Loading...
HomeMy WebLinkAboutAddendum 2_ADD 2_Snee Hall Reno for Colocation of EAS_8-25-2020CORNELL UNIVERSITY SNEE HALL RENOVATION FACILITIES CONTRACTS FOR COLOCATION OF EAS 121 HUMPHREYS SERVICE BUILDING ITHACA, NEW YORK 14853-3701 ADDENDUM NO. 2 AUGUST 25, 2020 This Addendum contains changes to the requirements of the Contract Documents and Specifications. Such changes are to be incorporated into the Construction Documents and shall apply to the work with the same meaning and force as if they had been included in the original document. Wherever this Addendum modifies a portion of a paragraph of the specifications or a portion of any Drawing, the remainder of the Paragraph or Drawing shall remain in force. NOTE: Provisions of all Contract Documents apply. TECHNICAL SPECIFCATIONS Item 1. Section 09 01 90.52 DELETE in its entirety. REPLACE with revised Section 09 01 90.52, attached Item 2. Section 211313, Paragraph 1.5.Item F ADD 4. Tom Jordan - CU Fire Protection Engineer. Section 211313, Paragraph 3.1.Item A DELETE in its entirety. REPLACE with A. Obtain fire-flow test information from Cornell EHS. Section 211313, Paragraph 3.8,.Item A ADD 5. Sprinkler testing to be conducted at system pressure for two hours unless new work can be isolated and tested at 200 psi. Verify gauge is installed for pressure test." SNEE RENOVATION FOR COLOCATION OF EAS Addendum No. 2 AUGUST 25, 2020 Page 2 Item 3. Section 224213.13, Article 2.2. DELETE in its entirety. REPLACE with 2.2 FLUSHOMETER VALVES A. Solenoid-Actuator, Diaphragm Flushometer Valves Type 1: 1. Basis-of-Design Product: Subject to compliance with requirements, provide product indicated on Drawings or comparable product by one of the following: a. Delany Products. b. Gerber Plumbing Fixtures LLC. c. Sloan Valve Company. d. Zurn Industries, LLC. 2. Standard: ASSE 1037. 3. Minimum Pressure Rating: 125 psig. 4. Features: Include integral check stop and backflow-prevention device. 5. Material: Brass body with corrosion-resistant components. 6. Exposed Flushometer-Valve Finish: Chrome plated. 7. Style: Exposed. 8. Actuator: Solenoid complying with UL 1951, and listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application. 9. Trip Mechanism: Battery-powered electronic sensor complying with UL 1951, and listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application. 10. Consumption: 1.28 gal. per flush. 11. Minimum Inlet: NPS 1. 12. Minimum Outlet: NPS 1-1/4. SNEE RENOVATION FOR COLOCATION OF EAS Addendum No. 2 AUGUST 25, 2020 Page 3 Item 4. Section 224216.13, Article 2.2. DELETE in its entirety. REPLACE with 2.2 SOLID-BRASS, AUTOMATICALLY OPERATED LAVATORY FAUCETS A. NSF Standard: Comply with NSF 372 for faucet materials that will be in contact with potable water. B. Lavatory Faucets Type 1: Automatic-type, battery-powered, electronic-sensor-operated, mixing, solid-brass valve. 1. Basis-of-Design Product: Subject to compliance with requirements, provide product indicated on Drawings or comparable product by one of the following: a. American Standard. b. Bradley Corporation. c. Chicago Faucets; Geberit Company. d. Gerber Plumbing Fixtures LLC. e. GROHE America, Inc. f. Hydrotek International, Inc. g. Kohler Co. h. Moen Incorporated. i. Sloan Valve Company. j. Speakman Company. k. Stern Engineering Ltd. l. T&S Brass and Bronze Works, Inc. m. TOTO USA, INC. n. Zurn Industries, LLC. 2. Standards: ASME A112.18.1/CSA B125.1 and UL 1951. 3. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application. 4. General: Include hot- and cold-water indicators; coordinate faucet inlets with supplies and fixture hole punchings; coordinate outlet with spout and fixture receptor. 5. Body Type: Single hole with 4-inch center cover plate. 6. Body Material: Commercial, solid brass. 7. Finish: Polished chrome plate. 8. Maximum Flow Rate: 0.5 gpm. 9. Mounting Type: Deck, concealed. 10. Spout: Rigid type. 11. Spout Outlet: Aerator. 12. Drain: Not part of faucet. SNEE RENOVATION FOR COLOCATION OF EAS Addendum No. 2 AUGUST 25, 2020 Page 4 DRAWINGS Item 5. Drawing AR101 ADD scale indicator - 1/8” = 1’-0” Item 6. Drawing AR102 ADD scale indicator - 1/8” = 1’-0” Item 7. Drawing AR103 ADD scale indicator - 1/8” = 1’-0” Item 8. Drawing AD101 ADD scale indicator - 1/8” = 1’-0” Item 9. Drawing AD102 DELETE in its entirety. REPLACE with revised Drawing AD102, attached. Item 10. Drawing AD103 ADD scale indicator - 1/8” = 1’-0” Item 11. Drawing AD104 DELETE in its entirety. REPLACE with revised Drawing AD104 attached. Item 12. Drawing AD105 DELETE in its entirety. REPLACE with revised Drawing AD105 attached. Item 13. Drawing A101 ADD scale indicator - 1/8” = 1’-0” Item 14. Drawing A102 DELETE in its entirety. REPLACE with revised Drawing A102 attached. Item 15. Drawing A103 ADD scale indicator - 1/8” = 1’-0” Item 16. Drawing A104 ADD scale indicator - 1/8” = 1’-0” SNEE RENOVATION FOR COLOCATION OF EAS Addendum No. 2 AUGUST 25, 2020 Page 5 Item 17. Drawing A105 DELETE in its entirety. REPLACE with revised Drawing A105, attached. Item 18. Drawing A151 DELETE in its entirety. REPLACE with revised Drawing A151, attached. Item 19. Drawing A161 ADD scale indicator - 1/8” = 1’-0” Item 20. Drawing A162 DELETE in its entirety. REPLACE with revised Drawing A162, attached. Item 21. Drawing A163 ADD scale indicator - 1/8” = 1’-0” Item 22. Drawing A164 ADD scale indicator - 1/8” = 1’-0” Item 23. Drawing A252 DELETE in its entirety. REPLACE with revised Drawing A252, attached. Item 24. Drawing A301 DELETE in its entirety. REPLACE with revised Drawing A301, attached. Item 25. Drawing A552 DELETE in its entirety. REPLACE with revised Drawing A552, attached. Item 26. Drawing A601 DELETE in its entirety. REPLACE with revised Drawing A601, attached. SNEE RENOVATION FOR COLOCATION OF EAS Addendum No. 2 AUGUST 25, 2020 Page 6 Item 27. Drawing A801 ADD scale indicator - 1/8” = 1’-0” Item 28. Drawing A802 ADD scale indicator - 1/8” = 1’-0” Item 29. Drawing A803 ADD scale indicator - 1/8” = 1’-0” Item 30. Drawing A804 ADD scale indicator - 1/8” = 1’-0” Item 31. Drawing P001 – Drawing Index, Symbol List & Abbreviations a. Plumbing Fixture Schedule, "Basin Fixtures," Lav A – Col. – Faucet Operation – DELETE "Manual" and REPLACE with "Sensor." Col. – Handle Type – DELETE "Lever" and REPLACE with "N/A." Col. – Faucet Manufacturer – DELETE "Moen" and REPLACE with "Sloan." Col. – Faucet Model – DELETE "8215F05" and REPLACE with "EAF-150-1SM" b. Plumbing Fixture Schedule, "Flushing Fixtures" Col. – Flush Method – DELETE "Manual" and REPLACE with "Sensor." Col. – Flush Valve Model – DELETE "111.1.28" and REPLACE with "REGAL 111 SFSM-1.2B." Item 32. Drawing P101 – First Floor Plan - Plumbing DELETE in its entirety. REPLACE with revised Drawing P101R, attached. Item 33. Drawing P102, Plumbing Keyed Notes , P19 DELETE in its entirety. REPLACE with P19 VERIFY AND LOCATE CONCRETE JOISTS PRIOR TO CORE DRILLING FLOOR. DO NOT LOCATE PENETRATION AT EXISTING JOIST. SEE DETAIL 6/S002. Item 34. Drawing P103, Plumbing Keyed Notes, P19 DELETE in its entirety. REPLACE with P19 VERIFY AND LOCATE CONCRETE JOISTS PRIOR TO CORE DRILLING FLOOR. DO NOT LOCATE PENETRATION AT EXISTING JOIST. SEE DETAIL 6/S002. SNEE RENOVATION FOR COLOCATION OF EAS Addendum No. 2 AUGUST 25, 2020 Page 7 Item 35. Drawing M103 – Third Floor Plan HVAC, Note – “ 12x4 ea duct up w/ fd in wall stud space….” DELETE in its entirety.R EPLACE with 12x4 EA DUCT UP W/ FD IN WALL STUD SPACE.VERIFY AND LOCATE EXISTING CONCRETE JOIST PRIOR TO CUTTING PENETRATION. DO NOT LOCATE PENETRATION AT EXISTING JOIST. SEE DETAIL 6/S002. Item 36. Drawing M104 – Fourth Floor Plan HVAC a. Note – “12x4 ea duct dn to floor….” DELETE in its entirety. REPLACE with “12x4 EA DUCT DN TO FLOOR BELOW IN WALL STUD SPACE. VERIFY AND LOCATE EXISTING CONCRETE JOIST PRIOR TO CUTTING PENETRATION. DO NOTLOCATE PENETRATION AT EXISTING JOIST. SEE DETAIL 6/S002. b. Note – “10 x 10 duct up w/…” DELETE in its entirety. REPLACE with 10x10 EA DUCT UP W/ AAD TO EF-1 ON ROOF ABOVE. VERIFY AND LOCATE EXISTING CONCRETE JOIST PRIOR TO CUTTING PENETRATION. DO NOT LOCATE PENETRATION AT EXISTING JOIST. SEE DETAIL 6/S002. Item 37. Drawing E001, General Notes ADD K. Remove and relocate existing wireless access point devices in rooms requiring ceiling replacement. Refer to reflected ceiling plans on Drawing A151. Item 38. Drawing ED102 – Second Floor Demolition Plan DELETE in its entirety. REPLACE with revised Drawing ED102 attached. Item 39. Drawing E101, General Notes ADD H. Provide card access controller in Electrical Room 1030. SNEE RENOVATION FOR COLOCATION OF EAS Addendum No. 2 AUGUST 25, 2020 Page 8 Item 40. Drawing E102, General Note ADD H. Provide card access controller with antenna. Locate in in Electrical Closet adjacent to Room 2122. Item 41. Drawing E104, General Note ADD H. Provide card access controller with antenna. Locate in in Electrical Closet adjacent to Room 4122. GENERAL REQUIREMENTS Item 42. General Requirements, 01 23 00 DELETE in its entirety. REPLACE with revo\ised 01 23 00, attached. Item 43. RFI Questions and Clarifications See attached RFI Log (Items 1-14) Attachments: Tech Spec 09 01 90.52 Drawings: AD102, AD104, AD105, A102, A105, A151, A162, A252, A301, A552, A601, P101R,, ED102 General Requirement 01 23 00 RFI Log (Items 1-14) ****END OF ADDENDUM**** SNEE HALL RENOVATION FOR COLOCATION OF EAS CORNELL UNIVERSITY ITHACA, NEW YORK 1921 MAINTENANCE REPAINTING-ADD2 09 01 90.52 - 1 SECTION 09 01 90.52 - MAINTENANCE REPAINTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. Section includes maintenance repainting as follows: 1. Cleaning, repair, patching, and preparation of existing substrates. 2. Patching substrates. 3. Repainting, including staining and varnishing of wood. 4. Electrostatic applied coating to existing metal substrates. B. Related Requirements: 1. Section 09 91 23 "Interior Painting," for paint materials and systems for new construction. 1.3 DEFINITIONS A. The following MPI gloss levels are defined in accordance with ASTM D 523. 1. Gloss Level 1: Not more than 5 units at 60 degrees and 10 units at 85 degrees. 