Loading...
HomeMy WebLinkAbout017.0_E-302 PHASE 2 ONE LINE DIAGRAME N L BATTERY BATTERY TO MV SWITCH 600AF800AS 400AF600AS 500AF800AS 400AF600AS 400AF600AS 400AF600AS 500AF800AS 800AF1600AS 4000AF4000AS E N L 800A/3P800A/3P 800A/3P 800A/3P800A/3P 800AF1600AS 400AF600AS 500AF800AS 400AF600AS 400AF600AS 500AF800AS ---AF600AS 500AF1200AS 4000AF4000AS 3000AF3000AS 2500-KVA PRI: 13.2-KV SEC: 480Y/277V 2500-KVA PRI: 13.2-KV SEC: 480Y/277V 800AF 400AT 800AF 400AT 800AF 400AT SPARE 800AF 400AT 800AF 400AT 800AF 400AT SPARE DP-MG1 SECT 1 800A, 480/277V, 3Ø, 4W DP-MG1 SECT 2 800A, 480/277V, 3Ø, 4W DP-MG2 SECT 2 800A, 480/277V, 3Ø, 4W DP-MG2 SECT 1 800A, 480/277V, 3Ø, 4W SPACESPACESPACESPACESPACESPACESPACESPACESPACESPACESPACESPACE DP-CC62 400A, 480/277V, 3Ø, 4W DP-CC72 400A, 480/277V, 3Ø, 4W DP-CC61 400A, 480/277V, 3Ø, 4W DP-CC71 400A, 480/277V, 3Ø, 4W SPARE SS-B2 4000A 480/277V, 3Ø, 4W SS-B1 4000A 480/277V, 3Ø, 4W ATS-3 NEW ATS-5 UPS MODULE #1 300KVA #1 #2 EXISTING 800A SBM CABINET SPACE UPS MODULE #2 300KVA #3 #4 MBP CBSMIS FBP CBP EXISTING J-BOX #1 BATTERY BATTERY 1 2 3 4 5 6 7 8 9 10 11 (3) SETS 4-250 KCMIL (3) SETS 4-250 KCMIL 12 CB-1 BATTERY BATTERY CB-1 500A/3P 500A/3P UPS MODULE #1 275KVA UPS MODULE #2 275KVA NEW 500A SBM CABINET 500A/3P 500A/3P 600A/3P 600A/3P 500A/3P 500A/3P 500A/3P600A/3P 500A/3P 500A/3P GLOBAL BYPASS DISTRIBTION PANEL 500A/3P500A/3P 800AF 400AT 800AF 500AT 800AF 500AT 800AF 600AT 800AF 600AT GUNIT 800-KW DS-EG 1200A 480/277V, 3Ø, 4W 1000AF 1200AT (2) SETS OF 3-#350 KCMIL & 1-#1 GND IN 3" EMT (2) SETS OF 3-#250 KCMIL & 1-#2 GND IN 3" EMT (2) SETS OF 3-250KCMIL & 1-#2 GND IN 3" EMT (2) SETS OF 3-#350 KCMIL & 1-#1 GND IN 3" EMT (2) SETS OF 3-#350 KCMIL & 1-#1 GND IN 3" EMT (2) SETS OF 3-#250 KCMIL & 1-#2 GND IN 3" EMT (2) SETS OF 3-#250 KCMIL & 1-#2 GND IN 3" EMT (2) SETS OF 3-#250 KCMIL & 1-#2 GND IN 3" EMT (2) SETS OF 3-#250 KCMIL & 1-#2 GND IN 3" EMT (2) SETS OF 3-#250 KCMIL & 1-#2 GND IN 3" EMT (2) SETS OF 3-#250 KCMIL & 1-#2 GND IN 3" EMT (2) SETS OF 3-#350 KCMIL & 1-#1 GND IN EXISTING 3" EMT (2) SETS OF 3-#350 KCMIL & 1-#1 GND IN EXISTING 3" EMT (3) SETS 4-250 KCMIL EXISTING J-BOX #1 #3 #4 13 14 15 16 (2) SETS OF 2-#500 KCMIL & 1-#2 GND IN 3" EMT 14 14 13 6 6 12 RECITIFIER DISTRIBUTION PANEL 600AF1200AS 8 CD DC BA AB SKRU ASKRU C MBP (NO) MIS (NC) MOB 2MOB 1LB1SIS (NC) GBB (NO)CORN E LL U N I V E R SI TYFOU N D E D 5681AD FACILITIES ENGINEERING ARCHIVE BAR CODEITHACA, NEW YORK ARCH/STRUCT: CIVIL/ENV: ELECTRICAL: MECHANICAL: DATE: FACILITY: DESIGN: DRAWN: WWW.FCS.CORNELL.EDU IT IS A VIOLATION OF NEW YORK STATE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT OR ENGINEER, TO ALTER THIS DOCUMENT IN ANY WAY. IF THIS DOCUMENT IS ALTERED, THE ALTERING ARCHITECT OR ENGINEER SHALL AFFIX TO SUCH DOCUMENT THEIR SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. WARNING REVISIONS ARCHITECTURAL, STRUCTURAL, CIVIL, ENVIRONMENTAL, MECHANICAL, AND ELECTRICAL ENGINEERING 201 HUMPHREYS SERVICE BLDG ITHACA, NEW YORK 14853-3701 136 HOY ROAD RHODES HALL UPS REPLACEMENT E-302 11874770 PHASE 2 ONE-LINE DIAGRAM E. REICHARD ETR 2051 APRIL 8, 2020 SCALE: NO SCALE 1 ONE-LINE DIAGRAM PHASE 2 #E-302 KEYED PHASE 2 NOTES 1 OPEN UPS #2 CIRCUIT BREAKER IN UPS MODULE. 