Loading...
HomeMy WebLinkAboutStatler Guest Rooms - Permit 32038Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 450 West 31 Street Floor 6 New York, NY 10001 212-245-5195 t 212-239-7130 f Richard McElhiney Architects LLC 161 Sixth Avenue Floor 3 New York, NY 10013 646-385-7625 HOK Key Plan: Notes: July 30, 2014 150 North Chestnut St. Rochester, NY 14604 585-202-5590 ME Engineering, PC N 100% CD Cover Sheet & no scale A-001 Drawing List Cornell University Statler Hotel Guest Room Renovation DRAWING LIST: A-001 A-002 A-003 A-004 A-005 A-006 A-007 A-008 A-101 A-102 A-103 A-104 A-111 A-112 A-113 A-114 A-115 A-116 A-117 A-118 A-119 A-120 A-121 A-122 A-131 A-132 A-133 A-134 A-135 A-136 A-137 A-138 A-139 A-140 A-141 A-142 A-501 A-511 A-512 A-513 A-514 A-601 A-601.1 A-601.2 A-602 A-603 A-604 COVER SHEET, DRAWING LIST LOCATION PLANS, NOTES TYPICAL ACCESSIBLE DETAILS TYPICAL ACCESSIBLE NOTES CONSTRUCTION SCHEDULE AND PHASING SITE PLAN, STAGING & ACCESS DIAGRAM SYMBOLS & ABBREVIATIONS PHOTOGRAPHS TAKEN DURING RENOVATION OF 718 & 718A OVERALL PLAN -- THIRD FLOOR OVERALL PLANS -- FOURTH & FIFTH FLOORS OVERALL PLANS -- SIXTH & SEVENTH FLOORS OVERALL PLANS -- EIGHTH & NINTH FLOORS REMOVAL PLAN, REMOVAL RCP, CONSTRUCTION PLAN -- ROOM TYPE 1.1 & 1.1A REMOVAL PLAN, REMOVAL RCP, CONSTRUCTION PLAN -- ROOM TYPE 1.2 & 1.2A REMOVAL PLAN, REMOVAL RCP, CONSTRUCTION PLAN -- ROOM TYPE 1.3 & 1.3A REMOVAL PLAN, REMOVAL RCP, CONSTRUCTION PLAN -- ROOM TYPE 1.4 & 1.4A REMOVAL PLAN, REMOVAL RCP, CONSTRUCTION PLAN -- ROOM TYPE 1.5 & 1.5A REMOVAL PLAN, REMOVAL RCP, CONSTRUCTION PLAN -- ROOM TYPE 2.1 (ADA) REMOVAL PLAN, REMOVAL RCP, CONSTRUCTION PLAN -- ROOM TYPE 2.2 (ADA) & 2.2A (ADA) REMOVAL PLAN, REMOVAL RCP, CONSTRUCTION PLAN -- ROOM TYPE 3 REMOVAL PLAN, REMOVAL RCP, CONSTRUCTION PLAN -- ROOM TYPE 4 REMOVAL PLAN, REMOVAL RCP, CONSTRUCTION PLAN -- ROOM TYPE 5 REMOVAL PLAN, REMOVAL RCP, CONSTRUCTION PLAN -- ROOM TYPE 6 (ADA) REMOVAL PLAN, REMOVAL RCP, CONSTRUCTION PLAN -- ROOM TYPE 7 FINISH PLANS, INTERIOR ELEVATIONS -- ROOM TYPE 1.1 & 1.1A FINISH PLANS, INTERIOR ELEVATIONS -- ROOM TYPE 1.2 & 1.2A FINISH PLANS, INTERIOR ELEVATIONS -- ROOM TYPE 1.3 & 1.3A FINISH PLANS, INTERIOR ELEVATIONS -- ROOM TYPE 1.4 & 1.4A FINISH PLANS, INTERIOR ELEVATIONS -- ROOM TYPE 1.5 & 1.5A FINISH PLANS, INTERIOR ELEVATIONS -- ROOM TYPE 2.1 (ADA) FINISH PLANS, INTERIOR ELEVATIONS -- ROOM TYPE 2.2 (ADA) & 2.2A (ADA) FINISH PLANS, INTERIOR ELEVATIONS -- ROOM TYPE 3 FINISH PLANS, INTERIOR ELEVATIONS -- ROOM TYPE 4 FINISH PLANS, INTERIOR ELEVATIONS -- ROOM TYPE 5 FINISH PLANS, INTERIOR ELEVATIONS -- ROOM TYPE 6 (ADA) FINISH PLANS, INTERIOR ELEVATIONS -- ROOM TYPE 7 DETAILS VANITY PLANS, ELEVATIONS & DETAILS VANITY PLANS, ELEVATIONS & DETAILS VANITY PLANS, ELEVATIONS & DETAILS VANITY PLANS, ELEVATIONS & DETAILS FINISH SCHEDULE FINISH SCHEDULE FINISH SCHEDULE PLUMBING FIXTURE SCHEDULE PLUMBING ACCESSORIES SCHEDULE, LIGHT FIXTURES SCHEDULE DOOR SCHEDULE M-001 MD-101 MD-102 M-101 M-102 M-201 E-000 ED-101 ED-102 E-101 E-102 P-100 P-101 P-102 P-103 P-104 P-105 P-106 P-107 GENERAL NOTES, SYMBOL LIST & SCHEDULE MECHANICAL DEMO PLANS, ROOM TYPES 1.1-1.5 MECHANICAL DEMO PLANS, ROOM TYPES 2-6 MECHANICAL PLANS, ROOM TYPES 1.1-1.5 MECHANICAL PLANS, ROOM TYPES 2-6 TOILET EXHAUST RISER DIAGRAM ELECTRICAL SYMBOL LIST & NOTES ELECTRICAL DEMO PLANS, ROOM TYPES 1.1-1.5 ELECTRICAL DEMO PLANS, ROOM TYPES 2-6 ELECTRICAL PLANS, ROOM TYPES 1.1-1.5 ELECTRICAL PLANS, ROOM TYPES 2-6 KEY PLAN, SYMBOLS & GENERAL NOTES TYPICAL GUEST ROOM RISER DIAGRAMS - PLUMBING TYPICAL GUEST ROOM RISER DIAGRAMS - PLUMBING TYPICAL GUEST ROOM RISER DIAGRAMS - PLUMBING GUEST ROOM PLANS AND DETAILS - PLUMBING GUEST ROOM PLANS AND DETAILS - PLUMBING GUEST ROOM PLANS AND DETAILS - PLUMBING GUEST ROOM PLANS AND DETAILS - PLUMBING 1 Addendum 2: August 22, 20141 Project Description:Cornell University Statler Hotel Guest Room RenovationIthaca, NY 14853Revisions:450 West 31 Street Floor 6New York, NY 10001212-245-5195 t212-239-7130 fRichard McElhiney Architects LLC161 Sixth Avenue Floor 3New York, NY 10013646-385-7625HOKKey Plan:Notes:July 30, 2014150 North Chestnut St.Rochester, NY 14604585-202-5590ME Engineering, PCN100% CDLocation Plans,A-002NotesNTSSite MapNTSLocation Map 1 2 INTERNATIONAL CODE COUNCIL (ICC) A117.1-2009 ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES STANDARD CLEARANCES: CLEAR WIDTH OF AN ACCESSIBLE ROUTE FIG 403.5 WHEELCHAIR TURNING SPACE 304.3.a CLEAR WIDTH OF DOORWAYS FIG 404.2.2 CLEAR FLOOR OR GROUND SPACE FIG 305.3 POSITION OF CLEAR FLOOR OR GROUND SPACE FIG 305.5 MANEUVERING CLEARANCE IN AN ALCOVE, FORWARD APPROACH FIG 305.7.1 VERTICAL CHANGE IN