HomeMy WebLinkAbout013.0_E-102 PHASE 2 PLANSUB
SS-B1
SUB
SS-B2
EXISTING
OVERHEAD
J-BOX #2
NEW
UPS #1
NEW
UPS #2
UPS #1
3" EMT
LINE OF BEAM
OVERHEAD
NEW
12"X12"X6"
OVERHEAD
J-BOX #3
NEW SBM
NEW
GLOBAL
WRAP
PANEL
ATS-3
ATS-2
ATS-5
EXISTING
OVERHEAD
J-BOX #1
1
2
3 4
5
6
7
8
9
10
11
5
7
5
4
D
E
F
C
F.8
G
4321 5 6
NEW 24"x24"
PULL BOX
PANEL DS-EG
SECTION 2
GENERATOR ROOM
PANEL DS-EG
SECTION 1
12"x12"
WIREWAY
12
13
14
15
16
3
6
7
11
12
12
12
14
NEW CELL
WATCH &
IBMU
#
0 4 8 16
SCALE: 1/8"=1'-0"CORN E LL U N I V
E
R
SI
TYFOU
N
D E D 5681AD
FACILITIES
ENGINEERING
ARCHIVE BAR CODEITHACA, NEW YORK
ARCH/STRUCT:
CIVIL/ENV:
ELECTRICAL:
MECHANICAL:
DATE:
FACILITY:
DESIGN:
DRAWN:
WWW.FCS.CORNELL.EDU
IT IS A VIOLATION OF NEW YORK STATE LAW FOR
ANY PERSON, UNLESS ACTING UNDER THE
DIRECTION OF A LICENSED ARCHITECT OR
ENGINEER, TO ALTER THIS DOCUMENT IN ANY
WAY. IF THIS DOCUMENT IS ALTERED, THE
ALTERING ARCHITECT OR ENGINEER SHALL AFFIX
TO SUCH DOCUMENT THEIR SEAL AND THE
NOTATION "ALTERED BY" FOLLOWED BY THEIR
SIGNATURE, THE DATE OF SUCH ALTERATION, AND
A SPECIFIC DESCRIPTION OF THE ALTERATION.
WARNING
REVISIONS
ARCHITECTURAL, STRUCTURAL,
CIVIL, ENVIRONMENTAL,
MECHANICAL, AND ELECTRICAL
ENGINEERING
201 HUMPHREYS SERVICE BLDG
ITHACA, NEW YORK 14853-3701
136 HOY ROAD
RHODES HALL
UPS
REPLACEMENT
E-102
11874770
PHASE 2 PLAN
E. REICHARD
ETR
2051
APRIL 8, 2020
SCALE:1/8" = 1'-0"1 PENTHOUSE PHASE 2 FLOOR PLAN
E-102 KEYED CONSTRUCTION NOTES
1 OPEN UPS #2 CIRCUIT BREAKER IN UPS MODULE.
2 OPEN UPS #2 BATTERY CIRCUIT BREAKER TO DISCONNECT BATTERY POWER.
3 OPEN 500A BREAKER IN PANEL DS-EG IN GENERATOR ROOM FOR EMERGENCY
FEED TO ATS #5. LOCK BREAKER IN OPEN POSITION.
4 OPEN 500A FUSED SWITCH IN SWITCHBOARD SS-B2 FOR NORMAL FEED TO ATS #5.
LOCK SWITCH IN OPEN POSITION.
5 DISCONNECT CONDUCTORS FROM LINE SIDE OF UPS #2. REMOVE CONDUIT AND
CONDUCTORS BACK ATS-5.
6 START GENERATOR AND SWITCH ATS-3 TO EMERGENCY POWER. OPEN 500A
SWITCH IN SWITCHBOARD SS-B2 FOR NORMAL FEED TO ATS-3.
7 OPEN 4000A MAIN SWITCH IN SS-B2. TIE SWITCH TO REMAIN OPEN. WHILE BUSS IS
DE-ENERGIZED, REMOVE AND DISPOSE OF EXISTING 2 SETS OF 250 KCMIL
CONDUCTORS FROM ATS-5 BACK TO SS-B2. DISCONNECT REMAINING POWER AND
CONTROL CONDUCTORS AND SAVE FOR REUSE. REMOVE AND DISPOSE OF ATS-5
AND REPLACE WITH A 600 AMP CLOSED TRANSITION ATS (NEW ATS-5). RECONNECT
POWER AND CONTROL CONDUCTORS SAVED FROM REMOVAL.