2. Gloss Level 2: Not more than 10 units at 60 degrees and 10 to 35 units at 85 degrees. 3. Gloss Level 3: 10 to 25 units at 60 degrees and 10 to 35 units at 85 degrees. 4. Gloss Level 4: 20 to 35 units at 60 degrees and not less than 35 units at 85 degrees. 5. Gloss Level 5: 35 to 70 units at 60 degrees. 6. Gloss Level 6: 70 to 85 units at 60 degrees. 7. Gloss Level 7: More than 85 units at 60 degrees. 1.4 SEQUENCING AND SCHEDULING A. Perform maintenance repainting in the following sequence, which includes work specified in this and other Sections: 1. Dismantle existing surface-mounted objects and hardware except items indicated to remain in place. Tag items with location identification and protect. 2. Verify that temporary protections have been installed. SNEE HALL RENOVATION FOR COLOCATION OF EAS CORNELL UNIVERSITY ITHACA, NEW YORK 1921 MAINTENANCE REPAINTING-ADD2 09 01 90.52 - 2 3. Examine condition of surfaces to be painted. 4. Perform repairs required to achieve smooth, sound surface ready to receive paint. 5. Remove existing paint to the degree required for each substrate and surface condition of existing paint. 6. Apply paint system. 7. Reinstall dismantled surface-mounted objects and hardware unless otherwise indicated. 1.5 ACTION SUBMITTALS A. Product Data: For each type of product. 1. Include recommendations for product application and use. 2. Include test data substantiating that products comply with requirements. B. Samples: For each type of paint system and each pattern, color, and gloss; in sizes indicated below. 1. Include a list of materials for each coat of each Sample. 2. Label each Sample for location and application. 3. Sample Size: a. Painted Surfaces: 4-by-8-inch Samples for each color and material, on hardboard. b. Stained or Natural Wood: 12-by-12-inch Samples of natural- or stained-wood finish, on representative surfaces. C. Product List: For each paint product indicated, include the following: 1. Cross-reference to paint system and locations of application areas. Use same designations indicated on Drawings and in schedules. 2. Printout of current "MPI Approved Products List" for each MPI-product category specified in paint systems, with the proposed product highlighted. 3. VOC content. 1.6 QUALITY ASSURANCE A. Color Matching: Custom computer-match paint colors to match Architect's samples. B. Mockups: Prepare mockups of maintenance repainting processes for each type of coating system and substrate indicated and each color and finish required to demonstrate aesthetic effects and to set quality standards for materials and execution. Duplicate appearance of approved Sample submittals. 1. Locate mockups on existing surfaces where directed by Architect. 2. Surface-Preparation Mockups: On existing surfaces using applicable specified methods of cleaning and other surface preparation, provide mockup sample of at least 100 sq. ft. SNEE HALL RENOVATION FOR COLOCATION OF EAS CORNELL UNIVERSITY ITHACA, NEW YORK 1921 MAINTENANCE REPAINTING-ADD2 09 01 90.52 - 3 3. Coating Mockups: One surface of at least 100 sq. ft. to represent surfaces and conditions for application of each type of coating system under same conditions as the completed Work. 4. Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless Architect specifically approves such deviations in writing. 5. Subject to compliance with requirements, approved mockups may become part of the completed Work if undisturbed at time of Substantial Completion. 1.7 DELIVERY, STORAGE, AND HANDLING A. Store materials not in use in tightly covered containers in well-ventilated areas with ambient temperatures continuously maintained at not less than 45 deg F. 1. Maintain containers in clean condition, free of foreign materials and residue. 2. Remove rags and waste daily. 1.8 FIELD CONDITIONS A. Apply paints only when temperature of surfaces to be painted and ambient air temperatures are between 50 and 95 deg F. PART 2 - PRODUCTS 2.1 PREPARATORY CLEANING MATERIALS A. Water: Potable. B. Detergent Solution: Solution prepared by mixing 2 cups of tetrasodium pyrophosphate (TSPP), ½ cup of laundry detergent that contains no ammonia, 5 quarts of 5 percent sodium hypochlorite bleach, and 15 quarts of warm water for every 5 gal. of solution required. C. Mildewcide: Commercial proprietary mildewcide or a job-mixed solution prepared by mixing ⅓ cup of household detergent that contains no ammonia, 1 quart of 5 percent sodium hypochlorite bleach, and 3 quarts of warm water. D. Abrasives for Ferrous Metal Cleaning: Aluminum oxide paper, emery paper, fine steel wool, steel scrapers, and steel-wire brushes of various sizes. E. Rust Remover: Manufacturer's standard phosphoric acid-based gel formulation, also called "naval jelly," for removing corrosion from iron and steel. SNEE HALL RENOVATION FOR COLOCATION OF EAS CORNELL UNIVERSITY ITHACA, NEW YORK 1921 MAINTENANCE REPAINTING-ADD2 09 01 90.52 - 4 2.2 PAINT REMOVERS A. Low-Odor, Solvent-Type Paste Paint Remover: Manufacturer's standard low-odor, water- rinsable, solvent-type paste, gel, or foamed emulsion formulation for removing paint from masonry, stone, wood, plaster, or metal as required to suit Project; and containing no methanol or methylene chloride. 1. Products: Subject to compliance with requirements, available products that may be incorporated into the Work include, but are not limited to, the following: a. ABR Products, Inc.; ABR Citrus Paint Removers or Super Bio Strip Gel. b. Cathedral Stone Products, Inc.; S-301, S-303, or S-305. c. Dumond Chemicals, Inc.; Peel Away 7 without paper covering, Smart Strip, or Smart Strip Pro. d. EaCo Chem, Inc.; InStrip. e. PROSOCO, Inc.; Enviro Klean SafStrip or Enviro Klean SafStrip 8. 2.3 PAINT MATERIALS, GENERAL A. MPI Standards: Provide products that comply with MPI standards indicated and that are listed in its "MPI Approved Products List." B. Material Compatibility: 1. Provide materials for use within each paint system that are compatible with one another and substrates indicated, under conditions of service and application as demonstrated by manufacturer, based on testing and field experience. 2. For each coat in a paint system, provide products recommended in writing by manufacturers of topcoat for use in paint system and on substrate indicated. C. VOC Content: For interior paints and coatings applied at Project site, the following VOC limits, exclusive of colorants added to a tint base: 1. Flat Paints and Coatings: 50 g/L. 2. Nonflat Paints and Coatings: 50 g/L. 3. Primers, Sealers, and Undercoaters: 100 g/L. 4. Anticorrosive and Antirust Paints Applied to Ferrous Metals: 100 g/L. D. Colors: Match Architect's samples. E. Transition Coat: Paint manufacturer's recommended coating for use where a residual existing coating is incompatible with the paint system. SNEE HALL RENOVATION FOR COLOCATION OF EAS CORNELL UNIVERSITY ITHACA, NEW YORK 1921 MAINTENANCE REPAINTING-ADD2 09 01 90.52 - 5 2.4 PAINT MATERIAL MANUFACTURERS A. Basis-of-Design Product: Subject to compliance with requirements, provide products indicated in Interior Maintenance Repainting Schedule at the end of Part 3, or comparable product by one of the following: 1. Benjamin Moore & Co. 2. PPG Architectural Coatings. 3. Pratt & Lambert. 4. Sherwin-Williams Company (The). 2.5 PATCHING MATERIALS A. Metal-Patching Compound: Two-part, polyester-resin, metal-patching compound; knife-grade formulation as recommended in writing by manufacturer for type of metal repair indicated, tooling time required for the detail of work, and site conditions. Compound shall be produced for filling metal that has deteriorated from corrosion. Filler shall be capable of filling deep holes and spreading to feather edge. B. Gypsum-Plaster Patching Compound: Finish coat plaster and bonding compound according to ASTM C 842 and manufacturer's written instructions. C. Gypsum Board Patching Compound: Setting-type joint taping compound according to ASTM C 475; paper tape where required. D. Wood-Patching Compound: Two-part, epoxy-resin, wood-patching compound; knife-grade formulation as recommended in writing by manufacturer for type of wood repair indicated, tooling time required for the detail of work, and site conditions. Compound shall be designed for filling voids in damaged wood materials that have deteriorated from weathering and decay. Compound shall be capable of filling deep holes and spreading to feather edge. 1. Use patching products that match natural color of wood. PART 3 - EXECUTION 3.1 PROTECTION A. Comply with each manufacturer's written instructions for protecting building and other surfaces against damage from exposure to its products. 3.2 MAINTENANCE REPAINTING, GENERAL A. Maintenance Repainting Appearance Standard: Completed work is to have a uniform appearance as viewed by Architect from building interior at 5 feet away from painted surface. SNEE HALL RENOVATION FOR COLOCATION OF EAS CORNELL UNIVERSITY ITHACA, NEW YORK 1921 MAINTENANCE REPAINTING-ADD2 09 01 90.52 - 6 B. Execution of the Work: In repainting surfaces, disturb them as minimally as possible and as follows: 1. Remove failed coatings and corrosion and repaint. 2. Verify that substrate surface conditions are suitable for repainting. 3. Allow other trades to repair items in place before repainting. 4. Repaint with sufficient coats to produce uniform appearance. C. Perform each cleaning method indicated in a manner that results in uniform coverage of all surfaces, including corners, moldings, and interstices, and that produces an even effect without streaking or damaging surfaces. D. Perform additional general cleaning, paint and stain removal, and spot cleaning of small areas that are noticeably different when viewed according to the "Maintenance Repainting Appearance Standard" Paragraph, so that cleaned surfaces blend smoothly into surrounding areas. E. Mechanical Abrasion: Where mechanical abrasion is needed for the work, use gentle methods, such as scraping and lightly hand sanding, that will not abrade softer substrates, reducing clarity of detail. F. Heat Processes: Do not use torches, heat guns, or heat plates. 