Loading...
HomeMy WebLinkAboutCourt Hall water heater replacement drwgsCB CB Village of Cayuga Heights Town of IthacaCity of IthacaWALL LINE UTILI TY TU NNE L R W UP UP DNUP UP DNUP UP DNEXTERIOR ELEVATION 1 X-100 X-100 1 1 INTERIOR ELEVATION 1 X-100 SECTION MARKER 1 X-100 ENLARGED DETAIL CONSTRUCTION KEYED NOTE DEMOLITION KEYED NOTE DRAWING REVISION NOTE LINETYPE: TO BE PROVIDED / NEW LINETYPE: DEMOLITION / TO BE RELOCATED LINETYPE: EXISTING TO REMAIN # # # 1 1 1 11 FACILITY 3202 CRADIT FARM ROAD SISSON PLTRIPHAMMER ROADWAI T AVETHURSTON AVE CORNE LL U N I V E R SI TYFOUN D E D 5681AD CORN E LL U N I V E R SI TYFOUN D E D 5681AD FACILITIES ENGINEERING ARCHIVE BAR CODEARCH/STRUCT: CIVIL/ENV: ELECTRICAL: MECHANICAL: DATE: FACILITY: DESIGN: DRAWN: WWW.FCS.CORNELL.EDU IT IS A VIOLATION OF NEW YORK STATE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT OR ENGINEER, TO ALTER THIS DOCUMENT IN ANY WAY. IF THIS DOCUMENT IS ALTERED, THE ALTERING ARCHITECT OR ENGINEER SHALL AFFIX TO SUCH DOCUMENT THEIR SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. WARNING REVISIONS ARCHITECTURAL, STRUCTURAL, CIVIL, ENVIRONMENTAL, MECHANICAL, AND ELECTRICAL ENGINEERING 201 HUMPHREYS SERVICE BLDG ITHACA, NEW YORK 14853-3701 Cornell University 148 CRADIT FARM DRIVE ITHACA, NEW YORK 14850 COURT HALL DOMESTIC HOT WATER REPLACEMENT T-001 12673548 TITLE SHEET FE DESIGN ALF 3202 AUGUST 8, 2020 COURT HALL DOMESTIC HOT WATER REPLACEMENT GENERAL T-001 TITLE SHEET PLUMBING P-001 GENERAL NOTES AND SYMBOL LEGENDS P-101 PLUMBING DEMOLITION & RENOVATION PLANS P-301 DOMESTIC HOT WATER SYSTEM CONTROLS AND SEQUENCE P-401 THERMAFLOW SKID DETAIL P-402 PHOTOS - DISCONNECTION POINTS P-403 PHASE 1 DEMOLITION AND CONSTRUCTION DETAILS P-404 PHASE 2 DEMOLITION AND CONSTRUCTION DETAILS P-501 SCHEDULES ELECTRICAL E-001 GENERAL NOTES AND SYMBOL LEGENDS E-101 ELECTRICAL DEMOLITION & RENOVATION PLANS AREA OF WORK AREA OF WORK SCOPE NOTE REPLACE THE EXISTING DOMESTIC HOT WATER SYSTEM IN COURT HALL WITH AN N INSTANTANEOUS STEAM TO DOMESTIC HOT WATER HEAT EXCHANGER. THE COURT HALL DOMESTIC HOT WATER SYSTEM SERVES COURT, MEWS, BAUER, AND KAY RESIDENCE HALLS. APPLICABLE CODES 2020 (EXISTING) IBC (ADOPTED BY NEW YORK STATE) PROJECT SUMMARY THIS PROJECT INCLUDES THE REPLACEMNT OF A DEOMESTIC WATER HEATING SYSTEM. THE WORK IS ALTERATION LEVEL 1 AS THE EXISTING DOMESTIC HOT WATER SYSTEM IS BEING REPLACED WITH A NEW SYSTEM SERVING THE SAME PURPOSE. BUILDING LIMITATIONS CONSTRUCTION CLASSIFICATION:1A CLASSIFICATION OF HAZARDS:NONE HIGH-RISE BUILDING:NO EXTINGUISHING REQUIREMENT:THE EXISTING BUILDING IS SPRINKLERED OCCUPANCY OCCUPANCY CLASSIFICATION:BUSINESS (B) BUILDING CODE SUMMARYGENERAL SYMBOLS LEGEND DRAWING INDEX PROJECT SCOPE PERSPECTIVE VIEWSITE LOCATION -COURT HALL KEY PLAN -FIRST FLOOR 1 07/27/20 ISSUE FOR COORDINATED REVIEW 2 08/08/20 ISSUE FOR CONSTRUCTION CORN E LL U N I V E R SI TYFOUN D E D 5681AD FACILITIES ENGINEERING ARCHIVE BAR CODEARCH/STRUCT: CIVIL/ENV: ELECTRICAL: MECHANICAL: DATE: FACILITY: DESIGN: DRAWN: WWW.FCS.CORNELL.EDU IT IS A VIOLATION OF NEW YORK STATE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT OR ENGINEER, TO ALTER THIS DOCUMENT IN ANY WAY. IF THIS DOCUMENT IS ALTERED, THE ALTERING ARCHITECT OR ENGINEER SHALL AFFIX TO SUCH DOCUMENT THEIR SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. WARNING REVISIONS ARCHITECTURAL, STRUCTURAL, CIVIL, ENVIRONMENTAL, MECHANICAL, AND ELECTRICAL ENGINEERING 201 HUMPHREYS SERVICE BLDG ITHACA, NEW YORK 14853-3701 148 CRADIT FARM DRIVE ITHACA, NEW YORK 14850 COURT HALL DOMESTIC HOT WATER REPLACEMENT P-001 12673548 GENERAL NOTES AND SYMBOL LEGENDS A. FOX ALF 3202 AUGUST 8, 2020 PLUMBING SUBMITTAL SCHEDULE SECTION REQUIRED TITLE 220517 SLEEVES AND SLEEVE SEALS FOR PLUMING PIPING PRODUCT DATA 220518 ESCUTCHEONS FOR PLUMBING PRODUCT DATA 220523 GENERAL DUTY VALVES FOR PLUMBING PIPING PRODUCT DATA 220529 HANGERS & SUPPORTS FOR PLUMBING PRODUCT DATA 220553 ID FOR PIPING AND EQUIPMENT PRODUCT DATA 220719 PLUMBING PIPING INSULATION PRODUCT DATA 221000 PLUMBING PIPING PRODUCT DATA 221116 DOMESTIC WATER PIPING PRODUCT DATA,TESTING 223000 PLUMBING EQUIPMENT PRODUCT DATA, MANUFACTURERS INSTRUCTIONS, O&M PLUMBING SCOPE OF WORK 1.0 REPLACE THE EXISTING DOMESTIC HOT WATER SYSTEM IN COURT HALL WHICH SERVES COURT, MEWS, BAUER, AND KAY RESIDENCE HALLS. 2.0 REMOVE THE EXISTING GAS FIRED AND STEAM GENERATING DOMESTIC HOT WATER HEATERS AND ACCESSORIES. 3.0 PROVIDE PIPING MODIFICATIONS AS REQUIRED TO CONNECT NEW DOMESTIC HOT WATER HEATING EQUIPMENT TO THE EXISTING DOMESTIC HOT WATER DISTRIBUTION. 4.0 PROVIDE DIGITIAL MIXING VALVE WITH INTEGRATION O THE EXISTING BUILDING MANAGEMENT SYSTEM FOR PROPER TEMPERATURE CONTROL. 5.0 PROVIDE AN INSTANTANEOUS STEAM TO DOMESTIC HOT WATER HEAT EXCHANGER. 6.0 PROVIDE A BACKUP DOMESTIC HOT WATER SUPPLY SYSTEM TO OPERATE DURING CAMPUS STEAM SHUTDOWN. 1 07/27/20 ISSUE FOR COORDINATED REVIEW 2 08/08/20 ISSUE FOR CONSTRUCTION 1 2 3 4 5 REFERENCE DRAWINGS P-403 AND P-404 FOR REMOVAL DETAILS CONDENSATE FROM HX'S (E) STEAM TO HX'S (E) 16" DIAMETER BOILER VENTING RISERS (E) 3 P-101 4 P-101 CONDENSATE TO CONDENSATE RECIEVER (E) DHW, DCW AND GAS TO MOBILE TRAILER 56 7 8 1-1/2" DHW (E), 1-1/2" DCW (E) 1-1/2" DHWR (E) 6" STEAM (E) TO TANK 4" DHW (E) 1" DHWR (E) 1" DHWR (E) 3" DHW (E) 4" DCW (E) 5" GAS (E) 14 8" STEAM FROM EXISTING STEAM PRESSURE REDUCING STATION (E) 1 5 P-101 4" CONDENSATE TO CONDENSATE RECIEVER 6 P-101 3 4 6" NG (E) 1" DHWR (E) 3" DHW (E) 4" DCW (E) 2 5 6 7 8 1-1/2" DHW 1-1/2" DCW 9 9 7 9 REFERENCE DRAWINGS P-403 AND P-404 FOR INSTALLATION DETAILS. 