Loading...
HomeMy WebLinkAboutMcGraw Tower Cooling SystemWARNING: IT IS A VIOLATION OF NEW YORK STATE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT OR ENGINEER, TO ALTER THIS DOCUMENT IN ANY WAY. IF THIS DOCUMENT IS ALTERED, THE ALTERING ARCHITECT OR ENGINEER SHALL AFFIX TO SUCH DOCUMENT HIS SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY HIS SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. REVISIONS: DATE: FACILITY: DESIGN: DRAWN: 15 A B C D E F G H I A B C D E F G H 16 14 13 12 11 10 9 8 7 6 5 4 3 2 1 1516 14 13 12 11 10 9 8 7 6 5 4 3 2 1 ARCHIVE BAR CODEIthaca, New YorkCORNELLUNIVERSITY FO UN DED5681ADFacilities EngineeringCornell UniversityARCH/STRUCT: CIVIL/ENV: ELECTRICAL: MECHANICAL: 8555933Level 9 CoolingMcGraw Clock TowerFebruary 23, 2016 2010T McGraw Clock TowerDATE: 02/23/16 - ISSUE FOR CONSTRUCTION M-000 POINT OF CONNECTION POINT OF DISCONNECTION PIPE DOWN (E) VALUE TAG NO. VALUE TAG NO. TAG NO. ?"X?" XXX T ROOM TEMPERATURE SENSOR, PLAN VIEWDEMOLITION WORK EXISTING EQUIPMENT NEW EQUIPMENT CFM, GPM, CAPACITY NECK SIZE REGISTER, GRILLE, DIFFUSER EQUIPMENT TAG (MOTORIZED) CFM, GPM, CAPACITY EQUIPMENT TAG (NON-MOTORIZED) EXISTING TO REMAIN MECHANICAL SCOPE OF WORK: alp MECHANICAL GENERAL NOTES: SCOPE OF WORK NOTES KEYNOTE - NEW WORK KEYNOTE - DEMOLITION BREAK LINE N XX XXXXX 999 NORTH ARROW SECTION ROOM NUMBER 22 99 3 7TH FLOOR BATHROOM. INSTALLATION OF A DRAIN FROM THE EVAPERATOR TO THE 1.4 SURROUNDINGS. PAINTING OF EQUIPMENT AND PIPING TO MATCH EXISTING 1.3 ON THE 10TH FLOOR. INSTALLATION OF A PITCH POCKET FOR THE REFRIGERANT PIPING 1.2 WIRING AND SENSORS. 9TH AND 10TH FLOORS AND ASSOCIATED PIPING AND CONTROL INSTALLATION OF A NEW EVAPERATOR AND CONDENSING UNIT ON1.1 FOLLOWING: CONDITIONS DURING THE SUMMER MONTHS. THIS WORK INCLUDES THE THE MECHANICAL SCOPE OF WORK IS TO IMPROVE THE 9TH FLOOR SPACE 1.0 CONDENSATECD PIPE UP PIPE CONNECTION PIPE CONNECTION COLD WATERHW HOT WATERCW A. PARTRIDGE SEQUENCE OF OPERATION: MECHANICAL SUBMITTAL SCHEDULEMECHANICAL SYMBOLOGY AND ABBREVIATIONS 1 2 SEQUENCE, & SCOPE ABBREVIATIONS, SYMBOLOGY, SCHEDULE, NOTES, MECHANICAL SEQUENCE OF OPERATION4 UNOCCUPIED COOLING: NOT REQUIRED FOR THIS SPACE. NOT REQUIRED FOR THIS SPACE.OCCUPIED SETBACK: PRIORITY 2: UNIT SHALL BE OFF WHEN SPACE TEMPERATURE DROPS BELOW 70°F. CONCERT SCHEDULE. COORDINATE WITH CUSTOMER PRIOR TO PROGRAMMING. PRIORITY 1: PROVIDE PROGRAMMABLE THERMOSTAT, PROGRAMMED WITH A 7 DAY SCHEDULE PROVIDED BY THE CUSTOMER AT THE TIME OF PROGRAMMING. COOLING TO THE 9TH FLOOR. COOLING SHALL BE ENABLED/DISABLED BASED ON OCCUPIED COOLING: A SPLIT AIR CONDITIONING UNIT SHALL PROVIDE SPACE ZONE TEMPERATURE CONTROL SPACE HEATING TEMPERATURE SET POINTS: NA NAUNOCCUPIED: 75°F +5°FOCCUPIED: SPACE COOLING TEMPERATURE SET POINTS: SET POINTS OVERRIDDEN BY THE HANDHELD REMOTE CONTROLLER. PROGRAMMABLE THERMOSTAT SHALL BE PROGRAMMED SUCH THAT IT CAN BE ALL SET POINTS SHALL BE ADJUSTABLE. REQUIRED CONNECTIONS. CONTRACTOR SHALL PROVIDE ALL LABOR AND MATERIAL TO COMPLETE THE GENERAL HANDHELD CONTROLLER CONTROLLED BY A WALL MOUNTED PROGRAMMABLE THERMOSTAT AND SPLIT AIR CONDITIONING UNIT (EVAPORATOR