3.3 EXAMINATION A. Examine substrates and conditions, with Installer present, for compliance with requirements for maximum moisture content and other conditions affecting performance of painting work. Comply with paint manufacturer's written instructions for inspection. B. Maximum Moisture Content of Substrates: Do not begin application of coatings unless moisture content of exposed surface is below the maximum value recommended in writing by paint manufacturer and not greater than the following maximum values when measured with an electronic moisture meter appropriate to the substrate material: 1. Gypsum Board: 12 percent. 2. Gypsum Plaster: 12 percent. 3. Wood: 15 percent. C. Alkalinity: Do not begin application of coatings unless surface alkalinity is within range recommended in writing by paint manufacturer. Conduct alkali testing with litmus paper on exposed plaster, cementitious, and masonry surfaces. D. Verify suitability of substrates, including surface conditions and compatibility with existing finishes and primers. 1. If existing surfaces cannot be prepared to an acceptable condition for proper finishing by using specified surface-preparation methods, notify Architect in writing. CORNELL UNIVERSITY SNEE HALL RENOVATION FACILITIES CONTRACTS FOR COLOCATION OF EAS 121 HUMPHREYS SERVICE BUILDING ITHACA, NEW YORK 14853-3701 ADDENDUM NO. 2 AUGUST 25, 2020 This Addendum contains changes to the requirements of the Contract Documents and Specifications. Such changes are to be incorporated into the Construction Documents and shall apply to the work with the same meaning and force as if they had been included in the original document. Wherever this Addendum modifies a portion of a paragraph of the specifications or a portion of any Drawing, the remainder of the Paragraph or Drawing shall remain in force. NOTE: Provisions of all Contract Documents apply. TECHNICAL SPECIFCATIONS Item 1. Section 09 01 90.52 DELETE in its entirety. REPLACE with revised Section 09 01 90.52, attached Item 2. Section 211313, Paragraph 1.5.Item F ADD 4. Tom Jordan - CU Fire Protection Engineer. Section 211313, Paragraph 3.1.Item A DELETE in its entirety. REPLACE with A. Obtain fire-flow test information from Cornell EHS. Section 211313, Paragraph 3.8,.Item A ADD 5. Sprinkler testing to be conducted at system pressure for two hours unless new work can be isolated and tested at 200 psi. Verify gauge is installed for pressure test." SNEE RENOVATION FOR COLOCATION OF EAS Addendum No. 2 AUGUST 25, 2020 Page 2 Item 3. Section 224213.13, Article 2.2. DELETE in its entirety. REPLACE with 2.2 FLUSHOMETER VALVES A. Solenoid-Actuator, Diaphragm Flushometer Valves Type 1: 1. Basis-of-Design Product: Subject to compliance with requirements, provide product indicated on Drawings or comparable product by one of the following: a. Delany Products. b. Gerber Plumbing Fixtures LLC. c. Sloan Valve Company. d. Zurn Industries, LLC. 2. Standard: ASSE 1037. 3. Minimum Pressure Rating: 125 psig. 4. Features: Include integral check stop and backflow-prevention device. 5. Material: Brass body with corrosion-resistant components. 6. Exposed Flushometer-Valve Finish: Chrome plated. 7. Style: Exposed. 8. Actuator: Solenoid complying with UL 1951, and listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application. 9. Trip Mechanism: Battery-powered electronic sensor complying with UL 1951, and listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application. 10. Consumption: 1.28 gal. per flush. 11. Minimum Inlet: NPS 1. 12. Minimum Outlet: NPS 1-1/4. SNEE RENOVATION FOR COLOCATION OF EAS Addendum No. 2 AUGUST 25, 2020 Page 3 Item 4. Section 224216.13, Article 2.2. DELETE in its entirety. REPLACE with 2.2 SOLID-BRASS, AUTOMATICALLY OPERATED LAVATORY FAUCETS A. NSF Standard: Comply with NSF 372 for faucet materials that will be in contact with potable water. B. Lavatory Faucets Type 1: Automatic-type, battery-powered, electronic-sensor-operated, mixing, solid-brass valve. 1. Basis-of-Design Product: Subject to compliance with requirements, provide product indicated on Drawings or comparable product by one of the following: a. American Standard. b. Bradley Corporation. c. Chicago Faucets; Geberit Company. d. Gerber Plumbing Fixtures LLC. e. GROHE America, Inc. f. Hydrotek International, Inc. g. Kohler Co. h. Moen Incorporated. i. Sloan Valve Company. j. Speakman Company. k. Stern Engineering Ltd. l. T&S Brass and Bronze Works, Inc. m. TOTO USA, INC. n. Zurn Industries, LLC. 2. Standards: ASME A112.18.1/CSA B125.1 and UL 1951. 3. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application. 4. General: Include hot- and cold-water indicators; coordinate faucet inlets with supplies and fixture hole punchings; coordinate outlet with spout and fixture receptor. 5. Body Type: Single hole with 4-inch center cover plate. 6. Body Material: Commercial, solid brass. 7. Finish: Polished chrome plate. 8. Maximum Flow Rate: 0.5 gpm. 9. Mounting Type: Deck, concealed. 10. Spout: Rigid type. 11. Spout Outlet: Aerator. 12. Drain: Not part of faucet. SNEE RENOVATION FOR COLOCATION OF EAS Addendum No. 2 AUGUST 25, 2020 Page 4 DRAWINGS Item 5. Drawing AR101 ADD scale indicator - 1/8” = 1’-0” Item 6. Drawing AR102 ADD scale indicator - 1/8” = 1’-0” Item 7. Drawing AR103 ADD scale indicator - 1/8” = 1’-0” Item 8. Drawing AD101 ADD scale indicator - 1/8” = 1’-0” Item 9. Drawing AD102 DELETE in its entirety. REPLACE with revised Drawing AD102, attached. Item 10. Drawing AD103 ADD scale indicator - 1/8” = 1’-0” Item 11. Drawing AD104 DELETE in its entirety. REPLACE with revised Drawing AD104 attached. Item 12. Drawing AD105 DELETE in its entirety. REPLACE with revised Drawing AD105 attached. Item 13. Drawing A101 ADD scale indicator - 1/8” = 1’-0” Item 14. Drawing A102 DELETE in its entirety. REPLACE with revised Drawing A102 attached. Item 15. Drawing A103 ADD scale indicator - 1/8” = 1’-0” Item 16. Drawing A104 ADD scale indicator - 1/8” = 1’-0” SNEE RENOVATION FOR COLOCATION OF EAS Addendum No. 2 AUGUST 25, 2020 Page 5 Item 17. Drawing A105 DELETE in its entirety. REPLACE with revised Drawing A105, attached. Item 18. Drawing A151 DELETE in its entirety. REPLACE with revised Drawing A151, attached. Item 19. Drawing A161 ADD scale indicator - 1/8” = 1’-0” Item 20. Drawing A162 DELETE in its entirety. REPLACE with revised Drawing A162, attached. Item 21. Drawing A163 ADD scale indicator - 1/8” = 1’-0” Item 22. Drawing A164 ADD scale indicator - 1/8” = 1’-0” Item 23. Drawing A252 DELETE in its entirety. REPLACE with revised Drawing A252, attached. Item 24. Drawing A301 DELETE in its entirety. REPLACE with revised Drawing A301, attached. Item 25. Drawing A552 DELETE in its entirety. REPLACE with revised Drawing A552, attached. Item 26. Drawing A601 DELETE in its entirety. REPLACE with revised Drawing A601, attached. SNEE RENOVATION FOR COLOCATION OF EAS Addendum No. 2 AUGUST 25, 2020 Page 6 Item 27. Drawing A801 ADD scale indicator - 1/8” = 1’-0” Item 28. Drawing A802 ADD scale indicator - 1/8” = 1’-0” Item 29. Drawing A803 ADD scale indicator - 1/8” = 1’-0” Item 30. Drawing A804 ADD scale indicator - 1/8” = 1’-0” Item 31. Drawing P001 – Drawing Index, Symbol List & Abbreviations a. Plumbing Fixture Schedule, "Basin Fixtures," Lav A – Col. – Faucet Operation – DELETE "Manual" and REPLACE with "Sensor." Col. – Handle Type – DELETE "Lever" and REPLACE with "N/A." Col. – Faucet Manufacturer – DELETE "Moen" and REPLACE with "Sloan." Col. – Faucet Model – DELETE "8215F05" and REPLACE with "EAF-150-1SM" b. Plumbing Fixture Schedule, "Flushing Fixtures" Col. – Flush Method – DELETE "Manual" and REPLACE with "Sensor." Col. – Flush Valve Model – DELETE "111.1.28" and REPLACE with "REGAL 111 SFSM-1.2B." Item 32. Drawing P101 – First Floor Plan - Plumbing DELETE in its entirety. REPLACE with revised Drawing P101R, attached. Item 33. Drawing P102, Plumbing Keyed Notes , P19 DELETE in its entirety. REPLACE with P19 VERIFY AND LOCATE CONCRETE JOISTS PRIOR TO CORE DRILLING FLOOR. DO NOT LOCATE PENETRATION AT EXISTING JOIST. SEE DETAIL 6/S002. Item 34. Drawing P103, Plumbing Keyed Notes, P19 DELETE in its entirety. REPLACE with P19 VERIFY AND LOCATE CONCRETE JOISTS PRIOR TO CORE DRILLING FLOOR. DO NOT LOCATE PENETRATION AT EXISTING JOIST. SEE DETAIL 6/S002. SNEE RENOVATION FOR COLOCATION OF EAS Addendum No. 2 AUGUST 25, 2020 Page 7 Item 35. Drawing M103 – Third Floor Plan HVAC, Note – “ 12x4 ea duct up w/ fd in wall stud space….” DELETE in its entirety.R EPLACE with 12x4 EA DUCT UP W/ FD IN WALL STUD SPACE.VERIFY AND LOCATE EXISTING CONCRETE JOIST PRIOR TO CUTTING PENETRATION. DO NOT LOCATE PENETRATION AT EXISTING JOIST. SEE DETAIL 6/S002. Item 36. Drawing M104 – Fourth Floor Plan HVAC a. Note – “12x4 ea duct dn to floor….” DELETE in its entirety. REPLACE with “12x4 EA DUCT DN TO FLOOR BELOW IN WALL STUD SPACE. VERIFY AND LOCATE EXISTING CONCRETE JOIST PRIOR TO CUTTING PENETRATION. DO NOTLOCATE PENETRATION AT EXISTING JOIST. SEE DETAIL 6/S002. b. Note – “10 x 10 duct up w/…” DELETE in its entirety. REPLACE with 10x10 EA DUCT UP W/ AAD TO EF-1 ON ROOF ABOVE. VERIFY AND LOCATE EXISTING CONCRETE JOIST PRIOR TO CUTTING PENETRATION. DO NOT LOCATE PENETRATION AT EXISTING JOIST. SEE DETAIL 6/S002. Item 37. Drawing E001, General Notes ADD K. Remove and relocate existing wireless access point devices in rooms requiring ceiling replacement. Refer to reflected ceiling plans on Drawing A151. Item 38. Drawing ED102 – Second Floor Demolition Plan DELETE in its entirety. REPLACE with revised Drawing ED102 attached. Item 39. Drawing E101, General Notes ADD H. Provide card access controller in Electrical Room 1030. SNEE RENOVATION FOR COLOCATION OF EAS Addendum No. 2 AUGUST 25, 2020 Page 8 Item 40. Drawing E102, General Note ADD H. Provide card access controller with antenna. Locate in in Electrical Closet adjacent to Room 2122. Item 41. Drawing E104, General Note ADD H. Provide card access controller with antenna. Locate in in Electrical Closet adjacent to Room 4122. GENERAL REQUIREMENTS Item 42. General Requirements, 01 23 00 DELETE in its entirety. REPLACE with revo\ised 01 23 00, attached. Item 43. RFI Questions and Clarifications See attached RFI Log (Items 1-14) Attachments: Tech Spec 09 01 90.52 Drawings: AD102, AD104, AD105, A102, A105, A151, A162, A252, A301, A552, A601, P101R,, ED102 General Requirement 01 23 00 RFI Log (Items 1-14) ****END OF ADDENDUM**** SNEE HALL RENOVATION FOR COLOCATION OF EAS CORNELL UNIVERSITY ITHACA, NEW YORK 1921 MAINTENANCE REPAINTING-ADD2 09 01 90.52 - 7 E. Begin coating application only after unsatisfactory conditions have been corrected and surfaces are dry. 1. Beginning coating application constitutes Contractor's acceptance of substrates and conditions. 