Loading...
HomeMy WebLinkAbout20-NJ079_P-100 PLUMBING FLOOR PLAN-P10030"48"36"SAFE(E)3/4"CW(E)2"CW(E)2"CW(E)2"CW(E)2"CWBFPW17(E)FPWH(E)2"CW(E)3/4"CW(E)FPWH(E)8"SAN(E)8"SAN(E)8"SAN3"VTRP-4P-2P-1FD-1TP-1P-82"SAN1-1/2" SANIN CEILING4"SAN4"SAN3/4"CW4"SAN4"SAN3/4"HW3/4"CW3/4"HWRCCO2"CW2"V4"SAN1"HW1-1/4"CW3/4"HWR73281534193442221222231223522552556237313018AH136MV-122EWH-13"VTRCB-11-1/2"SANITARY DROPDOWN TO CATCH BASIN.4" SANITARYDOWNP-1192792"V2"V2"V28992899FD-1FD-1P-2P-2P-10FCOFCOP-6P-5P-93"VTRP-1P-12"V2"V2"V4"SAN4"SAN3"SAN3"SAN2"SAN3"SANP-730292916931293030FD-129FD-1FD-1P-2P-2P-10P-5P-7P-1P-1MV-1MV-1MV-1TP-13/4"HW3/4"CW3/4"HWR3/4"HW3/4"CW2351TP-1FD-137EWH-1BFPP-11BFP131"HW1-1/2"CW3/4"HWR1"HW1-1/2"CW3/4"HWR1"HW1-1/4"CW3/4"HWR2"CW99261112339109PROVIDE RAYCHEM XL-TRACE HEATINGCABLE ON ALL EXTERIOR SANITARYAND WATER PIPING. COORDINATEELECTRICAL REQUIREMENTS WITH E.C.1499FPRH1-1/2" SANITARYDOWN THROUGHROOF3/4" MAKE-UP COLDWATER UP THROUGHROOF TO SUPPLYCONDENSER.P-100.001.3/4" HOT WATER AND 1-1/2" COLD WATER DROPS IN WALL. ROUTE1/2" HOT AND COLD WATER TO MIXING VALVES LOCATEDBENEATH EACH LAVATORY. SET MIXING VALVES TO 105 DEGREES.ROUTE 1/2" TEMPERED AND COLD WATER TO EACH LAVATORY.ROUTE 1" COLD WATER TO EACH WATER CLOSET. ROUTE 1/2"COLD WATER TO TRAP PRIMER. ROUTE 1/2" COLD WATER TODRINKING FOUNTAINS.2.1/2" HOT AND COLD WATER DROP IN WALL. ROUTE 1/2" HOT ANDCOLD WATER TO MIXING VALVE LOCATED BENEATH HAND SINK.SET MIXING VALVE TO 105 DEGREES. ROUTE 1/2" TEMPERED ANDCOLD WATER TO HAND SINK.3.3/4" HOT AND COLD WATER DROP IN WALL TO SUPPLY 3COMPARTMENT SINK.4.1/2" HOT WATER AND 1-1/4" COLD WATER DROP IN WALL. ROUTE1/2" HOT AND COLD WATER TO MIXING VALVE LOCATED BENEATHLAVATORY. SET MIXING VALVE TO 105 DEGREES. ROUTE 1/2"TEMPERED AND COLD WATER TO LAVATORY. ROUTE 1/2" COLDWATER TO TRAP PRIMER. ROUTE 1" COLD WATER TO WATERCLOSET.5.SEE PLATFORM ENLARGEMENT - WATER FOR CONTINUATION.6.1/2" HOT AND COLD WATER DOWN FROM PLATFORM. ROUTE 1/2"HOT AND COLD WATER TO BREAK ROOM SINK. ROUTE 1/4" COLDWATER BENEATH SINK TO WATER FILTER. SEE DETAIL ON SHEETP-200 FOR MORE INFORMATION. P.C. TO INSTALL PERMANUFACTURERS INSTRUCTIONS.7.3/4" COLD WATER DROP IN WALL TO SUPPLY LANDLORDPROVIDED FROST PROTECTED WALL HYDRANT.8.1/2" HOT AND COLD WATER DROP IN WALL TO SUPPLY SERVICESINK. 