LEVEL FIG 303.2 32" MIN24" MAX60" MIN60" MIN 60" (1525MM) DIAMETER SPACE T-SHAPED TURNING SPACE60" MIN36" MIN12" MIN 36" MIN 12" MIN 32" MIN (a) DETAIL30" MIN48" MIN (A) FORWARD APPROACH (B) PARALLEL APPROACH NOTE: X = 12 IN (305 MM) IF DOOR HAS BOTH A CLOSER AND A CATCH FRONT APPROACHES - SWINGING DOOR NOTE: X = 36 IN (915 MM) MINIMUM IF Y = 60 IN (1525 MM) X = 42 IN (1065 MM) MINIMUM IF Y = 54 IN (1370 MM) NOTE: Y = 48 IN (1220 MM) MINIMUM IF DOOR HAS BOTH A CLOSER AND A LATCH HINGE SIDE APPROACHES - SWINGING DOOR NOTE: Y = 54 IN (1370 MM) MINIMUM IF DOOR HAS A CLOSER NOTE: Y = 48 IN (1220 MM) MINIMUM IF DOOR HAS A CLOSER LATCH SIDE APPROACHES SWINGING DOOR PULL SIDE X Y22" MIN 42" MINYPULL SIDE PUSH SIDE 60" MIN18" MIN 48" MINX48" MIN30" MIN 48" MIN30" MIN48" MINX > 24"36" MIN 60" MIN X > 15"30" MIN14" MAX1/4"-1/2"48" MINYPULL SIDE PUSH SIDE24" MIN 24" MIN 42" MINY20" MAX 48" MAX>20 - 25" MAX 44" MAXOBSTRUCTED HIGH FORWARD REACH FIG 308.2.2 46" MAX> 10 - 24" MAX34" MAXOBSTRUCTED HIGH SIDE REACH FIG 308.3.2 (B) MANEUVERING CLEARANCES AT MANUAL SWINGING DOORS AND GATES FIG 404.2.3.2 FIG 304.3.b MANEUVERING CLEARANCE IN AN ALCOVE, PARALLEL APPROACH FIG 305.7.2 BEVELED CHANGE IN LEVEL FIG 303.3 GENERAL NOTE: CONTRACTOR TO VERIFY, WHERE APPLICABLE AND / OR REQUIRED, CLEARANCES AS PER FIGURES ABOVE. MOUNTING HEIGHTS 4' - 0" MAX TYPICAL WALL SWITCH CL 1' - 6" TYP. TYPICAL WALL OUTLET CL48" MAX44" MAXUNOBSTRUCTED FORWARD REACH FIG 308.2.115" MIN.10" MAX UNOBSTRUCTED SIDE REACH FIG 308.3.1 (B)48" MAX15" MIN.DISTANCE BETWEEN CORRESPONDING DOTS IN ADJACENT CELLS DISTANCE BETWEEN DOTS IN THE SAME CELL DISTANCE BETWEEN CORRESPONDING DOTS FROM ONE CELL DIRECTLY BELOW DISTANCE BETWEEN DOTS IN THE SAME CELL SINGLE BRAILLE CELL BLANK CELL SPACE BETWEEN WORDS RAISED DOT DOT DIAMETER NO RAISED DOT FIG 703.4.3 3812" MIN3051.5" MINFIG 609.318" 9" FIG 604.5.1 12" MIN 305 24" MIN 610 36" MIN 915 FIG 604.5.256" MIN142060" MIN 1525 FIG 604.3 (A) WHEELCHAIR ACCESSIBLE WATER CLOSETS (B) AMBULATORY ACCESSIBLE WATER CLOSETS 16"-18" 405-455 17"-19" 430-485 FIG 604.2 SPACING OF GRAB BARS SIDE WALL GRAB BAR FOR WATER CLOSET REAR WALL GRAB BAR AT WATER CLOSET SIZE OF CLEARANCE FOR WATER CLOSET WATER CLOSET LOCATION BRAILLE MEASUREMENT (SIGNAGE BY OWNER)X> 27"685X > 80"2000LIMITS OF PROTRUDING OBJECTS FIG 307.2 MEN 6" MIN150NOT IN PICTOGRAM FIELD FIG 703.5 PICTOGRAM FIELD (SIGNAGE BY OWNER) 1 2 1/4"MAX.1/2" MAX(a) (b) (a)(b) 48" MIN.36" MIN.24" MAX ƒ(c,d) (g) (f) (e) (b)(a) FIG 604.4 WATER CLOSET SEAT HEIGHT17"-19"SEAT HEIGHT SECTION 609.4 35"SECTION609.4PROTRUDING TOILET PAPER DISPENSER BELOW GRAB BAR 1.5" ȭ FIG 604.7 TOILET PAPER HOLDER LOCATION FIG 608.3.2 Grab Bars in Standard Roll-In-Type Showers FIG 608.5.2 Standard Roll-In-Type Shower Control and Handshower Location FIG 607.4.2 Grab Bars for Bathtubs without Permanent Seats FIG 607.5 Location of Bathtub Controlscontrolendwallhead end wall 24 min61030512 min12 max 305 24 max 610 (b) plan 24 min 610 9 230 (a) elevation 35back wall control end wall 122048" max(a) without seat can be located on any wall of shower6 max6 max150150(a) without seat 6 max 150 6 max 150 side wall side wall back wall 36" min.965max3"to 6"18" min.17-25 9 230 430-635 6 max 150 30 min760(a) elevation (b) plan 11 min27 min685280 205 8 min 9 min 230 (a) elevation (b) plan 30 min760635 25 max FIGURE 306.3 KNEE CLEARANCE FIGURE 306.2 TOE CLEARANCE 2" LATCH SIDE 55"TO BASELINE OF LOWESTBRAILLE CELL2" LATCH SIDE 55"TO BASELINE OF LOWESTBRAILLE CELL36"B.O. MIRROR36"B.O. MIRROR12"12"45"MAX.45"MAX.9"MIN.27"34"8" MIN.9"MIN.27"34"8" MIN. ROOM SIGNAGEFULL-LENGTH MIRRORSHELF AND COAT HOOKMIRRORCOUNTER-MOUNTED LAVATORY MOUNTING HEIGHTS FOR RESTROOM ACCESSORIES CORNELL UNIVERSITY DESIGN STANDARDS. These standards shall take precedence. 1.COMPLETE COMPLIANCE WITH ALL ASPECTS OF 2010 ADA STANDARDS FOR ACCESSIBLE DESIGN AND ICC/ANSI A117.1-2003 IS REQUIRED OF ALL PROJECTS AND ACTIVITIES. 2.ALL OPERABLE HARDWARE, INCLUDING DOOR HARDWARE, TO BE LEVER TYPE. 3.WHERE A LOOSE TRASH CAN IS PROVIDED, ENSURE THAT TRASH CAN LOCATION DOES NOT INTERFERE WITH ANY REQUIRED MANEUVERING CLEARANCES. 