3.4 PREPARATORY CLEANING A. General: Use the gentlest, appropriate method necessary to clean surfaces in preparation for painting. Clean all surfaces, corners, contours, and interstices. B. Detergent Hand Cleaning: Wash surfaces by hand using clean rags, sponges, and bristle brushes. Scrub surface with detergent solution and bristle brush until soil is thoroughly dislodged and can be removed by rinsing. Use small brushes to remove soil from joints and crevices. Dip brush in solution often to ensure that adequate fresh detergent is used and that surface remains wet. Rinse with water applied by clean rags or sponges. C. Solvent Cleaning: Use solvent cleaning to remove oil, grease, smoke, and other contaminants from painted or unpainted surfaces before other preparation work. Wipe surfaces with solvent using clean rags and sponges. If necessary, spot-solvent cleaning may be employed just prior to commencement of paint application, provided enough time is allowed for complete evaporation. Use clean solvent and clean rags for the final wash to ensure that all foreign materials have been removed. Do not use solvents, including primer thinner and turpentine, that leave residue. D. Mildew: Clean off existing mildew by scrubbing with bristle brush or sponge and detergent solution. Scrub mildewed areas with mildewcide. Rinse with water applied by clean rags or sponges. E. Chemical Rust Removal: 1. Remove loose rust scale with specified abrasives for ferrous-metal cleaning. 2. Apply rust remover with brushes or as recommended in writing by manufacturer. 3. Allow rust remover to remain on surface for period recommended in writing by manufacturer or as determined by preconstruction testing. Do not allow extended dwell time. 4. Wipe off residue with mineral spirits and either steel wool or soft rags, or clean with method recommended in writing by manufacturer to remove residue. 5. Dry immediately with clean, soft cloths. Follow direction of grain in metal. 6. Prime immediately to prevent rust. Do not touch cleaned metal surface until primed. F. Mechanical Rust Removal: 1. Remove rust with specified abrasives for ferrous-metal cleaning. Clean to bright metal. 2. Wipe off residue with mineral spirits and either steel wool or soft rags. 3. Dry immediately with clean, soft cloths. Follow direction of grain in metal. 4. Prime immediately to prevent rust. Do not touch cleaned metal surface until primed. SNEE HALL RENOVATION FOR COLOCATION OF EAS CORNELL UNIVERSITY ITHACA, NEW YORK 1921 MAINTENANCE REPAINTING-ADD2 09 01 90.52 - 8 3.5 PAINT REMOVAL A. General: Remove paint where indicated. Where cleaning methods have been attempted and further removal of the paint is required because of incompatible or unsatisfactory surfaces for repainting, remove paint to extent required by conditions. 1. Application: Apply paint removers according to paint-remover manufacturer's written instructions. Do not allow paint removers to remain on surface for periods longer than those indicated or recommended in writing by manufacturer. a. Apply materials to all surfaces, corners, contours, and interstices, to provide a uniform final appearance without streaks. b. After work is complete, remove protection no longer required. Remove tape and adhesive marks. 2. Brushes: Use brushes that are resistant to chemicals being used. a. Metal Substrates: If using wire brushes on metal, use brushes of same metal composition as metal being treated. B. Paint Removal with Hand Tools: Remove paint manually using hand-held scrapers, wire brushes, sandpaper, and metallic wool as appropriate for the substrate material. C. Paint Removal with Alkaline Paste Paint Remover: 1. Remove loose and peeling paint using water, scrapers, stiff brushes, or a combination of these. Let surface dry thoroughly. 2. Apply paint remover to dry, painted surface with brushes. 3. Allow paint remover to remain on surface for period recommended in writing by manufacturer or as determined by preconstruction testing. 4. Remove chemicals and paint residue by the following methods, as recommended in writing by paint remover manufacturer: a. Rinse with cold or hot water applied by low or medium-pressure spray. b. Use mechanical removal methods. 5. Repeat process if necessary to remove all paint. 3.6 SUBSTRATE REPAIR A. General: Repair substrate surface defects that are inconsistent with the surface appearance of adjacent materials and finishes. B. Gypsum-Plaster and Gypsum-Board Substrates: 1. Repair defects including dents and chips more than ⅛ inch in size and all holes and cracks by filling with gypsum-plaster patching compound and sanding smooth. Remove protruding fasteners. SNEE HALL RENOVATION FOR COLOCATION OF EAS CORNELL UNIVERSITY ITHACA, NEW YORK 1921 MAINTENANCE REPAINTING-ADD2 09 01 90.52 - 9 2. Rout out surface cracks to remove loose, unsound material; fill with patching compound and sand smooth. C. Metal Substrate: 1. Preparation: Treat repair locations by wire-brushing and solvent cleaning. Use chemical or mechanical rust removal method to clean off rust. 2. Defects in Metal Surfaces: Repair non-load-bearing defects in existing metal surfaces, including dents and gouges more than 1/16 inch deep or ½ inch across and all holes and cracks by filling with metal-patching compound and sanding smooth. Remove burrs and protruding fasteners. 3. Priming: Prime iron and steel surfaces immediately after repair to prevent flash rusting. Stripe paint corners, crevices, bolts, welds, and sharp edges. Apply two coats to surfaces that are inaccessible after completion of the Work. D. Wood Substrate: 1. Repair wood defects including dents and gouges more than ⅛ inch in size and all holes and cracks by filling with wood-patching compound and sanding smooth. Reset or remove protruding fasteners. 2. Where existing paint is allowed to remain, sand irregular buildup of paint, runs, and sags to achieve a uniformly smooth surface. 3. Remove peeling or bubbled veneer to area with sound adhesion. a. For opaque finish: Patch veneer matching pores, texture, and grain direction, finish patches level and smooth with adjacent veneer. b. For transparent finish: Patch veneer with excellent color matching and the same species and cut, locate edges of patches to hide seams or re-veneer entire surface is seams cannot be blended. 3.7 PAINT APPLICATION, GENERAL A. Comply with manufacturers' written instructions for application methods unless otherwise indicated in this Section. B. Prepare surfaces to be painted according to the Surface-Preparation Schedule and with manufacturer's written instructions for each substrate condition. C. Apply a transition coat over incompatible existing coatings. D. Metal Substrate: Stripe paint corners, crevices, bolts, welds, and sharp edges before applying full coat. Apply two coats to surfaces that are inaccessible after completion of the Work. Tint stripe coat different than the main coating and apply with brush. E. Blending Painted Surfaces: When painting new substrates patched into existing surfaces or touching up missing or damaged finishes, apply coating system specified for the specific substrate. Apply final finish coat over entire surface from edge to edge and corner to corner. SNEE HALL RENOVATION FOR COLOCATION OF EAS CORNELL UNIVERSITY ITHACA, NEW YORK 1921 MAINTENANCE REPAINTING-ADD2 09 01 90.52 - 10 3.8 CLEANING AND PROTECTION A. At end of each workday, remove rubbish, empty cans, rags, and other discarded materials from Project site. B. After completing paint application, clean spattered surfaces. Remove spattered paints by washing, scraping, or other methods. Do not scratch or damage adjacent finished surfaces. C. Protect work of other trades against damage from paint application. Correct damage to work of other trades by cleaning, repairing, replacing, and refinishing, as approved by Architect, and leave in an undamaged condition. D. At completion of construction activities of other trades, touch up and restore damaged or defaced painted surfaces. 3.9 SURFACE-PREPARATION SCHEDULE A. General: Before painting, prepare surfaces for painting according to applicable requirements specified in this schedule. 1. Examine surfaces to evaluate each surface condition according to paragraphs below. 2. Where existing degree of soiling prevents examination, preclean surface and allow it to dry before making an evaluation. 3. Repair substrate defects according to "Substrate Repair" Article. B. Surface Preparation for MPI DSD 0 Degree of Surface Degradation: 1. Surface Condition: Existing paint film in good condition and tightly adhered. 2. Paint Removal: Not required. 3. Preparation for Painting: Wash surface by detergent cleaning; use solvent cleaning where needed. Roughen or degloss cleaned surfaces to ensure paint adhesion according to paint manufacturer's written instructions. C. Surface Preparation for MPI DSD 1 Degree of Surface Degradation: 1. Surface Condition: Paint film cracked or broken but adhered. 2. Paint Removal: Scrape by hand-tool cleaning methods to remove loose paint until only tightly adhered paint remains. 3. Preparation for Painting: Wash surface by detergent cleaning; use other cleaning methods for small areas of bare substrate if required. Roughen, degloss, and sand the cleaned surfaces to ensure paint adhesion and a smooth finish according to paint manufacturer's written instructions. D. Surface Preparation for MPI DSD 2 Degree of Surface Degradation: 1. Surface Condition: Paint film loose, flaking, or peeling. 