SCU-1 AND CONDENSING UNIT CU-1) SYSTEM DESCRIPTION AND RE-ROOF AFTER THE ABATEMENT. RESPONSIBILITY OF THE CONTRACTOR TO CUT THE PENETRATIONS, SEAL OUT AREA TO BE ABATED PRIOR TO CORES FOR PENERTRATIONS. IT IS THE AMC MASTIC REMOVAL IS BY OTHERS. GENERAL CONTRACTOR TO MARK 12.0 CONTROL WIRING SHALL BE PROVIDED BY THE MECHANICAL CONTRACTOR.11.0 REFER TO THE SPECIFICATIONS FOR ADDITIONAL PROJECT REQUIREMENTS.10.0 MECHANICAL SYSTEMS. HOURS OF TRAINING ON THE OPERATION OF THE NEWLY INSTALLED TRAINING: THE BUILDING OCCUPANTS SHALL RECEIVE A MINIMUM OF 2 9.0 PROTECT VALVES FROM PHYSICAL DAMAGE.8.8 INSTALL VALVES IN ACCESSIBLE LOCATIONS.8.7 PIPING. CONNECT BRANCH PIPING FROM TOP OR SIDE OF HORIZONTAL 8.6 CONNECTIONS. INSTALL FITTINGS FOR CHANGES IN DIRECTION AND BRANCH 8.5 SAGGING, AND INDEPENDENT OF EQUIPMENT CONNECTIONS. SUPPORT ALL PIPING AND CONDUIT SUCH THAT IT IS FREE OF 8.4 WALLS, FLOORS, CONCRETE SLABS. INSTALL SLEEVES FOR CONDUITS, PIPES AND PASSING THROUGH 8.3 INSTALL PIPING FREE OF SAGS AND BENDS.8.2 OTHERWISE. DIAGONAL RUNS ARE PROHIBITED UNLESS SPECIFICALLY INDICATED INSTALL PIPING AT RIGHT ANGLES OR PARALLEL TO BUILDING WALLS. 8.1 PIPING INSTALLATION8.0 VERIFY FINAL EQUIPMENT/FIXTURE LOCATIONS FOR ROUGHING-IN.7.0 THE UNIVERSITY. ORDER TO ACCESS SYSTEMS REQUIRING REPAIR SHALL BE AT NO COST TO REQUIRED AS A RESULT OF DISTURBING FINISHES OR STRUCTURE IN FIREPROOFING, AND ENCLOSURE IN SHAFTS. ANY RESTORATION WORK ALL SYSTEM TESTING SHALL BE CONDUCTED PRIOR TO INSULATION, 6.0 DEFICIENCIES ARE CORRECTED. MIND SHALL BE RELOCATED AT NO EXPENSE TO THE UNIVERSITY UNTIL REPAIR. EQUIPMENT THAT IS NOT INSTALLED WITH THIS REQUIREMENT IN AND WITH SUFFICIENT SPACE TO PERFORM ROUTINE MAINTENANCE AND INSTALL EQUIPMENT TO ENSURE PROPER ACCESS TO CONTROL DEVICES 5.0 MATERIAL AND THE FILL, VOID OR CAVITY MATERIAL. EXPANSION JOINTS. FIRE STOPPING INCLUDES BOTH FORM OR PACKING WALL TO FLOOR OR ROOF DECK, WALL TO BEAMS, AND CONTROL OR STOPPED. CAPS AND JOINTS INCLUDE (BUT ARE NOT LIMITED TO) TOP OF JOINTS AT RATED FLOORS, ROOFS AND WALLS ARE TO BE FIRE AND SMOKE FIRE STOPPED IN ACCORDANCE WITH UL STANDARDS. ALL GAPS AND ALL PENETRATIONS THROUGH FULL HEIGHT WALLS ARE TO BE 4.0 RESTORE THESE SPACES OR AREAS TO ORIGINAL CONDITION. AND OTHER CONSTRUCTION AS NECESSARY TO PERFORM WORK AND CONSISTING OF REMOVAL / REPLACEMENT OF CEILINGS, WALLS, FINISHES, NECESSARILY SHOWN ON DRAWINGS, WORK IS REQUIRED IN THESE AREAS WORK OF OTHER TRADES (EG. ELECTRICAL, MECHANICAL). ALTHOUGH NOT WORK IS REQUIRED IN VARIOUS PORTIONS OF THE FACILITY TO EXECUTE 3.0 BUILDING COORDINATOR. REPRESENTATIVE TO COORDINATE BUILDING FUNCTIONS WITH THE SCHEDULE WORK TEN DAYS IN ADVANCE AND NOTIFY THE OWNER'S CONTRACTOR SHALL BEAR THE COST OF THE UTILITY SHUTDOWN. BE COORDINATED WITH CUSTOMER SERVICE AT PH: 607-255-5322. THE UTILITY SHUTDOWNS: SHUTDOWN OF ANY BUILDING UTILITY SYSTEM SHALL 2.0 ENGINEER. CONTRACTOR SHALL IMMEDIATELY REFER THE CONFLICT TO THE CONDITIONS ARE FOUND TO BE IN CONFLICT WITH THE DRAWINGS, THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS. IF DIMENSIONS OR ARRANGEMENT OF SYSTEMS AND WORK INCLUDED IN THE CONTRACT. DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL1.0 MECHANICAL SCHEDULES 4/2009 WRITTEN SCOPE OF PROJECT Dept. Student & Campus Life Facilities Mgmt Contact Michael Stewart Phone 5-7441 Date 3/9/2016 NAME OF PROJECT: McGraw Tower Level 9 Cooling Description of Work: 1. Provide and install an air conditioning unit at the Chimes performance space (Level 9) of McGraw Tower. 