4.DOOR THRESHOLDS SHOULD BE FLUSH WHEREVER POSSIBLE. THRESHOLD HEIGHT SHALL NOT EXCEED 1/8" CORNELL UNIVERSITY DESIGN STANDARDS ADDITIONAL NOTES: Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 450 West 31 Street Floor 6 New York, NY 10001 212-245-5195 t 212-239-7130 f Richard McElhiney Architects LLC 161 Sixth Avenue Floor 3 New York, NY 10013 646-385-7625 HOK Key Plan: Notes: July 30, 2014 150 North Chestnut St. Rochester, NY 14604 585-202-5590 ME Engineering, PC N 100% CD Typical Accessible A-003 Details ICC A117.1-2003 REFERENCE NOTES:SECTION 304 - TURNING SPACE307.2 PROTRUSION LIMITS.SECTION 505 - HANDRAILS505.7 CROSS SECTION. HANDRAIL GRIPPING SURFACES SHALL HAVE A CROSS SECTION COMPLYING WITH 505.7.1 OR 505.7.2.505.7.1 CIRCULAR CROSS SECTION. HANDRAIL GRIPPING SURFACES WITH A CIRCULAR CROSS SECTION SHALL HAVE AN OUTSIDE DIAMETER OF 1 14" (32mm) MINIMUM AND 2 INCHES (51mm) MAXIMUM.505.7.2 NON-CIRCULAR CROSS SECTIONS. HANDRAIL GRIPPING SURFACES WITH A NON-CIRCULAR CROSS SECTION SHALL HAVE A PERIMETER DIMENSION OF 4 INCHES (100 mm) MINIMUM AND 6 14 INCHES (160 mm) MAXIMUM, AND A CROSS SECTION DIMENSION OF 2 14 INCHES (57 mm) MAXIMUM.505.8 SURFACES. HANDRAIL GRIPPING SURFACES AND ANY SURFACES ADJACENT TO THEM SHALL BE FREE OF SHARP OR ABRASIVE ELEMENTS AND SHALL HAVE ROUNDED EDGES.505.9 FITTINGS. HANDRAILS SHALL NOT ROTATE WITHIN THEIR FITTINGS.505.10 HANDRAIL EXTENSIONS. HANDRAILS GRIPPING SURFACES SHALL EXTEND BEYOND AND IN THE SAME DIRECTION OF STAIR FLIGHTS AND RAMP RUNS IN ACCORDANCE WITH 505.10.SECTION 604 - WATER CLOSETS AND TOILET COMPARTMENTS604.2 LOCATION. THE WATER CLOSET SHALL BE POSITIONED WITH A WALL OR PARTITION TO THE REAR AND TO ONE SIDE. THE CENTERLINE OF THE WATER CLOSET SHALL BE 16 INCHES (405 mm) MINIMUM TO 18 INCHES (455 mm) MAXIMUM FROM THE SIDE WALL OR PARTITION, EXCEPT THAT THE WATER CLOSET SHALL BE 17 INCHES (430 mm) MINIMUM AND 19 INCHES (485 mm) MAXIMUM FROM THE SIDE WALL OR PARTITION IN THE AMBULATORY ACCESSIBLE TOILET COMPARTMENT SPECIFIED IN 604.8.2. WATER CLOSETS SHALL BE ARRANGED FOR A LEFT-HANDED OR RIGHT-HANDED APPROACH.604.3.1 SIZE. CLEARANCE AROUND A WATER CLOSET SHALL BE 60 INCHES (1525 mm) MINIMUM MEASURED PERPENDICULAR FROM THE SIDE WALL AND 56 INCHES (1420 mm) MINIMUM MEASURED PERPENDICULAR FROM THE REAR WALL.604.5.1 SIDE WALL.604.5.2 REAR WALL. THE REAR WALL GRAB BAR SHALL BE 36 INCHESLONG AND EXTEND FROM THE CENTERLINE OF THE WATER CLOSET 12 INCHES (305 mm) ON ONE SIDE AND 24 INCHES (610 mm) ON THE TRANSFER SIDE.604.9.3 DOORSSECTION 606 - LAVATORIES AND SINKS606.1 LAVATORIES AND SINKS - GENERAL. LAVATORIES AND SINKS SHALL COMPLY WITH 606.606.2 CLEAR FLOOR SPACE.606.3 HEIGHT. LAVATORIES AND SINKS SHALL BE INSTALLED WITH THE FRONT OF THE HIGHER OF THE RIM OR COUNTER SURFACE 34 INCHES (865 mm) MAXIMUM ABOVE THE FINISH FLOOR OR GROUND.606.4 FAUCETS. CONTROLS FOR FAUCETS SHALL COMPLY WITH 309. HAND OPERATED MEETING FAUCETS SHALL REMAIN OPEN FOR 10 SECONDS MINIMUM.606.6 EXPOSED PIPES AND SURFACES. WATER SUPPLY AND DRAIN PIPES UNDER LAVATORIES AND SINKS SHALL BE INSULATED OR OTHERWISE CONFIGURED TO PROTECT AGAINST CONTACT. THERE SHALL BE NO SHARP OR ABRASIVE SURFACES UNDER LAVATORIES AND SINKS.SECTION 609 - GRAB BARS609.3 SPACING.SECTION 703 - SIGNS (SIGNAGE BY OWNER)703.1 SIGNS - GENERAL.703.2.4 CHARACTER HEIGHT.703.4.5 MOUNTING HEIGHT703.5.2 PICTOGRAM FIELD PICTOGRAMS SHALL HAVE A FIELD HEIGHT OF 6 INCHES (150 MM) MINIMUM. CHARACTERS AND BRAILLE SHALL NOT BE LOCATED IN THE PICTOGRAM FIELD. OBJECTS WITH LEADING EDGES MORE THAN 27 INCHES(685 mm) AND NOT MORE THAN 80 INCHES (2030 mm)ABOVE THE FINISH FLOOR OR GROUND SHALLPROTRUDE 4 INCHES (100 mm) MAXIMUM HORIZONTALLYINTO THE CIRCULATION PATH.EXCEPTION: HANDRAILS SHALL BE PERMITTED TOPROTRUDE 4 1/2" (115MM) MAXIMUM. FIXED SIDE-WALL GRAB BARS SHALL BE 48 INCHESLONG, LOCATED 10 INCHES FROM THE REAR WALL.IN ADDITION , A VERTICAL GRAB BAR 18 INCHES INLENGTH SHALL BE MOUNTED WITH THE BOTTOM OFTHE BAR LOCATED 40 INCHES ABOVE THE FLOOR,AND WITH THE CENTER LINE OF THE BAR LOCATED40 INCHES FROM THE REAR WALL.TOILET COMPARTMENT DOORS, INCLUDING DOORHARDWARE, SHALL COMPLY WITH SECTION 404,EXCEPT IF THE APPROACH IS TO THE LATCH SIDE OFTHE COMPARTMENT DOOR CLEARANCE BETWEEN THEDOOR SIDE OF THE STALL AND ANY OBSTRUCTIONSHALL BE 42 INCHES (1065 MM) MINIMUM. THE DOORSHALL BE SELF-CLOSING. A DOOR PULL COMPLYINGWITH SECTION 404.2.6 SHALL BE PLACED ON BOTHSIDES OF THE DOOR NEAR THE LATCH. TOILETCOMPARTMENT DOORS SHALL NOT SWING INTO THEREQUIRED MINIMUM AREA OF THE COMPARTMENT.A CLEAR FLOOR SPACE COMPLYING WITH SECTION305.3, POSITIONED FOR FORWARD APPROACH, SHALLBE PROVIDED. KNEE AND TOE CLEARANCECOMPLYINGWITH SECTION 306 SHALL BE PROVIDED. THE DIP OFTHE OVERFLOW SHALL NOT BE CONSIDERED INDETERMINING KNEE AND TOE CLEARANCES.EXCEPTIONS:1 . A PARALLEL APPROACH COMPLYING WITHSECTION 305AND CENTERED ON THE SINK, SHALL BE PERMITTEDTOA KITCHEN SINK IN A SPACE WHERE A COOK TOP ORCONVENTIONAL RANGE IS NOT PROVIDED.2. THE REQUIREMENT FOR KNEE AND TOECLEARANCESHALL NOT APPLY TO A LAVATORY IN A TOILET ORBATHING FACILITY FOR A SINGLE OCCUPANT,ACCESSED ONLYTHROUGH A PRIVATE OFFICE AND NOT FOR COMMONUSE OR PUBLIC USE.3. A