2. Paint Removal: Remove loose, flaking, or peeling paint film by hand-tool or chemical paint-removal methods. SNEE HALL RENOVATION FOR COLOCATION OF EAS CORNELL UNIVERSITY ITHACA, NEW YORK 1921 MAINTENANCE REPAINTING-ADD2 09 01 90.52 - 11 3. Preparation for Painting: Wash surface by detergent cleaning; use solvent cleaning where needed. Use other cleaning methods for small areas of bare substrate if required. Sand surfaces to smooth remaining paint film edges. Prepare bare cleaned surface to be painted according to paint manufacturer's written instructions for substrate construction materials. 3.10 INTERIOR MAINTENANCE REPAINTING SCHEDULE A. Ferrous Metal Substrates (excluding radiator covers in offices): 1. Latex System: MPI RIN 5.1N system over a transition coat. a. Prime Coat Conditions: 1) For MPI DSD 0 degree of surface degradation, no primer required. 2) For MPI DSD 1 degree of surface degradation, touch up with topcoat. 3) For MPI DSD 2 degree of surface degradation, spot prime with primer. b. Prime Coat: Primer, Metal, Surface Tolerant, MPI #23. 1) Benjamin Moore; Coronado Rust Scat Metal Primer. c. Intermediate Coat: Latex matching topcoat. d. Topcoat: Latex, interior, semigloss (Gloss Level 5), MPI #54. 1) Benjamin Moore; Natura Waterborne Interior Semi-Gloss. B. Metal Substrates (radiator covers in offices): 1. Electrostatic Alkyd Enamel System. a. Prime Coat Conditions: 1) For MPI DSD 0 degree of surface degradation, no primer required. 2) For MPI DSD 1 degree of surface degradation, touch up with topcoat. 3) For MPI DSD 2 degree of surface degradation, spot prime with primer. b. Prime Coat: Primer, Metal, Surface Tolerant, MPI #79. 1) Benjamin Moore; Corotech V140 Alkyd Metal Primer. c. Intermediate Coat: Alkyd Enamel matching topcoat. d. Topcoat: Alkyd Enamel, interior, semigloss (Gloss Level 5). 1) Benjamin Moore; Corotech V260 Electrostatic Semi-gloss Enamel. C. Gypsum Board and Plaster: 1. Institutional Low-Odor/VOC Latex System over Waterborne Primer: MPI RIN 9.2M: SNEE HALL RENOVATION FOR COLOCATION OF EAS CORNELL UNIVERSITY ITHACA, NEW YORK 1921 MAINTENANCE REPAINTING-ADD2 09 01 90.52 - 12 a. Prime Coat Conditions: 1) For MPI DSD 0 degree of surface degradation, no primer required. 2) For MPI DSD 1 degree of surface degradation, touch up with topcoat. 3) For MPI DSD 2 degree of surface degradation, spot prime with primer. b. Prime Coat: Primer, Stain Blocking, Water Based, MPI #137. 1) Benjamin Moore; Sure Seal Latex Primer Sealer. c. Topcoat, Ceilings and Soffits: Latex, interior, institutional low odor/VOC flat (Gloss Level 1), MPI #143. 1) Benjamin Moore; Ultra Spec 500 Interior Flat Finish. d. Topcoat, Walls: Latex, interior, institutional low odor/VOC (Gloss Level 2), MPI #144. 1) Benjamin Moore; Ultra Spec 500 Interior Low-Sheen Finish. D. Wood Paneling and Millwork: 1. Polyurethane Varnish Satin Finish System (Over Stain): MPI RIN 6.4G. a. Stain Coat: Stain, semitransparent, for interior wood, MPI #90. 1) Sherwin Williams; Minwax Performance Series Tintable Interior Wood Stain. b. Prime Coat: For MPI DSD 1 degree of surface degradation, touch up with topcoat. c. Prime Coat: For MPI DSD 2 degree of surface degradation, spot prime with topcoat. d. Prime Coat: For MPI DSD 3 degree of surface degradation, fully prime coat with topcoat. e. Intermediate Coat: Interior polyurethane matching topcoat. f. Topcoat: Varnish, interior, polyurethane, oil modified, satin (Gloss Level 4) MPI #57. 1) Sherwin Williams; Minwax Polyurethane Clear Satin. END OF SECTION 09 01 90.52 SNEE HALL RENOVATION FOR COLOCATION OF EAS CORNELL UNIVERSITY ITHACA, NEW YORK 1921 MAINTENANCE REPAINTING-ADD2 09 01 90.52 - 13 INTENTIONALLY LEFT BLANK REF.DEMOLITION NOTES:D1. DEMOLISH FLOORING AND WALL BASE, ENTIRE SPACE, TYPICALD2. DEMOLISH PARTITIONS.D3. DEMOLISH DOOR AND FRAME ASSEMBLYD4. SEE HAZMAT DRAWINGS FOR ABATEMENTD5. DEMOLISH CEILING TILE AND GRID, ENTIRE SPACE, TYPICALD6. SALVAGE MILLWORK FOR RE-USED7. REMOVE WATER FOUNTAIN SERVICE MODULE & CMU WALL BELOW.D8. REMOVE CEILING.D9. REMOVE METAL PLAQUE AND PATCH/ CLEAN CONCRETE.D10. REMOVE TACKBOARD AND DELIVER TO OWNER.D11. REMOVE HANDRAILS AND PATCH CONCRETE.D12. REMOVE & ABATE EXISTING COUNTERTOP, SINK, WALL & BASE CABINETS, COMPLETE. 20202024202220212029OPEN TO1ST FLOOROPEN TO1ST FLOOR2152215821572146OPEN TO 1ST20392159212021612013A21542122B20342001LOADINGDOCKOPEN TO 1STPATIOPATIOGARDEN2161B2157AUPUPDN UPUPDND1D1D1D1D1D5D1D1D1D1D1D1D5D6D1D5D1D5D1D5D1D1D1D1D1D1D4D4D3D4D2,D3D5D6DEMOLISH RAMP AND RAILINGSD2D7D3D3D2D1D5D3REMOVE EXISTING LIEBERT UNITREMOVE FURNITURE PARTITIONSREMOVE EXISTING RAISED ACCESS FLOORING TILE SYTEMD4D55'-0"3'-8"DCBD3FRAME TO REMAIND1D8D3D3D23'-0" 3'-0"3'-8"D4D5D4ALTERNATE 3CREATE OPENINGSSEE DETAILS - A601REMOVE PERIMETER TRIM AND RELATED CONSTRUCTION FROM THE TOP AND NORTH SIDE OF METAL BOOKCASE TO ALLOW INSTALLATION OF GYPSUM PARTITION, SALVAGE TRIM FOR REINSTALLATION, PROTECT BOOKCASE DURING CONSTRUCTION.REMOVE EXISTING ARTWORK, RELIQUISH TO OWNER.REMOVE EXISTING CEILING TRACK LIGHT FIXTURE, PATCH CEILING AS NEEDEDWARNING: It is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration.DATE:PROJECT:OTHER:DRAWN BY:ABCDEFGABCDEF1234567891012345678910NAD102SECONDFLOORDEMOLITIONPLAN7/30/202011365/ COB #1921YNPCORNELL UNIVERSITYConstruction DocumentsSnee Hall Renovation for Colocation of EAS112 Hollister Drive1/8" = 1'-0"A1SECOND FLOOR DEMO# Description Date2 Addendum #2 8/24/202022 DEMOLITION NOTES:D1. DEMOLISH FLOORING AND WALL BASE, ENTIRE SPACE, TYPICALD2. DEMOLISH PARTITIONS.D3. DEMOLISH DOOR AND FRAME ASSEMBLYD4. SEE HAZMAT DRAWINGS FOR ABATEMENTD5. DEMOLISH CEILING TILE AND GRID, ENTIRE SPACE, TYPICALD6. SALVAGE MILLWORK FOR RE-USED7. REMOVE WATER FOUNTAIN SERVICE MODULE & CMU WALL BELOW.D8. REMOVE CEILING.D9. REMOVE METAL PLAQUE AND PATCH/ CLEAN CONCRETE.D10. REMOVE TACKBOARD AND DELIVER TO OWNER.D11. REMOVE HANDRAILS AND PATCH CONCRETE.D12. REMOVE & ABATE EXISTING COUNTERTOP, SINK, WALL & BASE CABINETS, COMPLETE. 4126 4130 4132 4134 4136 4138 41404160415940244147416441424160B4160A4154C 4146A4154A4154B41584158A4154414641444149OPEN TO1ST FLOOROPEN TO1ST FLOOR41124108411641204122402140224002OPEN TO 1ST4102OPEN TO 1ST40014122B403441244146BUPUPDNDN4154D4161B4161C1454161A4161D4161D1D5D1D1D5D3D3D3D2D3D44146CUT BLOCK AT JOINT9'-0 3/32"D122WARNING: It is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration.DATE:PROJECT:OTHER:DRAWN BY:ABCDEFGABCDEF1234567891012345678910NAD104FOURTHFLOORDEMOLITIONPLAN7/30/202011365/ COB #1921YNPCORNELL UNIVERSITYConstruction DocumentsSnee Hall Renovation for Colocation of EAS112 Hollister Drive1/8" = 1'-0"A1FOURTH FLOOR DEMO# Description Date2 Addendum #2 8/24/202022 REMOVE ENTIRE EXISTING SKYLIGHT. PREPARE EXISTING CURB TO RECEIVE NEW SKYLIGHT SYSTEM.(SEE STRUCTURAL DRAWINGS)ALL SKYLIGHT ASSOCIATED WORK IS ALTERNATE #5REMOVE AND RETAIN EXISTING LOUVER FOR EXTENTS SHOWNREMOVE AND RETAIN EXISTING LOUVER FOR EXTENTS SHOWNWARNING: It is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration.DATE:PROJECT:OTHER:DRAWN BY:ABCDEFGABCDEF1234567891012345678910NAD105ROOFDEMOLITIONPLAN7/30/202011365/ COB #1921YNPCORNELL UNIVERSITYConstruction DocumentsSnee Hall Renovation for Colocation of EAS112 Hollister Drive1/8" = 1'-0"A1ROOF PLAN - DEMO# Description Date2 Addendum #2 8/24/202022 REF.210 SF2160BChair Office117 SF2160COffice127 SF2160DOffice170 SF2160AOffice202020242022202120292152215821572146OPEN TO 1ST2039215921542122B2034LOADINGDOCKOPEN TO 1STPATIOPATIOGARDEN2157AUPUPDN UPUPDN334 SF2160Admin Suite135 SF2102AOffice125 SF2102OfficeA252E6221 SF2108Office293 SF2112Office296 SF2116Office140 SF2118Office134 SF2120Office449 SF2122Shared Office202 SF2124Office204 SF2126Office203 SF2130Office203 SF2134Office97 SF2136Office96 SF2138Office195 SF2140Office200 SF2142Office130 SF2144Office472 SF2149SharedWorkspace924 SF2161AComputer Lab309 SF2161Workroom143 SF2161BIT Office59 SF2014ToiletA252E4A501F4A252C4C7C9A301BCC1A501F121022160B2160A2160C2160DA401F12149A1A301D1A301A401a9A401A72134567891011ABCDEFGHJKLM212020142161ALTERNATE 3: ATRIUM WINDOWSA501F45'-0"D2102AA1A253D3A253F6A253A3A253F7A253D7A253C7A253B7A253C3C6D4CLEAR12'-10 3/4"CLEAR5'-4"6'-0 3/4"13'-2 3/8"ALIGNLAMINATE 1/2" GYPSUM BOARD TO WALLS SHOWND7AAAAAA253B4A253A44'-8"BEQEQA252A1A301A7NOTE 7NOTE 7A253B8C.G.C.G.C.G.A552F6TYPMODIFY AND REINSTALL TRIM ON THE TOP AND NORTH SIDE OF THE BOOKCASE TO ACCOMODATE CONSTRUCTION.AAAAA1A601SIMA1A601SIMA252F42FLOOR PLAN NOTES:1. ALL WALLS TO BE WALL TYPE A UNLESS OTHERWISE NOTED2. PATCH ALL FLOOR PENETRATIONS TO MATCH EXISTING CONSTRUCTION. PROVIDE FINISHES AT ALL MEP REMOVAL LOCATIONS3. PATCH ALL WALL PENETRATIONS TO MATCH EXISTING ADJACENT CONSTRUCTION 4. PROVIDE BLOCKING AS REQUIRED AT ALL WALL-MOUNTED SHELVING, FURNITURE, A/V MONITORS AND ANCILLARY EQUIPMENT5.ROOF PENETRATION AND ROOF REPAIR MUST MAINTAIN EXISTING ROOF WARRANTY6. TAPERED PATCH FLOORS AT TRANSITIONS TO CORRIDORS FOR FLUSH ADA COMPLIANCE..7.PARTITIONS TO ALIGN WITH EXISTING WAFFLE SLAB RIB. ALERT ARCHITECT IF DIMENSIONS SHOWN DO NOT COINCIDE WITH EXISTING WAFFLE SLAB RIB LOCATIONS.8. C.G.: SS-PLATE CORNER GUARD9. ALL SKYLIGHT ASSOCIATED WORK -ALTERNATE 5WARNING: It is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration.DATE:PROJECT:OTHER:DRAWN BY:ABCDEFGABCDEF1234567891012345678910NA102SECONDFLOOR PLAN7/30/202011365/ COB #1921YNPCORNELL UNIVERSITYConstruction DocumentsSnee Hall Renovation for Colocation of EAS112 Hollister Drive# Description Date2 Addendum #2 8/24/20200'4'8'16'32'2 2134567891011ABCDEFGHJKLMA501A9SimA501A9SimA5A501SIMA7A501SIMC6A501SIMA1A501SIMA1A501SIMA3A501SIMA3A501SIMC6A501SIM12'-0"REINSTALL SALVAGED LOUVER FOR EXTENTS SHOWNREINSTALL RETAINED LOUVER FOR EXTENTS SHOWNCOORDINATE ROOFING WORK TO MAINTAIN ROOF WARRANTY AND PROVIDE DOCUMENTATION OF WARRANTY CONTINUANCE. TREMCO WARRANTY #114389.FLOOR PLAN NOTES:1. ALL WALLS TO BE WALL TYPE A UNLESS OTHERWISE