HomeMy WebLinkAboutStamped and Signed Drawings_Grumman Reno INDEXEDRevisions:347 West 36 Street Suite 1501New York, NY 10018212-245-5195 T212-239-7130 FKey Plan:Notes:Grumman HallCornell UniversityIthaca, NY 14850Richard McElhiney Architects LLCApril 2, 2020Issue for Bid April 2, 2020Scale:31 Knight StreetNorwalk, CT 06851203-866-5538 T203-866-5243 FAltieri Sebor Wieber LLC303 South Broadway, Suite G20Tarrytown, NY 10591914-333-1110 T914-333-1109 FJacobs Consultancy4588 South Park AvenueBlasdell, NY 14219716-823-0006 TTrophy PointAREA OF WORK4592 Jordan RoadSkaneateles Falls, NY 13153315-685-4732 TRyan Biggs Clark Davis Engineering & SurveyingFirst and Second Floor Renovation Phase 1Cover SheetT-101INDEX OF DRAWINGST-101 Cover SheetT-102 Symbols, Abbreviations & NotesT-103 Accessibility Notes & DetailsT-104 Area of Work and Code PlansEX-101 Basement Floor Existing PlanEX-102 First Floor Existing PlanEX-103 Second Floor Existing PlanEX-111 Basement Floor Existing Reflected Ceiling PlanEX-112 First Floor Existing Reflected Ceiling PlanEX-113 Second Floor Existing Reflected Ceiling PlanDA-101 Basement Floor Demolition PlanDA-102 First Floor Demolition PlanDA-103 Second Floor Demolition PlanDA-111 Basement Floor Demolition Reflected Ceiling PlanDA-112 First Floor Demolition Reflected Ceiling PlanDA-113 Second Floor Demolition Reflected Ceiling PlanA-101 Basement Floor Construction PlanA-102 First Floor Construction PlanA-103 Second Floor Construction PlanA-111 Basement Floor Reflected Ceiling PlanA-112 First Floor Reflected Ceiling PlanA-113 Second Floor Reflected Ceiling PlanA-121 First and Second Floor Finish PlansA-142 First Floor Furniture & Equipment PlanA-143 Second Floor Furniture & Equipment PlanA-301 Interior Elevations - Lab 182A-302 Interior Elevations - Lab 181A-303 Interior Elevations - Common Area 100CAA-304 Interior Elevations - Student Space 184A-305 Interior Elevations - Student Workstations 289A-501 Lab Details IA-502 Lab Details IIA-601 Door Schedule and DetailsA-602 Window Schedule and DetailsA-603 Finish Schedule and Partition TypesS-100 Plan, Detail & NotesM-001 Cover SheetDM-102 First Floor - DemolitionDM-103 Second Floor - DemolitionDM-104 Roof - ExistingM-102 First Floor - DuctworkM-103 Second Floor - DuctworkM-112 First Floor - PipingM-113 Second Floor - PipingM-301 DetailsM-400 Flow & Control - MechanicalM-401 Flow & Control - MechanicalM-402 Flow & Control - MechanicalM-403 Flow & Control - MechanicalM-501 Schedules - MechanicalE-001 Cover SheetE-002 Fire Alarm RiserE-003 Lighting ControlE-004 Telecom RiserDE-102 First Floor - DemolitionDE-103 Second Floor - DemolitionE-101 Basement Plan - PowerE-102 First Floor - PowerE-103 Second Floor - PowerE-112 First Floor - LightingE-113 Second Floor - LightingE-300 Electrical DetailsP-001 Details, Symbols & SchedulesDP-101 Basement Plan - RemovalDP-102 First Floor - RemovalP-101 Basement Plan - PlumbingP-102 First Floor - PlumbingP-103 Second Floor - PlumbingP-300 Gas Piping Schematic Details - PlumbingP-301 Gas Detection Shutdown Controller Schematic - PlumbingFP-001 Notes & Details - Fire ProtectionDFP-102 First Floor Removal Plan - Fire ProtectionDFP-103 Second Floor Removal Plan - Fire ProtectionFP-102 First Floor Plan - Fire ProtectionFP-103 Second Floor Plan - Fire ProtectionARCHITECTURALDEMOLITIONEXISTINGTITLEPLUMBINGMECHANICALELECTRICALSTRUCTURALFIRE PROTECTIONGRUMMAN HALL FIRST AND SECOND FLOOR RENOVATION PHASE 1
ABBREVIATIONS:&AND@ATAASSOCIATEACALTERNATING CURRENT/ACOUSTICALA/CAIR CONDITIONINGACMASBESTOS CONTAINING MATERIALACTACOUSTICAL CEILING TILEADAREA DRAINADJADJUSTABLE/ADJACENTAFACCESS FLOORAFFABOVE FINISH FLOORALTALTERNATEALUMALUMINUMAMPAMPEREANODANODIZEDAPACCESS PANELAPPDAPPROVEDARCHARCHITECT/ARCHITECTURALASPHASPHALTASYMASYMMETRICALAVBAIR & VAPOR BARRIERAVGAVERAGEBBBUILDING BOARDBDBOARDBLDGBUILDINGBLKGBLOCKINGBMBEAM/BENCH MARKB.O.BY OTHERSBRKBRICKBSMTBASEMENTBTMBOTTOMBTWBETWEENBURBUILT UP ROOFINGBVLBEVELCABCABINETC.C.CENTER TO CENTERCERCERAMICCFMCUBIC FEET PER MINUTECJCONTROL JOINTCLCLOSERCLGCEILINGCLRCLEARCMUCONCRETE MASONRY UNITC.O.CASED OPENINGCOL(S)COLUMN(S)COMMCOMMUNICATIONCONCCONCRETECONDCONDUITCONFCONFERENCECONNCONNECTION(S)CONSTRCONSTRUCTIONCONTCONTINUOUSCOORDCOORDINATECORRCORRIDORCPCIRCUIT PANELCPTCARPETCRCOLD ROLLEDCRSCOURSE(S)CSOCASED OPENINGCTCERAMIC TILECTAICOOLING TOWER AIR INTAKECTRCENTERCUCUBICCWCOLD WATERCYCOPYDDEEP/DEPTHDBLDOUBLEDCDIRECT CURRENTDEMODEMOLITIONDETDETAILDFDRINKING FOUNTAINDIADIAMETER/DIAGONALDIMDIMENSIONDISPDISPENSERDLDEAD LOADDNDOWNDODOOR OPENINGDRDOORDWGDRAWINGEEAST(E)EXISTING TO REMAINEAEACHECEMPTY CONDUITEECEXISTING EXPOSED CONSTRUCTIONEFEXHAUST FANEIFSEXTERIOR INSULATION FINISH SYSTEMELELEVATION(S)ELECELECTRICALELEVELEVATOREMEMERGENCYEMTELECTRICAL METALLIC TUBINGENCLENCLOSUREEQEQUAL(ER)EXIST. TO BE REMOVED(ERR)EXIST. TO BE REMOVED & RELOCATEDEWCELECTRICAL WATER COOLEREXHEXHAUSTEXIST,EXEXISTINGEXP BTEXPANSION BOLTEXP JTEXPANSION JOINTEXTEXTERIORFFILEFAFIRE ALARMFDFLOOR DRAINFEFIRE EXTINGUISHERFECFIRE EXTINGUISHER CABINETFHCFIRE HOSE CABINETFINFINISHFIXTFIXTUREFLRFLOORFLUORFLUORESCENTF.O.FACE OFFPFIRE PROOFFPSCFIRE PROOF SELF CLOSINGFPBFIRE PULL BOXFRFRAMEFSPFIRE STANDPIPEFTFOOTFTGFOOTINGFWCFABRIC WALL COVERINGGAGAUGEGALVGALVANIZEDGBLKGYPSUM BLOCKGCGENERAL CONTRACTORGFIGROUND FAULT INTERRUPTERGLGLASSGR,GDGRADEGWBGYPSUM WALLBOARDGYPGYPSUMHBHOSE BIBBHCHANDICAPPEDHMHOLLOW METALHDWHARDWAREHDWDHARDWOODHORIZHORIZONTALHPHIGH POINTHPLHIGH PRESSURE LAMINATEHRHOURHTHEIGHTHTGHEATINGHVACHEATING, VENTILATION, AIR CONDITIONINGHVPHIGH VOLTAGE PANELHWHOT WATERIBCINSTALL BY CONTRACTORIBOINSTALL BY OWNERIDINSIDE DIAMETERINCLINCLUDE/INCLUDINGINSULINSULATIONINTINTERIORJBOXJUNCTION BOXJSJAMB SWITCHJTJOINTKWKILOWATTLACLACQUERLAMLAMINATELAVLAVATORYLBSPOUNDSLFLINEAR FEETLHLEFT HANDLHRBLEFT HAND RETURN BEVELLLLIVE LOADLSCLOCKSET CYLINDRICALLSMLOCKSET MORTISEDLDLINEAR DIFFUSERLTLIGHTLVLOUVERLVPLOW VOLTAGE PANELMAGMAGNETICMARBMARBLEMASMASONRYMAXMAXIMUMMCMAIL CHUTEMEZZMEZZANINEMFRMANUFACTURERMINMINIMUMMISCMISCELLANEOUSMLDGMOLDINGM.O.MASONRY OPENINGMOD-BITMODIFIED BITUMINOUS ROOFINGMPMEASURE POINT / MASONRY PAINTMTDMOUNTEDMTLMETALMULMULLIONNNORTH/NEWNATNATURALNECNEW EXPOSED CONSTRUCTIONNICNOT IN CONTRACTNONUMBERNOMNOMINALNRNOISE REDUCTIONNRCNOISE REDUCTION COEFFICIENTNTSNOT TO SCALEOCON CENTERODOUTSIDE DIAMETEROHOPPOSITE HANDOPPOPPOSITEPARTPARTITIONPCPLPORTLAND CEMENT PLASTERPGLPLATE GLASSPBOPROVIDED BY OWNERPLFPOUNDS PER LINEAR FOOTPLAMPLASTIC LAMINATEPLASPLASTERPSIPOUNDS PER SQUARE INCHPTPAINTPTDPAINTEDPTGPAINTINGPTDRPAPER TOWEL DISPENSERPTRPAPER TOWEL RECEPTACLEPVCPOLYVINYL CHLORIDEPWDPLYWOODR/ARETURN AIRRADRADIUSRBRUBBER BASERDROOF DRAIN(RE)RELOCATED EXISTINGRCPREFLECTED CEILING PLANREFREFRIGERATORREINREINFORCING/REINFORCEDREQDREQUIREDRHRIGHT HANDRHRBRIGHT HAND REVERSE BEVELRMROOMROROUGH OPENINGRUBRUBBERSSOUTH/SUPPLYSAFBSOUND ATTENUATION FIRE BATTSBSTRAIGHT BASESCSEPARATE CIRCUIT/SELF CLOSINGSCHSCHEDULESEALSEALANTSIMSIMILARSLCSOLID CORESNDSANITARY NAPKIN DISPOSALSNVSANITARY NAPKIN VENDORSPECSPECIFICATIONSQSQUARESSSTAINLESS STEELSTDSTANDARDSTLSTEELSTNSTAINSTRUCTSTRUCTURESUBSUBSTITUTESUSPSUSPENDEDSVCSERVICESYMSYMMETRICALSYSSYSTEMTBTOWEL BARTBDTO BE DETERMINEDTDTRENCH DRAINTELTELEPHONETGLTEMPERED GLASST>ONGUE & GROOVETHTHRESHOLDTHRUTHROUGHTHKTHICK/THICKNESSTLTILET.O.TOP OFT.O.S.TOP OF SLABTPDTOILET PAPER DISPENSERTSTILE STARTTYPTYPICALU.O.N.UNLESS OTHERWISE NOTEDVVOLTVBVINYL BASEVCTVINYL COMPOSITE TILEVERTVERTICALVIFVERIFY IN FIELDVNRVENEERV. PLASVENEER PLASTERVTVINYL TILEWWEST/WATTW/WITHWCWATER CLOSETWDWOODWFWIDE FLANGEWPWATER PROOFWRWASTE RECEPTACLEWSWET STACKWWFWELDED WIRE FABRICWWMWELDED WIRE MESHYDYARDPROPERTY LINEEXISTING EXTERIOR WALL TO REMAINEXISTING INTERIOR PARTITION TO REMAINEXISTING CONSTRUCTION TO BE DEMOLISHEDNEW WALL WITH NO REQUIRED FIRE RATINGNEW WALL WITH REQUIRED 2-HOUR FIRE RATINGWALL LEGEND:SYMBOLS:KEYNOTEDETAILSECTIONELEVATIONSVERTICAL ELEVATIONPARTITION TYPEROOM NAME & NUMBERDOOR NUMBERWINDOW NUMBERREVISION NUMBERCENTERLINEALIGN SURFACESEQUAL DIMENSIONSGYPSUM BOARDWOODRIGID INSULATIONBATT INSULATION101A-00101X'-X"FINISH FL.A-00101A-0012413(TYPE) 000 CLALIGNEQ.EQ.ROOM NAMEROOM #DOOR #WINDOW #(FIRE RATING IN HOURS)00ROOM #REFLECTED CEILING PLAN LEGEND:HVAC SUPPLY DIFFUSERHVAC RETURN GRILLESUSPENDED DOWNLIGHT FIXTURELINEAR DOWNLIGHT FIXTURESUSPENDED LINEAR LIGHT FIXTUREUNDER CABINET LIGHT FIXTURERECESSED LINEAR LIGHT FIXTURECEILING-MOUNTED OCCUPANCY SENSORCEILING-MOUNTED PHOTO SENSORMOTOR LOCATIONEXHAUST INLETSINGLE POLE SWITCH - 48" AFF U.O.N.DIMMER (SWITCH) OR CONTROL - 48" AFF U.O.N.CEILING MOUNTED CORD REELCARBON MONOXIDE DETECTORABCDEOCPSSSDGENERAL NOTES:1.CONSTRUCTION SHALL BE ACCORDANCE WITH ALL APPLICABLE FEDERAL, STATE, & LOCAL LAWS AND ORDINANCES.2.CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE RULES, REGULATIONS, AND INSTRUCTIONS OF THE OWNER.3.DIMENSIONS AND LOCATIONS OF WORK SHALL BE DETERMINED BY WRITTEN DIMENSIONS ONLY. DIMENSIONS ARE TAKEN TO FINISH SURFACES OF GWB, INSIDE SURFACE OF GLASS, CENTERLINES OF STEEL, AND THE INSIDE EDGE OF NOMINAL DOOR OPENINGS, UNLESS OTHERWISE INDICATED. NOTIFY ARCHITECT OF ANY DISCREPANCIES. CONTRACTOR TO VERIFY ALL DIMENSIONS IN FIELD PRIOR TO THE START OF WORK.4.THE SITE SHALL BE KEPT CLEAR OF DEBRIS AND IN ORDER AT ALL TIMES. REFUSE TO BE REMOVED DAILY.5.ANY FIREPROOFING OR PROTECTION SYSTEMS IN EXISTING BUILDING DISTURBED BY WORK SHALL BE REPAIRED AND/OR MAINTAINED TO PROVIDE THE EXISTING RATING OR DEGREE OF PROTECTION (UNLESS OTHERWISE NOTED).6.ALL SERVICES AND UTILITIES WHICH SERVE ACTIVE FACILITIES SHALL NOT BE INTERRUPTED. INCLUDING BUT NOT LIMITED TO: FIRE PROTECTION, WATER, AND ELECTRICAL. COORDINATE SWITCHOVERS WITH OWNER. CONFIRM IN WRITING SCHEDULING AT LEAST 72 HOURS IN ADVANCE OF EVERY ACTIVE SHUT DOWN OR SWITCHOVER.7.FOR REQUIRED PROJECT SCHEDULE. SEE THE PROJECT MANUAL.LOCATION OF WORKLOADING DOCKRevisions:347 West 36 Street Suite 1501New York, NY 10018212-245-5195 T212-239-7130 FKey Plan:Notes:Grumman HallCornell UniversityIthaca, NY 14850Richard McElhiney Architects LLCApril 2, 2020Issue for Bid April 2, 2020Scale:31 Knight StreetNorwalk, CT 06851203-866-5538 T203-866-5243 FAltieri Sebor Wieber LLC303 South Broadway, Suite G20Tarrytown, NY 10591914-333-1110 T914-333-1109 FJacobs Consultancy4588 South Park AvenueBlasdell, NY 14219716-823-0006 TTrophy PointAREA OF WORK4592 Jordan RoadSkaneateles Falls, NY 13153315-685-4732 TRyan Biggs Clark Davis Engineering & SurveyingFirst and Second Floor Renovation Phase 1As indicatedSymbols, Abbreviations & NotesT-102CAMPUS LOCATOR PLANN.T.S.
32" MIN24" MAX60" MIN60" MIN60" MIN36" MIN12" MIN36" MIN12" MIN32" MIN30" MIN48" MIN22" MIN42" MIN60" MIN48" MINX48" MIN30" MIN 48" MIN30" MIN48" MINX > 24"36" MIN60" MINX > 15"30" MIN1/4"-1/2"48" MIN42" MIN20" MAX48" MAX>20 - 25" MAX44" MAX46" MAX> 10 - 24" MAX34" MAX48" MAX44" MAX15" MIN.10" MAX48" MAX15" MIN.X> 27"685X > 80"20006" MIN1501/4"MAX.1/2" MAX48" MIN.36" MIN.24" MAX90°12XYY1/4" MAXYY12MEN5'-0"8'-0"MAX.1'-6"3'-8"3'-8"5'-0"EQ.EQ.EQ.9"3'-4"5'-0"FINISH FLOORINTERNATIONAL CODE COUNCIL (ICC) A117.1-2009 ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES STANDARD CLEARANCES:CLEAR WIDTH OF AN ACCESSIBLE ROUTEFIG 403.5 WHEELCHAIR TURNING SPACE304.3.aCLEAR WIDTH OF DOORWAYSFIG 404.2.2CLEAR FLOOR OR GROUND SPACEFIG 305.3POSITION OF CLEAR FLOOR OR GROUND SPACEFIG 305.5MANEUVERING CLEARANCEIN AN ALCOVE, FORWARDAPPROACHFIG 305.7.1VERTICAL CHANGE IN LEVELFIG 303.260" (1525MM)DIAMETER SPACET-SHAPED TURNING SPACE(a)DETAIL(A)FORWARD APPROACH(B)PARALLEL APPROACHNOTE: X = 12 IN (305 MM) IF DOORHAS BOTH A CLOSER AND A CATCHFRONT APPROACHES - SWINGING DOORNOTE: X = 36 IN (915 MM)MINIMUM IF Y = 60 IN X = 42 INMINIMUM IF Y = 54 INNOTE: Y = 48 IN (1220 MM)MINIMUM IF DOOR HAS BOTHA CLOSER AND A LATCHHINGE SIDE APPROACHES - SWINGING DOORNOTE: Y = 54 IN MINIMUMIF DOOR HAS A CLOSERNOTE: Y = 48 IN MINIMUMIF DOOR HAS A CLOSERLATCH SIDE APPROACHES SWINGING DOORPULL SIDEPULL SIDE PUSH SIDE18"MINPULL SIDEPUSHSIDE24"MIN24"MINOBSTRUCTED HIGH FORWARD REACHFIG 308.2.2OBSTRUCTED HIGH SIDE REACHFIG 308.3.2 (B)MANEUVERING CLEARANCES AT MANUAL SWINGING DOORS ANDGATESFIG 404.2.3.2FIG 304.3.bMANEUVERING CLEARANCEIN AN ALCOVE, PARALLELAPPROACHFIG 305.7.2BEVELED CHANGE IN LEVELFIG 303.3GENERAL NOTE: CONTRACTOR TO VERIFY,WHERE APPLICABLE AND / OR REQUIRED,CLEARANCES AS PER FIGURES ABOVE.MOUNTING HEIGHTS4' - 0"MAXTYPICAL WALL SWITCHCL1' - 6"TYP.TYPICAL WALL OUTLETCLUNOBSTRUCTED FORWARD REACHFIG 308.2.1UNOBSTRUCTED SIDE REACHFIG 308.3.1 (B)DISTANCE BETWEEN CORRESPONDINGDOTS IN ADJACENT CELLSDISTANCE BETWEEN DOTSIN THE SAME CELLDISTANCE BETWEENCORRESPONDING DOTSFROM ONE CELL DIRECTLYBELOWDISTANCE BETWEEN DOTSIN THE SAME CELLSINGLE BRAILLECELLBLANK CELL SPACEBETWEEN WORDSRAISEDDOTDOTDIAMETERNO RAISEDDOTFIG 703.4.3BRAILLE MEASUREMENTLIMITS OF PROTRUDING OBJECTSFIG 307.2NOT IN PICTOGRAMFIELDFIG 703.5PICTOGRAM FIELDSECTION 304 - TURNING SPACE307.2 PROTRUSION LIMITS.505.8 SURFACES.505.9 FITTINGS.505.10 HANDRAIL EXTENSIONS.SECTION 703 - SIGNS703.1 SIGNS - GENERAL.703.2.4 CHARACTER HEIGHT.703.4.5 MOUNTING HEIGHT703.5.2 PICTOGRAM FIELD(a)(b)(a)(b)(c,d)(g)(f)(e)(b)(a)OBJECTS WITH LEADING EDGES MORE THAN 27 INCHES (685mm) AND NOT MORE THAN 80 INCHES (2030 mm) ABOVE THEFINISH FLOOR OR GROUND SHALL PROTRUDE 4 INCHES (100mm) MAXIMUM HORIZONTALLY INTO THE CIRCULATION PATH.EXCEPTION: HANDRAILS SHALL BE PERMITTED TO PROTRUDE 41/2" (115MM) MAXIMUM.ACCESSIBLE SIGNS SHALL COMPLY WITH SECTION703. TACTILE SIGNS SHALL CONTAIN BOTH RAISED CHARACTERSAND BRAILLE. WHERE SIGNS WITH BOTH VISUAL AND RAISEDCHARACTERS ARE REQUIRED, EITHER ONE SIGN WITH BOTH VISUALAND RAISED CHARACTERS, OR TWO SEPARATE SIGNS, ONE WITHVISUAL, AND ONE WITH RAISED CHARACTERS, SHALL BEPROVIDED.703.1.1 DESIGNATIONS.INTERIOR AND EXTERIOR SIGNS IDENTIFYING PERMANENT ROOMSAND SPACES SHALL COMPLY WITH SECTIONS 703.1, 703.2, AND703.3.EXCEPTION: EXTERIOR SIGNS THAT ARE NOT LOCATED AT THEDOOR TO THE SPACE THEY SERVE SHALL NOT BE REQUIRED TOCOMPLY WITH SECTION 703.3.703.1.2 DIRECTIONAL AND INFORMATIONAL SIGNS.SIGNS THAT PROVIDE DIRECTION TO OR INFORMATION ABOUTINTERIOR SPACES AND FACILITIES OF THE SITE SHALL COMPLYWITH SECTION 703.2.THE UPPERCASE LETTER "I" SHALL BE USED TO DETERMINE THEALLOWABLE HEIGHT OF ALL CHARACTERS OF A FONT. THEUPPERCASE LETTER "I" OF THE FONT SHALL HAVE A MINIMUMHEIGHT COMPLYING WITH TABLE 703.2.4. VIEWING DISTANCESHALL BE MEASURED AS THE HORIZONTAL DISTANCE BETWEENTHE CHARACTER AND AN OBSTRUCTION PREVENTING FURTHERAPPROACH TOWARDS THE SIGN.BRAILLE SHALL BE 48 INCHES (1220 MM) MINIMUM AND 60INCHES (1525 MM) MAXIMUM ABOVE THE FLOOR, MEASURED TOTHE BASELINE OF THE BRAILLE CELLS.703.1.3 PICTOGRAMS.WHERE PICTOGRAMS ARE PROVIDED AS DESIGNATIONS OFPERMANENT INTERIOR ROOMS AND SPACES, THE PICTOGRAMSSHALL COMPLY WITH SECTION 703.5 AND SHALL HAVE TEXTDESCRIPTORS LOCATED DIRECTLY BELOW THE PICTOGRAM FIELDAND COMPLYING WITH SECTIONS 703.2 AND 703.3.EXCEPTION: PICTOGRAMS THAT PROVIDE INFORMATION ABOUT AROOM OR SPACE, SUCH AS "NO SMOKING", OCCUPANT LOGOS,AND THE INTERNATIONAL SYMBOL OF ACCESSIBILITY, ARE NOTREQUIRED TO HAVE TEXT DESCRIPTORS.HANDRAIL GRIPPING SURFACES AND ANY SURFACES ADJACENTTO THEM SHALL BE FREE OF SHARP OR ABRASIVE ELEMENTSAND SHALL HAVE ROUNDED EDGES.HANDRAILS SHALL NOT ROTATE WITHIN THEIR FITTINGS.HANDRAILS GRIPPING SURFACES SHALL EXTEND BEYONDAND IN THE SAME DIRECTION OF STAIR FLIGHTS ANDRAMP RUNS IN ACCORDANCE WITH 505.10.ICC A117.1-2015 REFERENCE NOTES:PICTOGRAMS SHALL HAVE A FIELD HEIGHT OF 6 INCHES (150 MM) MINIMUM. CHARACTERS AND BRAILLE SHALL NOT BE LOCATED IN THE PICTOGRAM FIELD.FIRE EXTINGUISHERCABINETSINGLE RECEPTACLE POWER OUTLETFIRE ALARM/STROBETHERMOSTATTYP. THROUGHOUTLIGHT SWITCHTYP THROUGHOUTOCCUPANCY SENSORNOTE:THE FITURES DRAWN WITHIN THESE DIAGRAMS ARE FOR REFERENCE ONLY.THEY DO NOT REPRESENT THE ACTUAL FIXTURES. FOR FIXTURE TYPES,SIZES, FINISHES, ETC. SEE SCHEDULE AND/OR PROJECT MANUAL.ADA - COMPLIANCE DIAGRAMS &MOUNTING HEIGHTS℄DOOR HINGE SPACING TOCOMPLY WITH BHMA STANDARDSLOCKSETS TO COMPLY WITHBHMA STANDARDS & ICC2010 NYS BUILDING CODEROOM ID SIGNAGERevisions:347 West 36 Street Suite 1501New York, NY 10018212-245-5195 T212-239-7130 FKey Plan:Notes:Grumman HallCornell UniversityIthaca, NY 14850Richard McElhiney Architects LLCApril 2, 2020Issue for Bid April 2, 2020Scale:31 Knight StreetNorwalk, CT 06851203-866-5538 T203-866-5243 FAltieri Sebor Wieber LLC303 South Broadway, Suite G20Tarrytown, NY 10591914-333-1110 T914-333-1109 FJacobs Consultancy4588 South Park AvenueBlasdell, NY 14219716-823-0006 TTrophy PointAREA OF WORK4592 Jordan RoadSkaneateles Falls, NY 13153315-685-4732 TRyan Biggs Clark Davis Engineering & SurveyingFirst and Second Floor Renovation Phase 11/4" = 1'-0"Accessibility Notes & DetailsT-103
DNUPPFPF PFREF.UPDNDNUPDNREF.100TD87100TC93OPEN TO BELOWSHAFT10048551181 LAB I597182 SADAF'SLAB754554 SF184 STUDENTSPACE18710118999191151193257188A439188495OPEN TO BELOWAREA OF WORKEXIT22'-0"20'-0"24'-0"13'-0"TOTAL DISTANCE = 79'-0"172900182A PRINTROOM76100CACOMMONAREA4421622752100SC2461007174100CBCORRIDOR2072 HOUR RATED WALLUPB882774B88A98B84A85B8687B841111B81902B00TC176OPENABOVEOPENABOVEB007174B006642B76323EXITAREA OF WORKB00CC137B0044902B0089483B70899B00SC238294452290437288729286387286A51282A136282896281511200C829283113200T15820023177OTBROOF289 STUDENTWORKSTATIONS480AREA OF WORKEXIT32'-0"24'-0"10'-0"TOTAL DISTANCE = 69'-0"2007174200SC2712 HOUR RATED WALL3'-0"16'-0"TOTAL DISTANCE = 50'-0"EXITINDICATES APPROXIMATE AREA OF WORK. OTHER WORK REQUIRED FOR A COMPLETE PROJECT MAY FALL OUTSIDE OF THIS AREA. WORK INSIDE THESE LIMITS SHALL BE PROTECTED FROM ADJACENT BUILDING AREAS BY TEMPORARY PARTITIONS / DOORS (WHETHER SPECIFICALLY SHOWN ON THE PLANS OR NOT) OR EXISTING BUILDINGS WALLS / DOORS.OUTSIDE SCOPE OF WORK, UNLESS OTHERWISE NOTEDRATED CONSTRUCTIONPROJECT DESCRIPTION:GRUMMAN HALL IS IN NEED OF AN UPDATE. THE FINISHES AND DESIGN ARE ORIGINAL TO THE PREVIOUS RENOVATION. THE PROJECT INCLUDES FULL RENOVATIN OF TWO LABS AND SUPPORTING STUDENT WORK SPACES ON THE FIRST FLOOR AND THE RENOVATION OF THREE OFFICES ON THE SECOND FLOOR TO SERVE AS ADDITIONAL STUDENT WORK SPACE.APPLICABLE CODES:2020 INTERNATIONAL EXISTING BUILDING CODE2020 INTERNATIONAL MECHANICAL CODE2020 INTERNATIONAL PLUMBING CODE2020 INTERNATIONAL FIRE CODE2020 INTERNATIONAL ENERGY CONSERVATION CODEEXISTING CONSTRUCTION SUMMARY:GRUMMAN HALL IS PRIMARILY CONSTRUCTED OF CONCRETE COLUMNS, BEAMS AND FLOOR SLABS WITH MASONRY WALLS. GIVEN THESE ELEMENTS, THE EXISTING CONSTRUCTION TYPE IS ASSUMED TO BE TYPE IIB.WORK TYPE:ALTERATION TYPE II (RENOVATION IMPACTING LESS THAN 50% OF THE TOTAL BUILDING AREA, IEBC 504)USE & OCCUPANCY:OCCUPANCY GROUP: B, BUSINESS (EDUCATIONAL OCCUPANCIES FOR STUDENTS ABOVE THE 12th GRADE AND LABORATORIES: TESTING AND RESEARCH) IBC 304NO CHANGETYPE OF CONSTRUCTION:CONSTRUCTION TYPE: IIB, NONCOMBUSTIBLE (IBC 602.1)NO CHANGEBUILDING HEIGHT & AREA:ALL WORK IS CONFINED TO THE EXISTING BUILDING. NO CHANGES IN THE BUILDING HEIGHT OR AREA ARE INCLUDED IN THE RENOVATION.FIRE PROTECTION & SEPARATIONS:STRUCTURAL FRAME:0 HOURSBEARING WALLS:0 HOURSFLOOR CONSTRUCTION:0 HOURSROOF CONSTRUCTION:0 HOURSSHAFT CONSTRUCTION:2 HOURSTHE CORRIDOR WALLS ARE NOT REQUIRED TO BE RATED BECAUSE THE BUILDING IS PROTECTED WITH AN AUTOMATIC SPRINKLER SYSTEM (IBC 1020.1)OCCUPANCY LOAD (1st FLOOR) :PROPOSED OCCUPANT LOAD:BUSINESS AREAS = 100 SF PER OCCUPANT (IBC TABLE 1004.1.2)ROOM 100CA (COMMON AREA) =442 SF / 100 =4ROOM 100CB (CORRIDOR) = (N/A) =0ROOM 181 (LAB I) = 597 SF / 100 =6ROOM 182 (SADAF'S LAB) = 754 SF / 100 =8 ROOM 182A (PRINT ROOM) = 76 SF / 100 =1ROOM 184 (STUDENT SPACE) = 563 SF (8 DESKS) =8 ROOM 187 =101 SF / 100 =1ROOM 188 = 495 SF / 100 =5ROOM 188A =439 SF / 100 =4ROOM 189 =99 SF / 100 =1ROOM 191 = 151 SF / 100 =2ROOM 193 =257 SF / 100 =3TOTAL = 43 OCCUPANTSNUMBER OF EXITS:1 EXIT PER STORY (IBC TABLE 1006.3.2)MINIMUM EGRESS WIDTH:ALL DOORS AND CORRIDORS IN THE PROJECT AREA WILL COMPLY WITH REQUIRED EGRESS WIDTHS:.2" PER OCCUPANT FOR EGRESS COMPONENTS OTHER THAN STAIRS (IBC 1005.3.2)EXISTING CORRIDOR WIDTH IS 8'-0", EXCEEDING CODE MINIMUM WIDTH.EXIT ACCESS TRAVEL DISTANCE:MAXIMUM COMMON PATH OF EGRESS TRAVEL DISTANCE NOT TO EXCEED 100' (IBC TABLE 1006.2, EXCEPTION B)EXISTING COMMON PATH OF EGRESS TRAVEL DISTANCE IS >100'. THIS MAY BE PERMITTED AS AN EXISTING CONDITION PER IEBC 805.2 WITH CODE OFFICIAL'S APPROVAL.PLUMBING FIXTURE REQUIREMENTS:NO CHANGE.ZONING:NO CHANGE.OCCUPANCY LOAD (2nd FLOOR) :PROPOSED OCCUPANT LOAD:BUSINESS AREAS = 100 SF PER OCCUPANT (IBC TABLE 1004.1.2)ROOM 200C (CORRIDOR) =(N/A) = 0ROOM 200T =158 SF / 100 =2ROOM 281 =511 SF / 100 =5ROOM 282 =896 SF / 100 =9ROOM 282A =136 SF / 100 =1ROOM 283 =113 SF / 100 =1ROOM 286 = 387 SF / 100 =4ROOM 286A = 51 SF / 100 =1 ROOM 288 =729 SF / 100 =7ROOM 289 (STUDENT WORKSTATIONS) = 480 SF (8 DESKS) =8ROOM 290= 437 SF / 100 =4 ROOM 294 =452 SF / 100 =5TOTAL = 47 OCCUPANTSRevisions:347 West 36 Street Suite 1501New York, NY 10018212-245-5195 T212-239-7130 FKey Plan:Notes:Grumman HallCornell UniversityIthaca, NY 14850Richard McElhiney Architects LLCApril 2, 2020Issue for Bid April 2, 2020Scale:31 Knight StreetNorwalk, CT 06851203-866-5538 T203-866-5243 FAltieri Sebor Wieber LLC303 South Broadway, Suite G20Tarrytown, NY 10591914-333-1110 T914-333-1109 FJacobs Consultancy4588 South Park AvenueBlasdell, NY 14219716-823-0006 TTrophy PointAREA OF WORK4592 Jordan RoadSkaneateles Falls, NY 13153315-685-4732 TRyan Biggs Clark Davis Engineering & SurveyingFirst and Second Floor Renovation Phase 1As indicatedArea of Work and Code PlansT-1041/8" = 1'-0"1FIRST FLOOR EGRESS PLAN1/8" = 1'-0"3BASEMENT FLOOR EGRESS PLAN1/8" = 1'-0"2SECOND FLOOR EGRESS PLAN
00112233445566778899ABDCEEFF16' - 0"16' - 0"16' - 0"12' - 0"9' - 0"27' - 0"1' - 6"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"1' - 7"UP1' - 9"1' - 9"UPB882774B88A98B84A85B8687B841111B81902B00TC176OPEN ABOVE6' - 11"2' - 0"OPENABOVEB0071B006642B76323EXIST. IONIZED WATER TANKB0089483B0044902Revisions:347 West 36 Street Suite 1501New York, NY 10018212-245-5195 T212-239-7130 FKey Plan:Notes:Grumman HallCornell UniversityIthaca, NY 14850Richard McElhiney Architects LLCApril 2, 2020Issue for Bid April 2, 2020Scale:31 Knight StreetNorwalk, CT 06851203-866-5538 T203-866-5243 FAltieri Sebor Wieber LLC303 South Broadway, Suite G20Tarrytown, NY 10591914-333-1110 T914-333-1109 FJacobs Consultancy4588 South Park AvenueBlasdell, NY 14219716-823-0006 TTrophy PointAREA OF WORK4592 Jordan RoadSkaneateles Falls, NY 13153315-685-4732 TRyan Biggs Clark Davis Engineering & SurveyingFirst and Second Floor Renovation Phase 11/4" = 1'-0"Basement Floor Existing PlanEX-1011/4" = 1'-0"1EXISTING BASEMENT FLOOR PLAN
00112233445566778899AABBDDCCEEFF16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"12' - 0"9' - 0"27' - 0"1' - 9"EX. PIPESEXISTING ROOF DRAIN100TD87100TC93OPEN TO BELOW1' - 9"1' - 7"1' - 6"SHAFT10048551EXISTING ROOF DRAIN18710118999191151193257188A439188495OPEN TO BELOW1729001821162182A338184228186100100717410066Revisions:347 West 36 Street Suite 1501New York, NY 10018212-245-5195 T212-239-7130 FKey Plan:Notes:Grumman HallCornell UniversityIthaca, NY 14850Richard McElhiney Architects LLCApril 2, 2020Issue for Bid April 2, 2020Scale:31 Knight StreetNorwalk, CT 06851203-866-5538 T203-866-5243 FAltieri Sebor Wieber LLC303 South Broadway, Suite G20Tarrytown, NY 10591914-333-1110 T914-333-1109 FJacobs Consultancy4588 South Park AvenueBlasdell, NY 14219716-823-0006 TTrophy PointAREA OF WORK4592 Jordan RoadSkaneateles Falls, NY 13153315-685-4732 TRyan Biggs Clark Davis Engineering & SurveyingFirst and Second Floor Renovation Phase 11/4" = 1'-0"First Floor Existing PlanEX-1021/4" = 1'-0"1EXISTING FIRST FLOOR PLAN
00112233445566778899AABBDDCCEEFF16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"12' - 0"9' - 0"27' - 0"294452290437288729286387286A51282A136282896281511200C8291' - 9"1' - 9"1' - 7"1' - 6"283113200T15820023177OTBROOF28715228915129116820045200642007174Revisions:347 West 36 Street Suite 1501New York, NY 10018212-245-5195 T212-239-7130 FKey Plan:Notes:Grumman HallCornell UniversityIthaca, NY 14850Richard McElhiney Architects LLCApril 2, 2020Issue for Bid April 2, 2020Scale:31 Knight StreetNorwalk, CT 06851203-866-5538 T203-866-5243 FAltieri Sebor Wieber LLC303 South Broadway, Suite G20Tarrytown, NY 10591914-333-1110 T914-333-1109 FJacobs Consultancy4588 South Park AvenueBlasdell, NY 14219716-823-0006 TTrophy PointAREA OF WORK4592 Jordan RoadSkaneateles Falls, NY 13153315-685-4732 TRyan Biggs Clark Davis Engineering & SurveyingFirst and Second Floor Renovation Phase 11/4" = 1'-0"Second Floor Existing PlanEX-1031/4" = 1'-0"1EXISTING SECOND FLOOR PLAN
00112233445566778899ABBDDCCEEFFB882774B841111B81902B84A85B8687B00TC176B76323B88A98B00664216' - 0"16' - 0"16' - 0"12' - 0"9' - 0"27' - 0"1' - 6"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"1' - 7"1' - 9"1' - 9"B0044902B0071B0089483NOTE: PLAN SHOWN FOR REFERENCE ONLYRevisions:347 West 36 Street Suite 1501New York, NY 10018212-245-5195 T212-239-7130 FKey Plan:Notes:Grumman HallCornell UniversityIthaca, NY 14850Richard McElhiney Architects LLCApril 2, 2020Issue for Bid April 2, 2020Scale:31 Knight StreetNorwalk, CT 06851203-866-5538 T203-866-5243 FAltieri Sebor Wieber LLC303 South Broadway, Suite G20Tarrytown, NY 10591914-333-1110 T914-333-1109 FJacobs Consultancy4588 South Park AvenueBlasdell, NY 14219716-823-0006 TTrophy PointAREA OF WORK4592 Jordan RoadSkaneateles Falls, NY 13153315-685-4732 TRyan Biggs Clark Davis Engineering & SurveyingFirst and Second Floor Renovation Phase 11/4" = 1'-0"Basement Floor ExistingReflected Ceiling PlanEX-1111/4" = 1'-0"1EXISTING BASEMENT FLOOR REFLECTED CEILING PLAN
FSFSFSFSFSFSFSEEEEEET00112233445566778899AABBDDCCEEFF18710118999191151193257188A439188495100TD87100TC9310048551SHAFT1729001821162182A33818422818610016' - 0"16' - 0"16' - 0"12' - 0"9' - 0"27' - 0"1' - 6"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"1' - 7"1' - 9"1' - 9"+ 11' - 10"+ 10' - 6"+ 11' - 10"+ 11' - 10"+ 11' - 10"+ 11' - 10"+ 11' - 10"+ 11' - 10"+ 10' - 6"+ 10' - 6"+ 10' - 6"NOTE: PLAN SHOWN FOR REFERENCE ONLY100717410066Revisions:347 West 36 Street Suite 1501New York, NY 10018212-245-5195 T212-239-7130 FKey Plan:Notes:Grumman HallCornell UniversityIthaca, NY 14850Richard McElhiney Architects LLCApril 2, 2020Issue for Bid April 2, 2020Scale:31 Knight StreetNorwalk, CT 06851203-866-5538 T203-866-5243 FAltieri Sebor Wieber LLC303 South Broadway, Suite G20Tarrytown, NY 10591914-333-1110 T914-333-1109 FJacobs Consultancy4588 South Park AvenueBlasdell, NY 14219716-823-0006 TTrophy PointAREA OF WORK4592 Jordan RoadSkaneateles Falls, NY 13153315-685-4732 TRyan Biggs Clark Davis Engineering & SurveyingFirst and Second Floor Renovation Phase 11/4" = 1'-0"First Floor Existing ReflectedCeiling PlanEX-1121/4" = 1'-0"1EXISTING FIRST FLOOR REFLECTED CEILING PLAN
00112233445566778899AABBDDCCEEFF28715228915129116828289628151120023177OTB283113200T158282A136286387286A51288729290437294452200C82916' - 0"16' - 0"16' - 0"12' - 0"9' - 0"27' - 0"1' - 6"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"1' - 7"1' - 9"1' - 9"+ 10' - 5"+ 10' - 5"+ 10' - 5"+ 9' - 2"+ 9' - 2"NOTE: PLAN SHOWN FOR REFERENCE ONLY20064200452007174Revisions:347 West 36 Street Suite 1501New York, NY 10018212-245-5195 T212-239-7130 FKey Plan:Notes:Grumman HallCornell UniversityIthaca, NY 14850Richard McElhiney Architects LLCApril 2, 2020Issue for Bid April 2, 2020Scale:31 Knight StreetNorwalk, CT 06851203-866-5538 T203-866-5243 FAltieri Sebor Wieber LLC303 South Broadway, Suite G20Tarrytown, NY 10591914-333-1110 T914-333-1109 FJacobs Consultancy4588 South Park AvenueBlasdell, NY 14219716-823-0006 TTrophy PointAREA OF WORK4592 Jordan RoadSkaneateles Falls, NY 13153315-685-4732 TRyan Biggs Clark Davis Engineering & SurveyingFirst and Second Floor Renovation Phase 11/4" = 1'-0"Second Floor Existing ReflectedCeiling PlanEX-1131/4" = 1'-0"1EXISTING SECOND FLOOR REFLECTED CEILING PLAN
00112233445566778899ABDCEEFF1' - 9"16' - 0"16' - 0"16' - 0"1' - 9"12' - 0"9' - 0"27' - 0"1' - 6"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"1' - 7"UPUPB882774B88A98B84A85B8687B841111B81902B00TC176OPEN ABOVE2' - 0"OPENABOVEB0071B006642B763236B0089483B0044902DEMOLITION KEYNOTES:DEMOLISH CONCRETE BLOCK WALL, INCLUDING BRICK WALL BASE, UP TO STRUCTURE. PATCH AND REPAIR ADJACENT BLOCK WALL, FLOOR AND CEILING SURFACES TO REMAIN.DEMOLISH DOOR AND FRAME.DEMOLISH FINISH TILE FLOORING.EXISTING DRAIN PIPE TO REMAIN.EXISTING PIPES TO REMAIN.DEMOLISH WATER TANK. (SEE MECHANICAL DRAWINGS)DEMOLISH ABANDONED ELECTRICAL BOX & CONDUIT.DEMOLISH WINDOW TREATMENT.DEMOLISH EXISTING A.C.T. CEILING, GRID AND SUPPORTS.DEMOLISH EXISTING LIGHT FIXTURES. (SEE ELECTRICAL DRAWINGS)REMOVE EXISTING CONSTRUCTION IN WINDOW AND RESTORE OPERABLE WINDOW FUNCTION.NOT USED.DEMOLISH EXISTING SAFETY SHOWER AND ASSOCIATED PIPING.NOT USED.NOT USED.DEMOLISH DOOR FRAME AND WALL ABOVE UP TO STRUCTURE. PATCH AND REPAIR ADJACENT BLOCK WALL, FLOOR AND CEILING SURFACES TO REMAIN.DEMOLISH CEILING AND WALL MOUNTED ACOUSTICAL PANELS.EXISTING FLOOR DRAIN TO REMAIN.REMOVE RADIATOR COVERS. CLEAN RADIATOR AND STRAIGHTEN FINS. SALVAGE COVERS FOR REPAINTING & REUSE.12345678910111213141516171819EXISTING DOOR AND FRAME TO REMAINEXISTING DOOR AND FRAME TO BE DEMOLISHEDEXISTING WALL CONSTRUCTION TO BE DEMOLISHEDEXISTING WALL CONSTRUCTION TO REMAINGENERAL SYMBOL KEYOUTSIDE SCOPE OF WORK, UNLESS OTHERWISE NOTEDRevisions:347 West 36 Street Suite 1501New York, NY 10018212-245-5195 T212-239-7130 FKey Plan:Notes:Grumman HallCornell UniversityIthaca, NY 14850Richard McElhiney Architects LLCApril 2, 2020Issue for Bid April 2, 2020Scale:31 Knight StreetNorwalk, CT 06851203-866-5538 T203-866-5243 FAltieri Sebor Wieber LLC303 South Broadway, Suite G20Tarrytown, NY 10591914-333-1110 T914-333-1109 FJacobs Consultancy4588 South Park AvenueBlasdell, NY 14219716-823-0006 TTrophy PointAREA OF WORK4592 Jordan RoadSkaneateles Falls, NY 13153315-685-4732 TRyan Biggs Clark Davis Engineering & SurveyingFirst and Second Floor Renovation Phase 11/4" = 1'-0"Basement Floor Demolition PlanDA-1011/4" = 1'-0"1DEMOLITION BASEMENT FLOOR PLAN
00112233445566778899AABBDDCCEEFF16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"12' - 0"9' - 0"27' - 0"1' - 9"100TD87100TC93OPEN TO BELOW1' - 9"1' - 7"1' - 6"SHAFT1004855118710118999191151193257188A439188495111111122222345OPEN TO BELOWOPEN TO BELOW172900OPEN TO BELOW78888162111111111341661821162182A3381842281861001818319191919100717410066DEMOLITION KEYNOTES:DEMOLISH CONCRETE BLOCK WALL, INCLUDING BRICK WALL BASE, UP TO STRUCTURE. PATCH AND REPAIR ADJACENT BLOCK WALL, FLOOR AND CEILING SURFACES TO REMAIN.DEMOLISH DOOR AND FRAME.DEMOLISH FINISH TILE FLOORING.EXISTING DRAIN PIPE TO REMAIN.EXISTING PIPES TO REMAIN.DEMOLISH WATER TANK. (SEE MECHANICAL DRAWINGS)DEMOLISH ABANDONED ELECTRICAL BOX & CONDUIT.DEMOLISH WINDOW TREATMENT.DEMOLISH EXISTING A.C.T. CEILING, GRID AND SUPPORTS.DEMOLISH EXISTING LIGHT FIXTURES. (SEE ELECTRICAL DRAWINGS)REMOVE EXISTING CONSTRUCTION IN WINDOW AND RESTORE OPERABLE WINDOW FUNCTION.NOT USED.DEMOLISH EXISTING SAFETY SHOWER AND ASSOCIATED PIPING.NOT USED.NOT USED.DEMOLISH DOOR FRAME AND WALL ABOVE UP TO STRUCTURE. PATCH AND REPAIR ADJACENT BLOCK WALL, FLOOR AND CEILING SURFACES TO REMAIN.DEMOLISH CEILING AND WALL MOUNTED ACOUSTICAL PANELS.EXISTING FLOOR DRAIN TO REMAIN.REMOVE RADIATOR COVERS. CLEAN RADIATOR AND STRAIGHTEN FINS. SALVAGE COVERS FOR REPAINTING & REUSE.12345678910111213141516171819EXISTING DOOR AND FRAME TO REMAINEXISTING DOOR AND FRAME TO BE DEMOLISHEDEXISTING WALL CONSTRUCTION TO BE DEMOLISHEDEXISTING WALL CONSTRUCTION TO REMAINGENERAL SYMBOL KEYOUTSIDE SCOPE OF WORK, UNLESS OTHERWISE NOTEDGENERAL FLOOR PREPARATION NOTES:1. THE EXISTING FINISH FLOOR HAS BEEN REMOVED BY THE CONTRACTOR.2. THE CONTRACTOR SHALL REMOVE ALL EXISTING MASTICS AND ADHESIVE FROM THE EXISTING SURFACE AS REQUIRED FOR PROPER INSTALLATION OF THE NEW FLOORING AND FLOOR PREPARATION.3. REMOVE EXISTING LOOSE AND DAMAGED FLOOR LEVELING COMPOUND FROM THE FLOOR SLAB, REQUIRED FOR THE INSTALLATION OF NEW FLOOR LEVELING COMPOUND.4. THE CONTRACTOR SHALL REMOVE ALL EXISTING METAL INSERTS, CUT OFF PIPES, AND OTHER IMPEDIMENTS TO A SMOOTH FLOOR SURFACE, AND PATCH ALL HOLES.5. REFER TO THE SPECIFICATIONS FOR FLOOR LEVELING REQUIREMENTS.6. THE CONTRACTOR SHALL INCLUDE THE FOLLOWING ALLOWANCES FOR ADDITIONAL FLOOR PREPARATIONS TO ADDRESS EXISTING CONDITIONS:A. LUMP SUM ALLOWANCE: INCLUDE THE SUM OF 10 LOCATIONS TO REMOVE PIPING AND PATCH FLOOR PENETRATIONS WHERE PIPING IS REMOVED TO PROVIDE FIRE-RATED CONSTRUCTION, AS SPECIFIED ON DRAWING DM-102.B. LUMP SUM ALLOWANCE: INCLUDE SUM OF 30 LOCATIONS TO REMOVE PIPING FASTENERS AND/OR APPURTENANCES, AS SPECIFIED ON DRAWING DM-102.C. LUMP SUM ALLOWANCE: INCLUDE SUM OF 200 SQUARE FEET OF 1/2" LEVELING COMPOUND TO ADDRESS EXISTING FLOORING CONDITIONS AND PROVIDE ADDITIONAL FLOOR PREPARATION AS REQUIRED TO MEET THE SPECIFICATION FOR NEW FINISH FLOOR INSTALLATION, AS SPECIFIED ON DRAWING DM-102.Revisions:347 West 36 Street Suite 1501New York, NY 10018212-245-5195 T212-239-7130 FKey Plan:Notes:Grumman HallCornell UniversityIthaca, NY 14850Richard McElhiney Architects LLCApril 2, 2020Issue for Bid April 2, 2020Scale:31 Knight StreetNorwalk, CT 06851203-866-5538 T203-866-5243 FAltieri Sebor Wieber LLC303 South Broadway, Suite G20Tarrytown, NY 10591914-333-1110 T914-333-1109 FJacobs Consultancy4588 South Park AvenueBlasdell, NY 14219716-823-0006 TTrophy PointAREA OF WORK4592 Jordan RoadSkaneateles Falls, NY 13153315-685-4732 TRyan Biggs Clark Davis Engineering & SurveyingFirst and Second Floor Renovation Phase 11/4" = 1'-0"First Floor Demolition PlanDA-1021/4" = 1'-0"1DEMOLITION FIRST FLOOR PLANPHOTO DETAIL A -EXISTING CONDITIONS (N.T.S.)PHOTO DETAIL B -EXISTING CONDITIONS (N.T.S.)PHOTO DETAIL C -EXISTING CONDITIONS (N.T.S.)
