THE UNOCCUPIED HEATING TEMPERATURE SETPOINT, THE BASEBOARD RADIATION CONTROL VALVE SHALL MODULATE AS REQUIRED TO MAINTAIN SETPOINT. COOLING: THERE ARE NO COOLING MODE SEQUENCES REQUIRED FOR THIS SPACE. EXHAUST FAN AND BYPASS VALVE CONTROL THE EXHAUST FAN SHALL BE ENABLED AT ALL TIMES AND RUN AT CONSTANT SPEED. IF THE EXHAUST DUCT STATIC PRESSURE FALLS MORE NEGATIVE THAN SETPOINT, THE BYPASS AIR VALVE WILL OPEN AND MODULATE TO MAINTAIN SETPOINT. IF THE EXHAUST DUCT STATIC PRESSURE RISES MORE POSITIVE THAN SETPOINT, THE BYPASS AIR VALVE SHALL MODULATE CLOSED AS NEEDED TO MAINTAIN SETPOINT. HEATING LOAD SHED UPON A STEAM LOAD SHED 1,2,3, OR 4 INPUT, THE ZONE SHALL INDEX TO UNOCCUPIED MODE, BUT SHALL BE RESETTABLE TO OCCUPIED MODE UPON OCCUPANCY. UPON A STEAM LOAD SHED 5 OR 6 INPUT, THE ZONE SHALL INDEX TO UNOCCUPIED MODE AIR CHANGE RATES, AND THE SPACE TEMPERATURE SETPOINT SHALL BE 60°F. LAB 103 AI SASH POSITION AI (FACE VELOCITY) BI (ALARM) BO (HOOD SETBACK COMMAND) EAV-103-2 FLOW AIAO COMMAND EF-10 (E) EAV-103-3 FLOW AIAO COMMAND N.C. F AI FLOW AO MOD AO COMMAND T AI REHEAT COILAO SAV-105 FTR-105 SASH POSITION SENSOR 6' FUME HOOD (E) FUME HOOD MONITOR EAV-105-1 FLOW AIAO COMMAND LAB 105 AI SASH POSITION AI (FACE VELOCITY) BI (ALARM) BO (HOOD SETBACK COMMAND) EAV-105-2 FLOW AIAO COMMAND EAV-105-3 FLOW AIAO COMMAND N.C. F AI FLOW AO MOD AO COMMAND T AI REHEAT COILAO SAV-107 FTR-107 SASH POSITION SENSOR 6' FUME HOOD (E) FUME HOOD MONITOR EAV-107-1 FLOW AIAO COMMAND LAB 107 AI SASH POSITION AI (FACE VELOCITY) BI (ALARM) BO (HOOD SETBACK COMMAND) EAV-107-2 FLOW AIAO COMMANDSASH POSITION SENSOR 5' FUME HOOD (E) FUME HOOD MONITOR AI SASH POSITION AI (FACE VELOCITY) BI (ALARM) BO (HOOD SETBACK COMMAND) OPEN TO ADJACENT LAB OPEN TO ADJACENT LAB BAV-103 FLOW AI AO COMMAND SP AI EF-13 (E) BAV-105FLOW AI AO COMMAND SP AI ROTAVAP EXHAUST EF-4(E) BAV-107FLOW AI AO COMMAND SP AI CV-103-RH CV-105-RH CORN E LL U N I V E RSI TYFOU N D E D 5681 AD FACILITIES ENGINEERING ARCHIVE BAR CODEARCH/STRUCT: CIVIL/ENV: ELECTRICAL: MECHANICAL: DATE: FACILITY: DESIGN: DRAWN: WWW.FCS.CORNELL.EDU IT IS A VIOLATION OF NEW YORK STATE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT OR ENGINEER, TO ALTER THIS DOCUMENT IN ANY WAY. IF THIS DOCUMENT IS ALTERED, THE ALTERING ARCHITECT OR ENGINEER SHALL AFFIX TO SUCH DOCUMENT THEIR SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. WARNING REVISIONS ARCHITECTURAL, STRUCTURAL, CIVIL, ENVIRONMENTAL, MECHANICAL, AND ELECTRICAL ENGINEERING 201 HUMPHREYS SERVICE BLDG ITHACA, NEW YORK 14853-3701 113 HO PLAZA ITHACA, NEW YORK OLIN HALL - 103 YU LAB M-401 12672497 SEQUENCE OF OPERATION AND CONTROL GRAPHICS E. KOLACKI TRF 2024 AUGUST 11, 2020 SCALE: NO SCALE 1 BUILDING AUTOMATION AND CONTROL SYSTEM 1 06/09/20 ISSUED FOR DD REVIEW 2 07/09/20 ISSUED FOR 90% REVIEW 3 08/11/20 ISSUED FOR CONSTRUCTION CB CB CBCB CB CB CB CB CB CB CB OLIN HALL 103, 105, 107 LAB RENOVATION SUPPLY RETURN ISOLATION VALVE (TYP. OF 2) BALANCING VALVE PRESSURE/TEMPERATURE TEST PORT (TYP. OF 2) MANUAL AIR VENT COIL CV-103-RH CV-105-RH 1ST FLOOR 0' -0" 2ND FLOOR 14' -0" 1ST FLOOR 0' -0" 2ND FLOOR 14' -0" GLOVE BOX (EXG)4ø5ø CORN E LL U N I V E RSI TYFOU N D E D 5681 AD FACILITIES ENGINEERING ARCHIVE BAR CODEARCH/STRUCT: CIVIL/ENV: ELECTRICAL: MECHANICAL: DATE: FACILITY: DESIGN: DRAWN: WWW.FCS.CORNELL.EDU IT IS A VIOLATION OF NEW YORK STATE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT OR ENGINEER, TO ALTER THIS DOCUMENT