Loading...
HomeMy WebLinkAbout014.0_E-103 PHASE 2 PLAN AND PRESPECTIVESUB SS-B1 SUB SS-B2 LINE OF BEAM OVERHEAD NEW UPS #1 NEW UPS #2 3" EMT ATS-3 ATS-5 EXISTING OVERHEAD J-BOX #1 2 3 4 5 6 7 8 9 10 11 1 D E F C F.8 G 4321 5 6 12 6 8 11 11 NEW GLOBAL BYPASS PANEL NEW SBM NEW UPS NEW BATTERY CABINETS NEW ATS-5 ATS-3 NEW RECTIFIER DISTRIBUTION PANEL NEW BEAMS ON FLOOR CORN E LL U N I V E R SI TYFOU N D E D 5681AD FACILITIES ENGINEERING ARCHIVE BAR CODEITHACA, NEW YORK ARCH/STRUCT: CIVIL/ENV: ELECTRICAL: MECHANICAL: DATE: FACILITY: DESIGN: DRAWN: WWW.FCS.CORNELL.EDU IT IS A VIOLATION OF NEW YORK STATE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT OR ENGINEER, TO ALTER THIS DOCUMENT IN ANY WAY. IF THIS DOCUMENT IS ALTERED, THE ALTERING ARCHITECT OR ENGINEER SHALL AFFIX TO SUCH DOCUMENT THEIR SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. WARNING REVISIONS ARCHITECTURAL, STRUCTURAL, CIVIL, ENVIRONMENTAL, MECHANICAL, AND ELECTRICAL ENGINEERING 201 HUMPHREYS SERVICE BLDG ITHACA, NEW YORK 14853-3701 136 HOY ROAD RHODES HALL UPS REPLACEMENT E-103 11874770 PHASE 3 PLAN AND PERSPECTIVE E. REICHARD EWK 2051 APRIL 8, 2020 0 4 8 16 SCALE: 1/8"=1'-0" SCALE:1/8" = 1'-0"1 PENTHOUSE PHASE 3 FLOOR PLAN SCALE:2 PERSPECTIVE VIEW FINAL E-103 KEYED CONSTRUCTION NOTES 1 EXERCISE BREAKERS MBP/MIS MULTIPLE TIMES PRIOR TO MAKING THE CUT OVER TO NEW FEED. OPEN MBP CIRCUIT BREAKER IN EXISITING SBM CABINET. 2 OPEN THE MAIN SWITCH FOR SS-B1. OPEN THE 800 AMP SWITCH AT SS-B1 TO THE ALTERNATE BYPASS FEED TO MBP. REMOVE CONDUIT AND CONDUCTORS BACK TO SWITCH AND DISPOSE OF. CLOSE MAIN SWITCH TO RE-ENERGIZE SS-B1. 3 FINALIZE THE INSTALLATION OF THE CONDUIT AND CONDUCTORS FROM THE GLOBAL BYPASS PANEL TO THE EXISTING SBM. CONNECT FEED TO THE MBP CIRCUIT BREAKER IN THE EXISTING SBM CABINET. 4 CLOSE MOB2 CIRCUIT BREAKER IN NEW SBM CABINET. CLOSE RECTIFIER PANEL MAIN BREAKER AND BREAKERS FEEDING UPS #2. 5 CLOSE MBP CIRCUIT BREAKER IN EXISITING SBM CABINET, OPEN MIS BREAKER TO TRANSFER LOAD TO NEW UPS #2. 6 OPEN CBS BREAKER IN THE EXISTING SBM CABINET. OPEN FBP AND CBP BREAKERS. START GENERATOR AND TRANSFER ATS-3 AND ATS-5 TO EMERGENCY POWER. OPEN MAIN SWITCH TO SS-B2. OPEN 800 AMP SWITCH, REMOVE AND DISPOSE OF STATIC BYPASS FEED BACK TO SS-B1. CLOSE MAIN SWITCH TO SS-B2 AND LABEL SWITCH “SPARE”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’S AND SBM. 12 INSTALL NEW BATTERIES FOR UPS #1. PROVIDE CONDUIT AND CONDUCTORS FROM BATTERIES TO UPS MODULE. CLOSE RECTIFIER PANEL BREAKERS FEEDING UPS #1. TRANSFER ATS-3 AND ATS-5 TO EMERGENCY POWER, SWITCH SBM INTO BYPASS. OPEN BREAKERS IN RECTIFIER PANEL FEEDING UPS #2. PERFORM LOAD TESTING ON UPS #1. ONCE COMPLETE, CLOSE BREAKERS IN RECTIFIER PANEL FEEDING UPS #2, CLOSE MOB1 BREAKER. SWITCH BACK TO UPS POWER AND TRANSFER ATS-3 AND ATS-5 TO NORMAL POWER. # 1 08/16/19 ISSUE FOR DD REVIEW 2 03/20/20 ISSUE FOR 95% REVIEW 3 05/05/20 ISSUE FOR COORDINATED REVIEW 4 04/08/20 ISSUE FOR CONSTRUCTION