Loading...
HomeMy WebLinkAbout20-NJ079_M-300 HVAC NOTES AND SCHEDULES SHEET-M102M-300.001.ENTIRE INSTALLATION SHALL COMPLY WITH ALL LOCAL AND STATE CODES AND OTHER AUTHORITIESHAVING JURISDICTION.2.CONTRACTOR SHALL BE RESPONSIBLE FOR ALL EQUIPMENT RIGGING, HOISTING, CUTTING ANDPATCHING AS A RESULT OF HIS WORK.3.CONTRACTOR SHALL SECURE AND PAY FOR ALL REQUIRED PERMITS AND SHALL ARRANGE ALLREQUIRED INSPECTIONS.4.PROPER FIRE PROTECTION MEASURES, SATISFACTORY TO THE LOCAL FIRE DEPARTMENT SHALL BETAKEN WHEN WELDING OR CUTTING WITH TORCHES OR ELECTRIC ARC.5.VERIFY ALL EQUIPMENT VOLTAGES WITH THE ELECTRICAL CONTRACTOR PRIOR TO ORDERINGEQUIPMENT.6.PROVIDE FLEXIBLE CONNECTIONS ON ALL ROTATING EQUIPMENT, UNLESS INDICATED OTHERWISE.7.CONTRACTOR SHALL PROVIDE ALL NECESSARY MISCELLANEOUS STEEL FOR THE SUPPORT OF ALLEQUIPMENT, PIPING, CONDUIT, AND DUCTWORK.8.CONTRACTOR SHALL PROVIDE ALL REQUIRED ADJUSTING AND BALANCING TO MEET SYSTEMOPERATION REQUIREMENT.9.CONTRACTOR SHALL COORDINATE HIS WORK WITH THE WORK OF ALL OTHER TRADES AND THEEXISTING FIELD CONDITIONS.10.ALL AIR MOVING DEVICES, INCLUDING BUT NOT LIMITED TO, AIR HANDLING UNITS AND ROOFTOP AIRCONDITIONING UNITS MUST COMPLY WITH AMCA STANDARD 210 AND ASHRAE.11.ALL MECHANICAL CONTROLS (THERMOSTATS, ETC.) SHALL BE FURNISHED AND INSTALLED AS PERBARRIER-FREE SUB-CODE OF THE LOCAL GOVERNING CODE.12.UNLESS OTHER WISE NOTED ON THE DRAWINGS, ALL MECHANICAL EQUIPMENT SHALL BE MOUNTEDON VIBRATION ISOLATORS TO PREVENT THE TRANSMISSION OF SOUND TO THE BUILDINGSTRUCTURE. VIBRATION ISOLATORS SHALL BE IN ACCORDANCE WITH THE SPECIFICATIONS AND ONACTUAL WEIGHT DISTRIBUTION OF THE EQUIPMENT FURNISHED. DEFLECTIONS SHALL BE AS NOTEDON THE EQUIPMENT SHOP DRAWING SUBMITTALS.13.ALL REMOVED EQUIPMENT, MATERIAL AND DEBRIS SHALL BE LEGALLY DISPOSED OF BY THISCONTRACTOR.14.FURNISH LOCAL DISCONNECT SWITCHES FOR ALL ELECTRICALLY DRIVEN HVAC EQUIPMENT.DISCONNECT SWITCH SHALL BE IN ACCORDANCE WITH MANUFACTURER'S REQUIREMENTS.WEATHERPROOF AS REQUIRED.15.CONTRACTOR SHALL ENSURE THAT ALL MECHANICAL DEVICES WILL BE INSTALLED IN A LOCATIONWHICH AFFORDS ACCESSIBILITY FOR MAINTENANCE AND REPAIR. COORDINATE INSTALLATIONAMONG ALL TRADES TO AVOID INTERFERENCE, AND LOCATE EQUIPMENT TO PROVIDE CLEARANCEOR EXCEED THOSE RECOMMENDED BY THE MANUFACTURER. PRIOR TO PROJECT COMPLETION,REPRESENTATIVES OF OWNER AND ENGINEER WILL REVIEW EACH INSTALLATION AND WILL DIRECTCHANGES WHENEVER ACCESS OR SERVICE ABILITY IS, IN THEIR OPINION, UNACCEPTABLE.16.INSTALL ALL DIELECTRIC UNIONS IN A MANNER WHICH MAKE THEM READILY ACCESSIBLE FORFUTURE REPAIR OR REPLACEMENT.17.CONTROL WIRING IN OCCUPIED SPACE SHALL BE INSTALLED IN CONCEALED SPACE, WALL ORCHASE.18.ALL INSULATION PROVIDED FOR THE PROJECT MUST MEET A MAXIMUM FLAME SPREAD RATING OF25 AND SMOKE