1" DHWR 11 4" STEAM TO HX SKID 1-1/2" GAS 1" DCW 1" DHWR 1-1/2" CD 1" DHWR (E) 8" STEAM TO BUILDING HEAT HX'S (E) 9 5" GAS (E) 4" DCW (E) 3" DHW (E) 1" DHWR (E) 10 114" DHW (E) 4" DCW (E) EXISTING COLD WATER PIPING TO COURT HALL EXISTING DHWR FROM MEWS AND COURT 13 12 2 1-1/2" DHW FROM MOBILE TRAILER. TIE INTO EXISTING DHW MAIN. 1" DHWR (E) 3" DHW (E)4" DCW (E) 3 4 4" DHW 5" GAS (E) 1-1/2" GAS 4" DCW 7 8 10 EXISTING EXPANSION TANK TO REMAIN 4" TO EXISTING CONDENSATE RECIEVER. EXISTING CIRCULATING PUMPS TO REMAIN EXISTING STEAM PIPING TO BUILDING HEAT EXCHANGERS 1" DHWR FROM COURT DCW (E) TO SPACE IN COURT 1-1/2" GAS TO MOBILE TRAILER CORN E LL U N I V E R SI TYFOUN D E D 5681AD FACILITIES ENGINEERING ARCHIVE BAR CODEARCH/STRUCT: CIVIL/ENV: ELECTRICAL: MECHANICAL: DATE: FACILITY: DESIGN: DRAWN: WWW.FCS.CORNELL.EDU IT IS A VIOLATION OF NEW YORK STATE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT OR ENGINEER, TO ALTER THIS DOCUMENT IN ANY WAY. IF THIS DOCUMENT IS ALTERED, THE ALTERING ARCHITECT OR ENGINEER SHALL AFFIX TO SUCH DOCUMENT THEIR SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. WARNING REVISIONS ARCHITECTURAL, STRUCTURAL, CIVIL, ENVIRONMENTAL, MECHANICAL, AND ELECTRICAL ENGINEERING 201 HUMPHREYS SERVICE BLDG ITHACA, NEW YORK 14853-3701 148 CRADIT FARM DRIVE ITHACA, NEW YORK 14850 COURT HALL DOMESTIC HOT WATER REPLACEMENT P-101 12673548 PLUMBING DEMOLITION & RENOVATION PLANS A. FOX ALF/TRF 3202 AUGUST 8, 2020 # 0' 2' 4' 8' SCALE: 1/4"=1'-0" P-101 KEYED DEMOLITION NOTES 1 DISCONNECT AND REMOVE EXISTING DOMESTIC COLD WATER AND HOT WATER FROM HOT WATER HEATERS BACK TO EXISTING MAIN SHUTOFF VALVES. REFERENCE IMAGE 1 ON P-402 FOR DISCONNECTION POINTS. 2 DISCONNECT EXISTING GAS TAP, AT VALVE, FOR REPIPING TO GAS MAIN. REFERENCE IMAGE 5 ON M-402. 3 DISCONNECT AND REMOVE EXISTING NATURAL GAS DISTRIBUTION PIPING SERVING GAS FIRED WATER HEATERS. EXISTING NATURAL GAS SUPPLY TO BOILER TRAILER TO REMAIN FOR FUTURE CONNECTION TO TRAILER DURING STEAM SHUTDOWNS. REFERENCE IMAGES 3, 5 & 9 ON P-402 FOR DISCONNECTION POINT. 4 DISCONNECT AND REMOVE EXISTING DOMESTIC HOT WATER STORAGE TANK AND STEAM TUBE BUNDLE. DISCONNECT STEAM AT LOCATION SHOWN IN IMAGE 7 ON P-401. 5 DISCONNECT AND REMOVE EXISTING GAS FIRED WATER HEATER AND ASSOCIATED VENTING BACK TO EXISTING VENT RISER AND CAP. REMOVE EXISTING DOMESTIC COLD, HOT, AND HOT WATER RETURN BRANCH PIPING SERVING GAS FIRED WATER HEATER BACK TO EXISTING MAINS. EXISTING DOMESTIC WATER MAINS TO REMAIN FOR RECONNECTION. 6 DISCONNECT EXISTING STEAM PIPING, FROM HOT WATER STORAGE TANK, BACK TO MAIN. REFERENCE IMAGE 8 ON P-401 FOR DISCONNECTION POINT. 7 DISCONNECT EXISTING DHWR PIPING AT POINT SHOWN. PREPARE FOR RECONNECTION TO COLD WATER PIPING SERVING MOBILE TRAILER. 8 DISCONNECT EXISTING DHW AND DCW PIPING AT POINT SHOWN. PIPE TO NEW HEAT EXCHANGER SKID. 9 DISCONNECT EXISTING GAS PIPING AT PENETRATION. PROVIDE VALVE AND PREPARE FOR RECONNECTION TO SERVE MOBILE TRAILER. REFERENCE IMAGE 1 ON P-402. 10 DISCONNECT EXISTING DCW PIPING AT VALVE. REFERENCE IMAGE 1 ON P-402. 11 DISCONNECT EXISTING DHW PIPING AT VALVE. REFERENCE IMAGE 1 ON P-402. 12 DISCONNECT EXISTING CONDESATE PIPING, FROM TANK, WHER IT TIES INTO THE CONDENSATE MAIN TO RECEIVER. REFERENCE IMAGE 7 ON P-401 FOR DISCONNECTION LOCATION. 13 DISCONNECT EXISTING DHWR SERVING THE EXISTING GAS BOILERS, AT DISCONNECTION POINT SHOWN. REFERENCE IMAGE 7 ON P-401 FOR DISCONNECTION LOCATION. 14 REFERENCE IMAGE 6 ON P-402 FOR EXISTING DCW AND DHW PIPING TO MOBILE BOILER TRAILER. #P-101 KEYED RENOVATION NOTES 1 STEAM TO HOT WATER HEAT EXCHANGER SKID PRE-PURCHASED BY OWNER (HX-10073). CONTRACTOR TO INSTALL. REFERENCE DRAWING ON P-401 FOR THERMAFLOW SKID DETAILS. 2 CONNECT NEW 4" DHW PIPING AT EXISTING 4" CONNECTION POINT. ROUTE DHW PIPING TO NEW HEAT EXCHANGER SKID. REFERENCE HEAT EXCHANGER SKID DETAIL ON P-401 FOR CONNECTION POINT. 3 CONNECT NEW 1-1/2" GAS PIPING FROM MOBILE TRALER CONNECTION TO POINT OF CONNECTION. 4 CONNECT NEW 4" DCW PIPING FROM POINT OF CONNECTION TO DCW CONNECTION POINT ON NEW HEAT EXCHANGER SKID. REFERENCE HEAT EXCHANGER SKID DETAIL ON P-401 FOR CONNECTION POINT. 5 CONNECT NEW 4" STEAM TO EXISTING STEAM MAIN. CONNECT AT EXSITING STEAM VALVE. ROUTE PIPING TO NEW HEAT EXCHANGER SKID. REFERENCE HEAT EXCHANGER SKID DETAIL ON P-401 FOR CONNECTION POINT. 6 CONNECT NEW 1-1/2" GAS PIPING FROM CONNECTION POINT AT MAIN TO EXISTING 1-1/2" GAS PIPING THAT SERVES MOBILE TRAILER. 7 REPIPE EXISTING 1" DCW PIPING TO PIPING MAIN FROM POINT OF CONNECTION SHOWN. REPIPE CW TO EXISTING AIR/DIRT SEPERATOR. VERIFY EXISTING PIPE SIZES IN FIELD. REFERENCE IMAGE 10 ON P-401 FOR LOCATION TO REPIPE CW TO AIR/DIRT SEPERATOR. 8 CONNECT NEW 1-1/2" DHWR PIPING, FROM EXISTING CIRCULATING PUMPS. PIPE TO NEW HEAT EXCHANGER SKID. REFERENCE HEAT EXCHANGER SKID DETAIL ON P-401 FOR CONNECTION POINT. 