Loading...
HomeMy WebLinkAboutMP-4013RD FLOOR 0' -0" ATTIC 10' -4" BOILER #1 420 MBH WATER HEATER 120 MBH COFFEE URN (REPLACED WITH ELECTRIC COFFEE MAKER) BOILER #2 420 MBH 1-1/2" 2" (1473 MBH) 1-1/4" (399.5 MBH) (30'-0") 2" 3/4" 1/2" 1" 2" (960 MBH) LOWER LEVEL THIRD FLOOR RANGE / OVEN / GRIDDLE (271.5 MBH) ATTIC HMAU-1 128 MBH 1-1/4"3/4" (VIF) 3/4" KEF-1 HMAU-1 14ø EA 14ø EA KEH-1 TEE WITH ACCESS DOOR IL-01 1" NG VENTED EXHAUST FAN CURB WITH HINGE KIT AND GREASE CUP GREASE DUCT SUPPORT SADDLE. SECURE TO ROOF RAFTERS SECURE 1/2" THREADED RODS TO L-BRACKETS FASTENED TO MID-DEPTH OF RAFTERS WITH 1/2”LAG SCREWS (TWO PER BRACKET).NOTE: INSTALL NEW FIBERGLASS BATT INSULATION WHERE DISTURBED BY CONSTRUCTION OPERATIONS. PROVIDE 8”BATT INSULATION BETWEEN 8”ATTIC FLOOR FRAMING MEMBERS, PLUS A SECOND LAYER OF 12”FIBERGLASS BATT INSULATION ABOVE AND PERPENDICULAR TO FRAMING MEMBERS. 1 1/4" NG EXISTING EMERGENCY GAS SHUTT OFF VALVE 2 MP-401 3RD FLOOR 0' -0" ATTIC 10' -4" STAINLESS STEEL FIELD WRAP 6' - 8"40x45 OA PLENUM16x16 SA FLEX CONNECTION SECURE UNIT TO FRAMING WITH SPRING VIBRATION ISOLATORS IL-01 12X12 ACCESS DOOR 3RD FLOOR 0' -0" ATTIC 10' -4"6' - 8"12" 7" 4 MP-401 12x8 SA 1" NG EXISTING EMERGENCY GAS SHUTOFF VALVE 1 1/4" NG 3/4" NG TO RANGE 12x12 SA 12x8 SA 12x8 SA 16x16 SA 14ø EA KEF-1 KEH-1 HOOD CONTROL CABINET SUPPLY AIR VOLUME DAMPERS ARE SUPPLIED WITH THE HOOD VD SAD-1 550 CFM SECURE 1/2" THREADED RODS TO L-BRACKETS FASTENED TO MID-DEPTH OF RAFTERS WITH 1/2”LAG SCREWS (TWO PER BRACKET). VD EXISTING ANSUL SYSTEM ANUL SYSTEM PIPING NOTE: INSTALL NEW FIBERGLASS BATT INSULATION WHERE DISTURBED BY CONSTRUCTION OPERATIONS. PROVIDE 8” BATT INSULATION BETWEEN 8”ATTIC FLOOR FRAMING MEMBERS, PLUS A SECOND LAYER OF 12”FIBERGLASS BATT INSULATION ABOVE AND PERPENDICULAR TO FRAMING MEMBERS.SPECIFICATION THE HOOD FIRE SUPPRESSION SYSTEM SHALL BE THE PRE-ENGINEERED TYPE WITH A FIXED NOZZLE AGENT DISTRIBUTION NETWORK. IT SHALL BE LISTED WITH UNDERWRITERS LABORATORIES, INC. (UL). THE REGULATED RELEASE MECHANISM SHALL BE COMPATIBLE WITH A FUSIBLE LINK DETECTION SYSTEM. THE FUSIBLE LINK SHALL BE SELECTED AND INSTALLED ACCORDING TO THE OPERATING TEMPERATURE IN THE VENTILATING SYSTEM. THE FUSIBLE LINK SHALL BE SUPPORTED BY A DETECTOR BRACKET/ LINKAGE ASSEMBLY. FIELD NOTES -FIELD PIPE DROPS AS SHOWN SLEEVING, ELBOWS, TEES, AND NOZZLES SUPPLIED BY HOOD MANUFACTURER. -RELOCATE NOZZLES IF FLOW PATTERN IS BLOCKED BY SHELVING, SALAMANDERS, ETC. -MAXIMUM 9 ELBOWS IN SUPPLY LINE. -MINIMUM 72 INCHES OF AGENT LINE FROM TANK TO FIRST NOZZLE. -PRE-PIPED CHARBROILER DROPS ARE SHIPPED LOOSE. -FACTORY PIPING EXTENDS A MAXIMUM OF 6" ABOVE THE TOP OF THE HOOD. -THIS FIRE SYSTEM COMPLIES WITH U.L. 300 REQUIREMENTS DETECTORS DETECTION LINE (INSTALLED IN FIELD) DUCT PROTECTION NOZZLE APPLIANCE PROTECTION NOZZLE PLENUM PROTECTION NOZZLE EXISTING PULL STATION TO REMAIN EXISTING HOOD FIRE SUPRESSION SYSTEM NOTE: HOOD DETAIL IS DIAGRAMMATIC IN NATURE, ACTUAL NOZZLE QUANTITY MAY DIFFER. HOOD FIRE SUPPRESSION SYSTEM SHALL BE PIPED AT THE FACTORY AND READY