Loading...
HomeMy WebLinkAboutMP-001CORNE LL U N IV E R SI TYFOUN D E D 5681AD FACILITIES ENGINEERING ARCHIVE BAR CODEITHACA, NEW YORK ARCH/STRUCT: CIVIL/ENV: ELECTRICAL: MECHANICAL: DATE: FACILITY: DESIGN: DRAWN: WWW.FCS.CORNELL.EDU IT IS A VIOLATION OF NEW YORK STATE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT OR ENGINEER, TO ALTER THIS DOCUMENT IN ANY WAY. IF THIS DOCUMENT IS ALTERED, THE ALTERING ARCHITECT OR ENGINEER SHALL AFFIX TO SUCH DOCUMENT THEIR SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. WARNING REVISIONS ARCHITECTURAL, STRUCTURAL, CIVIL, ENVIRONMENTAL, MECHANICAL, AND ELECTRICAL ENGINEERING 201 HUMPHREYS SERVICE BLDG ITHACA, NEW YORK 14853-3701 PHI SIGMA SIGMA, 14 SOUTH AVE KITCHEN HOOD EXHAUST RENOVATION MP-001 11191594 GENERAL NOTES AND SYMBOL LEGENDS P. OCKENFELS PCO 4724 JULY 15, 2019 MECHANICAL ABBREVIATIONS BCU BLOWER COIL UNIT CHWR CHILLED WATER RETURN CHWS CHILLED WATER SUPPLY CC CLEAN CONDENSATE CO CLEAN OUT CS CLEAN STEAM CD CONDENSATE DRAIN EA EXHAUST AIR EAG EXHAUST AIR GRILLE FD FIRE DAMPER GWR GLYCOL HEATING RETURN GWS GLYCOL HEATING SUPPLY HPR HIGH PRESSURE STEAM RETURN HPS HIGH PRESSURE STEAM SUPPLY HWR HOT WATER HEATING RETURN HWS HOT WATER HEATING SUPPLY LPC LOW PRESSURE CONDENSATE LPS LOW PRESSURE STEAM MU MAKE UP WATER MPC MEDIUM PRESSURE CONDENSATE MPS MEDIUM PRESSURE STEAM NG NATURAL GAS PCWR PROCESS CHILLED WATER RETURN PCWS PROCESS CHILLED WATER SUPPLY HG REFRIGERANT HOT GAS RL REFRIGERANT LIQUID RS REFRIGERANT SUCTION RAG RETURN AIR GRILLE SA SUPPLY AIR SAD SUPPLY AIR DIFFUSER VD VOLUME DAMPER MECHANICAL SYMBOLOGY AIRFLOW BACKFLOW PREVENTER BALANCE VALVE BALL VALVE BOTTOM PIPE CONNECTION BUTTERFLY VALVE CAP OR PLUG CHECK VALVE CIRCULATING PUMP DIRECTION OF FLOW DUCT AIRFLOW DUCT DOWN (EXHAUST OR RETURN) DUCT DOWN (SUPPLY) FIRE AND SMOKE DAMPER IN DUCT FIRE DAMPER IN DUCT FLANGE CONNECTION FLEX CONNECTOR FLEXIBLE CONNECTION FLEXIBLE DUCT FLOW METER FLOW SWITCH FUSIBLE LINK VALVE GLOBE VALVE MANUAL AIRVENT ORIFICE METER PIPE DOWN PIPE UP PIPING REDUCER (CONCENTRIC) PIPING REDUCER (ECCENTRIC) PRESSURE GAUGE PRESSURE OR TEMPERATURE PETES PLUG PRESSURE REDUCING VALVE PRESSURE SWITCH RECTANGULAR ELBOW RECTANGULAR ELBOW WITH TURNING VANES RELIEF VALVE SMOKE DAMPER IN DUCT SOLENOID VALVE STANDARD BRANCH DUCT STEAM TRAP STRAINER (DUPLEX) STRAINER WITH BLOWDOWN VALVE AND CAP SUPPLY THROUGH NEXT FLOOR OR ROOF TEMPERATURE WELL THERMOMETER THERMOMETER (DIAL) TOP PIPE CONNECTION TRIPLE DUTY VALVE UNION CONNECTION VACUUM BREAKER VOLUME DAMPER IN DUCT CONTROL SYMBOLOGY 2-WAY CONTROL VALVE, DIGITAL 2-WAY CONTROL VALVE, PNEUMATIC 3-WAY CONTROL VALVE, DIGITAL 3-WAY CONTROL VALVE, PNEUMATIC ADDRESSABLE OUTPUT MODULE (FIRE ALARM INTERFACE) AIRFLOW CONTROL VALVE (VENTURI OR VORTEX SHEDDING) AVERAGING SENSOR BINARY POINT BUTTERFLY CONTROL DAMPER CARBON DIOXIDE SENSOR CONDENSATE SENSOR CURRENT SENSOR DEW-POINT SENSOR DIFFERENTIAL PRESSURE SENSOR DIFFERENTIAL PRESSURE SENSOR ELECTRIC TO PNEUMATIC SWITCH ELECTRIC TO PNEUMATIC TRANSDUCER END SWITCH FLOW ELEMENT (METER) FLOW SENSOR HIGH LEVEL SWITCH HUMIDSTAT SENSOR LIQUID IMERSION TEMPERATURE SENSOR LOW LEVEL SWITCH MODULATING MOTOR MOTOR STARTER NETWORK COMMUNICATION POINT, BACnet MSTP OCCUPANCY SENSOR OPEN/CLOSE OPPOSED BLADE CONTROL DAMPER PARALLEL BLADE CONTROL DAMPER PNEUMATIC THERMOSTAT PRESSURE SENSOR PRESSURE SWITCH RELATIVE HUMIDITY SENSOR RELAY ROOM TEMPERATURE SENSOR WITH ADJUSTABLE THERMOSTAT ROOM TEMPERATURE SENSOR WITH OCCUPANCY OVERRIDE ROOM TEMPERATURE SENSOR WITH ON/OFF SWITCH ROOM TEMPERATURE SENSOR WITH VISUAL DISPLAY ROTATION DETECTOR SINGLE POINT SENSOR SMOKE DETECTOR SPEED COMMAND START/STOP STATIC PRESSURE SENSOR SWITCH TEMPERATURE SENSOR TEMPERATURE SENSOR TEMPERATURE SENSOR WITH ADJUSTABLE SETPOINT GENERAL DRAWING SYMBOLOGY DEMOLISHED WORK EXISTING PIPING TO REMAIN EXISTING TO REMAIN EXISTING WORK TO REMAIN NEW WORK POINT OF CONNECTION POINT OF DISCONNECTION CONTROL ABBREVIATIONS AI ANALOG INPUT AO ANALOG OUTPUT AV ANALOG VALUE BI BINARY INPUT BO BINARY OUTPUT BV BINARY VALUE F.L. FAIL LAST N.C. NORMALLY CLOSED N.O. NORMALLY OPEN VFD VARIABLE FREQUENCY DRIVE MECHANICAL & PLUMBING SCOPE OF WORK 1.0 REMOVE EXISTING KITCHEN EXHAUST SYSTEM. 2.0 CLEAN EXISTING GREASE DUCT EXHAUST DUCT UP THROUGH CHIMNEY. ONCE COMPLETELY CLEANED, CAP WATER/AIR TIGHT AT THE DISCHARGE AND IN THE ATTIC. 3.0 INSTALL NEW KITCHEN HOOD, ROOF MOUNTED EXHAUST FAN, MAKE UP AIR UNIT, PRE-MANUFACTURED GREASE DUCTWORK, SUPPLY DUCTWORK, INTAKE LOUVER, AND GRILLE. 4.0 INSTALL NATURAL GAS PIPING TO SERVE NEW MAKE UP AIR UNIT. 5.0 PERFORM AIR BALANCING OF THE KITCHEN EXHAUST HOOD AND MAKE UP AIR SYSTEM. 