00112233445566778899AABBDDCCEEFF16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"12' - 0"9' - 0"27' - 0"294452290437288729286387286A51282A136282896281511200C8291' - 9"1' - 9"1' - 7"1' - 6"283113200T15820023177OTBROOF112233318882128715228915129116819191920064200452007174DEMOLITION KEYNOTES:DEMOLISH CONCRETE BLOCK WALL, INCLUDING BRICK WALL BASE, UP TO STRUCTURE. PATCH AND REPAIR ADJACENT BLOCK WALL, FLOOR AND CEILING SURFACES TO REMAIN.DEMOLISH DOOR AND FRAME.DEMOLISH FINISH TILE FLOORING.EXISTING DRAIN PIPE TO REMAIN.EXISTING PIPES TO REMAIN.DEMOLISH WATER TANK. (SEE MECHANICAL DRAWINGS)DEMOLISH ABANDONED ELECTRICAL BOX & CONDUIT.DEMOLISH WINDOW TREATMENT.DEMOLISH EXISTING A.C.T. CEILING, GRID AND SUPPORTS.DEMOLISH EXISTING LIGHT FIXTURES. (SEE ELECTRICAL DRAWINGS)REMOVE EXISTING CONSTRUCTION IN WINDOW AND RESTORE OPERABLE WINDOW FUNCTION.NOT USED.DEMOLISH EXISTING SAFETY SHOWER AND ASSOCIATED PIPING.NOT USED.NOT USED.DEMOLISH DOOR FRAME AND WALL ABOVE UP TO STRUCTURE. PATCH AND REPAIR ADJACENT BLOCK WALL, FLOOR AND CEILING SURFACES TO REMAIN.DEMOLISH CEILING AND WALL MOUNTED ACOUSTICAL PANELS.EXISTING FLOOR DRAIN TO REMAIN.REMOVE RADIATOR COVERS. CLEAN RADIATOR AND STRAIGHTEN FINS. SALVAGE COVERS FOR REPAINTING & REUSE.12345678910111213141516171819EXISTING DOOR AND FRAME TO REMAINEXISTING DOOR AND FRAME TO BE DEMOLISHEDEXISTING WALL CONSTRUCTION TO BE DEMOLISHEDEXISTING WALL CONSTRUCTION TO REMAINGENERAL SYMBOL KEYOUTSIDE SCOPE OF WORK, UNLESS OTHERWISE NOTEDGENERAL FLOOR PREPARATION NOTES:1. THE EXISTING FINISH FLOOR HAS BEEN REMOVED BY THE CONTRACTOR.2. THE CONTRACTOR SHALL REMOVE ALL EXISTING MASTICS AND ADHESIVE FROM THE EXISTING SURFACE AS REQUIRED FOR PROPER INSTALLATION OF THE NEW FLOORING AND FLOOR PREPARATION.3. REMOVE EXISTING LOOSE AND DAMAGED FLOOR LEVELING COMPOUND FROM THE FLOOR SLAB, REQUIRED FOR THE INSTALLATION OF NEW FLOOR LEVELING COMPOUND.4. THE CONTRACTOR SHALL REMOVE ALL EXISTING METAL INSERTS, CUT OFF PIPES, AND OTHER IMPEDIMENTS TO A SMOOTH FLOOR SURFACE, AND PATCH ALL HOLES.5. REFER TO THE SPECIFICATIONS FOR FLOOR LEVELING REQUIREMENTS.6. THE CONTRACTOR SHALL INCLUDE THE FOLLOWING ALLOWANCES FOR ADDITIONAL FLOOR PREPARATIONS TO ADDRESS EXISTING CONDITIONS:A. LUMP SUM ALLOWANCE: INCLUDE THE SUM OF 10 LOCATIONS TO REMOVE PIPING AND PATCH FLOOR PENETRATIONS WHERE PIPING IS REMOVED TO PROVIDE FIRE-RATED CONSTRUCTION, AS SPECIFIED ON DRAWING DM-102.B. LUMP SUM ALLOWANCE: INCLUDE SUM OF 30 LOCATIONS TO REMOVE PIPING FASTENERS AND/OR APPURTENANCES, AS SPECIFIED ON DRAWING DM-102.C. LUMP SUM ALLOWANCE: INCLUDE SUM OF 200 SQUARE FEET OF 1/2" LEVELING COMPOUND TO ADDRESS EXISTING FLOORING CONDITIONS AND PROVIDE ADDITIONAL FLOOR PREPARATION AS REQUIRED TO MEET THE SPECIFICATION FOR NEW FINISH FLOOR INSTALLATION, AS SPECIFIED ON DRAWING DM-102.Revisions:347 West 36 Street Suite 1501New York, NY 10018212-245-5195 T212-239-7130 FKey Plan:Notes:Grumman HallCornell UniversityIthaca, NY 14850Richard McElhiney Architects LLCApril 2, 2020Issue for Bid April 2, 2020Scale:31 Knight StreetNorwalk, CT 06851203-866-5538 T203-866-5243 FAltieri Sebor Wieber LLC303 South Broadway, Suite G20Tarrytown, NY 10591914-333-1110 T914-333-1109 FJacobs Consultancy4588 South Park AvenueBlasdell, NY 14219716-823-0006 TTrophy PointAREA OF WORK4592 Jordan RoadSkaneateles Falls, NY 13153315-685-4732 TRyan Biggs Clark Davis Engineering & SurveyingFirst and Second Floor Renovation Phase 11/4" = 1'-0"Second Floor Demolition PlanDA-1031/4" = 1'-0"1DEMOLITION SECOND FLOOR PLAN
00112233445566778899ABBDDCCEEFF1' - 9"16' - 0"16' - 0"16' - 0"1' - 9"12' - 0"9' - 0"27' - 0"1' - 6"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"1' - 7"OPEN TO ABOVEOPEN TO ABOVEOPEN TO ABOVEOPEN TO ABOVEB882774B841111B81902B00TC176B76323B006642B88A98B8687B84A856B0044902B0071B0089483DEMOLITION KEYNOTES:DEMOLISH CONCRETE BLOCK WALL, INCLUDING BRICK WALL BASE, UP TO STRUCTURE. PATCH AND REPAIR ADJACENT BLOCK WALL, FLOOR AND CEILING SURFACES TO REMAIN.DEMOLISH DOOR AND FRAME.DEMOLISH FINISH TILE FLOORING.EXISTING DRAIN PIPE TO REMAIN.EXISTING PIPES TO REMAIN.DEMOLISH WATER TANK. (SEE MECHANICAL DRAWINGS)DEMOLISH ABANDONED ELECTRICAL BOX & CONDUIT.DEMOLISH WINDOW TREATMENT.DEMOLISH EXISTING A.C.T. CEILING, GRID AND SUPPORTS.DEMOLISH EXISTING LIGHT FIXTURES. (SEE ELECTRICAL DRAWINGS)REMOVE EXISTING CONSTRUCTION IN WINDOW AND RESTORE OPERABLE WINDOW FUNCTION.NOT USED.DEMOLISH EXISTING SAFETY SHOWER AND ASSOCIATED PIPING.NOT USED.NOT USED.DEMOLISH DOOR FRAME AND WALL ABOVE UP TO STRUCTURE. PATCH AND REPAIR ADJACENT BLOCK WALL, FLOOR AND CEILING SURFACES TO REMAIN.DEMOLISH CEILING AND WALL MOUNTED ACOUSTICAL PANELS.EXISTING FLOOR DRAIN TO REMAIN.REMOVE RADIATOR COVERS. CLEAN RADIATOR AND STRAIGHTEN FINS. SALVAGE COVERS FOR REPAINTING & REUSE.12345678910111213141516171819EXISTING DOOR AND FRAME TO REMAINEXISTING DOOR AND FRAME TO BE DEMOLISHEDEXISTING WALL CONSTRUCTION TO BE DEMOLISHEDEXISTING WALL CONSTRUCTION TO REMAINGENERAL SYMBOL KEYOUTSIDE SCOPE OF WORK, UNLESS OTHERWISE NOTEDRevisions:347 West 36 Street Suite 1501New York, NY 10018212-245-5195 T212-239-7130 FKey Plan:Notes:Grumman HallCornell UniversityIthaca, NY 14850Richard McElhiney Architects LLCApril 2, 2020Issue for Bid April 2, 2020Scale:31 Knight StreetNorwalk, CT 06851203-866-5538 T203-866-5243 FAltieri Sebor Wieber LLC303 South Broadway, Suite G20Tarrytown, NY 10591914-333-1110 T914-333-1109 FJacobs Consultancy4588 South Park AvenueBlasdell, NY 14219716-823-0006 TTrophy PointAREA OF WORK4592 Jordan RoadSkaneateles Falls, NY 13153315-685-4732 TRyan Biggs Clark Davis Engineering & SurveyingFirst and Second Floor Renovation Phase 11/4" = 1'-0"Basement Floor DemolitionReflected Ceiling PlanDA-1111/4" = 1'-0"1DEMOLITION BASEMENT FLOOR REFLECTED CEILING PLAN
FSFSFSFSFSFSFSEEEEEET00112233445566778899AABBDDCCEEFF1' - 9"16' - 0"16' - 0"16' - 0"1' - 9"12' - 0"9' - 0"27' - 0"1' - 6"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"1' - 7"18710118999191151193257188A439188495100TD87100TC9310048551SHAFT172900910101010101010171010171821162182A338184228186100910+ 11' - 10"+ 10' - 6"+ 11' - 10"+ 11' - 10"+ 11' - 10"+ 11' - 10"+ 11' - 10"+ 11' - 10"+ 10' - 6"+ 10' - 6"+ 10' - 6"100717410066DEMOLITION KEYNOTES:DEMOLISH CONCRETE BLOCK WALL, INCLUDING BRICK WALL BASE, UP TO STRUCTURE. PATCH AND REPAIR ADJACENT BLOCK WALL, FLOOR AND CEILING SURFACES TO REMAIN.DEMOLISH DOOR AND FRAME.DEMOLISH FINISH TILE FLOORING.EXISTING DRAIN PIPE TO REMAIN.EXISTING PIPES TO REMAIN.DEMOLISH WATER TANK. (SEE MECHANICAL DRAWINGS)DEMOLISH ABANDONED ELECTRICAL BOX & CONDUIT.DEMOLISH WINDOW TREATMENT.DEMOLISH EXISTING A.C.T. CEILING, GRID AND SUPPORTS.DEMOLISH EXISTING LIGHT FIXTURES. (SEE ELECTRICAL DRAWINGS)REMOVE EXISTING CONSTRUCTION IN WINDOW AND RESTORE OPERABLE WINDOW FUNCTION.NOT USED.DEMOLISH EXISTING SAFETY SHOWER AND ASSOCIATED PIPING.NOT USED.NOT USED.DEMOLISH DOOR FRAME AND WALL ABOVE UP TO STRUCTURE. PATCH AND REPAIR ADJACENT BLOCK WALL, FLOOR AND CEILING SURFACES TO REMAIN.DEMOLISH CEILING AND WALL MOUNTED ACOUSTICAL PANELS.EXISTING FLOOR DRAIN TO REMAIN.REMOVE RADIATOR COVERS. CLEAN RADIATOR AND STRAIGHTEN FINS. SALVAGE COVERS FOR REPAINTING & REUSE.12345678910111213141516171819EXISTING DOOR AND FRAME TO REMAINEXISTING DOOR AND FRAME TO BE DEMOLISHEDEXISTING WALL CONSTRUCTION TO BE DEMOLISHEDEXISTING WALL CONSTRUCTION TO REMAINGENERAL SYMBOL KEYOUTSIDE SCOPE OF WORK, UNLESS OTHERWISE NOTEDRevisions:347 West 36 Street Suite 1501New York, NY 10018212-245-5195 T212-239-7130 FKey Plan:Notes:Grumman HallCornell UniversityIthaca, NY 14850Richard McElhiney Architects LLCApril 2, 2020Issue for Bid April 2, 2020Scale:31 Knight StreetNorwalk, CT 06851203-866-5538 T203-866-5243 FAltieri Sebor Wieber LLC303 South Broadway, Suite G20Tarrytown, NY 10591914-333-1110 T914-333-1109 FJacobs Consultancy4588 South Park AvenueBlasdell, NY 14219716-823-0006 TTrophy PointAREA OF WORK4592 Jordan RoadSkaneateles Falls, NY 13153315-685-4732 TRyan Biggs Clark Davis Engineering & SurveyingFirst and Second Floor Renovation Phase 11/4" = 1'-0"First Floor Demolition ReflectedCeiling PlanDA-1121/4" = 1'-0"1DEMOLITION FIRST FLOOR REFLECTED CEILING PLAN
00112233445566778899AABBDDCCEEFFROOF1' - 9"16' - 0"16' - 0"16' - 0"1' - 9"12' - 0"9' - 0"27' - 0"1' - 6"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"1' - 7"101010999287152289151291168281511283113200T158282896282A136286A51286387288729290437294452200C82920023177OTB+ 10' - 5"+ 9' - 2"+ 10' - 5"+ 9' - 2"+ 10' - 5"20064200452007174DEMOLITION KEYNOTES:DEMOLISH CONCRETE BLOCK WALL, INCLUDING BRICK WALL BASE, UP TO STRUCTURE. PATCH AND REPAIR ADJACENT BLOCK WALL, FLOOR AND CEILING SURFACES TO REMAIN.DEMOLISH DOOR AND FRAME.DEMOLISH FINISH TILE FLOORING.EXISTING DRAIN PIPE TO REMAIN.EXISTING PIPES TO REMAIN.DEMOLISH WATER TANK. (SEE MECHANICAL DRAWINGS)DEMOLISH ABANDONED ELECTRICAL BOX & CONDUIT.DEMOLISH WINDOW TREATMENT.DEMOLISH EXISTING A.C.T. CEILING, GRID AND SUPPORTS.DEMOLISH EXISTING LIGHT FIXTURES. (SEE ELECTRICAL DRAWINGS)REMOVE EXISTING CONSTRUCTION IN WINDOW AND RESTORE OPERABLE WINDOW FUNCTION.NOT USED.DEMOLISH EXISTING SAFETY SHOWER AND ASSOCIATED PIPING.NOT USED.NOT USED.DEMOLISH DOOR FRAME AND WALL ABOVE UP TO STRUCTURE. PATCH AND REPAIR ADJACENT BLOCK WALL, FLOOR AND CEILING SURFACES TO REMAIN.DEMOLISH CEILING AND WALL MOUNTED ACOUSTICAL PANELS.EXISTING FLOOR DRAIN TO REMAIN.REMOVE RADIATOR COVERS. CLEAN RADIATOR AND STRAIGHTEN FINS. SALVAGE COVERS FOR REPAINTING & REUSE.12345678910111213141516171819EXISTING DOOR AND FRAME TO REMAINEXISTING DOOR AND FRAME TO BE DEMOLISHEDEXISTING WALL CONSTRUCTION TO BE DEMOLISHEDEXISTING WALL CONSTRUCTION TO REMAINGENERAL SYMBOL KEYOUTSIDE SCOPE OF WORK, UNLESS OTHERWISE NOTEDRevisions:347 West 36 Street Suite 1501New York, NY 10018212-245-5195 T212-239-7130 FKey Plan:Notes:Grumman HallCornell UniversityIthaca, NY 14850Richard McElhiney Architects LLCApril 2, 2020Issue for Bid April 2, 2020Scale:31 Knight StreetNorwalk, CT 06851203-866-5538 T203-866-5243 FAltieri Sebor Wieber LLC303 South Broadway, Suite G20Tarrytown, NY 10591914-333-1110 T914-333-1109 FJacobs Consultancy4588 South Park AvenueBlasdell, NY 14219716-823-0006 TTrophy PointAREA OF WORK4592 Jordan RoadSkaneateles Falls, NY 13153315-685-4732 TRyan Biggs Clark Davis Engineering & SurveyingFirst and Second Floor Renovation Phase 11/4" = 1'-0"Second Floor DemolitionReflected Ceiling PlanDA-1131/4" = 1'-0"1DEMOLITION SECOND FLOOR REFLECTED CEILING PLAN
00112233445566778899ABDCEEFFUPUPB882774B88A98B84A85B8687B841111B81902B00TC176OPEN ABOVEB0071B006642B763231' - 9"16' - 0"16' - 0"16' - 0"1' - 9"12' - 0"9' - 0"27' - 0"1' - 6"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"1' - 7"10B0044902B008948310EXISTING DOOR AND FRAME TO REMAINNEW DOOR AND FRAMENEW WALL WITH REQUIRED 2-HOUR FIRE RATINGEXISTING WALL CONSTRUCTION TO REMAINGENERAL SYMBOL KEYOUTSIDE SCOPE OF WORK, UNLESS OTHERWISE NOTEDINDICATES CASEWORK OR MILLWORKXXNEW WALL WITH NO REQUIRED FIRE RATINGGLASS MARKERBOARD.NEW INTERIOR WINDOW.NEW STAINLESS STEEL CORNER GUARD.EXISTING FLOOR DRAIN TO REMAIN.(SEE PLUMBING PLANS)EXISTING DRAIN PIPE TO REMAIN.NEW 2'x3' FIRE RATED ACCESS PANEL.REINSTALL REPAINTED RADIATOR COVERS.WALL-MOUNTED COAT HOOK RACK, STAINLESS STEEL TYPE 304, MIN. 6 HOOKS PER RACK (BASIS OF DESIGN WEBI)NEW UNDERCABINET REFRIGERATOR. (BY OWNER)NEW MICROWAVE. (BY OWNER)NEW ROOM SIGNAGE.NEW FLAMMABLE STORAGE CABINET.NEW CORROSIVE STORAGE CABINET.NEW CAULK AT WINDOW SILL TO MATCH ADJACENT.11121314151617181920CONSTRUCTION KEYNOTES:NEW BASE CABINETS AND COUNTERTOP. (CASEWORK FURNISHED BY OWNER AND INSTALLED BY CONTRACTOR.)NEW WALL SHELVES.NEW SINK. (SINK & FAUCET FURNISHED BY OWNER AS PART OF CASEWORK)NEW FUME HOOD. (FUME HOOD FURNISHED BY OWNER AND INSTALLED BY CONTRACTOR)INFILL EXISTING OPENING IN CONCRETE SLAB WITH NEW CONCRETE. (SEE STRUCTURAL DRAWINGS)NEW SAFETY SHOWER WITH EYEWASH.NEW GLASS PARTITION SYSTEM.NEW FINISH FLOOR (SEE FINISH SCHEDULE).NEW MANUAL DUAL ROLLER WINDOW SHADES WITH FASCIA (TYP.)NEW DEIONIZED WATER POLYETHYLENE STORAGE TANK (SEE MECHANICAL PLANS)1234567891021222324Revisions:347 West 36 Street Suite 1501New York, NY 10018212-245-5195 T212-239-7130 FKey Plan:Notes:Grumman HallCornell UniversityIthaca, NY 14850Richard McElhiney Architects LLCApril 2, 2020Issue for BidApril 2, 2020Scale:31 Knight StreetNorwalk, CT 06851203-866-5538 T203-866-5243 FAltieri Sebor Wieber LLC303 South Broadway, Suite G20Tarrytown, NY 10591914-333-1110 T914-333-1109 FJacobs Consultancy4588 South Park AvenueBlasdell, NY 14219716-823-0006 TTrophy PointAREA OF WORK4592 Jordan RoadSkaneateles Falls, NY 13153315-685-4732 TRyan Biggs Clark Davis Engineering & SurveyingFirst and Second Floor Renovation Phase 11/4" = 1'-0"Basement Floor Construction PlanA-1011/4" = 1'-0"1CONSTRUCTION BASEMENT FLOOR PLAN
REF.GLASS MARKERBOARD.NEW INTERIOR WINDOW.NEW STAINLESS STEEL CORNER GUARD.EXISTING FLOOR DRAIN TO REMAIN.(SEE PLUMBING PLANS)EXISTING DRAIN PIPE TO REMAIN.NEW 2'x3' FIRE RATED ACCESS PANEL.REINSTALL REPAINTED RADIATOR COVERS.WALL-MOUNTED COAT HOOK RACK, STAINLESS STEEL TYPE 304, MIN. 6 HOOKS PER RACK (BASIS OF DESIGN WEBI)NEW UNDERCABINET REFRIGERATOR. (BY OWNER)NEW MICROWAVE. (BY OWNER)NEW ROOM SIGNAGE.NEW FLAMMABLE STORAGE CABINET.NEW CORROSIVE STORAGE CABINET.NEW CAULK AT WINDOW SILL TO MATCH ADJACENT.11121314151617181920CONSTRUCTION KEYNOTES:NEW BASE CABINETS AND COUNTERTOP. (CASEWORK FURNISHED BY OWNER AND INSTALLED BY CONTRACTOR.)NEW WALL SHELVES.NEW SINK. (SINK & FAUCET FURNISHED BY OWNER AS PART OF CASEWORK)NEW FUME HOOD. (FUME HOOD FURNISHED BY OWNER AND INSTALLED BY CONTRACTOR)INFILL EXISTING OPENING IN CONCRETE SLAB WITH NEW CONCRETE. (SEE STRUCTURAL DRAWINGS)NEW SAFETY SHOWER WITH EYEWASH.NEW GLASS PARTITION SYSTEM.NEW FINISH FLOOR (SEE FINISH SCHEDULE).NEW MANUAL DUAL ROLLER WINDOW SHADES WITH FASCIA (TYP.)NEW DEIONIZED WATER POLYETHYLENE STORAGE TANK (SEE MECHANICAL PLANS)123456789102122232400112233445566778899AABBDDCCEEFF16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"12' - 0"9' - 0"27' - 0"1' - 9"100TD87100TC93OPEN TO BELOW1' - 9"1' - 7"1' - 6"SHAFT10048551181 LAB I597182 SADAF'SLAB754184 STUDENTSPACE56318710118999191151193257188A439188495A-3011243A-3021243A-3031243A-30412432' - 0"9' - 6"8' - 0"182A PRINTROOM761234A0B2A0B2B2A01821182A1184118811811A0A0A0A0A0A0A01234566A0132A0OPEN TO BELOW88888172900100CA199996100UA1B2A0A0A011111112100CACOMMONAREA44211111313131313182A11841184218436' - 4"6' - 4"141415151' - 0"100UA6131313133' - 0"3' - 0"3' - 0"3' - 0"3' - 0"3' - 0"3' - 0"2' - 9"1310A-5019A-50111A-50110A-5019A-50111A-50110A-5016' - 0"3' - 0"3' - 0"ALIGNALIGN4"ALIGN4"ALIGN5' - 9 1/2"1616NOTE:SEE A-142 FOR FURNITURE AND EQUIPMENT LAYOUT.17171717131313EXISTING FUME HOOD1819208A-5012121212121212121212112"18"60" MIN.48" MIN.ADA CLEARANCE (SHOWN DASHED)ADA CLEARANCE (SHOWN DASHED)1007174100662223222324135' - 6"EXISTING DOOR AND FRAME TO REMAINNEW DOOR AND FRAMENEW WALL WITH REQUIRED 2-HOUR FIRE RATINGEXISTING WALL CONSTRUCTION TO REMAINGENERAL SYMBOL KEYOUTSIDE SCOPE OF WORK, UNLESS OTHERWISE NOTEDINDICATES CASEWORK OR MILLWORKXXNEW WALL WITH NO REQUIRED FIRE RATINGRevisions:347 West 36 Street Suite 1501New York, NY 10018212-245-5195 T212-239-7130 FKey Plan:Notes:Grumman HallCornell UniversityIthaca, NY 14850Richard McElhiney Architects LLCApril 2, 2020Issue for Bid April 2, 2020Scale:31 Knight StreetNorwalk, CT 06851203-866-5538 T203-866-5243 FAltieri Sebor Wieber LLC303 South Broadway, Suite G20Tarrytown, NY 10591914-333-1110 T914-333-1109 FJacobs Consultancy4588 South Park AvenueBlasdell, NY 14219716-823-0006 TTrophy PointAREA OF WORK4592 Jordan RoadSkaneateles Falls, NY 13153315-685-4732 TRyan Biggs Clark Davis Engineering & SurveyingFirst and Second Floor Renovation Phase 11/4" = 1'-0"First Floor Construction PlanA-1021/4" = 1'-0"1CONSTRUCTION FIRST FLOOR PLAN
REF.00112233445566778899AABBDDCCEEFF16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"12' - 0"9' - 0"27' - 0"294452290437288729286387286A51282A136282896281511200C8291' - 9"1' - 9"1' - 7"1' - 6"283113200T15820023177OTBROOF289 STUDENTWORKSTATIONS480A-30512348A02891999ALIGN17171718192012"18"60" MIN.48" MIN.ADA CLEARANCE (SHOWN DASHED)ADA CLEARANCE (SHOWN DASHED)20045200642007174GLASS MARKERBOARD.NEW INTERIOR WINDOW.NEW STAINLESS STEEL CORNER GUARD.EXISTING FLOOR DRAIN TO REMAIN.(SEE PLUMBING PLANS)EXISTING DRAIN PIPE TO REMAIN.NEW 2'x3' FIRE RATED ACCESS PANEL.REINSTALL REPAINTED RADIATOR COVERS.WALL-MOUNTED COAT HOOK RACK, STAINLESS STEEL TYPE 304, MIN. 6 HOOKS PER RACK (BASIS OF DESIGN WEBI)NEW UNDERCABINET REFRIGERATOR. (BY OWNER)NEW MICROWAVE. (BY OWNER)NEW ROOM SIGNAGE.NEW FLAMMABLE STORAGE CABINET.NEW CORROSIVE STORAGE CABINET.NEW CAULK AT WINDOW SILL TO MATCH ADJACENT.11121314151617181920CONSTRUCTION KEYNOTES:NEW BASE CABINETS AND COUNTERTOP. (CASEWORK FURNISHED BY OWNER AND INSTALLED BY CONTRACTOR.)NEW WALL SHELVES.NEW SINK. (SINK & FAUCET FURNISHED BY OWNER AS PART OF CASEWORK)NEW FUME HOOD. (FUME HOOD FURNISHED BY OWNER AND INSTALLED BY CONTRACTOR)INFILL EXISTING OPENING IN CONCRETE SLAB WITH NEW CONCRETE. (SEE STRUCTURAL DRAWINGS)NEW SAFETY SHOWER WITH EYEWASH.NEW GLASS PARTITION SYSTEM.NEW FINISH FLOOR (SEE FINISH SCHEDULE).NEW MANUAL DUAL ROLLER WINDOW SHADES WITH FASCIA (TYP.)NEW DEIONIZED WATER POLYETHYLENE STORAGE TANK (SEE MECHANICAL PLANS)1234567891021222324EXISTING DOOR AND FRAME TO REMAINNEW DOOR AND FRAMENEW WALL WITH REQUIRED 2-HOUR FIRE RATINGEXISTING WALL CONSTRUCTION TO REMAINGENERAL SYMBOL KEYOUTSIDE SCOPE OF WORK, UNLESS OTHERWISE NOTEDINDICATES CASEWORK OR MILLWORKXXNEW WALL WITH NO REQUIRED FIRE RATINGRevisions:347 West 36 Street Suite 1501New York, NY 10018212-245-5195 T212-239-7130 FKey Plan:Notes:Grumman HallCornell UniversityIthaca, NY 14850Richard McElhiney Architects LLCApril 2, 2020Issue for Bid April 2, 2020Scale:31 Knight StreetNorwalk, CT 06851203-866-5538 T203-866-5243 FAltieri Sebor Wieber LLC303 South Broadway, Suite G20Tarrytown, NY 10591914-333-1110 T914-333-1109 FJacobs Consultancy4588 South Park AvenueBlasdell, NY 14219716-823-0006 TTrophy PointAREA OF WORK4592 Jordan RoadSkaneateles Falls, NY 13153315-685-4732 TRyan Biggs Clark Davis Engineering & SurveyingFirst and Second Floor Renovation Phase 11/4" = 1'-0"Second Floor Construction PlanA-1031/4" = 1'-0"1CONSTRUCTION SECOND FLOOR PLAN
00112233445566778899AABBDDCCEEFF16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"12' - 0"9' - 0"27' - 0"OPEN TO ABOVEOPEN TO ABOVEOPEN TO ABOVE1B882774B841111B81902B84A85B8687B00TC176B88A98B76323B006642B0044902B0071B0089483REFLECTED CEILING PLAN KEYNOTES:INFILL EXISTING OPENING IN CONCRETE SLAB WITH NEW CONCRETE. (SEE STRUCTURAL DRAWINGS)UNDER CABINET LIGHTING.PROVIDE NON-UV LIGHT FIXTURES.NEW 2'x2' A.C.T. CEILING.PAINT EXISTING CEILING SLAB AND ALL CEILING MOUNTED PIPES AND DUCTWORK. (TYPICAL)ACOUSTICAL PANELS ATTACHED TO CEILING.METHANE GAS, COMPRESSED AIR, AND GAS TANK DROPS TO TABLE. (SEE PLUMBING DRAWINGS)CONNECTION FOR FUME HOOD EXTRACTOR ARM OR HOOD EXHAUST.GENERAL NOTE:1. EXISTING AND/OR NEW MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE PROTECTION ELEMENTS ARE SHOWN FOR COORDINATION ONLY. REFER TO MEP & FP DRAWINGS FOR SCOPE OF WORK.12345678EXISTING DOOR AND FRAME TO REMAINNEW DOOR AND FRAMENEW WALL WITH REQUIRED 2-HOUR FIRE RATINGEXISTING WALL CONSTRUCTION TO REMAINGENERAL SYMBOL KEYOUTSIDE SCOPE OF WORK, UNLESS OTHERWISE NOTEDINDICATES CASEWORK OR MILLWORKXXNEW WALL WITH NO REQUIRED FIRE RATINGREFLECTED CEILING PLAN LINEWORK LEGEND:GENERAL EXHAUST DUCTWORKLAB EXHAUST DUCTWORKSUPPLY AIR DUCTWORKRETURN AIR DUCTWORKFIRE PROTECTION PIPINGMETHANE GAS PIPINGKRYPTON GAS PIPINGHOT WATER PIPINGCOLD WATER PIPINGSANITARY WASTE PIPINGSANITARY VENT PIPINGCOMPRESSED AIR PIPINGACID WASTE PIPINGGENERAL NOTE:1. EXISTING AND/OR NEW MECHANICAL, ELECTRICAL, PLUMBING AND FIRE PROTECTION ELEMENTS ARE SHOWN FOR COORDINATION ONLY. REFER TO MEP & FP DRAWINGS FOR SCOPE OF WORK.Revisions:347 West 36 Street Suite 1501New York, NY 10018212-245-5195 T212-239-7130 FKey Plan:Notes:Grumman HallCornell UniversityIthaca, NY 14850Richard McElhiney Architects LLCApril 2, 2020Issue for Bid April 2, 2020Scale:31 Knight StreetNorwalk, CT 06851203-866-5538 T203-866-5243 FAltieri Sebor Wieber LLC303 South Broadway, Suite G20Tarrytown, NY 10591914-333-1110 T914-333-1109 FJacobs Consultancy4588 South Park AvenueBlasdell, NY 14219716-823-0006 TTrophy PointAREA OF WORK4592 Jordan RoadSkaneateles Falls, NY 13153315-685-4732 TRyan Biggs Clark Davis Engineering & SurveyingFirst and Second Floor Renovation Phase 11/4" = 1'-0"Basement Floor Reflected CeilingPlanA-1111/4" = 1'-0"1CONSTRUCTION BASEMENT FLOOR REFLECTED CEILING PLAN
FSSVSSSSLOCLOCLOCPCFSFSFSFSFSPAPAPASLOCCOCOFSLCRLCRLCRLCRPAMMTHTTTTTT00112233445566778899AABBDDCCEEFF182 SADAF'SLAB754181 LAB I597184 STUDENTSPACE563188495188A43919325719115118999187101100TD87100TC93SHAFT182A PRINTROOM7616' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"12' - 0"9' - 0"27' - 0"17290010048551AA2232D?DDDDDDDD445555555566TYP. TYP.6TYP.6TYP.6TYP.6TYP.888878100CACOMMONAREA442CCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCBBBEEEEEEEEEEEEE8787874100UA6+ 8' - 0"+ 8' - 0"8' - 0"4' - 0"4' - 0"8' - 0"8' - 0"4' - 0"4' - 0"8' - 0"8' - 0"4' - 0"4' - 0"8' - 0"+ 10' - 6"+ 11' - 10"+ 10' - 6"+ 11' - 10"+ 10' - 6"+ 11' - 10"+ 11' - 10"+ 11' - 10"+ 10' - 6"+ 11' - 10"EQEQEQEQ100717410066REFLECTED CEILING PLAN KEYNOTES:INFILL EXISTING OPENING IN CONCRETE SLAB WITH NEW CONCRETE. (SEE STRUCTURAL DRAWINGS)UNDER CABINET LIGHTING.PROVIDE NON-UV LIGHT FIXTURES.NEW 2'x2' A.C.T. CEILING.PAINT EXISTING CEILING SLAB AND ALL CEILING MOUNTED PIPES AND DUCTWORK. (TYPICAL)ACOUSTICAL PANELS ATTACHED TO CEILING.METHANE GAS, COMPRESSED AIR, AND GAS TANK DROPS TO TABLE. (SEE PLUMBING DRAWINGS)CONNECTION FOR FUME HOOD EXTRACTOR ARM OR HOOD EXHAUST.GENERAL NOTE:1. EXISTING AND/OR NEW MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE PROTECTION ELEMENTS ARE SHOWN FOR COORDINATION ONLY. REFER TO MEP & FP DRAWINGS FOR SCOPE OF WORK.12345678REFLECTED CEILING PLAN LEGEND:HVAC SUPPLY DIFFUSERHVAC RETURN GRILLESUSPENDED DOWNLIGHT FIXTURELINEAR DOWNLIGHT FIXTURESUSPENDED LINEAR LIGHT FIXTUREUNDER CABINET LIGHT FIXTURERECESSED LINEAR LIGHT FIXTURECEILING-MOUNTED OCCUPANCY SENSORCEILING-MOUNTED PHOTO SENSORMOTOR LOCATIONEXHAUST INLETSINGLE POLE SWITCH - 48" AFF U.O.N.DIMMER (SWITCH) OR CONTROL - 48" AFF U.O.N.CEILING MOUNTED CORD REELCARBON MONOXIDE DETECTORABCDEOCPSSSDEXISTING DOOR AND FRAME TO REMAINNEW DOOR AND FRAMENEW WALL WITH REQUIRED 2-HOUR FIRE RATINGEXISTING WALL CONSTRUCTION TO REMAINGENERAL SYMBOL KEYOUTSIDE SCOPE OF WORK, UNLESS OTHERWISE NOTEDINDICATES CASEWORK OR MILLWORKXXNEW WALL WITH NO REQUIRED FIRE RATINGREFLECTED CEILING PLAN LINEWORK LEGEND:GENERAL EXHAUST DUCTWORKLAB EXHAUST DUCTWORKSUPPLY AIR DUCTWORKRETURN AIR DUCTWORKFIRE PROTECTION PIPINGMETHANE GAS PIPINGKRYPTON GAS PIPINGHOT WATER PIPINGCOLD WATER PIPINGSANITARY WASTE PIPINGSANITARY VENT PIPINGCOMPRESSED AIR PIPINGACID WASTE PIPINGGENERAL NOTE:1. EXISTING AND/OR NEW MECHANICAL, ELECTRICAL, PLUMBING AND FIRE PROTECTION ELEMENTS ARE SHOWN FOR COORDINATION ONLY. REFER TO MEP & FP DRAWINGS FOR SCOPE OF WORK.Revisions:347 West 36 Street Suite 1501New York, NY 10018212-245-5195 T212-239-7130 FKey Plan:Notes:Grumman HallCornell UniversityIthaca, NY 14850Richard McElhiney Architects LLCApril 2, 2020Issue for Bid April 2, 2020Scale:31 Knight StreetNorwalk, CT 06851203-866-5538 T203-866-5243 FAltieri Sebor Wieber LLC303 South Broadway, Suite G20Tarrytown, NY 10591914-333-1110 T914-333-1109 FJacobs Consultancy4588 South Park AvenueBlasdell, NY 14219716-823-0006 TTrophy PointAREA OF WORK4592 Jordan RoadSkaneateles Falls, NY 13153315-685-4732 TRyan Biggs Clark Davis Engineering & SurveyingFirst and Second Floor Renovation Phase 11/4" = 1'-0"First Floor Reflected Ceiling PlanA-1121/4" = 1'-0"1FIRST FLOOR REFLECTED CEILING PLAN
LOCSKDLOCFPCPALCRT00112233445566778899AABBDDCCEEFFROOF289 STUDENTWORKSTATIONS48028289628151120023177OTBROOF16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"12' - 0"9' - 0"27' - 0"5655283113200T158282A136286A51286387288729290437294452200C829TYP.6TYP.CCCCCCCCCC+ 10' - 5"+ 9' - 2"+ 10' - 5"+ 9' - 2"+ 10' - 5"20064200452007174REFLECTED CEILING PLAN KEYNOTES:INFILL EXISTING OPENING IN CONCRETE SLAB WITH NEW CONCRETE. (SEE STRUCTURAL DRAWINGS)UNDER CABINET LIGHTING.PROVIDE NON-UV LIGHT FIXTURES.NEW 2'x2' A.C.T. CEILING.PAINT EXISTING CEILING SLAB AND ALL CEILING MOUNTED PIPES AND DUCTWORK. (TYPICAL)ACOUSTICAL PANELS ATTACHED TO CEILING.METHANE GAS, COMPRESSED AIR, AND GAS TANK DROPS TO TABLE. (SEE PLUMBING DRAWINGS)CONNECTION FOR FUME HOOD EXTRACTOR ARM OR HOOD EXHAUST.GENERAL NOTE:1. EXISTING AND/OR NEW MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE PROTECTION ELEMENTS ARE SHOWN FOR COORDINATION ONLY. REFER TO MEP & FP DRAWINGS FOR SCOPE OF WORK.12345678REFLECTED CEILING PLAN LEGEND:HVAC SUPPLY DIFFUSERHVAC RETURN GRILLESUSPENDED DOWNLIGHT FIXTURELINEAR DOWNLIGHT FIXTURESUSPENDED LINEAR LIGHT FIXTUREUNDER CABINET LIGHT FIXTURERECESSED LINEAR LIGHT FIXTURECEILING-MOUNTED OCCUPANCY SENSORCEILING-MOUNTED PHOTO SENSORMOTOR LOCATIONEXHAUST INLETSINGLE POLE SWITCH - 48" AFF U.O.N.DIMMER (SWITCH) OR CONTROL - 48" AFF U.O.N.CEILING MOUNTED CORD REELCARBON MONOXIDE DETECTORABCDEOCPSSSDEXISTING DOOR AND FRAME TO REMAINNEW DOOR AND FRAMENEW WALL WITH REQUIRED 2-HOUR FIRE RATINGEXISTING WALL CONSTRUCTION TO REMAINGENERAL SYMBOL KEYOUTSIDE SCOPE OF WORK, UNLESS OTHERWISE NOTEDINDICATES CASEWORK OR MILLWORKXXNEW WALL WITH NO REQUIRED FIRE RATINGREFLECTED CEILING PLAN LINEWORK LEGEND:GENERAL EXHAUST DUCTWORKLAB EXHAUST DUCTWORKSUPPLY AIR DUCTWORKRETURN AIR DUCTWORKFIRE PROTECTION PIPINGMETHANE GAS PIPINGKRYPTON GAS PIPINGHOT WATER PIPINGCOLD WATER PIPINGSANITARY WASTE PIPINGSANITARY VENT PIPINGCOMPRESSED AIR PIPINGACID WASTE PIPINGGENERAL NOTE:1. EXISTING AND/OR NEW MECHANICAL, ELECTRICAL, PLUMBING AND FIRE PROTECTION ELEMENTS ARE SHOWN FOR COORDINATION ONLY. REFER TO MEP & FP DRAWINGS FOR SCOPE OF WORK.Revisions:347 West 36 Street Suite 1501New York, NY 10018212-245-5195 T212-239-7130 FKey Plan:Notes:Grumman HallCornell UniversityIthaca, NY 14850Richard McElhiney Architects LLCApril 2, 2020Issue for Bid April 2, 2020Scale:31 Knight StreetNorwalk, CT 06851203-866-5538 T203-866-5243 FAltieri Sebor Wieber LLC303 South Broadway, Suite G20Tarrytown, NY 10591914-333-1110 T914-333-1109 FJacobs Consultancy4588 South Park AvenueBlasdell, NY 14219716-823-0006 TTrophy PointAREA OF WORK4592 Jordan RoadSkaneateles Falls, NY 13153315-685-4732 TRyan Biggs Clark Davis Engineering & SurveyingFirst and Second Floor Renovation Phase 11/4" = 1'-0"Second Floor Reflected CeilingPlanA-1131/4" = 1'-0"1SECOND FLOOR REFLECTED CEILING PLAN
PFPF PFREF.REF.00112233445566778899AABBDDCCEEFF16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"12' - 0"9' - 0"27' - 0"1' - 9"100TD87100TC93OPEN TO BELOW1' - 9"1' - 7"1' - 6"SHAFT100717410048181 LAB I597182 SADAF'SLAB754184 STUDENTSPACE56318710118999191151193257188A439188495RES-1RES-1RES-1OPEN TO BELOWCPT-1RES-1100CACOMMONAREA442182A PRINTROOM76RES-2RES-21006600112233445566778899AABBDDCCEEFF16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"12' - 0"9' - 0"27' - 0"294452290437288729286387286A51282A136282896281511200C8291' - 9"1' - 9"1' - 7"1' - 6"283113200T15820023OTB20071ROOF289 STUDENTWORKSTATIONS480CPT-1CHEMICAL RESISTANT RESILIENT SHEET FLOORING AND 4" RUBBER BASELINOLEUM FLOORING AND 4" RUBBER BASECARPET FLOORING WITH 4" RUBBER BASENOTE:PROVIDE ALL REQUIRED FLOOR FINISH ACCESSORIES, INCLUDING TRANSITIONS TO EXISTING OR NEW FLOOR FINISHES OR DIFFERENT MATERIAL.FLOORING LEGEND:RES-1RES-2CPT-1Revisions:347 West 36 Street Suite 1501New York, NY 10018212-245-5195 T212-239-7130 FKey Plan:Notes:Grumman HallCornell UniversityIthaca, NY 14850Richard McElhiney Architects LLCApril 2, 2020Issue for Bid April 2, 2020Scale:31 Knight StreetNorwalk, CT 06851203-866-5538 T203-866-5243 FAltieri Sebor Wieber LLC303 South Broadway, Suite G20Tarrytown, NY 10591914-333-1110 T914-333-1109 FJacobs Consultancy4588 South Park AvenueBlasdell, NY 14219716-823-0006 TTrophy PointAREA OF WORK4592 Jordan RoadSkaneateles Falls, NY 13153315-685-4732 TRyan Biggs Clark Davis Engineering & SurveyingFirst and Second Floor Renovation Phase 1As indicatedFirst and Second Floor FinishPlansA-1211/8" = 1'-0"2FIRST FLOOR FINISH PLAN1/8" = 1'-0"1SECOND FLOOR FINISH PLAN
REF.4S44SVSKDSSSS4JJJSJSLOCK44444TCPJVAVJ-HCHC-LCRLCRLCRMMMMMLCRLCRMMJJ00112233445566778899AABBDDCCEEFF16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"12' - 0"9' - 0"27' - 0"1' - 9"EX. PIPES100TD87100TC93OPEN TO BELOW1' - 9"1' - 7"1' - 6"SHAFT100717410048FHFHFHFHFH181 LAB I597182 SADAF'SLAB754184 STUDENTSPACE56318710118999191151193257188A439188495OPEN TO BELOW121971718112293620201012142326N.I.C.N.I.C.NOTE:DESKS & CHAIRS SHALL BE PROVIDED AND INSTALLED BY OWNER. WIRING OF WORKSTATIONS SHALL BE DONE BY CONTRACTOR.100CACOMMONAREA442182A PRINTROOM7615156A-502113211625EXISTING FUME HOOD27ACACACACACAC12"18"60" MIN.48" MIN.ADA CLEARANCE (SHOWN DASHED)ADA CLEARANCE (SHOWN DASHED)10066N.I.C.N.I.C.N.I.C.N.I.C.N.I.C.N.I.C.N.I.C.N.I.C.RM. ITEM # EQUIPMENT NAME QUANTITY PRODUCT MANUFACTURER / MODEL NEW - FURNISHED NEW - FURNISHED EXISTING INSTALLED BYBY OWNER BY CONTRACTOR REUSED CONTRACTOR1 DEBIND & SINTERING COMBINED FURNACE 1 ADMATEC Y N2 CERAMIC PRINTER 1 ADMATEC - ADMAFLEX 130 Y N3 THERMAL PROPERTY ANALYZER 1 C-THERM - TRIDENT Y N4 PORTABLE DENSITY/SPECIFIC GRAVITY METER 1 ANTON PAAR - DMA 35 Y N5NOT USED -- ----6 FUME EXTRACTOR ARM & CEILING BRACKET 2/4 MOVEX - ME100 Y Y7 3D PRINTER 1 FORMLABS - FORM 2 PRINTER Y N8 POROUS FOAMS 1 ULTRAMET, LITHOZ Y N9 GC / MS 1 THERMO ELECTRON CORPORATIONDSQ II MASS SPECTROMETER &YNK27300000000080 GAS CHROMATOGRAPH10 VACUUM PUMP 1 T.B.D. (FUTURE)YN11 FUME HOOD 1 LABCONCO - 5' Y Y12 FIXED LAB BENCH WITH CABINETS & SINK 1 MOTT Y Y13 GAS CYLINDER CABINET 1 AIRGAS LAB 1000 SERIES (SEE PLUMB. DRAWINGS) Y Y14 SAFETY SHOWER AND EYEWASH 1 BRADLEYYY15 SUSPENDED UTILITY SHELF 2 MOTT Y Y16 CANOPY HOOD 1 SEE MECHANICAL DRAWINGS Y Y17 OPTICAL TABLE 1 NEWPORT RS 2000YN18 OPTICAL TABLE 1 T.B.D. (EXISTING)YN19 LAB BENCH (2' x 6') 1 MOTT Y Y20 LAB BENCH (3' x 5') 2 MOTT Y Y21 CYLINDER RACK AND VALVE 1 UNISTRUT CORP Y Y22 FUME HOOD 1 LABCONCO - 5' Y Y23 FIXED LAB BENCH WITH CABINETS & SINK 1 MOTT Y Y24 LAB BENCH 4 MOTT Y Y25 SAFETY SHOWER & EYEWASH 1 BRADLEYYY26 SAFETY SHOWER & EYEWASH 1 BRADLEYYY27 GAS CYLINDER CABINET 1 AIRGAS LAB 1000 SERIES (SEE PLUMB. DRAWINGS) Y YSADAF'S LABLAB IEQUIPMENT SCHEDULE188POWER & COMMUNICATIONS SYMBOLS LEGEND:AUTOMATIC DOOR CONTROLSINGLE CONVENIENCE RECEPTACLE - 16" AFF U.O.N.DUPLEX CONVENIENCE RECEPTACLE - 16" AFF U.O.N.DOUBLE DUPLEX CONVENIENCE RECEPTACLE - 16" AFF U.O.N.GROUND FAULT INTERRUPTING RECEPTACLE - 16" AFF U.O.N.SPECIAL OUTLET CONFIGURATION - SEE NEMA #CEILING MOUNTED CORD REELCOMMUNICATIONS OUTLET (# = # OF CABLE DROPS) - 16" AFF U.O.N.FLOOR BOX WITH DUPLEX RECEPTACLE.NOTE: SEE ELECTRICAL DRAWINGS FOR COORDINATION.#ACRevisions:347 West 36 Street Suite 1501New York, NY 10018212-245-5195 T212-239-7130 FKey Plan:Notes:Grumman HallCornell UniversityIthaca, NY 14850Richard McElhiney Architects LLCApril 2, 2020Issue for Bid April 2, 2020Scale:31 Knight StreetNorwalk, CT 06851203-866-5538 T203-866-5243 FAltieri Sebor Wieber LLC303 South Broadway, Suite G20Tarrytown, NY 10591914-333-1110 T914-333-1109 FJacobs Consultancy4588 South Park AvenueBlasdell, NY 14219716-823-0006 TTrophy PointAREA OF WORK4592 Jordan RoadSkaneateles Falls, NY 13153315-685-4732 TRyan Biggs Clark Davis Engineering & SurveyingFirst and Second Floor Renovation Phase 11/4" = 1'-0"First Floor Furniture & EquipmentPlanA-1421/4" = 1'-0"1FIRST FLOOR FURNITURE & EQUIPMENT PLAN
REF.4JSKDF--SMSMJJ66LCRMT00112233445566778899AABBDDCCEEFF16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"16' - 0"12' - 0"9' - 0"27' - 0"294452290437288729286387286A51282A136282896281511200C8291' - 9"1' - 9"1' - 7"1' - 6"283113200T15820023177OTB2007174ROOF289 STUDENTWORKSTATIONS480NOTE:DESKS & CHAIRS SHALL BE PROVIDED AND INSTALLED BY OWNER. WIRING OF WORKSTATIONS SHALL BE DONE BY CONTRACTOR.N.I.C.N.I.C.N.I.C.N.I.C.N.I.C.N.I.C.N.I.C.N.I.C.AC12"18"60" MIN.48" MIN.ADA CLEARANCE (SHOWN DASHED)ADA CLEARANCE (SHOWN DASHED)POWER & COMMUNICATIONS SYMBOLS LEGEND:AUTOMATIC DOOR CONTROLSINGLE CONVENIENCE RECEPTACLE - 16" AFF U.O.N.DUPLEX CONVENIENCE RECEPTACLE - 16" AFF U.O.N.DOUBLE DUPLEX CONVENIENCE RECEPTACLE - 16" AFF U.O.N.GROUND FAULT INTERRUPTING RECEPTACLE - 16" AFF U.O.N.SPECIAL OUTLET CONFIGURATION - SEE NEMA #CEILING MOUNTED CORD REELCOMMUNICATIONS OUTLET (# = # OF CABLE DROPS) - 16" AFF U.O.N.FLOOR BOX WITH DUPLEX RECEPTACLE.NOTE: SEE ELECTRICAL DRAWINGS FOR COORDINATION.#ACRevisions:347 West 36 Street Suite 1501New York, NY 10018212-245-5195 T212-239-7130 FKey Plan:Notes:Grumman HallCornell UniversityIthaca, NY 14850Richard McElhiney Architects LLCApril 2, 2020Issue for Bid April 2, 2020Scale:31 Knight StreetNorwalk, CT 06851203-866-5538 T203-866-5243 FAltieri Sebor Wieber LLC303 South Broadway, Suite G20Tarrytown, NY 10591914-333-1110 T914-333-1109 FJacobs Consultancy4588 South Park AvenueBlasdell, NY 14219716-823-0006 TTrophy PointAREA OF WORK4592 Jordan RoadSkaneateles Falls, NY 13153315-685-4732 TRyan Biggs Clark Davis Engineering & SurveyingFirst and Second Floor Renovation Phase 11/4" = 1'-0"Second Floor Furniture &Equipment PlanA-1431/4" = 1'-0"1SECOND FLOOR FURNITURE & EQUIPMENT PLAN
SAFETY SHOWER WITH EYEWASHSUSPENDED LIGHT FIXTURE(SEE REFLECTED CEILING PLAN)AUTOMATIC SLIDING GLASS DOOR (SEE DOOR SCHEDULE)UNDER CABINET LIGHTINGUTILITY CHASEFIXED BASE CABINETADJUSTABLE OPEN WALL SHELVINGDEBIND AND SINTERING COMBINED FURNACEEXISTING DRAIN PIPENEW DOOR (SEE DOOR SCHEDULE)MECHANICAL EXHAUST DUCT (SEE MECHANICAL PLANS)48" MAX.82" - 96" CLEAR36" MAX.GLASS MARKERBOARDSUSPENDED LIGHT FIXTURE(SEE REFLECTED CEILING PLAN)ACOUSTICAL PANEL ATTACHED TO CEILINGACOUSTICAL PANEL ATTACHED TO CEILINGBASE (SEE FINISH SCHEDULE)4' - 0"3' - 0"182A1DOOR PUSH BUTTON2'x3' FIRE RATED ACCESS PANELSTAINLESS STEEL CORNER GUARDSTAINLESS STEEL CORNER GUARDPROVIDE UV LIGHT BLOCKING GLASS FILMSTAINLESS STEEL CORNER GUARDGLASS MARKING DECALS2' - 6"1' - 8"2' - 10"11' - 10" V.I.F.2' - 6"5' - 0"3' - 0"NEW DOOR (SEE DOOR SCHEDULE)SUSPENDED LIGHT FIXTURE(SEE REFLECTED CEILING PLAN)STAINLESS STEEL CORNER GUARDMANUAL DUAL ROLLER WINDOW SHADES WITH FASCIA (TYP.)6' - 0"2' - 0"GAS CYLINDER CABINET EXHAUST (SEE MECHANICAL PLANS)BASE (SEE FINISH SCHEDULE)18211841GAS CYLINDER CABINET W/ TOXIC GAS DETECTION SYSTEMELECTRICAL WIREMOLD(SEE ELECTRICAL PLANS)STAINLESS STEEL CORNER GUARD11' - 10" V.I.F.REMOVE RADIATOR COVERS. CLEAN RADIATOR, STRAIGHTEN FINS, REPAINT COVERS & REINSTALL2' - 10"FUME HOOD EXHAUST DUCT (SEE MECHANICAL PLANS)SUSPENDED LIGHT FIXTURE(SEE REFLECTED CEILING PLAN)FUME HOODBASE CABINETS ON LOCKING CASTORSACOUSTICAL PANEL ATTACHED TO CEILINGREMOVE EXISTING CONSTRUCTION IN WINDOW AND RESOTRE OPERABLE WINDOW FUNCTION (TYP.)REMOVE EXISTING CONSTRUCTION IN WINDOW AND RESOTRE OPERABLE WINDOW FUNCTION (TYP.)MANUAL DUAL ROLLER WINDOW SHADES WITH FASCIA (TYP.)SUSPENDED UTILITY SHELF ATTACHED TO CEILINGACOUSTICAL PANEL ATTACHED TO CEILINGMANUAL DUAL ROLLER WINDOW SHADES WITH FASCIA (TYP.)PROVIDE METAL COVERS FOR RADIATOR CONTROL VALVES (TYP.)FUME EXTRACTOR ARM SUSPENDED FROM CEILING2' - 10"1' - 8"2' - 6"11' - 10" V.I.F.REMOVE RADIATOR COVERS. CLEAN RADIATOR, STRAIGHTEN FINS, REPAINT COVERS & REINSTALL2' - 10"3' - 0"2' - 6"FUME HOODBASE CABINETS ON LOCKING CASTORSFIXED BASE CABINETSADJUSTABLE OPEN WALL SHELVINGSINKADA SINK BASE CABINETWINDOW TO PRINT ROOMFUME HOOD EXHAUST DUCT (SEE MECHANICAL PLANS)SUSPENDED LIGHT FIXTURE(SEE REFLECTED CEILING PLAN)MANUAL DUAL ROLLER WINDOW SHADES WITH FASCIA (TYP.)ACOUSTICAL PANEL ATTACHED TO CEILINGOPEN10A-5019A-50111A-501ADA PULL-IN BASE CABINETBASE (SEE FINISH SCHEDULE)CABINET DOORS TO SWING OUT AND SLIDE IN TO UNDERSIDE OF COUNTERTOP182A1ELECTRICAL WIREMOLD (SEE ELECTRICAL PLANS)(2) LOCKABLE DRAWERSPROVIDE UV LIGHT BLOCKING GLASS FILM2' - 6"1' - 8"2' - 10"11' - 10" V.I.F.3' - 0"3' - 0"3' - 0"3' - 0"3' - 0"4' - 0"6' - 0"FLAMMABLE STORAGE CABINETCORROSIVE STORAGE CABINETRevisions:347 West 36 Street Suite 1501New York, NY 10018212-245-5195 T212-239-7130 FKey Plan:Notes:Grumman HallCornell UniversityIthaca, NY 14850Richard McElhiney Architects LLCApril 2, 2020Issue for Bid April 2, 2020Scale:31 Knight StreetNorwalk, CT 06851203-866-5538 T203-866-5243 FAltieri Sebor Wieber LLC303 South Broadway, Suite G20Tarrytown, NY 10591914-333-1110 T914-333-1109 FJacobs Consultancy4588 South Park AvenueBlasdell, NY 14219716-823-0006 TTrophy PointAREA OF WORK4592 Jordan RoadSkaneateles Falls, NY 13153315-685-4732 TRyan Biggs Clark Davis Engineering & SurveyingFirst and Second Floor Renovation Phase 11/2" = 1'-0"Interior Elevations -Lab 182A-3011/2" = 1'-0"1SADAF'S LAB - NORTH ELEVATION1/2" = 1'-0"2SADAF'S LAB - EAST ELEVATION1/2" = 1'-0"4SADAF'S LAB - SOUTH ELEVATION1/2" = 1'-0"3SADAF'S LAB - WEST ELEVATION