2. Provide and install a remote condensing unit within the bell cage (Level 10) of McGraw Tower. 3. Installation of condensate piping to drain connection at restroom (Level 7). 4. Installation of associated conduits, electrical power wiring, control wiring, piping, insulation, to provide a full working cooling system. a. Complete work for all penetrations, fire stopping, flashing and sealing. b. Minor roof repair at penetrations. c. Provide and install all mounting hardware required for the new work and equipment. d. Provide anti-vibration pads / connections at remote condensing unit. 5. Contractor shall paint housing on exterior condensing unit to match cage color (gray). Contractor shall paint interior conduit and piping runs to match existing painted structural steel and conduit. 6. All asbestos containing material removal and abatement shall be completed by an abatement contractor, under a separate contract. Contractor shall mark all areas required for penetrations and coordinate with owner’s abatement contractor for access and determining extent and location of abatement work. Contractor shall coordinate scheduling of activities with owner / owner’s abatement contractor. 4/2009 Project Schedule: The project shall be started within 10 days after receipt of written authorization to proceed and shall be completed by May 23, 2016. Attachments: Short Form Contract Proposal Form Drawings by Cornell University Facilities Engineering, dated February 23, 2016 T-001 Title Sheet M-000 Mechanical Schedule, Notes, Symbology, Abbreviations, Sequence & Scope M-101 7TH, 8TH, 9TH, & 10TH Floor Mechanical Plans M-400 Elevations & Details E-101 Electrical Floor Plans, New Work 6/2010 CORNELL UNIVERSITY MCGRAW TOWER LEVEL 9 COOLING PROPOSAL FORM Submitted by: Date Legal name of person, partnership or corporation To: Nancy A. Phelps, Manager (Insert your name here) Facilities Contracts 121 Humphreys Service Building AND Cornell University Cornell University Ithaca, New York 14853 Ithaca, New York 14853 The undersigned, (Name of Proposer) a (Type of Firm, State of Incorporation, if applicable) of (Address) having carefully examined specifications as well as the premises and conditions affecting the work, proposed to furnish all material, equipment, labor, plant, machinery, tools, supplies, services, applicable taxes and specified insurance necessary to perform the entire written scope of work, as set forth in, and in accordance with the said documents for the following considerations. 1. BASE PROPOSAL a. All work complete, for the sum of ($ ) for the MATERIALS, SUPPLIES AND LABOR AND SERVICES AND ALL OTHER COSTS. 2. ALTERNATE PROPOSAL a. Cost for providing "Performance" & "Labor and Material Payment" Bonds ($ ) (Sign Bid Here) By: Authorized Signature