FOR FIELD CONNECTION TO EXISTING FIRE SUPPRESSION SYSTEM. ANUSL SYSTEM PIPING (FIELD INSTALLED) 6' 0"Nom./6' 0.00"OD 7'-0.00" Overall Length 48" 12" 12" 19" 6" 8" 46" 6" 8" 24" 3" 36"36" 11" ∅14" U.L. LISTED RECESSED ROUND LED FIXTURE AND LED LIGHT SECTION VIEW FANSLIGHTS LCD SCREEN FAN & LIGHT BUTTONS ROOM TEMP SENSOR FIELD INSTALLED IN KITCHEN. REFER TO PLANS FOR LOCATION TEMP SENSOREXISTING WALL-MOUNTED ANSUL SYSTEM 3" INTERNAL STANDOFF GREASE DRAIN WITH REMOVABLE CUP EXHAUST RISER HANGING ANGLE RECESSED ALLANSON ROUND LED FIXTURE AND LED LIGHT, 3500 K WARM OUTPUT. 23.5% OPEN STAINLESS STEEL PERFORATED PANEL ATTACHING PLATES SUPPLY RISER WITH VOLUME DAMPER 6" 2 3/4" 12" 18" FIELD WRAPPER 1" LAYER OF INSULATION FACTORY INSTALLED ON TOP OF HOOD. MEETS 0 INCH REQUIREMENTS FOR CLEARANCE TO COMBUSTIBLE SURFACES EXISTING EQUIPMENT 48.0" MAX 24" NOM. 48" GREASE FILTERS 1" LAYER OF INSULATION FACTORY INSTALLED IN INTERNAL BACK STANDOFF AND TOP OF HOOD. MEETS 0 INCH REQUIREMENTS FOR CLEARANCE TO COMBUSTIBLE SURFACES. 24" UTILITY CABINET PLAN VIEW HOOD CORNER HANGING ANGLE (WEIGHT BEARING ANCHOR POINT FOR HOOD) 1/2" -13 TPI STEEL ALL-THREAD 1/2" STEEL FLAT WASHER TOP & BOTTOM 1/2" -13 TPI STEEL HEX NUT 1/2" -13 TPI STEEL HEX NUTS 1/2" STEEL FLAT WASHER HOOD CORNER HANGING ANGLE (HARDWARE BY INSTALLER) NOTE: ALL HARDWARE SHALL BE GRADE 5 (MINIMUM). 1/2" -13 TPI STEEL HEX NUTS ASSEMBLY INSTRUCTIONS HANGING ANGLE MUST BE SUPPORTED WITH 1/2" -13 TPI GRADE 5 (MINIMUM) ALL-THREAD. SANDWICH HANGING ANGLES AND CEILING ANCHOR POINTS WITH 1/2" GRADE 5 (MINIMUM) STEEL FLAT WASHERS AND 1/2" -13 TPI GRADE 5 (MINIMUM) HEX NUTS AS SHOWN. MUST USE DOUBLED HEX NUT CONFIGURATION BENEATH HOOD HANGING ANGLES AND ABOVE CEILING ANCHORS. MAINTAIN 1/4" OF EXPOSED THREADS BENEATH BOTTOM HEX NUT. TORQUE ALL HEX NUTS TO 57 FT-LBS. SYSTEM CONTROLLER (KEH-1, KEF-1, HMAU-1, & ALARM)CORNE LL U N IV E R SI TYFOUN D E D 5681AD FACILITIES ENGINEERING ARCHIVE BAR CODEITHACA, NEW YORK ARCH/STRUCT: CIVIL/ENV: ELECTRICAL: MECHANICAL: DATE: FACILITY: DESIGN: DRAWN: WWW.FCS.CORNELL.EDU IT IS A VIOLATION OF NEW YORK STATE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT OR ENGINEER, TO ALTER THIS DOCUMENT IN ANY WAY. IF THIS DOCUMENT IS ALTERED, THE ALTERING ARCHITECT OR ENGINEER SHALL AFFIX TO SUCH DOCUMENT THEIR SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. WARNING REVISIONS ARCHITECTURAL, STRUCTURAL, CIVIL, ENVIRONMENTAL, MECHANICAL, AND ELECTRICAL ENGINEERING 201 HUMPHREYS SERVICE BLDG ITHACA, NEW YORK 14853-3701 PHI SIGMA SIGMA, 14 SOUTH AVE KITCHEN HOOD EXHAUST RENOVATION MP-401 11191594 DETAILS AND ISOMETRICS P. OCKENFELS PCO 4724 JULY 15, 2019 0 2 4 8 SCALE: 1/4"=1'-0" SCALE: NO SCALE 3 NATURAL GAS PIPING SCHEMATIC SCALE: NO SCALE 1 KITCHEN EXHAUST SYSTEM ISOMETRIC SCALE:1/4" = 1'-0"4 KITCHEN SECTION 2 SCALE:1/4" = 1'-0"2 KITCHEN SECTION 1 SCALE: NO SCALE 6 KITCHEN HOOD FIRE SUPRESSION DETAIL SCALE: NO SCALE 5 KITCHEN EXHAUST HOOD DETAILS 1 5/31/19 ISSUE FOR 50% REVIEW 2 7/10/19 ISSUE FOR COORDINATED REVIEW 3 7/15/19 ISSUE FOR CONSTRUCTION