HomeMy WebLinkAbout012.0_E-101 EXISTING AND PHASE 1 PLANSEXISTING
UPS
EXISTING
UPS
EXISTING
SBM
EXISTING
BATTERIES
SUB
SS-B1
ATS-3
ATS-2
ATS-5
DP-MG1
DP-MG2
EXISTING
OVERHEAD
J-BOX #1
EXISTING
OVERHEAD
J-BOX #2
SUB
SS-B2
LINE OF BEAM
OVERHEAD
TO GENERATOR ROOM
3" EMT
4" EMT
1
2
D
E
F
C
F.8
G
4321
SUB
SS-B1
SUB
SS-B2
NEW
UPS #1
NEW UPS BATTERIES
(STORE OUTSIDE
ELECTRICAL ROOM)NEW
UPS #2NEW
SBM
NEW GLOBAL
BYPASS PANEL
LINE OF BEAM
OVERHEAD
ATS-3
ATS-2
ATS-5
EXISTING
OVERHEAD
J-BOX #1
1
2
3
4
5
6
7
NEW
RECTIFIER
PANEL
D
E
F
C
F.8
G
4321
DP-MG1
DP-MG2
8
8
2
NEW CELL WATCH
COTROL/IBMU
ENCLOSURES
ELP-P
9 CORN E LL U N I V
E
R
SI
TYFOU
N
D E D 5681AD
FACILITIES
ENGINEERING
ARCHIVE BAR CODEITHACA, NEW YORK
ARCH/STRUCT:
CIVIL/ENV:
ELECTRICAL:
MECHANICAL:
DATE:
FACILITY:
DESIGN:
DRAWN:
WWW.FCS.CORNELL.EDU
IT IS A VIOLATION OF NEW YORK STATE LAW FOR
ANY PERSON, UNLESS ACTING UNDER THE
DIRECTION OF A LICENSED ARCHITECT OR
ENGINEER, TO ALTER THIS DOCUMENT IN ANY
WAY. IF THIS DOCUMENT IS ALTERED, THE
ALTERING ARCHITECT OR ENGINEER SHALL AFFIX
TO SUCH DOCUMENT THEIR SEAL AND THE
NOTATION "ALTERED BY" FOLLOWED BY THEIR
SIGNATURE, THE DATE OF SUCH ALTERATION, AND
A SPECIFIC DESCRIPTION OF THE ALTERATION.
WARNING
REVISIONS
ARCHITECTURAL, STRUCTURAL,
CIVIL, ENVIRONMENTAL,
MECHANICAL, AND ELECTRICAL
ENGINEERING
201 HUMPHREYS SERVICE BLDG
ITHACA, NEW YORK 14853-3701
136 HOY ROAD
RHODES HALL
UPS
REPLACEMENT
E-101
11874770
EXISTING AND
PHASE 1 PLANS
E. REICHARD
ETR
2051
April 8, 2020
0 4 8 16
SCALE: 1/8"=1'-0"
SCALE:1/8" = 1'-0"1 PENTHOUSE EXISTING FLOOR PLAN
SCALE:1/8" = 1'-0"2 PENTHOUSE PHASE 1 FLOOR PLAN
#
#E-101 KEYED DEMOLITION NOTES
1 REMOVE EXISTING CONCRETE PADS. WET CONCRETE AND TENT AREA TO MINIMIZE
DUST AND KEEP EXISTING EQUIPMENT CLEAN. SMOOTH FLOOR DOWN TO MATCH
EXISTING FLOOR. WIPE DOWN AND CLEAN EQUIPMENT FROM ANY DUST CREATED
FROM THE CONCRETE REMOVAL.
2 REMOVE EXISTING CONCRETE PAD FROM NORTH EDGE TO EDGE OF EXISTING SBM
TO ALLOW FOR PLACEMENT OF STRUCTURAL BEAMS ACROSS THE FLOOR.
E-101 KEYED CONSTRUCTION NOTES
1 INSTALL BEAMS ON FLOOR IN LOCATION INDICATED. REFER TO STRUCTURAL
DRAWING FOR BEAM AND INSTALLATION DETAILS.
