PLANNING & DEVELOPMENT BOARD Project Review
NOTICE OF MEETING & AGENDA
TO: City of Ithaca Project Review Committee (Planning & Development Board)
FROM: Lisa Nicholas, Deputy Director of Planning and Development
DATE: October 3, 2019
SUBJECT: Agenda for Project Review Committee Meeting: THURSDAY, OCTOBER 10, 2019
The Project Review Committee Meeting is scheduled to begin at 8:30 a.m. in the Third Floor Conference Room, City
Hall, 108 E. Green St. Please call Anya Harris at 274-6550, if you cannot attend or you require additional information.
8:30 Project: Minor Subdivision
Location: 620 S Aurora St, Tax Parcel # 106.-1-8 (in the City & Town of Ithaca)
Applicant: Sean McCabe of Harris Beach PLLC for Emersonsub 15 LLC, owner
Anticipated Board Action(s) in October: Public Hearing and Consideration and Preliminary and Final
Subdivision Approval
Project Description: The applicant is proposing to subdivide the 96-acre parcel into two parcels: Parcel OU-1,
measuring .897 acres (39,057 SF) with approximately 240 feet of frontage on S Cayuga Street and containing
two underground storage tanks, a treatment building, and a portion of an asphalt parking lot; and Parcel OU-2,
measuring 95.04 acres in both the City and the Town of Ithaca and containing all existing buildings, roads, and
parking areas of the former factory site. The owner intends to retain OU-1 to continue remediation work and
to convey OU-2 to L Enterprises, LLC, for mixed-use development. The portion of the property in the City of
Ithaca, which includes all of the proposed OU-1 and a portion of OU-2 is in the Chain Works Planned Unit
Development District (PUD) adopted by Common Council on September 3, 2019. The portion of OU-2 in the
Town of Ithaca is currently in the Industrial Zoning District but will be in a newly-formed Planned Development
Zone (PDZ) that will be adopted by the Town Board before development can begin. The proposed subdivision
plats include easements for a primary and two alternative routes of a future trail that will connect S Aurora
Street to Stone Quarry Road, and, ultimately, to the planned Gateway Trail. The subdivision proposal is
consistent with the environmental review of the larger development project that was determined to be a Type
I Action under the City of Ithaca Code, Environmental Quality Review Ordinance, §174-6 (B)(1)(i),(j),(k),(n), (2),
(6), (7),(8)(a)and (b) and the State Environmental Quality Review Act §617.4 (b)(2),(3), (5)(iii), (6)(i), and (iv), for
which the City of Ithaca Planning Board as Lead Agency issued a Positive Declaration of Environmental
Significance on October 28, 2014. The Lead Agency held subsequently Public Scoping on November 18, 2014.
The Lead Agency deemed the Draft GEIS adequate for public review on March 8, 2016, held the public hearing
on March 29, 2016, and accepted comments until May 10, 2016. The Lead Agency filed a Notice of Completion
for the FGEIS on March 5, 2019. The FGEIS includes the original DGEIS, all comments and responses on the
DGEIS, revised information resulting from those comments, and updated information since the publication of
the DEIS. The Board adopted findings on March 26, 2019. The Board granted final site plan approval for Phase
1 of the project proposing Phase 1 of the project in August 2019.
Project materials are available for download from the City website and are updated regularly:
https://www.cityofithaca.org/DocumentCenter/Index/1109
CITY OF ITHACA
108 E. Green St. — Third Floor Ithaca, NY 14850-5690
DEPARTMENT OF PLANNING AND DEVELOPMENT
JoAnn Cornish, Director
Planning & Development – 607-274-6550 Community Development/IURA – 607-274-6565
E-Mail: dgrunder@cityofithaca.org
“An Equal Opportunity Employer with a commitment to workforce diversification.”
2 of 3
8:45 Project: Mixed-Use Student Apartments
Location: 411-415 College Avenue
Applicant: Whitham Planning & Design for Student Agencies
Anticipated Board Action(s) in October: Project Updates, Review of FEAF Part 2
Project Description: The applicant proposes to construct a six-story building with a 7,038 SF footprint, ground
floor retail, and 56 student apartments on floors two through six. The project includes a partially-covered
outdoor plaza area on land partially owned by Cornell. Project development will require the removal of the
existing four-story building known as the Chacona Block, as well as the existing outdoor patio and retaining
walls. The parcel is in the MU-2 Collegetown Area Form District (CAFD) and requires Design Review. This has
been determined to be a Type 1 Action under the City of Ithaca Environmental Quality Review Ordinance §176-
4(B)(1)(h)(4), (k) and (n) and the State Environmental Quality Review Act (“SEQRA”) §617.4(b)(9).
