HomeMy WebLinkAbout003.0_S-101 PENTHOUSE FLOOR PLAN1 2 3
E
D
C
1 2 3
E
D
C7' - 6 5/8"7' - 6 5/8"7' - 6 5/8"1 5' - 2 1/4"
5' - 10 3/4"
6' - 7 1/4"
7' - 3 3/4"
(E) W12X16 BELOW
(E) W12X16 BELOW
BEAMS EXTEND
3" PAST GRIDLINE
BEAMS EXTEND
3" PAST GRIDLINE
1/2" GAP BETWEEN
ENDS OF BEAMS,
TYP. ABOVE
EXISTING BEAMS
(E) W36X150 BELOW
(E) W36X150 BELOW (E) W21X50 BELOW(E) W24X55 BELOWCORN E LL U N I V
E
R
SI
TYFOU
N
D E D 5681AD
FACILITIES
ENGINEERING
ARCHIVE BAR CODEITHACA, NEW YORK
ARCH/STRUCT:
CIVIL/ENV:
ELECTRICAL:
MECHANICAL:
DATE:
FACILITY:
DESIGN:
DRAWN:
WWW.FCS.CORNELL.EDU
IT IS A VIOLATION OF NEW YORK STATE LAW FOR
ANY PERSON, UNLESS ACTING UNDER THE
DIRECTION OF A LICENSED ARCHITECT OR
ENGINEER, TO ALTER THIS DOCUMENT IN ANY
WAY. IF THIS DOCUMENT IS ALTERED, THE
ALTERING ARCHITECT OR ENGINEER SHALL AFFIX
TO SUCH DOCUMENT THEIR SEAL AND THE
NOTATION "ALTERED BY" FOLLOWED BY THEIR
SIGNATURE, THE DATE OF SUCH ALTERATION, AND
A SPECIFIC DESCRIPTION OF THE ALTERATION.
WARNING
REVISIONS
ARCHITECTURAL, STRUCTURAL,
CIVIL, ENVIRONMENTAL,
MECHANICAL, AND ELECTRICAL
ENGINEERING
201 HUMPHREYS SERVICE BLDG
ITHACA, NEW YORK 14853-3701
136 HOY ROAD
RHODES HALL
UPS
REPLACEMENT
S-101
11874770
PENTHOUSE
FLOOR PLAN
Q. OLSEN
JD
2051
APRIL 8, 2020
SCALE:1/4" = 1'-0"1 NEW FRAMING ABOVE SLAB
0 2 4 8
SCALE: 1/4"=1'-0"
GENERAL NOTES
1. EXISTING BATTERY CABINETS CAN REMAIN IN PLACE WHEN STEEL IS
INSTALLED.
2. REMOVE TWO EXISTING BATTERY CABINETS PRIOR TO INSTALLATION OF TWO
NEW CABINETS. REMOVE REMAINING TWO EXISTING BATTERY CABINETS PRIOR
TO INSTALLATION OF FINAL TWO NEW CABINETS. THIS IS CRITICAL FOR THE
LOAD OF THE CABINETS TO NOT EXCEED THE CAPACITY OF THE STRUCTURAL
FRAMING. WHEN BATTERIES ARE BROUGHT INTO THE ROOM, THEY MUST BE
BROUGHT IN WITH ONLY A SINGLE LAYER OF BATTERIES ON THE PALLET. IF THE
CONTRACTOR WISHES TO TRANSPORT THE BATTERIES IN A DIFFERENT WAY,
THE ENGINEER OF RECORD MUST APPROVE FIRST.
3. SEE ELECTRICAL DRAWINGS FOR THE EXACT LAYOUT OF THE BATTERY
CABINETS. THE CABINETS MUST BE CENTERED BETWEEN GRIDS D AND E. THE
CABINETS MUST BE CENTERED ON THE NEW STEEL BEAMS IN THE EAST-WEST
DIRECTION.
4. SEE ELECTRICAL DRAWINGS FOR CONCRETE EQUIPMENT PADS TO BE
REMOVED IN THE 1-2/D-E BAY MUST BE REMOVED PRIOR TO THE INSTALLATION
OF THE BATTERY CABINETS. THE CONCRETE PADS IN THE 1-2/C-D BAY MUST BE
REMOVED PRIOR THE UPS & SBM INSTALLATIONS. CONTRACTOR TO PROTECT
EXISTING STRUCTURAL SLAB DURING DEMO OF CONCRETE EQUIPMENT PADS.
5. CONTRACTOR TO REVIEW SEQUENCE OF DEMO AND INSTALLATION WITH
STRUCTURAL ENGINEER PRIOR TO BEGINNING DEMO AND INSTALLATION.
THERE ARE LIMITED OPTIONS FOR TEMPORARY SHORING BECAUSE OF THE
SERVER ROOM LOCATED DIRECTLY BELOW. SEE THE LIVE LOAD MAP ON S-001
FOR THE MAXIMUM LOADS THAT CAN BE PLACED ON THE FLOOR IN EACH AREA
WITHOUT ANY SHORING BEING REQUIRED. THESE LOADS ASSUME THE
CONCRETE EQUIPMENT PADS HAVE ALREADY BEEN REMOVED.
S-100 KEYED CONSTRUCTION NOTES
1 12 NEW W8 X 31 BEAMS TO BE INSTALLED SO THAT THE BOTTOM OF THE STEEL IS
1 ½” ABOVE THE TOP OF THE SLAB.
#
1 08/16/19 ISSUE FOR DD REVIEW
2 03/20/20 ISSUE FOR 95% REVIEW
3 05/05/20 ISSUE FOR COORDINATED REVIEW
4 04/08/20 ISSUE FOR CONSTRUCTION