9 NEW 1-1/2" DHW AND 1-1/2" DCW SHALL BE PIPED FROM CONNECTION POINTS SERVING THE MOBILE TRAILER TO THE TIE-IN POINTS SHOWN ON THE MAINS. PIPE THE DHW PIPING, FROM THE TRAILER CONNECTION POINT, TO THE HEAT EXCHANGER SKID, BETWEEN THE HEAT EXCHANGER AND THE MIXING VALVE. DURING STEAM SHUT DOWNS THE MOBILE TRAILER WILL BE USED TO PROVIDE DHW TO THE BUILDING. 10 CONNECT NEW 1-1/2" CONDENSATE PIPING TO CONDENSATE RECIEVER PIPNG, AT EXISTING CONNECTION POINT. ROUTE CONDENSATE PIPING TO HEAT EXCHANGER SKID. REFERENCE HEAT EXCHANGER SKID DETAIL ON P-401 FOR CONNECTION POINT. 11 CONNECT NEW 1" DHWR PIPING AT CONNECTION POINT SHOWN. PIPE TO CONNECTION POINT FOR MOBILE TRAILER. SCALE:1/4" = 1'-0"1 FIRST FLOOR MECHANICAL DEMOLITION PLAN SCALE:1/4" = 1'-0"2 FIRST FLOOR MECHANICAL RENOVATION PLAN PLUMBING SCOPE OF WORK 1.0 REPLACE THE EXISTING DOMESTIC HOT WATER SYSTEM IN COURT HALL WHICH SERVES COURT, MEWS, BAUER, AND KAY RESIDENCE HALLS. 2.0 REMOVE THE EXISTING GAS FIRED AND STEAM GENERATING DOMESTIC HOT WATER HEATERS AND ACCESSORIES. 3.0 PROVIDE PIPING MODIFICATIONS AS REQUIRED TO CONNECT NEW DOMESTIC HOT WATER HEATING EQUIPMENT TO THE EXISTING DOMESTIC HOT WATER DISTRIBUTION. 4.0 PROVIDE DIGITIAL MIXING VALVE WITH INTEGRATION O THE EXISTING BUILDING MANAGEMENT SYSTEM FOR PROPER TEMPERATURE CONTROL. 5.0 PROVIDE AN INSTANTANEOUS STEAM TO DOMESTIC HOT WATER HEAT EXCHANGER. 6.0 PROVIDE A BACKUP DOMESTIC HOT WATER SUPPLY SYSTEM TO OPERATE DURING CAMPUS STEAM SHUTDOWN. SCALE:NO SCALE3NORTH ELEVATION VIEW - DISCONNECTION POINTS SCALE: NO SCALE 4 SOUTH ELEVATION VIEW - DISCONNECTION POINTS SCALE: NO SCALE 5 NORTH ELEVATION - CONNECTION POINTS SCALE: NO SCALE 6 SOUTH ELEVATION - CONNECTION POINTS SCALE:7 3D VIEW - NORTH SCALE:8 3D VIEW - SOUTH GENERAL PLUMBING NOTES 1.0 VERIFY ALL EXISTING PIPE SIZES IN FIELD BEFORE REROUTING EXISTING PIPING. 2.0 EXISTING EXPANSION TANK, RECIRCULATING PUMPS SHALL REMAIN FOR RE USE. 3.0 PROVIDE ISOLATION VALVES AT ALL POINTS OF DISCONNECTION IF ONE DOES NOT ALREADY EXIST. 4.0 DHW, DHWR, GAS AND DCW PIPING CONNECTIONS FOR MOBILE TRAILER SHALL REMAIN FOR USE DURING STEAM SHUTDOWN. PIPING SHALL BE REROUTED FROM THESE CONNECTION POINTS AND TIED IN WHERE SHOWN ON THE DRAWINGS (BEFORE HEAT EXCHANGER SKID). 5.0 REFERENCE THE IMAGES ON P-402 FOR EXISTING DISCONNECTION POINTS. 6.0 REFERENCE THE PHASED REMOVAL AND INSTALLATION SINGLE LINES ON P-403 AND P-404. PHASED DEMOLITION AND INSTALLATION ALLOWS FOR THE DHW SYSTEM TO REMAIN RUNNING AT ALL TIMES. 1 07/27/20 ISSUE FOR COORDINATED REVIEW 2 08/08/20 ISSUE FOR CONSTRUCTION SYSTEM DESCRIPTION: GENERAL: SYSTEM SHALL BE ADJUSTABLE AND CONTROLLED THROUGH THE BUILDING AUTOMATION AND CONTROL SYSTEM (BACS). EXISTING BUILDING HOT WATER RECIRCULATION PUMPS (RP-C AND RP-M) PUMP SHALL RUN CONTINUOUSLY. UPON PUMP FAILURE, AN ALARM SHALL BE GENERATED AND A SIGNAL SENT TO A SUPERVISORY STATION OR ADDRESS AS DETERMINED BY OWNER. PUMPS RP-C AND RP-M RUN CONDITIONS: PUMPS RP-C AND RP-M SHALL OPERATE SIMULTANEOUSLY AT THE ALREADY ESTABLISHED FLOW RATES PUMPS P-3 AND P-4 SHALL RUN CONTINUOUSLY REGARDLESS OF STEAM VALVE POSITION. SYSTEM MONITORING: : THE BUILDING ENERGY MANAGEMENT CONTROL SYSTEM SHALL MONITOR THE FOLLOWING EXISTING POINTS: BUILDING HOT WATER SUPPLY TEMPERATURE PUMP STATUS VIA CURRENT SENSING SWITCH (ALL PUMPS) STEAM CONTROL VALVE HX-10073 STEAM CONDENSATE STEAM AO MV-1 PRE-PURCHASED SKID BY OWNER THERMAFLO CONTROLLER W/SKID AO N.C. T AI T AI RP-C (E) DHWS TO MEWS AND COURT DHWR FROM MEWS RP-M (E) DHWR FROM COURT M MS BICS S SBO M MS BICS S SBO DCW AO N.C. T AI AV SETPOINT P BI BV SETPOINT T AI BUILDING HOT WATER RETURN TEMPERATURE SEQUENCE OF OPERATION HEAT EXCHANGER SKID (HX-10073)CORN E LL U N I V E R SI TYFOUN D E D 5681AD FACILITIES ENGINEERING ARCHIVE BAR CODEARCH/STRUCT: CIVIL/ENV: ELECTRICAL: MECHANICAL: DATE: FACILITY: DESIGN: DRAWN: WWW.FCS.CORNELL.EDU IT IS A VIOLATION OF NEW YORK STATE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT OR ENGINEER, TO ALTER THIS DOCUMENT IN ANY WAY. IF THIS DOCUMENT IS ALTERED, THE ALTERING ARCHITECT OR ENGINEER SHALL AFFIX TO SUCH DOCUMENT THEIR SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. WARNING REVISIONS ARCHITECTURAL, STRUCTURAL, CIVIL, ENVIRONMENTAL, MECHANICAL, AND ELECTRICAL ENGINEERING 201 HUMPHREYS SERVICE BLDG ITHACA, NEW YORK 14853-3701 148 CRADIT FARM DRIVE ITHACA, NEW YORK 14850 COURT HALL DOMESTIC HOT WATER REPLACEMENT P-301 12673548 DOMESTIC HOT WATER SYSTEM CONTROLS AND SEQUENCE A. FOX alp 3202 AUGUST 8, 2020 CONTROL AND ALARM POINTS SCHEDULE STEAM TO DOMESTIC HOT WATER SYSTEM HARDWARE POINTS SOFTWARE POINTS SHOW ON GRAPHIC NOTESBI BO AI AO AV BV SCH TREND ALARM BACS EMCS DESCRIPTION DOMESTIC HOT WATER SUPPLY PRESSURE SETPOINT X DOMESTIC HOT WATER SUPPLY PRESSURE X X X X LOW PRESSURE X EXISTING ALERTON POINT DOMESTIC HOT WATER SUPPLY TEMPERATURE SETPOINT X X X EXISTING ALERTON POINT DOMESTIC HOT WATER SUPPLY TEMPERATURE X X X X +/- 4 DEG F FROM SETPOINT X EXISTING ALERTON POINT (RP-C) PUMP MOTOR START/STOP X X X EXISTING ALERTON POINT (RP-C) PUMP MOTOR STATUS X X X MOTOR FAILURE X EXISTING ALERTON POINT (RP-M) PUMP MOTOR START/STOP X X X EXISTING ALERTON POINT (RP-M) PUMP MOTOR STATUS X X X MOTOR FAILURE X EXISTING ALERTON POINT DOMESTIC HOT WATER RETURN TEMPERATURE X X X CONDENSATE FLOW X X X EXISTING ALERTON POINT STEAM CONTROL VALVE POSITION COMMAND X X X EXISTING