FUME HOOD EXHAUST DUCT (SEE MECHANICAL PLANS)SUSPENDED LIGHT FIXTURE(SEE REFLECTED CEILING PLAN)ACOUSTICAL PANEL ATTACHED TO CEILINGACOUSTICAL PANEL ATTACHED TO CEILINGBASE (SEE FINISH SCHEDULE)STAINLESS STEEL CORNER GUARD11' - 10" V.I.F.36" MAX.82"-96" CLEAR48" MAX.SAFETY SHOWER WITH EYEWASHNEW DOOR (SEE DOOR SCHEDULE)SUSPENDED LIGHT FIXTURE(SEE REFLECTED CEILING PLAN)ACOUSTICAL PANEL ATTACHED TO CEILINGBASE (SEE FINISH SCHEDULE)1811ELECTRICAL WIREMOLD(SEE ELECTRICAL PLANS)11' - 10" V.I.F.UNDER CABINET LIGHTINGUTILITY CHASEFIXED BASE CABINETADJUSTABLE OPEN WALL SHELVINGNEW DOOR (SEE DOOR SCHEDULE)SUSPENDED LIGHT FIXTURE(SEE REFLECTED CEILING PLAN)ACOUSTICAL PANEL ATTACHED TO CEILINGBASE (SEE FINISH SCHEDULE)ACOUSTICAL PANEL ATTACHED TO CEILINGSUSPENDED LIGHT FIXTURE(SEE REFLECTED CEILING PLAN)STAINLESS STEEL CORNER GUARD2'x3' FIRE RATED ACCESS PANEL1' - 8"2' - 6"11' - 10" V.I.F.3' - 0"2' - 6"FUME HOODBASE CABINETS ON LOCKING CASTORSFUME HOOD EXHAUST DUCT (SEE MECHANICAL PLANS)SUSPENDED LIGHT FIXTURE(SEE REFLECTED CEILING PLAN)10A-501OPEN9A-50111A-501FIXED BASE CABINETSADJUSTABLE OPEN WALL SHELVINGSINKADA SINK BASE CABINETADA PULL-IN BASE CABINETCABINET DOORS TO SWING OUT AND SLIDE IN TO UNDERSIDE OF COUNTERTOPELECTRICAL WIREMOLD(SEE ELECTRICAL PLANS)2' - 10"1' - 8"2' - 6"2' - 9"3' - 0"3' - 0"3' - 0"11' - 10" V.I.F.FLAMMABLE STORAGE CABINETCORROSIVE STORAGE CABINET5' - 6"Revisions:347 West 36 Street Suite 1501New York, NY 10018212-245-5195 T212-239-7130 FKey Plan:Notes:Grumman HallCornell UniversityIthaca, NY 14850Richard McElhiney Architects LLCApril 2, 2020Issue for Bid April 2, 2020Scale:31 Knight StreetNorwalk, CT 06851203-866-5538 T203-866-5243 FAltieri Sebor Wieber LLC303 South Broadway, Suite G20Tarrytown, NY 10591914-333-1110 T914-333-1109 FJacobs Consultancy4588 South Park AvenueBlasdell, NY 14219716-823-0006 TTrophy PointAREA OF WORK4592 Jordan RoadSkaneateles Falls, NY 13153315-685-4732 TRyan Biggs Clark Davis Engineering & SurveyingFirst and Second Floor Renovation Phase 11/2" = 1'-0"Interior Elevations -Lab 181A-3021/2" = 1'-0"1LAB I - NORTH ELEVATION1/2" = 1'-0"2LAB I - EAST ELEVATION1/2" = 1'-0"4LAB I - SOUTH ELEVATION1/2" = 1'-0"3LAB I - WEST ELEVATION
CEILING MOUNTED LIGHTING (SEE REFLECTED CEILING PLAN)SUSPENDED ACOUSTICAL CEILING TILEBASE (SEE FINISH SCHEDULE)GLASS MARKERBOARDS ON DOOR FACENEW DOOR (SEE DOOR SCHEDULE)SINKWALL MOUNTED LIGHTING. MATCH HEIGHT IN ADJACENT CORRIDOR.(SEE REFLECTED CEILING PLAN)NEW DOOR (SEE DOOR SCHEDULE)NEW DOOR (SEE DOOR SCHEDULE)10A-501FIXED BASE CABINETSADJUSTABLE OPEN WALL SHELVINGADA SINK BASE CABINET100CA1100UA1STAINLESS STEEL CORNER GUARDCABINET DOORS TO SWING OUT AND SLIDE IN TO UNDERSIDE OF COUNTERTOPWALL MOUNTED DOOR BUMPERUNDER CABINET REF.(BY OWNER)MICROWAVE(BY OWNER)ROOM SIGNAGE2' - 6"1' - 8"2' - 10"11' - 10" V.I.F.8' - 0"3' - 6"2' - 0"1' - 4"2' - 8"NEW DOOR (SEE DOOR SCHEDULE)NEW DOOR (SEE DOOR SCHEDULE)GLASS PARTITIONGLASS MARKERBOARDCEILING MOUNTED LIGHTING (SEE REFLECTED CEILING PLAN)SUSPENDED ACOUSTICAL CEILING TILEWALL MOUNTED LIGHTING. MATCH HEIGHT IN ADJACENT CORRIDOR(SEE REFLECTED CEILING PLAN)OPEN TO CORRIDORSTAINLESS STEEL CORNER GUARD1881BASE (SEE FINISH SCHEDULE)STAINLESS STEEL CORNER GUARDWALL MOUNTED DOOR BUMPERPROVIDE OPAQUE GLASS FILM. BASIS OF DESIGN: 97% UV OPAQUE ORANGE BY DECORATIVE FILMS.ROOM SIGNAGE3' - 0"4' - 0"11' - 10" V.I.F.8' - 0"NEW DOOR (SEE DOOR SCHEDULE)NEW DOOR (SEE DOOR SCHEDULE)INFILL EXISTING OPENING IN CONCRETE SLAB WITH NEW CONCRETE TO MATCH ADJACENT (SEE STRUCTURAL PLANS)GLASS MARKING DECALSGLASS PARTITIONCEILING MOUNTED LIGHTING (SEE REFLECTED CEILING PLAN)SUSPENDED ACOUSTICAL CEILING TILEBASE (SEE FINISH SCHEDULE)NEW DOOR (SEE DOOR SCHEDULE)18411842WALL MOUNTED DOOR BUMPERWALL MOUNTED DOOR BUMPERROOM SIGNAGEROOM SIGNAGEROOM SIGNAGELIMITS OF PATTERNED GLASS PRIVACY FILM. PATTERN TO BE SELECTED BY ARCHITECT.LIMITS OF PATTERNED GLASS PRIVACY FILM. PATTERN TO BE SELECTED BY ARCHITECT.8' - 0"11' - 10" V.I.F.UNDER CABINET LIGHTINGUTILITY CHASEADA SINK BASE CABINETADJUSTABLE OPEN WALL SHELVINGNEW DOOR (SEE DOOR SCHEDULE)NEW DOOR (SEE DOOR SCHEDULE)GLASS PARTITIONGLASS MARKERBOARDCEILING MOUNTED LIGHTING (SEE REFLECTED CEILING PLAN)SUSPENDED ACOUSTICAL CEILING TILEWALL MOUNTED LIGHTING. MATCH HEIGHT IN ADJACENT CORRIDOR.(SEE REFLECTED CEILING PLAN)STAINLESS STEEL CORNER GUARD18211811BASE (SEE FINISH SCHEDULE)STAINLESS STEEL CORNER GUARDWALL MOUNTED DOOR BUMPERWALL MOUNTED DOOR BUMPERROOM SIGNAGEROOM SIGNAGE2' - 6"1' - 8"2' - 10"3' - 0"4' - 0"11' - 10" V.I.F.8' - 0"2' - 6"Revisions:347 West 36 Street Suite 1501New York, NY 10018212-245-5195 T212-239-7130 FKey Plan:Notes:Grumman HallCornell UniversityIthaca, NY 14850Richard McElhiney Architects LLCApril 2, 2020Issue for Bid April 2, 2020Scale:31 Knight StreetNorwalk, CT 06851203-866-5538 T203-866-5243 FAltieri Sebor Wieber LLC303 South Broadway, Suite G20Tarrytown, NY 10591914-333-1110 T914-333-1109 FJacobs Consultancy4588 South Park AvenueBlasdell, NY 14219716-823-0006 TTrophy PointAREA OF WORK4592 Jordan RoadSkaneateles Falls, NY 13153315-685-4732 TRyan Biggs Clark Davis Engineering & SurveyingFirst and Second Floor Renovation Phase 11/2" = 1'-0"Interior Elevations -CommonArea 100CAA-3031/2" = 1'-0"1COMMON AREA - NORTH ELEVATION1/2" = 1'-0"2COMMON AREA - EAST ELEVATION1/2" = 1'-0"4COMMON AREA - SOUTH ELEVATION1/2" = 1'-0"3COMMON AREA - WEST ELEVATION
ACOUSTICAL PANEL ATTACHED TO CEILINGINFILL EXISTING OPENING IN CONCRETE SLAB WITH NEW CONCRETE TO MATCH ADJACENT (SEE STRUCTURAL PLANS)GLASS PARTITIONGLASS MARKING DECALSSUSPENDED LIGHT FIXTURE (SEE REFLECTED CEILING PLAN)BASE (SEE FINISH SCHEDULE)NEW DOOR (SEE DOOR SCHEDULE)1841ACOUSTICAL PANEL ATTACHED TO CEILING1842SUSPENDED LIGHT FIXTURE (SEE REFLECTED CEILING PLAN)WINDOWWINDOW4' - 6"WALL MOUNTED COAT HOOK RACK. STAINLESS STEEL TYPE 304. MIN. 6 HOOKS PER RACK (BASIS OF DESIGN WEBI)PROVIDE OPAQUE GLASS FILM. BASIS OF DESIGN: 97% UV OPAQUE ORANGE BY DECORATIVE FILMS.11' - 10" V.I.F.MANUAL DUAL ROLLER WINDOW SHADES WITH FASCIA (TYP.)ACOUSTICAL PANEL ATTACHED TO CEILINGSUSPENDED LIGHT FIXTURE (SEE REFLECTED CEILING PLAN)BASE (SEE FINISH SCHEDULE)1843WINDOWREMOVE, REPAINT & REINSTALL RADIATOR COVERS6' - 0"2' - 0"PROVIDE OPAQUE GLASS FILM. BASIS OF DESIGN: 97% UV OPAQUE ORANGE BY DECORATIVE FILMS.11' - 10" V.I.F.MANUAL DUAL ROLLER WINDOW SHADES WITH FASCIA (TYP.)MANUAL DUAL ROLLER WINDOW SHADES WITH FASCIA (TYP.)ACOUSTICAL PANEL ATTACHED TO CEILINGSUSPENDED LIGHT FIXTURE (SEE REFLECTED CEILING PLAN)PROVIDE METAL COVERS FOR RADIATOR CONTROL VALVES (TYP.)WINDOWWINDOWREMOVE RADIATOR COVERS. CLEAN RADIATOR, STRAIGHTEN FINS, REPAINT COVERS & REINSTALLPROVIDE OPAQUE GLASS FILM. BASIS OF DESIGN: 97% UV OPAQUE ORANGE BY DECORATIVE FILMS.11' - 10" V.I.F.PROVIDE METAL COVERS FOR RADIATOR CONTROL VALVES (TYP.)REMOVE RADIATOR COVERS. CLEAN RADIATOR, STRAIGHTEN FINS, REPAINT COVERS & REINSTALLMANUAL DUAL ROLLER WINDOW SHADES WITH FASCIA (TYP.)GLASS PARTITIONACOUSTICAL PANEL ATTACHED TO CEILINGSUSPENDED LIGHT FIXTURE (SEE REFLECTED CEILING PLAN)BASE (SEE FINISH SCHEDULE)1841WINDOWREMOVE, REPAINT & REINSTALL RADIATOR COVERS2' - 0"6' - 0"11' - 10" V.I.F.Revisions:347 West 36 Street Suite 1501New York, NY 10018212-245-5195 T212-239-7130 FKey Plan:Notes:Grumman HallCornell UniversityIthaca, NY 14850Richard McElhiney Architects LLCApril 2, 2020Issue for Bid April 2, 2020Scale:31 Knight StreetNorwalk, CT 06851203-866-5538 T203-866-5243 FAltieri Sebor Wieber LLC303 South Broadway, Suite G20Tarrytown, NY 10591914-333-1110 T914-333-1109 FJacobs Consultancy4588 South Park AvenueBlasdell, NY 14219716-823-0006 TTrophy PointAREA OF WORK4592 Jordan RoadSkaneateles Falls, NY 13153315-685-4732 TRyan Biggs Clark Davis Engineering & SurveyingFirst and Second Floor Renovation Phase 11/2" = 1'-0"Interior Elevations -StudentSpace 184A-3041/2" = 1'-0"1STUDENT SPACE - NORTH ELEVATION1/2" = 1'-0"2STUDENT SPACE - EAST ELEVATION1/2" = 1'-0"4STUDENT SPACE - SOUTH ELEVATION1/2" = 1'-0"3STUDENT SPACE - WEST ELEVATION
MANUAL DUAL ROLLER WINDOW SHADES WITH FASCIA (TYP.)ACOUSTICAL PANEL ATTACHED TO CEILINGSUSPENDED LIGHT FIXTURE(SEE REFLECTED CEILING PLAN)MANUAL DUAL ROLLER WINDOW SHADES WITH FASCIA (TYP.)ACOUSTICAL PANEL ATTACHED TO CEILINGSUSPENDED LIGHT FIXTURE(SEE REFLECTED CEILING PLAN)MICROWAVE (BY OWNER)UNDER CABINET REFRIGERATOR (BY OWNER)10' - 5" V.I.F.PROVIDE METAL COVERS FOR RADIATOR CONTROL VALVES (TYP.)REMOVE RADIATOR COVERS. CLEAN RADIATOR, STRAIGHTEN FINS, REPAINT COVERS & REINSTALLACOUSTICAL PANEL ATTACHED TO CEILINGMANUAL DUAL ROLLER WINDOW SHADES WITH FASCIA (TYP.)NEW DOOR (SEE DOOR SCHEDULE)SUSPENDED LIGHT FIXTURE(SEE REFLECTED CEILING PLAN)BASE (SEE FINISH SCHEDULE)10' - 5" V.I.F.NEW DOOR (SEE DOOR SCHEDULE)ACOUSTICAL PANEL ATTACHED TO CEILINGSUSPENDED LIGHT FIXTURE(SEE REFLECTED CEILING PLAN)ACOUSTICAL PANEL ATTACHED TO CEILINGSUSPENDED LIGHT FIXTURE(SEE REFLECTED CEILING PLAN)BASE (SEE FINISH SCHEDULE)28914' - 6"WALL MOUNTED COAT HOOK RACK. STAINLESS STEEL TYPE 304. MIN. 6 HOOKS PER RACK (BASIS OF DESIGN WEBI)10' - 5" V.I.F.SUSPENDED LIGHT FIXTURE(SEE REFLECTED CEILING PLAN)MANUAL DUAL ROLLER WINDOW SHADES WITH FASCIA (TYP.)BASE (SEE FINISH SCHEDULE)10' - 5" V.I.F.Revisions:347 West 36 Street Suite 1501New York, NY 10018212-245-5195 T212-239-7130 FKey Plan:Notes:Grumman HallCornell UniversityIthaca, NY 14850Richard McElhiney Architects LLCApril 2, 2020Issue for Bid April 2, 2020Scale:31 Knight StreetNorwalk, CT 06851203-866-5538 T203-866-5243 FAltieri Sebor Wieber LLC303 South Broadway, Suite G20Tarrytown, NY 10591914-333-1110 T914-333-1109 FJacobs Consultancy4588 South Park AvenueBlasdell, NY 14219716-823-0006 TTrophy PointAREA OF WORK4592 Jordan RoadSkaneateles Falls, NY 13153315-685-4732 TRyan Biggs Clark Davis Engineering & SurveyingFirst and Second Floor Renovation Phase 11/2" = 1'-0"Interior Elevations -StudentWorkstations 289A-3051/2" = 1'-0"1STUDENT WORKSTATIONS - NORTH ELEVATION1/2" = 1'-0"2STUDENT WORKSTATIONS - EAST ELEVATION1/2" = 1'-0"3STUDENT WORKSTATIONS - SOUTH ELEVATION1/2" = 1'-0"4STUDENT WORKSTATIONS - WEST ELEVATION
36" MAXIMUM82"-96" CLEAR HEADROOM48" MAXIMUM27" MINIMUM15" MINIMUM48"30"HEIGHT TOKNEE CLEARANCEHEIGHT FORFROM SPRAYFINISH FLOORMINIMUM CLEAR FLOOR SPACEELEVATION VIEWPLAN VIEWUNDERNEATH UNITSPRAY HEADFORWARD REACHHEADS TO WALLOR OBSTRUCTIONREQUIREMENTS FOR FORWARD APPROACH515__16"[151.2mm]35_8"[92.3mm]25__16"[59.0mm]3__16"[4.2mm]75_8"[193.0mm]77__16"[188.8mm]WINDOWMULLION(BY OTHERS)SHADE OPENING HEIGHTDRIVECHAINSOLARSHADECLOTHIN DOWNPOSITIONSNAPLOC®FASCIAHEM BARSEALED INSIDECLOTHBLACKOUTSHADECLOTHIN DOWNPOSITION1_2"[12.7mm]MIN.∅33_8" [∅85.7mm]∅23_4" [∅69.9mm]R.U.D.MAX.R.U.D. MAX.ALIGNROLLER TUBE ANDSHADE ASSEMBLY WITHDOUBLESHADE®#15BRACKET3 1/2" [89.0mm]R3/16" [R4.7mm]90°G.W.B.(BY OTHERS)STEEL STUD(BY OTHERS)#10 X 3/4" S/S PHILLIPSFLAT HEAD TEK METALSCREW 18" [457.2mm] O.C.#10 X 1 1/2" PH FLAT HDWOOD SCREW16" [406.4mm] O.C. MAX.G.W.B. (BY OTHERS)5/8" [15.9mm]STAINLESSSTEEL GUARDCUSTOMERSPECIFIEDLEG WIDTH1 3/8" [34.9mm]STAINLESS STEELCORNER GUARD1" [25.4mm]8-PHSECTIONAL VIEW AT INTERIOR WALLSCO-8SECTIONAL VIEW AT INTERIOR COLUMNSADJUSTABLE CONNECTION TO EXHAUST.SEE MECHANICAL DRAWINGS.NOTE:ALL FUME HOOD UTILITY AND SERVICE CONNECTIONS SHALL BE FLEXIBLE/ADJUSTABLE TO ACCOMMODATE HEIGHT VARIATIONS. PROVIDE SERVICE FITTINGS FOR COLD WATER, NATURAL GAS, AND COMPRESSED AIR.LABORATORY FUME HOODTEMPERED SAFETY GLASSSOLID SURFACE EPOXY COUNTERTOP TO MATCH ADJACENT CASEWORK (MATERIAL AND HEIGHT)ELECTRIC HYDRAULIC LIFT BASE STAND.BASE CABINETS ON LOCKING CASTORS TO BE MOVED FOR ADA FRONT APPROACH..34" -37"FUME HOOD BASIS OF DESIGN:LABCONCO 5' PROTECTOR XL HOOD, AUTOMATIC ADJUSTABLE HEIGHTVARIESCROSS TEEMAIN RUNNERACOUSTICAL CEILING TILE (SEE PLAN FOR HEIGHT)HANGER RODANCHOR TO EXISTING STRUCTURE ABOVEWALL ANGLEMAIN RUNNERWALLADA CLEARANCE (SHOWN DASHED)MIN.2' - 3"MIN.1' - 5"TOE CLR.6"MIN.11"MIN.9"MIN.8"FINISH FLOOR2' - 6"1' - 8"2' - 10"7' - 0"WOOD PANELEPOXY BACKSPLASH (6" HIGH)SOLID SURFACE EPOXY COUNTERTOPELECTRICAL RACEWAY(SEE ELECTRICAL DRAWINGS)VALANCE WITH UNDERCABINET LIGHTINGADJUSTABLE OPEN WALL SHELVINGUTILITY CHASE5 1/2"1 1/2"2' - 6"1' - 0"1"ADA CLEARANCE (SHOWN DASHED)MIN.2' - 3"MIN.1' - 5"TOE CLR.6"MIN.11"MIN.9"MIN.8"FINISH FLOOR2' - 6"1' - 8"2' - 10"7' - 0"WOOD ACCESS PANELWOOD PANELSTAINLESS STEEL DROP-IN SINK AS SPECIFIED(SEE PLUMBING SCHEDULE)FAUCET (SEE PLUMBING SCHEDULE)EPOXY BACKSPLASH (6" HIGH)SOLID SURFACE EPOXY COUNTERTOPELECTRICAL RACEWAY(SEE ELECTRICAL DRAWINGS)VALANCE WITH UNDERCABINET LIGHTINGADJUSTABLE OPEN WALL SHELVINGUTILITY CHASE2' - 6"5 1/2"1 1/2"CABINET DOORS TO SWING OUT AND SLIDE IN TO UNDERSIDE OF COUNTERTOP1' - 0"1"FINISH FLOOR2' - 6"1' - 8"2' - 10"7' - 0"ADJUSTABLE SHELFWOOD DRAWER WITH PULLEPOXY BACKSPLASH (6" HIGH)SOLID SURFACE EPOXY COUNTERTOPELECTRICAL RACEWAY(SEE ELECTRICAL DRAWINGS)VALANCE WITH UNDERCABINET LIGHTINGADJUSTABLE OPEN WALL SHELVINGUTILITY CHASE4"1' - 11"5 1/2"1 1/2"WOOD CABINET WITH PULLCONCEALED HINGES (TYP.)2' - 6"1' - 0"1"EQEQLED STRIP LIGHTMOUNTING CLIPSEE PLANWOOD PANELUTILITY CHASECABINET DOORS TO SLIDE IN TO UNDERSIDE OF COUNTERTOPCABINET DOORS TO SWING OUT AND SLIDE IN TO UNDERSIDE OF COUNTERTOPCAVITY FOR CABINET DOORADA CLEARANCES AS PER SECTIONFINISH FLOOR2' - 6"1' - 8"2' - 10"7' - 0"UNDER CABINET REFRIGERATOR (BY OWNER)EPOXY BACKSPLASH (6" HIGH)SOLID SURFACE EPOXY COUNTERTOPELECTRICAL RACEWAY(SEE ELECTRICAL DRAWINGS)VALANCE WITH UNDERCABINET LIGHTINGADJUSTABLE OPEN WALL SHELVINGUTILITY CHASE1 1/2"2' - 6"1' - 0"1' - 6"MICROWAVE(BY OWNER)MICROWAVE SHELF1"Revisions:347 West 36 Street Suite 1501New York, NY 10018212-245-5195 T212-239-7130 FKey Plan:Notes:Grumman HallCornell UniversityIthaca, NY 14850Richard McElhiney Architects LLCApril 2, 2020Issue for Bid April 2, 2020Scale:31 Knight StreetNorwalk, CT 06851203-866-5538 T203-866-5243 FAltieri Sebor Wieber LLC303 South Broadway, Suite G20Tarrytown, NY 10591914-333-1110 T914-333-1109 FJacobs Consultancy4588 South Park AvenueBlasdell, NY 14219716-823-0006 TTrophy PointAREA OF WORK4592 Jordan RoadSkaneateles Falls, NY 13153315-685-4732 TRyan Biggs Clark Davis Engineering & SurveyingFirst and Second Floor Renovation Phase 1As indicatedLab Details IA-5013/4" = 1'-0"5FUME HOOD ELEVATION3/4" = 1'-0"7SAFETY SHOWER DETAILS6" = 1'-0"4WINDOW SHADE DETAIL1 1/2" = 1'-0"3CEILING SECTION DETAIL1 1/2" = 1'-0"9ADA PULL-IN CABINET SECTION1 1/2" = 1'-0"10ADA SINK CABINET SECTION1 1/2" = 1'-0"11TYP. CABINET SECTION6" = 1'-0"2UNDERCABINET LIGHTING DETAIL1 1/2" = 1'-0"6ADA SINK CABINET PLAN1 1/2" = 1'-0"8FRIDGE/MICROWAVE CABINET SECTION6" = 1'-0"1Corner Guard Details
8' - 0" TABLE4' - 0" TABLEFUME EXTRACTOR ARM(SEE MECHANICAL PLANS)METHANE GAS CONNECTIONCOMPRESSED AIR CONNECTIONELECTRICAL/DATA RACEWAY(SEE ELECTRICAL DRAWINGS)2x4 STEEL TUBE ATTACHED TO CEILING (TYP.)2x5 STEEL TUBE FRAMEA-5024A-50232x4 STEEL TUBE ATTACHED TO CEILING (TYP.)ELECTRICAL/DATA RACEWAY(SEE ELECTRICAL DRAWINGS)6' - 0"2' - 6"OPTIONAL LOCATION FOR FUME EXTRACTOR ARM GAS CONNECTION TO WALL HUNG TANKNOTE:SUSPENDED UTILITY SHELF BY LAB CASEWORK MANUFACTURER TO BE FULLY COORDINATED WITH FUME EXTRACTOR ARM IN SHOP DRAWING SUBMITTALS.4"4"2"2"FUME EXTRACTOR ARM AND CEILING BRACKET2x4 STEEL TUBE ATTACHED TO CEILING (TYP.)LAB BENCHRUN UTILITIES INSIDE TUBES DOWN TO RACEWAY (ELECTRIC, GAS & COMPRESSED AIR)6' - 8"5"2x5 STEEL TUBE FRAMING4"4"2' - 6"3' - 1"FINISH FLOORADJUSTABLE HEIGHT LEGS (DOWN TO 34" MIN.)2x5 STEEL TUBE FRAMINGCONNECTION TO EXHAUST SYSTEMFUME EXTRACTOR ARM AND CEILING BRACKETMETHANE GAS CONNECTIONCOMPRESSED AIR CONNECTION2x5 STEEL TUBE FRAMING2x4 STEEL TUBE ATTACHED TO CEILING (TYP.)SUSPENDED LIGHT FIXTURE(SEE REFLECTED CEILING PLAN)FINISH FLOORLAB BENCHRUN UTILITIES INSIDE TUBES DOWN TO RACEWAY (ELECTRIC, GAS & COMPRESSED AIR)5"6' - 8"3"2"2x4 STEEL TUBE FRAMING2"2"6' - 0"3' - 1"ADJUSTABLE HEIGHT LEGS (DOWN TO 34" MIN.)OPTIONAL LOCATION FOR FUME EXTRACTOR ARM GAS CONNECTION TO WALL HUNG TANK2x5 STEEL TUBE FRAMINGELECTRICAL/DATA RACEWAY(SEE ELECTRICAL DRAWINGS)CONNECTION TO EXHAUST SYSTEM1' - 0"FUME EXTRACTOR ARM CEILING BRACKETRevisions:347 West 36 Street Suite 1501New York, NY 10018212-245-5195 T212-239-7130 FKey Plan:Notes:Grumman HallCornell UniversityIthaca, NY 14850Richard McElhiney Architects LLCApril 2, 2020Issue for Bid April 2, 2020Scale:31 Knight StreetNorwalk, CT 06851203-866-5538 T203-866-5243 FAltieri Sebor Wieber LLC303 South Broadway, Suite G20Tarrytown, NY 10591914-333-1110 T914-333-1109 FJacobs Consultancy4588 South Park AvenueBlasdell, NY 14219716-823-0006 TTrophy PointAREA OF WORK4592 Jordan RoadSkaneateles Falls, NY 13153315-685-4732 TRyan Biggs Clark Davis Engineering & SurveyingFirst and Second Floor Renovation Phase 11" = 1'-0"Lab Details IIA-5021" = 1'-0"1SUSPENDED UTILITY SHELF PLAN1" = 1'-0"4SUSPENDED UTILITY SHELF ELEVATION B1" = 1'-0"3SUSPENDED UTILITY SHELF ELEVATION A2SUSPENDED UTILITY SHELF PERSPECTIVE
SEE SCHEDULESEE SCHEDULESEE SCHEDULESEE SCHEDULE-D1--D2--D3-NON FIRE RATEDSOUND RATED HOLLOW METAL DOORNON FIRE RATEDSOUND RATEDSLIDING GLASS DOORNON FIRE RATEDSOUND RATEDHOLLOW METAL DOOR-D4-NON FIRE RATEDSOUND RATEDSOLID CORE WOOD DOORSEE SCHEDULESEE SCHEDULESEE SCHEDULESEE SCHEDULE-D5-FIRE RATEDHOLLOW METAL DOORSEE SCHEDULESEE SCHEDULE-D6-NON FIRE RATEDHOLLOW METAL DOORSEE SCHEDULESEE SCHEDULEPROVIDE UV LIGHT BLOCKING GLASS FILM<100 sq.in. GLASS VISION PANELSEE 1/A-303 FOR DOOR MOUNTED ACCESSORYGL-1 GL-1GL-2 GL-2GL-1PROVIDE GLASS MARKING DECALS43" AFF MAX.3' - 6"-F1--F2--F3-2"DOOR SIZE (SEE SCH.)2"2"DOOR SIZE (SEE SCH.)OPENDOOR SIZE (SEE SCH.)2"2"DOOR SIZE (SEE SCH.)2"-F4-OPENOPENOPEN2"DOOR SIZE (SEE SCH.)2"SEE SCHEDULE2"FIRE RATEDFULLY WELDED HOLLOW METAL2"SEE SCHEDULE2"1' - 4"2"2"DOOR SIZE (SEE SCH.)2"10"GLASS SIDELITENON FIRE RATEDFULLY WELDED HOLLOW METALNON FIRE RATEDFULLY WELDED HOLLOW METALNON FIRE RATEDFULLY WELDED HOLLOW METALWITH SIDELITEGL-1H15/8"2"3/4"5/8" GYPSUM BOARD EACH SIDE#20 GA. STEEL STUDS @16" O.C. W/ FIBER BLANKET3/4" Z-CHANNEL REVEAL AROUND DOOR FRAME AT OUTSIDE FACE (TYP.)SEE PLANFILL H.M. FRAME VOIDS WITH FIBERGLASS INSULATION PRIOR TO WALL CONSTRUCTIONMETAL STUD BOX BEAM HEADERSECURE G.W.B. SHEATHING TO JAMB FRAMING AS REQUIREDWELDED H.M. DOOR AND #12 GA. STEEL FRAME. SET FRAME AND BRACE AS REQUIRED PRIOR TO WALL CONSTRUCTIONDOOR SLAB (SEE SCHEDULE)5/8"2"3/4"SEE PLAN5/8" GYPSUM BOARD EACH SIDE(2) #16 GA. STEEL STUDS AT JAMB3/4" Z-CHANNEL REVEAL AROUND DOOR FRAME AT OUTSIDE FACE (TYP.)FILL H.M. FRAME VOIDS WITH FIBERGLASS INSULATION PRIOR TO WALL CONSTRUCTIONSECURE G.W.B. SHEATHING TO JAMB FRAMING AS REQUIREDWELDED H.M. #12 GA. STEEL FRAME. SET FRAME AND BRACE AS REQUIRED PRIOR TO WALL CONSTRUCTIONDOOR SLAB (SEE SCHEDULE)#20 GA. STEEL STUDS @16" O.C. W/ FIBER BLANKETJ1ITEM MANUFACTURER MODEL FINISHSET 1 - LAB1 ELECTRIFIED LATCH SARGENT M1 82271 24V BPS B 03 26DELECTRICAL POWER TRANSFER MCKINNEY EL CEPT 26DCONNECTOR CABLES SARGENT2 PR. DOOR CONTACTS SARGENTTOP & BOTTOM FLUSH BOLT ROCKWOOD 555 26D3 PR. HINGES MCKINNEY TA2714 26D2 SILENCERSGRAY COLOR2 WALL BUMPER IVES WS404CVX 26D1-1/8" UNDERSLUNG TRANSITION STRIP ARMSTRONG VT82 SURFACE MOUNTED DOOR CLOSERS SARGENT 351UO 26D1 POWER SUPPLY SECURITRON BPS-24-11 METAL ASTRAGAL BY DOOR MANUFACTURER PAINTEDDOOR SEALS NATIONAL GUARD 5050 CL & 5070 CL CLSET 2 - SLIDING DOORSEE SPECIFICATIONS FOR HARDWARE ASSA ABLOY SL500 POWDER COATEDSET 3 - STUDENT SPACE1 ELECTRIFIED LATCH SARGENT M1 82271 24V BPS B 03 26DELECTRICAL POWER TRANSFER MCKINNEY EL CEPT 26DCONNECTOR CABLES SARGENT1 PR. DOOR CONTACTS SARGENT2 PR. HINGES MCKINNEY TA2714 26D2 SILENCERSGRAY COLOR1 FLOOR STOPDOME STYLE 26D1-1/8" UNDERSLUNG TRANSITION STRIP ARMSTRONG VT81 SURFACE MOUNTED DOOR CLOSER SARGENT 351UO1 POWER SUPPLY SECURITRON BPS-24-11 DOOR SEAL NATIONAL GUARD 5050 CL & 5070 CL CLSET 4 - STUDENT WORKSTATIONS1 OFFICE & INNER ENTRY LOCK SARGENT M1 82271 24V BPS B 03 26D1-1/2 PR. HINGES MCKINNEY TA2714 26D3 SILENCERSGRAY COLOR1 FLOOR STOP IVES DOME STYLE 26D1 NEOPRENE SPONGE SELF ADHESIVE GASKETING NGP 3611 AUTOMATIC DOOR BOTTOM PEMKO 411APKL1 SURFACE MOUNTED DOOR CLOSER SARGENT 351UOELECTRICAL POWER TRANSFER MCKINNEY EL CEPT 26DCONNECTOR CABLES SARGENT1 PR. DOOR CONTACTS SARGENT1 POWER SUPPLY SECURITRON BPS-24-1SET 5 - CORRIDOR DOORS (2 HOUR FIRE RATED)2 EXIT DEVICE SARGENT 12 43 NB 8713 ETL 32D3 PR. HINGES MCKINNEY TA2714 26D2 SURFACE MOUNTED DOOR CLOSER SARGENT 351UO2 KICK PLATE ROCKWOOD K1050 6"1 GASKETING PEMKO S773BL BL2 ASTRAGAL PEMKO S771BL BL1-18" UNDERSLUNG TRANSITION STRIP ARMSTRONG VT8SET 6 - STOREROOM PAIR1 STOREROOM LOCK SARGENT 8203 LNL 26D2 PR. HINGES MCKINNEY TA2714 26D2 FLUSH BOLT ROCKWOOD 555 26D1 DUST PROOF STRIKE ROCKWOOD 570 26D1 GASKET PEMKO 5773BL BL1 ASTRAGAL PEMKO 5771BL BLHARDWARE SCHEDULET1DOOR AUTOMATIC BOTTOM SOUND SEALFLOOR FINISHFINISH FLOORDOOR SLAB (SEE SCHEDULE)T2VINYL 1/8" UNDERSLUNG RESILIENT FLOOR TRANSITION STRIPFLOOR FINISHFINISH FLOORDOOR SLAB(SEE SCHEDULE)H25/8"2"DOUBLE GLAZED GLASS PANELHOLLOW METAL FRAMEDOOR LEAF. SEE DOOR SCHEDULE FOR ADDITIONAL INFORMATION.J22"5/8"DOOR LEAF. SEE DOOR SCHEDULE FOR ADDITIONAL INFORMATION.HOLLOW METAL FRAMEDOUBLE GLAZED GLASS PANELH35/8"2"CMU WALL, NEW OR EXISTING ABOVE LINTELMASONRY LINTEL WITH REINFORCEMENT PER SPECIFICATIONSBACKER ROD & CONTINUOUS BEAD OF SEALANT AROUND PERIMETER OF FRAME, TYP. BOTH SIDESSEE PLANHOLLOW METAL FRAME GROUTED SOLID, WITH MASONRY ANCHORS IN NEW WALL; THROUGH BOLT IN EXISTINGDOOR LEAF. SEE DOOR SCHEDULE FOR ADDITIONAL INFORMATION.J32"5/8"SEE PLANCMU WALL (JAMB BLOCK)DOOR LEAF. SEE DOOR SCHEDULE FOR ADDITIONAL INFORMATION.HOLLOW METAL FRAME GROUTED SOLID WITH MASONRY T ANCHORS IN NEW WALL; THROUGH BOLT IN EXIST.BACKER ROD & CONTINUOUS BEAD OF SEALANT AROUND PERIMETER OF FRAME, TYP. BOTH SIDESC1SECONDARY DOOR LEAF18 GAUGE BREAK METAL TRIM PAINTED TO MATCH DOOR(FOR LATCH SECURITY)MAIN DOOR LEAF. SEE DOOR SCHEDULE FOR ADDITIONAL INFORMATION.ATTACH TRIM TO MAIN DOOR LEAFRevisions:347 West 36 Street Suite 1501New York, NY 10018212-245-5195 T212-239-7130 FKey Plan:Notes:Grumman HallCornell UniversityIthaca, NY 14850Richard McElhiney Architects LLCApril 2, 2020Issue for Bid April 2, 2020Scale:31 Knight StreetNorwalk, CT 06851203-866-5538 T203-866-5243 FAltieri Sebor Wieber LLC303 South Broadway, Suite G20Tarrytown, NY 10591914-333-1110 T914-333-1109 FJacobs Consultancy4588 South Park AvenueBlasdell, NY 14219716-823-0006 TTrophy PointAREA OF WORK4592 Jordan RoadSkaneateles Falls, NY 13153315-685-4732 TRyan Biggs Clark Davis Engineering & SurveyingFirst and Second Floor Renovation Phase 1As indicatedDoor Schedule and DetailsA-601DOOR AND FRAME SYSTEM SCHEDULELEVEL DOOR # ROOM # ROOM NAMEDOORTYPEMATERIAL# OFLEAFSWIDTH HEIGHT THICKNESS GLAZINGFRAMETYPEFRAMEMATERIALFRAMEFINISHHEADDETAILJAMBDETAILTHRESHOLDDETAILFIRE RATINGHARDWARESET #REMARKSFIRST FLOOR 1 100CA HALL D5 HM 2 7' - 0" 7' - 0" 1 3/4" F1 HM PT H3 J3 T2 2 HOUR5FIRST FLOOR 1 100UA ELECTRIC CLOSET D6 HM 2 5' - 6" 7' - 0" 1 3/4" F2 HM PTH1 J1 T1 6FIRST FLOOR 1 181 LAB I D1 HM 2 5' - 0" 7' - 0" 1 3/4" F2 HM PT H1 J1 T1 1 MAIN DOOR = 3'-0" WIDE. PROVIDE ACCESS CONTROL.FIRST FLOOR 1 182 SADAF'S LAB D1 HM 2 5' - 0" 7' - 0" 1 3/4" F2 HM PT H1 J1 T11 MAIN DOOR = 3'-0" WIDE. PROVIDE ACCESS CONTROL.FIRST FLOOR 1 182A PRINT ROOM D2 HM 2 6' - 0" 7' - 0" F2 HM PT H1 J1 2 PROVIDE ACCESS CONTROL.FIRST FLOOR 1 184 STUDENT SPACE D3 HM 12' - 10 11/32" 7' - 9 1/2" 1 3/4" F3 HM PT H2 J2 T2 3 PROVIDE ACCESS CONTROL.FIRST FLOOR 1 188 LAB 188 D1 HM 2 5' - 0" 7' - 0" 1 3/4" F2 HM PT H1 J1 T1 1 MAIN DOOR = 3'-0" WIDE. PROVIDE OPAQUE GLASS FILM. PROVIDE ACCESS CONTROL.SECOND FLOOR 1 289 STUDENT WORKSTATIONS D4 WD 1 3' - 0" 7' - 0" 1 3/4" F4HM PT H1 J1 T1 4 PROVIDE ACCESS CONTROL.1/2" = 1'-0"Legend - Door Types1/2" = 1'-0"Legend - Frame Types1 1/2" = 1'-0"Door Head Detail - H11 1/2" = 1'-0"Door Jamb Detail - J11 1/2" = 1'-0"Door Threshold Detail - T11 1/2" = 1'-0"Door Threshold Detail - T21 1/2" = 1'-0"Door Head Detail - H21 1/2" = 1'-0"Door Jamb Detail - J21 1/2" = 1'-0"Door Head Detail - H31 1/2" = 1'-0"Door Jamb Detail - J3 3' -0" ( V.I.F. )1 1/2" = 1'-0"Door Closure Detail - C1
-W1--W2-FIXED - HOLLOW METAL FRAMEFIXED - HOLLOW METAL FRAMEH1S1J2M1H1J1S2M2SEE SCHEDULESEE SCHEDULEM2-W3-FIXED - HOLLOW METAL FRAMESEE SCHEDULESEE SCHEDULESEE SCHEDULESEE SCHEDULESEE SCHEDULESEE SCHEDULESEE DOOR SCHEDULEEQEQEQEQEQEQEQEQEQEQEQS2H1J1GL-2GL-1GL-1H12"1/2"1/2"5/8" GYPSUM BOARD EACH SIDE#20 GA. STEEL STUDS @16" O.C. W/ FIBER BLANKETEXTEND GYPSUM BOARD INTO FRAME 5/8" MIN.SEE PLANFILL H.M. FRAME VOIDS WITH FIBERGLASS INSULATION PRIOR TO WALL CONSTRUCTIONMETAL STUD BOX BEAM HEADERSECURE G.W.B. SHEATHING TO JAMB FRAMING AS REQUIREDHOLLOW METAL FRAMEGLAZING STOPDOUBLE GLAZED GLASS PANELJ12"SEE PLAN5/8" GYPSUM BOARD EACH SIDE(2) #16 GA. STEEL STUDS AT JAMBGLAZING STOPSECURE G.W.B. SHEATHING TO JAMB FRAMING AS REQUIREDWELDED H.M. #12 GA. STEEL FRAME. SET FRAME AND BRACE AS REQUIRED PRIOR TO WALL CONSTRUCTION#20 GA. STEEL STUDS @16" O.C. W/ FIBER BLANKETDOUBLE GLAZED GLASS PANELFILL H.M. FRAME VOIDS WITH FIBERGLASS INSULATION PRIOR TO WALL CONSTRUCTIONS12"FILL H.M. FRAME VOIDS WITH FIBERGLASS INSULATION PRIOR TO WALL CONSTRUCTIONHOLLOW METAL FRAMESECURE FRAMING TO SLAB AS REQUIREDFINISH FLOORDOUBLE GLAZED GLASS PANELGLAZING STOPS22"1/2"1/2"5/8" GYPSUM BOARD EACH SIDE#20 GA. STEEL STUDS @16" O.C. W/ FIBER BLANKETEXTEND GYPSUM BOARD INTO FRAME 5/8" MIN.SEE PLANFILL H.M. FRAME VOIDS WITH FIBERGLASS INSULATION PRIOR TO WALL CONSTRUCTION(2) #16 GA. STEEL STUDS AT SILLSECURE G.W.B. SHEATHING TO JAMB FRAMING AS REQUIREDHOLLOW METAL FRAMEDOUBLE GLAZED GLASS PANELM12"HOLLOW METAL FRAMEDOOR (SEE DOOR SCHEDULE)DOUBLE GLAZED GLASS PANELGLAZING STOPINTERIOR FRAME SCHEDULELEVEL WINDOW # ROOM # ROOM NAME TYPE WIDTH HEIGHT SILL HEIGHT FRAME TYPE FRAME MATERIAL FRAME FINISH HEAD DETAIL JAMB DETAIL SILL DETAIL MULLION DETAIL REMARKSFIRST FLOOR 1 182A PRINT ROOM W3 6'-0" 4'-0" 3'-0" A.F.F. F1 HM PT H1 J1 S2 ---- PROVIDE UV LIGHT BLOCKING GLASS FILMFIRST FLOOR 1 184 STUDENT SPACE W2 16'-8" (V.I.F.) 2'-6" 6'-0" A.F.F. F1 HM PT H1 J1 S2 M3FIRST FLOOR 2 184 STUDENT SPACE W1 21'-8" (V.I.F.) 8'-6" --- F1 HM PT H1 J2 S1 M1 PROVIDE GLASS MARKING AS PER NYS DoL PART 47FIRST FLOOR 3 184 STUDENT SPACE W2 16'-8" (V.I.F.) 2'-6" 6'-0" A.F.F. F1 HM PT H1 J1 S2 M3 PROVIDE OPAQUE GLASS FILMM2HOLLOW METAL FRAMEDOUBLE GLAZED GLASS PANELDOUBLE GLAZED GLASS PANELBUTT JOINT BETWEEN GLAZING2"3/4"SEE PLAN5/8" GYPSUM BOARD EACH SIDE(2) #16 GA. STEEL STUDS AT JAMB3/4" Z-CHANNEL REVEAL AROUND DOOR FRAME AT OUTSIDE FACE (TYP.)FILL H.M. FRAME VOIDS WITH FIBERGLASS INSULATION PRIOR TO WALL CONSTRUCTIONSECURE G.W.B. SHEATHING TO JAMB FRAMING AS REQUIREDWELDED H.M. #12 GA. STEEL FRAME. SET FRAME AND BRACE AS REQUIRED PRIOR TO WALL CONSTRUCTIONDOUBLE GLAZED GLASS PANEL#20 GA. STEEL STUDS @16" O.C. W/ FIBER BLANKETJ2Revisions:347 West 36 Street Suite 1501New York, NY 10018212-245-5195 T212-239-7130 FKey Plan:Notes:Grumman HallCornell UniversityIthaca, NY 14850Richard McElhiney Architects LLCApril 2, 2020Issue for Bid April 2, 2020Scale:31 Knight StreetNorwalk, CT 06851203-866-5538 T203-866-5243 FAltieri Sebor Wieber LLC303 South Broadway, Suite G20Tarrytown, NY 10591914-333-1110 T914-333-1109 FJacobs Consultancy4588 South Park AvenueBlasdell, NY 14219716-823-0006 TTrophy PointAREA OF WORK4592 Jordan RoadSkaneateles Falls, NY 13153315-685-4732 TRyan Biggs Clark Davis Engineering & SurveyingFirst and Second Floor Renovation Phase 1As indicatedWindow Schedule and DetailsA-6021/2" = 1'-0"Legend - Window Types1 1/2" = 1'-0"Window Head Detail - H11 1/2" = 1'-0"Window Jamb Detail - J11 1/2" = 1'-0"Window Sill Detail - S11 1/2" = 1'-0"Window Sill Detail - S21 1/2" = 1'-0"Window Mullion Detail - M11 1/2" = 1'-0"Window Mullion Detail - M21 1/2" = 1'-0"Window Jamb Detail - J2
FINISH TAG DESCRIPTION MANUFACTURER, MODEL NO., COLOR, SIZE, ETC.REMARKSACT-1 ACOUSTICAL CEILING TILE (2' x 2') ARMSTRONG ULTIMA TEGULAR FINE TEXTURE WITH 15/16 PRELUDE GRIDCPT-1 CARPET BROADLOOM CARPET BY MOHAWKGWB-1 GYPSUM WALL BOARD SEE SPECIFICATIONSGWB-2 IMPACT RESISTANT GYPSUM WALL BOARD SEE SPECIFICATIONSPT-1 PAINT PAINT COLOR TO BE SELECTED BY THE ARCHITECTPT-2 PAINT PAINT COLOR TO BE SELECTED BY THE ARCHITECTRES-1 CHEMICAL RESISTANT RESILIENT SHEET FLOORING 0.12" THICK, 18"x18" DOLCE TILE BY ALTRORES-2 LINOLEUM HARMONIUM XF SHEET LINOLEUM BY JOHNSONITERES-3 RESILIENT WALL BASE 4" HIGH x 1/8" THICK TRADITIONAL WALL BASE BY JOHNSONITEMATERIAL SCHEDULEBOTTOM OF EXISTING SLABCONTINUOUS SEALANT & FLAT TAPE BOTH SIDESFIRESTOPPING @ BOTH SIDESCEILING RUNNER WITH STUD BOLTS @ 24" O.C.(1) LAYER HIGH IMPACT GYPSUM WALL BOARD @ EACH SIDE20 GA. 3-5/8" METAL STUDS @ 16" O.C.3-1/2" ACOUSTICAL INSULATION (2-1/2" PCF MINERAL WOOL, TYP.)SEE FINISH SCHEDULE FOR FINISH MATERIAL20 GA. METAL RUNNER WITH STUD BOLTS @ 24" O.C.BASE, SEE FINISH SCHEDULECONTINUOUS SEALANT & FLAT TAPE BOTH SIDESFINISH FLOOR, SEE FINISH SCHEDULE+/-5"INTERIOR PARTITIONA0BOTTOM OF EXISTING SLABCONTINUOUS SEALANT & FLAT TAPE BOTH SIDESFIRESTOPPING @ BOTH SIDESCEILING RUNNER WITH STUD BOLTS @ 24" O.C.(2) LAYERS 5/8" FIRE RATED GYPSUM WALL BOARD @ EACH SIDE20 GA. 3-5/8" METAL STUDS @ 16" O.C.3-1/2" ACOUSTICAL INSULATION (2-1/2" PCF MINERAL WOOL, TYP.)SEE FINISH SCHEDULE FOR FINISH MATERIAL20 GA. METAL RUNNER WITH STUD BOLTS @ 24" O.C.BASE, SEE FINISH SCHEDULECONTINUOUS SEALANT & FLAT TAPE BOTH SIDESFINISH FLOOR, SEE FINISH SCHEDULE+/-6"2 HOUR FIRE RATED - UL #U412INTERIOR PARTITIONB2NON FIRE RATEDBOTTOM OF EXISTING SLABCONTINUOUS SEALANT & FLAT TAPE BOTH SIDESCOMPRESSIBLE FLUTE FILLER(MINERAL WOOL PACKING)CEILING RUNNER WITH 1/2" STUD BOLTS @ 24" O.C.20 GA. METAL STUDS @ 16" O.C.GYPSUM WALL BOARDACOUSTICAL INSULATIONBOTTOM OF EXISTING SLABCOMPRESSIBLE FLUTE FILLER(MINERAL WOOL PACKING)CEILING RUNNER WITH 1/2" STUD BOLTS @ 24" O.C.20 GA. METAL STUDS @ 16" O.C.GYPSUM WALL BOARD, FIRE RATED ASSEMBLYACOUSTICAL INSULATIONFIRESTOPPING AT BOTH SIDES WITH FIRE RATING AS PER RATED WALL. SEE SPEC. FOR APPROVED MANUFACTURERS.1" MAX.FIRESTOPPING NOTES:1. FIRESTOPPING SHALL BE INSTALLED AS PER MANUFACTURER'S RECOMMENDED METHODS FOR THE REQUIRED FIRE RATING OF A WALL ASSEMBLY.2. ALTERNATE METHODS OF FIRESTOPPING MUST CONFORM TO U.L. REQUIREMENTS AND TO THE BUILDING CODE OF THE STATE OF NEW YORK.3. PROVIDE SLIP OR CUSHION TYPE JOINT BETWEEN METAL FRAMING AND STRUCTURE AS RECOMMENDED BY MANUFACTURER TO PREVENT TRANSFER OF LOADS OR MOVEMENT TO PARTITIONS.213AASECTION A-A13321. WALL ASSEMBLY -THE 1 HOUR FIRE-RATED GYPSUM BOARD/STUD ASSEMBLY.2. THROUGH PENETRANTS -ONE OR MORE PIPES OR CONDUITS INSTALLED IN SINGLE LAYER ARRAY WITHIN THE FIRESTOP SYSTEM. THE ANNULAR SPACE BETWEEN THE PIPES AND CONDUITS AND THE EDGES OF THE OPENING SHALL BE MIN. 0 IN. (0 MM, POINT CONTACT) TO MAX 1-3/8 IN. (35 MM). THE SEPARATION BETWEEN THE PIPES AND CONDUITS TO BE A MIN. 0 IN. (0 MM, POINT CONTACT) TO A MAX. 1-1/4 IN. (32 MM). PIPES AND CONDUITS TO BE RIGIDLY SUPPORTED ON BOTH SIDES OF WALL ASSEMBLY. THE FOLLOWING TYPES AND SIZES OF METALLIC PIPES OR CONDUITS MAY BE USED:A. STEEL PIPE -NOM. 2 IN. (51 MM) DIAM. (OR SMALLER) SCHEDULE 5 (OR HEAVIER) STEEL PIPE.B. CONDUIT -NOM. 2 IN. (51 MM) DIAM. (OR SMALLER) RIGID STEEL CONDUIT OR STEEL ELECTRICAL METALLIC TUBING (EMT).3. FILL VOID OR CAVITY MATERIALS BEARING THE U.L. CLASSIFICATION MARK -SEALANT -MIN. 5/8 IN. THICKNESS OF FILL MATERIAL INSTALLED TO COMPLETELY FILL ANNULAR SPACE BETWEEN PIPES, CONDUITS AND GYPSUM FLUSH WITH EACH SURFACE OF WALL. MIN. 1/2 IN. DIAM. BEAD OF FILL MATERIAL APPLIED TO THE THROUGH PENETRANT/WALL INTERFACE AT THE POINT CONTACT LOCATIONS ON BOTH SIDES OF THE WALL WITH THE 1 HOUR SEALANT.1' - 0"9 1/2"7/8" THUMBSLOT8 3/8"10 7/8"11"1/8" ACRYLIC BACKERINSERT SLOTVINYL TAPEFILLER1/16" NON-GLARE ACRYLICFILLERINTERIOR ROOM IDENTIFICATION SIGNAGE:1. A ROOM SIGN, AS DETAILED HERE, SHALL BE PROVIDED AND INSTALLED FOR EACH NEW DOOR IN THE PROJECT AREA.2. WHEN MOUNTING ON GLASS, PROVIDE BACKING (SAME SIZE AS SIGN) ON OPPOSITE SIDE OF THE GLASS.3. SUBMIT SHOP DRAWINGS SHOWING SCHEDULE LAYOUT, PROFILES AND PRODUCT COMPONENTS, INCLUDING MATERIAL DETAILS, DIMENSIONS, ANCHORAGE, AND ACCESSORIES FOR ARCHITECT'S REVIEW AND APPROVAL BEFORE STARTING FABRICATION.4. ALL SIGNAGE SYSTEMS SHALL MEET REQUIREMENTS OF THE AMERICANS WITH DISABILITIES ACT ACCESSIBILITY GUIDELINES (ADAAG) AND LOCAL AMENDMENTS AND MODIFICATIONS.5. RAISED LETTERING AND/OR NUMERALS: COMPUTER-CUT CHARACTERS WITH MATTE FINISH, COLOR AS SPECIFIED FROM MANUFACTURER'S STANDARD COLOR CHART. SHALL EXTEND A MINIMUM OF 1/32" FROM THE SIGN SURFACE. PHOTOPOLYMER TAGS SHALL NOT BE ACCEPTABLE.6. GRADE 2 BRAILLE: CLEAR RASTER BALLS COMPUTER DRILLED AND PRESSURE INSERTED INTO SIGN FACE, SHALL BE HALF-HEMISPHERE IN SHAPE AND SHALL EXTEND A MINIMUM OF 0.025" FROM THE SIGN SURFACE. OTHER METHODS OF MANUFACTURE, INCLUDING SURFACE APPLIED PHOTOPOLYMER BRAILLE TAGS SHALL NOT BE ACCEPTABLE.7. FASTENER: VERY HIGH BOND (VHB) .030 INCH THICK DOUBLE-FACE TAPE.FINISHES:1. COLORS AS SELECTED FROM THE MANUFACTURER'S STANDARD CHART.2. PATTERNS: AS SELECTED FROM THE MANUFACTURER'S STANDARD CHART.000RAISED CHARACTERS AND BRAILLE1/16" NON-GLARE ACRYLICPLASTIC SIGN FIELD1/8" SLIDING ACRYLIC LENS INSERTED INTO C-CHANNEL SHAPE FOR PAPER INSERT INSTALLATIONSPACE FOR PAPER INSERT0.06" CLEAR ACRYLIC UNDERSIZED BACKERPROVIDE BACK PLATE (SAME SIZE AND COLOR AS SIGN) WHEN MOUNTING ON GLASSRAISED CHARACTERS AND BRAILLEPLASTIC SIGN FIELD1/8" SLIDING ACRYLIC LENS INSERTED INTO C-CHANNEL SHAPE FOR PAPER INSERT INSTALLATIONSPACE FOR PAPER INSERTPROVIDE BACK PLATE (SAME SIZE AND COLOR AS SIGN) WHEN MOUNTING ON GLASSRevisions:347 West 36 Street Suite 1501New York, NY 10018212-245-5195 T212-239-7130 FKey Plan:Notes:Grumman HallCornell UniversityIthaca, NY 14850Richard McElhiney Architects LLCApril 2, 2020Issue for Bid April 2, 2020Scale:31 Knight StreetNorwalk, CT 06851203-866-5538 T203-866-5243 FAltieri Sebor Wieber LLC303 South Broadway, Suite G20Tarrytown, NY 10591914-333-1110 T914-333-1109 FJacobs Consultancy4588 South Park AvenueBlasdell, NY 14219716-823-0006 TTrophy PointAREA OF WORK4592 Jordan RoadSkaneateles Falls, NY 13153315-685-4732 TRyan Biggs Clark Davis Engineering & SurveyingFirst and Second Floor Renovation Phase 1As indicatedFinish Schedule and PartitionTypesA-603ROOM FINISH SCHEDULELevel Name Floor Finish Base Finish North Wall Finish East Wall Finish South Wall Finish West Wall Finish Ceiling Finish CommentsFIRST FLOOR 181 LAB I RES-1 RES-3 PT-1 PT-1 PT-1 PT-1 PT-2FIRST FLOOR 182 SADAF'S LAB RES-1 RES-3 PT-1 PT-1 PT-1 PT-1 PT-2FIRST FLOOR 100CA COMMON AREA RES-2 RES-3 PT-1 PT-1 PT-1 PT-1 PT-2FIRST FLOOR 184 STUDENT SPACE CPT-1 RES-3 PT-1 PT-1 PT-1 PT-1 ACT-1FIRST FLOOR 182A PRINT ROOM RES-1 RES-3 PT-1 PT-1 PT-1 PT-1 PT-2SECOND FLOOR 289 STUDENT WORKSTATIONS CPT-1 RES-3 PT-1 PT-1 PT-1 PT-1 PT-21 1/2" = 1'-0"1PARTITION TYPES3" = 1'-0"2ANCHOR DETAIL3" = 1'-0"3FIRESTOPPING DETAIL1 1/2" = 1'-0"4FIRESTOP DETAIL AT WALL PENETRATIONS (UL SYSTEM NO. W-L-1389)6" = 1'-0"5ROOM SIGNAGE DETAIL
Issue for BidApril 2First and Second Floor Renovation Phase 1
BUTTERFLY VALVES
GATE VALVES
GLOBE VALVES
CHECK VALVES
STRAINERS
BALL VALVES
BALANCING VALVES
CONTROL VALVES (2-WAY)
CONTROL VALVES (3-WAY)
FLEXIBLE CONNECTORS
UNIONS
HOT WATER SUPPLY, RETURNHWRHWS
CHILLED WATER SUPPLY, RETURNCHRCHS
CONDENSER WATER SUPPLY, RETURNCRCS
LOW PRESSURE STEAM SUPPLY, RETURNLPRLPS
MEDIUM PRESSURE STEAM SUPPLY, RETURNMPRMPS
HIGH PRESSURE STEAM SUPPLY, RETURNHPRHPS
SECONDARY CHILLED WATER SUPPLY, RETURNSCHRSCHS
SECONDARY HOT WATER SUPPLY, RETURNSHWRSHWS
HEAT RECOVERY SUPPLY, RETURNHRRHRS
GLYCOL SUPPLY, RETURNGRGS
CHILLED/ HOT WATER SUPPLY, RETURNC/HWRC/HWS
CONDENSATECD
PUMP DISCHARGEPD
DUCT (WIDTH X HEIGHT)W x H
ACOUSTICAL LINED DUCT (CLEAR INSIDE DIM.)W x H
F FIRE DAMPER
C C COMBINATION FIRE & SMOKE DAMPER
S S SMOKE DAMPER
MOTORIZED CONTROL DAMPERM
VOLUME DAMPER (VD)
FLEXIBLE CONNECTOR (FC)
ELBOW DOWN - ELBOW UP
LIGUID, HOT GAS, SUCTION (REFRIGERANT)HGL S
ANCHOR POINT
PIPE GUIDE
END OF MAIN DRIPEOM
CABLE OPERATED DAMPERCOD
LINEAR DIFFUSER, CEILING DIFFUSERLD, CD
LINEAR , CEILING, TOP, BOTTOM GRILLELG, CG, TG, BG
LINEAR , CEILING, TOP, BOTTOM REGISTERLR, CR, TR, BR
RETURN AIRRA
OUTSIDE AIR INTAKEOAI
NECKN, NK
INSIDE DIMENSIONID
ACCESS DOORAD
ABOVE FINISHED FLOORAFF
FLAT OVALFO
VANE EXTRACTORVE
F
RETURN OR EXHAUST AIR
SYMBOL
SYMBOL LIST
DESCRIPTION
TEMPERATURE SENSORT
HUMIDITY SENSORH
SYSTEM WATER SUPPLY, RETURNSWRSWS
ECCENTRIC REDUCER / INCREASERECC
FIRE RATED ENCLOSUREFRE
BY OTHER DIVISIONBOD
FLAT ON TOPFT
FLAT ON BOTTOMFB
WIRE MESH SCREENWMS
OPEN END DUCTOED
ACOUSTICAL LININGAL
ACOUSTICALLY LINED PLENUMALP
CARBON DIOXIDE SENSORCO2
CARBON MONOXIDE SENSORCO
REFRIGERANT SENSORRS
BREAK GLASS SWITCHBG
EXISTING DUCT TO REMAIN
EXISTING PIPE TO REMAIN
EXISTING DUCT TO BE REMOVED
EXISTING PIPE TO BE REMOVED
SUPPLY AIR
VARIABLE REFRIGERANT FLOWVRF
AIRFLOW MEASURING STATIONAFMS
POINT OF CONNECTION
EXISTING DUCT TO BE REMOVED
EXISTING DUCT TO REMAIN
EXISTING PIPE TO REMAIN
EXISTING PIPE TO BE REMOVED
A -SYMBOL - REFER TO SCHEDULE
X - FACE SIZE, WIDTH, NUMBER OF SLOTS
Y - NECK SIZE, LENGTH
Z - CUBIC FEET PER MINUTE
COMM. - COMMENT (OPTIONAL)
X/Y/Z
COMM
.