IN ANY WAY. IF THIS DOCUMENT IS ALTERED, THE ALTERING ARCHITECT OR ENGINEER SHALL AFFIX TO SUCH DOCUMENT THEIR SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. WARNING REVISIONS ARCHITECTURAL, STRUCTURAL, CIVIL, ENVIRONMENTAL, MECHANICAL, AND ELECTRICAL ENGINEERING 201 HUMPHREYS SERVICE BLDG ITHACA, NEW YORK 14853-3701 113 HO PLAZA ITHACA, NEW YORK OLIN HALL - 103 YU LAB M-501 12672497 SCHEDULES, DETAILS, AND ELEVATIONS E. KOLACKI TRF 2024 AUGUST 11, 2020 AIR VALVE SCHEDULE & SPECS TAG # SERVES SUP EXH BASIS OF DESIGN SIZE DESIGN CFM ΔPT @ MAX DESIGN CFM REHEAT COIL TAG DAMPER POSITIONMANF MODEL MAX MIN SAV-103 LAB 103 X ACCUVALVE AVC6410-03-IW 10" 1056 120 0.30 RHC-103 (E) N.C SAV-105 LAB 105 X ACCUVALVE AVC6410-03-IW 10" 1085 120 0.30 RHC-105 (E) N.C. EAV-103-1 LAB 103 FUME HOOD X ACCUVALVE AVC6210-03-W 10"1056 120 0.30 N/A N.O. EAV-103-3 LAB 103 PROCESS X ACCUVALVE AVC6406-03-W 8" 650 80 0.30 N/A N.O. EAV-103-2 LAB 103 GENERAL X ACCUVALVE AVC6408-03-W 8" 650 80 0.30 N/A N.O. EAV-105-1 LAB 105 FUME HOOD X ACCUVALVE AVC6210-03-W 10"1056 120 0.30 N/A N.O. EAV-105-3 LAB 105 PROCESS X ACCUVALVE AVC6406-03-W 8" 254 30 0.30 N/A N.O. EAV-105-2 LAB 105 GENERAL X ACCUVALVE AVC6406-03-W 8" 254 30 0.30 N/A N.O. BAV-103 LAB 103 BYPASS X ACCUVALVE AVC6412-03-W 12" 1461 180 0.30 N/A N.O. BAV-105 LAB 105 BYPASS X ACCUVALVE AVC6412-03-W 12" 1461 180 0.30 N/A N.O. AIRFLOW SCHEDULE LAB ROOM DIMENSIONS MINIMUM AIR CHANGE RATES EXHAUST AIR SUPPLY AIR AREA (SF) HEIGHT (FT)8 ACH 6 ACH 4 ACH 3 ACH EXHAUST POINT VALVE OCC SASH OPEN 100 FPM OCC SASH OPEN 80 FPM OCC SASH CLOSED UNOCC SASH FULL UNOCC SASH OPEN UNOCC SASH CLOSED SUPPLY POINT OCC SASH OPEN 100 FPM OCC SASH OPEN 80 FPM (CFM) OCC SASH CLOSED UNOCC SASH FULL UNOCC SASH OPEN UNOCC SASH CLOSED XFER ALL MODES (CFM) 103 542 9 650 488 325 244 6' FUME HOOD (EXISTING TO REMAIN) EAV-103-1 785 CFM 628 CFM 110 CFM 785 CFM 510 CFM 110 CFM SAV-103 1085 CFM 928 CFM 550 CFM 1085 CFM 810 CFM 410 CFM -100 CFM GENERAL EXHAUST EAV-103-2 100 CFM 100 CFM 240 CFM 100 CFM 100 CFM 100 CFM PROCESS EXHAUST EAV-103-3 300 CFM 300 CFM 300 CFM 300 CFM 300 CFM 300 CFM TOTAL LAB 1185 CFM 1028 CFM 650 CFM 1135 CFM 860 CFM 460 CFM BYPASS AIR BAV-103 265 CFM 422 CFM 800 CFM 315 CFM 590 CFM 990 CFM EF-10 (EXISTING TO REMAIN)1450 CFM 1450 CFM 1450 CFM 1450 CFM 1450 CFM 1450 CFM 105 559 9 671 503 335 252 6' FUME HOOD (EXISTING TO REMAIN) EAV-105-1 785 CFM 628 CFM 110 CFM 785 CFM 510 CFM 110 CFM SAV-105 960 CFM 803 CFM 285 CFM 910 CFM 635 CFM 235 CFM -100 CFM GENERAL EXHAUST EAV-105-2 150 CFM 150 CFM 150 CFM 100 CFM 100 CFM 100 CFM PROCESS EXHAUST EAV-105-3 125 CFM 125 CFM 125 CFM 125 CFM 125 CFM 125 CFM TOTAL LAB 1060 CFM 903 CFM 385 CFM 1010 CFM 735 CFM 335 CFM BYPASS AIR BAV-105 390 CFM 547 CFM 1065 CFM 440 CFM 715 CFM 1115 CFM EF-13 (EXISTING TO REMAIN)1450 CFM 1450 CFM 1450 CFM 1450 CFM 1450 CFM 1450 CFM 107 571 9 685 514 343 257 6' FUME HOOD (EXISTING TO REMAIN) EAV-107-1 EXISTING TO REMAIN) 785 CFM 628 CFM 330 CFM 785 CFM 510 CFM 130 CFM SAV-107 1432 CFM 1142 CFM 585 CFM 1432 CFM 925 CFM 242 CFM -100 CFM 5' ADA FUME HOOD (EXISTING TO REMAIN) EAV-107-2 (EXISTING TO REMAIN) 665 CFM 532 CFM 273 CFM 665 CFM 432 CFM 130 CFM SNORKEL (EXISTING TO REMAIN) N/A 82 CFM 82 CFM 82 CFM 82 CFM 82 CFM 82 CFM TOTAL LAB 1532 CFM 1242 CFM 685 CFM 1532 CFM 1025 CFM 342 CFM BYPASS AIR BAV-107 (EXISTING TO REMAIN) 0 CFM 290 CFM 847 CFM 0 CFM 508 CFM 1190 CFM EF-4 1532 CFM 1532 CFM 1532 CFM 1532 CFM 1532 CFM 1532 CFM