Loading...
HomeMy WebLinkAboutMP-101ROOM 312 ROOM 30002 ROOM 312B REMOVE EXISTING KITCHEN EXHAUST HOOD AND ASSOCIATED SUPPORTS. EXISTING FIRE SUPPRESSION SYSTEM TO REMAIN. DISCONNECT FIRE SUPPRESSION PIPING AT HOOD AND PREPARE FOR RECONNECTION TO THE NEW HOOD. PULL STATION AND EMERGENCY GAS VALVE TO REMAIN. REMOVE EXISTING DUCTWORK AND EXHAUST FAN. CLEAN GREASE DUCT LOCATED IN CHIMNEY PRIOR TO CAPPING. CAP AND SEAL ABANDONED GREASE DUCT AT THE TOP OF THE CHIMNEY AND AT CHIMNEY PENETRATION AIR/WATER TIGHT.14x12 (E)16x20 (E) EXISTING CHIMNEY EXISTING DRY PIPE FIRE PROTECTION SYSTEM EXISTING GENERAL EXHAUST EQUIPMENT AND DUCTWORK 2 MP-401 ROOM 312 ROOM 30002 ROOM 312B 24x8 TRANSITION TO 12x8 UP TO ATTIC 14" DIAMETER, REDUCED CLEARANCE PRE-MANUFACTURED GREASE DUCT UP TO ATTIC TIE INTO EXISTING 1-1/4" NATURAL GAS LINE. RUN UP WALL INTO ATTIC TO SERVE NEW KITCHEN MAKE UP AIR UNIT 1 KEH-1 4 MP-401 SAD-1 550 CFM 12x12 SA UP TO ATTIC ANSUL SYSTEM (E) T KITCHEN TEMPERATURE SENSOR PROVIDED BY KITCHEN HOOD MANUFACUTER AND INSTALLED BY MECHANICAL CONTRACTOR 2 2 3 4 S 2 MP-401 IL-01 14"Ø EA UP TO KEF-1 14" TOOLESS ACCESS DOOR 5 2" V 14"Ø UP FROM KEH-1 4 MP-401 12x12 SA 16x16 SA 12x12 DOWN TO DIFFUSER 1-1/4" NG DN TO KITCEHN HMAU-1 8x12 SA 6 12x12 ACCESS DOOR 4 7 INTAKE LOUVER EXTERIOR 3.5" X 3/4" TRIM BOARD AROUND LOVER OPENING. PRIME AND PAINT TO MATCH EXISTING WINDOW TRIM EXISTING WOOD SIDING AND SHEATHING EXTERIOR 3.5" X 3/4" TRIM BOARD AROUND LOVER OPENING. PRIME AND PAINT TO MATCH EXISTING WINDOW TRIM (2) 2X10 HEADER PROVIDE BACKER ROD AND SEALANT AROUND LOUVER PITCH DUCT DOWN TO LOUVER CAULK AND SEAL SEAM AIR/WATER TIGHT ALL AROUND WALL SLEEVE W/STANDING SEAMS ON SIDES AND TOP WALL SLEEVE (2) 2X10 SILL BIRD SCREEN ACCESS DOOR ACCESS DOOR CEILING BATT INSULATION 12" BATT INSULATION SHEET METAL SHROUD 6"X6" PLATE CORD FOR PULLING INSULATION OUT OF SHROUD THREE 2" LAYERS OF R10 POLYSTYRENE RIGID INSULATION0' - 6"MINPROTECT THE EDGE CORNE LL U N IV E R SI TYFOUN D E D 5681AD FACILITIES ENGINEERING N ARCHIVE BAR CODEITHACA, NEW YORK ARCH/STRUCT: CIVIL/ENV: ELECTRICAL: MECHANICAL: DATE: FACILITY: DESIGN: DRAWN: WWW.FCS.CORNELL.EDU IT IS A VIOLATION OF NEW YORK STATE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT OR ENGINEER, TO ALTER THIS DOCUMENT IN ANY WAY. IF THIS DOCUMENT IS ALTERED, THE ALTERING ARCHITECT OR ENGINEER SHALL AFFIX TO SUCH DOCUMENT THEIR SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. WARNING REVISIONS ARCHITECTURAL, STRUCTURAL, CIVIL, ENVIRONMENTAL, MECHANICAL, AND ELECTRICAL ENGINEERING 201 HUMPHREYS SERVICE BLDG ITHACA, NEW YORK 14853-3701 PHI SIGMA SIGMA, 14 SOUTH AVE KITCHEN HOOD EXHAUST RENOVATION MP-101 11191594 MECHANICAL AND PLUMBING PLANS P. OCKENFELS PCO 4724 JULY 15, 2019 0 2 4 8 SCALE: 1/4"=1'-0" SCALE:1/4" = 1'-0"1 THIRD FLOOR - HVAC DEMOLITION PLAN SCALE:1/4" = 1'-0"2 ATTIC - HVAC & PLUMBING DEMOLITION SCALE:1/4" = 1'-0"3 THIRD FLOOR - NEW HVAC & PLUMBING PLAN SCALE:1/4" = 1'-0"4 ATTIC - NEW MECANICAL & PLUMBING PLAN MP-101 KEYED CONSTRUCTION NOTES 1 CONNECT ANSUL SYSTEM TO PRE-PIPED KITCHEN EXHAUST HOOD ANSUL PIPING. THE GRIDDLE FIRE SUPPRESSION NOZZLE WILL REQUIRE FIELD PIPING. REFER TO DETAILS. 2 PATCH & PAINT GYP CEILING TO MATCH EXISTING 3 ANSUL SYSTEM PIPING SIZED PER MANUFACTURER'S RECOMMENDATION 4 PROVIDE A 12”x12” FIRE RATED ACCESS DOOR. THIS ACCESS DOOR SHALL BE UTILIZED TO RUN HOT WATER AND VACUUM LINES INTO THE ATTIC FOR DUCT CLEANING PURPOSES. PROVIDE A SHEET METAL SHROUD AROUND THE ACCESS DOOR TO HOLD BACK THE BATT INSULATION IN THE ATTIC. TERMINATE THE SHEET METAL 6” ABOVE THE ATTIC INSULATION. PROVIDE A GUARD ON THE ATTIC SIDE OF THE SHEET METAL SHROUD TO PROTECT FROM CUTTING ANY HOSES OR VACUUM LINES USED BY THE CLEANING CONTRACTOR. 5 PROVIDE MANUAL GAS SHUT-OFF VALVE W/ PLUGGED 1/8” NPT, GROUND JOINT UNION W/ BRASS SEAT, AND 3” (MIN) SEDIMENT TRAP. REFER TO MANUFACTURE’S INSTALLATION INSTRUCTIONS. 6 GREASE DUCTWORK LOCATED IN THE ATTIC SHALL BE WRAPPED WITH INSULATION TO PRESERVE THE COLD ATTIC DESIGN. 7 INSTALL NEW FIBERGLASS BATT INSULATION WHERE DISTURBED BY CONSTRUCTION OPERATIONS. PROVIDE 8” BATT INSULATION BETWEEN 8” ATTIC FLOOR FRAMING MEMBERS, PLUS A SECOND LAYER OF 12” FIBERGLASS BATT INSULATION ABOVE AND PERPENDICULAR TO FRAMING MEMBERS. # SCALE:NO SCALEALOUVER DETAIL SCALE: NO SCALE B ACCESS DOOR TO ATTIC 1 5/31/19 ISSUE FOR 50% REVIEW 2 7/10/19 ISSUE FOR COORDINATED REVIEW 3 7/15/19 ISSUE FOR CONSTRUCTION