KNEE CLEARANCE OF 24 INCHES (610 MM)MINIMUMABOVE THE FLOOR SHALL BE PERMITTED ATLAVATORIESAND SINKS USED PRIMARILY BY CHILDREN AGES 6THROUGH 12 WHERE THE RIM OR COUNTER SURFACEIS 31 INCHES (785 MM) MAXIMUM ABOVE THE FLOOR.4. A PARALLEL APPROACH COMPLYING WITH SECTION305 AND CENTERED ON THE SINK, SHALL BEPERMITTED AT LAVATORIES AND SINKS USEDPRIMARILY BYCHILDREN AGES 5 AND YOUNGER.THE SPACE BETWEEN THE WALL AND THE GRAB BAR SHALLBE 1 1/2 INCHES (38 MM). THE SPACE BETWEEN THE GRABBAR AND PROJECTING OBJECTS BELOW AND AT THE ENDSSHALL BE 1 1/2 INCHES (38 MM) MINIMUM. THE SPACEBETWEEN THE GRAB BAR AND PROJECTING OBJECTS ABOVESHALL BE 12 INCHES (305 MM) MINIMUM.ACCESSIBLE SIGNS SHALL COMPLY WITH SECTION703. TACTILE SIGNS SHALL CONTAIN BOTH RAISEDCHARACTERS AND BRAILLE. WHERE SIGNS WITHBOTH VISUAL AND RAISED CHARACTERS AREREQUIRED, EITHER ONE SIGN WITH BOTH VISUAL ANDRAISED CHARACTERS, OR TWO SEPARATE SIGNS,ONE WITH VISUAL, AND ONE WITH RAISEDCHARACTERS, SHALL BE PROVIDED.703.1.1 DESIGNATIONS.INTERIOR AND EXTERIOR SIGNS IDENTIFYINGPERMANENT ROOMS AND SPACES SHALL COMPLYWITH SECTIONS 703.1, 703.2, AND 703.3.EXCEPTION: EXTERIOR SIGNS THAT ARE NOTLOCATED ATTHE DOOR TO THE SPACE THEY SERVE SHALL NOT BEREQUIRED TO COMPLY WITH SECTION 703.3.703.1.2 DIRECTIONAL AND INFORMATIONAL SIGNS.SIGNS THAT PROVIDE DIRECTION TO ORINFORMATION ABOUT INTERIOR SPACES ANDFACILITIES OF THE SITE SHALL COMPLY WITHSECTION 703.2.HEIGHT ABOVE FLOOR TO BASELINE OF CHARACTERHORIZONTAL VIEWING DISTANCEMINIMUM CHARACTER HEIGHT40 INCHES (1015 MM) TO LESS THAN OR EQUAL TO 70INCHES (1780 MM)GREATER THAN 70 INCHES (1780 MM) TO LESS THANOR EQUAL TO 120 INCHES (3050 MM)GREATER THAN 120 INCHES (3050 MM)LESS THAN 6 FEET (1830 MM)6 FEET (1830 MM) AND GREATERLESS THAN 15 FEET (4570 MM)15 FEET (4570 MM) AND GREATERLESS THAN 21 FEET (6400 MM)21 FEET (6400 MM) AND GREATER5/8 INCH (16 MM)5/8 INCH (16 MM), PLUS 1/8 INCH (3.2 MM) PER FOOT(305 MM) OF VIEWING DISTANCE ABOVE 6 FEET(1830 MM)2 INCHES (51 MM)2 INCHES (51 MM), PLUS 1/8 INCH (3.2 MM) PER FOOT(305 MM) OF VIEWING DISTANCE ABOVE 15 FEET (4570MM)3 INCHES (75 MM)3 INCHES (75 MM), PLUS 1/8 INCH (3.2 MM) PER FOOT(305 MM) OF VIEWING DISTANCE ABOVE 21 FEET (6400MM)TABLE 703.2.4 - VISUAL CHARACTER HEIGHT (SIGNAGE BY OWNER)THE UPPERCASE LETTER "I" SHALL BE USED TO DETERMINETHE ALLOWABLE HEIGHT OF ALL CHARACTERS OF A FONT.THE UPPERCASE LETTER "I" OF THE FONT SHALL HAVE AMINIMUM HEIGHT COMPLYING WITH TABLE 703.2.4. VIEWINGDISTANCE SHALL BE MEASURED AS THE HORIZONTALDISTANCE BETWEEN THE CHARACTER AND AN OBSTRUCTIONPREVENTING FURTHER APPROACH TOWARDS THE SIGN.BRAILLE SHALL BE 55 INCHES ABOVE THE FLOOR, MEASUREDTO THE BASELINE OF THE BRAILLE CELLS.703.1.3 PICTOGRAMS.WHERE PICTOGRAMS ARE PROVIDED ASDESIGNATIONS OF PERMANENT INTERIOR ROOMSAND SPACES, THE PICTOGRAMS SHALL COMPLYWITH SECTION 703.5 AND SHALL HAVE TEXTDESCRIPTORS LOCATED DIRECTLY BELOW THEPICTOGRAM FIELD AND COMPLYING WITHSECTIONS 703.2 AND 703.3.EXCEPTION: PICTOGRAMS THAT PROVIDEINFORMATIONABOUT A ROOM OR SPACE, SUCH AS "NO SMOKING",OCCUPANT LOGOS, AND THE INTERNATIONALSYMBOL OFACCESSIBILITY, ARE NOT REQUIRED TO HAVE TEXTDESCRIPTORS.608.2.2 STANDARD ROLL-IN-TYPE SHOWER COMPARTMENTS.STANDARD ROLL-IN-TYPE SHOWER COMPARTMENTSSHALL HAVE A CLEAR INSIDE DIMENSION OF 60 INCHES(1525 MM) MINIMUM IN WIDTH AND 30 INCHES (760 MM)MINIMUM IN DEPTH; MEASURED AT THE CENTER POINTOF OPPOSING SIDES. AN ENTRY 60 INCHES (1525 MM)MINIMUM IN WIDTH SHALL BE PROVIDED.A CLEARANCE OF 60 INCHES (1525 MM) MINIMUM INLENGTH ADJACENT TO THE 60-INCH (1525 MM) WIDTHOF THE OPEN FACE OF THE. SHOWER COMPARTMENT,AND 30 INCHES (760 MM) MINIMUM IN DEPTH, SHALL BEPROVIDED.WHERE SHOWER CONTROLS ARE LOCATED ON THEBACK WALL AND NO SEAT IS PROVIDED, THE LAVATORYSHALL BE PERMITTED AT EITHER END OF THECLEARANCE.608.3 GRAB BARS.GRAB BARS SHALL COMPLY WITH SECTION 609 ANDSHALL BE PROVIDED IN ACCORDANCE WITH SECTION608.3. WHERE MULTIPLE GRAB BARS ARE USED,REQUIRED HORIZONTAL GRAB BARS SHALL BEINSTALLED AT THE SAME HEIGHT ABOVE THE FLOOR.608.3.2 STANDARD ROLL-IN-TYPE SHOWERS.IN STANDARD ROLL-IN TYPE SHOWERS, GRAB BARSSHALL BE PROVIDED ON THREE WALLS OF SHOWERSWITHOUT SEATS.WHERE A SEAT IS PROVIDED IN A STANDARD ROLL-INTYPE SHOWER, GRAB BARS SHALL BE PROVIDED ONTHE BACK WALL AND ON THE WALL OPPOSITE THESEAT. GRAB BARS SHALL NOT BE PROVIDED ABOVETHE SEAT. GRAB BARS SHALL BE 6 INCHES (150 MM)MAXIMUM FROM THE ADJACENT WALL.608.5 CONTROLS AND HAND SHOWERS.CONTROLS AND HAND SHOWERS SHALL COMPLY WITHSECTIONS 608.5 AND 309.4.608.5.2 STANDARD ROLL-IN SHOWERS.IN STANDARD ROLL-IN SHOWERS, THE CONTROLS ANDHAND SHOWER SHALL BE LOCATED 38 INCHES (965 MM)MINIMUM AND 48 INCHES '(1220 