HVAC PIPE AND FITTING SCHEDULE AND SPECIFICATIONS PIPE SERVICE ABBREVIATION PIPE SIZE MATERIAL FITTINGS JOINT INSULATION HYDRONIC HOT WATER HWS&R 1-1/2" & BELOW ASTM B88 TYPE L COPPER ASTM B16.22 STD WROUGHT COPPER ASTM B32 SOLDER 1", TYPE B WITH VAPOR RETARDER CONTROL VALVE SCHEDULE & SPEC TAG BOD MANF BOD VALVE MODEL SERVICE VALVE TYPE VALVE SIZE (IN)CV ACTUATOR MODEL CONTROL CAPACITY (GPM)MAX PD (PSIG) FAIL POS CV-103-RH BELIMO CCV-B211 RHC-103 (E) 2-WAY 1/2 1.9 TR24-SR-T US ELECTRIC 4.0 4 OPEN CV-105-RH BELIMO CCV-B211 RHC-105 (E) 2-WAY 1/2 1.9 TR24-SR-T US ELECTRIC 4.0 4 OPEN DUCT SCHEDULE AND SPECIFICATIONS SERVICE PRESSURE CLASS SEAL CLASS LEAKAGE CLASS DUCT MATERIAL LINING DUCT INSULATION SUPPLY, RECTANGULAR, CONCEALED (ABOVE CEILING) 4" POS A 6" POS/NEG G90 GALVANIZED NONE MIN R-6, TYPE A WITH VAPOR RETARDER SUPPLY, ROUND, CONCEALED (ABOVE CEILING) 4" POS A 3" POS/NEG G90 GALVANIZED NONE MIN R-6, TYPE A WITH VAPOR RETARDER EXHAUST, ROUND, GENERAL AND PROCESS 4" NEG A 3" POS/NEG G90 GALVANIZED NONE NONE EXHAUST, ROUND, FUME HOOD EXHAUST 4" NEG A 3" POS/NEG 316 STAINLESS STEEL, WELDED NONE NONE SCALE:NO SCALE1REHEAT COIL PIPING DETAIL 1 06/09/20 ISSUED FOR DD REVIEW 2 07/09/20 ISSUED FOR 90% REVIEW 3 08/11/20 ISSUED FOR CONSTRUCTION SCALE:1/4" = 1'-0"2 PROCESS EXHAUST AIR ELEVATION 1. ALL DUCTWORK AND ACCESSORIES SHALL BE FABRICATED AND INSTALLED IN COMPLIANCE WITH THE LATEST ISSUE OF SMACNA'S HVAC DUCT CONSTRUCTION STANDARDS -METAL AND FLEXIBLE. 2. CONSTRUCT TEES, BENDS, AND ELBOWS WITH RADIUS OF NOT LESS THAN 1.0 TIMES THE WIDTH OF DUCT ON CENTER LINES. 3. WHERE RECTANGULAR ELBOWS ARE USED, PROVIDE AIR FOIL TYPE TURNING VANES 4. INCREASE DUCT SIZES GRADUALLY, AND IN COMPLIANCE WITH FIGURE 4-7 OF SMACNA'S HVAC DUCT CONSTRUCTION STANDARDS -METAL AND FLEXIBLE. 5. BRANCH CONNECTIONS SHALL BE MADE WITH A 45 DEGREE ENTRY. STRAIGHT TEES ARE NOT ACCEPTABLE. 6. SEALANTS AND GASKETS: SURFACE BURNING CHARACTERISTICS SHALL BE A MAXIMUM FLAME-SPREAD INDEX OF 25, AND MAXIMUM SMOKE-DEVELOPED INDEX OF 50 WHEN TESTED TO UL 723. 7. ALL MANUAL BALANCING DAMPERS SHALL BE PROVIDED WITH LOCKING HAND QUADRANT. 8. ACCESS DOORS SHALL BE GALVANIZED SHEETMETAL WITH INSULATION FILL AND THICKNESS AS INDICATED FOR DUCT PRESSURE CLASS. 9. ACCESS DOORS SHALL BE INSTALLED IN THE FOLLOWING LOCATIONS: BOTH SIDES OF DUCT COILS IN ORDER TO RESET OR REINSTALL FUSIBLE LINKS, AND AS INDICATED. 10. INSTALL VOLUME DAMPERS AT POINTS ON SUPPLY AND EXHAUST SYSTEMS WHERE BRANCHES EXTEND FROM LARGER DUCTS. 11. PAINT ALL DUCTWORK EXPOSED TO VIEW IN OCCUPIED AREAS TO MATCH SURROUNDING FINISH. 12. REMOVE SURFACE CONTAMINANTS AND DEPOSITS FROM DUCTWORK AND EQUIPMENT PRIOR TO TESTING AND BALANCING. 13. LEAK TESTING OF DUCTWORK SHALL BE IN ACCORDANCE WITH SMACNA'S HVAC AIR DUCT LEAKAGE TEST MANUAL. 14. ALL DUCTS DESIGNED TO OPERATE AT STATIC PRESSURES IN EXCESS OF 3-INCHES WG (POS OR NEG) SHALL BE TESTED. TEST SHALL BE WITNESSED BY A DESIGNATED CORNELL REPRESENTATIVE AND THE PROJECT ENGINEER OF RECORD. 25% OF DUCTS DESIGNED TO OPERATE AT STATIC PRESSURES 3-INCHES AND BELOW SHALL BE TESTED. ACCEPTANCE CRITERIA: INTERIOR SUPPLY, RETURN AND GENERAL EXHAUST: 5% SYSTEM LEAKAGE TESTED AT 1.25 TIMES THE EXPECTED OPERATING STATIC PRESSURE. ACCEPTANCE CRITERIA: INTERIOR LABORATORY EXHAUST SYSTEMS: 2% SYSTEM LEAKAGE TESTED AT 1.25 TIMES THE EXPECTED OPERATING STATIC PRESSURE. AN AIR DUCT LEAKAGE TEST SUMMARY SHALL BE SUBMITTED TO THE ENGINEER FOR APPROVAL PRIOR TO FINAL PROJECT ACCEPTANCE. 