HomeMy WebLinkAboutAddendum 1CORNELL UNIVERSITY WING HALL, SPACE SCIENCES, FACILITIES CONTRACTS PLANT BREEDING LOVE LAB 121 HUMPHREYS SERVICE BUILDING ELECTRIC SERVICE ENTRANCE REPLACEMENT ITHACA, NEW YORK 14853-3701 ADDENDUM NO. 1 February 7, 2020 This Addendum contains changes to the requirements of the Contract Documents and Specifications. Such changes are to be incorporated into the Construction Documents and shall apply to the work with the same meaning and force as if they had been included in the original document. Wherever this Addendum modifies a portion of a paragraph of the specifications or a portion of any Drawing, the remainder of the Paragraph or Drawing shall remain in force. NOTE: Provisions of all Contract Documents apply. Item 1. A second walk-through of each building site has been scheduled for Tuesday, February 11, 2020, at 9:00 am. Please meet Debra Melanson at the entrance to Plant Breeding Love Lab, 126 Medicago Drive, Ithaca, New York. ****END OF ADDENDUM****