DEVELOPED OF 50 OR LESS, AS TESTED IN ACCORDANCE WITH ASTM, NFPA & U.L.GUIDELINES.19.ALL EQUIPMENT FOR THIS PROJECT SHALL BE LISTED BY A NATIONALLY RECOGNIZED TESTINGLABORATORY.20.HVAC UNIT MANUFACTURER TO PROVIDE 120V SMOKE DETECTORS WITH AUXILIARY CONTACTS ASSHOWN. UPON ACTIVATION, THE SMOKE DETECTORS SHALL SHUT DOWN THE AIR DISTRIBUTIONSYSTEM TO WHICH IT IS CONNECTED AND ACTIVATE A VISIBLE AND AUDIBLE SUPERVISORY SIGNALAT A CONSTANTLY ATTENDED LOCATION VIA THE SPRINKLER/FIRE ALARM PANEL. SMOKEDETECTORS SHALL ALSO BE FURNISHED WITH WALL MOUNTED REMOTE TEST. REMOTE SD TESTSUPERVISORY SIGNAL SHALL BE LED TYPE WITH AUDIBLE BEEPING ALERT.21.REFER TO SPECIFICATIONS FOR DETAILED REQUIREMENTS.22.THE FINISH AND COLOR OF THE AIR DEVICES, AND ALL OTHER EXPOSED HVAC EQUIPMENT SHALL BECOORDINATED WITH THE ARCHITECT AND WITH AN OWNER'S REPRESENTATIVE.23.PROVIDE PHASE LOSS PROTECTION FOR ALL POLY-PHASE MOTOR DEVICES.24.THE FINAL LOCATION OF AIR DEVICES MUST BE COORDINATED WITH THE REFLECTED CEILING PLANWHERE PRESENT AND ALL OTHER MECHANICAL, ELECTRICAL, FIRE PROTECTION, ARCHITECTURAL,AND STRUCTURAL SYSTEMS.25.DUCT SIZES MUST BE VERIFIED FOR CLEARANCES AT THE JOB SITE PRIOR TO FABRICATION.DIMENSIONS MAY BE CHANGED TO ACCOMMODATE CONSTRUCTION AS LONG AS EFFECTIVECROSS-SECTIONAL AREA IS MAINTAINED. DUCT TRANSITIONS SHALL BE CONSTRUCTED WITH ASLOPE OF 1" TO 4". ALL DEVIATIONS FROM ORIGINAL CONTRACT DRAWINGS SHALL BE REVIEWED BYENGINEER DURING THE SHOP DRAWING PROCESS.26.PROVIDE ELBOWS OR TEES WITH TURNING VANES FOR ALL CHANGES OF DUCT DIRECTION. PROVIDESPLITTER DAMPERS WITH LOCKING QUADRANTS IN ALL TEES.27.FLEXIBLE DUCT DIAMETER SHALL MATCH THE NECK SIZE OF THE DIFFUSER TO WHICH IT CONNECTS,UNLESS NOTED OTHERWISE. TOTAL LENGTH OF FLEXIBLE DUCT RUN SHALL NOT EXCEED 5'-0".EXTEND SHEETMETAL DUCT WITHIN 5'-0" OF THE AIR DEVICE FOR COMPLIANCE. FLEXIBLEDUCTWORK IS NOT PERMITTED FOR USE IN ANY PARTS OF THE RETURN OR EXHAUST AIR SYSTEMS.FLEXIBLE DUCTWORK SHALL NOT PASS THROUGH FIRE RATED CONSTRUCTION.28.PROVIDE FIRE DAMPERS WITH RATED ACCESS DOORS AT ALL DUCT PENETRATIONS THROUGH FIRERATED WALLS, SMOKE AND FIRE STOPPING, SHAFTS, FLOORS, RATED CEILINGS AND PARTITIONS ASREQUIRED TO MAINTAIN ARCHITECTURAL FIRE RATINGS. REFER TO THE ARCHITECTURAL PLANSAND SPECIFICATIONS FOR LOCATIONS AND FIRE RATING REQUIREMENTS.29.ALL ACCESS DOORS REQUIRED IN GENERAL CONSTRUCTION ARE TO BE PROVIDED AND INSTALLEDBY THE GENERAL CONTRACTOR. IT IS THE RESPONSIBILITY OF THE HVAC CONTRACTOR TOIDENTIFY SIZE, TYPE AND LOCATION OF SUCH DOORS FOR PROPER ACCESS TO ALL CONCEALEDHVAC EQUIPMENT, VALVES AND OTHER RELATED EQUIPMENT. THE HVAC CONTRACTOR SHALLIDENTIFY THESE REQUIREMENTS ON A COORDINATED SHOP DRAWING PRIOR TO SYSTEMFABRICATION AND INSTALLATION.30.ALL WALL AND ROOF OPENINGS 12" X 