MM) MAXIMUM ABOVETHE SHOWER FLOOR.608.6 HAND SHOWERS.A HAND SHOWER WITH A HOSE 59 INCHES (1500MM)MINIMUM IN LENGTH, THAT CAN BE USED BOTH AS AFIXED SHOWER HEAD AND AS A HAND SHOWER, SHALLBE PROVIDED. THE HAND SHOWER SHALL HAVE ACONTROL WITH A NONPOSITIVE SHUT-OFF FEATURE.AN ADJUSTABLE-HEIGHT SHOWER HEAD MOUNTED ONA VERTICAL BAR SHALL BE INSTALLED SO AS TO NOTOBSTRUCT THE USE OF GRAB BARS.608.9 WATER TEMPERATURE.SHOWERS SHALL DELIVER WATER THAT IS 120DEGREES F (49 DEGREES C) MAXIMUM.607.1 GENERAL.ACCESSIBLE BATHTUBS SHALL COMPLY WITH SECTION607.607.2 CLEARANCE.A CLEARANCE IN FRONT OF BATHTUBS EXTENDING THELENGTH OF THE BATHTUB AND 30 INCHES (760 MM)MINIMUM IN DEPTH SHALL BE PROVIDED. WHERE APERMANENT SEAT IS PROVIDED AT THE HEAD END OFTHE BATHTUB, THE CLEARANCE SHALL EXTEND 12INCHES (305 MM) MINIMUM QEYOND THE WALL AT THEHEAD END OF THE BATHTUB.607.3 SEAT.A PERMANENT SEAT ATTHE HEAD END OF THEBATHTUB OR A REMOVABLE IN-TUB SEAT SHALL BEPROVIDED. SEATS SHALL COMPLY WITH SECTION 610.607.4 GRAB BARS.GRAB BARS SHAIL COMPLY WITH SECTION 609 ANDSHALL BE PROVIDED IN ACCORDANCE WITH SECTION607.4.1 OR 607.4.2.607.4.2 BATHTUBS WITHOUT PERMANENT SEATS.FOR BATHTUBS WITHOUT PERMANENT SEATS, GRABBARS COMPLYING WITH SECTION 607.4.2 SHALL BEPROVIDED.607.4.2.1 BACK WALL.TWO HORIZONTAL GRAB BARS SHALL BE PROVIDED ONTHE BACK WALL, ONE COMPLYING WITH SECTION 609.4AND THE OTHER 9 INCHES (230 MM) ABOVE THE RIM OFTHE BATHTUB.EACH GRAB BAR SHALL BE 24 INCHES (610 MM)MINIMUM IN LENGTH, LOCATED 24 INCHES (610 MM)MAXIMUM FROM THE HEAD END WALL AND EXTEND TO12 INCHES (305 MM) MAXIMUM FROM THE CONTROL ENDWALL.607.4.2.2 CONTROL END WALL.CONTROL END WALL GRAB BARS SHALL COMPLY WITHSECTION 607.4.2.2.EXCEPTION: AN L-SHAPED CONTINUOUS GRAB BAR OFEQUIVALENT DIMENSIONS AND POSITIONING SHALL BEPERMITTED TO SERVE THE FUNCTION OF SEP~RATEVERTICAL AND HORIZONTAL GRAB BARS.607.4.2.2.1 HORIZONTAL GRAB BAR.A HORIZONTAL GRAB BAR 24 INCHES (610 MM) MINIMUMIN LENGTH SHALL BE PROVIDED ON THE CONTROL ENDWALL BEGINNING NEAR THE FRONT EDGE OF THEBATHTUB AND EXTEND TOWARD THE INSIDE CORNEROF THE BATHTUB.607.4.2.2.2 VERTICAL GRAB BAR.A VERTICAL GRAB BAR 18 INCHES (455 MM) MINIMUM INLENGTH SHALL BE PROVIDED ON THE CONTROL ENDWALL 3 INCHES (76 MM) MINIMUM TO 6 INCHES (150 MM)MAXIMUM ABOVE THE HORIZONTAL GRAB BAR, AND 4INCHES (102 MM) MAXIMUM INWARD FROM THE FRONTEDGE OF THE BATHTUB.607.4.2.3 HEAD END WALL.A HORIZONTAL GRAB BAR 12 INCHES (305 MM) MINIMUMIN LENGTH SHALL BE PROVIDED ON THE HEAD ENDWALL AT THE FRONT EDGE OF THE BATHTUB.607.5 CONTROLS.CONTROLS, OTHER THAN DRAIN STOPPERS, SHALL BE3529,'('21$1(1'ā:$///2&$7('%(7:((17+(BATHTUB RIM AND GRAB BAR, AND BETWEEN THE OPENSIDE OF THE BATHTUB AND THE MIDPOINT OF THEWIDTH OF THE BATHTUB. CONTROLS SHALL COMPLYWITH SECTION 309.4.607.6 HAND SHOWER.A HAND SHOWER WITH A HOSE 59 INCHES (1500 MRN)MINIMUM IN LENGTH, THAT CAN BE USED AS BOTH A),;('6+2:(5+($'$1'$6ā$+$1'6+2:(56+$//%(ā3529,'('7+(+$1'6+2:(56+$//+$9($CONTROL WITH A NONPOSITIVE SHUT-OFT FEATURE.AN ADJUSTABLE-HEIGHT HAND SHOWER MOUNTED ONA VERTICAL BAR SHALL BE INSTALLED SO AS TO NOTOBSTRUCT THE USE OF GRAB BARS.607.7 BATHTUB ENCLOSURES.ENCLOSURES FOR BATHTUBS SHALL NOT OBSTRUCTCONTROLS OR TRANSFER FROM WHEELCHAIRS ONTO%$7+78%6($7625,172%$7+78%6(1&/2685(6ā21BATHTUBS SHALL NOT HAVE TRACKS INSTALLED ONTHE RIM OF THE BATHTUB .607.8 WATER TEMPERATURE.BATHTUBS SHALL DELIVER WATER THAT IS 120DEGREES F (49 DEGREES C) MAXIMUM.SECTION 608 - SHOWER COMPARTMENTS608.1 GENERAL.ACCESSIBLE SHOWER COMPARTMENTS SHALL COMPLYWITH SECTION 608.SECTION 607 - BATHTUBS306.3 KNEE CLEARANCE.306.3.1 GENERAL.SPACE UNDER AN ELEMENT BETWEEN 9 INCHES (230MM) AND 27 INCHES (685 MM) ABOVE THE FINISHFLOOR OR GROUND SHALL BE CONSIDERED KNEECLEARANCE AND SHALL COMPLY WITH 306.3.306.3.2 MAXIMUM DEPTH. KNEE CLEARANCE SHALLEXTEND 25 INCHES (635 MM) MAXIMUM UNDER ANELEMENT AT 9 INCHES (230 MM) ABOVE THE FINISHFLOOR OR GROUND.306.3.3 MINIMUM REQUIRED DEPTH.WHERE KNEE CLEARANCE IS REQUIRED UNDER ANELEMENT AS PART OF A CLEAR FLOOR SPACE, THEKNEE CLEARANCE SHALL BE 11 INCHES (280 MM)DEEP MINIMUM AT 9 INCHES (230 MM) ABOVE THEFINISH FLOOR OR GROUND, AND 8 INCHES (205 MM)DEEP MINIMUM AT 27 INCHES (685 MM) ABOVE THEFINISH FLOOR OR GROUND.306.3.4 CLEARANCE REDUCTION.BETWEEN 9 INCHES (230 MM) AND 27 INCHES (685 MM)ABOVE THE FINISH FLOOR OR GROUND, THE KNEECLEARANCE SHALL BE PERMITTED TO REDUCE AT ARATE OF 1 INCH (25 MM) IN DEPTH FOR EACH 6INCHES (150 MM) IN HEIGHT.306.3.5 WIDTH.KNEE CLEARANCE SHALL BE 30 INCHES (760 MM)WIDE MINIMUM.306 KNEE AND TOE CLEARANCE306.2 TOE CLEARANCE.306.2.1 GENERAL.SPACE UNDER AN ELEMENT BETWEEN THE FINISHFLOOR OR GROUND AND 9 INCHES (230 MM) ABOVETHE FINISH FLOOR OR GROUND SHALL BECONSIDERED TOE CLEARANCE AND SHALL COMPLYWITH 306.2.306.2.2 MAXIMUM DEPTH.TOE CLEARANCE SHALL EXTEND 25 INCHES (635 MM)MAXIMUM UNDER AN ELEMENT. 