2" VENT UP, 3" SANITARY DOWN.9.SEE PLUMBING FLOOR PLAN FOR CONTINUATION.10.1/2" HOT AND COLD WATER DROP IN WALL THROUGH FLOOR.PROVIDE SHUT OFF VALVES ON PIPE VERTICAL DROPS.11.3/4" COLD WATER DROP DOWN TO B.F.P.12.1/2" COLD WATER DOWN TO EVAC SYSTEM. PROVIDE B.F.P.DEVICE AS REQUIRED. REFER TO DETAIL ON P-200.13.1" HOT AND 1-1/2" COLD AND 3/4" HOT WATER RETURN TOCONNECT TO WATER HEATER. SEE DETAIL ON P-200 FOR MOREINFORMATION. PROVIDE SHUT-OFF VALVES ON VERTICAL PIPESECTIONS.14.3/4" COLD WATER TO THE LANDLORD PROVIDED FROSTPROTECTED ROOF HYDRANT (FPRH). BACKFLOW PREVENTIONDEVICE TO BE INSTALLED FOR FPRH. SEE LANDLORD PLANS FOREXACT LOCATION.15.3/4" MAKE-UP COLD WATER THROUGH ROOF TO SUPPLYCONDENSER.16.REFER TO DETAIL ON SHEET P-200 FOR COMPARTMENT SINKCONNECTION.17.WATER METER AND B.F.P. LOCATED ALONG WALL. P.C. TOLOCATE WATER METER AND LANDLORD PROVIDED WATER PIPINGTO SHOWN LOCATION IN ORDER TO MEET TENANTSREQUIREMENTS. LANDLORD TO PROVIDE FLOOR DRAIN TO DRAINOUTSIDE OF BUILDING. COORDINATE PIPING WITH LANDLORDPLANS AND MODIFY AS REQUIRED.18.TAP NEW 2" COLD WATER LINE FROM LANDLORD PROVIDED 2"WATER SERVICE. P.C. TO VERIFY LOCATION AND SIZE OFLANDLORD PROVIDED LINE PRIOR TO BID. COORDINATE PIPINGWITH LANDLORD PLANS.19.1-1/2" SANITARY LINE DOWN FROM ROOF TO RUN IN CEILING.20.NOT IN USE.21.3" SANITARY DOWN FROM PLATFORM.22.SEE PLATFORM ENLARGEMENT- SANITARY FOR CONTINUATION.23.2" VENT UP THROUGH PLATFORM FLOOR TO CONTINUE TOPLATFORM. 2" SANITARY DOWN.24.NOT IN USE.25.SEE RESTROOMS AND DEMO ROOM ENLARGEMENT - SANITARYFOR CONTINUATION.26.SEE RESTROOMS AND DEMO ROOM ENLARGEMENT - WATER FORCONTINUATION.27.3" SANITARY DOWN THROUGH FLOOR TO UNDER FIRST FLOORSLAB. 2" VENT UP.28.2" VENT UP FROM BELOW PLATFORM FLOOR.29.2" VENT UP.30.2" VENT UP, 2" SANITARY DOWN.31.2" VENT UP, 4" SANITARY DOWN.32.8" SANITARY LINE PROVIDED BY LANDLORD. P.C. TO VERIFYLOCATION, SIZE, AND INVERT OF LINE IN FIELD PRIOR TO BID.NEW 4" SANITARY LINE TO CONNECT LANDLORD PROVIDEDSANITARY LINE. P.C. TO COORDINATE PIPING WITH LANDLORDPLANS.33.3/4" HOT AND COLD WATER DOWN TO FLOOR SINK.34.SEE ROOF ENLARGEMENT - CONDENSER FOR CONTINUATION.35.4" SANITARY DOWN FROM CATCH BASIN TO RUN IN BREAK ROOMCEILING.36.CONDENSATE PIPING FROM SPLIT SYSTEM INTERNALCONDENSATE PUMP. CONDENSATE TO DRAIN IN FLOOR SINK INDEMO ROOM.37.1/2" COLD WATER DROP TO SUPPLY TRAP PRIMER.5 Independence Way, Suite 360Princeton, NJ 08540+1 (609) 751-9655 office+1 (609) 751-9658 faxwww.coolsysenergydesign.comCLIVE SAMUELS07/16/2020CS ENGINEERING FIRM #: 5635830S:\Signatures\Clive Samuels - New York Sign & Sea l.JPG