Loading...
HomeMy WebLinkAbout20-NJ079_P-101 PLUMBING ROOF PLAN-P101RTU-3240 MBHRTU-2240 MBHRTU-1300 MBHGM1-1/4"G130 MBH1-1/2"G240 MBH1-1/2"G240 MBH1-1/2"G300 MBHRTU-4130 MBH2"G480 MBH2-1/2"G780 MBH2-1/2"G910 MBH2-1/2"G910 MBHLANDLORD TO PROVIDE GASMETER AND GAS PIPING. P.C.TO VERIFY GAS SERVICESIZE, LOCATION, ANDPRESSURE IN FIELD PRIORTO BID.GGG GG NOTE: LANDLORD TOPROVIDE ROOFTOPDRAINAGE. SEE LANDLORDPLANS FOR STORMDRAINAGE PIPING.RTU-1240 MBHRTU-2240 MBHHVAC-1300 MBHGM1-1/4"G130 MBH1-1/2"G240 MBH1-1/2"G240 MBH1-1/2"G300 MBHRTU-3130 MBH2"G480 MBH2-1/2"G780 MBH2-1/2"G910 MBH2-1/2"G910 MBHGGGGGP-101.005 Independence Way, Suite 360Princeton, NJ 08540+1 (609) 751-9655 office+1 (609) 751-9658 faxwww.coolsysenergydesign.comCLIVE SAMUELS07/16/2020CS ENGINEERING FIRM #: 5635830S:\Signatures\Clive Samuels - New York Sign & Sea l.JPGA.THESE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THEGENERAL EXTENT OF THE WORK. THE CONTRACTOR SHALL BERESPONSIBLE FOR THE COORDINATION AND PROPERINSTALLATION OF ALL MECHANICAL SYSTEMS. THE CONTRACTORSHALL PROVIDE ALL NECESSARY OFFSETS AND FITTINGS WHICHMAY BE REQUIRED DUE TO SPACE CONSTRAINTS OR OTHERCONDITIONS.B.THE CONTRACTOR SHALL PROVIDE ALL MISCELLANEOUSSUPPORTING STEEL, ETC. FOR THE PROPER INSTALLATION OF ALLMECHANICAL SYSTEMS.C.THE CONTRACTOR SHALL COORDINATE FLOOR, WALL AND ROOFPENETRATIONS, LOUVER SIZES, ETC. WITH GENERAL TRADES.D.THE CONTRACTOR SHALL VERIFY ALL CLEARANCES PRIOR TOFABRICATION OF ANY WORK.E.THE INFORMATION ON THIS PLAN IS INCLUDED FOR REFERENCE ONLY. THECONTRACTOR SHALL BE HELD RESPONSIBLE TO HAVE VISITED THE SITEPRIOR TO SUBMITTING HIS ESTIMATE AND TO HAVE EXAMINED ANDFAMILIARIZED HIMSELF WITH THE SITE CONDITIONS OF THE PROJECT. HESHALL COMPARE THE DRAWINGS AND SPECIFICATIONS WITH THE RESULTSOF HIS EXAMINATION OF THE SITE AND GENERALLY VERIFY THE LOCATIONOF ALL EXISTING WORK, AND BECOME INFORMED AS TO THE RELATION TOAND AFFECT ON THE WORK REQUIRED, BEFORE SUBMITTING A BID.SUBMISSION OF A BID WILL CONSTITUTE EVIDENCE THAT THE CONTRACTORHAS INSPECTED THE SITE OF THE PROPOSED WORK AND NO EXTRAPAYMENT WILL BE ALLOWED TO THE CONTRACTOR BECAUSE OFUNFAMILIARITY WITH THE SITE CONDITIONS.F.IT IS NOT INTENDED THAT THE DRAWINGS SHALL SHOW ALL DETAILS OFCONSTRUCTION, HOWEVER, THE H.V.A.C. SUBCONTRACTOR SHALL BEREQUIRED TO FURNISH AND INSTALL ALL MATERIALS NECESSARY TOCOMPLETE THE H.V.A.C. SYSTEM IN ACCORDANCE WITH THE BESTPRACTICE AND TO THE FULL EXTENT OF THE DRAWINGS ANDSPECIFICATIONS. THE H.V.A.C. SUBCONTRACTOR SHALL FURNISH ANDINSTALL ALL PARTS WHICH MAY BE REQUIRED BY THE DRAWINGS ANDOMITTED BY THE SPECIFICATIONS, OR VICE VERSA, JUST AS THOSEREQUIRED BY BOTH. SHOULD THERE APPEAR TO BE DISCREPANCIES OR AQUESTION OF INTENT, THE H.V.A.C. CONTRACTOR SHALL REFER TO THEARCHITECT/ENGINEER FOR DECISIONS, FURTHERMORE, HISINTERPRETATION SHALL BE FINAL, CONCLUSIVE AND BINDING.G.WITH THE SUBMISSION OF BID, THE H.V.A.C. CONTRACTOR SHALL HAVEAGREED TO HAVE INCLUDED THE COST OF ALL REQUIRED ITEMS IN HISPROPOSAL AND THAT HE WILL BE HELD RESPONSIBLE FOR THE APPROVEDSATISFACTORY FUNCTIONING FOR THE ENTIRE SYSTEM WITHOUT EXTRACOMPENSATION.GENERAL NOTESPIPING PROTECTIVE COATINGNTSGAS DESIGN CRITERIANTSALL METALLIC EXTERIOR PIPING AND FITTINGS SHALL BE COATED WITH A CORROSION-RESISTANTMATERIAL. A REST PROHIBITIVE PAINT IS AN ACCEPTABLE MEANS, THE PAINT SHALL BE YELLOW IN COLOR.RISER #1IS SIZED BASED ON (TOTAL DEVELOPED LENGTH 300') LESS THAN 2 PSI WITH A .5 IN. W.C. PRESSURE DROPAND 0.6 SPECIFIC GRAVITY ON THE HOUSE OF THE METER AFTER REGULATOR.RISER #1 GAS LOADROOF TOP UNITRTU-1300 MBHROOF TOP UNITRTU-2240 MBHROOF TOP UNITRTU-3240 MBHHVAC UNITHVAC-1130 MBHTOTAL CONNECTED GAS LOAD910 MBHTHE LOW PRESSURE PSI GAS PIPING IS SIZED BASED OFF OF THE 2015 INTERNATIONAL FUEL GAS CODETABLE 402.4(2)