15. ALL INSULATION AND ADHESIVE SHALL HAVE A MAXIMUM FLAME-SPREAD INDEX OF 25 AND A MAXIMUM SMOKE-DEVELOPED INDEX OF 50 WHEN TESTED IN ACCORDANCE WITH ASTM E84. 16. INSULATION TYPE A: MINERAL FIBERGLASS BLANKET, ASTM C553 TYPE I, ASTM C1136 TYPE I FACTORY APPLIED FSK JACKET, K-VALUE BETWEEN 0.22 -0.29 BTU-IN/HR-FT²-˚F @ 75 ˚F, 0.75 PCF 1. OCCUPIED SASH OPEN MODE: FUME HOOD EXHAUST AIRFLOW REPRESENTS A 100 FPM FACE VELOCITY AT 18-INCH SASH HEIGHT. 2. COORDINATE WITH CORNELL EH&S DURING FUME HOOD TESTING AND CERTIFICATION. REDUCTION IN THE FUME HOOD FACE VELOCITY TO 80 FPM MAY BE POSSIBLE. 3. IF THE SPACE IS UNOCCUPIED, AND THE SASH IS ABOVE 18-INCHES, THE FUME HOOD EXHAUST VALVE SHALL NOT INDEX TO UNOCCUPIED MODE. 4. UNOCC SASH MODE: FUME HOOD EXHAUST AIRFLOW REPRESENTS A 65 FPM FACE VELOCITY, SASH IS AT OR BELOW 18-INCHES. FUME HOOD EXHAUST VALVE SHALL INDEX TO UNOCCUPIED MODE. CONTROL AND ALARM POINTS SCHEDULE LAB 105 HARDWARE POINTS SOFTWARE POINTS SHOW ON GRAPHIC NOTESBI BO AI AO AV BV SCH TREND ALARM BACS EMCS DESCRIPTION BAV-103 POSITION COMMAND (CFM)X X BAV-105 POSITION COMMAND (CFM)X CV-103-RH, COIL VALVE POSITION COMMAND (%)X 5 DEG F DELTA T ACROSS COIL WITH VALVE COMMANDED CLOSED CV-105-RH, COIL VALVE POSITION COMMAND (%)X 5 DEG F DELTA T ACROSS COIL WITH VALVE COMMANDED CLOSED DOWNSTREAM DUCT STATIC PRESSURE (BAV-103)X X X X DEVIATION FROM SETPOINT X DOWNSTREAM DUCT STATIC PRESSURE (BAV-105)X X X X DEVIATION FROM SETPOINT X DOWNSTREAM DUCT STATIC PRESSURE SETPOINT (BAV-103)X X DOWNSTREAM DUCT STATIC PRESSURE SETPOINT (BAV-105)X X EAV-103-1, AIRFLOW (CFM)X X X USE EXISTING POINT EAV-103-1, AIRFLOW SETPOINT (CFM)X X 10% DEVIATION FROM SETPOINT EAV-103-1, FUME HOOD UNOCC COMMAND X X EAV-103-1, VALVE POSTION COMMAND (CFM)X X SERVES NEW EXHAUST VALVE ON EXISTING FUME HOOD EAV-103-2, AIRFLOW (CFM)X X X USE EXISTING POINT EAV-103-2, AIRFLOW SETPOINT (CFM)X X USE EXISTING POINT EAV-103-2, VALVE POSITION COMMAND (CFM)X X USE EXISTING POINT EAV-103-3, AIRFLOW (CFM)X X X SERVES NEW PROCESS EXHAUST VALVE EAV-103-3, AIRFLOW SETPOINT (CFM)X X SERVES NEW PROCESS EXHAUST VALVE EAV-103-3, VALVE POSITION COMMAND (CFM)X X 10% DEVIATION FROM SETPOINT SERVES NEW PROCESS EXHAUST VALVE EAV-105-1, AIRFLOW (CFM)X X X USE EXISTING POINT EAV-105-1, AIRFLOW SETPOINT (CFM) EAV-105-1, FUME HOOD UNOCC COMMAND X X EAV-105-1, VALVE POSITION COMMAND (CFM)X X SERVES NEW EXHAUST VALVE ON EXISTING FUME HOOD EAV-105-2, AIRFLOW (CFM)X X X USE EXISTING POINT EAV-105-2, AIRFLOW SETPOINT (CFM)X X USE EXISTING POINT EAV-105-2, VALVE POSITION COMMAND (CFM)X X USE EXISTING POINT EAV-105-3, AIRFLOW (CFM)X X X SERVES NEW PROCESS EXHAUST VALVE EAV-105-3, AIRFLOW SETPOINT (CFM)X X SERVES NEW PROCESS EXHAUST VALVE EAV-105-3, VALVE POSITION COMMAND (CFM)X X 10% DEVIATION FROM SETPOINT X SERVES NEW PROCESS EXHAUST VALVE LAB 103 FUME HOOD SASH POSITION X X X SASH OPEN (18") FOR 24 CONTINUOUS HOURS OR MORE X PROVIDE SASH SENSOR ON EXISTING FUME HOOD LAB 103 FUME HOOD STATUS (ALARM)X X X LOW FACE VELOCITY X SERVES EXISTING FUME HOOD LAB 103 FUME HOOD VELOCITY (FPM)X X PROVIDE NEW FUME HOOD MONITOR ON EXISTING FUME HOOD LAB 105 FUME HOOD SASH POSITION X X X SASH OPEN (18") FOR 24 CONTINUOUS HOURS OR MORE X PROVIDE SASH SENSOR ON EXISTING FUME HOOD LAB 105 FUME HOOD STATUS (ALARM)X X X LOW FACE VELOCITY X SERVES EXISTING FUME HOOD LAB 105 FUME HOOD VELOCITY (FPM)X X PROVIDE NEW FUME HOOD MONITOR ON EXISTING FUME HOOD SAV-103, AIRFLOW (CFM)X X X USE EXISTING POINT SAV-103, AIRFLOW SETPOINT (CFM)X X USE EXISTING POINT SAV-103, VALVE POSITION COMMAND (CFM)X X USE EXISTING POINT SAV-105, AIRFLOW (CFM)X X X USE EXISTING POINT SAV-105, AIRFLOW SETPOINT (CFM)X X USE EXISTING POINT SAV-105, VALVE POSITION COMMAND (CFM)X X USE EXISTING POINT 1. THE AIRFLOW DEVICES SHALL BE CALIBRATED AT THE FACTORY TO THE FULL RANGE OF RECOMMENDED AIRFLOWS. ACTUAL AIRFLOWS WILL BE SET IN SOFTWARE. 