X/Y
Z
COMM
.X
Y
Z
COMM.
REGISTERS, GRILLES, & DIFFUSERS TAGAA
A
W - INTERIOR WIDTH, H - INTERIOR HEIGHT
L - INTERIOR LENGTH
TW - TAP INTERIOR WIDTH DIMENSION
TH - TAP INTERIOR HEIGHT DIMENSION
COMM. - COMMENT (OPTIONAL)
WxHxL ALP/TWxTH
TAP
COMM.
WxHxL ALP
TWxTH TAP
COMM.
ACOUSTICAL LINED PLENUM (ALP) TAG
SYMBOL
SYMBOL LIST
DESCRIPTION
LAST POINT OF REMOVAL
APPLICABLE CODES
BUILDING:
MECHANICAL:
ENERGY:
PLUMBING:
ELECTRICAL:
GENERAL NOTES:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
ALL WORK SHALL BE IN CONFORMANCE WITH CODES AND REGULATIONS FOR THE
STATE OF NEW YORK AS WELL AS ALL LOCAL CODES PERTAINING TO CITY OF ITHACA
INCLUDING BUT NOT LIMITED TO:
2017 NYS UNIFORM CODE SUPPLEMENT
2015 INTERNATIONAL CODES (ICC)
THE EXISTING CONDITIONS ARE BASED ON DESIGN DRAWINGS, LIMITED FIELD
OBSERVATIONS, AND 3D DOCUMENTATION FOR SELECT AREAS. ANY DISCREPANCIES
IN THE EXISTING CONDITIONS SHALL BY BROUGHT TO THE ATTENTION OF THE
ENGINEER.
HAZARDOUS MATERIAL REMEDIATION: IT IS KNOWN THAT IN A BUILDING OF THIS AGE,
ISSUES WITH RESPECT TO "HAZARDOUS MATERIALS" AS DEFINED BY THE
ENVIRONMENTAL PROTECTION AGENCY INCLUDING BUT NOT LIMITED TO LEAD PAINT
AND ASBESTOS-CONTAINING BUILDING MATERIALS ARE PRESENT. ALL INQUIRIES
WITH RESPECT TO DEALING WITH THE REMOVAL OF, SEALING OF, ABATEMENT OF,
PENETRATIONS THROUGH, AND/OR ATTACHMENTS TO ANY HAZARDOUS MATERIALS
SHALL BE DIRECTED TO THE HAZARDOUS MATERIALS CONSULTANT AND THE OWNER.
THE MECHANICAL DRAWINGS DO NOT PROVIDE ANY REPRESENTATION OF
HAZARDOUS MATERIALS.
PRIOR TO CONSTRUCTION THE CONTRACTOR SHALL BE RESPONSIBLE FOR RETRO-
COMMISSIONING ALL EXISTING TO REMAIN EQUIPMENT & TERMINAL DEVICES. THE
CONTRACTOR SHALL PROVIDE A REPORT TO THE OWNER OF THEIR FINDINGS
INCLUDING AIRFLOW AND WATER BALANCE RATES AS WELL AS ANY DEFICIENCIES IN
EXISTING: MOTORS, FANS, SENSORS, ACTUATORS, CONTROL VALVES, OR OTHER
CONTROL DEVICES AND.
FAN COIL UNITS SHALL BE PROVIDED WITH AUXILIARY DRAIN PANS WITH LEAK
DETECTION SET TO DISABLE THE COOLING COIL UPON DETECTION.
ALL CONDENSATE SHALL BE GRAVITY DRAINING TO EXISTING OPEN ENDED DRAINS
WITH AIR GAP CONDENSATE RETURNS TO THE STORM DRAINAGE SYSTEM. IN THE
EVENT GRAVITY DRAINING IS NOT POSSIBLE CONDENSATE PUMPS SHALL BE
PROVIDED WITH APPROVAL FROM THE ENGINEER AND THE BUILDING FACILITIES
MANAGER.
ALL LABORATORY SPACES SHALL BE BALANCED SUCH THAT A NEGATIVE PRESSURE
IS MAINTAINED RELATIVE TO OFFICES, CORRIDORS, STUDENT WORK AREAS, OR
OTHER NON LABORATORY SPACES. AREAS WITH ACCESS TO THE LABORATORY
AREAS SHALL BE POSITIVELY PRESSURIZED TO MAINTAIN OVERALL AIR BALANCE IN
THE BUILDING.
ALL MECHANICAL EQUIPMENT & TERMINAL DEVICES INDICATED TO BE REMOVED ON
THE DEMOLITION DRAWINGS SHALL BE TURNED OVER TO THE FACILITIES MANAGER
FOR DETERMINATION OF STORAGE LOCATION OF REMOVED EQUIPMENT OR TO
PROVIDE DIRECTION ON DISPOSAL OF EQUIPMENT.
ALL NEW EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THE
MANUFACTURERS GUIDELINES WITH PROPER SPACE MAINTAINED FOR ALL SERVICE
AREA CLEARANCES.
A SET OF COORDINATION DRAWINGS SHALL BE PRODUCED BY THE CONTRACTOR IN
ACCORDANCE WITH HE REQUIREMENTS OF SECTION 230000 (1.16). IN ADDITION THE
SUB CONTRACTORS SHALL COORDINATE WITH ALL OTHER TRADES PRIOR TO THE
REMOVAL OR INSTALLATION OF ANY WORK AS REQUIRED TO INSTALL NEW WORK IN
AN ORGANIZED FASHION.
Revisions:
347 West 36 Street Suite 1501
New York, NY 10018
212-245-5195 T
212-239-7130 F
Key Plan:
Notes:
Grumman Hall
Cornell University
Ithaca, NY 14850
Richard McElhiney Architects LLC
April 2, 2020
Issue for Bid April 2, 2020
Scale:
31 Knight Street
Norwalk, CT 06851
203-866-5538 T
203-866-5243 F
Altieri Sebor Wieber LLC
303 South Broadway, Suite G20
Tarrytown, NY 10591
914-333-1110 T
914-333-1109 F
Jacobs Consultancy
4588 South Park Avenue
Blasdell, NY 14219
716-823-0006 T
Trophy Point
AREA OF WORK
4592 Jordan Road
Skaneateles Falls, NY 13153
315-685-4732 T
Ryan Biggs Clark Davis Engineering & Surveying
First and Second Floor Renovation Phase 1
12" = 1'-0"
Cover Sheet
M-001
DRAWING LIST
Sheet
Number Sheet Name
M-001 Cover Sheet
M-102 FIRST FLOOR- Ductwork
M-103 SECOND FLOOR- Ductwork
M-112 FIRST FLOOR - Piping
M-113 SECOND FLOOR- Piping
M-301 Details
M-400 Flow & Control - Mechanical
M-401 Flow & Control - Mechanical
M-402 Flow & Control - Mechanical
M-403 Flow & Control - Mechanical
M-501 Schedules - Mechanical
12" = 1'-0"2 Applicable Codes
HUMIDIFIER
HEATING (OR COOLING) COIL
OPPOSED BLADE DAMPER
FAN (OR PUMP)
AUTOMATIC 2-WAY VALVE
MANUAL 2-WAY VALVE
MANUAL BUTTERFLY VALVE
AUTOMATIC BUTTERFLY VALVE
CHECK VALVE
STRAINER
SPACE TEMPERATURE SENSOR
SPACE HUMIDITY SENSOR
TEMPERATURE TRANSMITTER
HUMIDITY TRANSMITTER
ELECTRIC MOTOR
ROTARY SWITCH
RELAY
END SWITCH
ELECTRIC-PNEUMATIC TRANSMITTER
PNEUMATIC-ELECTRIC TRANSMITTER
CONTROL RELAY
ALARM BUZZER
NORMALLY CLOSED CONTACT
NORMALLY OPEN CONTACT
MOMENTARY ON SWITCH
MOMENTARY OFF SWITCH
MOTOR THERMAL OVERLOADS
CONTROL POINT ADJUSTMENT
REVERSE ACTING
DIRECT ACTING
NORMALLY OPEN
NORMALLY CLOSED
HAND OFF AUTOMATIC
MOTOR STARTER
HEATER (ELECTRIC SUMP)
VARIABLE SPEED DRIVE UNIT
SMOKE DETECTOR
DDC DIGITAL INPUT POINT
DDC DIGITAL OUTPUT POINT
DDC ANALOG OUTPUT POINT
DDC ANALOG INPUT POINT
DDC ALARM POINT
DO
DI
AI
AO
A
SD
VS
MS
HOA
NC
NO
DA
RA
CPA
PE
EP
ES
R
M
P
H
T
H
T
SYMBOL LIST
SYMBOL DESCRIPTION
HTR
M
M
DIFFERENTIAL PRESSURE
AUTOMATIC 3-WAY VALVEM
ALARM (OR INDICATION LAMP
BACNET INTERFACEBN
CARBON DIOXIDE TRANSMITTERCO2
AIR QUALITY TRANSMITTERAQ
RS485 RS485 INTERFACE
SWITCHS
WATER DETECTORW
FLOW SENSORF
CURRENT SENSORCS
ELECTRONICALLY COMMUTATED MOTORECM
012345678
9
A
B
D
C
E
F
CC
012345678
9
A
B
D
C
E
F
BB
CC
EAV-03
14Ø EXH. UP
EAG-01
315 CFM
TO BE REMOVED
12"ø
CAP
12"ø
EXISTING
CAPPED
BRANCHES
12"ø
12"ø
12"ø
12Ø EXH. UP
12Ø EXH. UP
→
EAG-01
315 CFM
24x24 SA UP
TO AHU-01
SOUND
ATTENUATION
24"x18"VAV-02
12"ø
18"x15"
SAD-02
18"Ø PERF.
1315 CFM
EAV-02
12"ø12"ø12"ø
FUME HOOD
785 CFM OCCUPIED
510 CFM UNOCCUPIED
SAV-06
SAV-07
EAV-01
14"x10"12"ø
14"ø12"ø
24"x18"24"x18"FUME HOOD
TO BE TURNED OVER
TO CORNELL
SAD-01
10"Ø PERF.
385 CFM
TO BE REMOVED
←
←
←
←
←
10"ø 8"ø
SAD-07 8"Ø
150 CFM
8"ø
SUPPLY AIR VALVE
TO BE REMOVED
12"ø
12Ø UP TO ROOM 294
12Ø UP TO ROOM 290
EXISTING CAPPED
BRANCH
18"ø 16"ø 12"ø
12"ø
FCU
3/4"
3/4"
12"ø
EXHAUST DUCT TO
BE REMOVED
4"ø
EXISITING
RETURN
INLET AND
DUCTWORK
TO BE
REMOVED
4"ø
1-1/2"HWS/R DN
1"HWS/R UP TO 2ND FLOOR
4"HWS/R AT CEILING
OF BASEMENT
1 1/4"HWR
1 1/4"HWS
1 1/4"HWR
1 1/4"HWS
1"HWS 1"HWR
1"HWR1"HWS
3/4"HWR
3/4"HWS
3/4"HWS 3/4"HWR
2 1/2"GWS
2 1/2"GWR
2"GWS
2"GWR
1 1/2"GWR
1 1/2"GWS
EXISITING
VALVED AND
CAPPED
1-1/2"GWS/R
2"GWS/R TO AHU-1 ON
ROOF ABOVE RM. 173
2-1/2"CHWS/R FROM
BASEMENT TO AHU-1
ON ROOF ABOVE RM.
1732"GWR
2"GWS
2 1/2"CHS
2 1/2"CHR
DN
3/4"
2"CD FROM AHU-1
3"SAN
3/4"HWR 3/4"HWS
1/2"HWS/R TO
REHEAT COIL
4"Ø DN TO BE
REMOVED
↑
EXHAUST VAV
BOX TO BE
REMOVED
17" UP TO
LABORATORY
EXHAUST FANS
LEF-01 AND
LEF-02 ON
ROOF
EXISTING
VACUUM
PUMP
EXISTING EXHAUST AIR VALVE TO BE REMOVED
EXISTING 8" DIAMETER TO BE REUSED
SUPPLY AIR VALVE
TO BE REMOVED
EXHAUST VAV BOX
TO BE REMOVED
182 SADAF'S LAB
754
181 LAB I
597
184 STUDENT
SPACE
563
EXISITING AHU-2
SEE NOTE 1
EXISTING FAN
COIL UNIT
AND
ASSOCIATED
BRANCH
PIPIING TO BE
REMOVED
PIPING TO CONTINUE TO EXISITING10"Ø PERF
400 CFM SA
TO BE REMOVED
12'-71/8"EXISTING
SHUT-OFF
VALVE
1"HWR1"HWS
3/4"CHS 3/4"CHR
EXISITING VFD
SERVING AHU-2
2 2 2 2 2
2
2
EXISITING FIRE WRAPPED DUCT TO REMAIN
Revisions:
347 West 36 Street Suite 1501
New York, NY 10018
212-245-5195 T
212-239-7130 F
Key Plan:
Notes:
Grumman Hall
Cornell University
Ithaca, NY 14850
Richard McElhiney Architects LLC
April 2, 2020
Issue for Bid April 2, 2020
Scale:
31 Knight Street
Norwalk, CT 06851
203-866-5538 T
203-866-5243 F
Altieri Sebor Wieber LLC
303 South Broadway, Suite G20
Tarrytown, NY 10591
914-333-1110 T
914-333-1109 F
Jacobs Consultancy
4588 South Park Avenue
Blasdell, NY 14219
716-823-0006 T
Trophy Point
AREA OF WORK
4592 Jordan Road
Skaneateles Falls, NY 13153
315-685-4732 T
Ryan Biggs Clark Davis Engineering & Surveying
First and Second Floor Renovation Phase 1
1/4" = 1'-0"
FIRST FLOOR -Demolition
DM-102
1/4" = 1'-0"1 FIRST FLOOR- Demolition
NOTES:
PROVIDE PRECONSTRUCTION AIR FLOW AND STATIC PRESSURE MEASUREMENT
FOR SUPPLY RETURN, EXHAUST AND OUTSIDE AIR DUCTS AT SPECIFIED LOCATIONS.
FOR ALL EXISTING FINTUBES TO REMAIN:
a. REPLACE PNEUMATIC CONTROL VALVES WITH ELECTRIC CONTROLVALVES
b. REPLACE BALANCING AND ISOLATION VALVES
c. STRAIGHTEN AND CLEAN FINS
d. MATCH ENCLOSURE TYPE AND FINISH
1
2
1
1
1
1
1
1
1
1
1
1
012345678
9
A
B
D
C
E
F
CC
012345678
9
A
B
D
C
E
F
BB
CC
CONTINUES TO
EXISITING DUCTWORK
20"x10"20"x10"14"Ø UP
12"Ø UP
16"Ø UP
16"Ø UP
24x24 SA DN
24"x24"
SOUND
ATTENUATION
LONG RADIUS ELBOW
W/ LONG RADIUS
TURNING VANES
2 1/2"CHS
2 1/2"CHR
2 1/2"CHS
2 1/2"CHR
FCU FCU FCU
AHU-1
EXISTING FINTUBE RADIATION TO BE REUSED
EXISTING HOT WATER RETURN TO REMAIN
289 STUDENT
WORKSTATIONS
480
LOUVERED PENTHOUSE
WITH OUTSIDE AIR CONNECTION
TO AHU-2 24X24 DWN
CONTINUES TO
EXISITING
CONTINUES TO
EXISITING
1"CHS
1"CHR
1"HWR
1"HWS
CONTINUES TO
EXISITING
1"HWR
CUH
3/4"HWS
3/4"HWS 3/4"HWS
3/4"HWR
3/4"HWR 3/4"HWR
DOWNDOWNDOWN
EXISTING FCU AND CORRESPONDING
CHILLED WATER PIPING TO BE
REMOVED BACK TO MAIN
CONDENSATE LINE TO REMAIN AND
BE CONNECTED TO NEW FCUS
EXISTING AHU TO REMAIN
24"x18"
CONTINUES TO
EXISITING
Revisions:
347 West 36 Street Suite 1501
New York, NY 10018
212-245-5195 T
212-239-7130 F
Key Plan:
Notes:
Grumman Hall
Cornell University
Ithaca, NY 14850
Richard McElhiney Architects LLC
April 2, 2020
Issue for Bid April 2, 2020
Scale:
31 Knight Street
Norwalk, CT 06851
203-866-5538 T
203-866-5243 F
Altieri Sebor Wieber LLC
303 South Broadway, Suite G20
Tarrytown, NY 10591
914-333-1110 T
914-333-1109 F
Jacobs Consultancy
4588 South Park Avenue
Blasdell, NY 14219
716-823-0006 T
Trophy Point
AREA OF WORK
4592 Jordan Road
Skaneateles Falls, NY 13153
315-685-4732 T
Ryan Biggs Clark Davis Engineering & Surveying
First and Second Floor Renovation Phase 1
1/4" = 1'-0"
SECOND FLOOR -Demolition
DM-103
1/4" = 1'-0"1 SECOND FLOOR- Demolition
NOTES:
PROVIDE PRECONSTRUCTION AIR BALANCING MEASUREMENT
FOR SUPPLY RETURN AND OUTSIDE AIR DUCTS.
FOR ALL EXISTING FINTUBES TO REMAIN:
a. REPLACE PNEUMATIC CONTROL VALVES WITH ELECTRIC CONTROLVALVES
b. REPLACE BALANCING AND ISOLATION VALVES
c. STRAIGHTEN AND CLEAN FINS
d. MATCH ENCLOSURE TYPE AND FINISH
1
2
1
2 2 2
1
1
1
012345678
9
A
B
D
C
E
F
CC
012345678
9
A
B
D
C
E
F
BB
CC
30"ø14"ø
12"ø
16"ø
16"ø
DUCTWORK SUPPORTS
TYPICAL FOR 2
EXISTING EXHAUST
FAN AND STACK
ROOF PENETRATION
CURB
BYPASS DAMPER AND
WETHER HOOD
EXISITING
LABORATORY
EXHAUST FANS
LEF-01, LEF-02
→
UP
24"Ø EXH.
20"x20"
18x18 EXH. BY-PASS
28" MIN. FILTER
ACCESS CLEARANCE
EXISITING AIR
CLEANER WITH
DUCTED BYPASS
16"ø
Revisions:
347 West 36 Street Suite 1501
New York, NY 10018
212-245-5195 T
212-239-7130 F
Key Plan:
Notes:
Grumman Hall
Cornell University
Ithaca, NY 14850
Richard McElhiney Architects LLC
April 2, 2020
Issue for Bid April 2, 2020
Scale:
31 Knight Street
Norwalk, CT 06851
203-866-5538 T
203-866-5243 F
Altieri Sebor Wieber LLC
303 South Broadway, Suite G20
Tarrytown, NY 10591
914-333-1110 T
914-333-1109 F
Jacobs Consultancy
4588 South Park Avenue
Blasdell, NY 14219
716-823-0006 T
Trophy Point
AREA OF WORK
4592 Jordan Road
Skaneateles Falls, NY 13153
315-685-4732 T
Ryan Biggs Clark Davis Engineering & Surveying
First and Second Floor Renovation Phase 1
1/4" = 1'-0"
ROOF-Existing
DM-104
1/4" = 1'-0"1 ROOF- Existing
EXHAUST DUCT
DOWN TO 17" ROUND
EXHAUST RISER
NOTES:
PROVIDE PRECONSTRUCTION AIR BALANCING MEASUREMENT
FOR SUPPLY RETURN AND OUTSIDE AIR DUCTS.1
1
PRECONSTRUCTION AIRFLOW
AND STATIC PRESSURE MEASURMENT
REQUIRED FOR LEF 1&2
AIR CLEANER TO BE CONTINUOUSLY
OFF AND AIR CLEANER DAMPERS
TO BE LOCKED IN BYPASS MODE
MMTHT
T TTT
T
012345678
9
A
B
D
C
E
F
CC
012345678
9
A
B
D
C
E
F
BB
CC
25"x12"
25"x12"
12"ø
20"x12"
8"ø
12"x12"
25"/8"
EAV-6
181 LAB I
597
186 STUDENT
SPACE
563
100CA COMMON
AREA
442
EXISTING AHU-2
24 X24 UP TO
EXISTING AHU-1
ON ROOF
17" Ø ROUND UP TO
LABORATORY EXHAUST
FANS LEF-01 AND LEF-02
PN ROOF
14" Ø ROUND UP TO LEF-01 AND LEF-02
12" Ø ROUND UP TO LEF-01 AND LEF-02
24 X24 OA UP TO
LOUVERED PENTHOUSE
ON ROOF
CAP DUCT
BALANCE TO 800 CFM
BALANCE TO 800 CFM
188
495
182 SADAF'S LAB
754
DH-1
NEW MD IN OA
DUCTWORK.
BALANCE TO 300 CFM
NEW MD IN RA
DUCTWORK
20"ø
6"ø
12"ø
30"/12"
30"/12"
20"x12"
30"x12"
30"x12"
20"/12"
17"ø
17"ø
12"ø12"ø
10"ø
14"ø
10"ø
10"ø
17"ø
20"/12"
14"ø
8"ø
8"ø
20"x12"
20"x12"
8"ø 8"ø
6"ø
6"ø
12"ø
8"ø
12"x12"
12"ø
SAV-3
SAV-1
SAV-2
RH-1
RH-3
RH-2
EAV-1
EAV-2
EAV-3
EAV-4
EAV-5
EAV-7
EAV-8
20"Ø FABRIC SUPPLY
DUCT 1800 CFM
18"Ø FABRIC SUPPLY
DUCT 735 CFM
10"Ø PERFERATED
SUPPLY DUCT 300 CFM
B/ 12"X12", 8" Ø
250 CFM SA (TYP-2)
4" Ø DOWN
TO FUME EXTRACTOR
ARM (TYP-4)
D/ 22"X6"
333 CFM (TYP-3)
A/ 18"X6" 315
CFM SA (TYP-4)
D/ 22"X6"
417 CFM RA (TYP-3)
C/ 30"x8" 500 CFM RA
B/ 12"X12", 8" Ø
150 CFM SA
B/ 12"X12",
EXISITING 8" Ø
BALANCED TO 150 CFM SA
SERVING CORRIDOR
D/ 22 x 6"
233 CFM (TYP-3)
184 STUDENT
SPACE
563
182A PRINT
ROOM
76
EAV-9
FLEX DUCT TO BE USED FOR
CONNECTION TO FUME HOOD
FLEX DUCT TO BE USED FOR
CONNECTION TO FUME HOOD EXISITING FIRE WRAPPED DUCT TO REMAIN
FIRE
WRAPPED
DUCT
EXISITING DUCT
TO BE FIRE WRAPPED
14"x10"
12"ø
VAV-1
VAV-2
CONDENSATE TO CLOSEST DRAIN
Revisions:
347 West 36 Street Suite 1501
New York, NY 10018
212-245-5195 T
212-239-7130 F
Key Plan:
Notes:
Grumman Hall
Cornell University
Ithaca, NY 14850
Richard McElhiney Architects LLC
April 2, 2020
Issue for Bid April 2, 2020
Scale:
31 Knight Street
Norwalk, CT 06851
203-866-5538 T
203-866-5243 F
Altieri Sebor Wieber LLC
303 South Broadway, Suite G20
Tarrytown, NY 10591
914-333-1110 T
914-333-1109 F
Jacobs Consultancy
4588 South Park Avenue
Blasdell, NY 14219
716-823-0006 T
Trophy Point
AREA OF WORK
4592 Jordan Road
Skaneateles Falls, NY 13153
315-685-4732 T
Ryan Biggs Clark Davis Engineering & Surveying
First and Second Floor Renovation Phase 1
1/4" = 1'-0"
FIRST FLOOR -Ductwork
M-102
1/4" = 1'-0"1 FIRST FLOOR- Ductwork
NOTES:
PROVIDE PRECONSTRUCTION AIR FLOW AND STATIC PRESSURE MEASUREMENT
FOR SUPPLY RETURN, EXHAUST AND OUTSIDE AIR DUCTS AT SPECIFIED LOCATIONS.
REFER TO M-501 FOR AIR VALVE AIRFLOW SCHEDULE
REPLACE EXISITING CONTROLS WITH NEW ALC CONTROL SYSTEM
REBALANCE EXISITING SYSTEMS IMPACTED BY SCOPE.
1
2
3
1
1
4
2
2
2
2
2
2
2
2
2
2
2
2
T
012345678
9
A
B
D
C
E
F
CC
012345678
9
A
B
D
C
E
F
BB
CC
FCU-2 FCU-1
289 STUDENT
WORKSTATIONS
480
AHU-1
HORIZONTAL CABINET
STYLE FCU 320 CFM (TYP-2)
14"ø
EXISTING AHU-1 TO REMAIN
EXISITING OA INTAKE SERVING
AHU-2 24X24 DWN
AIRFLOW DIRECTION
20"x10"
20"x10"
Revisions:
347 West 36 Street Suite 1501
New York, NY 10018
212-245-5195 T
212-239-7130 F
Key Plan:
Notes:
Grumman Hall
Cornell University
Ithaca, NY 14850
Richard McElhiney Architects LLC
April 2, 2020
Issue for Bid April 2, 2020
Scale:
31 Knight Street
Norwalk, CT 06851
203-866-5538 T
203-866-5243 F
Altieri Sebor Wieber LLC
303 South Broadway, Suite G20
Tarrytown, NY 10591
914-333-1110 T
914-333-1109 F
Jacobs Consultancy
4588 South Park Avenue
Blasdell, NY 14219
716-823-0006 T
Trophy Point
AREA OF WORK
4592 Jordan Road
Skaneateles Falls, NY 13153
315-685-4732 T
Ryan Biggs Clark Davis Engineering & Surveying
First and Second Floor Renovation Phase 1
1/4" = 1'-0"
SECOND FLOOR -Ductwork
M-103
1/4" = 1'-0"1 SECOND FLOOR- Ductwork
NOTES:
PROVIDE PRECONSTRUCTION AIR FLOW AND STATIC PRESSURE MEASUREMENT
FOR SUPPLY RETURN, EXHAUST AND OUTSIDE AIR DUCTS AT SPECIFIED LOCATIONS.
REPLACE EXISITING CONTROLS WITH NEW ALC CONTROL SYSTEM
REBALANCE EXISITING SYSTEMS IMPACTED BY SCOPE.
1
2
3
1
1
1
REF.
THT
T TTT
T
012345678
9
A
B
D
C
E
F
CC
012345678
9
A
B
D
C
E
F
BB
CC
2"HWS
2"HWR
AHU-2
184 STUDENT
SPACE
563
182 SADAF'S LAB
754
181 LAB I
597
188
495
RH-3
RH-1
RH-2
2" HWS/R DOWN TO 4" HWS/R AT BASEMENT CEILING
3/4"HWS
3/4"HWR
3/4"HWS
3/4"HWR
3/4"HWR
3/4"HWS
3/4"HWR
3/4"HWS
3/4"HWS3/4"HWR
1"HWR
3/4"HWR 3/4"HWS
1"HWS 1"HWR
3/4"HWR 3/4"HWS
1"HWS
3/4"HWR
1"HWR
3/4"HWS
1"HWS
3/4"HWR
1"HWR
3/4"HWS
1"HWS 3/4"HWR
1"HWR
3/4"HWS
1"HWS 1"HWR3/4"HWR 3/4"HWS
1"HWS 3/4"HWR
1"HWR
3/4"HWS
1"HWS
2"GWS
2"GWR1 1/2"GWS
1 1/2"GWR
CV-1
CV-2
CV-3
CV-4
CV-5
VAV-1
VAV-2 Revisions:
347 West 36 Street Suite 1501
New York, NY 10018
212-245-5195 T
212-239-7130 F
Key Plan:
Notes:
Grumman Hall
Cornell University
Ithaca, NY 14850
Richard McElhiney Architects LLC
April 2, 2020
Issue for Bid April 2, 2020
Scale:
31 Knight Street
Norwalk, CT 06851
203-866-5538 T
203-866-5243 F
Altieri Sebor Wieber LLC
303 South Broadway, Suite G20
Tarrytown, NY 10591
914-333-1110 T
914-333-1109 F
Jacobs Consultancy
4588 South Park Avenue
Blasdell, NY 14219
716-823-0006 T
Trophy Point
AREA OF WORK
4592 Jordan Road
Skaneateles Falls, NY 13153
315-685-4732 T
Ryan Biggs Clark Davis Engineering & Surveying
First and Second Floor Renovation Phase 1
1/4" = 1'-0"
FIRST FLOOR -Piping
M-112
1/4" = 1'-0"1 FIRST FLOOR- Piping
NOTES:
FOR ALL EXISTING FINTUBES TO REMAIN:
a. REPLACE PNEUMATIC CONTROL VALVES WITH ELECTRIC CONTROL VALVES
b. REPLACE BALANCING AND ISOLATION VALVES
c. STRAIGHTEN AND CLEAN FINS
d. MATCH ENCLOSURE TYPE AND FINISH
1 1 1 1 1 1 1
1
REF.
T
012345678
9
A
B
D
C
E
F
CC
012345678
9
A
B
D
C
E
F
BB
CC
1"HWR
1"HWS
1"CHS 1"CHR
3/4"HWS
3/4"HWR
3/4"CHS
3/4"CHR 3/4"HWR 3/4"HWS
3/4"CHS
FCU-1FCU-2
3/4"CHR
3/4"CHS
3/4"HWR
3/4"HWS
3/4" COOLING COIL
CONDENSATE TO
EXISTING CONDENSATE
LINE
AHU-1
CUH
1" ISOLATION VALVE (TYP-2)
289 STUDENT
WORKSTATIONS
480 CONNECT TO
EXISTING CONDENSATE
LINE
EXISTING AHU TO REMAIN
CONDENSATE LINE TO
MAINTAIN CONTINUOUS
PITCH2 1/2"CHS
2 1/2"CHR
1 1/2"HWR
1 1/2"HWS
1 1/2"CHS
1 1/2"CHR
1 1/2"HWS
1 1/2"HWR
3/4"HWR
3/4"HWS 1"HWS 1"HWR
3/4"HWS
3/4"HWR
1"HWR
1"HWR
1"HWR
1"HWR
3/4"HWR
1"HWR
1"HWS
CV-7
CV-6
3/4"CHR
CV-8
CV-9
Revisions:
347 West 36 Street Suite 1501
New York, NY 10018
212-245-5195 T
212-239-7130 F
Key Plan:
Notes:
Grumman Hall
Cornell University
Ithaca, NY 14850
Richard McElhiney Architects LLC
April 2, 2020
Issue for Bid April 2, 2020
Scale:
31 Knight Street
Norwalk, CT 06851
203-866-5538 T
203-866-5243 F
Altieri Sebor Wieber LLC
303 South Broadway, Suite G20
Tarrytown, NY 10591
914-333-1110 T
914-333-1109 F
Jacobs Consultancy
4588 South Park Avenue
Blasdell, NY 14219
716-823-0006 T
Trophy Point
AREA OF WORK
4592 Jordan Road
Skaneateles Falls, NY 13153
315-685-4732 T
Ryan Biggs Clark Davis Engineering & Surveying
First and Second Floor Renovation Phase 1
1/4" = 1'-0"
SECOND FLOOR -Piping
M-113
1/4" = 1'-0"1 SECOND FLOOR- Piping
NOTES:
FOR ALL EXISTING FINTUBES TO REMAIN:
a. REPLACE PNEUMATIC CONTROL VALVES WITH ELECTRIC CONTROL VALVES
b. REPLACE BALANCING AND ISOLATION VALVES
c. STRAIGHTEN AND CLEAN FINS
CONNECT ENCLOSURE AND MATCH ENCLOSURE FINISH
1
2
1 21 1
TERMINAL BOX INSTALLATION DETAIL
STRAINER
ISOLATION VALVE
(TYPICAL)
BALANCING AND ISOLATION VALVE
CONTROL VALVE
DUCT TRANSITION
PRESSURE & TEMPERATURE
PORT (TYPICAL)
MANUAL AIR VENT M
HWSHWRUNION
(TYPICAL)
3/4" DRAIN VALVE
WITH CAP
HEATING COIL
DUCT TRANSITION
RECTANGULAR TO ROUND
TERMINAL BOX
& HEATING COIL
ACCESS DOOR
TRANSITION
AS REQUIRED
2'-0"
MINIMUM
1
M301M301 N.T.S.
HORIZONTAL FAN COIL UNIT4
M301M301 N.T.S.
COMBINATION SHUTOFF
BALANCE & FLOW VALVE
CHR
CHS
STRAINER
ISOLATION
VALVE
UNION(TYP)
DRAIN VALVE
3/4"CD TO DRAIN
1" DEEP TRAP
W/CLEANOUTS AUXILIARY DRAIN PAN
WATER SENSOR
AUXILIARY DRAINNOTE: PROVIDE AUXILIARY DRAIN TO APPROVED LOCATION
OR WATER SENSOR TO SHUT DOWN UNIT.
AIR VENT
SUPPORTING RODS WITH
VIBRATION ISOLATORS
CONTROL VALVE
HWR
HWS
PIPE PENETRATIONS
CORE DRILLED
UL LISTED FIRESTOP SYSTEM.
REFER TO SPECIFICATIONS.
WITH
T-RATING
WITHOUT
T-RATING
2"
WELDED WATER
STOP (NEW
CONSTRUCTION)
2
M301M301 N.T.S.
PIPE RISER
W/ INSULATION
1/4" THICK STEEL
X 2" WIDE
SUPPORT RING
SECURE AND SEAL
TO FLOOR (TYP)
SCHEDULE 40
PIPE SLEEVE
SEAL SLEEVE WITH
EXPANDING CONCRETE
GROUT AS REQ'D
(EXIST'G CONSTRUCTION)
NOTES:
1. ALL PENETRATIONS THROUGH RATED CONSTRUCTION SHALL BE FIRE STOPPED WITH AN APPROVED
UL LISTED/FM APPROVED FIRESTOP SYSTEM MEETING ASTM E-814 & UL 1479.
2. FIRESTOP SYSTEM SHALL BE FIRE RATED (F-RATING) AND THERMAL RATED (T-RATING) EQUAL TO
CONSTRUCTION RATING WITH A MINIMUM OF 1 HOUR.
3. THERMAL RATING (T-RATING) IS NOT REQUIRED WHEN THE APPLICABLE CODE(S) HAVE AN EXCEPTION
FOR THE SPECIFIC INSTALLATION CONDITION.
4. PENETRATIONS THROUGH NON-RATED CONSTRUCTION SHALL BE SEALED WITH AN APPROVED
NON-COMBUSTIBLE MATERIAL TO RESIST THE PASSAGE OF FLAMES AND THE PRODUCTS OF COMBUSTION.
WELDED WATER
STOP (EXISTING
CONSTRUCTION)
SECURE AND
SEAL TO FLOOR
2" and Smaller 2 1/2" and Larger
Fluids 150°F -250°F (15psi Steam) - 50' from Anchor
Fluids greater than 250°F - 30' from Anchor
Fluids greater than 100°F
2" and Smaller 2 1/2" and Larger
Fluids less than 100°F
2" and Smaller 2 1/2" and Larger
12" RIGID
INSULATION
12" SHIELD
HANGER
PIPE
INSULATION
18" RIGID INSULATION
18" SHIELD
ROD
DOUBLE NUTS
AND WASHERS
12" RIGID
INSULATION
12" SHIELD
INSULATION INSERT
SADDLE
HANGER SCHEDULE
PIPE SIZE ROD SIZE MAX. SPACING
up to 1 1/4"
up to 1 1/2"
1 1/2" & 2"
2 1/2" & 3"
4" & 5"
6"
8", 10", 12"
14" & 16"
18"
3/8" DIA.
3/8" DIA.
3/8" DIA.
1/2" DIA.
5/8" DIA.
3/4" DIA.
7/8" DIA.
1" DIA.
1 1/8" DIA.
8' Steel
6' Copper & Steel
10'
10'
10'
10'
10'
10'
10'
PIPE HANGER DETAIL3
M301M301 N.T.S.
TYPICAL VOLUME DAMPER LOCATIONS6
M301M301 N.T.S.
NOTES:
1.PROVIDE VOLUME DAMPERS IN EVERY BRANCH AND DIFFUSER BRANCH AS SHOWN ABOVE.
2.PROVIDE ADDITIONAL VOLUME DAMPERS AS SHOWN ON CONTRACT DOCUMENTS.
3.VOLUME DAMPERS SHALL BE CABLE OPERATED (COD) WHERE LOCATED ABOVE OR BEHIND
INACCESSIBLE SURFACES.
4.TYPICAL FOR SUPPLY, RETURN, EXHAUST AND VENTILATION AIR.
MAIN
DUCT
BRANCH DUCT
VOLUME DAMPER (VD) OR COD
(TYPICAL)
RADIUS TAP(TYPICAL)
DIFFUSER BRANCH
DUCT (TYPICAL)
VD VD VDVD
SQUARE ELBOW
DOUBLE
THICKNESS
VANES BRANCH DUCT
SUPPLY TAP
X
X
12" MAX
AIRFLOW
12" MAX
X
AIRFLOW
BRANCH DUCT
RETURN TAP
AIRFLOW
R
R=W
W
SUPPLY SPLITRADIUS ELBOWCOIL OR REGISTER
R
R=W
W
WAIRFLOW
DUCT TAP TO
REHEAT COIL
OR REGISTER
VOLUME EXTRACTOR
WITH MANUAL
ADJUSTING LEVER
20DEG MAX
TRANSITION
DUCT CONSTRUCTION DETAILS
NOTE: SPECIFICATIONS EXCEED
SMACNA STANDARDS IN
SOME INSTANCES.
SMACNA SHALL BE
CONSIDERED THE MINIMUM
STANDARD UNLESS
OTHERWISE NOTED
7
M301M301 N.T.S.
X
DUCT
HANGER
(TYP)
END CAP
SUPPLY DIFFUSER OR
RETURN/EXHAUST GRILLE
DUCT
VOLUME DAMPER
CEILING FRAMING
SUSPENSION SYSTEM
BY OTHER DIVISION
3'-0" MAX.
DUCT SIZE TO
MATCH DIFFUSER
NECK SIZE
REFER TO SCHEDULE
VD
CEILING-REFER TO
REFLECTED CEILING
PLANS FOR CEILING
TYPE AND DIFFUSER
LOCATION
NOTE: PROVIDE DIFFUSER W/ OPPOSED BLADE CABLE OPERATED DAMPER
AND IN-AIRSTREAM OPERATORS WHERE INSTALLED IN HARD INACCESSIBLE CEILING.
TYPICAL SUPPLY, RETURN
AND EXHAUST OUTLET DETAIL10
M301M301 N.T.S.
TYPE "C" FOAMGLAS
INSULATION
WATERPROOFING
(BY OTHER DIVISION)
SILICONE CAULKING
AROUND FULL PERIMETER
OF ANGLES - INSIDE AND
OUTSIDE
DUCT
OUTSIDE INSIDE
12" MIN
CONTINUOUS 18 GA ALUMINUM ANGLE
AROUND FULL PERIMETER OF DUCT
INSIDE AND OUTSIDE
INSULATE PER
SPECIFICATIONS
MAINTAIN VAPOR
BARRIER
DUCT PENETRATION THROUGH WALL8
M301M301 N.T.S.
METAL DECK HANGER BOLTS CONCRETE DECK INSERTS
BEAM CLAMPS
SUPPLEMENTAL STEEL
WELDING PROCEDURE TO
BE SUBMITTED FOR REVIEW
INTERMEDIATE ATTACHMENT
ONE SIZE LARGER THAN
LARGEST HANGER ROD
END ATTACHMENT
TO BE SAME AS
LARGEST HANGER ROD
SQUARE STEEL WASHER TYP
BACK TO BACK STRUCTURAL SHAPES
WITH SPACERS WELDED AT 24" INTERVALS
TWO HANGER RODS MAXIMUM
BETWEEN STRUCTURE ATTACHMENTS
PIPE HANGER ATTACHMENT DETAIL5
M301M301 N.T.S.
HWR
HWS
A
STRAINER
BALANCING AND
ISOLATION VALVE
AIR VENT
TYPICAL
PRESSURE & TEMPERATURE
PORT (TYPICAL)
ISOLATION VALVE
BLOWDOWN VALVE
CONTROL VALVE
REDUCER
COIL NO.A
HOSE END
GATE VALVE
UNION
(TYPICAL)
HOT WATER REHEAT COIL9
M301M301 N.T.S.
RH-1 THRU 3 3/4"
HWS
DRAIN VALVE
(@LOW POINT)
UNION (TYP)
BALANCE & FLOW VALVE
MANUAL AIR VENT
(@ HIGH POINT)
P IT C H U P
FINTUBE
INCREASER / REDUCER
AS REQUIRED (TYP)
CONTROL VALVE
WHERE INDICATED
ISOLATION
VALVE
FINTUBE RADIATION DETAIL
TO SPACE THERMOSTAT
12
M-301M-301 N.T.S.
HWR
ISOLATION VALVE
PROVIDE NEW VAVLE ASSEMBLY TO EXISTING
FINTUBE PERIMETER RADIATION. TIE INTO
EXISTING HWS/R RISERS.
Revisions:
347 West 36 Street Suite 1501
New York, NY 10018
212-245-5195 T
212-239-7130 F
Key Plan:
Notes:
Grumman Hall
Cornell University
Ithaca, NY 14850
Richard McElhiney Architects LLC
April 2, 2020
Issue for Bid April 2, 2020
Scale:
31 Knight Street
Norwalk, CT 06851
203-866-5538 T
203-866-5243 F
Altieri Sebor Wieber LLC
303 South Broadway, Suite G20
Tarrytown, NY 10591
914-333-1110 T
914-333-1109 F
Jacobs Consultancy
4588 South Park Avenue
Blasdell, NY 14219
716-823-0006 T
Trophy Point
AREA OF WORK
4592 Jordan Road
Skaneateles Falls, NY 13153
315-685-4732 T
Ryan Biggs Clark Davis Engineering & Surveying
First and Second Floor Renovation Phase 1
12" = 1'-0"
Details
M-301
DEHUMIDIFIER DETAIL
REGEN. EXHAUST
SUPPLY AIR
REGEN. INTAKE
PROCESS SUPPLY
11
M301 M301 NTS
OVERALL AIRFLOW DIAGRAM
SCALE: NONE
1
M-400M-400EAV-6EAV-3EAV-1AO
AI COM
BACnet/MSTPAV
AO
AI COM
BACnet/MSTPAV
17"Ø EXHAUSTDUCT UP TO
EXISTING
LEF-01 & LEF-02
ON ROOF
12"Ø EXHAUSTDUCT UP TO
EXISTING
LEF-01 & LEF-02
ON ROOF
FUME HOOD
GAS CABINET
FURNACE CANOPY HOODEAV-4AO
AI COM
BACnet/MSTPAV
FUME
EXTRACTION
ARMEAV-5AO
AI COM
BACnet/MSTPAV EAV-8AO
AI COM
BACnet/MSTPAV
GENERAL
EXHAUST
FUME HOOD
GENERALEXHAUST
FUME
EXTRACTION
ARM
24"x24" SUPPLY
DUCT DN FROM
EXISTING AHU
ON ROOF
12"Ø EXHAUSTDUCT TO OUT OFSCOPE LAB AREA
SAV-3
AHU-1SUPPLY AIR
ETR SUPPLYDUCT TO OUTOF SCOPE
AREA
SAV-1
AO
AI COM
BACnet/MSTPAV
SAV-2AHU-1
SUPPLY AIR
AHU-1
SUPPLY AIR
182A PRINT ROOM182 SADAF'S LAB 180 LAB I
GENERALEXHAUST
14"Ø EXHAUSTDUCT UP TO
EXISTING LEF-01
& LEF-02 ON
ROOF
AO
AI COM
BACnet/MSTPAV
EXIST. FUME HOOD EAV-EX1AO
AI COM
BACnet/MSTPAV
EAV-EX2EXIST.GENERALEXHAUST
188 LAB
AO
AI COM
BACnet/MSTPAV
AO
AI COM
BACnet/MSTPAV
HC ~HWS
HWR~AO
HC ~HWS
HWR~HC ~HWS
HWR~AO
AO
NOTES:
1.REFER TO M-401 FOR SEQUENCES AND POINTS LIST.
2. ALL EXISTING CONTROLS INDICATED ABOVE SHALL BE TRANSFERRED OVER TO THE NEW ALC PANEL.EAV-2DH-1
SAV-EX1HCEX~HWSHWR
~AO
AO
AICOM
BACnet/MSTP AV SAV-EX2HCEX~HWSHWR
~AO
AO
AICOM
BACnet/MSTP AV
EXIST.
SUPPLY
AI
T OCC
DI
AO
PERIMETER RADIATION
AO
PERIMETER RADIATION
NEW CONTROLVALVE ON HWR
AI
& HUMIDITY SENSORS
SPACE TEMPERATURE
H
DO
NEW CONTROLVALVE ON HWR
AI
T
AI
& OCCUPANCY SENSORS
SPACE TEMPERATURE, HUMDITY
T OCC
DI AI
& OCCUPANCY SENSORS
SPACE TEMPERATURE
T OCC
DI
AO
AI
COM
BACnet/MSTP
AV
AO
AICOM
BACnet/MSTP AV
FUME HOOD
FUME HOOD
CONTROLLER
VERTICAL
SASHSENSOR
HORIZONTAL
SASH SENSOR
FUME HOODDISPLAY
FUME HOOD
EXHAUST VALVE
TYPICAL FUME HOOD CONTROLLER DETAIL
SCALE: NONE
2
M-400M-400
A
A A A A AA
A
A
A
A
A
A A
AI
T
AI
T
AI
T
AI T AI T
AI
T
AI
H
AI
T
AI
H
LINE TYPE LEGEND
NEW WORK
EXISTING TO REMAIN
AI
H
AI
H
AO
AICOM
BACnet/MSTP AV
A
FUME
EXTRACTION
ARM
FUME
EXTRACTION
ARMEAV-7AO
AICOM
BACnet/MSTP AV
A
AI
H
DI
EAV-9AO
AI COM
BACnet/MSTPAV
A
& OCCUPANCY SENSORS
SPACE TEMPERATURE, HUMDITY
Revisions:
347 West 36 Street Suite 1501
New York, NY 10018
212-245-5195 T
212-239-7130 F
Key Plan:
Notes:
Grumman Hall
Cornell University
Ithaca, NY 14850
Richard McElhiney Architects LLC
April 2, 2020
Issue for Bid April 2, 2020
Scale:
31 Knight Street
Norwalk, CT 06851
203-866-5538 T
203-866-5243 F
Altieri Sebor Wieber LLC
303 South Broadway, Suite G20
Tarrytown, NY 10591
914-333-1110 T
914-333-1109 F
Jacobs Consultancy
4588 South Park Avenue
Blasdell, NY 14219
716-823-0006 T
Trophy Point
AREA OF WORK
4592 Jordan Road
Skaneateles Falls, NY 13153
315-685-4732 T
Ryan Biggs Clark Davis Engineering & Surveying
First and Second Floor Renovation Phase 1
12" = 1'-0"
Flow & Control -Mechanical
M-400
DI DO AI AO AV BV SCH TREND BACS
SOFTWARE POINTSHARDWARE POINTS
ALARM
DESCRIPTION
SHOWN
ON
GRAPHIC
NOTESLAB PREP ROOM 200C
SUPPLY AIR VALVE (SAV-1 , 2, 3, & EX) MAX AIRFLOW SETPOINT (CFM)
SUPPLY AIR VALVE (SAV-1 , 2, 3, & EX) POSITION COMMAND (CFM)
SPACE TEMPERATURE SETPOINT (DEG F)
REHEAT COIL (RH-1, 2, 3, EX) VALVE POSITION COMMAND (%)
X
X
X
XX
REHEAT COIL (RH-1, 2, 3, EX) LEAVING AIR TEMPERATURE (DEG F)
SUPPLY AIR VALVE (SAV-1 , 2, 3, & EX) FLOW FEEDBACK (CFM)
SUPPLY AIR VALVE (SAV-1 , 2, 3, & EX) MIN AIRFLOW SETPOINT (CFM)
X
XX
X
X
X
X
X
X X
X
XX
SPACE TEMPERATURE (DEG F)
SPACE OCCUPANCY
X
X
X
X
X
X
SUPPLY AIR VALVE (SAV-1 , 2, 3, & EX) STATUS X
X
X
X
10% FLOW DEVIATION FROM SETPOINT
JAM ALARM
LOW DIFFERENTIAL PRESSURE
X TRI-STATE ALARM
X
EXHAUST AIR VALVE (EAV-1 THRU 9 & EX1 THRU EX3) MAX AIRFLOW SETPOINT (CFM)
EXHAUST AIR VALVE (EAV-1 THRU 9 & EX1 THRU EX3) POSITION COMMAND (CFM)
X
EXHAUST AIR VALVE (EAV-3, 6, 7, 8, 9, EX1, EX2, & EX3 ) FLOW FEEDBACK (CFM)
EXHAUST AIR VALVE (EAV-1 THRU 9 & EX1 THRU EX3)MIN AIRFLOW SETPOINT (CFM)
XX
X X
X
X X
X
XX
X
EXHAUST AIR VALVE (EAV-1 THRU 9 & EX1 THRU EX3) STATUS X
X
X
X
10% FLOW DEVIATION FROM SETPOINT
JAM ALARM
LOW DIFFERENTIAL PRESSURE
X TRI-STATE ALARM
EXHAUST AIR VALVE (EAV-1, 2, 4, & 5)FLOW FEEDBACK (CFM)X X X
EXHAUST AIR VALVE (EAV-1, 2, 4, & 5) STATUS X X
X
JAM ALARM
LOW DIFFERENTIAL PRESSURE X TWO-STATE ALARM
FUME HOOD SASH POSITION FEEDBACK X X XXSASH OPEN FOR 24 CONTINUOUS HOURS OR MORE
FUME HOOD OCC/UNOCC/HIBERNATION COMMAND XX TRI-STATE OUTPUT POINT
PERIMETER RADIATION CONTROL VALVE COMMAND (%)XXX
EXHAUST AIR VALVE (EAV-1, 2, 4, & 5) POSITION COMMAND (CFM)XXX INTERLOCKED TO FUME HOOD
SEQUENCE OF OPERATION
ZONE CONTROL: 182 SADAF'S LAB CONTROL
A.SYSTEM DESCRIPTION
1.