306.2.3 MINIMUM REQUIRED DEPTH.WHERE TOE CLEARANCE IS REQUIRED AT ANELEMENT AS PART OF A CLEAR FLOOR SPACE, THETOE CLEARANCE SHALL EXTEND 17 INCHES (430 MM)MINIMUM UNDER THE ELEMENT.306.2.4 ADDITIONAL CLEARANCE.SPACE EXTENDING GREATER THAN 6 INCHES (150MM) BEYOND THE AVAILABLE KNEE CLEARANCE AT 9INCHES (230 MM) ABOVE THE FINISH FLOOR ORGROUND SHALL NOT BE CONSIDERED TOECLEARANCE.306.2.5 WIDTH.TOE CLEARANCE SHALL BE 30 INCHES (760 MM) WIDEMINIMUM.Cornell University Statler Hotel Guest Room RenovationIthaca, NY 14853Revisions:450 West 31 Street Floor 6New York, NY 10001212-245-5195 t212-239-7130 fRichard McElhiney Architects LLC161 Sixth Avenue Floor 3New York, NY 10013646-385-7625HOKKey Plan:Notes:July 30, 2014150 North Chestnut St.Rochester, NY 14604585-202-5590ME Engineering, PCN100% CDTypical Accessible A-004Notes Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 450 West 31 Street Floor 6 New York, NY 10001 212-245-5195 t 212-239-7130 f Richard McElhiney Architects LLC 161 Sixth Avenue Floor 3 New York, NY 10013 646-385-7625 HOK Key Plan: Notes: July 30, 2014 150 North Chestnut St. Rochester, NY 14604 585-202-5590 ME Engineering, PC N 100% CD Construction Schedule A-005 & Phasing If access is required for plumbing work from above when floor is not available, finished ceiling access panels on Floors 3-8, which will allow Contractor to install P-trap and related plumbing and allow the room to be sold thereafter. 1 Room Availability Schedule 2 NTS Access Panels The Building Department will not permit floors to be partially under construction. Where the schedule above has no shading or black shading, the entire floor must be cleared of all personnel, material, debris; must be fully operational and all rooms must be available to be sold. Addendum 11 1 1 1 1 2 A-006 Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 450 West 31 Street Floor 6 New York, NY 10001 212-245-5195 t 212-239-7130 f Richard McElhiney Architects LLC 161 Sixth Avenue Floor 3 New York, NY 10013 646-385-7625 HOK Key Plan: Notes: July 30, 2014 150 North Chestnut St. Rochester, NY 14604 585-202-5590 ME Engineering, PC N 100% CD Site Plan A-006 Staging & Access Diagram 2 1/16" = 1'-0" Staging & Access Diagram11" = 50'-0" Site Location Plan Addendum 2: August 22, 20141 1 1 A0.001Symbol Key:0A0.00 A0.00A0.0Abbreviations:Symbol Key:SDCornell University Statler Hotel Guest Room RenovationIthaca, NY 14853Revisions:450 West 31 Street Floor 6New York, NY 10001212-245-5195 t212-239-7130 fRichard McElhiney Architects LLC161 Sixth Avenue Floor 3New York, NY 10013646-385-7625HOKKey Plan:Notes:July 30, 2014150 North Chestnut St.Rochester, NY 14604585-202-5590ME Engineering, PCN100% CDSymbol Key,A-007Abbreviations 1 Room 718A - Looking East 5 Room 718A - Looking East 2 Room 718A - Looking South 6 Room 718A - Looking South 3 Room 718A - Looking South 9 Room 718 - Looking South 10 Room 718 - Looking North 11 Room 718- Looking East 4 Room 718A - Shower Light Installation 7 Room 718A - Looking South 8 Room 718A- Looking South Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 450 West 31 Street Floor 6 New York, NY 10001 212-245-5195 t 212-239-7130 f Richard McElhiney Architects LLC 161 Sixth Avenue Floor 3 New York, NY 10013 646-385-7625 HOK Key Plan: Notes: July 30, 2014 150 North Chestnut St. Rochester, NY 14604 585-202-5590 ME Engineering, PC N 100% CD Photographs taken during A-008 Renovation of 718 & 718A OVERALL PLAN1/8" = 1'-0"A-101THIRD FLOOR11/8" = 1'-0"THIRD FLOOR PLANCornell University Statler Hotel Guest Room RenovationIthaca, NY 14853Revisions:450 West 31 Street Floor 6New York, NY 10001212-245-5195 t212-239-7130 fRichard McElhiney Architects LLC161 Sixth Avenue Floor 3New York, NY 10013646-385-7625HOKKey Plan:Notes:July 30, 2014150 North Chestnut St.Rochester, NY 14604585-202-5590ME Engineering, PCN100% CD1ASI No. 1: September 19, 20141 OVERALL PLANS 1/8" = 1'-0" A-102 FOURTH & FIFTH FLOORS 1 1/8" = 1'-0" FOURTH FLOOR PLAN Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 450 West 31 Street Floor 6 New York, NY 10001 212-245-5195 t 212-239-7130 f Richard McElhiney Architects LLC 161 Sixth Avenue Floor 3 New York, NY 10013 646-385-7625 HOK Key Plan: Notes: July 30, 2014 150 North Chestnut St. Rochester, NY 14604 585-202-5590 ME Engineering, PC N 100% CD 2 1/8" = 1'-0" FIFTH FLOOR PLAN 1 ASI No. 1: September 19, 20141 OVERALL PLANS 1/8" = 1'-0" A-103 SIXTH & SEVENTH FLOORS 1 1/8" = 1'-0" SIXTH FLOOR