NOTED2. PATCH ALL FLOOR PENETRATIONS TO MATCH EXISTING CONSTRUCTION. PROVIDE FINISHES AT ALL MEP REMOVAL LOCATIONS3. PATCH ALL WALL PENETRATIONS TO MATCH EXISTING ADJACENT CONSTRUCTION 4. PROVIDE BLOCKING AS REQUIRED AT ALL WALL-MOUNTED SHELVING, FURNITURE, A/V MONITORS AND ANCILLARY EQUIPMENT5.ROOF PENETRATION AND ROOF REPAIR MUST MAINTAIN EXISTING ROOF WARRANTY6. TAPERED PATCH FLOORS AT TRANSITIONS TO CORRIDORS FOR FLUSH ADA COMPLIANCE..7.PARTITIONS TO ALIGN WITH EXISTING WAFFLE SLAB RIB. ALERT ARCHITECT IF DIMENSIONS SHOWN DO NOT COINCIDE WITH EXISTING WAFFLE SLAB RIB LOCATIONS.8. C.G.: SS-PLATE CORNER GUARD9. ALL SKYLIGHT ASSOCIATED WORK -ALTERNATE 5WARNING: It is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration.DATE:PROJECT:OTHER:DRAWN BY:ABCDEFGABCDEF1234567891012345678910NA105ROOF PLAN7/30/202011365/ COB #1921YNPCORNELL UNIVERSITYConstruction DocumentsSnee Hall Renovation for Colocation of EAS112 Hollister Drive1/8" = 1'-0"A2ROOF PLAN# Description Date2 Addendum #2 8/24/20200'4'8'16'32'22 SDOS1134Map RoomEXISTING GYPSUM CEILING TO REMAINREPLACE LIGHT FIXTURES WITH NEW LED FIXTURESMOTORIZED ROLLER SHADE14'-2" V.I.F.F4A551SIM6'-4" V.I.F.6'-4" V.I.F.PROVIDE METAL FRAMING TO DECK ABOVE TO SUPPORT MICROPHONE. INSTALL MICROPHONE CEILING MOUNTING FRAME. COORDINATE WITH AV VENDOR.2'-0"PROVIDE SKYLIGHT PERFORMANCE FILM FOR ALL SLOPED GLAZINGSPEAKER HOLES IN FINISHED CEILING TO BE CUT BY GC. COORDINATE WITH AV VENDOR.LINEAR PENDANT LIGHT FIXTURELINEAR SURFACE MOUNTED LIGHT FIXTURELAY-IN DIRECT/INDIRECT LIGHT FIXTURES RECESSED CAN LIGHT FIXTURERETURN AIR GRILLESUPPLY AIR GRILLEMANUAL PROJECTION SCREENMOTORIZED PROJECTION SCREENSOFFIT MOUNTED LINEAR LIGHT FIXTURESSPRINKLER HEADEXIT SIGNFIRE DETECTOROCCUPANCY SENSORSPEAKERGYPSUM BOARD CEILING2' X 2' ACOUSTICAL PANEL CEILINGREFLECTED CEILING PLAN NOTES:1. ALL LAY-IN ACOUSTIC CEILINGS ARE 8'-8 1/2" ABOVE FINISHED FLOOR, UNLESS OTHERWISE NOTED.2. ALL GYPSUM SOFFITS AND CEILINGS ARE 8'-8" ABOVE FINISHED FLOOR, UNLESS OTHERWISE NOTED.3. MOUNT ALL SPRINKLER HEADS, ELECTRICAL DEVICES, LIGHT FIXTURES, ETC. CENTERED IN 2'X2' ACOUSTIC CEILING PANELS, UNLESS OTHERWISE NOTED.4. CENTER ACOUSTIC CEILING PANELS WITHIN FIELD AS INDICATED ON REFLECTED CEILING PLANS, PROVIDING NUMBER OF PANELS SHOWN, UNLESS OTHERWISE NOTED.5. REPAIR CEILINGS AFFECTED BY HVAC WORK.6. PROVIDE PROJECTOR MOUNT FRAMING AS NEEDED FOR INSTALL.7. REPAIR CEILINGS AFFECTED BY AV WORK. CEILING MATERIALS:LIGHT FIXTURES:OTHER:CEILING MOUNTED 2" ACOUSTICAL PANELPROJECTOR112161AComputer Lab2161Workroom2161BIT Office2149SharedWorkspace2014ToiletA4A551SIMA4A551SIM334 SF2160Admin Suite170 SF2160AOffice210 SF2160BChair Office117 SF2160COffice127 SF2160DOffice125 SF2102OfficeA4A551SIMA4A551SIMA4A551SIMA4A551SIMA4A551SIMA4A551SIMD4A551A4A551SIMA4A551SIMA1A551SIMF1A551SIM755 SF2152Classroom1D1A551SIM55 SF3116Kitchenette1140 SF3161SharedWorkspace717 SF3147SharedWorkspace59 SF3014ToiletA4A551SIMA4A551SIMD1A551SIMALTERNATE 1A1A551SIM453 SF4122Pryor Lab296 SF4120Office55 SF4114KitchenetteQUAD POWER CORD REEL, RELOCATED FROM BRADFIELD HALLCOORDINATE FINAL LOCATION WITH OWNER PAINT EXPOSED CONCRETETYP.2'-0"8'-0"10'-0"8'-0"5'-0"2'-0"D1A551SIM1/8" = 1'-0"F1PARTIAL FIRST FLOOR RCP - MAP ROOMWARNING: It is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration.DATE:PROJECT:OTHER:DRAWN BY:ABCDEFGABCDEF1234567891012345678910NA151PARTIALREFLECTEDCEILING PLANS7/30/202011365/ COB #1921MDCORNELL UNIVERSITYConstruction DocumentsSnee Hall Renovation for Colocation of EAS112 Hollister Drive1/8" = 1'-0"A1PARTIAL SECOND FLOOR RCP1/8" = 1'-0"D6PARTIAL THIRD FLOOR RCP1/8" = 1'-0"A6PARTIAL FOURTH FLOOR RCP# Description Date1 Addendum #1 08/12/20202 Addendum #2 8/24/20202 REF.B1W1F12160BChair OfficeB1W1F12160COfficeB1W1F12160DOfficeB1W1F12160AOffice1312551093256164820202024202220212029OPEN TO1ST FLOOR21522037215821572146OPEN TO 1ST20392159203520132013A2012A2012203621542122B203420012002LOADINGDOCKOPEN TO 1STPATIOPATIOGARDEN2157AUPUPDN UPUPDNB1W1F12160Admin SuiteB1W1F12102AOfficeB1W1F12102OfficeB1W1F12108OfficeB1W1F12142OfficeB1W1F12140OfficeB1W1F12138OfficeB1W1F12136OfficeB1W1F12134OfficeB1W1F12130OfficeB1W1F12126OfficeB1W1F12124OfficeB1W1F12122SharedOfficeB1W1F12112OfficeB1W1F12116OfficeB1W1F12144OfficeB1W1F12161AComputerLabB1W1F12149SharedWorkspaceB2W1F22161WorkroomB1W1F12161BIT OfficeB1W1F12118OfficeB1W1F12120OfficeB3W3/W4F32014ToiletVCT TO MATCH EXISTINGB1W1F12001CorridorREPAINT GYPSUM WALL BOARD SURFACES ON ALL FOUR LEVELSFWTP BFWTP BFWTP AFWTP BFWTP AW2REMOVE AND REPLACE STAINED, DAMAGED AND MISSING ACOUSTICAL CEILING TILES TO MATCH EXISTINGFINISH NOTES:1. ALL WALLS IN WORK AREAS TO BE PAINTED W1 UNLESS OTHERWISE NOTED.2. ALL GYPSUM BOARD CEILINGS IN WORK AREAS TO BE PAINTED W3 UNLESS OTHERWISE NOTED ON REFLECTED CEILING PLAN.3. HM DOORS / FRAMES AND PAINTED WINDOW TRIM / FRAMES SHALL BE PAINTED W1B UNLESS OTHERWISE NOTED.4. ALL WALL BASE TO BE B1 UNLESS OTHERWISE NOTED.5. ALL CEILING WITHIN WORK AREAS TO BE ACP UNLESS OTHERWISE NOTED. NO TILE TO BE CUT LESS THAN 6". REFER TO RCP FOR LAYOUT6. SEE INTERIOR ELEVATIONS FOR ADDITIONAL WALL AND BASE FINISHES, TYPICAL.7. SEE REFLECTED CEILING PLAN FOR ADDITIONAL FINISH INFORMATION, TYPICAL.8. SEE INTERIOR ELEVATIONS FOR WALL TILE LAYOUT AND LOCATION, TYPICAL.9. ALL FLOORING MATERIAL AND TRANSITIONS SHALL BE CENTERED UNDER THE DOOR IN THE CLOSED POSITION UNLESS OTHERWISE NOTED.10. MISCELLANEOUS ELECTRICAL PANEL COVERS, GRILLES, ETC. TO BE PAINTED TO MATCH ADJACENT WALL SURFACES.11. NO LUXURY VINYL TILE TO BE CUT LESS THAN 6", REFER TO FINISH PLAN FOR PATTERN.12. ALL METAL UNDER-COUNTER SUPPORT BRACKETS TO BE PAINTED TO MATCH ADJACENT WALL FINISH.13. EXISTING FIN TUB HEATER COVERS TO BE ELECTROSTATICALLY PAINTED TO MATCH ADJACENT WALL SURFACES IN ALL WORK AREAS WHERE EXISTING MECHANICAL REMAINS. PROVIDE COST PER OFFICE PER UNIT PRICE 1.14. FWTP: FABRIC WRAPPED TACK PANELS, INSTALLED WITH Z-CLIPSFWTP A: 3'6" WIDEFWTP B: 6' WIDEFWTP C: 10' WIDE.SEE INTERIOR ELEVATIONS FOR HEIGHT, TYP. 15. PROVIDE EPOXY PAINT ON ALL WALLS IN TOILET ROOMS. FINISH KEY:WALLW1PAINT COLOR 1W2PAINT COLOR 2W3PAINT COLOR 3W4 PORCELAIN TILE MOSAICPORCELAIN TILESOLID SURFACECOLOR 1: UNLESS OTHERWISE NOTEDCOLOR 2: IN ROOM 1134FINISH LEGEND:FLOORF1CARPET TILE 1F2 LUXURY VINYL TILE 1F3 PORCELAIN TILE 8X8BASEB1RESILIENT BASE COLOR 1B2RESILIENT BASE COLOR 2B3PORCELAIN TILE 8X4ROOM #WALLFLOORBASEFINISH TAGWARNING: It is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration.DATE:PROJECT:OTHER:DRAWN BY:ABCDEFGABCDEF1234567891012345678910NA162SECONDFLOOR FINISHPLAN7/30/202011365/ COB #1921YNPCORNELL UNIVERSITYConstruction DocumentsSnee Hall Renovation for Colocation of EAS112 Hollister Drive# Description Date2 Addendum #2 8/24/20200'4'8'16'32'22 INTERIOR ELEVATION NOTES:1.COORDINATE ALL AV WITH AV CONTRACTOR AND OWNER2.REFER TO FINISH SCHEDULE FOR BASE MATERIAL3. OFCI: OWNER FURNISHED CONTRACTOR INSTALLED. PROVIDE BLOCKING AS NEEDED.4. PATCH, REPAIR, AND REPAINT ANY DAMAGED WALL SURFACES FROM REMOVAL OF EXISTING BLACKBOARDS, MARKERBOARDR, TACKBOARDS, TYP. 5. GMB: GLASS MARKER BOARD; OFCI. COORDINATE FINAL LOCATIONS WITH ARCHITECT.6.EXISTING TO REMAIN AND BE PROTECTED FROM DAMAGE DURING CONSTRUCTION -MB: MARKER BOARD; CB: CHALK BOARD 7.FWTP: FABRIC WRAPPED TACK PANEL8. ALL CABINETS TO BE PLASTIC LAMINATE U.O.N. 9. ALL MILLWORK IN MAPROOM 1134 TO BE WOOD DIGITAL SIGNAGEFLAT PANEL DISPLAYGC TO INSTALL WALL MOUNT8'-0"WINDOW PRIVACY FILM FIRE RATED WINDOW147"F3A552SIMC1A552SIMFINISHED END PANELREFRIGERATOR, NICSALVAGED PLASTIC LAMINATE BASE CABINET U.N.O.SALVAGED PLASTIC LAMINATE UPPER CABINET, U.N.O.SOLID SURFACE COUNTERTOP WITH BACKSPLASH & LEFT SIDESPLASH 2'-2"NEW3'-0" 1'-6"3'-0"A1A552SIM38"FINISHED END PANELPLOTTER, NICCOPIER, NIC54" x 96" (110" DIAGONAL) MOTORIZEDPROJECTION SCREEN.RECESSED IN CEILING. 110 1/4"96"54"F1A551SIMGMB, OFCI8'-0"4'-0"4'-0"2'-6"8" S.S. BASEA9A252RELOCATED ARTWORKCOORDINATE LOCATION WITH OWNER PRIOR TO INSTALLATION3'-6"ALIGN TO ONE COURSE OF CMUFWTPFWTPALIGN TO ONE COURSE OF CMU10'-0"FWTP, TYP5/8" GYPSUM BOARDEXISTING CEILING3 5/8" METAL STUDEXISTING WALL3/4" PLYWOOD. FIRE-RATED BLOCKING.2 1/2" METAL STUDSS BASE PLATE8"MAX 4"DIGITAL SIGNAGE FLAT PANEL DISPLAY (TYPE E)PROVIDE DATA POWER OUTLET & (2) POWER JACKSMOUNT FURNISHED BY AVC, INSTALLED BY GC. SEE TA551 MOUNTING DETAIL INCLUDING BLOCKING. COORDINATE FINAL MOUNT LOCATION WITH AVC.3 7/8"14 1/4"PAC526 IN-WALL BOXA9A252Sim3'-6"RELOCATED PUSH BUTTONRELOCATED FIRE PULLDIGITAL SIGNAGEFLAT PANEL DISPLAYGC TO INSTALL WALL MOUNTWARNING: It is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration.DATE:PROJECT:OTHER:DRAWN BY:ABCDEFGABCDEF1234567891012345678910A252INTERIORELEVATIONS7/30/202011365/ COB #1921MDCORNELL UNIVERSITYConstruction DocumentsSnee Hall Renovation for Colocation of EAS112 Hollister Drive1/4" = 1'-0"E4SECOND FLOOR NORTH CORRIDOR - NORTH ELEVATION1/4" = 1'-0"C4WORKROOM - NORTH ELEVATION1/4" = 1'-0"C7WORKROOM - SOUTH ELEVATION1/4" = 1'-0"C9WORKROOM - EAST ELEVATION1/4" = 1'-0"E6COMPUTER LAB - EAST ELEVATION1/4" = 1'-0"C1WORKROOM - WEST ELEVATION1/4" = 1'-0"A7FIRST FLOOR ATRIUM CORRIDOR SOUTH WALL1/4" = 1'-0"E1FIRST FLOOR CORRIDOR WEST ELEVATION1/4" = 1'-0"A1CORRIDOR OUTSIDE 2144, 3144, FWTP A TYP VERTICAL1/4" = 1'-0"A3CORRIDOR WALL BETWEEN 4124 & 4126, FWTP C TYP HORIZONTAL1 1/2" = 1'-0"A9FLAT PANEL DISPLAY WALL SECTION# Description Date1 Addendum #1 08/12/20202 Addendum #2 8/24/202011/4" = 1'-0"F4SECOND FLOOR - DIGITAL DISPLAY2 FIRST FLOOR100' -0"SECOND FLOOR112' -2"THIRD FLOOR124' -4"FOURTH FLOOR136' -6"PENTHOUSE148' -8"56789FWP INSTALLED ON ATRIUM WALL ALTERNATE 2FWP INSTALLED ON ATRIUM WALL ALTERNATE 2PAINT ENTIRE ATRIUM GYPSUM WALL SURFACEALTERNATE 5FIRST FLOOR100' -0"SECOND FLOOR112' -2"THIRD FLOOR124' -4"FOURTH FLOOR136' -6"PENTHOUSE148' -8"FGHJKLPROTECT AND COVER FOSSIL DISPLAY DURING CONSTRUCTIONPAINT ENTIRE ATRIUM GYPSUM WALL SURFACEFWP INSTALLED ON ATRIUM WALL ALTERNATE 2ALTERNATE #3NEW ATRIUM WINDOWSAPPROXIMATELY 3'-2 1/4" WIDE BY 3'-1 3/8" HIGHTO MATCH EXISTING, V.I.F.ALIGNA601A1SIMGHJKLPATCH AND REPAIR ANY DAMAGED GYPSUM