2 PROVIDE EATON 600 AMP RECTIFIER DISTRIBUTION PANEL. PANEL TO BE
INSTALLED IN FRONT OF HORIZONTAL BEAM TO ALLOW FOR CONDUIT
INSTALLATION IN/OUT OF TOP OF ENCLOSURE. INSTALL ON FLOOR MOUNTED
STEEL STRUT. PROVIDE CONDUIT FROM PANEL TO ATS-5 LOCATION. CONDUIT AND
CONDUCTORS TO BE TERMINATED IN NEXT PHASE. REFER TO ONE-LINE DIAGRAM
FOR CONDUIT AND CONDUCTOR SIZES.
3 PROVIDE TWO (2) EATON 9395HP 275KVA/275KW UPS MODULES FOR PARALLEL
REDUNDANT SYSTEM. INSTALL MODULES DIRECTLY ON FINISHED FLOOR. PROVIDE
CONDUIT AND CONDUCTORS FOR UPS RECTIFIER AND BYPASS FEEDS FROM
RECTIFIER DISTRIBUTION PANEL TO BOTH UPS MODULES. REFER TO ONE-LINE
DIAGRAM FOR CONDUIT AND CONDUCTOR SIZES.
4 PROVIDE EATON SBM PARALLEL TIE CABINET WITH TWO BREAKER MAINTENANCE
BYPASS IN LOCATION INDICATED. CABINET TO BE INSTALLED IN FRONT OF
HORIZONTAL BEAM TO ALLOW FOR CONDUIT INSTALLATION IN/OUT OF TOP OF
CABINET. PROVIDE CONDUIT AND CONDUCTORS FROM UPS MODULES TO THE SBM
CABINET. REFER TO ONE-LINE DIAGRAM FOR CONDUIT AND CONDUCTOR SIZES.
5 PROVIDE NEW EATON 1200A GLOBAL BYPASS PANELBOARD. PANEL TO BE
INSTALLED IN FRONT OF HORIZONTAL BEAM TO ALLOW FOR CONDUIT
INSTALLATION IN/OUT OF TOP OF ENCLOSURE. PROVIDE CONDUIT AND
CONDUCTORS FROM THE SBM CABINET TO THE GLOBAL BYPASS PANEL. REFER TO
ONE-LINE DIAGRAM FOR CONDUIT AND CONDUCTOR SIZES.
6 PROVIDE CONDUIT FROM GLOBAL BYPASS PANELBOARD TO ABOVE EXISTING SBM
BYPASS CABINET. CONDUIT AND CONDUCTORS TO BE TERMINATED AT PHASE 3.
REFER TO ONE-LINE DIAGRAM FOR CONDUIT AND CONDUCTOR SIZES.
7 PROVIDE UPS VRLA BATTERIES FOR UPS MODULES. STORE OUTSIDE OF
ELECTRICAL ROOM DURING CONSTRUCTION AND INSTALL BATTERIES IN PHASES
IDENTIFIED.
8 PROVIDE TWO 3” EMT CONDUITS WITH PULL STRING FROM GLOBAL BYPASS
PANELBOARD TO EACH PANEL DP-MG1 AND PANEL DP-MG2 FOR FUTURE FEEDS.
PROVIDE TWO NEW SPECTRA RMS SKHA36AT0800 BREAKER WITH 500A PLUG,
PADLOCK AND HARDWARE MOUNTING KITS. TURN BREAKERS OVER TO THE
FACILITY FOR FUTURE INSTALLATION.
9 PROVIDE CELLWATCH CONTROL PANEL AND IBMU IN LOCATION INDICATED. MOUNT
ON STRUT AT 5’ AFF. PROVIDE NEMA 5-20R RECEPTACLE ON WALL FOR
CELLWATCH/IBMU POWER. PROVIDE 2-#12 & 1#12 THHN GND IN ¾” EMT FROM PANEL
ELP-P 20A SPARE BREAKER IN CIRCUIT SPACE #4 TO RECEPTACLE. PROVIDE 500VA
UPS WITH MINIMUM 15 MINUTE RUNTIME ON WALL NEXT TO RECEPTACLE AND PLUG
INTO RECEPTACLE. PROVIDE POWER TO CONTROL PANEL/IBMU FROM 500VA UPS
WITH 12-2 SO TYPE CORD AND PROVIDE NEMA 5-15P PLUG.
1 08/16/19 ISSUE FOR DD REVIEW
2 03/20/20 ISSUE FOR 95% REVIEW
3 05/05/20 ISSUE FOR COORDINATED REVIEW
4 04/08/20 ISSUE FOR CONSTRUCTION