PLAN Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 450 West 31 Street Floor 6 New York, NY 10001 212-245-5195 t 212-239-7130 f Richard McElhiney Architects LLC 161 Sixth Avenue Floor 3 New York, NY 10013 646-385-7625 HOK Key Plan: Notes: July 30, 2014 150 North Chestnut St. Rochester, NY 14604 585-202-5590 ME Engineering, PC N 100% CD 2 1/8" = 1'-0" SEVENTH FLOOR PLAN 1 ASI No. 1: September19, 20141 OVERALL PLANS 1/8" = 1'-0" A-104 EIGHTH & NINTH FLOORS 1 1/8" = 1'-0" EIGHTH FLOOR PLAN Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 450 West 31 Street Floor 6 New York, NY 10001 212-245-5195 t 212-239-7130 f Richard McElhiney Architects LLC 161 Sixth Avenue Floor 3 New York, NY 10013 646-385-7625 HOK Key Plan: Notes: July 30, 2014 150 North Chestnut St. Rochester, NY 14604 585-202-5590 ME Engineering, PC N 100% CD 2 1/8" = 1'-0" NINTH FLOOR PLAN 1 1 Addendum 2: August 22, 20141 2 ASI No. 2: September 19, 20142 2 A-131 1 A-131 Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 450 West 31 Street Floor 6 New York, NY 10001 212-245-5195 t 212-239-7130 f Richard McElhiney Architects LLC 161 Sixth Avenue Floor 3 New York, NY 10013 646-385-7625 HOK Key Plan: Notes: July 30, 2014 150 North Chestnut St. Rochester, NY 14604 585-202-5590 ME Engineering, PC N 100% CD Removal & Construction Plans 1/2" = 1'-0" A-111 Room Types 1.1 & 1.1A 3 1/2" = 1'-0" ROOM TYPE 1.1 & 1.1A: CONSTRUCTION PLAN11/2" = 1'-0" ROOM TYPE 1.1 & 1.1A: REMOVAL PLAN 2 1/2" = 1'-0" ROOM TYPE 1.1 & 1.1A: REMOVAL RCP Addendum 2: August 22, 20141 1 1 A-132 2 A-132 1 1/2" = 1'-0" ROOM TYPE 1.2 & 1.2A: REMOVAL PLAN Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 450 West 31 Street Floor 6 New York, NY 10001 212-245-5195 t 212-239-7130 f Richard McElhiney Architects LLC 161 Sixth Avenue Floor 3 New York, NY 10013 646-385-7625 HOK Key Plan: Notes: July 30, 2014 150 North Chestnut St. Rochester, NY 14604 585-202-5590 ME Engineering, PC N 100% CD 3 1/2" = 1'-0" ROOM TYPE 1.2 & 1.2A: CONSTRUCTION PLAN Removal & Construction Plans 1/2" = 1'-0" A-112 Room Type 1.2 & 1.2A 2 1/2" = 1'-0" ROOM TYPE 1.2 & 1.2A: REMOVAL RCP 1 Addendum 2: August 22, 20141 1 1/2" = 1'-0" ROOM TYPE 1.3 (ROOMS 409, 509, 609, 709, 809 & 909) & 1.3A (ROOM 309): REMOVAL PLAN Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 450 West 31 Street Floor 6 New York, NY 10001 212-245-5195 t 212-239-7130 f Richard McElhiney Architects LLC 161 Sixth Avenue Floor 3 New York, NY 10013 646-385-7625 HOK Key Plan: Notes: July 30, 2014 150 North Chestnut St. Rochester, NY 14604 585-202-5590 ME Engineering, PC N 100% CD 3 1/2" = 1'-0" ROOM TYPE 1.3 (ROOMS 409, 509, 609, 709, 809 & 909) & 1.3A (ROOM 309): CONSTRUCTION PLAN Removal & Construction Plans 1/2" = 1'-0" A-113 Room Type 1.3 & 1.3A 2 1/2" = 1'-0" ROOM TYPE 1.3 (ROOMS 409, 509, 609, 709, 809 & 909) & 1.3A (ROOM 309): REMOVAL RCP 1 1 Addendum 2: August 22, 20141 2 A-134 1 A-134 1 1/2" = 1'-0" ROOM TYPE 1.4 (ROOMS 411, 511, 611, 711, 811 & 911) & 1.4A (ROOM 311): REMOVAL PLAN Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 450 West 31 Street Floor 6 New York, NY 10001 212-245-5195 t 212-239-7130 f Richard McElhiney Architects LLC 161 Sixth Avenue Floor 3 New York, NY 10013 646-385-7625 HOK Key Plan: Notes: July 30, 2014 150 North Chestnut St. Rochester, NY 14604 585-202-5590 ME Engineering, PC N 100% CD 3 1/2" = 1'-0" ROOM TYPE 1.4 (ROOMS 411, 511, 611, 711, 811 & 911) & 1.4A (ROOM 311): CONSTRUCTION PLAN Removal & Construction Plans 1/2" = 1'-0" A-114 Room Type 1.4 & 1.4A 2 1/2" = 1'-0" ROOM TYPE 1.4 (ROOMS 411, 511, 611, 711, 811 & 911) & 1.4A (ROOM 311): REMOVAL RCP 1 Addendum 2: August 22, 20141 2 A-135 1 1/2" = 1'-0" ROOM TYPE 1.5 (ROOMS 414, 514, 614, 714, 814 & 914) & 1.5A (ROOM 314): REMOVAL PLAN Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 450 West 31 Street Floor 6 New York, NY 10001 212-245-5195 t 212-239-7130 f Richard McElhiney Architects LLC 161 Sixth Avenue Floor 3 New York, NY 10013 646-385-7625 HOK Key Plan: Notes: July 30, 2014 150 North Chestnut St. Rochester, NY 14604 585-202-5590 ME Engineering, PC N 100% CD 3 1/2" = 1'-0" ROOM TYPE 1.5 (ROOMS 414, 514, 614, 714, 814 & 914) & 1.5A (ROOM 314): CONSTRUCTION PLAN Removal & Construction Plans 1/2" = 1'-0" A-115 Room Type 1.5 & 1.5A 2 1/2" = 1'-0" ROOM TYPE 1.5 (ROOMS 414, 514, 614, 714, 814 & 914) & 1.5A (ROOM 314): REMOVAL RCP 1 Addendum 2: August 22, 20141 1 1/2" = 1'-0" ROOM TYPE 2.1 (ROOMS 526 & 626): REMOVAL PLAN Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 450 West 31 Street Floor 6 New York, NY 10001 212-245-5195 t 212-239-7130 f Richard McElhiney Architects LLC 161 Sixth Avenue Floor 3 New York, NY 10013 646-385-7625 HOK