6.0 ONCE THE KITCHEN EXHAUST SYSTEM AND MAKE-UP AIR UNIT ARE INSTALLED, COORDINATE SERVICE DESIGN VERIFICATION WITH MANUFACTURER’S REPRESENTATIVE. 7.0 CONNECT EXISTING FIRE SUPPRESSION SYSTEM TO THE NEW KITCHEN HOOD CONTROLLER AND PRE-PIPED FIRE SUPPRESSION SYSTEM. 8.0 PAINT/PATCH/REPAIR CEILING AND WALLS TO MATCH EXISTING. 9.0 INSTALL NEW FIBERGLASS BATT INSULATION WHERE DISTURBED BY CONSTRUCTION OPERATIONS. PROVIDE 8” BATT INSULATION BETWEEN 8” ATTIC FLOOR FRAMING MEMBERS, PLUS A SECOND LAYER OF 12” FIBERGLASS BATT INSULATION ABOVE AND PERPENDICULAR TO FRAMING MEMBERS. SUBMITTAL SCHEDULE SECTION TITLE REQUIRED 230529 HANGERS & SUPPORTS FOR HVAC PRODUCT DATA 230593 TESTING, ADJUSTING & BALANCING FOR HVAC INSPECTION AND TEST REPORT 233113 METAL DUCTS PRODUCT DATA 233300 AIR DUCT ACCESSORIES PRODUCT DATA 220000 NATURAL GAS PIPING PRODUCT DATA MECHANICAL GENERAL NOTES 1.0 ALL DUCT DIMENSIONS INDICATED ARE IN INCHES, AND ARE INSIDE FREE AND CLEAR DIMENSIONS. 2.0 TESTING AND BALANCING: THE CONTRACTOR SHALL BALANCE ALL AIR SYSTEMS AS INDICATED. SUBMIT RESULTS OF TESTING AND BALANCING ON STANDARD TAB CONTRACTOR'S FORMS TO THE ENGINEER FOR REVIEW. SYSTEMS SHALL BE BALANCED TO WITHIN +/- 10% OF DESIGN VALUES. 3.0 INSTALL EQUIPMENT TO ENSURE PROPER ACCESS TO CONTROL DEVICES AND WITH SUFFICIENT SPACE TO PERFORM ROUTINE MAINTENANCE AND REPAIR. EQUIPMENT THAT IS NOT INSTALLED WITH THIS REQUIREMENT IN MIND SHALL BE RELOCATED AT NO EXPENSE TO THE UNIVERSITY UNTIL DEFICIENCIES ARE CORRECTED. 4.0 ALL SYSTEM TESTING SHALL BE CONDUCTED PRIOR TO INSULATION, FIREPROOFING, AND ENCLOSURE IN SHAFTS. ANY RESTORATION WORK REQUIRED AS A RESULT OF DISTURBING FINISHES OR STRUCTURE IN ORDER TO ACCESS SYSTEMS REQUIRING REPAIR SHALL BE AT NO COST TO THE UNIVERSITY. 5.0 CUTTING AND PATCHING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING, FITTING, AND PATCHING TO COMPLETE THE WORK. WHERE EXISTING CONSTRUCTION IS REMOVED, CAUSING AN EXPOSURE OF UNFINISHED AND/OR DAMAGED SURFACES, RESULTING SURFACES SHALL BE RECONSTRUCTED WITH MATERIALS TO MATCH FINISHED AREAS. 6.0 ANY FIRESTOPPING DISTURBED DURING THE COURSE OF WORK SHALL BE REPAIRED TO MAINTAIN A 2-HOUR FIRE RATING. GENERAL NOTES 1.0 ASBESTOS CONTAINING MATERIALS MAY BE PRESENT IN THE FACILITY. IF ANY SUSPECT MATERIAL IS IDENTIFIED PLEASE NOTIFY THE PROJECT MANAGER TO MANAGE REMOVAL. 