Project materials are available for download from the City website and are updated regularly:
https://www.cityofithaca.org/DocumentCenter/Index/1101
9:15 Project: City Harbor Development/ Guthrie Clinic
Location: 101 Pier Road
Applicant: Jessica Edger-Hillman
Anticipated Board Action(s) in October: Public Hearing (10/22), Special Meeting & Site Visit (10/29)
Project Description: The 11.09-acre project site consists of 8.33 acres of privately-owned land and 2.76 acres of
adjacent City-owned parkland and road. The applicant proposes to redevelop the 8.33-acre project site and
make improvements to 2.76 acres of adjacent City land. The project site consists of (3) privately-owned tax
parcels. The building program will be a total of 316,280 SF consisting of (1) 60,000 SF medical office building, (2)
five-story residential structures with a total of 172,980 GSF and 111 housing units, (1) five-story mixed use
building with 77,800 GFA with 45 housing units, 15,743 SF of ground floor commercial (expected to be a
restaurant), and (1) 5,500 SF Community Building to support golf, boating and other recreational activities
associated with the adjacent City-owned Newman Golf Course. Improvements on City property in Phase 1 of
the plan include the rebuilding of Pier Road to include sidewalks, street trees, a fire engine turnaround, and
additional and reorganized parking. After Phase I, the applicant proposes to realign the end of Pier Road, extend
it to a new clubhouse and add parking. Site improvements on private property to include a 1,570-foot
publically-accessible promenade along Cascadilla Creek, including construction of a new seawall and
replacement of existing docks, waterfront parks, a paddle park, internal circulation streets, bus stops, surface
parking for 400 cars, and landscaping. The project is in the Newman Zoning District and will likely require
variances. This has been determined to be a Type 1 Action under the City of Ithaca Environmental Quality
Review Ordinance §176-4(B)(1)(d), (h)(2), (i), (k) and (n) and the State Environmental Quality Review Act
(“SEQRA”) §617.4(b)(6)(iii) and (v).
Project materials are available for download from the City website and are updated regularly:
https://www.cityofithaca.org/DocumentCenter/Index/783
9:45 Project: Immaculate Conception Redevelopment Project
Location: 320 W Buffalo Street
Applicant: Ithaca Neighborhood Housing Services (INHS)
Anticipated Board Action(s) in October: Consideration of Preliminary & Fianl Site Plan Approval
Project Description: The project involves the renovation/conversion of the existing two-story former school
building into a mixed-use building, a new four-story apartment building, (2) three-unit townhome buildings, (1)
four-unit townhome building, the renovation/conversion of a single-family home into a two-family home, and
the renovation of the “Catholic Charities” Building. The overall project will contain 79 dwelling units with 130
bedrooms. Total increase in square footage on the site will be 44,305 SF (from 62,358 to 106,663 SF). 3,773 SF
of new and existing space in the former school will be commercial use and 2,055 SF will be rented to the
Greater Ithaca Activities Center (GIAC). Site development will require demolition of one wing of the existing
school building and one single-family home. The project also includes greenspace areas, 48 surface parking
spaces and other site amenities. The property is located in the R-2b zoning district; however, the applicant has
applied to Common Council for a Planned Unit Development (PUD). This has been determined to be a Type 1
“An Equal Opportunity Employer with a commitment to workforce diversification.”
3 of 3
Action under the City of Ithaca Environmental Quality Review Ordinance §176-4(B)(1)(k), (n), (B)(6), and the
State Environmental Quality Review Act (“SEQRA”) §617.4(b)(11), for which the Planning Board, acting as Lead
Agency, made a Negative Determination of Environmental Significance on September 24, 2019.
Project materials are available for download from the City website and are updated regularly:
https://www.cityofithaca.org/DocumentCenter/Index/1016
10:15 Agenda Review for 10-22-19 and 10-29-2019
10:20 Adjournment
cc: Mayor Svante Myrick & Common Council
Dr. Luvelle Brown, Superintendent, ICSD
Jay Franklin, Tompkins County Assessment
If you have a disability & would like
specific accommodations to
participate, please contact the City
Clerk at 274-6570 by 12:00 p.m., no
later than 2 days (not including
weekends and holidays) before the
meeting.
Out of consideration for the health of
other individuals, please try to refrain
from using perfume/cologne and other
scented personal care products at City
of Ithaca meetings. Thank you for your
cooperation and understanding.