2. OPTION: INSULATION 3. SETPOINTS REPRESENT FUME HOOD FACE VELOCITY AT 100 FPM. FINAL SETPOINTS WILL BE ADJUSTED IF FACE VELOCITIES ARE REDUCED TO 80 FPM AS A RESULT OF FUME HOOD TESTING AND CERTIFICATION. 4. ACCEPTABLE MANUFACTURERS: ACCUTROL 5. CONFIGURATION: PRESSURE INDEPENDENT. 6. SUPPLY VALVE BODY: 20 GA GALVANIZED STEEL, NO COATING, INSULATED. 7. HOOD EXHAUST VALVE BODY: 20 GA 304 STAINLESS STEEL. 8. INSTALLATION: LEVEL AND PLUMB, PER NFPA 90A, SMACNA DUCT CONSTRUCTION STANDARDS, AND MANUFACTURERS RECOMMENCED INSTRUCTIONS. CB CB CBCB CB CB CB CB CB CB CB OLIN HALL 103, 105, 107 LAB RENOVATION CORNE LL U N I V E R SI TYFOUN D E D 5681AD FACILITIES ENGINEERING ARCHIVE BAR CODEARCH/STRUCT: CIVIL/ENV: ELECTRICAL: MECHANICAL: DATE: FACILITY: DESIGN: DRAWN: WWW.FCS.CORNELL.EDU IT IS A VIOLATION OF NEW YORK STATE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT OR ENGINEER, TO ALTER THIS DOCUMENT IN ANY WAY. IF THIS DOCUMENT IS ALTERED, THE ALTERING ARCHITECT OR ENGINEER SHALL AFFIX TO SUCH DOCUMENT THEIR SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. WARNING REVISIONS ARCHITECTURAL, STRUCTURAL, CIVIL, ENVIRONMENTAL, MECHANICAL, AND ELECTRICAL ENGINEERING 201 HUMPHREYS SERVICE BLDG ITHACA, NEW YORK 14853-3701 113 HO PLAZA ITHACA, NEW YORK OLIN HALL - YU LAB 103 E-001 12672497 GENERAL NOTES AND SYMBOL LEGENDS H. TRAN JD 2024 AUGUST 11, 2020 ELECTRICAL SUBMITTAL SCHEDULE MATERIAL SCHEDULE/ SHOP DWGS. PRODUCT DATA SAMPLES INSPECTIONS & TESTS O&M DATA WARRANTIES RECEPTACLES X WIREMOLD X GENERAL ELECTRICAL NOTES 1.0 ELECTRICAL SCHEMATICS INDICATED ON CONTRACT DOCUMENTS ARE DIAGRAMMATIC. IT IS NOT THE INTENT TO SHOW EXACT OR MOST EFFICIENT ROUTING. VERIFY ALL DIMENSIONS AND FIELD CONDITIONS ON SITE. ANY CONFLICTS BETWEEN CONSTRUCTION DOCUMENTS AND FIELD CONDITIONS SHALL BE BROUGHT TO CORNELL'S PROJECT MANAGER FOR RESOLUTION BEFORE WORK PROCEEDS. 2.0 ASSURE PUBLIC AND WORKER SAFETY AT ALL TIMES. PROTECT ADJOINING AREAS FROM DAMAGE AND DUST. REMOVE ALL DEBRIS FROM SITE AND DISPOSE OF WASTE MATERIAL IN A SAFE MANNER. KEEP THE PREMISES FREE OF DEBRIS FROM THE EXECUTION OF WORK. DELIVER A FINAL PRODUCT THAT IS CLEAN AND OPERABLE. 3.0 FIRE STOP ELECTRICAL PENETRATIONS THROUGH FIRE RATED WALLS AND/OR FLOORS WITH MATERIAL EQUAL IN RATING TO THE CONSTRUCTION OF THE MATERIAL PENETRATED. 4.0 WORK SHALL BE COMPLETED AS SPECIFIED AND INDICATED ON CONTRACT DOCUMENTS. ANY SUGGESTED ALTERNATE MANUFACTURER OR METHOD OF INSTALLATION SHALL BE SUBMITTED TO PROJECT ENGINEER FOR APPROVAL PRIOR TO ORDERING ANY MATERIALS OR COMMENCING EXECUTION OF WORK. 5.0 GROUNDING SHALL BE IN STRICT ACCORDANCE WITH NEC ARTICLE 250. PROVIDE EQUIPMENT GROUND CONDUCTOR WITH EACH BRANCH CIRCUIT INDICATED ON CONTRACT DOCUMENTS. EQUIPMENT GROUND CONDUCTOR SHALL BE ROUTED WITH ASSOCIATED PHASE CONDUCTORS. 6.0 PROVIDE A NEW TYPED PANELBOARD DIRECTORY FOR EACH PANELBOARD. LABEL ALL NEW DEVICE FACEPLATES WITH SOURCE AND CIRCUIT NUMBER. PROVIDE PERMANENT LABEL ON SWITCHING DEVICES INDICATING EQUIPMENT SERVICE AND INVENTORY NUMBERS. COORDINATE EQUIPMENT INVENTORY NUMBERS WITH CORNELL UNIVERSITY'S MECHANICAL SHOP, 255-8667. 