ALERTON POINT STEAM PRESSURE SETPOINT X STEAM PRESSURE X X X X LOW PRESSURE X EXISTING ALERTON POINT 1 07/27/20 ISSUE FOR COORDINATED REVIEW 2 08/08/20 ISSUE FOR CONSTRUCTION CORN E LL U N I V E R SI TYFOUN D E D 5681AD FACILITIES ENGINEERING ARCHIVE BAR CODEARCH/STRUCT: CIVIL/ENV: ELECTRICAL: MECHANICAL: DATE: FACILITY: DESIGN: DRAWN: WWW.FCS.CORNELL.EDU IT IS A VIOLATION OF NEW YORK STATE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT OR ENGINEER, TO ALTER THIS DOCUMENT IN ANY WAY. IF THIS DOCUMENT IS ALTERED, THE ALTERING ARCHITECT OR ENGINEER SHALL AFFIX TO SUCH DOCUMENT THEIR SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. WARNING REVISIONS ARCHITECTURAL, STRUCTURAL, CIVIL, ENVIRONMENTAL, MECHANICAL, AND ELECTRICAL ENGINEERING 201 HUMPHREYS SERVICE BLDG ITHACA, NEW YORK 14853-3701 148 CRADIT FARM DRIVE ITHACA, NEW YORK 14850 COURT HALL DOMESTIC HOT WATER REPLACEMENT P-401 12673548 THERMAFLOW SKID DETAIL A. FOX ALF 3202 AUGUST 8, 2020 SCALE:12" = 1'-0"1 THERMAFLOW HEAT EXCHANGER SKID 1 07/27/20 ISSUE FOR COORDINATED REVIEW 2 08/08/20 ISSUE FOR CONSTRUCTION DISCONNECT CONDENSATE, FROM EXISTING DHW TANK, WHERE IT TIES INTO THE CONDENSATE RECIEVER MAIN DISCONNECT DCW AT ELBOW. REPIPE TO DCW MAIN.CORN E LL U N I V E R SI TYFOUN D E D 5681AD FACILITIES ENGINEERING ARCHIVE BAR CODEARCH/STRUCT: CIVIL/ENV: ELECTRICAL: MECHANICAL: DATE: FACILITY: DESIGN: DRAWN: WWW.FCS.CORNELL.EDU IT IS A VIOLATION OF NEW YORK STATE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT OR ENGINEER, TO ALTER THIS DOCUMENT IN ANY WAY. IF THIS DOCUMENT IS ALTERED, THE ALTERING ARCHITECT OR ENGINEER SHALL AFFIX TO SUCH DOCUMENT THEIR SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. WARNING REVISIONS ARCHITECTURAL, STRUCTURAL, CIVIL, ENVIRONMENTAL, MECHANICAL, AND ELECTRICAL ENGINEERING 201 HUMPHREYS SERVICE BLDG ITHACA, NEW YORK 14853-3701 148 CRADIT FARM DRIVE ITHACA, NEW YORK 14850 COURT HALL DOMESTIC HOT WATER REPLACEMENT P-402 12673548 PHOTOS - DISCONNECTION POINTS A. FOX ALF 3202 AUGUST 8, 2020 SCALE: NO SCALE 6 IMAGE 6 SCALE: NO SCALE 10 IMAGE 10 SCALE: NO SCALE 5 IMAGE 5 SCALE: NO SCALE 1 IMAGE 1 SCALE: NO SCALE 3 IMAGE 3 SCALE: NO SCALE 4 IMAGE 4 SCALE: NO SCALE 7 IMAGE 7 SCALE: NO SCALE 2 IMAGE 2 SCALE: NO SCALE 9 IMAGE 9 SCALE: NO SCALE 8 IMAGE 8 1 07/27/20 ISSUE FOR COORDINATED REVIEW 2 08/08/20 ISSUE FOR CONSTRUCTION HW CW 1" DHWR CP CP 1" DHWR FROM MEWS 1" DHWR FROM COURT 4" DCW SUPPLY 3"4" 5" 6"1" ASME EXPANSION TANK NATURAL GAS (G) TEMPORARY MOBILE TRAILER EXISTING EXTERIOR WALL DCW TO SOMEWHERE OUTSIDE MECH ROOM HW TIE-IN FROM TRAILER CW TIE-IN TO TRAILER CWHW 1-1/2" GAS 1-1/2" GAS 1-1/2" DCW 1-1/2" DHW DHWR FROM SOMEWHERE IN COURT HALL DHWOPEN CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED HEAT EXCHANGER SKID PRE-PURCHASED BY OWNER, INSTALLED BY CONTRACTOR.HEAT EXCHANGER T FROM CAMPUS STEAM TO BUILDING HEAT HEAT EXCHANGERS 3"DHW TO COURT 3"DHW TO MEWS 1-1/2" CONDENSATE TO EXISTING CONDENSATE RECIEVER 4" DHW 4" STEAM 1-1/2" DHWR 4" DCW NOTE: SHUTOFF VALVES WILL NEED TO BE INSTALLED ON GAS PIPING BEFORE REMOVING BOILERS. CURRENTLY THERE AREN'T ANY INSTALLED G G GHOT WATER STORAGE TANK (ASME) 4"HW HWCW 1"HWR CP CP 4"CW 1"HWR FROM MEWS 1"HWR FROM COURT 4"CW SUPPLY 3"DHW TO COURT 3"DHW TO MEWS 3" 3" 3" 4" 5" 6"1" STEAM TO HOT WATER STORAGE TANK ASME EXPANSION TANK NATURAL GAS (G) TEMPORARY MOBILE TRAILER EXISTING EXTERIOR WALL CW TO SOMEWHERE OUTSIDE MECH ROOM HW TIE-IN FROM TRAILER CW TIE-IN TO TRAILER CWHW GAS TIE-IN POINT FOR TRAILER GAS GAS CW HW CW CONDENSATE TEAM PIT TO STEAM PIT TO BUILDING HEAT HEAT EXCHANGERS HWR FROM SOMEWHERE IN COURT HALL HW 4"HWR DHWOPEN CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CORN E LL U N I V E R SI TYFOUN D E D 5681AD FACILITIES ENGINEERING ARCHIVE BAR CODEARCH/STRUCT: CIVIL/ENV: ELECTRICAL: MECHANICAL: DATE: FACILITY: DESIGN: DRAWN: WWW.FCS.CORNELL.EDU IT IS A VIOLATION OF NEW YORK STATE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT OR ENGINEER, TO ALTER THIS DOCUMENT IN ANY WAY. IF THIS DOCUMENT IS ALTERED, THE ALTERING ARCHITECT OR ENGINEER SHALL AFFIX TO SUCH DOCUMENT THEIR SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. WARNING REVISIONS ARCHITECTURAL, STRUCTURAL, CIVIL, ENVIRONMENTAL, MECHANICAL, AND ELECTRICAL ENGINEERING 201 HUMPHREYS SERVICE BLDG ITHACA, NEW YORK 14853-3701 148 CRADIT FARM DRIVE ITHACA, NEW YORK 14850 COURT HALL DOMESTIC HOT WATER REPLACEMENT P-403 12673548 PHASE 1 DEMOLITION AND CONSTRUCTION DETAILS A. FOX alf 3202 AUGUST 8, 2020 SCALE:1/4" = 1'-0"2 PHASE 1 CONSTRUCTION - HEAT EXCHANGER SKID INSTALLATION SCALE:1/4" = 1'-0"1 PHASE 1 DEMOLITION - HOT WATER TANK AND BOILER REMOVAL 1 07/27/20 ISSUE FOR COORDINATED REVIEW 2 08/08/20 ISSUE FOR CONSTRUCTION HW CW 1"HWR CP CP 1"HWR FROM MEWS 1"HWR FROM COURT 4"CW SUPPLY 3"4" 5" 6"1" ASME EXPANSION TANK NATURAL GAS (G) TEMPORARY MOBILE TRAILER EXISTING EXTERIOR WALL CW TO SOMEWHERE OUTSIDE MECH ROOM HW TIE-IN FROM TRAILER CW TIE-IN TO TRAILER CWHW GAS GAS CW HW HWR FROM SOMEWHERE IN COURT HALL DHWOPEN CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED HEAT EXCHANGER SKID PRE-PURCHASED BY OWNER HEAT EXCHANGER T FROM CAMPUS STEAM TO BUILDING HEAT HEAT EXCHANGERS 3"DHW TO COURT 3"DHW TO MEWS CONDENSATE TO STEAM PIT 1" DHWR CP CP 