2.
3.
4.
5.
6.
7.
SUPPLY AIR VALVE (SAV-2)
CANOPY HOOD EXHAUST AIR VALVE (EAV-1)
GAS CABINET EXHAUST AIR VALVE (EAV-3)
FUME EXTRACTION ARM EXHAUST AIR VALVE (EAV-4)
FUME EXTRACTION ARM EXHAUST AIR VALVE (EAV-5)
VARIABLE FUME HOOD EXHAUST AIR VALVE (EAV-6)
GENERAL EXHAUST AIR VALVE (EAV-7)
B.LABORATORY AIRFLOW CONTROL OCCUPIED MODE
1.
2.
3.
4.
5.
WHEN THE ROOM IS OCCUPIED, THE ROOM EXHAUST & SUPPLY MIN/MAX RATES SHALL CORRESPOND TO THE LAB AIRFLOW MATRIX VALUES FOR OCCUPIED MODE.
THE BACS SHALL SEND AN OCCUPIED COMMAND TO THE FUME HOOD CONTROLLER. THE FUME HOOD CONTROLLER SHALL INDEX THE FUME HOOD SASH POSITION. THE FUME HOOD
EXHAUST VALVE (EAV-6) CONTROLLER SHALL MODULATE THE EXHAUST VALVE TO MAINTAIN THE REQUIRED 100 FPM FACE VELOCITY SETPOINT BASED ON SASH POSITION.
THE CANOPY HOOD, GAS CABINET, AND FUME EXTRACTION ARM EXHAUST AIR VALVES (EAV-1,EAV-3,EAV-4,EAV-5 RESPECTIVELY) SHALL ADJUST TO THEIR OCCUPIED EXHAUST RATE
POSITIONS.
THE GENERAL EXHAUST VALVE (EAV-7) SHALL MODULATE TO MAINTAIN THE OVERALL ROOM AIRFLOW OFFSET BASED ON THE TOTAL ROOM EXHAUST AND SUPPLY AIRFLOW RATES.
THE SUPPLY AIR VALVE (SAV-2) SHALL MODULATE BETWEEN ITS MAX & MIN POSITIONS BASED ON THE ROOM TEMPERATURE SETPOINT & REQUIRED AIR FOR EXHAUST OFFSET (REFER TO LAB
AIRFLOW MATRIX). THE SUPPLY VALVE SHALL NOT BE ALLOWED TO MODULATE BELOW ITS REQUIRED MINIMUM AIR POSITION FOR THE CURRENT OVERALL ROOM EXHAUST RATE.
C.LABORATORY AIRFLOW CONTROL UNOCCUPIED MODE
1.
2.
3.
4.
5.
WHEN THE ROOM IS UNOCCUPIED, THE ROOM EXHAUST & SUPPLY MIN/MAX RATES SHALL CORRESPOND TO THE LAB AIRFLOW MATRIX VALUES FOR UNOCCUPIED MODE UNLESS STATED
OTHERWISE BELOW.
THE FUME HOOD CONTROLLER SHALL INDEX THE FUME HOOD SASH POSITION. IF THE SASH POSITION IS BELOW 18" THE BACS SHALL SEND AN UNOCCUPIED COMMAND TO THE FUME HOOD
CONTROLLER. THE FUME HOOD EXHAUST VALVE (EAV-6) CONTROLLER SHALL MODULATE THE EXHAUST VALVE TO MAINTAIN THE REQUIRED 80 FPM (ADJUSTABLE) FACE VELOCITY
SETPOINT BASED ON SASH POSITION. IF THE SASH POSITION IS ABOVE 18" THE BACS SHALL NOT SEND AN UNOCCUPIED COMMAND TO THE FUME HOOD CONTROLLER. THE FUME HOOD
EXHAUST VALVE (EAV-6) CONTROLLER SHALL MODULATE THE EXHAUST VALVE TO MAINTAIN THE REQUIRED 100 FPM FACE VELOCITY SETPOINT BASED ON SASH POSITION.
THE CANOPY HOOD, GAS CABINET, AND FUME EXTRACTION ARM EXHAUST AIR VALVES (EAV-1,EAV-3,EAV-4,EAV-5 RESPECTIVELY) SHALL ADJUST TO THEIR UNOCCUPIED EXHAUST RATE
POSITIONS.
THE GENERAL EXHAUST VALVE (EAV-7) SHALL MODULATE TO MAINTAIN THE OVERALL ROOM AIRFLOW OFFSET BASED ON THE TOTAL ROOM EXHAUST AND SUPPLY AIRFLOW RATES.
THE SUPPLY AIR VALVE (SAV-2) SHALL MODULATE BETWEEN ITS MAX & MIN POSITIONS BASED ON THE ROOM TEMPERATURE SETPOINT & REQUIRED AIR FOR EXHAUST OFFSET (REFER TO
LAB AIRFLOW MATRIX). THE SUPPLY VALVE SHALL NOT BE ALLOWED TO MODULATE BELOW ITS REQUIRED MINIMUM AIR POSITION FOR THE CURRENT OVERALL ROOM EXHAUST RATE.
D.LABORATORY AIRFLOW CONTROL HIBERNATION MODE
1.THE ROOM SHALL BE CAPABLE OF BEING MANUALLY SET INTO "HIBERNATION MODE". A LIST OF EQUIPMENT THAT CAN BE TURNED OFF VIA CLOSING BLAST GATES AS WELL AS ANY
ADDITIONAL REDUCED AIRFLOW RATES FROM THE UNOCCUPIED MODE SHALL BE PREDETERMINED BY THE FACILITIES ENGINEER AND HEALTH AND SAFETY OFFICER (HSO). THE EXHAUST
AIR VALVES SERVING CLOSED OFF EQUIPMENT SHALL BE CLOSED. THE OVERALL ROOM ACH SHALL NOT FALL BELOW 3 ACH AS DETERMINED BY THE HSO. ANY EQUIPMENT DETERMINED
NOT TO BE CLOSED DOWN SHALL ENTER INTO UNOCCUPIED MODE. THE SUPPLY AIR VALVE SHALL BE ALLOWED TO RESET DOWN TO ITS HIBERNATION MODE MINIMUM. THE GENERAL
EXHAUST VALVE SHALL CONTINUE TO TRACK THE OVERALL ROOM EXHAUST TO MAINTAIN REQUIRED ROOM OFFSET.
E.LABORATORY GAS DETECTION
1.UPON A GAS DETECTION INPUT FROM THE GAS DETECTION PANEL, THE BACS SHALL OVERRIDE THE ROOM OCCUPANCY AS OCCUPIED. THE FUMEHOOD, CANOPY HOOD, FUME EXTRACTION
ARMS AND GENERAL EXHAUST AIR VALVES SHALL MAINTAIN THEIR OCCUPIED MODE OPERATION. THE GAS CABINET EXHAUST AIR VALVE (EAV-3) SHALL OPEN TO ITS EMERGENCY AIRFLOW
RATE OF XYZ CFM. THE SUPPLY AIR EXHAUST VALVE SHALL BE ALLOWED TO MODULATE UP TO ITS EMERGENCY SUPPLY RATE AS REQUIRED TO MAINTAIN THE ROOM EXHAUST AIRFLOW
OFFSET.
F.ZONE TEMPERATURE CONTROL
1.
2.
3.
WHEN THE SPACE TEMPERATURE SETPOINT IS MET THE SUPPLY AIR VALVE (SAV-2) SHALL MODULATE TOWARDS ITS MINIMUM POSITION BASED ON THE CURRENT ROOM EXHAUST AIRFLOW
RATE, THE HOT WATER CONTROL VALVE ASSOCIATED WITH SAV-2 SHALL MODULATE TO MAINTAIN A SUPPLY AIR TEMPERATURE OF 70.0°F TO THE SPACE. THIS SHALL BE CONSIDERED
NEUTRAL OPERATION FOR THE SUPPLY VALVE.
UPON A CALL FOR COOLING THE HOT WATER CONTROL VALVE ASSOCIATED WITH SAV-2 SHALL CLOSE. IF AFTER A PERIOD OF 15 MINUTES (ADJUSTABLE) THE SPACE IS CALLING FOR
ADDITIONAL COOLING THEN THE SUPPLY VALVE SHALL MODULATE TOWARDS ITS MAXIMUM AIRFLOW POSITION.
UPON A CALL FOR HEATING THE SUPPLY AIR VALVE SHALL CONTINUE TO MAINTAIN A SUPPLY AIR TEMPERATURE OF 70.0°F AT ITS MINIMUM POSITION. THE PERIMETER RADIATION HOT WATER
CONTROL VALVE SHALL MODULATE OPEN. IF AFTER A PERIOD OF 15 MINUTES (ADJUSTABLE) THE ROOM IS CALLING FOR ADDITIONAL HEATING, THE HOT WATER CONTROL VALVE
ASSOCIATED WITH SAV-2 SHALL MODULATE OPEN TO PROVIDE 80.0°F SUPPLY AIR TO THE SPACE. UPON SATISFYING THE HEATING SET POINT SAV-2 AND ITS ASSOCIATED HOT WATER
CONTROL VALVE SHALL RETURN TO NEUTRAL OPERATION AND THE PERIMETER RADIATION CONTROL VALVE SHALL CLOSE.
SEQUENCE OF OPERATION
ZONE CONTROL: 180 LAB I CONTROL
A.SYSTEM DESCRIPTION
1.
2.
3.
SUPPLY AIR VALVE (SAV-1)
VARIABLE FUME HOOD EXHAUST AIR VALVE (EAV-EX1)
GENERAL EXHAUST AIR VALVE (EAV-8)
B.LABORATORY AIRFLOW CONTROL OCCUPIED MODE
1.
2.
3.
4.
WHEN THE ROOM IS OCCUPIED, THE ROOM EXHAUST & SUPPLY MIN/MAX RATES SHALL CORRESPOND TO THE LAB AIRFLOW MATRIX VALUES FOR OCCUPIED MODE.
THE BACS SHALL SEND AN OCCUPIED COMMAND TO THE FUME HOOD CONTROLLER. THE FUME HOOD CONTROLLER SHALL INDEX THE FUME HOOD SASH POSITION. THE FUME HOOD
EXHAUST VALVE (EAV-EX1) CONTROLLER SHALL MODULATE THE EXHAUST VALVE TO MAINTAIN THE REQUIRED 100 FPM FACE VELOCITY SETPOINT BASED ON SASH POSITION.
THE GENERAL EXHAUST VALVE (EAV-8) SHALL MODULATE TO MAINTAIN THE OVERALL ROOM AIRFLOW OFFSET BASED ON THE TOTAL ROOM EXHAUST AND SUPPLY AIRFLOW RATES.
THE SUPPLY AIR VALVE (SAV-1) SHALL MODULATE BETWEEN ITS MAX & MIN POSITIONS BASED ON THE ROOM TEMPERATURE SETPOINT & REQUIRED AIR FOR EXHAUST OFFSET (REFER TO LAB
AIRFLOW MATRIX). THE SUPPLY VALVE SHALL NOT BE ALLOWED TO MODULATE BELOW ITS REQUIRED MINIMUM AIR POSITION FOR THE CURRENT OVERALL ROOM EXHAUST RATE.
C.LABORATORY AIRFLOW CONTROL UNOCCUPIED MODE
1.
2.
3.
4.
WHEN THE ROOM IS UNOCCUPIED, THE ROOM EXHAUST & SUPPLY MIN/MAX RATES SHALL CORRESPOND TO THE LAB AIRFLOW MATRIX VALUES FOR UNOCCUPIED MODE UNLESS STATED
OTHERWISE BELOW.
THE FUME HOOD CONTROLLER SHALL INDEX THE FUME HOOD SASH POSITION. IF THE SASH POSITION IS BELOW 18" THE BACS SHALL SEND AN UNOCCUPIED COMMAND TO THE FUME HOOD
CONTROLLER. THE FUME HOOD EXHAUST VALVE (EAV-EX1) CONTROLLER SHALL MODULATE THE EXHAUST VALVE TO MAINTAIN THE REQUIRED 80 FPM (ADJUSTABLE) FACE VELOCITY
SETPOINT BASED ON SASH POSITION. IF THE SASH POSITION IS ABOVE 18" THE BACS SHALL NOT SEND AN UNOCCUPIED COMMAND TO THE FUME HOOD CONTROLLER. THE FUME HOOD
EXHAUST VALVE (EAV-EX1) CONTROLLER SHALL MODULATE THE EXHAUST VALVE TO MAINTAIN THE REQUIRED 100 FPM FACE VELOCITY SETPOINT BASED ON SASH POSITION.
THE GENERAL EXHAUST VALVE (EAV-8) SHALL MODULATE TO MAINTAIN THE OVERALL ROOM AIRFLOW OFFSET BASED ON THE TOTAL ROOM EXHAUST AND SUPPLY AIRFLOW RATES.
THE SUPPLY AIR VALVE (SAV-1) SHALL MODULATE BETWEEN ITS MAX & MIN POSITIONS BASED ON THE ROOM TEMPERATURE SETPOINT & REQUIRED AIR FOR EXHAUST OFFSET (REFER TO
LAB AIRFLOW MATRIX). THE SUPPLY VALVE SHALL NOT BE ALLOWED TO MODULATE BELOW ITS REQUIRED MINIMUM AIR POSITION FOR THE CURRENT OVERALL ROOM EXHAUST RATE.
D.LABORATORY AIRFLOW CONTROL HIBERNATION MODE
1.THE ROOM SHALL BE CAPABLE OF BEING MANUALLY SET INTO "HIBERNATION MODE". A LIST OF EQUIPMENT THAT CAN BE TURNED OFF VIA CLOSING BLAST GATES AS WELL AS ANY
ADDITIONAL REDUCED AIRFLOW RATES FROM THE UNOCCUPIED MODE SHALL BE PREDETERMINED BY THE FACILITIES ENGINEER AND HEALTH AND SAFETY OFFICER (HSO). THE EXHAUST
AIR VALVES SERVING CLOSED OFF EQUIPMENT SHALL BE CLOSED. THE OVERALL ROOM ACH SHALL NOT FALL BELOW 3 ACH AS DETERMINED BY THE HSO. ANY EQUIPMENT DETERMINED
NOT TO BE CLOSED DOWN SHALL ENTER INTO UNOCCUPIED MODE. THE SUPPLY AIR VALVE SHALL BE ALLOWED TO RESET DOWN TO ITS HIBERNATION MODE MINIMUM. THE GENERAL
EXHAUST VALVE SHALL CONTINUE TO TRACK THE OVERALL ROOM EXHAUST TO MAINTAIN REQUIRED ROOM OFFSET.
F.ZONE TEMPERATURE CONTROL
1.
2.
3.
WHEN THE SPACE TEMPERATURE SETPOINT IS MET THE SUPPLY AIR VALVE (SAV-1) SHALL MODULATE TOWARDS ITS MINIMUM POSITION BASED ON THE CURRENT ROOM EXHAUST AIRFLOW
RATE, THE HOT WATER CONTROL VALVE ASSOCIATED WITH SAV-1 SHALL MODULATE TO MAINTAIN A SUPPLY AIR TEMPERATURE OF 70.0°F TO THE SPACE. THIS SHALL BE CONSIDERED
NEUTRAL OPERATION FOR THE SUPPLY VALVE.
UPON A CALL FOR COOLING THE HOT WATER CONTROL VALVE ASSOCIATED WITH SAV-1 SHALL CLOSE. IF AFTER A PERIOD OF 15 MINUTES (ADJUSTABLE) THE SPACE IS CALLING FOR
ADDITIONAL COOLING THEN THE SUPPLY VALVE SHALL MODULATE TOWARDS ITS MAXIMUM AIRFLOW POSITION.
UPON A CALL FOR HEATING THE HOT WATER CONTROL VALVE ASSOCIATED WITH SAV-1 SHALL MODULATE OPEN TO PROVIDE 85.0°F SUPPLY AIR TO THE SPACE. UPON SATISFYING THE
HEATING SET POINT SAV-1 AND ITS ASSOCIATED HOT WATER CONTROL VALVE SHALL RETURN TO NEUTRAL OPERATION.
SEQUENCE OF OPERATION
ZONE CONTROL: 182A PRINT ROOM CONTROL
A.SYSTEM DESCRIPTION
1.
2.
3.
SUPPLY AIR VALVE (SAV-3)
GENERAL EXHAUST AIR VALVE (EAV-2)
DEHUMIDIFIER (DH-1)
B.LABORATORY AIRFLOW CONTROL
1.THE PRINT ROOM SHALL BE A NEUTRAL PRESSURE AREA AND SHALL BE PROVIDED WITH CONSTANT VOLUME SUPPLY (SAV-3) AND EXHAUST (EAV-2) WITH MULTIPLE OPERATING MODES.
DURING DEHUMIDIFICATION MODE THE UNIT SHALL SUPPLY AND EXHAUST 300 CFM. WHEN NOT IN DEHUMIDIFICATION MODE SAV-3 AND EAV-2 SHALL BE ALLOWED TO SETBACK TO THE
OCCUPIED AND UNOCCUPIED MINIMUM SUPPLY AIR RATES. REFER TO THE LAB AIRFLOW MATRIX ON SHEET M-501.
C.LABORATORY AIRFLOW CONTROL HIBERNATION MODE
1.THE ROOM SHALL BE CAPABLE OF BEING MANUALLY SET INTO "HIBERNATION MODE". A LIST OF EQUIPMENT THAT CAN BE TURNED OFF VIA CLOSING BLAST GATES AS WELL AS ANY
ADDITIONAL REDUCED AIRFLOW RATES FROM THE UNOCCUPIED MODE SHALL BE PREDETERMINED BY THE FACILITIES ENGINEER AND HEALTH AND SAFETY OFFICER (HSO). THE EXHAUST
AIR VALVES SERVING CLOSED OFF EQUIPMENT SHALL BE CLOSED. THE OVERALL ROOM ACH SHALL NOT FALL BELOW 3 ACH AS DETERMINED BY THE HSO. ANY EQUIPMENT DETERMINED
NOT TO BE CLOSED DOWN SHALL ENTER INTO UNOCCUPIED MODE. THE SUPPLY AIR VALVE SHALL BE ALLOWED TO RESET DOWN TO ITS HIBERNATION MODE MINIMUM. THE GENERAL
EXHAUST VALVE SHALL CONTINUE TO TRACK THE OVERALL ROOM EXHAUST TO MAINTAIN REQUIRED ROOM OFFSET.
F.ZONE TEMPERATURE CONTROL
1.
2.
3.
4.
WHEN THE SPACE TEMPERATURE SETPOINT IS MET THE HOT WATER CONTROL VALVE ASSOCIATED WITH SAV-1 SHALL MODULATE TO MAINTAIN A SUPPLY AIR TEMPERATURE OF 70.0°F TO
THE SPACE. THIS SHALL BE CONSIDERED NEUTRAL OPERATION FOR THE SUPPLY VALVE.
UPON A CALL FOR COOLING THE HOT WATER CONTROL VALVE ASSOCIATED WITH SAV-3 SHALL CLOSE.
UPON A CALL FOR HEATING THE HOT WATER CONTROL VALVE ASSOCIATED WITH SAV-3 SHALL MODULATE OPEN TO PROVIDE A 85.0°F LEAVING SUPPLY AIR TO THE SPACE. UPON SATISFYING
THE HEATING SET POINT THE HOT WATER CONTROL VALVE SHALL RETURN TO NEUTRAL OPERATION.
THE DEHUMIDIFIER (DH-1) SHALL OPERATE INDEPENDENT OF THE TEMPERATURE CONTROLS. UPON THE SPACE HUMIDISTAT RETURNING A RELATIVE HUMIDITY (RH) OF GREATER THAN 40%
RH THE DEHUMIDIFIER SHALL BE ENABLED BY THE ROOM HUMIDISTAT AND REMAIN ENABLED UNTIL THE SPACE HAS REACHED A RELATIVE HUMIDITY LEVEL OF 35% RH (ADJUSTABLE)
SEQUENCE OF OPERATION
ZONE CONTROL: 188 LAB CONTROL
A.SYSTEM DESCRIPTION
1.
2.
3.
SUPPLY AIR VALVE (SAV-EX1)
VARIABLE FUME HOOD EXHAUST AIR VALVE (EAV-EX2)
GENERAL EXHAUST AIR VALVE (EAV-EX3)
B.LABORATORY AIRFLOW CONTROL OCCUPIED MODE
1.
2.
3.
4.
WHEN THE ROOM IS OCCUPIED, THE ROOM EXHAUST & SUPPLY MIN/MAX RATES SHALL CORRESPOND TO THE LAB AIRFLOW MATRIX VALUES FOR OCCUPIED MODE.
THE BACS SHALL SEND AN OCCUPIED COMMAND TO THE FUME HOOD CONTROLLER. THE FUME HOOD CONTROLLER SHALL INDEX THE FUME HOOD SASH POSITION. THE FUME HOOD
EXHAUST VALVE (EAV-EX2) CONTROLLER SHALL MODULATE THE EXHAUST VALVE TO MAINTAIN THE REQUIRED 100 FPM FACE VELOCITY SETPOINT BASED ON SASH POSITION.
THE GENERAL EXHAUST VALVE (EAV-EX3) SHALL MODULATE TO MAINTAIN THE OVERALL ROOM AIRFLOW OFFSET BASED ON THE TOTAL ROOM EXHAUST AND SUPPLY AIRFLOW RATES.
THE SUPPLY AIR VALVE (SAV-EX1) SHALL MODULATE BETWEEN ITS MAX & MIN POSITIONS BASED ON THE ROOM TEMPERATURE SETPOINT & REQUIRED AIR FOR EXHAUST OFFSET (REFER TO
LAB AIRFLOW MATRIX). THE SUPPLY VALVE SHALL NOT BE ALLOWED TO MODULATE BELOW ITS REQUIRED MINIMUM AIR POSITION FOR THE CURRENT OVERALL ROOM EXHAUST RATE.
C.LABORATORY AIRFLOW CONTROL UNOCCUPIED MODE
1.
2.
3.
4.
WHEN THE ROOM IS UNOCCUPIED, THE ROOM EXHAUST & SUPPLY MIN/MAX RATES SHALL CORRESPOND TO THE LAB AIRFLOW MATRIX VALUES FOR UNOCCUPIED MODE UNLESS STATED
OTHERWISE BELOW.
THE FUME HOOD CONTROLLER SHALL INDEX THE FUME HOOD SASH POSITION. IF THE SASH POSITION IS BELOW 18" THE BACS SHALL SEND AN UNOCCUPIED COMMAND TO THE FUME HOOD
CONTROLLER. THE FUME HOOD EXHAUST VALVE (EAV-EX2) CONTROLLER SHALL MODULATE THE EXHAUST VALVE TO MAINTAIN THE REQUIRED 80 FPM (ADJUSTABLE) FACE VELOCITY
SETPOINT BASED ON SASH POSITION. IF THE SASH POSITION IS ABOVE 18" THE BACS SHALL NOT SEND AN UNOCCUPIED COMMAND TO THE FUME HOOD CONTROLLER. THE FUME HOOD
EXHAUST VALVE (EAV-EX2) CONTROLLER SHALL MODULATE THE EXHAUST VALVE TO MAINTAIN THE REQUIRED 100 FPM FACE VELOCITY SETPOINT BASED ON SASH POSITION.
THE GENERAL EXHAUST VALVE (EAV-EX3) SHALL MODULATE TO MAINTAIN THE OVERALL ROOM AIRFLOW OFFSET BASED ON THE TOTAL ROOM EXHAUST AND SUPPLY AIRFLOW RATES.
THE SUPPLY AIR VALVE (SAV-EX1) SHALL MODULATE BETWEEN ITS MAX & MIN POSITIONS BASED ON THE ROOM TEMPERATURE SETPOINT & REQUIRED AIR FOR EXHAUST OFFSET (REFER TO
LAB AIRFLOW MATRIX). THE SUPPLY VALVE SHALL NOT BE ALLOWED TO MODULATE BELOW ITS REQUIRED MINIMUM AIR POSITION FOR THE CURRENT OVERALL ROOM EXHAUST RATE.
D.LABORATORY AIRFLOW CONTROL HIBERNATION MODE
1.THE ROOM SHALL BE CAPABLE OF BEING MANUALLY SET INTO "HIBERNATION MODE". A LIST OF EQUIPMENT THAT CAN BE TURNED OFF VIA CLOSING BLAST GATES AS WELL AS ANY
ADDITIONAL REDUCED AIRFLOW RATES FROM THE UNOCCUPIED MODE SHALL BE PREDETERMINED BY THE FACILITIES ENGINEER AND HEALTH AND SAFETY OFFICER (HSO). THE EXHAUST
AIR VALVES SERVING CLOSED OFF EQUIPMENT SHALL BE CLOSED. THE OVERALL ROOM ACH SHALL NOT FALL BELOW 3 ACH AS DETERMINED BY THE HSO. ANY EQUIPMENT DETERMINED
NOT TO BE CLOSED DOWN SHALL ENTER INTO UNOCCUPIED MODE. THE SUPPLY AIR VALVE SHALL BE ALLOWED TO RESET DOWN TO ITS HIBERNATION MODE MINIMUM. THE GENERAL
EXHAUST VALVE SHALL CONTINUE TO TRACK THE OVERALL ROOM EXHAUST TO MAINTAIN REQUIRED ROOM OFFSET.
F.ZONE TEMPERATURE CONTROL
1.
2.
3.
WHEN THE SPACE TEMPERATURE SETPOINT IS MET THE SUPPLY AIR VALVE (SAV-EX1) SHALL MODULATE TOWARDS ITS MINIMUM POSITION BASED ON THE CURRENT ROOM EXHAUST
AIRFLOW RATE, THE HOT WATER CONTROL VALVE ASSOCIATED WITH SAV-EX1 SHALL MODULATE TO MAINTAIN A SUPPLY AIR TEMPERATURE OF 70.0°F TO THE SPACE. THIS SHALL BE
CONSIDERED NEUTRAL OPERATION FOR THE SUPPLY VALVE.
UPON A CALL FOR COOLING THE HOT WATER CONTROL VALVE ASSOCIATED WITH SAV-EX1 SHALL CLOSE. IF AFTER A PERIOD OF 15 MINUTES (ADJUSTABLE) THE SPACE IS CALLING FOR
ADDITIONAL COOLING THEN THE SUPPLY VALVE SHALL MODULATE TOWARDS ITS MAXIMUM AIRFLOW POSITION.
UPON A CALL FOR HEATING THE SUPPLY AIR VALVE SHALL CONTINUE TO MAINTAIN A SUPPLY AIR TEMPERATURE OF 70.0°F AT ITS MINIMUM POSITION. THE PERIMETER RADIATION HOT WATER
CONTROL VALVE SHALL MODULATE OPEN. IF AFTER A PERIOD OF 15 MINUTES (ADJUSTABLE) THE ROOM IS CALLING FOR ADDITIONAL HEATING, THE HOT WATER CONTROL VALVE
ASSOCIATED WITH SAV-EX1 SHALL MODULATE OPEN TO PROVIDE 80.0°F SUPPLY AIR TO THE SPACE. UPON SATISFYING THE HEATING SET POINT SAV-EX1 AND ITS ASSOCIATED HOT WATER
CONTROL VALVE SHALL RETURN TO NEUTRAL OPERATION AND THE PERIMETER RADIATION CONTROL VALVE SHALL CLOSE.
ROOM AREA (SQUARE FEET)X
XX
XX
X
X
X
X
X
X
X
TOTAL OCCUPIED EXHAUST AIRFLOW SETPOINT (CFM), MAXIMUM X
LABORATORY AIR CHANGE RATE (ACH), ACTUAL XX
LABORATORY FLOW OFFSET (CFM), ACTUAL XX
XX
TOTAL EXHAUST AIRFLOW (CFM), ACTUAL XX
TOTAL SUPPLY AIRFLOW (CFM), ACTUAL
TOTAL OCCUPIED EXHAUST AIRFLOW SETPOINT (CFM), MINIMUM
TOTAL UNOCCUPIED EXHAUST AIRFLOW SETPOINT (CFM), MAXIMUM
TOTAL UNOCCUPIED EXHAUST AIRFLOW SETPOINT (CFM), MINIMUM
TOTAL OCCUPIED SUPPLY AIRFLOW SETPOINT (CFM), MAXIMUM
TOTAL OCCUPIED SUPPLY AIRFLOW SETPOINT (CFM), MINIMUM
TOTAL UNOCCUPIED SUPPLY AIRFLOW SETPOINT (CFM), MAXIMUM
TOTAL UNOCCUPIED SUPPLY AIRFLOW SETPOINT (CFM), MINIMUM
LABORATORY AIR CHANGE RATE SETPOINT (ACH), MAXIMUM
LABORATORY AIR CHANGE RATE SETPOINT (ACH), MINIMUM
ROOM CEILING HEIGHT (FEET)X
THE EXISTING LAB CONTROLS SHALL REMAIN. THE BELOW SEQUENCES ARE PROVIDED AS REFERENCE.
INTERLOCK WITH FUME HOOD EXHAUST VALVE
FUME HOOD FACE VELOCITY (FPM)XX
FUME HOOD FACE VELOCITY SETPOINT (FPM)XX
X BELOW SETPOINT FOR > 10 SEC. (ADJUSTABLE)
DEHUMIDIFIER (D-1) ENABLE/DISABLE XXX
DEHUMIDIFIER (D-1) STATUS XXX
GAS DETECTION HIGH LIMIT (EAV-3 & 9 GAS CABINETS)XXX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X HIGH LIMIT
SPACE HUMIDITY SETPOINT (DEG F)XX
SPACE HUMIDITY (DEG F)X X X
182 PRINT ROOM ONLY
MONITORING IN ALL SPACESX
X
X
X
X
CO & CH4 CABINETS
D.VENTILATION SYSTEM EMERGENCY SHUTOFF
1.A MANUAL SHUTOFF CONTROL BUTTON SHALL BE PROVIDED OUTSIDE THE ROOM ADJACENT TO THE ACCESS DOOR. THE SWITCH SHALL BE A BREAK GLASS TYPE. WHEN THIS MANUAL
EMERGENCY CONTROL SWITCH IS ACTIVATED, ALL AIR VALVES ASSOCIATED WITH THE LABORATORY SHALL BE COMMANDED INTO THEIR CLOSED POSITION.
Revisions:
347 West 36 Street Suite 1501
New York, NY 10018
212-245-5195 T
212-239-7130 F
Key Plan:
Notes:
Grumman Hall
Cornell University
Ithaca, NY 14850
Richard McElhiney Architects LLC
April 2, 2020
Issue for Bid April 2, 2020
Scale:
31 Knight Street
Norwalk, CT 06851
203-866-5538 T
203-866-5243 F
Altieri Sebor Wieber LLC
303 South Broadway, Suite G20
Tarrytown, NY 10591
914-333-1110 T
914-333-1109 F
Jacobs Consultancy
4588 South Park Avenue
Blasdell, NY 14219
716-823-0006 T
Trophy Point
AREA OF WORK
4592 Jordan Road
Skaneateles Falls, NY 13153
315-685-4732 T
Ryan Biggs Clark Davis Engineering & Surveying
First and Second Floor Renovation Phase 1
12" = 1'-0"
Flow & Control -Mechanical
M-401
ALL EXISTING CONTROL POINTS INDICATED ABOVE SHALL BE TRANSFERRED OVER TO THE NEW ALC PANEL.
AO
LINE TYPE LEGEND
NEW WORK
EXISTING TO REMAIN
VFD
CSR
95%finalfilter30%pre-filterP
DP
SP
~
LT
~M ~RETURN AIR
SD
SP AI
TO VAVS
TO VAVS
T
GLYCOL
PREHEAT COIL CHILLED WATER
COOLING COIL
AO
T
AI
AO
A
DI
T
AI
AO
T
AIDI
DI DOAO
AI
A
DI
AI
RETURN AIR DAMPER COMMAND
DI DO AI AO AV BV SCH TREND BAS
SOFTWARE POINTSHARDWARE POINTS
ALARM
DESCRIPTION
SHOWN
ON
GRAPHIC
NOTESVARIABLE AIR VOLUME AIR HANDLING UNIT (AHU-2)
OUTSIDE AIR DAMPER COMMAND
RETURN AIRFLOW MEASURING STATION
THE POINTS LISTED BELOW ARE EXISTING TO AHU-2. THE SENSORS AND DEVICES SHALL REMAIN. THE CONTROL POINTS SHALL BE MOVED TO THE NEW ALC PANEL.
X
X
X
X
X
X
X
OUTSIDE AIRFLOW MEASURING STATION
X
X
X
CHILLED WATER COIL VALVES
AHU-2 VARIABLE SPEED DRIVE
X
X
X
X
X
XX
X
XX
1
SCALE: NONE
OUTSIDE AIR
M
AFMSAI
M-402M-402
GENERAL NOTES:
1.
2.
3.
4.
AIR HANDLING UNIT (AHU-2) IS EXISTING UNIT TO REMAIN.
CONTROL DEVICES AND SENSORS SHOWN IN GRAYSCALE ARE EXISTING TO REMAIN.
CONTROL DEVICES AND SENSORS SHOWN IN DARKER LINE TYPE ARE TO BE REPLACED OR PROVIDED NEW.
ALL CONTROL POINTS SHALL BE MOVED OVER TO THE NEW AUTOMATED LOGIC CONTROL PANEL.
NEW AIR FLOW
MEASURING STATION
EXISTING AHU-2 SHALL BE MODIFIED TO INCLUDE A OUTSIDE AIR DAMPER, RETURN AIR DAMPER, AND AIRFLOW MEASURING STATIONS ON OA & RA.
EXISTING VARIABLE VOLUME AIR HANDLING UNIT (AHU -2)
AO
CONNECT NEW RA
DUCT TO EXISTING
AHU-2 FLANGE
CUT IN NEW OA
MOTORIZED DAMPER
TO EXISTING OA
DUCTWORK. PROVIDEWITH AIR FLOWMEASURING STATION
GLYCOL PREHEAT COIL VALVES X X X
GLYCOL TEMPERATURE X X X
CHILLED WATER TEMPERATURE X X X
FILTER DIFFERENTIAL PRESSURE X X X
DISCHARGE AIR TEMPERATURE X X X
SUPPLY FAN START/STOP X X X
AHU-2 SYSTEM SHUTDOWN X X X
SUPPLY FAN VARIABLE SPEED DRIVE ALARM X X X
CHILLED WATER COIL FREEZE STAT X X X
SUPPLY FAN CURRENT SENSOR RELAY X X X
X
X
LOW TEMPERATURE
FAILURE
GLYCOL PREHEAT COIL AIR TEMPERATURE X X X
CHILLED WATER COIL AIR TEMPERATURE X X X
DISCHARGE STATIC PRESSURE X X X
DUCT STATIC PRESSURE SENSOR XXX
SEQUENCE OF OPERATION
EXISTING AIR HANDLING UNIT AHU-2
A.GENERAL
1.
2.
3.
4.
5.
6.
SYSTEM SHALL BE CONTROLLED THROUGH THE BUILDING AUTOMATION SYSTEM (BAS).
ALL SET POINTS SHALL BE ADJUSTABLE.
THE BAS SHALL BE CAPABLE OF STARTING AND STOPPING THE SYSTEM FOR SEVEN DIFFERENT DAILY SCHEDULES PER WEEK.
THE BAS SHALL BE CAPABLE OF RETAINING ITS PROGRAMMING AND TIME SETTING DURING A LOSS OF POWER FOR AT LEAST TEN HOURS.
ALL SAFETIES SHALL BE HARD WIRED INTO THE FAN MOTOR POWER CIRCUIT, AND SHALL REQUIRE MANUAL RESET.
DESIGN INTENT: THE AIR HANDLING UNIT IS PROVIDING HEATING, COOLING, AND POSITIVE PRESSURIZATION FOR THE SPACES SERVED. AIRFLOW CONTROL DEVICES WITH REHEAT COILS SHALL BE PROVIDED ON
THE ZONE SUPPLY CONNECTIONS.
B.DISABLED MODE
1.WHEN THE UNIT IS DISABLED, THE SUPPLY FANS SHALL BE OFF, THE OUTSIDE AIR DAMPER SHALL BE CLOSED, THE RETURN DAMPER SHALL BE OPEN, AND THE COOLING COIL CONTROL VALVES SHALL BE CLOSED.
THE GLYCOL PREHEAT COIL SHALL REMAIN AVAILABLE FOR SIGNAL FROM THE CHILLED WATER COIL FREEZE STAT.
C.NORMAL OPERATING MODE
1.
2.
3.
4.
SUPPLY AIR FAN SHALL MODULATE VIA A VARIABLE FREQUENCY DRIVE AS REQUIRED TO MAINTAIN THE SUPPLY DUCT STATIC PRESSURE SET POINT. THE SUPPLY DUCT STATIC PRESSURE SET POINT SHALL BE RESET
AS NEEDED TO MAINTAIN THE CRITICAL ZONE DAMPER POSITION AT 95% OPEN.
COOLING MODE: WHEN DISCHARGE AIR TEMPERATURE RISES ABOVE SETPOINT, COOLING MODE SHALL BE INITIATED. THE CHILLED WATER CONTROL VALVE SHALL MODULATE AS REQUIRED TO MAINTAIN THE
DISCHARGE AIR TEMPERATURE SET POINT.
DISCHARGE AIR TEMPERATURE (DAT) RESET: THE DISCHARGE AIR TEMPERATURE SHALL BE ALLOWED TO RESET BASED ON AN AVERAGE SPACE TEMPERATURE OF THE ASSOCIATED VAV ZONES. WHEN THE
AVERAGE ZONE TEMPERATURE IS BELOW THE SETPOINT FOR A PERIOD OF 15 MINUTES (ADJUSTABLE) THE DAT SHALL BE ALLOWED TO RESET UP TO 65°F. UPON A CALL FOR COOLING IN ANY ZONE FOR A PERIOD
GREATER THAN 15 MINUTES (ADJUSTABLE) THE DAT SHALL RETURN TO A 55°F SETPOINT.
DEHUMIDIFICATION MODE: THE ZONE HUMIDITY LEVELS SHALL BE MONITORED BY THE BMS. IF AT ANY TIME A ZONE HUMIDITY LEVEL RISES ABOVE 60% RH (ADJUSTABLE) THE DAT RESET SHALL BE OVERRIDDEN AND
THE DAT SETPOINT SHALL RETURN TO 55°F.
D.MORNING WARM UP
1.THE OUTSIDE AIR DAMPER SHALL REMAIN OPEN TO SATISFY ROOM PRESSURIZATION REQUIREMENTS. THE SPACE TEMPERATURE SENSOR SET POINT SHALL BE THE SAME AS DURING NORMAL OPERATING MODE.
THE DAT SHALL RESET TO 65°F. THE ZONE VAVs SHALL OPEN TO THEIR MAXIMUM AIRFLOWS AND REMAIN OPEN UNTIL THE SPACE TEMPERATURE SETPOINT IS SATISFIED. THE HOT WATER CONTROL VALVE SHALL
MODULATE TO ITS FULL OPEN POSITION. UPON REACHING THE SPACE TEMPERATURE SETPOINT, NORMAL MODE SHALL RESUME.
E.VENTILATION CONTROL
1.
2.
THE OUTSIDE AIR DAMPER AND THE RETURN AIR DAMPER SHALL MODULATE BASED ON THE OUTSIDE AIR DAMPER AFMS TO MAINTAIN PRESSURIZATION. THE AIR FLOW SET POINT OF 600 CFM SHALL BE
ESTABLISHED DURING SYSTEM AIR BALANCING AND SHALL BE MONITORED BY THE OUTSIDE AIR DAMPER AFMS.
THE GLYCOL PREHEAT COIL SHALL MODULATE TO MAINTAIN MINIMUM DISCHARGE AIR TEMPERATURE TO THE COOLING COIL 48 °F (ADJUSTABLE).
F.SAFETIES AND ALARMS
1.
2.
3.
4.
5.
6.
A FREEZESTAT LOCATED UPSTREAM OF THE CHILLED WATER COIL SHALL SIGNAL THE GLYCOL COIL CONTROL VALVE TO MODULATE TO ITS FULL OPEN POSITION WHEN THE AIR TEMPERATURE SENSED ON ANY
SEGMENT OF THE SERPENTINE SENSING ELEMENT HAS DROPPED BELOW 40°F (ADJUSTABLE). IF AFTER A PERIOD OF 5 MINUTES (ADJUSTABLE) THE FREEZE STAT IS STILL SENSING ANY POINTS BELOW 40°F AN
ADDITIONAL ALARM SHALL BE SIGNALED AND THE BACS SHALL CLOSE THE OUTSIDE AIR DAMPER . AT THE SAME TIME THE RETURN AIR DAMPER SHALL FULLY OPEN. THE FREEZESTAT SHALL BE RESET WITH ITS
OWN MANUAL RESET BUTTON.
UPON ACTIVATION OF THE SUPPLY OR RETURN AIR SMOKE DETECTORS, THE SUPPLY FAN SHALL SHUT DOWN WITH THE HOA SWITCH IN BOTH THE HAND AND AUTO POSITIONS, AND THE OUTSIDE AIR DAMPER
SHALL CLOSE. THE FIRE ALARM SYSTEM SHALL BE WIRED DIRECTLY TO THE FAN START CIRCUIT. SMOKE DETECTORS SHALL BE FURNISHED BY DIVISION 26, INSTALLED IN THE DUCTWORK WHERE INDICATED BY
DIVISION 23, AND WIRED TO THE FIRE ALARM SYSTEM BY DIVISION 26.
THE SUPPLY AIR STATIC PRESSURE SENSOR SHALL SHUT DOWN THE SUPPLY FANS WHEN THE DUCT STATIC PRESSURE EXCEEDS 3" W.C. (ADJUSTABLE). WHEN THE FAN IS SHUT DOWN, AN ALARM SHALL BE
INITIATED.
THE DDC CONTROL SYSTEM SHALL MONITOR THE STATUS OF THE SUPPLY FAN VIA THE CURRENT SENSOR. IF ANYTIME THE SUPPLY FAN IS ENABLED AND AFTER A 20 SECOND DELAY THE CONTROL SYSTEM
SENSES NO CURRENT, THE SUPPLY FAN SHALL BE TURNED OFF AND AN ALARM SHALL BE INITIATED ON THE BAS.
THE CONTROL SYSTEM SHALL MONITOR THE DISCHARGE AIR TEMPERATURE VIA A TEMPERATURE SENSOR LOCATED IN THE SUPPLY DUCT. IF THE DISCHARGE AIR TEMPERATURE DEVIATES MORE THAN 5 F ABOVE
OR BELOW THE SETPOINT FOR A PERIOD OF 5 MINUTES WHILE THE UNIT IS ENABLED, AN ALARM SHALL BE INITIATED ON THE BAS.
FOLLOWING A SAFETY SHUT-DOWN, A MANUALLY INITIATED RESTART COMMAND SHALL RESTART THE SYSTEM AS PREVIOUSLY DESCRIBED UNDER NORMAL OPERATING MODE.
Revisions:
347 West 36 Street Suite 1501
New York, NY 10018
212-245-5195 T
212-239-7130 F
Key Plan:
Notes:
Grumman Hall
Cornell University
Ithaca, NY 14850
Richard McElhiney Architects LLC
April 2, 2020
Issue for Bid April 2, 2020
Scale:
31 Knight Street
Norwalk, CT 06851
203-866-5538 T
203-866-5243 F
Altieri Sebor Wieber LLC
303 South Broadway, Suite G20
Tarrytown, NY 10591
914-333-1110 T
914-333-1109 F
Jacobs Consultancy
4588 South Park Avenue
Blasdell, NY 14219
716-823-0006 T
Trophy Point
AREA OF WORK
4592 Jordan Road
Skaneateles Falls, NY 13153
315-685-4732 T
Ryan Biggs Clark Davis Engineering & Surveying
First and Second Floor Renovation Phase 1
12" = 1'-0"
Flow & Control -Mechanical
M-402
FILE:REV:T
AI
AI
AO AO
AI
T
AI
DI
COM
DI DO AI AO AV BV SCH TREND BAS
SOFTWARE POINTSHARDWARE POINTS
ALARM
DESCRIPTION
SHOWN
ON
GRAPHIC
NOTESZONE CONTROL - VAV WITH REHEAT
REHEAT COIL VALVE POSITION COMMAND XXX
ZONE TEMPERATURE SETPOINT
ZONE TEMPERATURE
X
X
X
X X +/- 4°F FROM SETPOINT
X
X
REHEAT COIL LEAVING AIR TEMPERATURE XXX SINGLE POINT SENSOR
X FAIL LAST
ZONE RELATIVE HUMIDITY XXX
SUPPLY AIR VAV BOX DAMPER POSITION COMMAND
SUPPLY AIR VAV BOX AIRFLOW FEEDBACK (CFM)
X
X
X
X X 10% FLOW DEVIATION FROM SETPOINT
X
SUPPLY AIR VAV BOX AIRFLOW SETPOINT (CFM)
SUPPLY AIR VAV BOX POSITION FEEDBACK (%)X
XX
X
X BACnet MSTP NETWORK POINT
X
X
X BACnet MSTP NETWORK POINT
BACnet MSTP NETWORK POINT
TERMINAL BOX
WITH REHEAT COIL
TYPICALSUPPLY AIR
FROM AHU
NC FL
HEATING COIL CONTROL VALVE POSITION COMMAND
DI DO AI AO AV BV SCH TREND BAS
SOFTWARE POINTSHARDWARE POINTS
ALARM
DESCRIPTION
SHOWN
ON
GRAPHIC
NOTESDUAL TEMPERATURE RADIANT FLOOR SYSTEM
COOLING COIL CONTROL VALVE POSITION COMMAND
FAN COIL UNIT FAN MOTOR START/STOP
SPACE TEMPERATURE SETPOINT
SPACE TEMPERATURE
FCU STATUS
DISCHARGE AIR TEMPERATURE
SPACE OCCUPANCY
X
X
X
X
X
X
X
X
X
X
X
X
X
FAIL LASTX
X
X
X
X
X
X
X
X
X
X
± 4°F FROM SETPOINT
FAILURE
X
NORMALLY CLOSED
VIA CURRENT SENSOR
SINGLE POINT SENSOR~SUPPLY AIR
V
COIL
HW
M
TCU
T SPACE TEMPERATURE
COMBACnet/MSTP
AOAO
HWS
HWR~CHR
CWS ~~~CHILLED
WATER
COIL
CC
HOT WATER
COIL
HC
~~SPACE TEMP
& OCCUPANCY
T OC
SENSORCS
DO ECM
VARIABLE VOLUME TERMINAL BOXES W/ REHEAT & PERIMETER RADIATION1
SCALE: NONEM-403M-403
4-PIPE FAN COIL UNIT & PERIMETER RADIATION2
SCALE: NONEM-403M-403MM/DD/YYHH:MM1942MF2AO
AI
END SWITCH
N.0.
EXISTING PERIMETER RADIATION
SPACE TEMP
T
SENSOR
T
AI
AI
TERMINAL BOX
WITH REHEAT COIL
TYPICAL ~SUPPLY AIR
V
COIL
HW
M
TCU
T SPACE TEMPERATURE
COMBACnet/MSTP
AOAO
184 STUDENT SPACE 563
100CA COMMON AREA 442
SEQUENCE OF OPERATION
VARIABLE AIR VOLUME AND PERIMETER HEATING ZONE CONTROL
A.SYSTEM DESCRIPTION
1.
2.
3.
VARIABLE AIR VOLUME BOX (VAV-1)
VARIABLE AIR VOLUME BOX (VAV-2)
PERIMETER RADIATION
B.SPACE TEMPERATURE SETPOINTS
70 °F +/-1.5 °F WINTER
75 °F +/-1.5 °F SUMMER
C.ZONE TEMPERATURE CONTROL WITH PERIMETER RADIATION (VAV-2)
1.
2.
3.
TEMPERATURE SETPOINTS SHALL BE DETERMINED BASED ON A COMBINATION OF PROGRAMMED SCHEDULE AND OCCUPANT CONTROL.
HEATING: UPON A CALL FOR HEAT, THE ROOM PERIMETER RADIATION CONTROL VALVE SHALL BE ENABLED AS 1ST STAGE HEATING. UPON A FURTHER CALL FOR HEAT THE SUPPLY AIR VAV BOX SHALL MODULATE TO
ITS MINIMUM POSITION AND THE REHEAT COIL CONTROL VALVE SHALL MODULATE AS REQUIRED TO MAINTAIN A DISCHARGE AIR TEMPERATURE OF 90°F (ADJUSTABLE). WHEN THE SPACE TEMPERATURE SETPOINT
HAS BEEN MET THE REHEAT COIL SHALL MODULATE TO MAINTAIN A DISCHARGE AIR TEMPERATURE OF 70°F .
COOLING: UPON A CALL FOR COOLING, THE SUPPLY AIR VAV BOX SHALL MODULATE OPEN AS REQUIRED TO MEET THE SPACE TEMPERATURE SETPOINT. THE PERIMETER RADIATION AND REHEAT COIL CONTROL
VALVES SHALL BE CLOSED. WHEN THE SPACE TEMPERATURE SETPOINT HAS BEEN MET THE VAV BOX SHALL MODULATE TO ITS MINIMUM POSITION AND THE REHEAT COIL CONTROL VALVE SHALL MODULATE TO
MAINTAIN A DISCHARGE AIR TEMPERATURE OF 70°F
D.ZONE TEMPERATURE CONTROL (VAV-1)
1.
2.
3.
TEMPERATURE SETPOINTS SHALL BE DETERMINED BASED ON A COMBINATION OF PROGRAMMED SCHEDULE AND OCCUPANT CONTROL.
HEATING: UPON A CALL FOR HEAT THE SUPPLY AIR VAV BOX SHALL MODULATE TO ITS MINIMUM POSITION AND THE REHEAT COIL CONTROL VALVE SHALL MODULATE AS REQUIRED TO MAINTAIN A DISCHARGE AIR
TEMPERATURE OF 85°F (ADJUSTABLE). WHEN THE SPACE TEMPERATURE SETPOINT HAS BEEN MET THE REHEAT COIL SHALL MODULATE TO MAINTAIN A DISCHARGE AIR TEMPERATURE OF 70°F .
COOLING: UPON A CALL FOR COOLING, THE SUPPLY AIR VAV BOX SHALL MODULATE OPEN AS REQUIRED TO MEET THE SPACE TEMPERATURE SETPOINT. THE REHEAT COIL CONTROL VALVE SHALL BE CLOSED. WHEN
THE SPACE TEMPERATURE SETPOINT HAS BEEN MET THE VAV BOX SHALL MODULATE TO ITS MINIMUM POSITION AND THE REHEAT COIL CONTROL VALVE SHALL MODULATE TO MAINTAIN A DISCHARGE AIR
TEMPERATURE OF 70°F
AO
END SWITCH
N.0.
EXISTING PERIMETER RADIATION
SEQUENCE OF OPERATION
4-PIPE FAN COIL UNITS AND PERIMETER RADIATION ZONE CONTROL
A.SYSTEM DESCRIPTION
1.
2.
FAN COIL UNIT (FCU-1 & 2)
PERIMETER RADIATION
B.SPACE TEMPERATURE SETPOINTS
70 °F +/-1.5 °F WINTER
75 °F +/-1.5 °F SUMMER
C.ZONE TEMPERATURE CONTROL WITH PERIMETER RADIATION (VAV-2)
1.
2.
3.
TEMPERATURE SETPOINTS SHALL BE DETERMINED BASED ON A COMBINATION OF PROGRAMMED SCHEDULE AND OCCUPANT CONTROL. THE TEMPERATURE SENSOR SHALL BE WALL MOUNTED AS INDICATED ON THE
PLANS.
THE SUPPLY FAN SHALL BE STARTED REMOTELY THROUGH THE DDC SYSTEM IN ACCORDANCE WITH THE PRE-DETERMINED OPERATING SCHEDULE. A CURRENT SENSOR SHALL INITIATE AN ALARM IF THE FAN HAS
NOT STARTED IN 30 SECONDS (ADJUSTABLE) AND SHUT DOWN THE SYSTEM.
UPON A CALL FOR COOLING, THE FAN SHALL START AT LOW SPEED AND THE COOLING COIL CONTROL VALVE SHALL MODULATE OPEN TO MAINTAIN SPACE TEMPERATURE SETPOINT. UPON A FURTHER CALL FOR
COOLING THE FAN SHALL AUTOMATICALLY SWITCH TO MEDIUM AND HIGH SPEED SETTINGS. THE PERIMETER RADIATION CONTROL VALVE SHALL BE CLOSED.
UPON A CALL FOR HEAT, THE ROOM PERIMETER RADIATION CONTROL VALVE SHALL BE ENABLED AS 1ST STAGE HEATING. UPON A FURTHER CALL FOR HEATING AFTER A PERIOD OF 15 MINUTES (ADJUSTABLE) THE
FAN COIL UNIT HEATING COIL CONTROL VALVE SHALL MODULATE OPEN TO MAINTAIN DISCHARGE AIR TEMPERATURE SETPOINT.