7.0 CIRCUITS RATED 20-AMP, 120 VOLT SHALL CONTAIN SEPARATE NEUTRAL CONDUCTORS. 8.0 CONDUCTORS SHALL BE A MINIMUM OF 12AWG, STRANDED COPPER, 600VAC, 90 DEGREE C, TYPE THHN/THWN-2 FOR DRY AREAS AND XHHW/THWN-2 FOR WET AREAS. 9.0 CONDUITS SHALL BE A MINIMUM OF 3/4 INCHES DIAMETER. CONDUITS SHALL BE ELECTRICAL METALLIC TUBING (EMT) AND SURFACE MOUNTED UNLESS NOTED OTHERWISE. 10.0 AIC RATING OF NEW CIRCUIT BREAKERS SHALL MATCH RATING OF RESPECTIVE PANELBOARD. SIZE AS INDICATED. 11.0 PROVIDE PULL STRING THROUGH NEW CONDUIT AND BOXES. PROVIDE SUPPORT HANGERS FOR CONDUIT AS NEEDED. 12.0 INSTALL RACEWAY SYSTEMS ENSURING PROPER ACCESS TO EQUIPMENT AND DEVICES AND WITH SUFFICIENT SPACE TO PERFORM ROUTINE MAINTENANCE AND REPAIR. RACEWAYS THAT ARE NOT INSTALLED WITH THIS REQUIREMENT IN MIND SHALL BE RELOCATED AT NO EXPENSE TO THE UNIVERSITY UNTIL DEFICIENCIES ARE CORRECTED. ELECTRICAL SCOPE OF WORK 1.0 PROVIDE ELECTRICAL SUPPORTS FOR THE RENOVATION IN LAB 103, 105, AND 107. ELECTRICAL LEGEND LIGHTING LEGEND MOTOR 1'x4' LUMINAIRE HARDWIRED EQUIPMENT CONNECTION P-1A 12 HOMERUN TO PANEL P-1A, CIRCUIT #12. FED FROM 20A -1P BREAKER IS INTENDED UNLESS NOTED OTHERWISE. RUN GREEN WIRE GROUND FOR ALL CIRCUITS. PROVIDE ONE GROUND PER CIRCUIT. EMERGENCY POWER OFF (EPO) GROUND ROD ELECTRODE DUPLEX RECEPTACLE WITH GFCI PROTECTION DUPLEX RECEPTACLE WITH AFCI PROTECTION QUAD RECEPTACLE LINETYPES LEGEND PANELBOARD JUNCTION BOX B = INSTALLED IN BASEBOARD TR = INSTALLED IN WOOD TRIM/CASEWORK/WAINSCOTT SR = SURFACE RACEWAY WP = WEATHERPROOF AC = AIR CONDITIONER DUPLEX RECEPTACLE: DOUBLE DUPLEX RECEPTACLE MOTOR STARTER J 2'x4' LUMINAIRE CEILING MOUNTED LUMINAIRE EM LIGHTING BATTERY UNIT COMBO EXIT SIGN/EM LIGHTING BATTERY UNIT SINGLE FACE, WALL MOUNT EXIT SIGN DOUBLE FACE, WALL MOUNT EXIT SIGN SINGLE FACE, CEILING MOUNT EXIT SIGN DOUBLE FACE, CEILING MOUNT EXIT SIGN LIGHT SWITCH: SAFETY SWITCH (NON-FUSED) SAFETY SWITCH (FUSED) 3 = 3-WAY SWITCH 4 = 4-WAY SWITCH D = DIMMER SWITCH O = WALL SWITCH OCCUPANCY SENSOR V = WALL SWITCH VACANCY SENSOR W = WIRELESS SWITCH S = WIRELESS SCENE SWITCH WIRELESS OCCUPANCY SENSOR WIRELESS DAYLIGHT SENSOR OS DS 1'x2' LUMINAIRE FIRE ALARM LEGEND FIRE ALARM CONTROL PANEL BATTERY CABINET WATER FLOW SWITCH MUXPAD REMOTE ANNUNCIATOR D = DUCT SMOKE DETECTOR R = RELAY BASE BR = BEAM RECEIVER BT = BEAM TRANSMITTER SB = SOUNDER BASE SMOKE DETECTOR: TAMPER SWITCH AUDIBLE NOTIFICATION APPLIANCE FACP BATT MUX FAA NAC PANELNAC MANUAL PULL STATIONF S X F = FIXED TEMPERATURE R = RATE OF RISE R/F = COMBINATION RISE/FIXED TEMPERATURE HEAT DETECTOR: H X CARBON MONOXIDE DETECTORCO AM F XXcd C FS F S XXcd C TS ADDRESSABLE MODULE XXcd = CANDELA C = CEILING COMBO A/V NOTIFICATION APPLIANCE: XXcd = CANDELA C = CEILING VISUAL NOTIFICATION APPLIANCE: SUPPRESSION SYSTEM ELECTRICAL ABBREVIATIONS AC AIR CONDITIONER AFF ABOVE FINISHED FLOOR AFG ABOVE FINISHED GRADE AFI ARC FAULT INTERRUPTER AMM ADDRESSABLE MONITOR MODULE AOM ADDRESSABLE OUTPUT MODULE ARB AUXILIARY RELAY BOARD ATS AUTOMATIC TRANSFER SWITCH B BASEBOARD BKR BREAKER C CONDUIT CD CANDELA CKT CIRCUIT CR CONTROL RELAY EC ELECTRICAL CONTRACTOR EMT ELECTRICAL METALLIC TUBING EPO EMERGENCY POWER OFF STATION FAA FIRE ALARM ANNUNCIATOR PANEL FACP FIRE ALARM CONTROL PANEL FSD FIRE SMOKE DAMPER GAA GENERATOR ALARM ANNUNCIATOR GFI GROUND FAULT INTERRUPTER GND