WALL ON ALL FLOORS WITHIN THE ATRIUM, TYPCLEAN STAINED CONCRETE WITHIN THE ATRIUM, TYPREPAIR, SAND, AND REFINISH DAMAGED WOOD TRIM AND RAILINGS, WITHIN ATRIUM, TYPALL REPAIR WORK FOR ATRIUM -ALTERNATE 556789PATCH AND REPAIR ANY DAMAGED GYPSUM WALL ON ALL FLOORS WITHIN THE ATRIUM, TYPCLEAN STAINED CONCRETE WITHIN THE ATRIUM, TYPREPAIR, SAND, AND REFINISH DAMAGED WOOD TRIM AND RAILINGS, WITHIN ATRIUM, TYPALL REPAIR WORK FOR ATRIUM -ALTERNATE 5WARNING: It is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration.DATE:PROJECT:OTHER:DRAWN BY:ABCDEFGABCDEF1234567891012345678910A301ATRIUMELEVATIONS7/30/202011365/ COB #1921MDCORNELL UNIVERSITYConstruction DocumentsSnee Hall Renovation for Colocation of EAS112 Hollister Drive1/8" = 1'-0"D1SECTION N-S1/8" = 1'-0"A1SECTION W-E1/8" = 1'-0"D7ATRIUM SOUTH ELEVATION1/8" = 1'-0"A7ATRIUM WEST ELEVATION# Description Date2 Addendum #2 8/24/20202 BACKSPLASH AND SIDESPLASH WHERE INDICATED ON ELEVATIONSCOUNTERTOPBASE CABINETCONTINUOUS BASECABINET DOORPULL4"2'-10" U.O.N. 4"3"ADJUSTABLE SHELVES WHERE INDICATED ON ELEVATIONS2'-1" U.O.N.1"7'-2" A.F.F. U.O.N.UNDERCABINET LIGHT FIXTURE, TYPADJUSTABLE SHELFSEE REFLECTED CEILING PLAN FOR SOFFIT LOCATIONS1'-1" U.O.N.VALANCE TO MATCH CABINETCABINET DOORWALL CABINET PULL3/4"2"2'-2" U.O.N.BACKSPLASH AND SIDESPLASH WHERE INDICATED ON ELEVATIONSCOUNTERTOPCABINET DRAWERBASE CABINETCONTINUOUS BASECABINET DOORPULLS 4"2'-10" U.O.N. 4"3"ADJUSTABLE SHELVES WHERE INDICATED ON ELEVATIONS2'-1" U.O.N.1 1/2"4 1/2"1"HARDWOOD VENEER ON 3/4" MDF WITH 3/4" THICK HARDWOOD EDGING 1/4" REMOVABLE TEMPERED HARDBOARD SHELVES, IN 3/16" GROOVES, EQUALLY SPACED3/4"3/4"2'-8 1/2"2'-10"VALANCE TO MATCH CABINET1'-0"SIXTEEN EQUALLY SPACED FULL DEPTH 16 GAUGE STAINLESS STEEL REMOVABLE SHELVES WITH FRONT EDGE FOLDED DOWN CREATING 1/2" LIP, NOTCH CORNERS AT FRONT LIP TO ALLOW SHELF TO SIT FLUSH, HOUSED IN 1/8" x 1/4" DEEP SLOT IN EACH SIDEBACKSPLASH AND SIDESPLASH WHERE INDICATED ON ELEVATIONSCOUNTERTOPBASE CABINETCONTINUOUS BASE4"2'-10" U.O.N. 4"ADJUSTABLE SHELVES WHERE INDICATED ON ELEVATIONS2'-1" U.O.N.2'-1" U.O.N.2'-10" U.O.N. 4"9" 1'-6"6" 1'-1"4 1/2"BACKSPLASH AND SIDESPLASH WHERE INDICATED ON ELEVATIONSSOLID SURFACE COUNTERTOPADA KNEE/TOE CLEARANCECONTINUOUS BASEPLASTIC LAMINATE APRON LAY IN SINK, SEE PLUMBING DRAWINGS4"1 1/2"3"PLASTIC LAMINATE PIPE SHIELD ON 1" X 1" ALUMINUM ANGLE SUPPORT FULL LENGTH OF SHIELD WITH KEYHOLED SLOTS IN FACECONTINUOUS BASEFINISHED END PANEL7 1/32" 1"FAUCET, SEE PLUMBNG DRAWINGSFINISHED BACK PANELPROVIDE CUT-OUT FOR EXHAUST FAN. COORDINATE WITH AV VENDORTOE-KICK VENTLINEAR METAL GRILLE22"34"1 1/2"SOLID SURFACE (COLOR 2)1" SOLID SURFACE SUBSTRATE2"3/4"4"3"1/2" PLYWOOD BRACE TO PREVENT SAGHARDWOOD VENEER CABINET BACK3/4" HARDWOOD PLYWOOD BOTTOM, TOP TO ALIGN WITH TOE-KICKPLENUM. PAINT INTERIOR BLACKDOOR HANDLE. INCLUDE LOCKNOTE: DOOR TO RECEIVE 155° HINGESELECTRICAL EQUIPMENT SHALL NOT REDUCE SIZE OF OPEN INTERIOR SPACE OF CABINETBACKSPLASH AND SIDESPLASH WHERE INDICATED ON ELEVATIONSCOUNTERTOPBASE CABINETCONTINUOUS BASE4"2'-10" U.O.N. 4"DOOR MOUNTED PULL-OUT TRASH BIN2'-1" U.O.N.4 1/2"CABINET DOORPULLS1"1 1/2"16 GAUGE STAINLESS STEEL BENTCORNER PLATE#8 x 1" PHILLIPS OVAL HEAD WOOD SCREW, COUNTERSUNK, TYP.MATCH RADIUS OF WOOD RAILINGEXISTING WOOD RAILING5 1/2" VIF1/4"1/2"1/2"2 1/2"- ELEVATION -- PLAN -D7A552A552C7C6A552F8A552DRAWER SLIDE, TYP.FOR SHADED REGIONS AT FRAME SUPPORT, REFER TO F8/A552D7A552A552C6A552C6Sim6'-0" 3'-0"V.I.F.V.I.F.6'-0"ALIGN DRAWER SEAM WITH SKYLIGHT MULLION, TYP.2X4 SUPPORT AT EVERY DRAWER SEAM, TYP.F8A5521/2"6"6"3/4"2 1/2"1/2"1 3/4"3'-2 1/4"3/4" 1/4"1"3/4"1"1"6"3/4" 8 1/2"1/2"1"EXISTING CONCRETE DISPLAYSHIM AS REQUIREDDRAWER SLIDE3/4" HARDWOOD PLYWOOD1" HARDWOOD DRAWER FRAME1" HARDWOOD DRAWER FACEDRAWER LOCKWOOD TO MATCH EXISTING1/2" TEMPERED GLASS SET IN A BED OF SILICONE ADHESIVEEXISTING CONCRETE WALL3/4" HARDWOOD DRAWER BACKWOOD TO MATCH EXISTINGEXISTING CONCRETE DISPLAY1" HARDWOOD DRAWER FACEWOOD TO MATCH EXISTING1/2" TEMPERED GLASS SET IN A BED OF SILICONE ADHESIVEEXISTING CONCRETE WALL3/4" HARDWOOD DRAWER BACKWOOD TO MATCH EXISTING1"1/2"6"3/4" 5 3/4" 1/2"WARNING: It is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration.DATE:PROJECT:OTHER:DRAWN BY:ABCDEFGABCDEF1234567891012345678910A552CASEWORKDETAILS7/30/202011365/ COB #1921MDCORNELL UNIVERSITYConstruction DocumentsSnee Hall Renovation for Colocation of EAS112 Hollister Drive3/4" = 1'-0"D1BASE CABINET - DOOR3/4" = 1'-0"F1WALL HUNG CABINET - DOOR3/4" = 1'-0"D3BASE CABINET - DRAWER AND DOOR3/4" = 1'-0"F3MAIL SLOTS3/4" = 1'-0"C1BASE CABINET - OPEN SHELVING3/4" = 1'-0"A1SINK - LAY IN3/4" = 1'-0"A3BASE CABINET - AV EQUIPMENT VENTED3/4" = 1'-0"C3BASE CABINET - DRAWER & PULL-OUT TRASH1 1/2" = 1'-0"F6CORNER GUARD1/4" = 1'-0"A7MAP DISPLAY PLAN - ALTERNATE 41/4" = 1'-0"C7MAP DISPLAY ELEVATION - ALTERNATE 41 1/2" = 1'-0"D7MAP DISPLAY SECTION - ALTERNATE 41 1/2" = 1'-0"F8MAP DISPLAY SECTION 2 - ALTERNATE 41 1/2" = 1'-0"C6MAP DISPLAY SECTION - ALTERNATE 4# Description Date2 Addendum #2 8/24/2020 DOOR TYPES:D1D2D36"6"6 1/2"10"NOTE: WHERE WOOD IS INDICATED FOR MATERIAL, PROVIDE STILE-AND-RAIL WOOD DOORS FOR TYPES D2 AND D2B AND D3, AND FLUSH WOOD DOORS FOR ALL OTHER TYPES.FRAME TYPES:F1F3SEE ELEV.VARIES10" 2'-6" 2" 3'-6" 2"2" 3'-0"8"2"6"1'-0"6"6" 3'-0" 6"6"1'-0"7'-4"2"7'-4"8"F22"2"VARIES3'-4"2"5'-0"8"3'-10"2"2'-6"10"D2B8"7'-4"6"1'-0"6"6" 3'-0"6"1'-0"WINDOW PRIVACY FILMWINDOW PRIVACY FILMFIXED LEAFVARIESWALL CONSTRUCTIONFRAME ANCHORHOLLOW METAL FRAMEDOOR1 15/16"1 15/16"5/8" 8"1/2"1/2"1/2"1/2"VARIES1 15/16"1 15/16"WALL CONSTRUCTIONFRAME ANCHORHOLLOW METAL FRAMEDOOR5/8" 2"2" UONTYP @ WALL RETURN1/2"VARIESWALL CONSTRUCTIONFRAME ANCHORJAMB ONLYHOLLOW METAL FRAME1/2"5/8" 2"1 15/16"1 15/16"EQEQGLAZINGREMOVABLE STOP ON SECURE SIDE OF FRAME5/8"2"5/8"1 15/16"EQEQ1 15/16"GLAZINGHOLLOW METAL FRAMEREMOVABLE STOP ON SECURE SIDE OF FRAMEHOLLOW METAL FRAMEGLAZINGREMOVABLE STOP ON SECURE SIDE OF FRAME5/8" 2" 5/8"1 15/16"1 15/16"1 15/16"1 15/16"EQEQVARIESDOORVARIESWALL CONSTRUCTIONFRAME ANCHORJAMB ONLYHOLLOW METAL FRAMEGLAZINGREMOVABLE STOP ON SECURE SIDE OF FRAMEEQ.1 15/16"1 15/16"EQ.5/8" 8"1/2"1/2"WALL CONSTRUCTIONFRAME ANCHORHOLLOW METAL FRAMEDOOR1 15/16"1 15/16"5/8" 7 1/2"VARIES1/2"5 1/2"1/2" 3/4"EQ.EQ.NOTE: IN CORRIDORS MATCH EXISTING SETBACK FROM FACE OF WALLNOTE: IN CORRIDORS MATCH EXISTING FRAME DEPTHWALL CONSTRUCTIONFRAME ANCHORHOLLOW METAL FRAMEDOOR1 15/16"1 15/16"5/8"1 1/2"VARIES1/2"5 1/2"1/2"3/4"EQ.EQ.NOTE: IN CORRIDORS MATCH EXISTING SETBACK FROM FACE OF WALLNOTE: IN CORRIDORS MATCH EXISTING FRAME DEPTHEXISTING WALL CONSTRUCTIONGLAZING GASKETFIRE SAFING AND FINISH SEALANT2 3/4"FIRE RATED E119 FRAMESTEEL GLAZING BEADGLAZING: CONTRAFLAM STRUCTURE 60SHIM1"2 9/16"11/16"1 15/16"1/4" ALUMINUM REVEAL1/4"WARNING: It is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration.DATE:PROJECT:OTHER:DRAWN BY:ABCDEFGABCDEF1234567891012345678910A601DOORSCHEDULE7/30/202011365/ COB #1921YNPCORNELL UNIVERSITYConstruction DocumentsSnee Hall Renovation for Colocation of EAS112 Hollister DriveSHEET SCHEDULE - DOOR AND FRAMEDOORNUMBERRoomNumberRoom NameFRAMEDOORFIRERATINGHARDWAREGROUPREMARKSDOORNUMBERELEV MATERIAL HEAD JAMB GLAZING ELEV MATERIAL SIZE GLAZING1134-1 1134 Map Room F1 HM D4/A601 D6/A601 D2 WD SEE ELEV FRG-2 3/4 HR 1 CARD READER1134-11134-2 1134 Map Room F1 HM D4/A601 D6/A601 D2B WD SEE ELEV FRG-2 3/4 HR 2 CARD READER & OPERATOR 1134-22014 2014 Toilet F1 HM D3/A601 D1/A601 D1 WD 3'-4" X 7'-4" 3/4 HR 520142102 2102 Office F2 HM D4/A601 D6/A601 FRG-1 D1 WD 3'-4" X 7'-4" 3/4 HR 421022102A 2102A Office EXISTINGD3 WD 3'-4" X 7'-4" FRG-2 3/4 HR 42102A2120 2120 Office F1 HM D3/A601 D1/A601 D1 WD 3'-4" X 7'-4" 3/4 HR 421202149 2149 Shared Workspace F1 HM D3/A601 D1/A601 D1 WD 3'-4" X 7'-4" 3/4 HR 621492160A 2160 Admin Suite F3 HM D6/A601SIMD6/A601 TG D3 WD 3'-0" X 7'-0" TG 42160A2160B 2160 Admin Suite F3 HM D6/A601SIMD6/A601 TG D3 WD 3'-0" X 7'-0" TG 42160B2160C 2160 Admin Suite F3 HM D6/A601SIMD6/A601 TG D3 WD 3'-0" X 7'-0" TG 42160C2160D 2160 Admin Suite F3 HM D6/A601SIMD6/A601 TG D3 WD 3'-0" X 7'-0" TG 42160D3014 3014 Toilet F1 HM D3/A601 D1/A601 D1 WD 3'-4" X 7'-4" 3/4 HR 530143" = 1'-0"D42" HOLLOW METAL WRAPPED DOOR HEAD3" = 1'-0"D62" HOLLOW METAL WRAPPED DOOR JAMB3" = 1'-0"C32" HOLLOW METAL WRAPPED LITE JAMB3" = 1'-0"C42" HOLLOW METAL WRAPPED LITE MULLION3" = 1'-0"C62" HOLLOW METAL WRAPPED LITE/ DOOR MULLION3" = 1'-0"C12" HOLLOW METAL WRAPPED LITE HEAD3" = 1'-0"D32" HOLLOW METAL DOOR HEAD3" = 1'-0"D12" HOLLOW METAL DOOR JAMB412241614122416141224161WIRELESS CARD READERWIRELESS CARD READER98216121612161WIRELESS CARD READER7EXISTING DOORS3" = 1'-0"A1FIRE-RATED WINDOW HEAD (ALTERNATE #3)WorkroomPryor LabClean Room# Description Date2 Addendum #2 8/24/20202222222 OUTDOOR PATIO 22 33 44 55 66 77 88 99 1010 1111 ABC D DE F FG H HJ K K L LM CLHW (E)CW (E)RHW (E)SAN (E)SAN (E) SAN (E)V (E)V (E)V (E)ST (E)ST (E)RHW (E)HW (E)CW (E)RHW CW HW SAN4" SAN UP SAN SAN2" WASTE UP CO P3 P4 2" 4" P1 P2 CO NO PIPING IN THIS ROOM FS ENGINEERING, DPC 721 E. Genesee Street Syracuse, NY 13210 Tel: 315-471-4013 Fax: 315-471-4044 FS#19100 DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 P101R FIRST FLOOR PLAN - PLUMBING 7/30/2020 1921 DDD CORNELL UNIVERSITYConstruction DocumentsSnee Hall Renovation for Colocation ofEASRevision Schedule Name Date Revision 2 8/20/20 3"SCALE: 1/8" = 1'-0"P101R 1 FIRST FLOOR PLAN PLUMBING KEYED NOTES P1 2"WASTE, 1/2"CW & HW UP. P2 CONNECT 2"WASTE TO EXISTING PIPING IN CHASE, 1/2" CW & HW TO EXISTING PIPING ABOVE CEILING. P3 CONNECT 2"WASTE TO EXISTING IN CHASE ABOVE CEILING. P4 CONNECT 4"SAN TO EXISTING IN CHASE ABOVE CEILING. REF.FFFED1EX. PANELL2LAEX. PANELL2LCEX. PANELL2LBED2ED1EX. PANELL2LI(2)(2)(4)(6)(6)(6)Computer Lab2161AShared Workspace2149Office2118Office2120Workroom2161Office2102Office2160AAdmin Suite2160Office2160DOffice2160CChair Office2160BIT Office2161BEX. PANELDL2LAEX. PANELH2LAEX.PANELL20AEX. PANELEH30AEX. PANELH20AED3ED4ED5WAPWAPWAPED72A. COORDINATE SCHEDULING OF REMOVAL WORK WITH OWNER OR OWNER'S REPRESENTATIVE, PHASING DRAWINGS AND REQUIREMENTS.B. VERIFY LOCATIONS