2 OPEN UPS #2 BATTERY CIRCUIT BREAKER TO DISCONNECT BATTERY POWER. 3 OPEN 500A BREAKER IN PANEL DS-EG IN GENERATOR ROOM FOR EMERGENCY FEED TO ATS #5. LOCK BREAKER IN OPEN POSITION. 4 OPEN 500A FUSED SWITCH IN SWITCHBOARD SS-B2 FOR NORMAL FEED TO ATS #5. LOCK SWITCH IN OPEN POSITION. 5 DISCONNECT CONDUCTORS FROM LINE AND LOAD SIDE OF UPS #2. REMOVE CONDUIT AND CONDUCTORS BACK ATS-5. 6 START GENERATOR AND SWITCH ATS-3 TO EMERGENCY POWER. OPEN 500A SWITCH IN SWITCHBOARD SS-B2 FOR NORMAL FEED TO ATS-3. 7 OPEN 4000A MAIN SWITCH IN SS-B2. TIE SWITCH TO REMAIN OPEN. WHILE BUSS IS DE-ENERGIZED, REMOVE AND DISPOSE OF EXISTING 2 SETS OF 250 KCMIL CONDUCTORS FROM ATS-5 BACK TO SS-B2. REMOVE AND DISPOSE OF ATS-5 AND REPLACE WITH A 600 AMP CLOSED TRANSITION ATS (NEW ATS-5). 8 PROVIDE NEW CONDUCTORS FROM SWITCH IN SS-B2 TO ATS-5. REUSE EXISTING 3” CONDUIT. REPLACE THE 500 AMP FUSES WITH 600 AMP FUSES (TYPE KRP-C). RETURN OLD FUSES TO CORNELL. SWITCH TO REMAIN LOCKED OPEN. 9 MAKE FINAL CONDUIT AND CONDUCTOR CONNECTIONS FROM RECITFIER POWER PANEL TO NEW ATS-5. 10 CLOSE MAIN SWITCH AND RE-ENERGIZE SS-B2. 11 CLOSE 500 AMP SWITCH FOR ATS-3. TRANSFER ATS-3 BACK TO NORMAL POWER. 12 PROVIDE CONDUIT AND CONDUCTORS FROM GLOBAL BYPASS PANEL TO PANEL DS-EG FOR NEW BYPASS FEED. INSTALL CONDUIT AND CONDUCTOR INTO GENERATOR ROOM PRIOR TO SHUTDOWN. FINAL CONNECTIONS AND TERMINATIONS TO BE MADE DURING EMERGENCY POWER SHUTDOWN. 13 OPEN GENERATOR BREAKER. DISCONNECT AND REMOVE THE 2 SETS OF EXISTING EMERGENCY FEEDERS BETWEEN ATS-5 AND THE 500 AMP BREAKER IN PANEL DS-EG. REMOVE 500 AMP BREAKER AND SAVE FOR BYPASS FEEDER CONNECTION. SHUNT WIRING CIRCUIT TO REMAIN FOR USE WITH NEW BREAKER. PROVIDE 600 AMP SPECTRA RMS BREAKER WITH SHUNT TRIP IN PLACE OF 500 AMP BREAKER. CONNECT SHUNT WIRING TO NEW BREAKER SHUNT LEADS. PROVIDE NEW FEEDER FROM 600 AMP BREAKER TO ATS-5. PROVIDE 12”X12”X6’ WIREWAY BETWEEN PANEL SECTIONS OF DS-EG. REINSTALL 500 AMP BREAKER WITH LUGS FACING WIREWAY. EXTEND SHUNT CIRCUITRY TO THE 500A BREAKER SHUNT LEADS AS NECESSARY. FINALIZE FEED FROM GLOBAL BYPASS PANEL AND TERMINATE TO THE 500 AMP BREAKER. DURING THIS TIME THE BUILDING WILL BE WITHOUT GENERATOR POWER AND CANNOT HAVE OCCUPANTS. COORDINATE THIS EMERGENCY POWER SHUTDOWN WITH THE FACILITY. 14 CLOSE GENERATOR BREAKER AND 600 AMP BREAKER IN PANEL DS-EG. CLOSE 600 AMP FUSED SWITCH FOR NORMAL POWER TO ATS-5. 15 REMOVE AND DISPOSE OF BATTERIES #3 AND #4 FOR EXISTING UPS #2. 16 INSTALL NEW BATTERIES #3 AND #4 FOR NEW UPS MODULE #2. PROVIDE CONDUIT AND CONDUCTORS FROM BATTERY CABINET TO UPS MODULE. CLOSE RECTIFIER PANEL MAIN BREAKER AND 600A BREAKER FEEDING UPS #2 AND PERFORM LOAD TEST PRIOR TO TRANSFERRING BUILDING LOAD TO UPS. BREAKERS FOR UPS #1 TO REMAIN OPEN UNTIL LOAD TEST IS TO BE PERFORMED. 1 08/16/19 ISSUE FOR DD REVIEW 2 03/20/20 ISSUE FOR 95% REVIEW 3 05/05/20 ISSUE FOR COORDINATED REVIEW 4 04/08/20 ISSUE FOR CONSTRUCTION