GROUND HP HORSEPOWER KW KILOWATT LC LIGHTING CONTACTOR LFMC LIQUID TIGHT FLEXIBLE METALLIC CONDUIT LTG LIGHTING MCB MAIN CIRCUIT BREAKER MLO MAIN LUG ONLY MTS MANUAL TRANSFER SWITCH NAC NOTIFICATION APPLIANCE CIRCUIT NIC NOT IN CONTRACT OE OVERHEAD ELECTRIC PC PHOTOCELL PM PLUGMOLD PP POWER PANEL PVC POLYVINYL CHLORIDE CONDUIT RGS RIGID GALVANIZED STEEL CONDUIT SR SURFACE RACEWAY ST SHUNT TRIP TM THERMAL MAGNETIC TR TRIM/CASEWORK/WAINSCOTT TSP TWISTED SHIELDED PAIR TYP TYPICAL UE UNDERGROUND ELECTRIC UON UNLESS OTHERWISE NOTED UPS UNINTERRUPTIBLE POWER SUPPLY V VOLTS VA VOLT AMPS WP WATERPROOF UNDERGROUND ELECTRICU E UNDERGROUND LIGHTINGUL OVERHEAD ELECTRICO E TO BE PROVIDED DEMOLITION / TO BE RELOCATED EXISTING TO REMAIN UNDERGROUND TELCOU C MOUNTING HEIGHTS CARD READER 48" TOP OF BOX LIGHT SWITCH 48" TOP OF BOX RECEPTACLE 18" TOP OF BOX DATA OUTLET 18" TOP OF BOX TV OUTLET 84" TOP OF BOX PHONE OUTLET 48" TOP OF BOX SAFETY SWITCH 60" CENTERLINE OF HANDLE MOTOR STARTER 60" CENTERLINE OF HANDLE PANELBOARD 72" TOP OF PANELBOARD MANUAL PULL STATION 48" OPERABLE HANDLE NOTIFICATION APPLIANCE 80" BOTTOM OF LENS DOOR HOLD OPEN COORDINATE IN FIELD EM BATTERY UNIT 96" BOTTOM OF UNIT EM REMOTE UNIT 102" BOTTOM OF UNIT EXIT SIGN 96" BOTTOM OF UNIT LIGHT POLE WITH LED LUMINAIRES, REFER TO PLANS FOR NUMBER AND CONFIGURATION OF HEADS GENERAL ELECTRICAL DEMOLITION NOTES 1.0 ELECTRICAL EQUIPMENT SHOWN DASHED ON DEMOLITION DRAWINGS, INCLUDING ASSOCIATED ANCHORS, SUPPORTS, STRAPS, BOXES, FITTINGS, AND OTHER APPURTENANCES NOT SHOWN, SHALL BE DISCONNECTED AND REMOVED. REMOVE ASSOCIATED BRANCH CIRCUITRY TO SOURCE, UNLESS NOTED OTHERWISE. 2.0 EXISTING RACEWAYS AND DEVICE BACKBOXES NOT INTERFERRING WITH NEW WORK SHALL BE REUSED WHERE POSSIBLE. 3.0 PROVIDE JUNCTION BOXES, RACEWAYS, AND WIRING TO MODIFY/EXTEND EXISTING SYSTEMS AND CIRCUITS FED DOWNSTREAM OF ELECTRICAL EQUIPMENT SHOWN TO BE DEMOLISHED. 4.0 CUT DEMOLISHED CONDUITS INSTALLED THRU WALLS AND FLOORS FLUSH WITH THE SURFACE AND PATCH PENETRATIONS (FIRESTOP IF LOCATED ON A FIRE RATED SURFACE). PATCH AND PAINT SURFACES IN EXPOSED AREAS TO MATCH SURROUNDING MATERIALS, FINISHES, AND COLORS. 5.0 PROVIDE BLANK COVERPLATES ON UNUSED BACKBOXES REMAINING FROM DEMOLITION NOT SPECIFIED TO BE INFILLED. 6.0 EXISTING EQUIPMENT SHOWN TO REMAIN SHALL BE PROTECTED DURING CONSTRUCTION. CEILING MOUNTED RECEPTACLE DATA BOX CLNG SPECIAL RECEPTACLE 1 06/09/20 ISSUE FOR DD REVIEW 2 07/09/20 ISSUE FOR 90% REVIEW 3 08/11/20 ISSUE FOR CONSTRUCTION CB CB CBCB CB CB CB CB CB CB CB OLIN HALL 103, 105, 107 LAB RENOVATION CLNG CLNG CLNG CLNG CLNG CLNG CLNG CLNG CLNG CLNG CLNG CLNG CLNG CLNGCLNG CLNG CLNG CLNG CLNG CLNG CLNG CLNG SFF CLNG CLNG CLNG CLNG 105107 1 LP1-A3 POWER PANEL TO REMAIN WIREMOLD 4000 ON CEILING WITH (4) RECEPTACLES TO REMAIN (3) PHONE JACK 103 30A, 250V, 3Ø RECEPTACLE (3)(3) (3) (3)(3) (3) WIREMOLD 3000 30A, 250V, 1Ø LP1-A2LP1-A1 WIREMOLD 3000 20A, 250V, 1Ø WIREMOLD 3000 WIREMOLD 3000 WIREMOLD 4000 WIREMOLD 3000 JJJJ (3) J 30A, 250V, 1Ø 2 105107 103 2 4 3 LP1-A3 POWER PANEL LP1-A2LP1-A1 THERMAL EVAPORATOR 4 5 6 7 8 3 9 9 10 11 105107 103 1 CORNE LL U N I V E R SI TYFOUN D E D 5681AD FACILITIES ENGINEERING ARCHIVE BAR CODEARCH/STRUCT: CIVIL/ENV: ELECTRICAL: MECHANICAL: DATE: FACILITY: DESIGN: DRAWN: WWW.FCS.CORNELL.EDU IT IS A VIOLATION OF NEW YORK STATE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT OR ENGINEER, TO ALTER THIS DOCUMENT IN ANY WAY. IF THIS DOCUMENT IS ALTERED, THE