HomeMy WebLinkAbout014.0_E-103 PHASE 2 PLAN AND PRESPECTIVESUB
SS-B1
SUB
SS-B2
LINE OF BEAM
OVERHEAD
NEW
UPS #1
NEW
UPS #2
3" EMT
ATS-3
ATS-5
EXISTING
OVERHEAD
J-BOX #1
2
3
4
5 6
7 8
9
10
11
1
D
E
F
C
F.8
G
4321 5 6
12
6
8
11
11
NEW GLOBAL
BYPASS PANEL
NEW SBM
NEW UPS
NEW BATTERY
CABINETS
NEW
ATS-5
ATS-3
NEW RECTIFIER
DISTRIBUTION
PANEL
NEW BEAMS
ON FLOOR CORN E LL U N I V
E
R
SI
TYFOU
N
D E D 5681AD
FACILITIES
ENGINEERING
ARCHIVE BAR CODEITHACA, NEW YORK
ARCH/STRUCT:
CIVIL/ENV:
ELECTRICAL:
MECHANICAL:
DATE:
FACILITY:
DESIGN:
DRAWN:
WWW.FCS.CORNELL.EDU
IT IS A VIOLATION OF NEW YORK STATE LAW FOR
ANY PERSON, UNLESS ACTING UNDER THE
DIRECTION OF A LICENSED ARCHITECT OR
ENGINEER, TO ALTER THIS DOCUMENT IN ANY
WAY. IF THIS DOCUMENT IS ALTERED, THE
ALTERING ARCHITECT OR ENGINEER SHALL AFFIX
TO SUCH DOCUMENT THEIR SEAL AND THE
NOTATION "ALTERED BY" FOLLOWED BY THEIR
SIGNATURE, THE DATE OF SUCH ALTERATION, AND
A SPECIFIC DESCRIPTION OF THE ALTERATION.
WARNING
REVISIONS
ARCHITECTURAL, STRUCTURAL,
CIVIL, ENVIRONMENTAL,
MECHANICAL, AND ELECTRICAL
ENGINEERING
201 HUMPHREYS SERVICE BLDG
ITHACA, NEW YORK 14853-3701
136 HOY ROAD
RHODES HALL
UPS
REPLACEMENT
E-103
11874770
PHASE 3 PLAN
AND
PERSPECTIVE
E. REICHARD
EWK
2051
APRIL 8, 2020
0 4 8 16
SCALE: 1/8"=1'-0"
SCALE:1/8" = 1'-0"1 PENTHOUSE PHASE 3 FLOOR PLAN
SCALE:2 PERSPECTIVE VIEW FINAL
E-103 KEYED CONSTRUCTION NOTES
1 EXERCISE BREAKERS MBP/MIS MULTIPLE TIMES PRIOR TO MAKING THE CUT OVER
TO NEW FEED. OPEN MBP CIRCUIT BREAKER IN EXISITING SBM CABINET.
2 OPEN THE MAIN SWITCH FOR SS-B1. OPEN THE 800 AMP SWITCH AT SS-B1 TO THE
ALTERNATE BYPASS FEED TO MBP. REMOVE CONDUIT AND CONDUCTORS BACK TO
SWITCH AND DISPOSE OF. CLOSE MAIN SWITCH TO RE-ENERGIZE SS-B1.
3 FINALIZE THE INSTALLATION OF THE CONDUIT AND CONDUCTORS FROM THE
GLOBAL BYPASS PANEL TO THE EXISTING SBM. CONNECT FEED TO THE MBP
CIRCUIT BREAKER IN THE EXISTING SBM CABINET.
4 CLOSE MOB2 CIRCUIT BREAKER IN NEW SBM CABINET. CLOSE RECTIFIER PANEL
MAIN BREAKER AND BREAKERS FEEDING UPS #2.
5 CLOSE MBP CIRCUIT BREAKER IN EXISITING SBM CABINET, OPEN MIS BREAKER TO
TRANSFER LOAD TO NEW UPS #2.
6 OPEN CBS BREAKER IN THE EXISTING SBM CABINET. OPEN FBP AND CBP
BREAKERS. START GENERATOR AND TRANSFER ATS-3 AND ATS-5 TO EMERGENCY
POWER. OPEN MAIN SWITCH TO SS-B2. OPEN 800 AMP SWITCH, REMOVE AND
DISPOSE OF STATIC BYPASS FEED BACK TO SS-B1. CLOSE MAIN SWITCH TO SS-B2
AND LABEL SWITCH “SPARE”. TRANSFER ATS-3 AND ATS-5 BACK TO NORMAL
POWER.
7 OPEN NORMAL FEED TO ATS-3 AT SS-B2 AND EMERGENCY FEED AT DS-EG. OPEN
UPS #1 BATTERY AND OUTPUT BREAKER. DISCONNECT THE NEUTRAL CONDUCTOR
FROM BOTH FEEDS IN THE ATS AND CAP.
8 DISCONNECT AND REMOVE EXISTING UPS #1 CONDUIT AND CONDUCTORS FROM
UPS #1 TO EXISTING SBM. REMOVE CONDUIT AND CONDUCTORS FROM UPS #1 TO
ATS-3.
9 PROVIDE CONDUIT AND CONDUCTORS FROM ATS-3 TO NEW 500 AMP SBM BYPASS
BREAKER. REFER TO ONELINE DIAGRAM FOR CONDUIT AND CONDUCTOR SIZES.
10 DISCONNECT AND REMOVE EXISTING UPS #2 CONDUIT AND CONDUCTORS FROM
UPS #2 TO EXISTING SBM.
11 REMOVE AND DISPOSE OF UPS #1 AND ITS BATTERIES. REMOVE AND DISPOSE OF
UPS #2. DISCONNECT AND REMOVE 3/4" COMMUNICATION CONDUITS BETWEEN
EXISTING UPS #1 AND UPS #2. DISCONNECT AND REMOVE THE COMMUNICATION
CONDUCTORS FROM ATS-5 TO EXISTING UPS/SBM. REMOVE CONDUIT BACK TO
ATS-5. REFER TO CONTROL RISER FOR THE NEW CONDUIT AND CONTROL WIRING
FROM ATS-5 TO THE NEW UPS’S AND SBM.
12 INSTALL NEW BATTERIES FOR UPS #1. PROVIDE CONDUIT AND CONDUCTORS FROM
BATTERIES TO UPS MODULE. CLOSE RECTIFIER PANEL BREAKERS FEEDING UPS #1.
TRANSFER ATS-3 AND ATS-5 TO EMERGENCY POWER, SWITCH SBM INTO BYPASS.
OPEN BREAKERS IN RECTIFIER PANEL FEEDING UPS #2. PERFORM LOAD TESTING
ON UPS #1. ONCE COMPLETE, CLOSE BREAKERS IN RECTIFIER PANEL FEEDING UPS
#2, CLOSE MOB1 BREAKER. SWITCH BACK TO UPS POWER AND TRANSFER ATS-3
AND ATS-5 TO NORMAL POWER.
#
1 08/16/19 ISSUE FOR DD REVIEW
2 03/20/20 ISSUE FOR 95% REVIEW
3 05/05/20 ISSUE FOR COORDINATED REVIEW
4 04/08/20 ISSUE FOR CONSTRUCTION