1" DHWR FROM MEWS 1" DHWR FROM COURT 4" CW SUPPLY 3"4" 5" 6"1" ASME EXPANSION TANK NATURAL GAS (G) TEMPORARY MOBILE TRAILER EXISTING EXTERIOR WALL DCW TO SOMEWHERE OUTSIDE MECH ROOM GAS GAS CW HW DHWR FROM SOMEWHERE IN COURT HALL HEAT EXCHANGER SKID PRE-PURCHASED BY OWNER HEAT EXCHANGER T FROM CAMPUS STEAM TO BUILDING HEAT HEAT EXCHANGERS 3"DHW TO COURT 3"DHW TO MEWS CONDENSATE TO CONDENSATE RECIEVER 4" DHW 1" DHWR 1-1/2" DCW TO TRAILER 1-1/2" DHW FROM TRAILER 1-1/2" GAS TO TRAILER 1" DHWR 1-1/2" CW 1-1/2" DHW CORN E LL U N I V E R SI TYFOUN D E D 5681AD FACILITIES ENGINEERING ARCHIVE BAR CODEARCH/STRUCT: CIVIL/ENV: ELECTRICAL: MECHANICAL: DATE: FACILITY: DESIGN: DRAWN: WWW.FCS.CORNELL.EDU IT IS A VIOLATION OF NEW YORK STATE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT OR ENGINEER, TO ALTER THIS DOCUMENT IN ANY WAY. IF THIS DOCUMENT IS ALTERED, THE ALTERING ARCHITECT OR ENGINEER SHALL AFFIX TO SUCH DOCUMENT THEIR SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. WARNING REVISIONS ARCHITECTURAL, STRUCTURAL, CIVIL, ENVIRONMENTAL, MECHANICAL, AND ELECTRICAL ENGINEERING 201 HUMPHREYS SERVICE BLDG ITHACA, NEW YORK 14853-3701 148 CRADIT FARM DRIVE ITHACA, NEW YORK 14850 COURT HALL DOMESTIC HOT WATER REPLACEMENT P-404 12673548 PHASE 2 DEMOLITION AND CONSTRUCTION DETAILS A. FOX alf 3202 AUGUST 8, 2020 SCALE:1/4" = 1'-0"1 PHASE 2 DEMOLITION - DHW MIXING VALVLE REMOVAL AND TRAILER DISCONNECTION SCALE:1/4" = 1'-0"2 PHASE 2 CONSTRUCTION - BACK UP TRAILER HOOK-UPS 1 07/27/20 ISSUE FOR COORDINATED REVIEW 2 08/08/20 ISSUE FOR CONSTRUCTION CORN E LL U N I V E R SI TYFOUN D E D 5681AD FACILITIES ENGINEERING ARCHIVE BAR CODEARCH/STRUCT: CIVIL/ENV: ELECTRICAL: MECHANICAL: DATE: FACILITY: DESIGN: DRAWN: WWW.FCS.CORNELL.EDU IT IS A VIOLATION OF NEW YORK STATE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT OR ENGINEER, TO ALTER THIS DOCUMENT IN ANY WAY. IF THIS DOCUMENT IS ALTERED, THE ALTERING ARCHITECT OR ENGINEER SHALL AFFIX TO SUCH DOCUMENT THEIR SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. WARNING REVISIONS ARCHITECTURAL, STRUCTURAL, CIVIL, ENVIRONMENTAL, MECHANICAL, AND ELECTRICAL ENGINEERING 201 HUMPHREYS SERVICE BLDG ITHACA, NEW YORK 14853-3701 148 CRADIT FARM DRIVE ITHACA, NEW YORK 14850 COURT HALL DOMESTIC HOT WATER REPLACEMENT P-501 12673548 SCHEDULES A. FOX pc 3202 AUGUST 8, 2020 PIPING ACCESSORIES SPECIFICATIONS: 1. PROVIDE VALVES WITH UNIONS OR FLANGES AT EACH PIECE OF EQUIPMENT ARRANGED TO ALLOW SERVICE, MAINTENANCE AND EQUIPMENT REMOVAL WITHOUT SYSTEM SHUTDOWN. 2. TERMINATE COMPRESSED AIR EQUIPMENT DRAINS INTO OIL/WATER SEPARATOR PRIOR TO DISCHARGE TO FLOOR DRAIN. 3. PROVIDE PRESSURE GAUGE IN PIPING TEE WITH BALL SHUTOFF VALVE. NUMBERS ARE NOT ACCEPTABLE. 4. PROVIDE PRESSURE GAUGES AT DISCHARGE OF EACH PRESSURE REDUCING VALVE, AIR FILTER, AIR DRYER, AIR COMPRESSOR, AND WHERE INDICATED. 5. PROVIDE UNIONS ADJACENT TO VALVES AND AT FINAL EQUIPMENT CONNECTIONS. PIPING ACCESSORIES SCHEDULE AND SPECIFICATIONS TAG DEVICE BOD MANUFACTURER MODEL PRESSURE RATING SPECIFICATIONS T-1 THERMOMETERS TRERICE BX9 N/A INDUSTRIAL STICK TYPE, ASTM E1, ACCURACY 1% OF SPAN RANGE, 9-INCH CASE, LOCKING ADJUSTABLE ANGLE BODY, ALUMINUM STEM, ALUMINUM/NON-METALLIC CASE, SECURED TO WELL BY TAPERED BUSHING, 3/4-INCH BRASS THERMOWELL (COPPER PIPING), 3/4-INCH STAINLESS STEEL THERMOWELL (STEEL PIPING), SELECT STEM LENGTH AND TEMPERATURE RANGE SUITABLE FOR APPLICATION V-1 SHUT-OFF BALL VALVE, NPS 1/2 - 2 INCH, WATER AND LOW PRESSURE STEAM SERVICE WATTS B6000-SS 300 PSIG WOG MSS SP-110, 2-PIECE, STANDARD PORT, BRONZE BODY, 316 SS BALL & STEM, PTFE OR TFE SEAT PT-1 PRESSURE/TEMPERATURE TEST PORT TRERICE D3769 500 PSIG @ 200 DEGF COLD/CHILLED WATER SERVICE: BRASS BODY & CAP, 1/2 NPT CONNECTION, NEOPRENE SEAT, GASKETED AND THREADED CAP WITH RETENTION CHAIN S-1 STRAINERS, WYE PATTERN, NPS 1/2 - 2 INCH, WATER AND LOW PRESSURE STEAM SERVICE WATTS SERIES 777 200 PSIG @ 210 DEGF WOG BRONZE BODY, #20 MESH 304 STAINLESS STEEL SCREEN, THREAD OR SWEAT CONNECTION. AV-1 AIR VENT BELL & GOSSETT MODEL 87 150 PSIG BRASS BODY, NON-FERROUS INTERNALS V-2 SHUT-OFF BUTTERFLY VALVE, NPS 2-1/2 INCHES AND ABOVE, WATER SERVICE NIBCO LD 3022 150 PSIG @ 250 ˚F DUCTILE IRON, FULLY LUGGED, RESILIENT SEAT, BI-DIRECTIONAL, DEAD-ENDABLE, 316 SS DISC, 17-4 PH SHAFT, EPDM SEAT AND SEAL V-3 SHUT-OFF BUTTERFLY VALVE, NPS 2-1/2 INCHES AND ABOVE, STEAM SERVICE JAMESBURY 815L--112236MT 100 PSIG @ 450 ˚F CARBON STEEL, FULLY LUGGED, RESILIENT SEAT, BI-DIRECTIONAL, DEAD-ENDABLE, 316 SS DISC & SHAFT, FILLED PTFE SEAT AND PTFE SEAL, GREAR OPERATOR 4" AND ABOVE. CHV-1 CHECK VALVE, NPS 1/2 - 2 INCHES, WATER AND LOW PRESSURE STEAM SERVICE WATTS SERIES CV 200 PSIG OWG, 125 PSIG WSP 45 DEGREE SWING CHECK, HORIZONTAL FLOW, ASTM B-584 BRONZE BODY AND DISC. G-1 PRESSURE GAUGE, WATER SERVICE TRERICE 700 SERIES N/A ASME B40.100, 3% ACCURACY, PHOSPHOR BRONZE BOURDON TUBE, 1/4-INCH NPT BRASS BOTTOM CONNECTION, SILICONE FILLED, STAINLESS STEEL CASE, MINIMUM 3-1/2-INCH G-2 PRESSURE GAUGE, STEAM SERVICE TRERICE 700 SERIES N/A ASME B40.100, 3% ACCURACY, PHOSPHOR BRONZE BOURDON TUBE, 1/4-INCH NPT BRASS BOTTOM CONNECTION, SILICONE FILLED, STAINLESS STEEL CASE, MINIMUM 3-1/2-INCH DIAMETER, NON-REPAIRABLE, GLASS LENS, NO SNUBBERS, PIGTAIL COOLING LOOP, SELECT