ALTERING ARCHITECT OR ENGINEER SHALL AFFIX TO SUCH DOCUMENT THEIR SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. WARNING REVISIONS ARCHITECTURAL, STRUCTURAL, CIVIL, ENVIRONMENTAL, MECHANICAL, AND ELECTRICAL ENGINEERING 201 HUMPHREYS SERVICE BLDG ITHACA, NEW YORK 14853-3701 113 HO PLAZA ITHACA, NEW YORK OLIN HALL - YU LAB 103 E-101 12672497 POWER, DATA, LIGHTING, AND FIRE ALARM PARTIAL FIRST FLOOR PLAN H. TRAN JD 2024 AUGUST 11, 2020 # SCALE: 3/16"=1'-0" 0' 2' 4' 6'12' E-101 KEYED DEMOLITION NOTES 1 REMOVE EXISTING SPECIAL RECEPTACLE AND ASSOCIATED CONDUIT AND WIRING COMPLETELY BACK TO THE PANEL. PROVIDE A BLANK PLATE OVER THE OPENING. THE EXISTING 30A/3P CIRCUIT BREAKER SHALL BE RE-USED TO FEED THE NEW LAB EQUIPMENT. 2 REMOVE EXISTING SPECIAL RECEPTACLE AND ASSOCIATED CONDUIT AND WIRING COMPLETELY BACK TO THE PANEL. PROVIDE A BLANK PLATE OVER THE OPENING, #E-101 KEYED RENOVATION NOTES 1 ABOVE DOOR, PROVIDE A NEW FIRE ALARM STROBE. NEW STROBE SHALL MATCH EXISTING IN BUILDING AND CIRCUIT TO NEAREST EXISTING NOTIFICATION CIRCUITRY. RACEWAY FROM STROBE TO A POINT ABOVE CEILING SHALL BE WIREMOLD 700. TESTING OF THE DEVICE W/ CORNELL EH&S SHALL BE REQUIRED. 2 REPLACE EXISTING SPECIAL RECEPTACLE WITH A NEW 20A, 250V, 2P, 3 WIRE, NEMA L6-20R. INSIDE OF THE EXISTING PANEL, REPLACE THE EXISTING 30A/2P CIRCUIT BREAKER WITH A NEW 20A/2P CIRCUIT BREAKER. RE-USE EXISTING CONDUIT AND WIRING. UPDATE PANEL DIRECTORY. 3 CONTRACTOR TO RE-ARRANGE EXISTING SPARE CIRCUIT BREAKERS IN THIS PANEL TO ACCOMMODATE THE NEW CIRCUIT BREAKERS TO SUPPORT THE NEW LAB EQUIPMENT. 4 CIRCUIT EACH 115V, 20A, NEMA 5-20R RECEPTACLE TO A SPARE (DEDICATED) 20A/1P CIRCUIT BREAKER IN THE PANEL. 5 PROVIDE A 30A, 3 PHASE, 208Y/120V, 3 POLE, 5 WIRE SPECIAL RECEPTACLE NEMA L11-30R. CIRCUIT RECEPTACLE TO A SPARE 30A/3P CIRCUIT BREAKER LOCATED IN PANEL LP1-A3. PROVIDE (4) 10 AWG & (1) 10 AWG GROUND IN 3/4" EMT FROM RECEPTACLE TO EXISTING PANEL. 6 UNISTRUT CLOUD BY OTHERS. ELECTRICAL CONTRACTOR TO INSTALL RECEPTACLES ON THE FACE OF THE UNISTRUT CLOUD AS INDICATED. 7 CIRCUIT RECEPTACLES INDICATED TO A SPARE 20A/1P CIRCUIT BREAKER IN PANEL LP1-A3. 8 FROM A POINT ABOVE CEILING, PROVIDE A GRAY WM3000 DOWN WALL. AT 42" AFF, TRANSITION WM3000 TO RUN HORIZONTALLY AS INDICATED. PROVIDE NEMA-5R DUPLEX RECEPTACLES AS SHOWN. 9 CONTRACTOR TO RELOCATE 3 EXISTING DATA CABLES TO THE FACE OF THE UNISTRUT CLOUD. AT THE NEW LOCATION PROVIDE A 4" X 4" SURFACE BOX TO HOUSE THE CABLES. CONDUIT SHALL BE 1" EMT. MAINTAIN CABLE LABELS AND TRANSFER TO THE NEW LOCATION. 10 CONTRACTOR TO PROVIDE A SURFACE MOUNT SPECIAL RECEPTACLE NEMA L11-30R AT THE FACE OF THE UNISTRUT CLOUD. INSIDE OF PANEL LP1-A3, PROVIDE A 30A/3P CIRCUIT BREAKER. FROM PANEL TO THE RECEPTACLE, PROVIDE (4) 10 AWG & (1) 10 AWG GROUND IN 3/4" EMT. THE CONTRACTOR ALSO TO PROVIDE A 10' LONG SPECIAL CORD W/ A NEMA L11-30P PLUG. TERMINATION AT GLOVE BOX BY OTHERS. 11 REPLACE EXISTING RECEPTACLES WITH NEW GFCI RECEPTACLES. (TOTAL OF 4 RECEPTACLES). SCALE:3/16" = 1'-0"1 PARTIAL FIRST FLOOR DEMOLITION SCALE:3/16" = 1'-0"3 PARTIAL FIRST FLOOR - POWER & DATA SCALE:3/16" = 1'-0"2 PARTIAL FIRST FLOOR - LIGHTING & FIRE ALARM GENERAL NOTES 1.0 AT THE END OF THE PROJECT, PROVIDE NEW PANEL DIRECTORY. 2.0 PAINT ALL NEW CONDUITS TO MATCH EXISTING CEILING. OS OS 1 06/09/20 ISSUE FOR DD REVIEW 2 07/09/20 ISSUE FOR 90% REVIEW 3 08/11/20 ISSUE FOR CONSTRUCTION CB CB CBCB CB CB CB CB CB CB CB OLIN HALL 103, 105, 107 LAB RENOVATION