AND SCHEDULE OF REMOVAL WORK IN ALL AREAS PRIOR TO STARTING WORK. REFER TO OTHER TRADES DRAWINGS AND COORDINATE REMOVAL WORK WITH OTHER TRADES DIVISION CONTRACTORS PRIOR TO STARTING.C. CONTRACTOR IS RESPONSIBLE FOR THE REMOVAL OF ALL ELECTRICAL EQUIPMENT AND DEVICES WITHIN SPACES INDICATED. D. PROVIDE ALL REQUIRED WIRING AND TEMPORARY CONNECTIONS NECESSARY TO MAINTAIN ELECTRICAL CONTINUITY OF ALL EXISTING ELECTRICAL EQUIPMENT, RECEPTACLES, DEVICES, LIGHTING FIXTURES AND DEVICES, FIRE ALARM EQUIPMENT AND DEVICES THAT ARE TO REMAIN DURING ALL STAGES OF WORK.E. PROVIDE TEMPORARY SUPPORT FOR ALL EXISTING RACEWAYS AND BRANCH CIRCUITRY TO REMAIN DURING ALL STAGES OF WORK.F. PROTECT ALL EXISTING ELECTRICAL EQUIPMENT, RECEPTACLES, DEVICES, LIGHTING FIXTURES AND DEVICES, FIRE ALARM EQUIPMENT AND DEVICES, TELECOMMUNICATIONS EQUIPMENT AND DEVICES, SECURITY (CCTV) EQUIPMENT AND DEVICES AND ALL ASSOCIATED RACEWAYS AND BRANCH CIRCUITRY TO REMAIN FROM DAMAGE AND DEBRIS DURING ALL STAGES OF WORK.G. ALL ELECTRICAL PANELS SHOWN ON FLOOR PLANS ARE EXISTING TO REMAIN UNLESS NOTED OTHERWISE.H. OBTAIN A LIST FROM THE OWNER, OR THE OWNER’S REPRESENTATIVE, OF ANY ITEMS THEY WISH TO RETAIN. DISCONNECT, REMOVE, INVENTORY AND DELIVER ALL ITEMS TO OWNER DESIGNATED ON-SITE LOCATION IN GOOD OPERATING ORDER. PROVIDE A TRANSMITTAL OF THE ITEMS INVENTORIED TO THE OWNER OR OWNER'S REPRESENTAIVE. ALL OTHER ITEMS SHALL BE REMOVED FROM THE PROJECT SITE COMPLETE AND DISPOSED OF IN THE APPROPRIATE MANNER.I. EXISTING CONDUIT AND BRANCH CIRCUTRY LOCATED IN NON-ACCESSIBLE WALLS/FLOORS, JUNCTION BOXES SHALL BE ABANDON IN PLACE AS FOLLOWS:• DISCONNECT BRANCH CIRCUIT AT SOURCE.• REMOVE SURFACE AND FLOOR BOX(ES).• PROVIDE PRIMED STEEL BLANK PLATE ON ANY FLUSH OUTLET BOX(ES) TO REMAIN.• CUT BACK RACEWAY SUBS SO AS TO BE RECESSED INTO FLOOR/WALL.• PATCH ALL ANCHOR HOLES FROM REMOVED EQUIPMENT. BOXES, AND RACEWAYS.J. REMOVE AND REPLACE EXISTING LIGHT FIXTURES AND SWITCHES IN ROOMS INDICATED.K. REMOVE AND REPLACE EXISTING RECEPTACLES AND WIRING.I. REMOVE AND REPLACE EXISTING DATA CABLES AND JACKS.GENERAL DEMOLITION NOTESFS ENGINEERING, DPC721 E. Genesee StreetSyracuse, NY 13210Tel: 315-471-4013Fax: 315-471-4044FS#19100DATE:PROJECT:OTHER:DRAWN BY:ABCDEFGABCDEF1234567891012345678910ED102SECONDFLOORDEMOLITIONPLAN7/30/20201921ASC/JLRCORNELL UNIVERSITYConstruction DocumentsSnee Hall Renovation for Colocation ofEAS3"SCALE: 1/8" = 1'-0"ED1021DEMO SECOND FLOOR PLANELECTRICAL KEYED NOTESED1 DISCONNECT, REMOVE AND REPLACE EXISTING PANEL FEEDER AND BRANCH CIRCUITS.ED2 RELOCATE RECEPTACLE AND DATA BOX WITH WIRING, RECEPTACLES AND DATA DROPS TO BEREPLACED.ED3 DISCONNECT AND REMOVE EXISTING WIRING FOR AUTOMATIC DOOR TO BE REMOVED.ED4 REMOVE EXISTING DISCONNECT, WIRING AND CONDUIT.ED5 REMOVE AND REPLACE EXISTING UNDERFLOOR CABLING.ED7 DISCONNECT AND REMOVE EXISTING TRACK LIGHTING. TURNOVER TO OWNER.Revision ScheduleName DateRevision 2 8/20/20 CORNELL UNIVERSITY SECTION 01 23 00 Ithaca, New York ALTERNATES SNEE HALL RENOVATION ALTERNATES 01 23 00-1 FOR COLOCATION OF EAS (Addendum No. 2) JULY 30, 2020 SECTION 01 23 00 ALTERNATES 1. GENERAL 1.1 RELATED DOCUMENTS A. This Section describes the changes to be made under each Alternative. B. The Specification Section containing the pertinent requirements of materials and methods to achieve the Work described herein. 1.2 DESCRIPTION OF REQUIREMENTS A. Definition: An alternate is an amount proposed by Bidders and stated on the Bid Proposal Submission Form and in he eBuilder Bid Module for certain items that may be added to or deducted from the Base Bid amount if the Owner decides to accept a corresponding change in either the amount of construction to be completed, or in the product, materials, equipment, systems or installation methods described in the Contract Documents. Alternates shall include all overhead, profit and other expenses, including bond costs, in connection therewith. B. Coordination: Coordinate related Work and modify or adjust adjacent Work as necessary to ensure that Work affected by each accepted alternate is complete and fully integrated into the Project. C. Notification: Immediately following Contract award, prepare and distribute to each party involved, notification of the status of each alternate. Indicate whether alternates have been accepted, rejected or deferred for consideration at a later date. Include a complete description of negotiated modifications to alternates. D. Schedule: A "Schedule of Alternates" is included at the end of this Section. Include as part of each alternate, miscellaneous devices, accessory objects or similar items incidental to or required for a complete installation whether or not mentioned as part of the alternate. 2.0 PRODUCTS – NOT USED 3.0 EXECUTION 3.1 SCHEDULE OF ALTERNATES A. ALTERNATE NO. 1 Third Floor Kitchenette - Create new third floor kitchenette as shown onAD104 and create new kitchenette as shown on A103 and subsequently noted details. CORNELL UNIVERSITY SECTION 01 23 00 Ithaca, New York ALTERNATES SNEE HALL RENOVATION ALTERNATES 01 23 00-2 FOR COLOCATION OF EAS (Addendum No. 2) JULY 30, 2020 B. ALTERNATE NO. 2 Acoustic Panel - Install new acoustical panels as shown in A1 and D1 on sheet 301 and subsequent details. C. ALTERNATE NO. 3 Atrium Windows - create openings as noted on A103 and subsequently noted details. D. ALTERNATE NO. 4 Map Display - Create a display area on top of existing bookcase as shown A161. E. ALTERNATE NO. 5 Skylight Replacement and Repairs – In kind replacement of skylight, repairs to damaged exterior/interior flashing, interior drywall and interior paint. ***END OF SECTION 01 23 00*** PROJECT: SNEE RENOVATION FOR COLOCATION OF EAS Date: August 25, 2020 RFI Form RFI/Page/ Response Dwg./Spec./Rep.Section/Design Team Index Number Paragraph/Topic RFI Response 1 Spec section 057000 references decorative mechanical grilles & frames. Please provide locations. The grilles are in the AV Equipment cabinets in the Map Room, shown on detail A3/A552. 2 1)Phasing Print G202 shows Classroom 2152 being in Phase 2 of the work. However, this classroom does NOT show up on Demo Print AD102 or Finish Print A162. Is this room getting new finishes? 2)Spec Section 096513 Resilient Base & Accessories / Part 2.2 B & C calls out a specific Visually Impaired Rubber Tread & Riser Combo. Other than the specific Stair Nosing at MAP ROOM 1134, we see no other stair finishes. Are there stair treads and risers in the project that we are overlooking? 1. Classroom 2152 will receive AV upgrades, but no finish upgrades. See sheet E102 for new work. 2. The only section this applies to is Map Room 1134. 3 None of the AR,AD,A Drawings have a Scale indicated. Please clarify Scale of these drawings. See Addendum No. 2, Items 5-8, 10, 13, 15-16, 19, 21-22, and 27-30. 4 There are numerous discrepancies and errors concerning the Door Schedule on Sht. A601. The frame details do not by and large correspond to the frame elevation listed. Jamb detail C5 noted does not exist. Frame elevation F2 is shown with jamb detail A3 which does not exist, and the details that do exist for this opening are contradictory. If this frame is to be of special fire resistive construction, than frame detail A1 only would apply. The Door Types note refers to Door Types D4 & D5 as stile and rail construction, flush doors for all other types. This we are assuming to be in error, as D4 & D5 do not exist. See Addendum No. 2 Item 26. 5 Alternate 3 requires 3 each fire resistive E119 borrow lite frames (atrium windows). Please provide an elevation showing detailed sizing requirement for these frames as they will be costly and none appear to exist. See Addendum No. 2 Item 24. 6 Drawing S002 details 6 & 7 show steel reinforcing. Please identify which locations on MEP drawings each detail applies. See Addendum No. 2 Item 33 - 36. 7 Drawing M104 show's a roof top penetration. Is there information that can be provided on the existing roof? See note on A105. 8 1) Please confirm Cornell will be responsible for the miscellaneous removal & reinstallation of existing room furnishings, tables, chairs, etc. 2) Please confirm offloading and transporting of Owner purchased AV equipment and Furniture will be by others and not the general contractor (unless noted otherwise on drawings). 1. CU has plans to remove all materials that they want for reuse, prior to each construction phase. If materials are found left in the rooms, at inception of construction phase, GC should confirm with Project Manager or Facilities Coordinator, that these can be removed by GC. 2. Unless otherwise noted, CU shall offload and transport Owner purchased AV equipment and furniture to building. For GC installed goods, that are CU purchased, CU will discuss where in building the GC shall obtain the materials for install provided the coordination overlaps. 9 Typical note #13 on the finish drawings A161-A164 states to paint fin tube heater covers electrostatically to match adjacent wall surfaces. Can these locations please be identified? Referencing the mechanical drawings they appear to not be shown either. Rooms 2102A, 2102, 2108, 2112, 2116, 2118, 2120, 2122, 2124, 2126, 2130,2134, 2136, 2138, 2140,2142, 2160B, 2160C, 2160D and 4142. RFI/Page/ Response Dwg./Spec./Rep.Section/Design Team Index Number Paragraph/Topic RFI Response 10 Detail A1 / A552: Please confirm what material the apron & pipe shield shall be. See Addendum No. 2, Item 25. 11 Drawing P101: please provide the keynotes for the P1 to P4 tags. See Addendum No. 2, Item 32. 12 Drawing G204, Note 7 reads: All skylight associated work is part of Alt. 5. Please confirm that the skylight replacement, louver removal and re-installation, and any and all associated patching is indeed part of Alt 5. Drawings AD105 and A105 do not specify this work as being in Alt 5. See Addendum No. 2, Item 42. 13 During walk through - 2 ceiling tile was damaged in one office, room 2130. See Addendum No. 2, Item 20. 14 What window film product for the map room 1134 was selected? Avery Dennison Spectrally Selective SP e-Lite 45i