WHEN THE SPACE SETPOINT HAS BEEN MET THE FAN COIL UNIT SHALL REMAIN ON IN LOW SPEED, THE HOT & CHILLED WATER CONTROL VALVES SHALL BE CLOSED., AND THE PERIMETER RADIATION CONTROL VALVE
SHALL CLOSE.
WHEN THE SPACE TEMPERATURE DROPS BELOW OR EXCEEDS THE SET POINT TEMPERATURE BY MORE THAN 5°F, AND ALARM SHOULD BE INITIATED AT THE BACS.
THE FOLLOWING POINTS SHALL BE PROGRAMMED FOR TRENDING: CONTROL VALVE POSITION, FAN MOTOR START/STOP, SPACE TEMPERATURE SETPOINT, SPACE TEMPERATURE, DISCHARGE AIR TEMPERATURE.
Revisions:
347 West 36 Street Suite 1501
New York, NY 10018
212-245-5195 T
212-239-7130 F
Key Plan:
Notes:
Grumman Hall
Cornell University
Ithaca, NY 14850
Richard McElhiney Architects LLC
April 2, 2020
Issue for Bid April 2, 2020
Scale:
31 Knight Street
Norwalk, CT 06851
203-866-5538 T
203-866-5243 F
Altieri Sebor Wieber LLC
303 South Broadway, Suite G20
Tarrytown, NY 10591
914-333-1110 T
914-333-1109 F
Jacobs Consultancy
4588 South Park Avenue
Blasdell, NY 14219
716-823-0006 T
Trophy Point
AREA OF WORK
4592 Jordan Road
Skaneateles Falls, NY 13153
315-685-4732 T
Ryan Biggs Clark Davis Engineering & Surveying
First and Second Floor Renovation Phase 1
12" = 1'-0"
Flow & Control -Mechanical
M-403
DESCRIPTION
ROOM DESCRIPTION MINIMUM AIR CHANGE RATES LAB AIR VALVE
VALVE VALVE MATERIAL
VALVE
SIZE
VALVE RANGE OCCUPIED
MAX
OCCUPIED
MAX
OCCUPIED
MAX
OCCUPIED
MAX
UNOCCUPIED
MAX
UNOCCUPIED
MAX
UNOCCUPIED
MAX
UNOCCUPIED
MAX
AREA HEIGHT 8 6 4 3 TAG SERVICE MAX 0.3" WG PD MIN MAX EXH & MAX SA MIN EXH & MAX SA MAX EXH & MIN SA MIN EXH & MIN SA MAX EXH & MAX SA MIN EXH & MAX SA MAX EXH & MIN SA MIN EXH & MIN SA
(SQFT)(FT' - in") ACH ACH ACH ACH (CFM)(CFM)(CFM)(CFM)(ACH)(CFM)(ACH)(CFM)(ACH)(CFM)(ACH)(CFM)(ACH)(CFM)(ACH)(CFM)(ACH)(CFM)(ACH)
182 SADAF LAB 751 11' - 10" 1185 889 592 444
EAV-1 CANOPY HOOD ACCUTROL AVC6608-05-SW HIGH TEMP, 304SS, 20 GA 6 315 254 30 150
12.8
150
12.8
150
10.5
150
8.2
150
10.3
150
10.3
150
9.7
150
7.8
EAV-3 3-CYL GAS CABINET ACCUTROL AVC6308-05-SW 316SS, 20 GA 8 800 650 80 450 450 450 450 450 450 450 450
EAV-4 SNORKEL ACCUTROL AVC6206-05-SW 304SS, 20 GA 6 315 254 30 180 180 180 180 180 180 180 180
EAV-5 SNORKEL ACCUTROL AVC6206-05-SW 304SS, 20 GA 6 315 254 30 180 180 180 180 180 180 180 180
EAV-6 5 FT HOOD ACCUTROL AVC6308-05-SW 316SS, 20 GA 8 800 650 80 595 250 595 250 480 200 480 200
EAV-7 GENERAL ACCUTROL AVC6210-05-SW 304SS, 20 GA 10 1300 1056 120 345 690 0 0 85 365 0 0
TOTAL 1900 1900 1555 1210 1525 1525 1440 1160
SAV-2 SUPPLY ACCUTROL AVC6414-05-SW ALUMINUM, 16 GA 14 2750 2275 250 1800 1800 1455 1110 1425 1425 1340 1060
182A PRINT ROOM 75 11' - 10"118 89 59 44
EAV-2 DH-1 REACTIVATION AIR ACCUTROL AVC6608-05-SW HIGH TEMP, 304SS, 20 GA 8 800 650 80 300 20.3 DNA 120 8.1 DNA 300 20.3 DNA 80 5.4 DNA
TOTAL 300 DNA 120 DNA 300 DNA 80 DNA
SAV-3 SUPPLY ACCUTROL AVC6408-05-SW ALUMINUM, 16 GA 8 800 650 80 300 DNA 300 DNA 300 DNA 80 DNA
181 LAB I 591 11' - 10"932 699 466 350
EAV-9 5 FT HOOD ACCUTROL AVC6308-05-SW 316SS, 20 GA 8 800 650 80 595
8.0
250
8.0
DNA DNA 480
4.1
200
4.0
480
4.1
200
4.0EAV-8 GENERAL ACCUTROL AVC6308-05-SW 316SS, 20 GA 8 800 650 80 340 685 DNA DNA 0 265 0 270
TOTAL 935 935 DNA DNA 480 465 480 470
SAV-1 SUPPLY ACCUTROL AVC6410-05-SW ALUMINUM, 16 GA 10 1300 1056 120 835 835 DNA DNA 380 365 380 370
188 LAB 500 11' - 10"789 592 394 296
EAV-EX1 5 FT HOOD BEVB110M-ABFHO-P --1000 -50 595
9.0
250
9.0
595
8.0
250
8.0
480
8.2
200
8.2
480
4.9
200
4.0EAV-EX2 GENERAL BEVA110M-ABFHO-P --1000 -50 290 635 195 540 330 610 0 195
TOTAL 885 885 790 790 810 810 480 395
SAV-EX1 SUPPLY PRICE SDV-5000 -12 2100 --785 785 690 690 710 710 380 295
Revisions:
347 West 36 Street Suite 1501
New York, NY 10018
212-245-5195 T
212-239-7130 F
Key Plan:
Notes:
Grumman Hall
Cornell University
Ithaca, NY 14850
Richard McElhiney Architects LLC
April 2, 2020
Issue for Bid April 2, 2020
Scale:
31 Knight Street
Norwalk, CT 06851
203-866-5538 T
203-866-5243 F
Altieri Sebor Wieber LLC
303 South Broadway, Suite G20
Tarrytown, NY 10591
914-333-1110 T
914-333-1109 F
Jacobs Consultancy
4588 South Park Avenue
Blasdell, NY 14219
716-823-0006 T
Trophy Point
AREA OF WORK
4592 Jordan Road
Skaneateles Falls, NY 13153
315-685-4732 T
Ryan Biggs Clark Davis Engineering & Surveying
First and Second Floor Renovation Phase 1
12" = 1'-0"
Schedules -Mechanical
M-501
FAN COIL UNITS
UNIT
NO CFM
EXT
SP
COOLING COIL HEATING COIL ELECTRICAL
MAKE/MODEL REMARKSSENS. MBH TOT MBH EAT LAT EFT LFT GPM PD MBH EAT LAT EFT LFT GPM PD HP VLT PH RPM
FCU-1 320 .05 7.55 11.24 80/67 60/58 45 55 2.3 4.0 12.76 70 90 130 100 0.9 2.0 79W 115 1 600 UniTrane MODEL D 060 3C/1H 1, 2, 3
FCU-2 320 .05 7.55 11.24 80/67 60/58 45 55 2.3 4.0 12.76 70 90 130 100 0.9 2.0 79W 115 1 600 UniTrane MODEL D 060 3C/1H 1, 2, 3
REGISTER, GRILLES, & DIFFUSERS
SYM TYPE SIZE
MATERIAL/
FINISH MAKE MODEL REMARKS
A SUPPLY REFER TO PLANS ALUMINUM/
ARCH
TITUS S300FS
B SUPPLY REFER TO PLANS ALUMINUM/
ARCH
TITUS OMNI
C RETURN REFER TO PLANS ALUMINUM/
ARCH
TITUS 350RL
D RETURN REFER TO PLANS ALUMINUM/
ARCH
TITUS 8FS
VARIABLE AIR VOLUME TERMINAL BOXES
UNIT
NO LOCATION SERVES
CFM SP MAX
in WG
DUCT CONN HEATING COIL
SCCR MAKE/MODEL REMARKSDESMININLET OUTLET MBH EAT LAT PD EFT LFT GPM PD
VAV-1 188 100CA COMMON AREA 650 400 0.5 8" Round 12" x 10"8.6 65 85 .17 130 100 0.6 ≤3'Titus DESV-08 1
VAV-2 188 184 STUDENT SPACE 1250 800 0.5 12" Round 16" x 15"25.9 65 95 .15 130 100 1.7 ≤3'Titus DESV-12 1
HOT WATER REHEAT COILS
UNIT NO LOCATION MBH
AIR DATA WATER DATA
SIZE ROW/FIN MAKE/MODELCFMEATLATVELPDEWTLWTGPMPD
RH-1 LAB 1 22.5 835 55 80 650 -130 100 1.5 -SEE PLANS 2/144 TRANE
RH-2 LAB 1 29.7 1110 55 80 725 -130 100 2.0 -SEE PLANS 2/144 TRANE
RH-3 PRINTING
ROOM
6.5 300 55 75 500 -130 100 .5 -SEE PLANS 2/144 TRANE
DEHUMIDIFIER
UNIT
NO LOCATION Btu/HR
PROCESS FAN PROCESS OUT ELECTRICAL
MAKE/MODEL REMARKSCFM
T DB
/ESP RH CFM
T DB
/ESP RH VOLT PH HZ
DH-1 182A 9000 300 70/0.5 60 300 71/0.5 28 208 1 60 NOVEL AIRE/ 300 DES/DX 1, 2
REMARKS:
1. FAN COIL UNITS SHALL BE PROVIDED AS CABINET TYPE WITH FRONT BAR GRILLE OUTLET & BACK STAMPED LOUVER INLET.
2. FAN COIL UNITS SHALL OPERATE AT A MAXIMUM OF MEDIUM SPEED.
3. PROVIDE WITH AUXILIARY DRAIN PAN OVER HOT WATER AND CHILLED WATER CONTROL VALVES.
REMARKS:
1. REFRIGERANT SHALL BE R-410A.
2. DEHUMIDIFER SHALL BE INSTALLED PER MANUFACTURER'S SERVICE ACCESS REQUIREMENTS.
REMARKS:
1. THE CONTRACTOR SHALL COORDINATE IN THE FIELD LEFT OR RIGHT HAND CONTROLS.
NOTES:
1. REFER TO SPECIFICATION SECTION 237000 (2.5)
NOTES:
1. ALL VALVES SHALL BE PROVIDED AS TIGHT SEALING TYPE CAPABLE OF MODULATING TO A CLOSED POSITION WHILE MAINTAINING VALVE AIRFLOW TRACKING.
2. VALVES SHALL BE PROVIDED WITH NEW CONTROL MODULES WITH THE POINTS INDICATED ON DRAWINGS M-400 AND M-401.
3. ALL VALVES ASSCOCIATED WITH FUME HOODS SHALL BE OF THE FAST ACTING TYPE.
4. REFER TO SPECIFICATION SECTION 237000(2.4) FOR ADDITIONAL REQUIREMENTS.
5. VARIABLE VOLUME HOODS SHALL BE PROVIDED WITH SASH STOPS PRVENTING THE SASH FROM OPENING BEYOND 18" IN HEIGHT.
CONTROL VALVE SCHEDULE
UNIT
NO BOD MODEL SERVICE
VALVE
TYPE
LINE SIZE
(IN)
VALVE SIZE
(IN)CV
ACTUATOR
MANF.
ACUATOR
MODEL CONTROL
CAPACITY
(GPM)
PD
(PSIG)FAIL POS REMARKS
CV-1 BELIMO B211 RH-1 2-WAY 3/4"1/2"1.9 BELIMO TF24-SR US MOD 2.5 1.7 F.L.
CV-2 BELIMO B211 RH-2 2-WAY 3/4"1/2"1.9 BELIMO TF24-SR US MOD 2.5 1.7 F.L.
CV-3 BELIMO B210 RH-3 2-WAY 3/4"1/2"1.2 BELIMO TR24-SR US MOD 1.0 0.7 F.L.
CV-4 BELIMO B211 VAV-1 2-WAY 3/4"1/2"1.9 BELIMO TF24-SR US MOD 2.5 1.7 F.L.
CV-5 BELIMO B211 VAV-2 2-WAY 3/4"1/2"1.9 BELIMO TF24-SR US MOD 2.5 1.7 F.L.
CV-6 BELIMO B210 FCU-1 HW 2-WAY 3/4"1/2"1.2 BELIMO TR24-SR US MOD 1.0 0.7 F.L.
CV-7 BELIMO B211 FCU-1 CHW 2-WAY 3/4"1/2"1.9 BELIMO TF24-SR US MOD 2.5 1.7 N.C.
CV-8 BELIMO B210 FCU-2 HW 2-WAY 3/4"1/2"1.2 BELIMO TR24-SR US MOD 1.0 0.7 F.L.
CV-9 BELIMO B211 FCU-2 CHW 2-WAY 3/4"1/2"1.9 BELIMO TF24-SR US MOD 2.5 1.7 N.C.
CV-10 BELIMO B211 FINTUBE (TYP.)2-WAY 3/4"1/2"1.9 BELIMO TF24-SR US MOD 2.5 1.7 N.O.
N.T.S.
PIPE PENETRATION WITH SLEEVE
RISER CLAMP
FIRE PROOF CAULK (TYP.)FLOOR
ANCHOR COLLAR
SCH. 40 GALV. STEEL
PIPE SLEEVE (1" O.D.)
LARGER THAN PIPE
INSULATION
CONC. FLOOR SLAB
OR FLOOR CONSTRUCTION
1
--
FIRE STOPPING SHALL HAVE F-RATING & T-RATED EQUAL TO OR
GREATER THAN THE FLOOR BEING PENETRATED -SEE 260500. REFER
TO ARCHITECTURAL DRAWINGS FOR FLOOR RATINGS AND LOCATIONS.
NOTE:
DRYWALL
PARTITION
FIRESTOP
SEALANT
SCHEDULE 40
GALVANIZED
PIPE SLEEVE
GROUT SLEEVE IN
MASONRY WALL FIRE SEALANT
PER 260000
CONCRETE/MASONRY WALL
NOTE:FIRE STOPPING SHALL HAVE A RATING EQUAL TO OR GREATER
THAN THE WALL BEING PENETRATED -SEE 260000. REFER TO
ARCHITECTURAL DRAWINGS FOR WALL RATINGS AND LOCATIONS.
SCALE: NONE
FIRE-RATED WALL PENETRATION2
--
ELECTRICAL SYMBOLS
EXIT LIGHT CEILING MOUNTED, ( ARROWS AS INDICATED )
SINGLE CONVENIENCE RECEPTACLE -16"AFF U.O.N.
DUPLEX CONVENIENCE RECEPTACLE -16"AFF U.O.N.
DOUBLE DUPLEX CONVENIENCE RECEPTACLE-16"AFF U.O.N.
EMS RECEPTACLE (ENERGY MGMT SYSTEM-CONTROLLED)-16"AFF U.O.N.
GROUND FAULT INTERRUPTING RECEPTACLE-16"AFF U.O.N.
SPECIAL OUTLET CONFIGURATION -SEE NEMA #
J WALL MOUNTED JUNCTION BOX
J CEILING MOUNTED JUNCTION BOX
CEILING MOUNTED DUPLEX RECEPTACLE
SINGLE POLE SWITCH -48"AFF U.O.N.S
LOCKABLE SINGLE POLE SWITCH. B.O.D: BRADY PART # 65392LOCKS
DIMMER ( SWITCH ) OR CONTROL-48"AFF U.O.N.DS
OCOCCUPANCY SENSOR SWITCH-1 WAY -CEILING MOUNTED
OCCUPANCY SENSOR SWITCH-WALL MOUNTED -48"AFF U.O.N.OS
POWER OR LIGHTING PANEL
DISCONNECT SWITCH (SWITCH SIZE/FUSE SIZE; NF = NON-FUSED)30/20
MOTOR LOCATION
COMBINATION MOTOR STARTER / MOTOR CIRCUIT PROTECTOR LOCATION
VARIABLE FREQUENCY DRIVE / VARIABLE SPEED CONTROLLER
MISCELLANEOUS CONTROL PANEL
WP WEATHERPROOF
CONDUITC
CH DEVICE MOUNTED ABOVE/AT COUNTER HEIGHT
EXISTING EQUIPMENT TO REMAIN (EX)
EXISTING EQUIPMENT TO BE REMOVED
EXISTING DEVICE TO REMAINE
NEW DEVICE IN EXISTING LOCATIONN
REPLACE EXISTING DEVICE WITH NEWR
REMOVE EXISTING DEVICE AND PATCHP
REMOVE EXISTING DEVICEX
RELOCATED POSITION OF EXISTING DEVICEL
FLOOR BOX WITH COMMUNICATIONS OUTLET
EQUIPMENT / OUTLET CONTROL GROUP WIRING
UNSWITCHED BRANCH CIRCUIT WIRING
LP/#HOMERUN TO PANEL (LP = PANEL NAME; # = CIRCUIT #)
CEILING-MOUNTED WIRELESS ACCESS POINTWAP
R RELAY OR CONTACTOR FOR CONTROL
LINEAR LIGHTING FIXTURE WITH EMERGENCY BATTERY DRIVER
LINEAR LIGHTING FIXTURE (LETTER INDICATES TYPE)A
FLOOR BOX WITH POWER & DATA = TYPE-SEE 2605001
2 COMMUNICATIONS OUTLET (# = # OF CABLE DROPS)-16"AFF U.O.N.
CEILING-MOUNTED PHOTO SENSORPS
CEILING-MOUNTED OCCUPANCY SENSOROC
EMERGENCY EQUIPMENT / OUTLET CONTROL GROUP WIRING
UNSWITCHED EMERGENCY BRANCH CIRCUIT WIRING
M MOTOR DISCONNECT SWITCH -SNAP TYPE (SEE SPECS.)S
FLOOR BOX WITH DUPLEX RECEPTACLE = TYPE-SEE 2605001
FLOOR BOX WITH DOUBLE DUPLEX RECEPTACLE = TYPE-SEE 2605001
EXISTING DEVICE TO REMAINE
REPLACE EXISTING DEVICE WITH NEWR
REMOVE EXISTING DEVICE AND PATCHP
REMOVE EXISTING DEVICEX
RELOCATED POSITION OF EXISTING DEVICEL
FIRE ALARM BELL -80"AFF U.O.N.F
FIRE ALARM HORN -80"AFF U.O.N.F
FIRE ALARM STROBE LIGHT -80"AFF U.O.N.F
FIRE ALARM HORN AND STROBE LIGHT -80"AFF U.O.N.F
F FIRE ALARM MANUAL PULL STATION-48"AFF U.O.N.
SMOKE DETECTOR (PHOTOELECTRIC U.O.N.)
135F HEAT DETECTOR UNLESS OTHERWISE NOTED
DUCT MOUNTED SMOKE DETECTOR (S=SUPPLY; R=RETURN)
CARBON MONOXIDE DETECTOR -60"AFF U.O.N.CO
FSR FAN SHUTDOWN RELAY
FIRE ALARM INTERFACE -ADDRESSABLE RELAY MODULEFAI
FS FLOW SWITCH
TS TAMPER SWITCH
NEW EQUIPMENT / WIRING
EXISTING EQUIPMENT / WIRING
EXISTING EQUIPMENT / WIRING TO BE REMOVED
FIRE ALARM SYMBOL LIST
FIRE SMOKE DAMPER -ADDRESSABLE MONITOR MODULEFSD
FAN CONTROL RELAY -ADDRESSABLE RELAY MODULEFCR
FSI
MAGNETIC DOOR HOLDER
FIRE/SECURITY INTERFACE -ADDRESSABLE RELAY MODULE
RECESSED CLG-MTD FIRE ALARM HORN/STROBEFS
xxxx
GENERAL NOTES
1.REFER TO SPECIFICATIONS FOR GENERAL REQUIREMENTS OF ALL
ELECTRICAL EQUIPMENT, RACEWAYS, AND GROUNDING SYSTEMS.
2.REFER TO ARCHITECTURAL REFLECTED CEILING PLANS AND ELEVATION
DETAILS FOR EXACT LOCATIONS, MOUNTING, AND ORIENTATION OF ALL
LIGHTING FIXTURES, EQUIPMENT, DEVICES, AND OUTLETS.
3.REFER TO ARCHITECTURAL DRAWINGS AND ELEVATION DETAILS FOR EXACT
LOCATION AND MOUNTING OF ALL RECEPTACLES, SWITCHES, TELEPHONE
AND DATA OUTLETS. CONFIRM WITH ARCHITECT EXACT LOCATION AND
MOUNTING HEIGHTS OF ALL DEVICES PRIOR TO INSTALLATION OF ANY
WORK.
4.ALL CONDUITS SHALL BE RUN CONCEALED IN WALLS AND ABOVE HUNG
CEILINGS. STUB-OUT OF WALLS AND FLOORS AS REQUIRED FOR
CONNECTIONS TO EQUIPMENT AND/OR DEVICES.
5.ALL FEEDERS AND BRANCH CIRCUITS SHALL INCLUDE A SEPARATE,
INSULATED GREEN GROUND CONDUCTOR, SIZED AS INDICATED AND PER
NEC REQUIREMENTS.
6.COORDINATE WITH MECHANICAL, PLUMBING, FIRE PROTECTION,
ARCHITECTURAL, IRRIGATION, AND LANDSCAPE DRAWINGS FOR EXACT
LOCATIONS, MOUNTING HEIGHTS, AND MOUNTING DETAILS FOR ALL
EQUIPMENT INSTALLED ON THIS PROJECT. WORK UNDER THIS DIVISION (26)
SHALL INCLUDE ALL ELECTRICAL WORK DETAILED, SPECIFIED, OR
OTHERWISE REQUIRED FOR THE SUPPORT OF OTHER TRADES, UNLESS
OTHERWISE SPECIFICALLY INDICATED.
7.COORDINATE WITH MECHANICAL CONTRACTOR AND THE REQUIREMENTS
OF DIVISION 23 FOR LOCATIONS OF ALL TEMPERATURE CONTROL PANELS,
DUCT-MOUNTED SMOKE DETECTORS, MOTOR STARTERS, AND OTHER
EQUIPMENT. POWER FOR THE SAME SHALL BE PROVIDED AND INSTALLED
BY DIVISION 26.
8.PROVIDE POWER TO ALL FIRE/SMOKE DAMPERS (FSD'S) AND SMOKE
DAMPERS. REFER TO MECHANICAL DRAWINGS FOR EXACT LOCATIONS.
POWER SHALL BE FROM SOURCES AS SCHEDULED ON THE ELECTRICAL
DRAWINGS.
9.PROVIDE POWER TO ALL VAV BOXES AND TERMINAL CONTROL UNITS.
REFER TO MECHANICAL DRAWINGS FOR EXACT LOCATIONS. POWER SHALL
BE FROM SOURCES AS SCHEDULED ON THE ELECTRICAL DRAWINGS.
10.ELECTRICAL CONTRACTOR SHALL PROVIDE POWER WIRING TO, BETWEEN,
AND FROM ALL DISCONNECT SWITCHES AND MOTOR STARTERS, WHETHER
IN THE SAME ENCLOSURE OR MOUNTED AS SEPARATE UNITS. ALL VARIABLE
FREQUENCY DRIVES (VFD'S), COMBINATION STARTERS, AND MANUAL
MOTOR STARTERS SHALL BE FURNISHED BY DIVISION 23 AND SHALL BE
INSTALLED BY DIVISION 26. REFER TO SECTION 230513.
11.ALL SAFETY DISCONNECT SWITCHES SHALL BE SUPPLIED AND INSTALLED BY
DIVISION 26. REFER TO SECTION 260500. REFER TO MECHANICAL AND
ELECTRICAL PLANS FOR UNIT AND DEVICE LOCATIONS. SAFETY
DISCONNECTS ON THE LOAD SIDE OF VFD'S SHALL BE EQUIPPED WITH
AUXILIARY CONTACTS AND WIRING BACK TO RUN-ALLOW TERMINALS ON
THE VFD TO PREVENT DISCONNECT FROM BEING CLOSED WITH THE VFD
UNIT ACTIVATED.
12.WIRING BETWEEN MOTOR CONTROLLERS AND 2-SPEED MOTORS AND
WYE/DELTA TYPE MOTORS SHALL INCLUDE 6 WIRES. WIRE SIZES SHALL
MATCH FEEDER TO CONTROLLER UNLESS OTHERWISE NOTED.
13.ELECTRICAL CONTRACTOR SHALL PROVIDE 120 VOLT POWER WIRING TO
ALL TEMPERATURE CONTROL PANELS, IRRIGATION CONTROL PANELS, AND
OTHER CONTROLLERS SUPPLIED BY OTHER DIVISIONS.
14.DO NOT SCALE THE DRAWINGS FOR DIMENSIONS NOT INDICATED. CONSULT
WITH ARCHITECT FOR RESOLUTION OF ANY DIMENSIONS NOT INDICATED.
15.PROVIDE A 1.25" EMPTY EMT CONDUIT FROM EACH TELE/DATA OUTLET BACK
TO THE CLOSEST TELE/DATA CLOSET. J-HOOKS MAY BE USED FOR SUPPORT
AND WIRE MANAGEMENT IN LIEU OF CONDUIT IN AREAS WITH ACCESSIBLE
CEILINGS.
CEILING MOUNTED CORD REELCR
THE ELECTRICAL CONTRACTOR SHALL PROVIDE ALL POWER REQUIREMENTS FOR
THE ABOVE SYSTEM AS OUTLINED IN DIVISION 26 & 27 SPECIFICATION SECTIONS
AND/OR AS SHOWN ON THE ELECTRICAL DRAWINGS.
THE ELECTRICAL CONTRACTOR SHALL PROVIDE A COMPLETE EMPTY RACEWAY AND
BACKBOX SYSTEM FOR THE ABOVE SYSTEM IN ACCORDANCE WITH
TELECOMMUNICATION "T" SERIES DRAWINGS, DIVISION 26 & 27 SPECIFICATION
SECTIONS AND THE "E" DRAWINGS, WHERE THE MORE STRINGENT REQUIREMENT
APPLIES.
TELECOM SYSTEM NOTES
THE TELECOM CONTRACTOR SHALL BE RESPONSIBLE FOR ALL
TELECOMMUNICATIONS EQUIPMENT, DEVICES, WIRING, AND CONNECTIONS AS
SPECIFIED IN THE TELECOMMUNICATIONS SPECIFICATIONS SECTION AND
RELATED DRAWINGS.
3.
2.
1.
EM
PUSH BUTTONHC
PUSH BUTTONHC
Revisions:
347 West 36 Street Suite 1501
New York, NY 10018
212-245-5195 T
212-239-7130 F
Key Plan:
Notes:
Grumman Hall
Cornell University
Ithaca, NY 14850
Richard McElhiney Architects LLC
April 2, 2020
Issue for Bid April 2, 2020
Scale:
31 Knight Street
Norwalk, CT 06851
203-866-5538 T
203-866-5243 F
Altieri Sebor Wieber LLC
303 South Broadway, Suite G20
Tarrytown, NY 10591
914-333-1110 T
914-333-1109 F
Jacobs Consultancy
4588 South Park Avenue
Blasdell, NY 14219
716-823-0006 T
Trophy Point
AREA OF WORK
4592 Jordan Road
Skaneateles Falls, NY 13153
315-685-4732 T
Ryan Biggs Clark Davis Engineering & Surveying
First and Second Floor Renovation Phase 1
12" = 1'-0"
Cover Sheet
E-001
THE ELECTRICAL CONTRACTOR SHALL PROVIDE ALL POWER CONNECTIONS FOR
THE ABOVE SYSTEM AS OUTLINED AS SHOWN ON THE ELECTRICAL DRAWINGS.
THE ELECTRICAL CONTRACTOR SHALL PROVIDE A COMPLETE EMPTY RACEWAY AND
BACKBOX SYSTEM FOR THE ABOVE SYSTEM IN ACCORDANCE WITH SPECIFICATIONS
SECTIONS 260500.
SECURITY SYSTEM NOTES
THE SECURITY CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SECURITY
EQUIPMENT, DEVICES, WIRING, AND CONNECTIONS AS SPECIFIED.
3.
2.
1.
LIGHTING FIXTURES SCHEDULES
Lighting Type DESCRIPTION MFR/MODEL WATT
A SUSPENDED LINEAR I-BEAM
LIGHT
SVI 4 55 G1 40 (0-10V DIMMABLE)50
B LINEAR STRIP LED LIGHT ZIPTWO 707-Z2 SL-C-0-SO-35 28
C SUSPENDED LINEAR I-BEAM
LIGHT
SVI 4 55 G1 40 (0-10V DIMMABLE)50
D UNDERCABINET LIGHTING COMES PART OF THE FURNITURE
E RECESSED 1X4 LIGHT METALUX 14SR LED SERIES 3,000K RECESSED LED 1’x4’ TROFFER WITH CURVED REFLECTOR 24.5
EXIT LED RECESSED WALL/CLG EDGE-LIT EXIT SIGN WITH LED LIGHT SOURCE, 6” RED SIGNS LETTERS ON WHITE PLEXIGLASS
BACKGROUND WITH WHITE TRIM PLATE, *. CEILING / WALL / PENDANT / END RECESSED
MOUNTED. DIRECTIONAL ARROWS AND MOUNTING AS REQUIRED BY PLANS. FINISH PER
ARCHITECT. COOPER LIGHTING "SURE-LITES"
MODEL:"ES6-FACE-WH-RW-CHEVRON-120-MOUNTING".
OR EQUAL BY: EMERGI-LITE "PRESTIGE" SERIES, OR ATLITE "MARATHON" SERIES, OR
McPHILBEN 45V LINE SERIES.
* EXIT SIGNS INSIDE OF LECTURE HALLS SHALL SAME AS ABOVE, EXCEPT SHALL INCLUDE
TRIM FINISH BRUSHED ALUMINUM, RED LETTERS, & CLEAR BACKGROUND. COORDINATE WITH
ARCHITECT. COOPER LIGHTING "SURE-LITES" MODEL:"ES6-1-R-120-C/W".
5
FIRE ALARM NOTES
TYPICAL FLOW SWITCH WIRING
TO OTHERTO FACP ~TYPICAL SPEAKER/STROBE WIRING
FOR WIRING SIZES AND QUANTITIES SERVING
REFER TO SECTION 283200 OF SPECIFICATIONS
EACH TYPE OF DEVICE ABOVE
TYPICAL MANUAL STATION WIRING
TYPICAL STROBE WIRING
TO FACP
TO FACP
TO OTHER
DEVICES
INITIATING~STROBES
TO OTHER
SPEAKERS
~TYPICAL DUCT SMOKE DETECTOR WIRING
TYPICAL TAMPER SWITCH WIRING
TO FACP
TO FACP
TO FACP
TO OTHER
STROBES
DEVICES
SUPERVISORY
TO OTHER
~~~SUPERVISORY
DEVICES
TO OTHER
~~TYPICAL ELEVATOR HEAT DETECTOR WIRING
TYPICAL ELEVATOR RECALL DETECTOR WIRING
TO FACP
TO FACP
TO FACP
DEVICES
INITIATION
TO OTHER
DEVICES
INITIATION
TO OTHER
~~200°~~TO OTHER
INITIATION
DEVICESERS~~FIRE ALARM DEVICE WIRING KEY
TYPICAL SMOKE DETECTOR WIRING
TO FACP INITIATION
TO OTHER
DEVICES
SIGNAL TO
ELEVATOR CONTROL
SYSTEM~~TYPICAL FAN SHUT DOWN RELAY WIRING
TO FACP
TO OTHER
DEVICES
INITIATING~WIRING FROM RELAY
TO STARTER FOR
FAN SHUT DOWN
TYPICAL ALARM INTERFACE RELAY WIRING
TO FACP
TO OTHER
DEVICES
INITIATING~F
FS
TS
FS
FSR
FAI
WIRING FROM RELAY
TO DEVICE FOR
INTERFACE
CONTROL
WIRING FROM BASE
CONTACTS OR
RELAY TO STARTER
FOR FAN SHUT
DOWN
WIRING FROM BASE
CONTACTS OR
RELAY TO ELEVATOR
POWER SHUNT TRIP
F
1.REFER TO PLANS FOR EXACT QUANTITIES AND LOCATIONS OF ALL DEVICES. IF A
DISCREPANCY BETWEEN THE PLANS AND THE RISER IS FOUND, PROVIDE THE
GREATER/MORE STRINGENT QUANTITY OF DEVICES.
2.ALL FIRE ALARM DEVICES SHALL BE WIRED VIA ADDRESSABLE LOOPS FORM THE FIRE
ALARM DGP'S PER MANUFACTURER'S RECOMMENDATIONS. LEAVE SPACE FOR THE
ADDITIONAL OF 10 FUTURE DEVICES PER NEW LOOP MINIMUM.
3.ALL WIRING FOR FIRE ALARM SYSTEM DEVICES SHALL BE RUN IN EMT CONDUIT
THROUGHOUT BUILDING. SEE SPECIFICATIONS.
4.ALL FIRE ALARM SYSTEM POWER SUPPLIES SHALL BE POWERED VIA FUSED CUTOUTS.
5.MAINTAIN EX. FIRE ALARM AND SIGNALING SYSTEM INTACT THROUGHOUT CONSTRUCTION
PHASE DUE TO CONSTANT OCCUPANCY OF THE BUILDING. COORDINATE ANY TEMPORARY
SHUT DOWNS WITH OWNER.
6.SMOKE DETECTORS SHALL NOT BE LOCATED IN A DIRECT AIR FLOW OR CLOSER THAN
THREE (3) FEET FROM AN AIR SUPPLY DIFFUSER OR RETURN AIR OPENING. INCREASE
SEPARATION AS REQUIRED BY NFPA 72.
7.CONTRACTOR SHALL VERIFY AND COORDINATE ALL NEW DEVICES NODE AND ADDRESS
NUMBERS WITH EXISTING BUILDING FIRE ALARM VENDOR (GAMEWELL FCI BY HONEYWELL
E3 SERIES).
8.PROVIDE NEW SIGNAL LOOPS CARDS, AMPLIFIERS AND POWER SUPPLIES AS REQUIRED IN
EXISTING AND NEW FA NODE PANELS/TRANSPONDERS TO ACCOMMODATE NEW DEVICES
AND LOOPS.
9.NEW SPEAKER/STROBES SHALL BE RATED 30 CANDELA WITH SPEAKERS SET AT 1/2 WATT
TAP.
10.PROVIDE TEMPORARY FIRE ALARM HEAT DETECTION FOR ALL CONSTRUCTION AREA.
11.COORDINATE WITH CM & CORNELL UNIVERSITY THE PROCEDURE TO PREVENT NUISANCE
FIRE ALARMS FROM SMOKE DETECTORS WITHIN CONSTRUCTION AREAS. FIRE ALARM
SYSTEM SHALL BE TAKEN OFFLINE WITH CONTRACTOR MANUALLY WATCHING FACP
DURING CONSTRUCTION AS REQUIRED. DURING DEMO WORK THE EXISTING SMOKE &
HEAT DETECTORS SHALL BE REMOVED DAILY, REINSTALLED & TESTED AT END OF DAY.
AREA SMOKE DETECTOR
DUCT SMOKE DETECTOR
AREA HEAT DETECTOR
MANUAL PULL STATION
ELEVATOR LOBBY OR MACHINE RM SMOKE DETECTOR
HEAT DETECTOR IN ELEVATOR SHAFT OR MACHINE ROOM
SPRINKLER WATER FLOW SWITCH
SPRINKLER VALVE TAMPER SWITCH
SYSTEM TROUBLE CONDITION
LOSS OF PRIMARY AC POWER
FIRE PUMP SUPERVISORY (3 TOTAL REQUIRED)DISPLAY&SOUNDEVENTATFACONTROLPANELX
INPUTSSENDSMOKE/HEATALARMSIGNALTOCENTRALSTATIONACTIVATEANNUNCIATIONDEVICES(SPEAKER/STROBES)THROUGHOUTSENDSIGNALTOBUILDINGMANAGEMENTSYSTEMSENDPULLSTATIONALARMSIGNALTOCENTRALSTATIONSENDWATERFLOWALARMTOCENTRALSTATIONSENDVALVESUPERVISORYSIGNALTOCENTRALSTATIONSENDSYSTEMTROUBLETOCENTRALSTATIONSENDFIREPUMPSUPERVISORYSIGNALTOCENTRALSTATIONRELEASESDOORHOLD-OPENDEVICESSENDSSHUTDOWNSIGNALTOAIRHANDLINGSYSTEMSSENDSUPERVISORYSIGNALTOFACONTROLPANELEMERGENCY GENERATOR ALARM OR TROUBLE SENDSIGNALTOSHUTDOWNTHEATERSOUND&PROJECTIONSYSTEMSSENDSIGNALTORAISETHEATERHOUSELIGHTINGSYSTEMSTOFULL"ON"X X X XX X X
X X X X XX X X
X XXXXX X XSENDSIGNALTORECALLELEVATORSTODESIGNATEDLEVELSENDSIGNALTOSHUTOFFPOWERTOELEVATOREQUIPMENT
X XXXXX X XX
X XXXXX X XX
X XXXXX X XX
X
X
X
X
X
FIRE ALARM SYSTEM
SEQUENCE OF
OPERATION
OUTPUTS
CARBON MONOXIDE DETECTOR X
FSD -ADJACENT IN-DUCT NO-FLOW SMOKE DETECTOR SENDSIGNALTOFACPVIAADDRESSABLEMONITORINGMODULESENDSIGNALTOCLOSEALLFSD'SVIAADDRESSABLEFARELAYSX
X
X
X
X
X SOUNDTEMPORAL4SIGNALVIAAUDIBLEBASEX SENDDISTINCTALARMSIGNALTOCONTROLPANELANDCENTRALSTATIONX
X
X
X
FAI
FAI
FAI
FAI
NEW GAS DETECTION
MAIN CONTROLLER
BY OTHERS.
ALARM 1
ALARM 2
SUPERVISORY
TROUBLE
NEW FCI ADDRESSIBLE
FIRE ALARM MONITOR
MODULES. TYPICAL.
FIRST FLOOR
182
SADAF'S LAB
182
SADAF'S LAB
CO
182
SADAF'S LAB
CO
180
LAB 1
184
COMMON AREA
EXISTING FACP PANEL
LOCATED IN B0063
MODEL: FCI E3
BASEMENT
FAI FAI
SYSTEMSENSOR 1224T
WALL MOUNTED
CO SENSOR.
TYPICAL.
FSFSFSFS
RUN NAC LOOP ALL THE WAY BACK TO
THE EX. FIRE ALARM PANEL IN UPSON
RUN SLC LOOP ALL THE WAY BACK TO
THE EX. FIRE ALARM PANEL IN UPSON
X
X
FS
EX.
SPLICE AND EXTEND EXISTING NAC LOOP
TO NEW SPEAKER STROBE.
EX.
SPLICE AND EXTEND EXISTING SLC LOOP
NEW FIRE DETECTION DEVICES.
FIRST FLOOR
~~~~AREA OF WORK
EXISTING FIRE ALARM PANEL
LOCATED IN ROOM B0063.
SCALE: NONE
BASEMENT PART PLAN2
--
SCALE: NONE
FIRE ALARM RISER1
--
SCALE: NONE
FIRE ALARM SYSTEM
SEQUENCE OF OPERATION3
--
Revisions:
347 West 36 Street Suite 1501
New York, NY 10018
212-245-5195 T
212-239-7130 F
Key Plan:
Notes:
Grumman Hall
Cornell University
Ithaca, NY 14850
Richard McElhiney Architects LLC
April 2, 2020
Issue for Bid April 2, 2020
Scale:
31 Knight Street
Norwalk, CT 06851
203-866-5538 T
203-866-5243 F
Altieri Sebor Wieber LLC
303 South Broadway, Suite G20
Tarrytown, NY 10591
914-333-1110 T
914-333-1109 F
Jacobs Consultancy
4588 South Park Avenue
Blasdell, NY 14219
716-823-0006 T
Trophy Point
AREA OF WORK
4592 Jordan Road
Skaneateles Falls, NY 13153
315-685-4732 T
Ryan Biggs Clark Davis Engineering & Surveying
First and Second Floor Renovation Phase 1
12" = 1'-0"
Fire Alarm Riser
E-002
WATTSTOPPER
0-10V DIMMING ROOM
CONTROL
LMRC-212
KEYPAD
LMDM-101-W
CAT 6 CAT 6
WATTSTOPPER
OCCUPANCY/VAC
SENSOR
CAT 6
WATTSTOPPER
DAYLIGHT SENSORWATTSTOPPER
OCCUPANCY/VAC
SENSOR
CAT 6
WATTSTOPPER
0-10V DIMMING ROOM
CONTROL
LMRC-212
CAT 6
WATTSTOPPER
OCCUPANCY/VAC
SENSOR
-
2
-
STUDENT SPACE 186 LIGHTING CONTROL
-
1
-
COMMON AREA LIGHTING CONTROL
WIRED
NETWORK
BRIDGE
LMBC-300
FROM BMS
BMS TO SIGNAL
WHEN THE LIGHT
TO TURN ON/OFF
WIRED
NETWORK
BRIDGE
LMBC-300
FROM BMS
MSTP Cable
FROM
WATTSTOPPER
WATTSTOPPER
0-10V DIMMING ROOM
CONTROL
LMRC-212
KEYPAD
LMDM-101-W
CAT 6 CAT 6
WATTSTOPPER
OCCUPANCY/VAC
SENSOR
CAT 6
WATTSTOPPER
DAYLIGHT SENSOR
WATTSTOPPER
OCCUPANCY/VAC
SENSOR
CAT 6
-
3
-
STUDENT WORKSTATIONS 296 LIGHTING CONTROL
WIRED
NETWORK
BRIDGE
LMBC-300
FROM BMS
STUDENT SPACE AND
STUDENT WORK STATION
ELECTRICAL ROOM
OCCUPANCY TYPE
DAYLIGHTINGCOMMON AREA
SCHEDULE BUSINESS
HOURS
NON-BUS.
HOURS
ON
MANUAL ONVACANCY OFF
MANUAL ONMANUAL OFF
MANUAL ONVACANCY OFFN/A
N/A
LIGHTING CONTROL SEQUENCE OF OPERATIONS
MANUAL ONMANUAL OFF
(BUSINESS HOURS)
LABS MANUAL ONMANUAL OFFN/A MANUAL ONMANUAL OFF
ONPER BUILDING
SCHEDULE HOURS
CORRIDOR/PUBLIC
CIRCULATION
OCCUPANCY ON
VACANCY OFF
X
X
XX
X
X
X
X
X
XLTG.CONTROLSYSTEMEND-USERINTERFACE(KEYPAD)TIMESCHEDULEWITHPHOTOCELLOVERRIDEAVINTERFACELOCALOCCUPANCYSENSOR(WITHOUTSWITCH)LOCALVACANCYSENSORWITHWALLMANUALCONTROLOCCUPANCY/VACANCYSENSORPARTOFLTG.CONTROLSYSTEMTHEATRICALCONSOLEINTERFACENOTE:
1.REFER TO FLOOR PLANS FOR EXACT LIGHTING DEVICES QUALITIES.
OCCUPANCY ON
VACANCY OFF
PER BUILDING
SCHEDULE HOURS
-
4
-
LIGHTING CONTROL SEQ. OF OPS.
CAT 6
CAT 6
CAT 6
LMCT-100-2
PROVIDE 1.
MSTP Cable
FROM
WATTSTOPPER
MSTP Cable
FROM
WATTSTOPPER
Revisions:
347 West 36 Street Suite 1501
New York, NY 10018
212-245-5195 T
212-239-7130 F
Key Plan:
Notes:
Grumman Hall
Cornell University
Ithaca, NY 14850
Richard McElhiney Architects LLC
April 2, 2020
Issue for Bid April 2, 2020
Scale:
31 Knight Street
Norwalk, CT 06851
203-866-5538 T
203-866-5243 F
Altieri Sebor Wieber LLC
303 South Broadway, Suite G20
Tarrytown, NY 10591
914-333-1110 T
914-333-1109 F
Jacobs Consultancy
4588 South Park Avenue
Blasdell, NY 14219
716-823-0006 T
Trophy Point
AREA OF WORK
4592 Jordan Road
Skaneateles Falls, NY 13153
315-685-4732 T
Ryan Biggs Clark Davis Engineering & Surveying
First and Second Floor Renovation Phase 1
12" = 1'-0"
Lighting Control
E-003
510152025
3035
401454035302520151054035302520151051 510152025
3035
401454035302520151054035302520151051 TELECOMMUNICATIONS SYMBOLS
COMMUNICATIONS OUTLET - 16"AFF U.O.N.
423222120291817161514131211101987654321847464544434241404938373635343332313039282726252
BASEMENT
FIRST FLOOR
EX CABLE TRAY
EX CABLE TRAY
B
A
C
E
EXISTING DATA
RACKS IN TR BC
COORDINATE EQUIPMENT
LOCATION IN EXISTING RACKS WITH
CORNELL CIT DEPARTMENT
A
C
E
F
B
D
RACK MOUNT CAT6 48 PORT PATCH PANEL SHALL ACCEPT PANDUIT MINICOM
MODULES. 2 RACK UNITS, TYPICAL.
OWNER SUPPLIED 48 PORT 10/100/1000 DATA SWITCH WITH POWER OVER ETHERNET. 1 RACK UNIT.
WIRE MANAGEMENT SHALL MATCH EXISTING PANDUIT WIRE MANAGEMENT. 2 RACK UNITS, TYPICAL.
CONDUIT SLEEVES THROUGH FLOOR AND WALL. PROVIDE AS REQUIRED
BY LOW VOLTAGE CABLING. NOT ALL CONDUITS ARE SHOWN ON PLANS.
PROVIDE FIRE STOP, TYPICAL.
PROVIDE WATERFALLS AS NECESSARY OVER EACH RACK, TYPICAL.
KEYED NOTES:
RACK MOUNT CAT6A 24 PORT PATCH PANEL SHALL ACCEPT PANDUIT MINICOM MODULES. 1 RACK UNITS, TYPICAL.
F
REFER TO DETAIL #5 ON E-801.0
FOR CONDUIT INSTALLATION.
EX CONDUIT.
REFER TO FLOOR PLAN
FOR EXACT QTY.
IT GENERAL NOTES
1.PROVIDE CONDUITS FROM ALL BACK BOXES - INCLUDING WALL BOXES, FLOOR BOXES AND CEILING BOXES TO ACCESSIBLE AREA.
2.CONDUITS FOR TELECOMMUNICATIONS SHALL BE DEDICATED TO THAT PURPOSE AND SEPARATE FROM POWER AND ANY OTHER FUNCTION.
3.ALL TELECOM WORK SHALL BE PERFORMED IN STRICT ACCORDANCE WITH ALL LOCAL, STATE, AND NATIONAL CODES, INCLUDING THE LATEST
APPROVED EDITION OF THE NATIONAL ELECTRICAL CODE , AND ALL OTHER AUTHORITIES HAVING JURISDICTION.
4.IT IS THE INTENT OF THE DRAWINGS AND SPECIFICATIONS TO OBTAIN FINISHED WORK - CLEAN, TESTED AND READY FOR OPERATION. ITEMS AND
SERVICES NECESSARY TO RENDER THE WORK COMPLETE AND READY FOR OPERATION, EVEN IF NOT SPECIFIED, SHALL BE PROVIDED WITHOUT
ADDITIONAL COST.
5.DRAWINGS ARE DIAGRAMMATIC ONLY. EXACT LOCATION, MOUNTING HEIGHTS AND ROUTING SHALL BE COORDINATED WITH ARCHITECT, GENERAL
CONTRACTOR, OTHER TRADES EQUIPMENT REQUIREMENTS AND FIELD CONDITIONS.
6.THE CONTRACTOR SHALL VERIFY FIELD CONDITIONS PRIOR TO THE COMMENCEMENT OF WORK AND REPORT ANY DISCREPANCIES TO THE
ENGINEER IN WRITING. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD.
7.THE CONTRACTOR SHALL VERIFY ROUGH-IN LOCATIONS FOR BACK BOXES AND MOUNTING BRACKETS IN ALL LOCATIONS PRIOR TO
CONSTRUCTION.
8.THE CONTRACTOR SHALL COORDINATE FLOOR MOUNTED DEVICES WITH ELECTRICAL, ELECTRICAL DRAWINGS.
9.DURING CONSTRUCTION, THE CONTRACTOR SHALL USE CARE IN PERFORMING THE WORK SO AS NOT TO DAMAGE EXISTING STRUCTURE OR
EQUIPMENT. THE CONTRACTOR SHALL REPAIR AND/OR REPLACE ANY DAMAGE CAUSED DURING CONSTRUCTION TO THE SAME AS NEW
CONDITION AT NO COST, AND TO THE FULL SATISFACTION OF THE OWNER.
10.ALL MEANS, METHODS AND EQUIPMENT USED BY THE CONTRACTOR SHALL MEET THE LATEST OSHA REQUIREMENTS.
11.THE CONTRACTOR SHALL FURNISH AND INSTALL ALL COMPONENTS AND PARTS AS INDICATED ON THESE DRAWINGS AND DESCRIBED IN THE
SPECIFICATIONS.
12.CONTRACTOR SHALL PROVIDE PULL ROPE IN ALL CONDUITS.
13.CONTRACTOR SHALL MAINTAIN AN UP TO DATE SET OF DRAWINGS WITH ALL CABLE NUMBERS SHOWN AT EACH LOCATION. DRAWINGS SHALL BE
AVAILABLE ON SITE FOR REVIEW.
14.ALL LADDER RACK AND DATA RACKS SHALL BE BONDED AND GROUNDED WITH #6 AWG COPPER (MIN.) SEE SPECIFICATIONS.
15.CONTRACTOR IS RESPONSIBLE FOR FIRE STOPPING IN ACCORDANCE WITH SPECIFICATIONS AND APPLICABLE CODES.
16.CONTRACTOR TO PROVIDE ALL HARDWARE, AS REQUIRED AND AS INDICATED, TO MOUNT AND SECURE ALL RACKS, DEVICES, CONDUIT, AND ANY
OTHER MATERIAL FURNISHED UNDER THIS SECTION OF WORK.
17.ALL WORK SHALL BE PERFORMED IN A NEAT AND WORKMANLIKE MANNER IN ACCORDANCE WITH THE BUILDING OWNER'S STANDARDS.
18.CONTRACTOR TO SUBMIT SHOP DRAWINGS, FOR ENGINEERS' REVIEW, FOR ALL EQUIPMENT AND MATERIAL FURNISHED UNDER THIS SECTION OF
WORK.
19.ALL CONDUIT SHALL BE SIZED IN ACCORDANCE WITH THE LATEST APPROVED EDITION OF THE NATIONAL ELECTRICAL CODE , INCLUDING ALL
REVISIONS AND ADDENDA; MINIMUM SIZE CONDUIT SHALL BE 1". DO NOT EXCEED REQUIRED CONDUIT FILL REQUIREMENTS.
20.ALL MATERIAL SHALL BEAR THE MARK OF APPROVAL OF UNDERWRITERS LABORATORIES (UL LISTED).
21.ALL WIRING INSTALLED WITHIN PLENUM SPACES SHALL BE PLENUM RATED IN ACCORDANCE WITH THE NATIONAL ELECTRICAL CODE . SEE
MECHANICAL DRAWINGS FOR EXACT LOCATIONS.
22.DO NOT PENETRATE STAIRWELLS OR ELEVATOR HOISTWAYS WITH RACEWAY NOT RELATED TO THESE SYSTEMS.
23.REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
24.CONTRACTOR SHALL PROVIDE EXCEL TEMPLATE AS-BUILT DOCUMENTING INSTALLATION OF CAT6, CAT6A CABLES PRIOR TO CERTIFICATE OF
OCCUPANCY.
25.CONTRACTOR SHALL COORDINATE ALL JACK LABELING WITH CIT. TYP. FOR ALL CABLING PROVIDED WITH THIS PROJECT.
ACCEPTABLE MANUFACTURERS LIST
CAT 6 PLENUM CABLE
COMMSCOPE SYSTIMAX GIGASPEED P/N 2071E
BERK-TEK LANMARK 1000 P/N 10032094
PANDUIT GENSPEED 6000
CAT 6A AUGMENTED PLENUM CABLE,
COMMSCOPE GIGASPEED X10D P/N 2091B
BERK-TEK LANMARK 10G2 P/N 10130484
CEILING-MOUNTED WIRELESS ACCESS POINTWAP
DATA OUTLET - 16# AFF U.O.N (# = NUMBER OF CABLE DROPS)(#)
FIRST FLOOR
EX CABLE TRAY
F
REFER TO DETAIL #5 ON E-801.0
FOR CONDUIT INSTALLATION.
EX CONDUIT.
REFER TO FLOOR PLAN
FOR EXACT QTY.
..
..........
.......
.........
.....
.
.
......
.....
....
....
.....
..
.
.
.
.
..
......
..
.
..
......
.
.
.
...
.
......
.
.
.
.
..
......
..
...
.
......
.
.
.
.
..
.....
.
.
.
.......
.
.
.
.
..
......
.
.
.
....
.......
.
....
.....
.......
.
....
....
.........
CORRIDOR
OFFICES
MEETING ROOM, ETC..
WAPWAP
7 4
3 61
8
9
5
MDF-1A24
MDF-2A20
MDF-2A19
TWO (2) CAT 6A STATION CABLE, TYPICAL
REFER TO SPECIFICATION SECTION 270528
SHIELDED CAT 6A
DATA
JACK, TYPICAL
ACCESSIBLE CEILING
OWNER PROVIDED
WIRELESS ACCESS
POINT TO LOCAL DATA
ROOM, SEE
DRAWINGS FOR
CONNECTION.
CAT 6 PLENUM CABLE, TYPICAL
FOR ACCEPTABLE CABLE MANUFACTURER
SEE LIST ON RISER DRAWING
CAT 6 DATA JACK, TYPICAL CAT 6 STATION CABLE, TYPICAL
OWNER
PROVIDED
COMPUTE
R
AND
MONITOR
OWNER
PROVIDED
IP PHONE
REFER TO ELECTRICAL
DRAWINGS FOR
POWER
CONNECTIONS.
FOR ALL DATA DEVICES
INSTALLED BELOW 72"
AFF, PROVIDE
TAMPERPROOF JACK
COVERS OVER
OUTLETS.
REFER TO
ARCHITECTURAL
DRAWINGS FOR DEVICE
MOUNTING HEIGHT
INFORMATION.
