HomeMy WebLinkAboutADD 2_Uris Hall Basement Lab Reno_7-14-2020CORNELL UNIVERSITY URIS HALL FACILITIES CONTRACTS BASEMENT LAB RENOVATION 121 HUMPHREYS SERVICE BUILDING ITHACA, NEW YORK 14853-3701 ADDENDUM NO. 2 July 14, 2020 This Addendum contains changes to the requirements of the Contract Documents and Specifications. Such changes are to be incorporated into the Construction Documents and shall apply to the work with the same meaning and force as if they had been included in the original document. Wherever this Addendum modifies a portion of a paragraph of the specifications or a portion of any Drawing, the remainder of the Paragraph or Drawing shall remain in force. NOTE: Provisions of all Contract Documents apply. Item 1. Instruction to Bidders, INS-5, Item 14.c. DELETE “…Bid Portal no later than 2:00PM on July 16, 2020.” REPLACE with “…Bid Portal no later than 2:00PM on July 21, 2020.” Item 2. Drawing A-102 – KEYED RENOVATION NOTES ADD the following sentence to end of Architectural Keyed Renovation Note #4: FIRE PROTECTION SUBCONTRACTOR TO DRAIN SPRINKLER SYSTEM AND REMOVE EXISTING SPRINKLER HEADS AND ESCUTCHEONS TO ALLOW FOR THE REMOVAL OF THE HARD CEILINGS. INSTALL NEW SPRINKLER HEADS AFTER HARD CEILING IS REPLACED. COORDINATE SPRINKLER SYSTEM SHUTDOWN WITH CORNELL CUSTOMER SERVICE AND CORNELL PROJECT MANAGER. Item 3. RFI Questions and Clarifications See attached RFI Log (Item 10) Attachments: RFI Log (Items 1-10) ****END OF ADDENDUM**** PROJECT: Uris Hall Basement Lab Renovation Date: July 14, 2020 RFI Form RFI/Page/ Response Dwg./Spec./Rep.Section/Design Team Index Number Paragraph/Topic RFI Response 1 Bid Proposal Certification Form M/WBE requirements listed in instruction to bidders. Please advise if certain percentages are required on this project. 2.1% and 2% are shown on the M/WBE utilization form contained within the front end specifications MWBE requirements are identified in the Bid Proposal Certification Form, Page BF-1, Item 2.a. 2 Instruction to Bidders A walk-through is indicated to take place the same day as the pre-bid meeting. Is this walk through being conducted in person with the contractors present or are we doing a "virtual walk-through" and contractors are to watch walk through via zoom, webex, etc. See Instruction to Bidders, INS-3, Item 4.a. Walkthrough will be conducted in person at Uris Hall. 3 Drawing A-001 Room B32 identified as a work area for this project. Per the pre-bid this was a mistake, please confirm. See Addendum 1 Item 2. 4 Drawing A-102 A-102 has patching noted for new lights in rooms B46, B44 and B44A. There are no lights called out for these rooms on E- 101. Please advise if lights need to be added in these rooms or if the note on A-102 should be revised. See Addendum 1 Item 5. 5 Specification Section 01 35 29 General Health & Safety Please confirm Cornell will be responsible for providing gowns to all workers on site See Addendum 1 Item 1. 6 Drawing A-102 Is there a spec on the access panels?See Addendum 1 Item 3. 7 Drawing E-101 Key Note 1 Key note 1 is calling to add a switch for A3 lights, but no demo is called for on Architectural plans. Will the existing conduits have enough space in them for an additional wire or do the walls need to be opened and new conduit provided? See Addendum 1 Item 10. 8 Drawing E-101 Drawing E-101 shows all switches as occupancy sensors according to the Electrical Symbol List on Drawing E-001. The occupancy sensors are not in the specs, they do give a few options for Switch and device covers, but do not state what switch cover is required at the different locations. Some covers will work with an Occ sensor, but some will not. Please clarify intent. See Addendum 1 Item 11. 9 Drawing E-001 Drawing E-001 Wall Plates section Note E. outlines the use of a weatherproof Switch Cover Plate. Will this Switch Plate be used at all New switch Location including B00CH1212? See Addendum 1 Item 9. 10 Drawing A-102 Key Note 4 Please confirm the GC will be responsible for the removal & reinstallation of sprikler heads as needed to accomplish work?See Addendum 2, Item 1.