12" OR LARGER ARE TO BE EQUIPPED WITH BURGLAR BARSUSING 5/8" DIAMETER RODS RUNNING 6" ON CENTER IN BOTH DIRECTIONS, AND WELDED AT ALLINTERSECTING POINTS. SECURE THE PERIMETER FRAME ASSEMBLY TO THE WALL OR ROOFFRAMED ASSEMBLY.31.ALL CEILING MOUNTED EQUIPMENT MUST BE SUPPORTED DIRECTLY FROM BUILDING STRUCTUREWITH COMBINATION SPRING AND NEOPRENE-IN-SHEAR HANGERS AND ROD. PROVIDESUPPLEMENTARY STEEL AS REQUIRED TO ADEQUATELY SUPPORT THE LOAD.32.ALL ROOFTOP HVAC EQUIPMENT SHALL BE INSTALLED SUFFICIENTLY AWAY FROM EDGE OF ROOFSO AS TO ALLOW FOR THE INSTALLATION OF PROPER FLASHING TO ENSURE A WEATHER TIGHTSEAL. IN ADDITION, ADEQUATE CLEARANCES SHALL BE PROVIDED FOR CLEANING ANDMAINTENANCE REQUIREMENTS. THE FINAL LOCATION OF ALL ROOFTOP EQUIPMENT MUST ALSOCOMPLY WITH ALL OSHA SAFETY REQUIREMENTS. WHEN MINIMUM REQUIRED DISTANCE FROM ROOFEDGE OR DROP OFF CANNOT BE MAINTAINED, IT SHALL BE THE RESPONSIBILITY OF THE GENERALCONTRACTOR TO PROVIDE AND INSTALL CODE COMPLAINT SAFETY RAILS.33.EXHAUST FLUES SHALL TERMINATE WITH A RAIN CAP AND SHALL UTILIZE A FLASHING CONEPENETRATION. OFFSET THE FLUE BELOW ROOF, SO THE FLASHING CAN BE INSTALLED ON A FLATPORTION OF ROOF AND SUFFICIENTLY AWAY FROM THE EDGE.34.GUARANTEE ALL HVAC WORK AND EQUIPMENT FOR A PERIOD OF ONE YEAR FROM DATE OF STOREOPENING. DURING THE ONE YEAR PERIOD, SERVICE SHALL BE PROVIDED TWENTY-FOUR HOURSPER DAY, SEVEN DAYS PER WEEK AND SHALL INCLUDE ALL SERVICE CALLS, PARTS, LABOR ANDMAINTENANCE AT NO ADDITIONAL COST TO THE OWNER OR TENANT. ALL FILTERS SHALL BECHANGED ONCE PER MONTH. IN ADDITION, ALL COMPRESSORS SHALL CARRY A FIVE YEARWARRANTY FROM THE MANUFACTURER.35.HVAC CONTRACTOR SHALL PROVIDE A MECHANIC TO BE PRESENT AT THE STORE FOR GRANDOPENING.36.THESE DRAWINGS ARE INTENDED TO BE USED AS A GRAPHICAL REPRESENTATION OF THE ACTUALSYSTEMS AND COMPONENTS TO BE INSTALLED. DO NOT SCALE FROM THESE DRAWINGS.37.THE CONTRACTOR SHALL COOPERATE WITH OTHER TRADES. FURNISH WORKMANSHIP OF THEHIGHEST GRADE, BE RESPONSIBLE FOR ALL LAYOUT, POSITIONING AND FIELD MEASUREMENTS FORA NEAT, ACCURATE AND COMPLETE HVAC INSTALLATION.38.MECHANICAL EQUIPMENT, APPLIANCES AND SUPPORTS THAT ARE EXPOSED TO WIND SHALL BEDESIGNED AND INSTALLED TO RESIST THE WIND PRESSURES ON THE EQUIPMENT AND THESUPPORTS AS DETERMINED IN ACCORDANCE WITH THE UTAH BUILDING CODE, BUILDING. ROOFMOUNTED MECHANICAL UNITS AND SUPPORTS SHALL BE SECURED TO THE STRUCTURE. THE USEOF WOOD "SLEEPERS" SHALL NOT BE PERMITTED.39.LOCATE ALL PIPES - FIRE SPRINKLER, GAS - HUG JOIST - AS HIGH AS POSSIBLE.MECHANICAL GENERAL NOTES5 Independence Way, Suite 360Princeton, NJ 08540+1 (609) 751-9655 office+1 (609) 751-9658 faxwww.coolsysenergydesign.comCLIVE SAMUELS07/16/2020CS ENGINEERING FIRM #: 5635830S:\Signatures\Clive Samue ls - New York Sign & Sea l.JPG