PRESSURE RANGE SUITABLE FOR APPLICATION PLUMBING PIPING SCHEDULE AND SPECIFICATIONS PIPE SERVICES PIPE SIZE MATERIALS FITTINGS JOINT INSULATION MATERIALS JACKET VAPOR RETARDANT DOMESTIC RUNOUTS ASTM B88 TYPE L COPPER ASTM B16.22 STD WROUGHT COPPER ASTM B32 SOLDER 1/2", k=0.27 (MAX) FIBERGLASS ASJ YES COLD WATER 1/2" - 6" ASTM B88 TYPE L COPPER ASTM B16.22 STD WROUGHT COPPER ASTM B32 SOLDER 1", k=0.27 (MAX)FLEXIBLE ELASTOMERIC NONE YES DOMESTIC HOT WATER RUNOUTS ASTM B88 TYPE L COPPER ASTM B16.22 STD WROUGHT COPPER ASTM B32 SOLDER 1/2", k=0.27 (MAX) FIBERGLASS ASJ NONE AND RECIRC 1/2" - 6" ASTM B88 TYPE L COPPER ASTM B16.22 STD WROUGHT COPPER ASTM B32 SOLDER 1", k=0.27 (MAX)FLEXIBLE ELASTOMERIC NONE NONE LOW PRESSURE STEAM 1/2" - 2" ASTM A53 STEEL, SCH 40 (80) BLACK, GRADE B, ERW ASTM A126, ASME B16.4 CAST IRON THREADED 2.5", k=0.27-0.30 FIBERGLASS ALUMINUM NONE 15 PSI & BELOW (CONDENSATE) 2-1/2" - 6" ASTM A53 STEEL, SCH 40 (80) BLACK, GRADE B, ERW ANSI B16.9 & B16.28 STD BUTT WELD WELDED 2.5", k=0.27-0.30 FIBERGLASS ALUMINUM NONE HIGH PRESSURE STEAM 4" & BELOW ASTM A53 STEEL, SCH 40 BLACK, GRADE B, ERW ANSI B16.9 & B16.28 STD BUTT WELD WELDED 2.5", k=0.27-0.30 FIBERGLASS ALUMINUM NONE NOTES: 1. SOLDER FILLER METALS: ASTM B32, LEAD-FREE ALLOYS. INCLUDE WATER FLUSHABLE FLUX ACCORDING TO ASTM B813. 2. DIELECTRIC FITTINGS: USE FLANGES OR COUPLINGS. UNIONS ARE UNACCEPTABLE. 3. INSTALL PLUMBING SYSTEMS TO FACILITATE SERVICE, MAINTENANCE AND REPAIR OR REPLACEMENT OF COMPONENTS. 4. PROVIDE VAPOR RETARDER ON PIPING INSULATION SYSTEMS CARRYING FLUIDS WITH AN OPERATING TEMPERATURE LOWER THAN 60 DEGREES F. 5. ALL EXPOSED PIPING BELOW 8 FEET SHALL BE ALUMINUM OR PVC. 6. DO NOT ENCLOSE, COVER OR PUT PLUMBING PIPING SYSTEMS INTO OPERATION UNTIL IT HAS BEEN INSPECTED AND APPROVED BY THE AUTHORITIES HAVING JURISDICTION. 7. LEAVE NEW, ALTERED, EXTENDED, OR REPLACED DOMESTIC WATER PIPING UNCOVERED AND UNCONCEALED UNTIL IT HAS BEEN TESTED. EXPOSE WORK THAT WAS COVERED OR CONCEALED BEFORE TESTED. 8. PROVIDE PIPE LABELS AND DIRECTIONAL ARROWS ON ALL NEW PIPING SYSTEMS. LABELS SHALL BE PRINTED PLASTIC WITH CONTACT-TYPE, PERMANENT ADHESIVE BACKING. 9. ALL INSULATION AND ADHESIVE SHALL HAVE A MAXIMUM FLAME-SPREAD INDEX OF 25 AND A MAXIMUM SMOKE-DEVELOPED INDEX OF 50 WHEN TESTED IN ACCORDANCE WITH ASTM E84. 10. TESTING OF DOMESTIC WATER PIPING: CAP AND SUBJECT DOMESTIC WATER PIPING TO STATIC WATER PRESSURE OF 50 PSIG ABOVE OPERATING PRESSURE, WITHOUT EXCEEDING PRESSURE RATING OF PIPING SYSTEM MATERIALS ISOLATE TEST SOURCE AND ALLOW TO STAND FOR FOUR HOURS. LEAKS AND LOSS IN TEST PRESSURE CONSTITUTE DEFECTS THAT MUST BE REPAIRED REPAIR LEAKS AND DEFECTS WITH NEW MATERIALS AND RETEST PIPING UNTIL SATISFACTORY RESULTS ARE OBTAINED. 11. CLEANING AND DISINFECTION OF POTABLE WATER SYSTEMS: FLUSH PIPING SYSTEM WITH CLEAN, POTABLE WATER UNTIL DIRTY WATER DOES NOT APPEAR AT OUTLETS FILL SYSTEM WITH WATER/CHLORINE SOLUTION WITH AT LEAST 50 PPM OF CHLORINE. ISOLATE WITH VALVES AND ALLOW TO STAND FOR 24 HOURS. DRAIN TO SANITARY. FLUSH SYSTEM WITH CLEAN, POTABLE WATER UNTIL NO TSP REMAINS IN WATER COMING FROM SYSTEM. SUBMIT WATER SAMPLES IN STERILE BOTTLES TO AUTHORITIES HAVING JURISDICTION. REPEAT PROCEDURE IF BIOLOGICAL EXAMINATION SHOWS EVIDENCE OF CONTAMINATION. 12. PROVIDE PIPING AND EQUIPMENT IDENTIFICATION SHOWING FLOW AND SERVICE. 13. INSTALL STEAM SUPPLY PIPING AT A MINIMUM UNIFORM GRADE OF 0.2 PERCENT DOWNWARD IN DIRECTION OF STEAM FLOW. INSTALL CONDENSATE RETURN PIPING AT A MINIMUM UNIFORM GRADE OF 0.4 PERCENT DOWNWARD IN DIRECTION OF CONDENSATE REDUCE STEAM PIPE SIZES USING ECCENTRIC REDUCER FITTINGS INSTALLED WITH LEVEL SIDE DOWN. STEAM WATER HEATER SCHEDULE (OWNER PRE-PURCHASED) TAG LOCATION SERVICE BASIS OF DESIGN TYPE CAPACITY (MBH) PRIMARY SIDE SECONDARY SIDE WEIGHT (LBS) NOTESMANUFACTURER MODEL STEAM PRESSURE (PSIG) FLOW RATE (PPH) FLOW RATE (GPM) EWT (°F) LWT (°F) WPD (PSI) FOULING FACTOR FLUID HX-10073 10073 HOT WATER COONEY COIL & ENERGY JADXK9.88.08.85N_H FLOODED HX 3303 80 3035 88 50 125 7 0.0009 H2O 1 07/27/20 ISSUE FOR COORDINATED REVIEW 2 08/08/20 ISSUE FOR CONSTRUCTION CORN E LL U N I V E R SI TYFOU N D E D 5681AD FACILITIES ENGINEERING ARCHIVE BAR CODEARCH/STRUCT: CIVIL/ENV: ELECTRICAL: MECHANICAL: DATE: FACILITY: DESIGN: DRAWN: WWW.FCS.CORNELL.EDU IT IS A VIOLATION OF NEW YORK STATE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT OR ENGINEER, TO ALTER THIS DOCUMENT IN ANY WAY. IF THIS DOCUMENT IS ALTERED, THE ALTERING ARCHITECT OR ENGINEER SHALL AFFIX TO SUCH DOCUMENT THEIR SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. WARNING REVISIONS ARCHITECTURAL, STRUCTURAL, CIVIL, ENVIRONMENTAL, MECHANICAL, AND ELECTRICAL ENGINEERING 201 HUMPHREYS SERVICE BLDG ITHACA, NEW YORK 14853-3701 148 CRADIT FARM DRIVE ITHACA, NEW YORK 14850 COURT HALL DOMESTIC HOT WATER REPLACEMENT E-001 12673548 GENERAL NOTES AND SYMBOL LEGENDS M. SCHOLENO MPS 3202 AUGUST 8, 2020 ELECTRICAL SCOPE OF WORK 1.0 DISCONNECT AND REMOVE EXISTING TEMPORARY DOMESTIC HOT WATER SYSTEM. 