8 PROVIDE NEW CONDUCTORS FROM SWITCH IN SS-B2 TO ATS-5. REFER TO
ONE-LINE DIAGRAM FOR CONDUCTOR SIZES. REUSE EXISTING 3” CONDUIT.
REPLACE THE 500 AMP FUSES WITH 600 AMP FUSES (TYPE KRP-C). SWITCH TO
REMAIN LOCKED OPEN.
9 MAKE FINAL CONDUIT AND CONDUCTOR CONNECTIONS FROM RECTIFIER POWER
PANEL TO NEW ATS-5.
10 CLOSE MAIN SWITCH AND RE-ENERGIZE SS-B2.
11 CLOSE 500 AMP SWITCH FOR ATS-3. TRANSFER ATS-3 BACK TO NORMAL POWER.
12 PROVIDE CONDUIT AND CONDUCTORS FROM GLOBAL BYPASS PANEL TO PANEL
DS-EG FOR NEW BYPASS FEED. INSTALL CONDUIT AND CONDUCTOR INTO
GENERATOR ROOM PRIOR TO SHUTDOWN. REFER TO ONE-LINE DIAGRAM FOR
CONDUIT AND CONDUCTOR SIZES. FINAL CONNECTIONS AND TERMINATIONS TO BE
MADE DURING EMERGENCY POWER SHUTDOWN.
13 OPEN GENERATOR BREAKER. DISCONNECT AND REMOVE THE 2 SETS OF EXISTING
EMERGENCY FEEDERS BETWEEN ATS-5 AND THE 500 AMP BREAKER IN PANEL
DS-EG. REMOVE 500 AMP BREAKER AND SAVE FOR BYPASS FEEDER CONNECTION.
SHUNT WIRING CIRCUIT TO REMAIN FOR USE WITH NEW BREAKER. PROVIDE 600
AMP SPECTRA RMS BREAKER WITH SHUNT TRIP IN PLACE OF 500 AMP BREAKER.
CONNECT SHUNT WIRING TO NEW BREAKER SHUNT LEADS. PROVIDE NEW FEEDER
FROM 600 AMP BREAKER TO ATS-5. PROVIDE 12”X12”X6’ WIREWAY BETWEEN PANEL
SECTIONS OF DS-EG. REINSTALL 500 AMP BREAKER WITH LUGS FACING WIREWAY.
EXTEND SHUNT CIRCUITRY TO THE 500A BREAKER SHUNT LEADS AS NECESSARY.
FINALIZE FEED FROM GLOBAL BYPASS PANEL AND TERMINATE TO THE 500 AMP
BREAKER. DURING THIS TIME THE BUILDING WILL BE WITHOUT GENERATOR POWER
AND CANNOT HAVE OCCUPANTS. COORDINATE THIS EMERGENCY POWER
SHUTDOWN WITH THE FACILITY.
14 CLOSE GENERATOR BREAKER AND 600 AMP BREAKER IN PANEL DS-EG. CLOSE 600
AMP FUSED SWITCH FOR NORMAL POWER TO ATS-5.
15 REMOVE AND DISPOSE OF BATTERIES #3 AND #4 FOR EXISTING UPS #2.
16 INSTALL NEW BATTERIES #3 AND #4 FOR NEW UPS MODULE #2. PROVIDE CONDUIT
AND CONDUCTORS FROM BATTERY CABINET TO UPS MODULE. CLOSE RECTIFIER
PANEL MAIN BREAKER AND 600A BREAKER FEEDING UPS #2 AND PERFORM LOAD
TEST PRIOR TO TRANSFERRING BUILDING LOAD TO UPS. BREAKERS FOR UPS #1 TO
REMAIN OPEN UNTIL LOAD TEST IS TO BE PERFORMED.
1 08/16/19 ISSUE FOR DD REVIEW
2 03/20/20 ISSUE FOR 95% REVIEW
3 05/05/20 ISSUE FOR COORDINATED REVIEW
4 04/08/20 ISSUE FOR CONSTRUCTION