2.0 ASSURE PUBLIC AND WORKER SAFETY AT ALL TIMES. PROTECT ADJOINING AREAS FROM DAMAGE AND DUST. REMOVE ALL DEBRIS FROM SITE AND DISPOSE OF WASTE MATERIAL IN A SAFE MANNER. KEEP THE PREMISES FREE OF DEBRIS FROM THE EXECUTION OF WORK. DELIVER A FINAL PRODUCT THAT IS CLEAN AND OPERABLE. 3.0 DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL ARRANGEMENT OF SYSTEMS AND WORK INCLUDED IN THE CONTRACT. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS. IF DIMENSIONS OR CONDITIONS ARE FOUND TO BE IN CONFLICT WITH THE DRAWINGS, THE CONTRACTOR SHALL IMMEDIATELY REFER THE CONFLICT TO THE ENGINEER. 4.0 UTILITY SHUTDOWNS: SHUTDOWN OF ANY BUILDING UTILITY SYSTEM SHALL BE COORDINATED WITH CUSTOMER SERVICE AT PH: 607-255-5322. THE CONTRACTOR SHALL BEAR THE COST OF THE UTILITY SHUTDOWN. SCHEDULE WORK TEN DAYS IN ADVANCE AND NOTIFY THE OWNER'S REPRESENTATIVE TO COORDINATE BUILDING FUNCTIONS WITH THE BUILDING COORDINATOR. 5.0 WORK IS REQUIRED IN VARIOUS PORTIONS OF THE FACILITY TO EXECUTE WORK OF OTHER TRADES (EG ELECTRICAL, MECHANICAL). ALTHOUGH NOT NECESSARILY SHOWN ON DRAWINGS, WORK IS REQUIRED IN THESE AREAS CONSISTING OF REMOVAL / REPLACEMENT OF CEILINGS, WALLS, FINISHES, AND OTHER CONSTRUCTION AS NECESSARY TO PERFORM WORK AND RESTORE THESE SPACES OR AREAS TO ORIGINAL CONDITION. 6.0 INSTALL EQUIPMENT TO ENSURE PROPER ACCESS TO CONTROL DEVICES AND WITH SUFFICIENT SPACE TO PERFORM ROUTINE MAINTENANCE AND REPAIR. EQUIPMENT THAT IS NOT INSTALLED WITH THIS REQUIREMENT IN MIND SHALL BE RELOCATED AT NO EXPENSE TO THE UNIVERSITY UNTIL DEFICIENCIES ARE CORRECTED. CONSTRUCTION IS REMOVED, CAUSING AN EXPOSURE OF UNFINISHED AND/OR DAMAGED SURFACES, RESULTING SURFACES SHALL BE RECONSTRUCTED WITH MATERIALS TO MATCH FINISHED AREAS. 7.0 CUTTING AND PATCHING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING, FITTING, AND PATCHING TO COMPLETE THE WORK. WHERE EXISTING CONSTRUCTION IS REMOVED, CAUSING AN EXPOSURE OF UNFINISHED AND/OR DAMAGED SURFACES, RESULTING SURFACES SHALL BE RECONSTRUCTED WITH MATERIALS TO MATCH FINISHED AREAS. 8.0 ANY FIRESTOPPING DISTURBED DURING THE COURSE OF WORK SHALL BE REPAIRED TO MAINTAIN EXISTING FIRE RATINGS. 1 5/31/19 ISSUE FOR 50% REVIEW 2 7/10/19 ISSUE FOR COORDINATED REVIEW 3 7/15/19 ISSUE FOR CONSTRUCTION