2.0 PROVIDE POWER FOR NEW DOMESTIC HOT WATER SYSTEM. ELECTRICAL LEGEND LIGHTING LEGEND MOTOR 1'x4' LUMINAIRE HARDWIRED EQUIPMENT CONNECTION P-1A 12 HOMERUN TO PANEL P-1A, CIRCUIT #12. FED FROM 20A -1P BREAKER IS INTENDED UNLESS NOTED OTHERWISE. RUN GREEN WIRE GROUND FOR ALL CIRCUITS. PROVIDE ONE GROUND PER CIRCUIT. EMERGENCY POWER OFF (EPO) GROUND ROD ELECTRODE DUPLEX RECEPTACLE WITH GFCI PROTECTION DUPLEX RECEPTACLE WITH AFCI PROTECTION QUAD RECEPTACLE LINETYPES LEGEND SPECIAL RECEPTACLE5-30R PANELBOARD JUNCTION BOX B = INSTALLED IN BASEBOARD TR = INSTALLED IN WOOD TRIM/CASEWORK/WAINSCOTT SR = SURFACE RACEWAY WP = WEATHERPROOF AC = AIR CONDITIONER DUPLEX RECEPTACLE: DOUBLE DUPLEX RECEPTACLE MOTOR STARTER J 2'x4' LUMINAIRE CEILING MOUNTED LUMINAIRE EM LIGHTING BATTERY UNIT COMBO EXIT SIGN/EM LIGHTING BATTERY UNIT SINGLE FACE, WALL MOUNT EXIT SIGN DOUBLE FACE, WALL MOUNT EXIT SIGN SINGLE FACE, CEILING MOUNT EXIT SIGN DOUBLE FACE, CEILING MOUNT EXIT SIGN LIGHT SWITCH: SAFETY SWITCH (NON-FUSED) SAFETY SWITCH (FUSED) 3 = 3-WAY SWITCH 4 = 4-WAY SWITCH D = DIMMER SWITCH O = WALL SWITCH OCCUPANCY SENSOR V = WALL SWITCH VACANCY SENSOR W = WIRELESS SWITCH S = WIRELESS SCENE SWITCH WIRELESS OCCUPANCY SENSOR WIRELESS DAYLIGHT SENSOR OS DS 1'x2' LUMINAIRE FIRE ALARM LEGEND FIRE ALARM CONTROL PANEL BATTERY CABINET WATER FLOW SWITCH MUXPAD REMOTE ANNUNCIATOR D = DUCT SMOKE DETECTOR R = RELAY BASE BR = BEAM RECEIVER BT = BEAM TRANSMITTER SB = SOUNDER BASE SMOKE DETECTOR: TAMPER SWITCH AUDIBLE NOTIFICATION APPLIANCE FACP BATT MUX FAA NAC PANELNAC MANUAL PULL STATIONF S X F = FIXED TEMPERATURE R = RATE OF RISE R/F = COMBINATION RISE/FIXED TEMPERATURE HEAT DETECTOR: H X CARBON MONOXIDE DETECTORCO AM F XXcd C FS F S XXcd C TS ADDRESSABLE MODULE XXcd = CANDELA C = CEILING COMBO A/V NOTIFICATION APPLIANCE: XXcd = CANDELA C = CEILING VISUAL NOTIFICATION APPLIANCE: SUPPRESSION SYSTEM ELECTRICAL ABBREVIATIONS AC AIR CONDITIONER AFF ABOVE FINISHED FLOOR AFG ABOVE FINISHED GRADE AFI ARC FAULT INTERRUPTER AMM ADDRESSABLE MONITOR MODULE AOM ADDRESSABLE OUTPUT MODULE ARB AUXILIARY RELAY BOARD ATS AUTOMATIC TRANSFER SWITCH B BASEBOARD BKR BREAKER C CONDUIT CD CANDELA CKT CIRCUIT CR CONTROL RELAY DHW DOMESTIC HOT WATER EC ELECTRICAL CONTRACTOR EMT ELECTRICAL METALLIC TUBING EPO EMERGENCY POWER OFF STATION FAA FIRE ALARM ANNUNCIATOR PANEL FACP FIRE ALARM CONTROL PANEL FSD FIRE SMOKE DAMPER GAA GENERATOR ALARM ANNUNCIATOR GFI GROUND FAULT INTERRUPTER GND GROUND HP HORSEPOWER KW KILOWATT LC LIGHTING CONTACTOR LFMC LIQUID TIGHT FLEXIBLE METALLIC CONDUIT LTG LIGHTING MCB MAIN CIRCUIT BREAKER MLO MAIN LUG ONLY MTS MANUAL TRANSFER SWITCH NAC NOTIFICATION APPLIANCE CIRCUIT NIC NOT IN CONTRACT OE OVERHEAD ELECTRIC PC PHOTOCELL PM PLUGMOLD PP POWER PANEL PVC POLYVINYL CHLORIDE CONDUIT RGS RIGID GALVANIZED STEEL CONDUIT SR SURFACE RACEWAY ST SHUNT TRIP TM THERMAL MAGNETIC TR TRIM/CASEWORK/WAINSCOTT TSP TWISTED SHIELDED PAIR TYP TYPICAL UE UNDERGROUND ELECTRIC UON UNLESS OTHERWISE NOTED UPS UNINTERRUPTIBLE POWER SUPPLY V VOLTS VA VOLT AMPS WP WATERPROOF UNDERGROUND ELECTRICU E UNDERGROUND LIGHTINGUL OVERHEAD ELECTRICO E TO BE PROVIDED DEMOLITION / TO BE RELOCATED EXISTING TO REMAIN UNDERGROUND TELCOU C MOUNTING HEIGHTS CARD READER 48" TOP OF BOX LIGHT SWITCH 48" TOP OF BOX RECEPTACLE 18" TOP OF BOX DATA OUTLET 18" TOP OF BOX TV OUTLET 84" TOP OF BOX PHONE OUTLET 48" TOP OF BOX SAFETY SWITCH 60" CENTERLINE OF HANDLE MOTOR STARTER 60" CENTERLINE OF HANDLE PANELBOARD 72" TOP OF PANELBOARD MANUAL PULL STATION 48" OPERABLE HANDLE NOTIFICATION APPLIANCE 80" BOTTOM OF LENS DOOR HOLD OPEN COORDINATE IN FIELD EM BATTERY UNIT 96" BOTTOM OF UNIT EM REMOTE UNIT 102" BOTTOM OF UNIT EXIT SIGN 96" BOTTOM OF UNIT LIGHT POLE WITH LED LUMINAIRES, REFER TO PLANS FOR NUMBER AND CONFIGURATION OF HEADS EQUIPMENT CONNECTION SCHEDULE - NOT AUTOMATED LABEL DESCRIPTION ROOM NO. PANEL RATING (kW, W, VA, A, HP)VOLTAGE PHASE WIRE & CONDUIT STARTER DISCONNECT NOTES ADDITIONAL REQUIREMENTSTYPE LOC BY ENC AUX BY RATING LOC ENC CP-1 CIRCULATION PUMP 10073 RPDP1-3C 1/12 HP 120 1 2#12AWG, 1#12G IN 3/4" C NA NA NA NA NA NA NA NA NA 1, 3, 4 MV-1 MIXING VALVE 10073 RPDP1-3C 10A 120 1 2#12AWG, 1#12G IN 3/4" C NA NA NA NA NA NA NA NA NA 1, 7 NOTES: 1. MAKE CONNECTION TO EQUIPMENT.A. START-STOP IN COVER. 2. INSTALL MOTOR STARTER FURNISHED BY OTHERS.B. HAND-OFF-AUTO IN COVER. 3. MAKE CONNECTIONS TO CONTROLS.C. PILOT LIGHT IN COVER. 4. FIELD CONTROL WIRING BY OTHERS.D. AUXILIARY CONTACTS. 5. RUN FEED THRU CONTACTOR. CONTROL FROM FAN SHUTDOWN RELAY. E. CONTROL CIRCUIT TRANSFORMER. 6. PROVIDE DUCT SMOKE DETECTOR.F. TWO-SPEED MOTOR CONTROLLER. 7. PROVIDE GFI RECEPTACLE AT UNIT. CIRCUIT TO NEAREST 120V CIRCUIT. G. KEY OPERATED - UP/DOWN OR OPEN/CLOSE. 8. WIRE THRU T-STAT THEN TO MOTOR. GENERAL ELECTRICAL DEMOLITION NOTES 1.0 ELECTRICAL EQUIPMENT SHOWN DASHED ON DEMOLITION DRAWINGS, INCLUDING ASSOCIATED ANCHORS, SUPPORTS, STRAPS, BOXES, FITTINGS, AND OTHER APPURTENANCES NOT SHOWN, SHALL BE DISCONNECTED AND REMOVED. REMOVE ASSOCIATED BRANCH CIRCUITRY TO SOURCE, UNLESS NOTED OTHERWISE. 2.0 EXISTING RACEWAYS AND DEVICE BACKBOXES NOT INTERFERRING WITH NEW WORK SHALL BE REUSED WHERE POSSIBLE. 3.0 PROVIDE JUNCTION BOXES, RACEWAYS, AND WIRING TO MODIFY/EXTEND EXISTING SYSTEMS AND CIRCUITS FED DOWNSTREAM OF ELECTRICAL EQUIPMENT SHOWN TO BE DEMOLISHED. 4.0 CUT DEMOLISHED CONDUITS INSTALLED THRU WALLS AND FLOORS FLUSH WITH THE SURFACE AND PATCH PENETRATIONS (FIRESTOP IF LOCATED ON A FIRE RATED SURFACE). PATCH AND PAINT SURFACES IN EXPOSED AREAS TO MATCH SURROUNDING MATERIALS, FINISHES, AND COLORS. 