FLOOR SLAB
DATA OUTLET
CORRIDOR
CABLE TRAY
DATA FLOOR BOX
1.25"C IN FLOOR SLAB
1"C UP
WITHIN WALL
CONSTRUCTION
FIRE-RATED SLEEVE
FOR ALL WALL
PENETRATIONS.
ACCESSIBLE
CEILING
DATA CABLE SHALL BE IN
CONDUIT BACK TO CABLE
TRAY.
CEILING
MOUNTED
WIRELESS
ACCESS
POINT
PROVIDE
1"C
FROM "WAP"
BACK TO
CABLE
TRAY
DATA CABLE SHALL BE IN
CONDUIT BACK TO
CEILING CABLE
TRAY.
SCALE: NO SCALE
TYPICAL P.O.E.
WIRELESS CONNECTION LABELING / NOMENCLATURE
SCALE: NO SCALE
NETWORK INTERFACE OUTLET
1A-1A48
1A-1A47 DATA CIRCUIT IDENTIFICATION
SCALE: NO SCALE
TYPICAL PHONE /COMPUTER
CONNECTIONS WALL MOUNT
SCALE: NO SCALE
OUTLET FLUSH
1A-1A48
SYMBOL:
EIA T568 A WIRING SCHEME
1A-1A47
(TYPICAL)
JACK "B"
JACK "A"
PRINTED LABEL
FOR DATA CONNECTION
1X4-UTP CABLE
1X4-UTP CABLE
SHOWING THE OUTLET
PANDUIT INSERT
PANDUIT" INSERT
EIA T568 A WIRING SCHEMEFOR DATA CONNECTION
DUPLEX DATA
IDENTIFICATION
2
LABELING / NOMENCLATURE
SCALE: NO SCALE
48 PORT PATCH PANEL1A-1A28272625
04030201 08070605
29 30 31 32
16151413
37 38 39 40
20191817
41 42 43 44
24232221
45 46 47 4836353433
09 10 11 12
PANDUIT FOR NETWORK CONNECTION (TYPICAL)
PRINTED LABEL SHOWING THE OUTLET IDENTIFICATION AND JACK (TYPICAL)
TYPICAL JACK 1X4-UNSHIELDED TWISTED PAIR (UTP) CABLE EIA568A WIRING SCHEME
PATCH PANEL LABEL
SCALE: NO SCALE
FLUSH WALL MOUNT
SCALE: NO SCALE
TRIPLE DATA OUTLET
SYMBOL:
EIA 568 A WIRING SCHEMEFOR TELEPHONE CONNECTION
1X4-UTP CABLEFOR DATA CONNECTION
PANDUIT INSERT
JACK "B"
1X4-UTP CABLE
PANDUIT INSERT
SHOWING THE OUTLETPRINTED LABEL
JACK "A"
(TYPICAL)
1A-1A44
BLUE "COMPUTER"
DATA CONNECTION1X4-UTP CABLE FORJACK "D"
BLANK
EIA 568 A WIRING
EIA 568 A WIRING SCHEME
SPARE JACK SLOT
INSERT
SCHEME
IDENTIFICATION
3
PAIR SEQUENCE
TERMINATION
PAIR 1
PAIR 2
GREEN / WHITEGREENORANGE / WHITEBLUEBLUE / WHITEORANGEBROWN / WHITEBROWN
PAIR 3
312 45678
PAIR 4
CATEGORY 6/6A CABLE
8.7.6.5.4.3.2.1.
TIA / EIA 568A
INSTALLATION
SCALE: NO SCALE
TELE/DATA CONDUIT
NOTES:
1.CONTRACTOR TO SUBMIT PROPOSED DATA
LABELING PLAN AND SPREADSHEET DURING
CONSTRUCTION FOR REVIEW. BY CIT.
2.CONTRACTOR TO PROVIDE AS-BUILT DATA
LABELING PLAN AND SPREADSHEET AFTER
COMPLETING LABEL INSTALLATION FOR CIT
ACTIVATION.
EACH HORIZONTAL UNSHIELDED TWISTED PAIR (UTP) CABLE SHALL BE
LABELED AT BOTH ENDS WITHIN 12" OF THE END OF THE CABLE JACKET.
EACH OUTLET ON THE FACEPLATE SHALL BE LABELED WITH THE
HORIZONTAL LINK IDENTIFIER IN A WAY THAT CLEARLY IDENTIFIES THE
INDIVIDUAL CONNECTOR ASSOCIATED WITH THE PARTICULAR
IDENTIFIER.
EACH PORT ON THE PATCH PANEL SHALL BE LABELED WITH ITS
ASSOCIATED HORIZONTAL LINK IDENTIFIER.
CONTRACTORS / INSTALLERS SHALL OBTAIN OUTLET NUMBER
CONFIGURATION FOR ROOM LAYOUTS FROM THE CIT / INFRASTRUCTURE
ENGINEER. TYPICALLY THE OUTLET DESIGNATIONS ARE ASSIGNED USING
THE ROOM NUMBER FOLLOWED BY LETTERS A-Z IN A CLOCK-WISE
ORIENTATION FROM THE LEFT OF THE PRIMARY ENTRANCE OF THE
ROOM.
REFER TO SPECIFICATION SECTION 270528 FOR ADDITIONAL
INFORMATION.
COORDINATE WITH CIT FOR LATEST STANDARDS. FINAL LABELING
DIRECTION PER CIT.
EACH PATCH PANEL AND FACEPLATE LABEL SHALL BE MECHANICALLY
LABELED. THE LABEL SHALL BE BLACK LETTERS ON A WHITE
BACKGROUND. THE LABELS SHALL BE SIZED FOR EACH APPLICATION
AND PROVIDE A LEGIBLE AND UNOBSTRUCTED MEANS OF
IDENTIFICATION. THE PROJECT MANAGER SHALL APPROVE THE
LABELING METHOD AND FONT SIZE TO BE USED PRIOR TO
INSTALLATION.
Revisions:
347 West 36 Street Suite 1501
New York, NY 10018
212-245-5195 T
212-239-7130 F
Key Plan:
Notes:
Grumman Hall
Cornell University
Ithaca, NY 14850
Richard McElhiney Architects LLC
April 2, 2020
Issue for Bid April 2, 2020
Scale:
31 Knight Street
Norwalk, CT 06851
203-866-5538 T
203-866-5243 F
Altieri Sebor Wieber LLC
303 South Broadway, Suite G20
Tarrytown, NY 10591
914-333-1110 T
914-333-1109 F
Jacobs Consultancy
4588 South Park Avenue
Blasdell, NY 14219
716-823-0006 T
Trophy Point
AREA OF WORK
4592 Jordan Road
Skaneateles Falls, NY 13153
315-685-4732 T
Ryan Biggs Clark Davis Engineering & Surveying
First and Second Floor Renovation Phase 1
12" = 1'-0"
Telecom Riser
E-004
S 4
4FSS
FS4SSS
S4S4
FS
S
4J 4
4FSFS4JS
4SSSSWAP
4J
FSFSJ
SJ4
4012345678
9
A
B
D
C
E
F
012345678
9
A
B
D
C
E
F
BB
EX. ILG6-1
SEE NOTE 2
SEE NOTE 3
EX. ILG4-1
EXISTING EMPTY PULL BOX
AND CONDUITS TO BE REMOVED.
LASER IN USE
SIGN.
EXISTING CABLE
TRAY TO REMAIN
EX.ILGIB-IEX.IHG2-3IEX.ILGIA-ISEE NOTE 1
SEE NOTE 3.
SEE NOTE 3.
EXISTING TO REMAIN
SEE NOTE 4
SEE NOTE 1
EX
SEE NOTE 4
SEE NOTE 1
SEE NOTE 1
EX
Revisions:
347 West 36 Street Suite 1501
New York, NY 10018
212-245-5195 T
212-239-7130 F
Key Plan:
Notes:
Grumman Hall
Cornell University
Ithaca, NY 14850
Richard McElhiney Architects LLC
April 2, 2020
Issue for Bid April 2, 2020
Scale:
31 Knight Street
Norwalk, CT 06851
203-866-5538 T
203-866-5243 F
Altieri Sebor Wieber LLC
303 South Broadway, Suite G20
Tarrytown, NY 10591
914-333-1110 T
914-333-1109 F
Jacobs Consultancy
4588 South Park Avenue
Blasdell, NY 14219
716-823-0006 T
Trophy Point
AREA OF WORK
4592 Jordan Road
Skaneateles Falls, NY 13153
315-685-4732 T
Ryan Biggs Clark Davis Engineering & Surveying
First and Second Floor Renovation Phase 1
1/4" = 1'-0"
First Floor-Demolition
DE-102
REFER TO REMOVAL NOTES.
NOTES:
1.REMOVE LIGHT FIXTURES AND ASSOCIATED CONDUIT AND WIRING COMPLETELY BACK TO SOURCE. TYPICAL ON THIS DRAWING FOR ALL
EXISTING TO BE REMOVED LIGHT FIXTURES.
2.EX. PANEL ILG6-1 FED FROM BLGI-1 200A/3P 208/120V TO BE RELOCATED AND REPLACED WITH NEW. REFER TO NEW WORK DRAWING FOR
ADDITIONAL INFORMATION. PROVIDE NEW CONDUIT FOR THE EXTENDED PORTION. PROVIDE NEW FEEDERS FROM ENTIRE LENGTH
FROM SOURCE TO THE PANEL'S NEW LOCATION.
3.REMOVE EXISTING WIREMOLD AND ASSOCIATED CONDUIT & WIRE COMPLETELY BACK TO SOURCE.
4.REMOVE ELECTRICAL, LOW VOLTAGE DEVICE AND ASSOCIATED CONDUIT & WIRING COMPLETELY BACK TO SOURCE. TYPICAL IN ROOM.
FOR RECESSED MOUNTED DEVICES, PROVIDE A WHITE BLANK PLATE OVER THE EXISTING BACKBOX.
5.REMOVE ELECTRICAL DEVICE AND ASSOCIATED CONDUIT & WIRING COMPLETELY BACK TO SOURCE. REFER TO THE ARCHITECTURAL
DRAWING FOR THE EXTEND OF THE SELECTIVE REMOVAL.
6.PROVIDE TEMPORARY HEAT DETECTORS TO PROVIDE FULL COVERAGE AREA OF WORK. THE HEAT DETECTORS SHALL BE TIED BACK TO
THE EXISTING FIRE ALARM SYSTEM. PROVIDE TESTING FOR THE HEAT DETECTORS. COORDINATE TESTING WITH EHS. REMOVE
TEMPORARY HEAT DETECTORS ONCE THE CONSTRUCTION IS COMPLETED.
GENERAL DEMOLITION NOTES:
1.ITEMS AND AREAS INDICATED ON THIS DRAWING ARE APPROXIMATE & SHOWN FOR IDENTIFICATION ONLY AND
AREA TO BE REMOVED DURING RENOVATION
2.REROUTE OR RELOCATE, AS REQUIRED, ANY CONDUIT AND/OR WIRING, PULLBOXES AND/OR JUNCTION BOXES,
LIGHTING, FIXTURES, OUTLETS, FIRE ALARM DEVICES, SECURITY DEVICES, TELECOM, ETC. WHICH ARE LAID BARE
IN THE COURSE OF, OR INTERFERED WITH THE ALTERATIONS
3.PROVIDE UNINTERRUPTED POWER SERVICES FOR ADJACENT AREAS NOT PART OF THE CONSTRUCTION.
SCHEDULE POWER OUTAGE DURING NON-BUSINESS HOURS TO DISCONNECT/REFEED EXISTING BRANCH CIRCUITS.
PROVIDE TEMPORARY POWER. COORDINATE WORK W/ARCHITECT AND OWNER.
4.MAINTAIN ALL COMMUNICATION PATHWAYS SPACES AND CABLING UNTIL NEW INFRASTRUCTURE IS IN SERVICES.
SEE NOTE 4
SEE NOTE 4
EXISTING TO REMAIN.
SEE NOTE 4
SEE NOTE 5
SEE
NOTE 5
SEE NOTE 6 FOR WHOLE
AREA OF WORK
4S J4 44S44012345678
9
A
B
D
C
E
F
012345678
9
A
B
D
C
E
F
BB
REFER TO REMOVAL NOTES.
SEE NOTE 1 AND 2
Revisions:
347 West 36 Street Suite 1501
New York, NY 10018
212-245-5195 T
212-239-7130 F
Key Plan:
Notes:
Grumman Hall
Cornell University
Ithaca, NY 14850
Richard McElhiney Architects LLC
April 2, 2020
Issue for Bid April 2, 2020
Scale:
31 Knight Street
Norwalk, CT 06851
203-866-5538 T
203-866-5243 F
Altieri Sebor Wieber LLC
303 South Broadway, Suite G20
Tarrytown, NY 10591
914-333-1110 T
914-333-1109 F
Jacobs Consultancy
4588 South Park Avenue
Blasdell, NY 14219
716-823-0006 T
Trophy Point
AREA OF WORK
4592 Jordan Road
Skaneateles Falls, NY 13153
315-685-4732 T
Ryan Biggs Clark Davis Engineering & Surveying
First and Second Floor Renovation Phase 1
1/4" = 1'-0"
Second Floor -Demolition
DE-103
ELECTRICAL REMOVAL NOTES:
1.ITEMS AND AREAS INDICATED ON THIS DRAWING ARE APPROXIMATED & SHOWN FOR IDENTIFICATION ONLY AND
AREA TO BE REMOVED DURING RENOVATION
2.REROUTE OR RELOCATE, AS REQUIRED, ANY CONDUIT AND/OR WIRING, PULLBOXES AND/OR JUNCTION BOXES,
LIGHTING, FIXTURES, OUTLETS, FIRE ALARM DEVICES, SECURITY DEVICES, TELECOM, ETC. WHICH ARE LAID BARE
IN THE COURSE OF, OR INTERFERE WITH THE ALTERATIONS
3.PROVIDE UNINTERRUPTED POWER SERVICES FOR ADJACENT AREAS NOT PART OF THE CONSTRUCTION.
SCHEDULE POWER OUTAGE DURING NON-BUSINESS HOURS TO DISCONNECT/REFEED EXISTING BRANCH CIRCUITS.
PROVIDE TEMPORARY POWER. COORDINATE WORK W/ARCHITECT AND OWNER.
4.MAINTAIN ALL COMMUNICATION PATHWAYS SPACES AND CABLING UNTIL NEW INFRASTRUCTURE IS IN SERVICES.
NOTES:
1.EXISTING CIRCUITS FOR POWER AND LIGHT TO BE REUSED FOR NEW OUTLETS AND LIGHTS.
2.PROVIDE TEMPORARY HEAT DETECTORS TO PROVIDE FULL COVERAGE AREA OF WORK. THE HEAT DETECTORS
SHALL BE TIED BACK TO THE EXISTING FIRE ALARM SYSTEM. PROVIDE TESTING FOR THE HEAT DETECTORS.
COORDINATE TESTING WITH EHS. REMOVE TEMPORARY HEAT DETECTORS ONCE THE CONSTRUCTION IS
COMPLETED.
012345678
9
A
B
D
C
E
F
012345678
9
A
B
D
C
E
F
BB
B81
TR BC
EX. BLGI-1
SEE NOTE 1
SEE NOTE 2
Revisions:
347 West 36 Street Suite 1501
New York, NY 10018
212-245-5195 T
212-239-7130 F
Key Plan:
Notes:
Grumman Hall
Cornell University
Ithaca, NY 14850
Richard McElhiney Architects LLC
April 2, 2020
Issue for Bid April 2, 2020
Scale:
31 Knight Street
Norwalk, CT 06851
203-866-5538 T
203-866-5243 F
Altieri Sebor Wieber LLC
303 South Broadway, Suite G20
Tarrytown, NY 10591
914-333-1110 T
914-333-1109 F
Jacobs Consultancy
4588 South Park Avenue
Blasdell, NY 14219
716-823-0006 T
Trophy Point
AREA OF WORK
4592 Jordan Road
Skaneateles Falls, NY 13153
315-685-4732 T
Ryan Biggs Clark Davis Engineering & Surveying
First and Second Floor Renovation Phase 1
1/4" = 1'-0"
Basement Plan-Power
E-101NOTE:
1.PANEL ILG6-1 IS FED BY EX. BLGI-1 PANEL. PROVIDE NEW
FEEDER FROM ILG6-1 NEW LOCATION TO BLGI-1. EXTEND
CONDUIT AS REQUIRED.
2.NEW DATA SHALL BE FED BY EXISTING RACK LOCATED IN TR BC.
ROOM REFER TO E-004 FOR ADDITIONAL REQUIREMENTS.
REF.
PF PFPF4
FS
S 4
4FS FSFSFSFS4JJJWAP
CO
CO
FS
J
SLOCK
44444TCPJVAVJ
-
HCHC-
LCR
LCR
LCRM
M
M
M
MLCRLCRM
MJ
J012345678
9
A
B
D
C
E
F
012345678
9
A
B
D
C
E
F
ILG6-1 EX. ILG4-1
EX.IHG2-3IEX.ILGIB-IEX.ILGIA-ISEE NOTE 3
ILG6-1 PANEL TO FEED
NEW EQUIPMENTS.
EXISTING PANEL
TO FEED NEW LOADS.
100TD
100TC
10048
181 LAB I
182 SADAF'S LAB
187 189 191
193
188A
100CA COMMON
AREA
184 STUDENT
SPACE
188
EX. CABLE TRAY
TO BE REUSED
1
2
7
3
9
CR
CR CR
22
EX
EX
EXEX
EX
WIRE MOLD
182A PRINT
ROOM
EX
EX
OPEN FROM
BELOW
ILG6-1 /1
ILG6-1 /2
ILG6-1 /4
ILG6-1 /6
ILG6-1 /7
ILG6-1 /8
ILG6-1 /9
ILG6-1 /10
ILG6-1 /11
ILG6-1 /12
ILG6-1 /13
ILG6-1 /16
ILG6-1 /14 ILG6-1 /15
ILG6-1 /17
ILG6-1 /20
ILG6-1 /21
ILG6-1 /22
FURNITURE WHIP
CONNECTION.FURNITURE WHIP
CONNECTION.
FURNITURE WHIP
CONNECTION.
EX
PROVIDE VERTICAL
DROP POLE FOR
POWER AND DATA
ILG6-1 /25
ILG6-1 /26,28
ILG6-1 /24
EX. IHG2-3I
/19,21,23
SEE NOTE 1
SEE NOTE 2
SEE NOTE 2
ILG6-1 /27
SEE NOTE 4
ILG6-1 /29
11
ILG6-1 /30
WIREMOLD
RACEWAY
WIREMOLD
RACEWAY
ILG6-1 /32
10
ILG6-1 /18
ILG6-1 /19
13
27
EX
ILG6-1 /34
ILG6-1 /38
ILG6-1 /42
ILG6-1 /40
ILG6-1 /31,33
DEHUMIDIFIER
ILG6-1 /35
D1
D1
D1
D3
SEE DOOR DETAIL
IN E-400. TYPICAL.
WIREMOLD
RACEWAY
WIREMOLD
RACEWAY
ILG6-1 /36
ILG6-1 /37
Revisions:
347 West 36 Street Suite 1501
New York, NY 10018
212-245-5195 T
212-239-7130 F
Key Plan:
Notes:
Grumman Hall
Cornell University
Ithaca, NY 14850
Richard McElhiney Architects LLC
April 2, 2020
Issue for Bid April 2, 2020
Scale:
31 Knight Street
Norwalk, CT 06851
203-866-5538 T
203-866-5243 F
Altieri Sebor Wieber LLC
303 South Broadway, Suite G20
Tarrytown, NY 10591
914-333-1110 T
914-333-1109 F
Jacobs Consultancy
4588 South Park Avenue
Blasdell, NY 14219
716-823-0006 T
Trophy Point
AREA OF WORK
4592 Jordan Road
Skaneateles Falls, NY 13153
315-685-4732 T
Ryan Biggs Clark Davis Engineering & Surveying
First and Second Floor Renovation Phase 1
1/4" = 1'-0"
First Floor-Power
E-102
LAB EQUIPMENT LIST
ITEM#EQUIPMENT NAME MANUFACTURER / MODEL ELECTRICAL HARD WIRED PLUG TYPE
1 Debind & Sintering Combined Furnace Admatec 480V 60 Hz (3P+N+PE) 8kW Y
2 Ceramic Printer Admatec Admaflex 130 110/115 Single Phase N 5-15P
3 Thermal Property Analyzer (with installation, software and laptop)C-Therm Trident N 5-15P
4 Portable Density / Specific Gravity Concentration Meter Anton Paar DMA 35 BATTERY OPERATED
5 Not Use -
6 Fume Extractor Arm MOVEX- ME100
7 3D Printer Formlabs Form 2 Printer 100-240 VAC 1.5A 50/60Hz 65W N 5-15P
8 Porous Foams Ultramet, Lithoz
9 GC / MS Thermo Electron Corporation DSQ II Mass Spectrometer
&K27300000000080 Gas Chromatograph
120VAC N (3)5-15P
10 Vacuum Pump T.B.D FUTURE
11 Fume Hood LABCONCO - 5'120VAC FLEX CONNECTION
12 Fixed lab bench with base cabinets, wall cabinets & sink MOTT
13 Gas Cyllinder Cabinet AIRGAS LAB 1000 SERIES
14 Safety Shower and Eyewash Bradley
15 Dehumidifier MOTT
16 Canopy Hood
17 Optical Table NEWPORT RS 2000
18 Optical Table T.B.D (EXISITNG)
19 Lab Bench MOTT
20 Lab Bench MOTT
21 Tank Bracket And Valve T.B.D 120VAC FLEX CONNECTION
22 Fume Hood LABCONCO - 5'
23 Fixed lab bench with base cabinets, wall cabinets & sink MOTT
24 Lab Bench MOTT
25 Safety Shower and Eyewash BRADLEY
26 Safety Shower and Eyewash BRADLEY
27 Gas Cyllinder Cabinet AIRGAS LAB 1000 SERIES
*CONTRACTOR SHALL VERIFY EXISTING LOAD TO REMAIN CIRCUIT BREAKER REQUIREMENTS.
ILG6-1 PANEL FED FROM BLGI-1 (200A/3P 208Y/120V VOLTS)
NOTES:
Total Connected Current (Amps):90 A
Total Connected Load (kVA):32.43 kVA
Total VA 13 11 9
--53 SPARE 201 0.00 0.00 1 20 MATCH EXISTIG EX. LOAD*54 --
--51 SPARE 201 0.00 0.00 1 20 MATCH EXISTIG EX. LOAD*52 --
--49 SPARE 20 1 0.00 0.00 1 20 MATCH EXISTIG EX. LOAD*50 --
--47 SPARE 201 0.00 0.00 1 20 MATCH EXISTIG EX. LOAD*48 --
--45 SPARE 201 0.00 0.00 1 20 MATCH EXISTIG EX. LOAD*46 --
--43 SPARE 20 1 0.00 0.00 1 20 MATCH EXISTIG EX. LOAD*44 --
--41 SPARE 201 0.00 0.18 1 20 2#12+G-3/4" C.VAV 42
--39 SPARE 201 0.00 0.18 1 20 2#12+G-3/4" C.TCP 40
37 FUME HOOD...2#12+G-3/4" C.20 1 0.18 0.18 1 20 2#12+G-3/4" C.REC. 442 38
35 AUTOMATIC...2#12+G-3/4" C.201 0.50 0.18 1 20 2#12+G-3/4" C.FUME HOOD... 36
33 4.75 0.18 1 20 2#12+G-3/4" C.GAS CABINET 34 13
31 DEHUMIDIFIER 2#12+G-3/4" C.2024.75 0.18 1 20 2#10+#10G-3/4" C.REC. 266 32
21 29 FUME HOOD 2#12+G-3/4" C.201 0.18 0.18 1 20 2#12+G-3/4" C.FUME HOOD 30 11
10 27 VAC. PUMP 2#12+G-3/4" C.201 0.18 1.80 28
25 REC. 186 2#12+G-3/4" C.20 1 0.54 1.80 2 20 2#12+G-3/4" C.FURNITURE
186
26
23 186 2#12+G-3/4" C.201 1.26 0.72 1 20 2#12+G-3/4" C.REC. 495 24
21 REC. 266 2#12+G-3/4" C.201 0.36 0.54 1 20 2#12+G-3/4" C.REC. 442 22
19 CEILING...2#12+G-3/4" C.20 1 1.80 0.36 1 20 2#12+G-3/4" C.REC. PRINT RM 20
17 REC. 258 2#12+G-3/4" C.201 0.54 1.80 1 20 2#12+G-3/4" C.CEILING...18
15 REC. 258 2#12+G-3/4" C.201 0.18 0.36 1 20 2#12+G-3/4" C.REC. 258 16
13 REC. 258 2#12+G-3/4" C.20 1 0.36 0.18 1 20 2#12+G-3/4" C.REC. 258 14
11 REC. 258 2#12+G-3/4" C.201 0.36 0.36 1 20 2#12+G-3/4" C.REC. 258 12
9 REC. 266 2#12+G-3/4" C.201 0.54 0.90 1 20 2#12+G-3/4" C.REC. 258 10
9 7 CHROMATOG. 2#10+#10G-3/4" C. 20 1 1.50 0.36 1 20 2#10+#10G-3/4" C. REC 188 8 9
5 LTG 182 2#12+G-3/4" C.201 1.18 1.50 1 20 2#10+#10G-3/4" C. MASS SPEC.6 9
3 LTG LAB1 2#12+G-3/4" C.201 0.80 0.18 1 20 2#10+#10G-3/4" C. 3D PRINTER 4 7
2 1 PRINTER 2#12+G-3/4" C.2010.18 0.18 1 20 2#10+#10G-3/4" C. ANALYZER 2 3
ITEM
#CKT LOAD
DESCRIPTION
WIRE SIZE
(AWG)TRIPP A B C P TRIP WIRE SIZE
(AWG)
LOAD
DESCRIPTION CKT ITEM
#
No No No No Yes
FEED THRU LUGS 600-KCM LUGS FLUSH MOUNT ISOLATED GROUND BUS SINGLE SECTION
OPTIONS:MAIN:MLO
MOUNTING:SURFACE WIRES:4 BUS:225
SUPPLY FROM:PHASE:3 MAIN TYPE:MLO
LOCATION:VOLTS:208Y/120V A.I.C. RATING:22,000
PANELBOARD: ILG6-1
NOTE:
1.PROVIDE 30A NF DISCONNECT TO FEED THE DEBIND & SINTERING COMBINED FURNACE
POWER VIA EXISTING 20A 3-POLE CIRCUIT BREAKER IN PANEL IHG2-3I. FEEDER SHALL BE 4
#12+12G-3/4" C.
2.WIRE DUPLEX RECEPTACLES IN UTILITY DISTRIBUTION SHELF'S RACEWAY.
3.EXTEND EXISTING CONDUIT FEEDING PANEL ILG6-1 TO NEW LOCATION. THE CONDUIT
PATHWAY SHALL AVOID NEW EQUIPMENT. PROVIDE PULL BOXES AS REQUIRED. PROVIDE
NEW FEEDER FROM SOURCE PANEL TO ILG6-1 PANEL NEW LOCATION.
4.EXISTING ILG6-1 PANEL TO BE REPLACED WITH NEW.
REF.4JF
--
SM SM
TJ J66
LCR
M
012345678
9
A
B
D
C
E
F
012345678
9
A
B
D
C
E
F
BB
EX. 2LG2-L
EX. 2LG2-L PANEL
TO BE USED TO FEED
NEW OUTLETS AND
LIGHTING IN ROOM 289
289 STUDENT
WORKSTATIONS
012345678
9
A
B
D
C
E
F
BB
TO EXISTING
CIRCUIT IN ROOM
TO EXISTING
CIRCUIT IN ROOM
TO EXISTING
CIRCUIT IN ROOM
D3
SEE DOOR DETAIL
IN E-400. TYPICAL.
Revisions:
347 West 36 Street Suite 1501
New York, NY 10018
212-245-5195 T
212-239-7130 F
Key Plan:
Notes:
Grumman Hall
Cornell University
Ithaca, NY 14850
Richard McElhiney Architects LLC
April 2, 2020
Issue for Bid April 2, 2020
Scale:
31 Knight Street
Norwalk, CT 06851
203-866-5538 T
203-866-5243 F
Altieri Sebor Wieber LLC
303 South Broadway, Suite G20
Tarrytown, NY 10591
914-333-1110 T
914-333-1109 F
Jacobs Consultancy
4588 South Park Avenue
Blasdell, NY 14219
716-823-0006 T
Trophy Point
AREA OF WORK
4592 Jordan Road
Skaneateles Falls, NY 13153
315-685-4732 T
Ryan Biggs Clark Davis Engineering & Surveying
First and Second Floor Renovation Phase 1
1/4" = 1'-0"
Second Floor -Power
E-103
WAP
SV
SKDSSSS
LOC
LOC LOC
PC
PA
PA
PA SLOC
PA
100TD
100TC
Room
SHAFT
10048
181 LAB I
187 189 191
193
188A
100CA COMMON
AREA
184 STUDENT
SPACE
188
182A PRINT
ROOM
D
D
D
D
D
D
D
DD
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
BB
B
EM
EM
EM
EM
EM
EM
EM
EM
EXTEND EXISTING
CIRCUIT TO THE
NEW LIGHT FIXTURES.EM
EM
EM
EM
EM
EM
EM
EM
EM
EM
EM
EM
EM
EM
EM
EM
ILG6-1 /5
ILG6-1 /3
ILG6-1 /23
EX
182 SADAF'S LAB
E E E E E E E
E E E E
A A
E E
EM EM EM EM
EM
EM
D
Revisions:
347 West 36 Street Suite 1501
New York, NY 10018
212-245-5195 T
212-239-7130 F
Key Plan:
Notes:
Grumman Hall
Cornell University
Ithaca, NY 14850
Richard McElhiney Architects LLC
April 2, 2020
Issue for Bid April 2, 2020
Scale:
31 Knight Street
Norwalk, CT 06851
203-866-5538 T
203-866-5243 F
Altieri Sebor Wieber LLC
303 South Broadway, Suite G20
Tarrytown, NY 10591
914-333-1110 T
914-333-1109 F
Jacobs Consultancy
4588 South Park Avenue
Blasdell, NY 14219
716-823-0006 T
Trophy Point
AREA OF WORK
4592 Jordan Road
Skaneateles Falls, NY 13153
315-685-4732 T
Ryan Biggs Clark Davis Engineering & Surveying
First and Second Floor Renovation Phase 1
1/4" = 1'-0"
First Floor-Lighting
E-112
LOC
SKD
LOC
PC
PA
289 STUDENT
WORKSTATIONS
C
C C
C C
C C
C C
C
TO EXISTING
LIGHTING POWER CKT
Revisions:
347 West 36 Street Suite 1501
New York, NY 10018
212-245-5195 T
212-239-7130 F
Key Plan:
Notes:
Grumman Hall
Cornell University
Ithaca, NY 14850
Richard McElhiney Architects LLC
April 2, 2020
Issue for Bid April 2, 2020
Scale:
31 Knight Street
Norwalk, CT 06851
203-866-5538 T
203-866-5243 F
Altieri Sebor Wieber LLC
303 South Broadway, Suite G20
Tarrytown, NY 10591
914-333-1110 T
914-333-1109 F
Jacobs Consultancy
4588 South Park Avenue
Blasdell, NY 14219
716-823-0006 T
Trophy Point
AREA OF WORK
4592 Jordan Road
Skaneateles Falls, NY 13153
315-685-4732 T
Ryan Biggs Clark Davis Engineering & Surveying
First and Second Floor Renovation Phase 1
1/4" = 1'-0"
Second Floor-Lighting
E-113
D1 D3
D1 D3
EXTERIOR VIEW
INTERIOR VIEW
EXTERIOR VIEW
INTERIOR VIEW
ICRPT
JB
PT
EL
JB
M
TO DATA ROOM
SECURITY PANEL
IN TR BC ROOM
IN BASEMENT.
(1)A
(1)B, 1(C)
(1)A
(1)B
ICR INTEGRATED CARD READER
M DOOR CONTACT
REX REQUEST TO EXIT MOTION
JB JUNCTION BOX
PT POWER TRANSFER DEVICE
EL ELECTRIC LATCH HARDWARE WITH
INTEGRAL REQUEST TO EXIT
DEVICE DESCRIPTION BACKBOX CABLE
PT
JB
ICR
PT
JB
M
(1)A
(1)B, 1(C)
(1)A
EL
D4
D4
EXTERIOR VIEW
INTERIOR VIEW
PT
JB
ICR
PT
JB
M
(1)A
(1)B, 1(C)
(1)A
EL
CABLE BROUGHT TO TRANSFER DEVICE D
6"X6"X6"-
SINGLE MTD. HORIZONTAL ABOVE DOOR B
-A
-B
--
PS POWER SUPPLY -
M
TO DATA ROOM
SECURITY PANEL
IN TR BC ROOM
IN BASEMENT.
TO DATA ROOM
SECURITY PANEL
IN TR BC ROOM
IN BASEMENT.
Revisions:
347 West 36 Street Suite 1501
New York, NY 10018
212-245-5195 T
212-239-7130 F
Key Plan:
Notes:
Grumman Hall
Cornell University
Ithaca, NY 14850
Richard McElhiney Architects LLC
April 2, 2020
Issue for Bid April 2, 2020
Scale:
31 Knight Street
Norwalk, CT 06851
203-866-5538 T
203-866-5243 F
Altieri Sebor Wieber LLC
303 South Broadway, Suite G20
Tarrytown, NY 10591
914-333-1110 T
914-333-1109 F
Jacobs Consultancy
4588 South Park Avenue
Blasdell, NY 14219
716-823-0006 T
Trophy Point
AREA OF WORK
4592 Jordan Road
Skaneateles Falls, NY 13153
315-685-4732 T
Ryan Biggs Clark Davis Engineering & Surveying
First and Second Floor Renovation Phase 1
12" = 1'-0"
Electrical Details
E-300
SECURITY CABLE LEGEND
TAG DESCRIPTIONS
A 18 GAUGE / 2 CONDUCTOR
B 22 GAUGE / 3 PAIR SHIELDED
C COMPOSITE CABLE (15 COND.)
D 18 GAUGE / 4 CONDUCTOR
E 22 GAUGE / 12 CONDUCTOR
F RG59U, COAXIAL CABLE
G CAT 5 COMMUNICATION CABLE
H 6 STRAND MULTIMODE FIBER
SYMBOL
SYMBOL LIST
DESCRIPTION
GATE VALVES
CHECK VALVES
STRAINERS
BALL VALVES
BALANCING VALVES
UNIONS
DOMESTIC HOT WATER SUPPLYHW
DOMESTIC HOT WATER RETURNHWR
DOMESTIC COLD WATER SUPPLYCW
SANITARY DRAIN PIPES
STORM DRAIN PIPEST
PUMP DISCHARGE PIPINGPD
VENT PIPINGV
WASTE PIPINGW
INDIRECT WASTE PIPINGIW
OVERFLOW STORM PIPINGOST
ELBOW DOWN -ELBOW UP
EXISTING PIPE TO REMAIN
EXISTING PIPE TO BE REMOVED
CONNECTCONN
CONNECT NEW TO EXISTING
AREA DRAINAD
ABOVE FINISHED FLOORAFF
BACKFLOW PREVENTERBFP
BIDETBI
BUILDINGBLDG
BIDETBI
CLEANOUTCO
CONTINUATIONCONT
DRAIN, TYPED#
DOWNDN
DISHWASHERDW
DRAWINGDWG
DECKPLATE CLEANOUTDPCO
ELEVATIONEL
EXISITING TO REMAINETR
ELECTRIC WATER COOLEREWC
EMERGENCY EYEWASH/ SHOWER COMBINATIONEW/SH
FRESH AIR INTAKEFAI
FLOOR DRAINFD
FUNNEL FLOOR DRAINFFD
FIRE PROTECTIONFP
FREEZE PROOF HOSE BIBBFPHB
FLOOR SINKFS
GALLONS PER MINUTEGPM
HOSE BIBBHB
INVERT ELEVATIONIE, INV
KITCHEN SINKKS
LAVATORYLAV
MOP RECEPTORMR
ROOF DRAINRD
REDUCED PRESSURE ZONERPZ
SHOWERSH
SINKSK
SERVICE SINKSS
URINALUR
VENT THRU ROOFVTR
WATER CLOSETWC
WALLPLATE CLEANOUTWPCO
PLUMBING GENERAL NOTES
1. THE PLUMBING CONTRACTOR SHALL COORDINATE ALL EQUIPMENT
AND PIPING LOCATIONS WITH OTHER TRADES AND STRUCTURES.
2. THESE DRAWINGS ARE TO BE CONSIDERED DIAGRAMMATIC ONLY, THE
LOCATION AND ELEVATIONS OF EXISTING EQUIPMENT AND PIPING
INDICATED ON THE DRAWINGS HAS BEEN TAKEN FROM AVAILABLE
DRAWINGS AND/OR FIELD SURVEYS, BUT MAY VARY SLIGHTLY FROM
ACTUAL CONDITIONS. THE PLUMBING CONTRACTOR SHALL VERIFY ALL
TRUE SIZES, LOCATIONS AND ELEVATIONS OF EQUIPMENT AND PIPING
(INCLUDING PIPING RUN BELOW SLAB) IN THE FIELD PRIOR TO
CONSTRUCTION.
3. NO EXISTING SERVICE MAY BE CUT OR DAMAGED WHEN
ENCOUNTERED ALONG THE ROUTE DESIGNED FOR NEW SERVICES
WITHOUT CONSENT OF THE ARCHITECT. ANY EXISTING SERVICE
SEVERED OR DAMAGED SHALL BE REPLACED (WITH NEW OR TO ITS
ORIGINAL WORKING CONDITION) AT NO ADDITIONAL COST TO THE
OWNER.
4. THE PLUMBING CONTRACTOR SHALL VISIT THE SITE AT THE TIME OF
BID TO EXAMINE CONDITIONS AND FAMILIARIZE HIMSELF WITH THE JOB
NOTING DEGREE OF DIFFICULTY IN GETTING EQUIPMENT IN AND OUT OF
THE CONSTRUCTION AREA.
5. THE PLUMBING CONTRACTOR SHALL VERIFY ALL PIPING IN THE FIELD
EITHER BY DYE OR FLOW TESTING BEFORE MAKING NEW CONNECTIONS
TO EXISTING PIPING. ANY DISCREPANCIES SHALL BE BROUGHT TO THE
ATTENTION OF THE ARCHITECT OR ENGINEER BEFORE ANY
CONNECTIONS ARE MADE.
6. THE PLUMBING CONTRACTOR SHALL VERIFY THE SIZES AND
LOCATIONS OF ALL EXISTING PIPING IN THE FIELD BEFORE MAKING NEW
CONNECTIONS TO EXISTING PIPING. ANY DISCREPANCIES SHALL BE
BROUGHT TO THE ATTENTION OF THE ARCHITECT OR ENGINEER BEFORE
ANY CONNECTIONS ARE MADE.
7. THE PLUMBING CONTRACTOR SHALL SEAL AROUND ALL NEW PIPE
PENETRATIONS THROUGH NEW AND EXISTING STRUCTURES WITH
SEALANT OF FIRE RETARDANT TYPE EQUAL IN FIRE RATING TO
STRUCTURE PENETRATED. SEALANT SHALL EXTEND FULL THICKNESS OF
STRUCTURE. CONTRACTOR SHALL VERIFY FIRE RATED WALLS. IF WALLS
ARE NOT FIRE RATED THEN FIRE SEALANT SHALL NOT BE REQUIRED.
8. THE CONTRACTOR SHALL VERIFY CONDITION OF EXISTING PIPING
PRIOR TO MAKING NEW CONNECTIONS. ALL PIPING FOUND TO BE
DETERIORATED AND/OR UNSUITABLE FOR USE SHALL BE REPORTED TO
THE ENGINEER FOR EVALUATION.
9. ALL CUTTING, ROUGH PATCHING AND PRIME PAINTING REQUIRED FOR
WORK OF THIS SECTION SHALL BE THE RESPONSIBILITY OF THE
PLUMBING CONTRACTOR. ALL FINISHED PATCHING AND PAINTING SHALL
BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR.
10. ALL EXCAVATION AND BACKFILLING REQUIRED FOR WORK OF THIS
SECTION SHALL BE THE RESPONSIBILITY OF THE PLUMBING
CONTRACTOR.
11. ALL FEES FOR PERMITS AND INSPECTIONS SHALL BE THE
RESPONSIBILITY OF THE PLUMBING CONTRACTOR.
12. ALL WORK SHALL BE PERFORMED IN STRICT ACCORDANCE WITH THE
REQUIREMENTS OF LOCAL AUTHORITIES HAVING JURISDICTION AND WITH
THE PROVISIONS OF ALL STATE AND FEDERAL CODES AND LAWS.
WATER CLOSET (flush valve)1"4"2"---
WATER CLOSET (flush tank)
3/4"
3"2"---
1/2"
2"2"
2"
2"3"
---
1/2"
1/2"
1/2"
1/2"
1/2"
---
---
---
2"
1 1/2"1 1/2"
1 1/2"1 1/2"
------
------
3/8"
3/4"
1/2"
1/2"
FIXTURE BRANCH SIZES
FIXTURE COLD HOT WASTE VENT
URINAL (flush valve)
LAVATORIES
SINKS
DRINKING FOUNTAINS/WATER COOLERS
HOSE BIBBS (interior)
HOSE BIBBS (exterior)
SERVICE SINKS
NTS
EMERGENCY EYEWASH
EMERGENCY SHOWER
1 1/4" TEMPERED WATER SUPPLY
CEILING BALL VALVE SHUTOFF
TEMPERING VALVE BOX IN WALL
COLD AND HOT INLETS FEED
FROM TOP OR BOTTOM OF
TEMPERING VALVE. SEE PLAN(S)
FOR CONTINUATION.
TYPICAL SUPPORT ASSEMBLY
EQ TO COOPER B-LINE
B3199 WALL FLANGE,
B32O5 THREADE ROD,
B3198 PIPE CLAMP
32"
84"
19"36"48"EMERGENCY SHOWER
PULL ROD
EMERGENCY EYEWASH
FIN FLOOR
1
__
PIPE PENETRATIONS
CORE DRILLED
UL LISTED FIRESTOP SYSTEM.
REFER TO SPECIFICATIONS.
WITH
T-RATING
WITHOUT
T-RATING
2"
WELDED WATER
STOP (NEW
CONSTRUCTION)
2
__N.T.S.
PIPE RISER
W/ INSULATION
1/4" THICK STEEL
X 2" WIDE
SUPPORT RING
SECURE AND SEAL
TO FLOOR (TYP)
SCHEDULE 40
PIPE SLEEVE
SEAL SLEEVE WITH
EXPANDING CONCRETE
GROUT AS REQ'D
(EXIST'G CONSTRUCTION)
NOTES:
1. ALL PENETRATIONS THROUGH RATED CONSTRUCTION SHALL BE FIRE STOPPED WITH AN APPROVED
UL LISTED/FM APPROVED FIRESTOP SYSTEM MEETING ASTM E-814 & UL 1479.
2. FIRESTOP SYSTEM SHALL BE FIRE RATED (F-RATING) AND THERMAL RATED (T-RATING) EQUAL TO
CONSTRUCTION RATING WITH A MINIMUM OF 1 HOUR.
3. THERMAL RATING (T-RATING) IS NOT REQUIRED WHEN THE APPLICABLE CODE(S) HAVE AN EXCEPTION
FOR THE SPECIFIC INSTALLATION CONDITION.
4. PENETRATIONS THROUGH NON-RATED CONSTRUCTION SHALL BE SEALED WITH AN APPROVED
5. NON-COMBUSTIBLE MATERIAL TO RESIST THE PASSAGE OF FLAMES AND THE PRODUCTS OF COMBUSTION.
WELDED WATER
STOP (EXISTING
CONSTRUCTION)
SECURE AND
SEAL TO FLOOR
PENETRATION THROUGH GWB PARTITION3
__N.T.S.
FRAMING AROUND OPENING
MIN. 4 PCF FIBERGLASS OR
MINERAL WOOL BATT INSULATION
FIRMLY PACKED INTO CAVITY,
RECESSED 5/8 IN. IN FROM SURFACE
OF WALL
PENETRATING DUCT, PIPE, OR
CONDUIT WITH LARGEST OUTSIDE
DIMENSION > 12 IN.
MAX. 1 IN. GAP AROUND
PENETRATING ITEM
MIN. 5/8" THICKNESS OF FLEXIBLE
NON-HARDENING SEALANT, FLUSH
WITH FINISH SURFACE OF WALL
PENETRATING DUCT PIPE, OR
CONDUIT WITH LARGEST OUTSIDE
DIMENSION < 12 IN.
MAX. 1 IN. GAP AROUND
PENETRATING ITEM
CONNECT TO EXISITINGCTE
EMERGENCY EYEWASHEW
NTS
DEIONIZED WATER TANK PIPING
850 GAL POLYPROPYLENE
STORAGE TANKS
TYPICAL 4" HIGH
CONCRETE PAD
FIN FLOOR
4
__
HIGH FILL
LOW DRAW 1" NPT PVC
HOSE CONNECTION
Revisions:
347 West 36 Street Suite 1501
New York, NY 10018
212-245-5195 T
212-239-7130 F
Key Plan:
Notes:
Grumman Hall
Cornell University
Ithaca, NY 14850
Richard McElhiney Architects LLC
April 2, 2020
Issue for Bid April 2, 2020
Scale:
31 Knight Street
Norwalk, CT 06851
203-866-5538 T
203-866-5243 F
Altieri Sebor Wieber LLC
303 South Broadway, Suite G20
Tarrytown, NY 10591
914-333-1110 T
914-333-1109 F
Jacobs Consultancy
4588 South Park Avenue
Blasdell, NY 14219
716-823-0006 T
Trophy Point
AREA OF WORK
4592 Jordan Road
Skaneateles Falls, NY 13153
315-685-4732 T
Ryan Biggs Clark Davis Engineering & Surveying
First and Second Floor Renovation Phase 1
12" = 1'-0"
DETAILS, SYMBOLS & SCHEDULES
P-001
DRAWING LIST
Sheet
Number Sheet Name
P-001 DETAILS, SYMBOLS & SCHEDULES
P-202 Storm & Gas Riser
P-201 Sanitary & Water Riser
P-101 BASEMENT PLAN- Plumbing
P-102 FIRST FLOOR- Plumbing
P-103 SECOND FLOOR- Plumbing
P-104 ROOF- Plumbing
DP-101 BASEMENT PLAN- Removal
DP-102 FIRST FLOOR- Removal
DP-103 SECOND FLOOR- Removal
DP-104 ROOF- Removal
012345678
9
A
B
D
C
E
F
012345678
9
A
B
D
C
E
F
BB
EXIST. DEIONIZED WATER
STORAGE TANK TO BE REMOVED.
NEW TANK WILL BE LOCATED IN BASEMENT
EX. 2"WASTE TO BE REMOVED
EX.2"WASTE TO REMAIN
B88
2774
B88
2774
B86
87
B84A
85
PLUG FOR RECONNECTION
EXIST. 2"WASTE UP
TO BE REMOVED
EXIST. PLUMBING SERVICES TO REMAIN
EX.4"S TO REMAIN
EX.4"S TO REMAIN
012345678
9
A
B
D
C
E
F
BB
ETR 4"ST UP&DN
Revisions:
347 West 36 Street Suite 1501
New York, NY 10018
212-245-5195 T
212-239-7130 F
Key Plan:
Notes:
Grumman Hall
Cornell University
Ithaca, NY 14850
Richard McElhiney Architects LLC
April 2, 2020
Issue for Bid April 2, 2020
Scale:
31 Knight Street
Norwalk, CT 06851
203-866-5538 T
203-866-5243 F
Altieri Sebor Wieber LLC
303 South Broadway, Suite G20
Tarrytown, NY 10591
914-333-1110 T
914-333-1109 F
Jacobs Consultancy
4588 South Park Avenue
Blasdell, NY 14219
716-823-0006 T
Trophy Point
AREA OF WORK
4592 Jordan Road
Skaneateles Falls, NY 13153
315-685-4732 T
Ryan Biggs Clark Davis Engineering & Surveying
First and Second Floor Renovation Phase 1
1/4" = 1'-0"
BASEMENT PLAN -Removal
DP-101
1/4" = 1'-0"1 BASEMENT PLAN- Removal
012345678
9
A
B
D
C
E
F
012345678
9
A
B
D
C
E
F
BB
ETR:
3/4"CA UP&DN
3/4"HWR UP&DN
1"HW UP&DN
1 1/2"CW UP&DN
4"W UP&DN
EX. DEIONIZED WATER
STORAGE TANK TO BE REMOVED/ TURNED OVER TO OWNER.
NEW TANKS WILL BE LOCATED IN BASEMENT
EX. SINK TO BE RELOCATED BY OWNER.
CAP WATER PIPING BACK TO MAINS
PLUG WASTE IN CEILING BELOW.
PLUG VENT IN CEILING
ETR FLOOR DRAINS
EX. 2"W UP
TO REMAIN
TO BE RE-PIPED
EX. 2'W
TO BE REMOVED
EX.2"W DROP
TO BE REMOVED
184 STUDENT
SPACE
563
182 SADAF'S LAB
754
EX. EMERGENCY EW/SH&SUPPLY
TO BE REMOVED
ETR 1 1/4"G UP&DN
TO BE CAPPED ON HORIZONTAL
ETR:
1 1/2"W, 1/2"CW, 1/2"CA
INTO WALL
1"CW
1"HW
3/4"CW
1"CA1"HW11/2"CW3/4"HW3/4"CW
1"CW
3/4"CA
1"CW
3/4"CA
1 1/2"W
1"HW
ETR CW&CA DN
GAS PIPE
TO BE REMOVED
ETR HW CAPPED
ETR CW&CA UP
EX. GAS PIPE
TO BE REMOVED
ETR CW INTO WALL
ETR:
CA DROP
HW CAPPED
ETR:
1 1/2"W UP
3/4"C&HW UP
ETR 4"S DROP&OFFSET UP
ETR 4"S UP
CO
CO
ETR 4"S DN
CO
ETR 2 1/2"AW UP
ETR 1 1/2"AW UP
2 1/2"AW
1"CA
1"HW
2 1/2"AW
1 1/2"CW3/4"3"S
ETR: 4"ST UP&DN
ETR 3"W UP
EX. C&HW UP
TO BE REPIPED
EX. 1"TW UP TO BE
REPIPED
EX. TMV TO BE REMOVED
CAP EX. C&HW SUPPLIES AT RISERS
ETR 1"W UP
CA TO BE REMOVED
CW TO BE REMOVED
CA TO BE REMOVED
CW TO BE REMOVED
ETR 4"ST UP&DN
ETR C&HW DROP
ETR:
CW,HW, CA
EX. GAS PIPE
TO BE REMOVED
ETR 2"W DN
ETR:
2"W UP
3/4"CW UP
3/4"CA UP
1/2"CA3/4"CW
1 1/4"G TO BE REMOVED ETR 1 1/2"W UP
1 1/2"W
ETR 1"HW RISER
100CA COMMON
AREA
442
188
495
188A
439
193
257
191
151
189
99
187
101
100CB
CORRIDOR
207
100UA
6
100TD
87
10048
551
100TC
93
SHAFT
905
10071
74
B0044
902
Room
10
181 LAB I
597
Revisions:
347 West 36 Street Suite 1501
New York, NY 10018
212-245-5195 T
212-239-7130 F
Key Plan:
Notes:
Grumman Hall
Cornell University
Ithaca, NY 14850
Richard McElhiney Architects LLC
April 2, 2020
Issue for Bid April 2, 2020
Scale:
31 Knight Street
Norwalk, CT 06851
203-866-5538 T
203-866-5243 F
Altieri Sebor Wieber LLC
303 South Broadway, Suite G20
Tarrytown, NY 10591
914-333-1110 T
914-333-1109 F
Jacobs Consultancy
4588 South Park Avenue
Blasdell, NY 14219
716-823-0006 T
Trophy Point
AREA OF WORK
4592 Jordan Road
Skaneateles Falls, NY 13153
315-685-4732 T
Ryan Biggs Clark Davis Engineering & Surveying
First and Second Floor Renovation Phase 1
1/4" = 1'-0"
FIRST FLOOR -Removal
DP-102
1/4" = 1'-0"1 FIRST FLOOR- Removal
012345678
9
A
B
D
C
E
F
012345678
9
A
B
D
C
E
F
BB
NEW POLYETHYLENE STORAGE TANKS FOR DEIONIZED WATER
EACH 750 GAL CAPACITY ON 4" HIGH CONCRETE PAD.
PROVIDE ALL CPV FITTINGS FOR DRAIN VALVE CONNECTIONS, AIR VENT VALVE,
USER SUPPLY 1"NPT HOSE BIBB, AND LEVEL INDICATOR.
B86
87
B84
1111
B00TC
176
NEW 1 1/2"W UP
EXIST. WASTE TO REMAIN
2"WASTE CTE
2"W UP
2"W UP
2"W UP
4"S
2"W CTE EX. 3"W
2"W CTE
CONN. 2"W TO
EX. 3"W3"S3"S4"S
4"SEX WASTE TO REMAIN
EX WASTE TO REMAIN
EX 4"S
UP
EX.3"W UP TO FD
EX.3"W UP TO FD
EX.4"ST UP&DN
EX.1" HW UP
3"S3"S
EX. 4"S CONT.
TO BLDG. DRAIN
EX. 4"S CONT.
TO BLDG. DRAIN
EX 1 1/2"CW
UP
EX 3/4"HWC
UP
3"S UP
ETR 4"ST UP&DN
Revisions:
347 West 36 Street Suite 1501
New York, NY 10018
212-245-5195 T
212-239-7130 F
Key Plan:
Notes:
Grumman Hall
Cornell University
Ithaca, NY 14850
Richard McElhiney Architects LLC
April 2, 2020
Issue for Bid April 2, 2020
Scale:
31 Knight Street
Norwalk, CT 06851
203-866-5538 T
203-866-5243 F
Altieri Sebor Wieber LLC
303 South Broadway, Suite G20
Tarrytown, NY 10591
914-333-1110 T
914-333-1109 F
Jacobs Consultancy
4588 South Park Avenue
Blasdell, NY 14219
716-823-0006 T
Trophy Point
AREA OF WORK
4592 Jordan Road
Skaneateles Falls, NY 13153
315-685-4732 T
Ryan Biggs Clark Davis Engineering & Surveying
First and Second Floor Renovation Phase 1
1/4" = 1'-0"
BASEMENT PLAN -Plumbing
P-101
1/4" = 1'-0"1 BASEMENT PLAN
REF.
012345678
9
A
B
D
C
E
F
012345678
9
A
B
D
C
E
F
BB
ETR:
3/4"CA UP&DN
3/4"HWR UP&DN
1 1/2"CW UP&DN
1"HW UP&DN
1 1/4"G UP&DN
ETR 4"AW UP&DN (VIF)
182 SADAF'S LAB
754
181 LAB I
597
184 STUDENT
SPACE
563
CTE 1 1/2"W FROM PVC DRAIN ABOVE
NEW 2" W DN
SK
2"W DN
1 1/2"V RISE
1/2"H&CW DROP
SK
2"W DN
1 1/2"V RISE
1/2"H&CW DROP
NEW SINK
2"W DN
1 1/2"V RISE
3/4"H&CW DROP
CONN. NEW
VENT & WATER
TO EXIST.