5.0 PROVIDE BLANK COVERPLATES ON UNUSED BACKBOXES REMAINING FROM DEMOLITION NOT SPECIFIED TO BE INFILLED. 6.0 EXISTING EQUIPMENT SHOWN TO REMAIN SHALL BE PROTECTED DURING CONSTRUCTION. GENERAL ELECTRICAL NOTES 1.0 ELECTRICAL SCHEMATICS INDICATED ON CONTRACT DOCUMENTS ARE DIAGRAMMATIC. IT IS NOT THE INTENT TO SHOW EXACT OR MOST EFFICIENT ROUTING. VERIFY ALL DIMENSIONS AND FIELD CONDITIONS ON SITE. ANY CONFLICTS BETWEEN CONSTRUCTION DOCUMENTS AND FIELD CONDITIONS SHALL BE BROUGHT TO CORNELL'S PROJECT MANAGER FOR RESOLUTION BEFORE WORK PROCEEDS. 2.0 ASSURE PUBLIC AND WORKER SAFETY AT ALL TIMES. PROTECT ADJOINING AREAS FROM DAMAGE AND DUST. REMOVE ALL DEBRIS FROM SITE AND DISPOSE OF WASTE MATERIAL IN A SAFE MANNER. KEEP THE PREMISES FREE OF DEBRIS FROM THE EXECUTION OF WORK. DELIVER A FINAL PRODUCT THAT IS CLEAN AND OPERABLE. 3.0 FIRE STOP ELECTRICAL PENETRATIONS THROUGH FIRE RATED WALLS AND/OR FLOORS WITH MATERIAL EQUAL IN RATING TO THE CONSTRUCTION OF THE MATERIAL PENETRATED. 4.0 WORK SHALL BE COMPLETED AS SPECIFIED AND INDICATED ON CONTRACT DOCUMENTS. ANY SUGGESTED ALTERNATE MANUFACTURER OR METHOD OF INSTALLATION SHALL BE SUBMITTED TO PROJECT ENGINEER FOR APPROVAL PRIOR TO ORDERING ANY MATERIALS OR COMMENCING EXECUTION OF WORK. 5.0 GROUNDING SHALL BE IN STRICT ACCORDANCE WITH NEC ARTICLE 250. PROVIDE EQUIPMENT GROUND CONDUCTOR WITH EACH BRANCH CIRCUIT INDICATED ON CONTRACT DOCUMENTS. EQUIPMENT GROUND CONDUCTOR SHALL BE ROUTED WITH ASSOCIATED PHASE CONDUCTORS. 6.0 PROVIDE A NEW TYPED PANELBOARD DIRECTORY FOR EACH PANELBOARD. LABEL ALL NEW DEVICE FACEPLATES WITH SOURCE AND CIRCUIT NUMBER. PROVIDE PERMANENT LABEL ON SWITCHING DEVICES INDICATING EQUIPMENT SERVICE AND INVENTORY NUMBERS. COORDINATE EQUIPMENT INVENTORY NUMBERS WITH CORNELL UNIVERSITY'S MECHANICAL SHOP, 255-8667. 7.0 CIRCUITS RATED 20-AMP, 120 VOLT SHALL CONTAIN SEPARATE NEUTRAL CONDUCTORS. 8.0 CONDUCTORS SHALL BE A MINIMUM OF 12AWG, STRANDED COPPER, 600VAC, 90 DEGREE C, TYPE THHN/THWN-2 FOR DRY AREAS AND XHHW/THWN-2 FOR WET AREAS. 9.0 CONDUITS SHALL BE A MINIMUM OF 3/4 INCHES DIAMETER. CONDUITS SHALL BE ELECTRICAL METALLIC TUBING (EMT) AND SURFACE MOUNTED UNLESS NOTED OTHERWISE. 10.0 AIC RATING OF NEW CIRCUIT BREAKERS SHALL MATCH RATING OF RESPECTIVE PANELBOARD. SIZE AS INDICATED. 11.0 PROVIDE PULL STRING THROUGH NEW CONDUIT AND BOXES. PROVIDE SUPPORT HANGERS FOR CONDUIT AS NEEDED. 12.0 INSTALL RACEWAY SYSTEMS ENSURING PROPER ACCESS TO EQUIPMENT AND DEVICES AND WITH SUFFICIENT SPACE TO PERFORM ROUTINE MAINTENANCE AND REPAIR. RACEWAYS THAT ARE NOT INSTALLED WITH THIS REQUIREMENT IN MIND SHALL BE RELOCATED AT NO EXPENSE TO THE UNIVERSITY UNTIL DEFICIENCIES ARE CORRECTED. 1 7/27/2020 ISSUE FOR COORDINATED REVIEW 2 8/8/2020 ISSUE FOR CONSTRUCTION 10073 142 140A RPDP1-3C HPP1-3C RPP1-3C 150kVA DHW-3 DHW-1 DHW-2 P-1 TEMP BOILER TRAILER 1 2 3 3 3 4 10073 142 140A HPP1-3C RPDP1-3C RPP1-3C 150kVA CP-1 SKID MIXING VALVE MV-1 RPDP1-3C -58 RPDP1-3C -60 RPDP1-3C -62 1 2 CIRCULATING PUMP 3 CORN E LL U N I V E R SI TYFOU N D E D 5681AD FACILITIES ENGINEERING ARCHIVE BAR CODEARCH/STRUCT: CIVIL/ENV: ELECTRICAL: MECHANICAL: DATE: FACILITY: DESIGN: DRAWN: WWW.FCS.CORNELL.EDU IT IS A VIOLATION OF NEW YORK STATE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT OR ENGINEER, TO ALTER THIS DOCUMENT IN ANY WAY. IF THIS DOCUMENT IS ALTERED, THE ALTERING ARCHITECT OR ENGINEER SHALL AFFIX TO SUCH DOCUMENT THEIR SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. WARNING REVISIONS ARCHITECTURAL, STRUCTURAL, CIVIL, ENVIRONMENTAL, MECHANICAL, AND ELECTRICAL ENGINEERING 201 HUMPHREYS SERVICE BLDG ITHACA, NEW YORK 14853-3701 148 CRADIT FARM DRIVE ITHACA, NEW YORK 14850 COURT HALL DOMESTIC HOT WATER REPLACEMENT E-101 12673548 ELECTRICAL DEMOLITION & RENOVATION PLANS M. SCHOLENO MPS 3202 AUGUST 8, 2020 # 0' 2' 4' 8' SCALE: 1/4"=1'-0" E-101 KEYED DEMOLITION NOTES 1 DISCONNECT EXISTING POWER FEED AND ASSOCIATED DEVICES TO TEMPORARY BOILER AND REMOVE BACK TO SOURCE. 2 DISCONNECT EXISTING POWER FEED AND ASSOCIATED DEVICES FROM DHW PUMP AND REMOVE BACK TO SOURCE. 3 DISCONNECT EXISTING POWER FEED AND ASSOCIATED DEVICES FROM HOT WATER HEATER AND REMOVE BACK TO SOURCE. 4 DISCONNECT EXISTING POWER FEED AND ASSOCIATED DEVICES FROM DHW TANK AND REMOVE BACK TO SOURCE. SCALE:1/4" = 1'-0"1 FIRST FLOOR ELECTRICAL DEMOLITION PLAN SCALE:1/4" = 1'-0"2 FIRST FLOOR ELECTRICAL RENOVATION PLAN #E-101 KEYED RENOVATION NOTES 1 PROVIDE 120V/20A CIRCUIT TO SKID. PROVIDE 2#12 AWG CU & 1#12 AWG GND THHN CONDUCTORS IN ¾” CONDUIT AND CONNECT. CIRCUIT FROM SPARE 20A/1P CIRCUIT BREAKER IN PANEL INDICATED. 2 PROVIDE 20A/125V GFCI DUPLEX RECEPTACLE AND SURFACE MOUNT ON WALL ADJACENT TO MIXING VALVE LOCATION. CIRCUIT WITH 2#12 AWG CU & 1#12 AWG GND CONDUCTORS IN ¾” CONDUIT AND CONNECT TO EXISTING SPARE 20A/1P CIRCUIT BREAKER IN PANEL INDICATED. 3 PROVIDE 120V/20A CIRCUIT TO CIRCULATION PUMP. PROVIDE 2#12 AWG CU & 1#12 AWG GND THHN CONDUCTORS IN ¾” CONDUIT AND CONNECT. CIRCUIT FROM SPARE 20A/1P CIRCUIT BREAKER IN PANEL INDICATED. E-101 GENERAL NOTES 1.0 COORDINATE LOCATIONS AND ALL WORK WITH MECHANICAL CONTRACTOR AND EQUIPMENT PROVIDED. 1 7/27/2020 ISSUE FOR COORDINATED REVIEW 2 8/8/2020 ISSUE FOR CONSTRUCTION