CONN. NEW
VENT & WATER
TO EXIST.
OPTICAL
TABLE
OPTICAL
TABLE
CH4 CYLINDERS
INSIDE GAS CABINET
(BY OTHER DIV.)
SHAFT
905
Room
10
NEW ES/EW, TMV IN
RECESSED BOX W/ 1"C&HW
SUPPLIES.
1 1/4"TEMPERED WATER @
65-90 °F SUPPLY TO ES/EW.
TYP. FOR ALL EW/SH.
CTE:
3/4"CA
1 1/2"HW
1 1/2"CW
EX.FD WITH NEW
DRAIN GRATE
3/4"CA DROP
TO FUMEHOOD
ES/EW
ES/EW
ES/EW
2"V CTE VENT STACK
3/4"CA DROP
TO FUMEHOOD
3/4"CA
1"CW
1/2"HWC
EX. PLUMBING SERVICES
TO REMAIN. RUN @ CEILING
EX.FD NEW
DRAIN GRATE
3/4"CA DROP
TO EQUIP.
1/2"CH4 DROP
TO EQUIP.
1"HW
1/2"CH4,CA,Kr DROP INTO
UTILITY CHANNEL TO
NOZZLES. TYP.
ETR 4"ST UP&DN
EX.4"ST UP&DN
3/4"HW3/4"CW 1 1/2"W
1"CW
1"HW
3/4"CW
1"CA1"HW11/2"CW1"CW 3/4"CA
1"CW
3/4"CA
1"HW
1"CA
1"HW2 1/2"AW
1 1/2"CW
1/2"CA3/4"CW2"WEX. 1 1/4"G CAPPED
ETR 4"S DROP&OFFSET UP
ETR 4"S UP
ETR 4"S DN
3"S
ETR 3"W UP
ETR 1"W UP
1"CW
1"C&HW CTE
ETR CW&CA DN
ETR HW CAPPED
ETR CW&CA UP
ETR CW INTO WALL
ETR C&HW DROP
ETR:
CW,HW, CA
ETR 2"W DN
ETR:
2"W UP
3/4"CW UP
3/4"CA UP
ETR 1 1/2"W UP
1 1/2"W
3/4"CA
1/2"Kr
1/2"CH43/4"CACO
ETR 2 1/2"AW UP
ETR 1 1/2"AW UP
2 1/2"AW
3/4"CW 3/4"HW
1"HW
1 1/4"CW
1 1/2"CW
1"HW 188
495
188A
439
100CB
CORRIDOR
207
100TC
93
10048
551
187
101
189
99
191
151
193
257
100CA COMMON
AREA
442
182A PRINT
ROOM
76
3/4"C&HW UP
1"TW UP
3"FD
MV2MV2
1 1/2"V CTE
1/2"CH4 RISE
FROM MANIFOLD
1/2"Kr RISE
FROM WALL-MOUNT
TANK1"HW1/2"HWR CTE
1/2"CH4 VALVE & CAP
OUTLET FOR FUTURE USE
1/2"CH4 1/2"CH4
1
GENERAL PLAN NOTES
CONTRACTOR TO COORDINATE GAS DETECTOR LOCATIONS WITH OWNER.
2 CA CONNNECTIONS TO ADJUSTIBLE TABLES REQUIRE FLEX CONNECTIONSALLOWING UP TO 6"
OF VERTICAL TRAVEL.
MV2
3/4"HW
1/2"HWC 3/4"CW
3/4"CA
1"C&HW DROP
1"TW RISE
1/2"CA DROP TO
GAS CABINET1/2"CA
Revisions:
347 West 36 Street Suite 1501
New York, NY 10018
212-245-5195 T
212-239-7130 F
Key Plan:
Notes:
Grumman Hall
Cornell University
Ithaca, NY 14850
Richard McElhiney Architects LLC
April 2, 2020
Issue for Bid April 2, 2020
Scale:
31 Knight Street
Norwalk, CT 06851
203-866-5538 T
203-866-5243 F
Altieri Sebor Wieber LLC
303 South Broadway, Suite G20
Tarrytown, NY 10591
914-333-1110 T
914-333-1109 F
Jacobs Consultancy
4588 South Park Avenue
Blasdell, NY 14219
716-823-0006 T
Trophy Point
AREA OF WORK
4592 Jordan Road
Skaneateles Falls, NY 13153
315-685-4732 T
Ryan Biggs Clark Davis Engineering & Surveying
First and Second Floor Renovation Phase 1
1/4" = 1'-0"
FIRST FLOOR -Plumbing
P-102
1/4" = 1'-0"1 FIRST FLOOR
EXIST. PLUMBING SERVICES TO REMAIN
REF.
012345678
9
A
B
D
C
E
F
012345678
9
A
B
D
C
E
F
BB
ETR 4"ST UP TO RD&DN
EX.4"ST DN&
UP TO RD
Revisions:
347 West 36 Street Suite 1501
New York, NY 10018
212-245-5195 T
212-239-7130 F
Key Plan:
Notes:
Grumman Hall
Cornell University
Ithaca, NY 14850
Richard McElhiney Architects LLC
April 2, 2020
Issue for Bid April 2, 2020
Scale:
31 Knight Street
Norwalk, CT 06851
203-866-5538 T
203-866-5243 F
Altieri Sebor Wieber LLC
303 South Broadway, Suite G20
Tarrytown, NY 10591
914-333-1110 T
914-333-1109 F
Jacobs Consultancy
4588 South Park Avenue
Blasdell, NY 14219
716-823-0006 T
Trophy Point
AREA OF WORK
4592 Jordan Road
Skaneateles Falls, NY 13153
315-685-4732 T
Ryan Biggs Clark Davis Engineering & Surveying
First and Second Floor Renovation Phase 1
1/4" = 1'-0"
SECOND FLOOR -Plumbing
P-103
1/4" = 1'-0"1 SECOND FLOOR
CH4
FLAMMABLE GAS CABINET PIPING SCHEMATIC
SCALE: NONE
1
P-300P-300
CH4
0-125PSIG 0-2000PSIG
0-125PSIG0-125PSIG
MANUAL
VALVE
EXCESS
FLOW
VALVE
FLASHBACK
ARRESTOR
DUCT AIRFLOW
SWITCH WITHVISUAL INDICATOR
EXHAUST AIR TOCABINET AIRVALVE
SHUTDOWN CONTROLLER
EGO
1/4" CH4 1/2" CH4
KEYED CONSTRUCTION NOTES
3-CYLINDER GAS CABINET (GC-1) WITH AUTOMATIC PNEUMATIC EMERGENCY SHUTOFF VALVE
PROVIDE RELAY BASED SHUTDOWN CONTROLLER AND TWO 0-100% LEL DETECTORS FOR
METHANE.
SHUTDOWN CONTROLLER TO INCLUDE MANUAL EMERGENCY STOP BUTTON AND MONITORING
GAS DETECTORS THAT SHALL COMMAND SHUT THE PNEUMATIC VALVES IN THE EVENT OF A
LEAK.
30-INCH OF STAINLESS STEEL FLEX HOSE OR PIG-TAIL TO BE INSTALLED ON REGULATOR INLET
WITH CGA 350 CONNECTION ON THE CYLINDERS, WITH INTEGRAL CHECK VALVE NIPPLE.
PNEUMATIC EMERGENCY SHUTOFF VALVE (ESO) CONNECTED TO 90 PSIG HOUSE
COMPRESSED AIR SERVICE.
PROVIDE AIRFLOW PRESSURE SWITCH/GAGE WITH TWO DPDT CONTACT RELAYS AND FACE
MOUNTED ADJUSTABLE SETPOINT KNOBS. WIRE TO GAS CABINET SHUTDOWN CONTROLLER .
SEE DETAIL 1/M-406 FOR ADDITIONAL INFORMATION. BASIS OF DESIGN, DWYER A3002.
1/2" NPT CONNECTION WITH SPRINKLER PROVIDED WITH GAS CABINET. REMOVE SPRINKLER
AND CAP OPENING. TURN OVER SPRINKLER TO OWNER FOR FUTURE USE.
GAS PIPING SHALL RUN EXPOSED WITHIN THE SPACE. PROVIDE UNI-STRUT WITH CUSHION
CLAMPS FOR ALL GAS PIPING SUPPORTS.
INSTALL SERVICE DROP DIRECTLY TO WALL. PROVIDE UNI-STRUT WITH CUSHION CLAMPS FOR
ALL GAS PIPING SUPPORTS.
GAS SERVICE TO EQUIPMENT. PROVIDE SWAGE TUBE FITTING. FINAL CONNECTION TO
EQUIPMENT BY RESEARCHER.
1
2
3
4
5
6
7
8
9
1
GENERAL CONSTRUCTION NOTES
THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL LABOR, MATERIAL, AND EQUIPMENT
NECESSARY TO FORM A COMPLETE FUNCTIONING SYSTEM. ITEMS NOT SPECIFICALLY
MENTIONED, BUT WHICH ARE INHERENTLY NECESSARY TO MAKE A COMPLETE WORKING
INSTALLATION SHALL BE PROVIDED.
THE FOLLOWING COMPONENTS ARE TO BE PROVIDED BY OTHERS. THEY ARE SHOWN FOR
INFORMATION AND COORDINATION PURPOSES ONLY.
- GAS CYLINDERS.
- GAS CYLINDERS VALVES.
- REDUCED FLOW ORIFICES.
THE GAS CABINET SHALL BE PROVIDED AS: AIRGAS - MODEL: LAB 1000 CUSTOM 48" WIDE x 18"
DEEP x 72" TALL CABINET CONSTRUCTED TO NFPA 55 STANDARDS, AND SHALL BE PROVIDED
WITH THE FOLLOWING:
SEMI AUTIMATIC CHANGEOVER MANIFOLD w/
0-125 PSIG MAX DELIVERY PRESSURE RANGE.
- (2) 36" FLEXIBLE STAINLESS STEEL PIGTAILS WITH CGA CONNECTIONS WITH CHECK NIPPLE
AND SHUTOFF VALVE.
- PNEUMATIC SHUTOFF VALVES ON INLET SIDES OF MANIFOLD.
- EXCESS FLOW VALVE AND FLASHBACK ARRESTOR MOUNTED ON OUTLET SIDE OF MANIFOLD.
INDIVIDUAL REGULATOR FOR ADDITIONAL FLAMMABLE GAS CYLINDER.
- 36" FLEXIBLE STAINLESS STEEL PIGTAILS WITH CGA CONNECTIONS WITH CHECK NIPPLE AND
SHUTOFF VALVE.
- PNEUMATIC SHUTOFF VALVE.
- EXCESS FLOW VALVE AND FLASHBACK ARRESTOR MOUNTED ON OUTLET SIDE OF MANIFOLD.
- TWO 0-100% LEL GAS DETECTORS (1) FOR LEAK DETECTION AT EXHAUST & (1) FOR AMBIENT
LEAK DETECTION AT POINT OF USE.
- DIFFERENTIAL PRESSURE SWITCH: 0-0.5" WG RANGE, TAMPER PROOF KNOBS, 120 VAC.
- CABINET SHUTDOWN CONTROLLER TO PNEUMATIC VALVE SHUTOFF.
- ONBOARD EMERGENCY STOP BUTTON.
1.0
2.0
3.0
FLAMMABLE GAS PIPING SCHEDULE
TAG
CH4
DESCRIPTION MATERIAL
METHANE ASTM A269 316L STAINLESS STEEL
FITTINGS
ASTM A162 316L STAINLESS STEEL
JOINTS
ORBITAL WELD
NOTES:
1.ALL PIPING SHALL BE MANUFACTURER CLEANED, PURGED, AND SEALED ACCORDING TO CGA G-4.1 OR SWAGELOCK SC-11 FOR
OXYGEN SERVICE.
SEE SECTION 220000 FOR FURTHER DETAILS.
2
3 3
44
5
6
77
1/4" CH48 1/4" CH48
9 9
MANUAL
VALVE
MANUAL
VALVE
1
CH4
FINAL CH4 GAS
CONNECTION TO
OPTICAL TABLEEQUIPMENT BYRESEARCHER
0-125PSIG
1/2" CH47
1/4" CH48
9
MANUAL
VALVE
0-125PSIG
1/2" CH47
1/4" CH48
9
MANUAL
VALVE
FINAL CH4 GAS
CONNECTION TO
OPTICAL TABLEEQUIPMENT BYRESEARCHER
FINAL CH4 GAS
CONNECTION TO
OPTICAL TABLEEQUIPMENT BYRESEARCHER
FINAL CH4 GAS
CONNECTION TO
OPTICAL TABLEEQUIPMENT BYRESEARCHER
OTHERFLAMMABLE GAS
3
4
AUTOMATIC
CHANGEOVERMANIFOLD
1/4" CH48
MANUAL
VALVE
CH4 GAS WITH
ISOLATION
VALVE AND CAP
TO LAB 188 FORFUTURECONNECTION.
1/2" CH47
MANUAL
VALVE
0-125
PSIG
0-2000
PSIG
MANUAL
VALVE
EXCESSFLOW
VALVEFLASHBACKARRESTOR
MANUAL
VALVE
KRYPTON GAS PIPING SCHEMATIC
SCALE: NONE
2
P-300P-300
Kr
KEYED CONSTRUCTION NOTES
PROVIDE CYLINDER RACK BARRICADE TYPE WITH 2-INCH SQUARE STEEL TUBE CONTINUOUSLY
WELDED SEAM WITH POWDER COATED FINISH; TWO LEVELS OF WELDED STEEL SHAINS,
CYLINDER SNAP, PRE-DRILLED HOLES FOR MOUNTING TO FLOOR, AND STRAPS TO PROPERLY
SECURE CYLINDERS. BASIS OF DESIGN USA SAFTEY MODEL BR4X1FS.
PROVIDE 30-INCH STAINLESS STEEL FLEX HOSE OR PIG-TAIL CONNECTION TO CYLINDERS.
INSTALL ALL REGULATORS AND MANUAL SHUTOFF VALVES ON PANEL MOUNTED TO WALL.
GAS PIPING SHALL RUN EXPOSED WITHIN THE SPACE. PROVIDE UNI-STRUT WITH CUSHION
CLAMPS FOR ALL GAS PIPING SUPPORTS.
INSTALL SERVICE DROP DIRECTLY TO WALL. PROVIDE UNI-STRUT WITH CUSHION CLAMPS FOR
ALL GAS PIPING SUPPORTS.
GAS SERVICE TO EXPERIMENT. PROVIDE SWAGE TUBE FITTING. FINAL CONNECTION TO
EQUIPMENT BY RESEARCHER. MOUNT AT 4-FEET ABOVE FINISHED FLOOR.
1
2
3
4
5
6
1
GENERAL CONSTRUCTION NOTES
THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL LABOR, MATERIAL, AND EQUIPMENT
NECESSARY TO FORM A COMPLETE FUNCTIONING SYSTEM. ITEMS NOT SPECIFICALLY
MENTIONED, BUT WHICH ARE INHERENTLY NECESSARY TO MAKE A COMPLETE WORKING
INSTALLATION SHALL BE PROVIDED.
THE FOLLOWING COMPONENTS ARE TO BE PROVIDED BY OTHERS. THEY ARE SHOWN FOR
INFORMATION AND COORDINATION PURPOSES ONLY.
- GAS CYLINDERS.
- GAS CYLINDERS VALVES.
- REDUCED FLOW ORIFICES.
THE KRYPTON GAS CYLINDER SHALL BE SECURELY FASHIONED TO THE STRUCTURE. REFER
TO CORNELL STANDARDS FOR GAS CYLINDER INSTALLATION. THE CYLINDER PIPING SHALL BE
PROVIDED WITH THE FOLLOWING.
- 36" FLEXIBLE STAINLESS STEEL PIGTAILS WITH CGA CONNECTIONS WITH CHECK NIPPLE AND
SHUTOFF VALVE.
- AIRGAS SINGLE STAGE STAINLESS STEEL REGULATOR MODEL EMD-400. PRESSURE RANGE
AND MOUNTING TYPE TO BE COORDINATED WITH FINALIZED OPTICAL TABLE REQUIREMENTS.
1.0
2.0
PROCESS GAS PIPING SCHEDULE
TAG
Kr
DESCRIPTION MATERIAL
KRYPTON ASTM A269 316L STAINLESS STEEL
FITTINGS ALT JOINTS
ORBITAL WELD, BENDS
NOTES:
1.ALL PIPING SHALL BE MANUFACTURER CLEANED, PURGED, AND SEALED ACCORDING TO CGA G-4.1 OR SWAGELOCK SC-11 FOR OXYGEN SERVICE.
SEE SECTION 220000 FOR FURTHER DETAILS.
2
0-100PSIG 0-1400PSIG
0-100
PSIG
0-XX
PSIG
6
MANUALVALVE
200 SCFCGA 580
3
1/2" Kr4
1/4" Kr4
1/4" Kr5
Kr OUTLET1/4" SWAGE
ASTM A162 316L STAINLESS STEEL
1/2" Kr4
GAS SERVICES TO
OPTICAL TABLE
0-100
PSIG
0-XX
PSIG
6
1/4" Kr5
Kr OUTLET1/4" SWAGE
GAS SERVICES TO
OPTICAL TABLE
0-100
PSIG
0-XX
PSIG
6
1/4" Kr5
Kr OUTLET1/4" SWAGE
GAS SERVICES TO
OPTICAL TABLE
0-100
PSIG
0-XX
PSIG
6
1/4" Kr5
Kr OUTLET1/4" SWAGE
GAS SERVICES TO
OPTICAL TABLE
1/2" Kr4
Revisions:
347 West 36 Street Suite 1501
New York, NY 10018
212-245-5195 T
212-239-7130 F
Key Plan:
Notes:
Grumman Hall
Cornell University
Ithaca, NY 14850
Richard McElhiney Architects LLC
April 2, 2020
Issue for Bid April 2, 2020
Scale:
31 Knight Street
Norwalk, CT 06851
203-866-5538 T
203-866-5243 F
Altieri Sebor Wieber LLC
303 South Broadway, Suite G20
Tarrytown, NY 10591
914-333-1110 T
914-333-1109 F
Jacobs Consultancy
4588 South Park Avenue
Blasdell, NY 14219
716-823-0006 T
Trophy Point
AREA OF WORK
4592 Jordan Road
Skaneateles Falls, NY 13153
315-685-4732 T
Ryan Biggs Clark Davis Engineering & Surveying
First and Second Floor Renovation Phase 1
12" = 1'-0"
Gas Piping Schematic Details 1
Plumbing
P-300
GAS DETECTION & SHUTDOWN CONTROLLER SCHEMATIC
SCALE: NONE
1
P-301P-301
2
CH4
1
CH4
SHUTDOWN CONTROLLERSPARE
SHUTDOWN CONTROLLERSPARE
SHUTDOWN CONTROLLERSPARE
SHUTDOWN CONTROLLERSPARE
SHUTDOWN CONTROLLERSPARE
SHUTDOWN CONTROLLERSPARE
SHUTDOWN CONTROLLERSPARE
SHUTDOWN CONTROLLERSPARE
SHUTDOWN CONTROLLERSPARE
SHUTDOWN CONTROLLERSPARE
SHUTDOWN CONTROLLERSPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
COMMON RELAY
TO SHUTDOWN CONTROLLERS
FIRE ALARM MONITORING
TO BACS
120 VAC
16 CHANNEL
GAS DETECTION
CONTROLLER
120 VAC
1
CH4
INPUTS
OUTPUTS
VENT
SHUTDOWN CONTROLLER
FLAMMABLE GAS CABINET
P
S
CH4CH4
AMM
COORDINATE WITH THE ELECTRICAL
CONTRACTOR A TIE-IN TO THE
NEAREST FIRE ALARM CONTROLLER
AND PROVIDE PROVISION OF
ADDRESSIBLE MONITOR MODULE .
80-100 PSIG HOUSE
COMPRESSED AIR
TAG
2/CH4
DEVICE LOCATION MONITOR ZONE NOTES
NOTES:
1.ALL PIPING SHALL BE MANUFACTURER CLEANED, PURGED, AND SEALED ACCORDING TO CGA G-4.1 OR SWAGELOCK SC-11 FOR OXYGEN SERVICE.
LEL
%
TRIGGER
SET POINT
10% LEL
0.51/CH4 GAS DETECTOR 182 SADAF'S LAB FLAMABLE GAS CABINET 0-100% LEL METHANE DETECTOR5
0.5GAS DETECTOR AMBIENT 0-100% LEL METHANE DETECTOR5182 SADAF'S LAB
EXHAUST
PRESSURESWITCH
SHUTDOWN CONTROLLERSPARE
SHUTDOWN CONTROLLERSPARE
SHUTDOWN CONTROLLERSPARE
CH4
Revisions:
347 West 36 Street Suite 1501
New York, NY 10018
212-245-5195 T
212-239-7130 F
Key Plan:
Notes:
Grumman Hall
Cornell University
Ithaca, NY 14850
Richard McElhiney Architects LLC
April 2, 2020
Issue for Bid April 2, 2020
Scale:
31 Knight Street
Norwalk, CT 06851
203-866-5538 T
203-866-5243 F
Altieri Sebor Wieber LLC
303 South Broadway, Suite G20
Tarrytown, NY 10591
914-333-1110 T
914-333-1109 F
Jacobs Consultancy
4588 South Park Avenue
Blasdell, NY 14219
716-823-0006 T
Trophy Point
AREA OF WORK
4592 Jordan Road
Skaneateles Falls, NY 13153
315-685-4732 T
Ryan Biggs Clark Davis Engineering & Surveying
First and Second Floor Renovation Phase 1
12" = 1'-0"
Gas Detection Shutdown
Controller Schematic -Plumbing
P-301
NOT TO SCALE
EXPOSED SPRINKLERS WTH
HEAD GUARDS
SPRINKLER
BRANCH PIPING
(TYPICAL)
EXPOSED UPRIGHT
SPRINKLER HEAD
HEAD GUARD
(TYPICAL)
EXPOSED PENDENT
SPRINKLER HEAD
1" SPRIG
1" X 1/2" REDUCER
EXPOSED SIDEWALL
SPRINKLER HEAD
EXPOSED UPRIGHT
SPRINKLER HEAD
MAINTAIN 18" CLEARANCE BETWEEN THE
DEFLECTORS AND THE TOP OF STORAGE
1.AREAS CURRENTLY SERVED BY THE WET AUTOMATIC SPRINKLER SYSTEM SHALL BE
MODIFIED TO SUPPORT RENOVATION WORK AS INDICATED IN THESE DRAWINGS.
2.CHANGES TO THE EXISTING SYSTEMS SHALL BE CONSISTENT WITH THE EXISTING DESIGN
INTENT AND INSTALLED SYSTEM (I.E., NEW SPRINKLERS SHALL MATCH EXISTING WHERE
APPROPRIATE, NEW PIPING SHALL MATCH EXISTING SIZES, ETC).
SCOPE OF WORK
GENERAL REQUIREMENTS
FIRE PROTECTION NOTES
11-03-2015
72 PSI66 PSI @ 773 GPM
HYDRANTS OUTSIDE UPSON HALLPER HYDRAULIC CALCULATION FROM SHOP DRAWING
(CONDOR FIRE SPRINKLER CO.)-FIRE SUPPRESSION
SPRINKLER SYSTEM 1ST FLOOR ON MAY 23, 2016
DESIGN CRITERIA
WATER SUPPLY INFORMATION:
DATE:
STATIC:
RESIDUAL:
LOCATION:
SOURCE:
CONTRACTOR SHALL OBTAIN NEW WATERFLOW DATA PRIOR TO SHOP DRAWING
SUBMITTAL, AND SUBMIT RESULTS WITH INITIAL SHOP DRAWING SUBMITTAL
DESCRIPTIONSYMBOL
FIRE PROTECTION SYMBOLS
NEW CONCEALED PENDENT SPRINKLER HEAD
EXISTING EXPOSED UPRIGHT SPRINKLER HEAD TO BE REMOVED
CONNECT TO EXISTING
AUTOMATIC BALL DRIP
ABOVE FINISHED FLOOR
AUXILIARY
COMBINATION SPRINKLER STANDPIPE
ELEVATOR
EXISTING
FIRE DEPARTMENT CONNECTION
FIRE DEPARTMENT VALVE
FLOW SWITCH
FIRE PROTECTION
SPRINKLER CONTROL ASSEMBLY
SPRINKLER
FIRE STANDPIPE
TAMPER SWITCH
UNDERGROUND
ABD
AFF
AUX
CSS
ELEV
EX
FDC
FDV
FS
FP
SCA
SPK
STP
TS
UG
NEW SPRINKLER PIPING
ABOVE AND BELOWAB
NOT IN CONTRACTNIC
NORMALLY CLOSEDN/C
EXISTING FIRE PROTECTION PIPING
DOWNDN
EXISTING FIRE PROTECTION PIPING TO BE REMOVED
EXISTING TO REMAINETR
1
FP-001
NEW EXPOSED UPRIGHT SPRINKLER HEAD
EXISTING EXPOSED UPRIGHT SPRINKLER HEAD TO REMAIN
1.THE DESIGN, INSTALLATION, ALL COMPONENTS AND ACCEPTANCE TESTING OF THE
SPRINKLER SYSTEM SHALL CONFORM AS A MINIMUM, TO THE NEW YORK STATE BUILDING
CODE; AND ANY APPLICABLE BUILDING CODE ARTICALS AND APPLICABLE REFERENCE
STANDARDS CITED THEREIN, INCLUDING NFPA 13-2013 AND FM GLOBAL PROPERTY LOSS
PREVENTION DATA SHEETS INCLUDING DATA SHEETS 2-0 AND 3-26.
2.NOTE -AN NFPA 13 COMPLIANT HYDROSTATIC TEST WILL BE REQUIRED FOR ALL FP
PIPING INVOLVED IN THIS SCOPE OF WORK. SAID TESTING SHOULD BE COMPLETED ON A
ZONE BY ZONE BASIS AND BE SCHEDULED WITH AND WITHNESSED BY IFD & EHS.
3.THE INSTALLATION OF FIRE PROTECTION SYSTEM AND ASSOCIATED COMPONENTS SHALL
BE PREFORMED BY INDIVIDUALS LAWFULLY LICENSED TO DO SO IN ACCORDANCE WITH
THE PROVISIONS OF NEW YORK STATE CODE.
4.USE ONLY UL LISTED/FM APPROVED SPRINKLERS, MATERIALS, AND DEVICES.
5.CONTRACTOR SHALL REVIEW ALL CONTRACT DOCUMENTS AND ALL EXISTING
CONDITIONS AS PART OF PREPARATION FOR SUBMITTING BID. ANY DISCREPANCIES
SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT OR ENGINEER (IN WRITING)
PRIOR TO SUBMITTING BID. DISCREPANCIES IDENTIFIED AFTER AWARD OF CONTRACT
ARE THE RESPONSIBILITY OF SPRINKLER CONTRACTOR.
6.CONTRACTOR SHALL REVIEW GENERAL METHODS OF INSTALLATION, NOTING DEGREE OF
DIFFICULTY, INCLUDING UNIQUE CEILING AND STRUCTURAL FEATURES OF BUILDING, AND
GETTING EQUIPMENT IN AND OUT OF THE BUILDING INCLUDING AND NEED FOR LIFTS
AND/OR SCAFFOLDING.
7.THE CONTRACTOR SHALL COORDINATE ALL PIPING WITH ALL OTHER TRADES AND
STRUCTURES.
8.PROVIDE PROPERLY SIZED FLUSHING VALVES ON MAINS AND CROSSMAINS, SIZED IN
ACCORDANCE WITH THE VELOCITY REQUIREMENTS IN NFPA 25 AND THE CORNELL
ENGINEERING AND FACILITIES STANDARDS. PROVIDE AND SUBMIT SUPPORTING
FLUSHING CALCULATIONS ALONG WITH INITIAL SHOP DRAWINGS.IF NECESSARY TO
ACHIEVE REQUIRED FLUSHING FLOW RATES, PROVIDE A TEMPORARY BOOSTER PUMP
ASSEMBLY.
9.PROVIDE READILY ACCESSIBLE DRAIN CONNECTIONS AS REQUIRED BY NFPA 13 AND AS
INDICATED IN THE CONTRACT DRAWINGS & SPECS. PIPE ALL TEST AND DRAIN PIPING TO
BUILDING EXTERIOR OR OTHER ARCHITECT, ENGINEER & CORNELL APPROVED LOCATION.
10.THE CONTRACTOR SHALL SEAL AROUND ALL NEW PIPE PENETRATIONS THROUGHOUT
THE BUILDING WITH SEALANT OF FIRE RETARDANT TYPE EQUAL IN FIRE RATING TO THE
STRUCTURE BEING PENETRATED. SEALANT SHALL BE UL LISTED ASSEMBLIES.
11.ARRANGE PIPING TO FACILITATE FLUSHING. PROVIDE (WITH WATER ONLY) OF AFFECTED
PIPING SHALL BE SCHEDULED WITH AND WITNESSED BY THE CONSTRUCTION MANAGER.
12.PROVIDE MAKES AND MODELS OF ALL SPRINKLERS AND COMPONENTS ON ALL SHOP
DRAWINGS. ALL SYSTEM COMPONENTS SHALL BE CAPABLE OF WITHSTANDING A
MINIMUM WORKING PRESSURE OF 175 PSI.
13.SUPPORT SPRINKLER PIPING IN A SUBSTANTIAL MANNER FROM BUILDING STRUCTURE,
AND INDEPENDENT OF THE CEILING SYSTEM. PROVIDE EARTHQUAKE/SEISMIC BRACING IN
ACCORDANCE WITH THE NY STATE BUILDING CODE AND NFPA 13. DO NOT USE
SPRINKLER PIPING OR HANGERS TO SUPPORT NON-SYSTEM COMPONENTS.ALL HANGER
MATERIAL SHALL BE GALVANIZED.
14.ANY DRAIN VALVES SHALL BE READILY ACCESSIBLE AND INSTALLED NOT OVER ±7'-0"
ABOVE THE FINISHED FLOOR, UNO. FROVIDE ALL VALVES WITH IDENTIFICATION SIGNS.
15.PIPING SHOWN ON DRAWINGS IS DIAGRAMMATIC, AND INDICATES A GENERAL
ARRANGEMENT OF SCOPE OF WORK. PROVIDE ANY ADDITIONAL SPRINKLERS, PIPING,
MATERIALS, LABOR, AND ENGINEERING REQUIRED FOR A COMPLETE, CODE COMPLIANT
SPRINKLER SYSTEM WITHIN THE FIRE PROTECTION SCOPE OF WORK. ANY ADDITIONAL
SPRINKLERS ARE TO BE COORDINATED WITH ARCHITECTURAL REFLECTED CERILING
PLANS. REVIEW ADDITIONAL SPRINKLERS, IF ANY, WITH ARCHITECT BEFORE PROCEEDING
WITH WORK.
16.DO NOT SCALE DRAWINGS FOR DIMENTIONS NOT INDICATED. REFER TO ARCHITECT FOR
RESOLUTION FOR ANY DIMENSIONS NOT INDICATED.
17.CONTRACTOR SHALL SECURE AND PAY COSTS OF ALL PERMITS, CERTIFICATES,
LICENSES, INSPECTIONS, AND APPROVALS ASSOCIATED WITH THEIR WORK.
18.PROVIDE SPRINKLER PROTECTION, INCLUDING ANY REQUIRED ADDITIONAL SPRINKLERS
BELOW ALL DUCTS, LIGHTS, STRUCTURAL FEATURES AND OTHER OBSTRUCTIONS
ACCORDANCE WITH THE OBSTRUCTION REQUIREMENTS OF NFPA 13.
19.IN ADDITION TO THOSE SPRINKLERS REQUIRED TO PROVIDE COMPLETE SPRINKLER
PROTECTION THROUGHOUT, INCLUDE AN ADDITIONAL 4 SPRINKLERS INCLUDING ANY
NECESSARY PIPING, FITTINGS AND HANGERS REQUIRED TO INSTALL THE SPRINKLERS.
THE PURPOSE OF THE ADDITIONAL 4 SPRINKLERS IS TO PROVIDE ENHANCED SPRINKLER
PROTECTION IN ANY EXPOSED OR FINISHED AREA AS MAY BE DEEMED NECESSARY BY
THE ARCHITECT OR ENGINEER BASED ON FIELD CONDITIONS OR DUE TO DESIGN
CHANGES. SPRINKLERS REQUIRED BELOW DUCTS AND OBSTRUCTIONS ARE NOT
INCLUDED IN THE ADDITIONAL 4 SPRINKLERS AS THEY ARE INCLUDED IN THOSE
SPRINKLERS REQUIRED TO PROVIDE COMPLETE SPRINKLER PROTECTION THROUGHOUT
THE BUILDING.
20.ALL NEW PIPING (INCLUDING MAINS) SHALL BE SCHEDULE 40 PIPE. ASTM A53, TYPE F,
GRADE A.
21.ACTIVATION OF A TAMPER SWITCH, SHALL RESULT AS A "SUPERVISORY" INDICATION AT
FIRE ALARM CONTROL PANEL AND THE FIRE ALARM ANNUNCIATOR PANEL. ACTIVATION
OF FLOW SWITCH SHALL RESULT AS AN "ALARM" INDICATION AT THE FIRE ALARM
CONTROL PANEL AND THE FIRE ALARM ANNUNCIATOR PANEL.
22.PROVIDE A COMPLETE VALVE TAG CHART. INCLUDE ALL CONTROL, TEST AND DRAIN
VALVES. ON THE CHART, INCLUDE FUNCTION AND LOCATION OF EACH VALVE.
23.INSTALL HEAD GUARDS ON ALL SPRINKLER HEADS IN MECHANICAL ROOMS AND ALL
OTHER AREAS WHERE SUBJECT TO MECHANICAL DAMAGE.
24.CONTRACTOR SHALL SECURE AND PAY COSTS OF ALL PERMITS, CERTIFICATES,
LICENSES, INSPECTIONS, AND APPROVALS ASSOCIATED WITH THEIR WORK.
25.PROVIDE COMPLETE TEST AND DRAINAGE PIPING IN ACCORDANCE WITH NFPA 13.ALL
DRAIN PIPE AND FITTINGS SHALL BE GALVANIZED.
1.CONTRACTOR SHALL VERIFY AND INDICATE EXISTING PIPING AND SPRINKLER LOCATIONS
AND INCLUDE EXISTING PIPE SIZES OF THOSE PORTIONS OF THE EXISTING SYSTEM
NECESSARY TO CLEARLY INDICATE SCOPE OF WORK.
2.USE OF LINE SPACING OFF WALL IN EXCESS OF 7'-6" (AS NOTED IN EXCEPTIONS IN NFPA 13)
IS NOT PERMITTED.
3.AREA OF SPRINKLER OPERATION SELECTED FOR HYDRAULIC CALCULATION SHALL BE THE
MOST DEMANDING, WITH MINIMUM OPERATING SQUARE FOOTAGE STATED BELOW, AND
CANNOT INCLUDE ANY UNSPRINKLERED AREAS. ALL SPRINKLERS IN REMOTE AREA MUST
OPERATE INCLUDING "SMALL ROOMS AND CLOSETS."
4.REDUCTION OF REMOTE AREA (AS NOTED IN QUICK RESPONSE SPRINKLERS EXCEPTION IN
NFPA 13) IS NOT PERMITTED.
5.ALL SPRINKLERS SHALL BE QUICK RESPONSE UNLESS NOTED OTHERWISE.
6.SPRINKLER CONTRACTOR SHALL PERFORM HYDRAULIC CALCULATIONS BASED ON THE
FOLLOWING CRITERIA:
7.INCREASE REMOTE AREA OF OPERATION BY 30% FOR SLOPED CEILING AREAS. ALL
HYDRAULIC CALCULATIONS SHALL CONTAIN A 10 PSI "SAFETY FACTOR" BETWEEN
REQUIRED PSI & AVAILABLE PSI.
8.FOR MECHANICAL AND STORAGE SPACES, SPRINKLERS SHALL BE FM APPROVED MINIMUM
K-FACTOR OF 8.0,UNLESS NOTED OTHERWISE.
9.FINISHED CEILING AREAS WILL BE CONCEALED (FLAT PLATE) PENDENTS CENTERED IN
CEILING TILES AND/OR ALIGNED WITH OTHER CEILING FIXTURES, WITH FACTORY APPLIES
CUSTOM FINISH. EXPOSED AREAS WILL HAVE UPRIGHT SPRINKLER HEADS. PROVIDE
SPRINKLERS BELOW ALL OBSTRUCTIONS INCLUDING EXPOSED DUCTWORK. INCLUDE
HEAD GUARDS ON ALL SPRINKLERS SUBJECT TO MECHANICAL INJURY. ALL SPRINKLERS
SHALL BE APPROVED QUICK RESPONSE TYPE. CUSTOM COLOR FINISHES TO BE
DETERMINED BY ARCHITECT.
HAZARD
CLASS
DESCRIPTION MAX.
SPACING
PER
SPRINKLER
HYDRAULIC
DESIGN
DENSITY
HOSE
ALLOWANCE
ORDINARY
GROUP II
182 SADAF'S LAB, ETC.130 FT20.30 GPM/FT2
OVER THE
MOST REMOTE
2500 FT2
500 GPM WET
LIGHT STUDENT SPACE, ETC.225 FT20.10 GPM/FT2
OVER THE
MOST REMOTE
1500 FT2
250 GPM WET
SYSTEM
TYPE
DEMOLITION & REMOVAL NOTES
1.PROVIDE ALL REQUIRED FIRE PROTECTION PIPING, SPRINKLER AND HANGER
REMOVAL/DEMOLITION. DO NOT RE-USE ANY REMOVED/DEMO'D MATERIALS.
2.IF SPRINKLER COVERAGE IS TO BE REMOVED FROM ANY SPACE FOR MORE THAN ONE
WORK SHIFT, HEAT DETECTION WILL NEED TO BE INSTALLED AND TESTED WITH EHS TO
MAINTAIN FIRE PROTECTION WITHIN THE SPACE, REFER TO DIVISION 26.
3.COORDINATE REMOVAL SCHEDULING WITH THE CONSTRUCTION MANAGER.
4.ENSURE THAT ALL REMAINING OUTLETS ARE PROPERLY CAPPED.
5.RETURN " EXISTING TO REMAIN " PORTIONS OF THE FP SYSTEMS BACK INTO SERVICE AT
THE END OF EACH WORKING DAY.
6.MAINTAIN DRAWING RECORDS OF REMOVAL STATUS, UPDATE DAILY. MAKE DRAWINGS
AVAILABLE TO CONSTRUCTION MANAGER.
DRAINING
FLOW
OBSTRUCTION (I.E.
DUCT, PIPING ETC.)
DRAIN ELBOW
1" PIPING CONNECTION BETWEEN TRAPPED
SECTION AND UNTRAPPED SECTION
NOTES:
•WHERE MAIN PIPING IS OFFSET AND ROUTED ABOVE AN OBSTRUCTION(S) AND A TRAPPED
SECTION OF MAIN PIPING IS CREATED, A 1" PIPING CONNECTION SHALL BE PROVIDED
BELOW THE OBSTRUCTION TO ALLOW FOR PROPER DRAINING OF THE TRAPPED SECTION
OF MAIN PIPING, AS DETAILED. A 1" PIPING CONNECTION IS NOT REQUIRED WHERE MAIN
PIPING IS OFFSET AND ROUTED BELOW THE OBSTRUCTION, OR FOR LOOPED MAINS
WHERE ONE OF THE LEGS OF THE LOOP ALLOWS FOR PROPER DRAINING.
•IN SITUATIONS WHERE SPACE BELOW THE MAIN IS TIGHT, USE DRAIN ELBOW. IF
NECESSARY, USE OF CLOSE NIPPLE IS ACCEPTABLE.
FP-001
2
NOT TO SCALE
ROUTING OF MAIN PIPING
GALVANIZED BEAM CLAMP
GALVANIZED HANGER ROD
GALVANIZED SWIVEL RING
SPRINKLER PIPING
GALVANIZED RETAINING STRAP
NOTES:
•ALL HANGER MATERIAL SHALL BE GALVANIZED.
•REFER TO HANGER/SUPPORT REQUIREMENTS AND SPACING CRITERIA DWG. F-001
FP-001
4
NOT TO SCALE
TYPICAL BEAM CLAMP HANGER
ASSEMBLY
TYPICAL GROOVED
COUPLING
APPROVED CRACKED
CONCRETEANCHORS
GALVANIZED HANGER ROD
SPRINKLER MAIN
GROOVED COUPLING (BEHIND)
GALVANIZED RISER CLAMP
CONCRETE DECK
GALVANIZED RISER CLAMP
(SEE ELEVATION VIEW)
APPROVED CRACKED
CONCRETE ANCHOR
±1"
ELEVATION VIEWS
NOTES:
•ALL HANGER MATERIAL SHALL BE GALVANIZED.
•REFER TO HANGER/SUPPORT REQUIREMENTS AND SPACING
CRITERIA DWG. F-001
FP-001
3
NOT TO SCALE
TYPICAL HANGER ASSEMBLY HUNG
TIGHT TO CONCRETE DECK
APPROVED CRACKED CONCRETE
ANCHOR
GALVANIZED HANGER ROD
GALVANIZED SWIVAL RING
CONCRETE DECK
SPRINKLER PIPING
NOTES:
•ALL HANGER MATERIAL SHALL BE GALVANIZED.
•REFER TO HANGER/SUPPORT REQUIREMENTS AND SPACING
CRITERIA DWG. F-001
FP-001
5
NOT TO SCALE
TYPICAL HANGER ASSEMBLY
W/CONCRETE ANCHOR
LEGEND
SPRINKLER SCHEDULE
TYPE/FINISH
CONCEALED
PENDENT SPRINKLER
AREA TEMP.
RATING APPROVAL
UL/FM SIN VK462
VIKING CORP.
MANUF./
MODEL
155°F**
NOTES:
** OR AS OTHERWISE REQUIRED BY NFPA 13 AND THE TEMPERATURE RATINGS CHART
CORRIDOR,
ETC
(HC-1)
(HC-3)
ORDINARY
GROUP I
PRINT ROOM, 180 LAB I,
ETC.
130 FT20.20 GPM/FT2
OVER THE
MOST REMOTE
2500 FT2
250 GPM WET
(HC-2)
NOT TO SCALE
TYPICAL CONCEALED PENDENT
SPRINKLER HEAD
SPRINKLER BRANCH
PIPING (TYPICAL)
1" x 1/2" REDUCER
STANDARD WET
CONCEALED PENDENT
SPRINKLER HEAD
1" DROP NIPPLE
CEILING
TYPICAL ARMOVER
NOTES:
1. SUPPORT ARMOVER IN ACCORDANCE WITH NFPA 13 WITH DUE
CONSIDERATION OF ARMOVER PIPE SIZE AND MAXIMUM EXPECTED
PRESSURE.
2. MAINTAIN 18" CLEARANCE BETWEEN THE DEFLECTOR AND THE TOP OF
STORAGE.
6
FP-001
EXISTING CONCEALED PENDENT SPRINKLER HEAD TO BE REMOVEDE
EXPOSED UPRIGHT
SPRINKLER UL/FM SIN VK300
VIKING CORP.155°F**EXPOSED
AREAS
Revisions:
347 West 36 Street Suite 1501
New York, NY 10018
212-245-5195 T
212-239-7130 F
Key Plan:
Notes:
Grumman Hall
Cornell University
Ithaca, NY 14850
Richard McElhiney Architects LLC
April 2, 2020
Issue for Bid April 2, 2020
Scale:
31 Knight Street
Norwalk, CT 06851
203-866-5538 T
203-866-5243 F
Altieri Sebor Wieber LLC
303 South Broadway, Suite G20
Tarrytown, NY 10591
914-333-1110 T
914-333-1109 F
Jacobs Consultancy
4588 South Park Avenue
Blasdell, NY 14219
716-823-0006 T
Trophy Point
AREA OF WORK
4592 Jordan Road
Skaneateles Falls, NY 13153
315-685-4732 T
Ryan Biggs Clark Davis Engineering & Surveying
First and Second Floor Renovation Phase 1
12" = 1'-0"
NOTES & DETAILS -FIRE
PROTECTION
FP-001
DRAWING LIST
Sheet
Number Sheet Name
New
Sprinklers
Removed
Sprinklers
FP-001 NOTES & DETAILS - FIRE PROTECTION ± 4 --
DFP-102 FIRST FLOOR REMOVALS PLAN - FIRE PROTECTION --± 10
DFP-103 SECOND FLOOR REMOVALS PLAN - FIRE PROTECTION ----
FP-102 FIRST FLOOR PLAN - FIRE PROTECTION ± 15 --
FP-103 SECOND FLOOR PLAN - FIRE PROTECTION ----
TOTAL ± 19 ± 10
E E E E E E
0
0
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
A A
B B
D D
C C
E E
F F
012345678
9
A
B
D
C
E
F
BB
1"
1"
1"1"
1 1/2"
1"
1"
1"
3"
3"
1 1/2"
1"1"
1"
1"
1 1/4"
1"
1"
1"
1"
1"
3"
1 1/2"
3"1"
1 1/2"
1 1/4"
1"
1"1"
1"
1"
1"
1 1/4"
1 1/4"1"
1 1/2"
2"1"
3"
1"4"
1"
1"
TYPICAL EXISTING SPRINKLER
HEAD & ASSOCIATED BRANCH
PIPING TO REMAIN
TYPICAL EXISTING SPRINKLER
HEAD & ASSOCIATED BRANCH
PIPING TO BE REMOVED. PLUG
REMAINING OUTLET.
TYPICAL EXISTING SPRINKLER
HEAD & ASSOCIATED BRANCH
PIPING TO BE REMOVED. PLUG
REMAINING OUTLET.
DEMO SCOPE OF WORK
1 1/2"
3"
1"
1"
1"1"
TYPICAL EXISTING SPRINKLER
HEAD & ASSOCIATED BRANCH
PIPING TO BE REMOVED. PLUG
REMAINING OUTLET.
EXISTING FULL SIZE
FLUSHING VALVE WITH
CAP ASSEMBLY TO BE REMOVED
TYPICAL EXISTING FULL SIZE
FLUSHING VALVE WITH
CAP ASSEMBLY TO REMAIN
EXISTING FULL SIZE
FLUSHING VALVE WITH
CAP ASSEMBLY TO BE REMOVED
Revisions:
347 West 36 Street Suite 1501
New York, NY 10018
212-245-5195 T
212-239-7130 F
Key Plan:
Notes:
Grumman Hall
Cornell University
Ithaca, NY 14850
Richard McElhiney Architects LLC
April 2, 2020
Issue for Bid April 2, 2020
Scale:
31 Knight Street
Norwalk, CT 06851
203-866-5538 T
203-866-5243 F
Altieri Sebor Wieber LLC
303 South Broadway, Suite G20
Tarrytown, NY 10591
914-333-1110 T
914-333-1109 F
Jacobs Consultancy
4588 South Park Avenue
Blasdell, NY 14219
716-823-0006 T
Trophy Point
AREA OF WORK
4592 Jordan Road
Skaneateles Falls, NY 13153
315-685-4732 T
Ryan Biggs Clark Davis Engineering & Surveying
First and Second Floor Renovation Phase 1
1/4" = 1'-0"
FIRST FLOOR REMOVALS PLAN -
FIRE PROTECTION
DFP-102
1/4" = 1'-0"1 FIRST FLOOR- Removal
EXISTING SPRINKLER SYSTEM IS PER "FIRE SUPPRESSION
SPRINKLER SYSTEM AS-BUILTS" DRAWINGS SUBMITTED BY
CONDOR FIRE SPRINKLER COMPANY, INC. ON FEBRUARY 5, 2018
0
0
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
A A
B B
D D
C C
E E
F F
012345678
9
A
B
D
C
E
F
BB
1"
1"1"
1"
1"
1"
1"
TYPICAL EXISTING SPRINKLER
HEAD & ASSOCIATED BRANCH
PIPING TO REMAIN
DEMO SCOPE OF WORK
TYPICAL EXISTING PIPE TO BE
REMOVED
TYPICAL EXITING FULL SIZE
FLUSHING VALVE WITH
CAP ASSEMBLY TO REMAIN
Revisions:
347 West 36 Street Suite 1501
New York, NY 10018
212-245-5195 T
212-239-7130 F
Key Plan:
Notes:
Grumman Hall
Cornell University
Ithaca, NY 14850
Richard McElhiney Architects LLC
April 2, 2020
Issue for Bid April 2, 2020
Scale:
31 Knight Street
Norwalk, CT 06851
203-866-5538 T
203-866-5243 F
Altieri Sebor Wieber LLC
303 South Broadway, Suite G20
Tarrytown, NY 10591
914-333-1110 T
914-333-1109 F
Jacobs Consultancy
4588 South Park Avenue
Blasdell, NY 14219
716-823-0006 T
Trophy Point
AREA OF WORK
4592 Jordan Road
Skaneateles Falls, NY 13153
315-685-4732 T
Ryan Biggs Clark Davis Engineering & Surveying
First and Second Floor Renovation Phase 1
1/4" = 1'-0"
SECOND FLOOR REMOVALS PLAN
-FIRE PROTECTION
DFP-103
1/4" = 1'-0"1 SECOND FLOOR- Removal
EXISTING SPRINKLER SYSTEM IS PER "FIRE SUPPRESSION
SPRINKLER SYSTEM AS-BUILTS" DRAWINGS SUBMITTED BY
CONDOR FIRE SPRINKLER COMPANY, INC. ON FEBRUARY 5, 2018
0
0
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
A A
B B
D D
C C
E E
F F
012345678
9
A
B
D
C
E
F
182 SADAF'S LAB
754
181 LAB I
597
184 STUDENT
SPACE
563
182A PRINT
ROOM
76
TYPICAL NEW EXPOSED
UPRIGHT SPRINKLER HEAD
1
FP-001
1"
1 1/4"
1"
1"
1"
1"
1"
1"
1 1/2"
3"1"
1"
1"
1"
1 1/2"
1"
1"
1 1/4"
1 1/2"
3"
1 1/2"
4"
1 1/4"
1"
1 1/2"
1"
CONNECT TO EXISTING
SPRINKLER PIPING WITH NEW
MECHANICAL TEE
3"
CONNECT TO EXISTING
SPRINKLER PIPING WITH NEW
3"X1 1/2" MECHANICAL TEE
CONNECT TO EXISTING
SPRINKLER PIPING
EXISTING UPRIGHT HEAD
TO REMAIN
1 1/2"
1 1/2"
1 1/4"
1"
1 1/4"
1"
1"
1 1/4"
1 1/2"
1"
TYPICAL NEW BRANCH PIPING
NEW SCOPE OF WORK
3"
1 1/2"
1"
1"
2"
1"
3"3"
TYPICAL NEW CONCEALED
PENDENT SPRINKLER HEAD
6
FP-001
2"
1"
EXISTING 4" SPRINKLER MAIN TO
SPRINKLER CONTROL ASSEMBLY
LOCATED AT EGRESS STAIR N 10002
TYPICAL EXISTING FULL SIZE
FLUSHING VALVE WITH
CAP ASSEMBLY TO REMAIN
TYPICAL NEW FULL SIZE
FLUSHING VALVE WITH
CAP ASSEMBLY
100CA COMMON
AREA
442
100CB CORRIDOR
207
100UA
6
Revisions:
347 West 36 Street Suite 1501
New York, NY 10018
212-245-5195 T
212-239-7130 F
Key Plan:
Notes:
Grumman Hall
Cornell University
Ithaca, NY 14850
Richard McElhiney Architects LLC
April 2, 2020
Issue for Bid April 2, 2020
Scale:
31 Knight Street
Norwalk, CT 06851
203-866-5538 T
203-866-5243 F
Altieri Sebor Wieber LLC
303 South Broadway, Suite G20
Tarrytown, NY 10591
914-333-1110 T
914-333-1109 F
Jacobs Consultancy
4588 South Park Avenue
Blasdell, NY 14219
716-823-0006 T
Trophy Point
AREA OF WORK
4592 Jordan Road
Skaneateles Falls, NY 13153
315-685-4732 T
Ryan Biggs Clark Davis Engineering & Surveying
First and Second Floor Renovation Phase 1
1/4" = 1'-0"
FIRST FLOOR PLAN -FIRE
PROTECTION
FP-102
1/4" = 1'-0"1 FIRST FLOOR
EXISTING SPRINKLER SYSTEM IS PER "FIRE SUPPRESSION
SPRINKLER SYSTEM AS-BUILTS" DRAWINGS SUBMITTED BY
CONDOR FIRE SPRINKLER COMPANY, INC. ON FEBRUARY 5, 2018
PART PLAN - EXISTING FIRST FLOOR STAIR N
NOT TO SCALE2
AREA OF WORK
KEY PLAN - FIRST FLOOR
NOT TO SCALE3
EXISTING FLOOR CONTROL
ASSEMBLY. REFER TO DETAIL 2
ON FP-102 FOR DETAIL.
0
0
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
A A
B B
D D
C C
E E
F F
012345678
9
A
B
D
C
E
F
BB
1"
1"
1"1"
EXISTING UPRIGHT
HEAD TO REMAIN
NEW SCOPE OF WORK
TYPICAL NEW PIPING
TYPICAL EXISTING
PIPING TO REMAIN
TYPICAL EXISTING FULL
SIZE FLUSHING VALVE
WITH CAP ASSEMBLY
TO REMAIN
289 STUDENT
WORKSTATIONS
480
Revisions:
347 West 36 Street Suite 1501
New York, NY 10018
212-245-5195 T
212-239-7130 F
Key Plan:
Notes:
Grumman Hall
Cornell University
Ithaca, NY 14850
Richard McElhiney Architects LLC
April 2, 2020
Issue for Bid April 2, 2020
Scale:
31 Knight Street
Norwalk, CT 06851
203-866-5538 T
203-866-5243 F
Altieri Sebor Wieber LLC
303 South Broadway, Suite G20
Tarrytown, NY 10591
914-333-1110 T
914-333-1109 F
Jacobs Consultancy
4588 South Park Avenue
Blasdell, NY 14219
716-823-0006 T
Trophy Point
AREA OF WORK
4592 Jordan Road
Skaneateles Falls, NY 13153
315-685-4732 T
Ryan Biggs Clark Davis Engineering & Surveying
First and Second Floor Renovation Phase 1
1/4" = 1'-0"
SECOND FLOOR PLAN -FIRE
PROTECTION
FP-103
1/4" = 1'-0"1 SECOND FLOOR
EXISTING SPRINKLER SYSTEM IS PER "FIRE SUPPRESSION
SPRINKLER SYSTEM AS-BUILTS" DRAWINGS SUBMITTED BY
CONDOR FIRE SPRINKLER COMPANY, INC. ON FEBRUARY 5, 2018