Key Plan: Notes: July 30, 2014 150 North Chestnut St. Rochester, NY 14604 585-202-5590 ME Engineering, PC N 100% CD 3 1/2" = 1'-0" ROOM TYPE 2.1 (ROOMS 526 & 626): CONSTRUCTIOON PLAN Removal & Construction Plans 1/2" = 1'-0" A-116 Room Type 2.1 (ADA) 2 1/2" = 1'-0" ROOM TYPE 2.1 (ROOMS 526 & 626): REMOVAL RCP 1 Addendum 2: August 22, 20141 1 1 1 1 1/2" = 1'-0" ROOM TYPE 2.2 (ROOMS 426, 826 & 926) & 2.2A (ROOM 326): REMOVAL PLAN Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 450 West 31 Street Floor 6 New York, NY 10001 212-245-5195 t 212-239-7130 f Richard McElhiney Architects LLC 161 Sixth Avenue Floor 3 New York, NY 10013 646-385-7625 HOK Key Plan: Notes: July 30, 2014 150 North Chestnut St. Rochester, NY 14604 585-202-5590 ME Engineering, PC N 100% CD 3 1/2" = 1'-0" ROOM TYPE 2.2 (ROOMS 426, 826 & 926) & 2.2A (ROOM 326): CONSTRUCTION PLAN Removal & Construction Plans 1/2" = 1'-0" A-117 Room Type 2.2 & 2.2A (ADA) 2 1/2" = 1'-0" ROOM TYPE 2.2 (ROOMS 426, 826 & 926) & 2.2A (ROOM 326): REMOVAL RCP 1 Addendum 2: August 22, 20141 1 1 1 1 A-138 2 A-138 1 1/2" = 1'-0" ROOM TYPE 3 (ROOMS 302, 402, 602 & 902): REMOVAL PLAN Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 450 West 31 Street Floor 6 New York, NY 10001 212-245-5195 t 212-239-7130 f Richard McElhiney Architects LLC 161 Sixth Avenue Floor 3 New York, NY 10013 646-385-7625 HOK Key Plan: Notes: July 30, 2014 150 North Chestnut St. Rochester, NY 14604 585-202-5590 ME Engineering, PC N 100% CD 2 1/2" = 1'-0" ROOM TYPE 3 (ROOMS 302, 402, 602 & 902): CONSTRUCTION PLAN Removal & Construction Plans 1/2" = 1'-0" A-118 Room Type 3 1 1/2" = 1'-0" ROOM TYPE 4 (ROOMS 702 & 802): REMOVAL PLAN Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 450 West 31 Street Floor 6 New York, NY 10001 212-245-5195 t 212-239-7130 f Richard McElhiney Architects LLC 161 Sixth Avenue Floor 3 New York, NY 10013 646-385-7625 HOK Key Plan: Notes: July 30, 2014 150 North Chestnut St. Rochester, NY 14604 585-202-5590 ME Engineering, PC N 100% CD 2 1/2" = 1'-0" ROOM TYPE 4 (ROOMS 702 & 802): CONSTRUCTION PLAN Removal & Construction Plans 1/2" = 1'-0" A-119 Room Type 4 2 A-140 1 A-140 1 1/2" = 1'-0" ROOM TYPE 5 (ROOM 502): REMOVAL PLAN Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 450 West 31 Street Floor 6 New York, NY 10001 212-245-5195 t 212-239-7130 f Richard McElhiney Architects LLC 161 Sixth Avenue Floor 3 New York, NY 10013 646-385-7625 HOK Key Plan: Notes: July 30, 2014 150 North Chestnut St. Rochester, NY 14604 585-202-5590 ME Engineering, PC N 100% CD 2 1/2" = 1'-0" ROOM TYPE 5 (ROOM 502): CONSTRUCTION PLAN Removal & Construction Plans 1/2" = 1'-0" A-120 Room Type 5 1 1/2" = 1'-0" ROOM TYPE 6 (ROOM 605): REMOVAL PLAN Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 450 West 31 Street Floor 6 New York, NY 10001 212-245-5195 t 212-239-7130 f Richard McElhiney Architects LLC 161 Sixth Avenue Floor 3 New York, NY 10013 646-385-7625 HOK Key Plan: Notes: July 30, 2014 150 North Chestnut St. Rochester, NY 14604 585-202-5590 ME Engineering, PC N 100% CD 3 1/2" = 1'-0" ROOM TYPE 6 (ROOM 605): CONSTRUCTION PLAN Removal & Construction Plans 1/2" = 1'-0" A-121 Room Type 6 (ADA) 2 1/2" = 1'-0" ROOM TYPE 6 (ROOM 605): REMOVAL RCP 1 1 Addendum 2: August 22, 20141 1 1 1 1 1 1 1 1 2 A-142 1 A-142 3 1/2" = 1'-0" ROOM TYPE 7: CONSTRUCTION PLAN Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 450 West 31 Street Floor 6 New York, NY 10001 212-245-5195 t 212-239-7130 f Richard McElhiney Architects LLC 161 Sixth Avenue Floor 3 New York, NY 10013 646-385-7625 HOK Key Plan: Notes: July 30, 2014 150 North Chestnut St. Rochester, NY 14604 585-202-5590 ME Engineering, PC N 100% CD Removal & Construction Plans 1/2" = 1'-0" A-122 Room Type 7 1 1/2" = 1'-0" ROOM TYPE 7: REMOVAL PLAN 2 1/2" = 1'-0" ROOM TYPE 7: REMOVAL RCP 1 Addendum 2: August 22, 20141 9 A-501 10 A-501 11 A-501 8 & 9 A-501 4 A-511 07 A-501 06 A-501 1 1/2"=1'-0" Demolition Plan 2 1/2"=1'-0" Construction Plan 3 1/2"=1'-0" Reflected Ceiling Plan 4 1/2"=1'-0" Floor Finish Plan 5 1/2" = 1'-0" Type 1.1A: Interior Elevation 10 1/2"=1'-0" Interior Elevation 12 1/2"=1'-0" Interior Elevation 11 1/2"=1'-0" Interior Elevation 8 1/2"=1'-0" Interior Elevation 7 1/2"=1'-0" Interior Elevation 6 1/2"=1'-0" Interior Elevation Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 450 West 31 Street Floor 6 New York, NY 10001 212-245-5195 t 212-239-7130 f Richard McElhiney Architects LLC 161 Sixth Avenue Floor 3 New York, NY 10013 646-385-7625 HOK Key Plan: Notes: July 30, 2014 150 North Chestnut St. Rochester, NY 14604 585-202-5590 ME Engineering, PC N 100% CD Finish Plans, Int. Elevations 1/2" = 1'-0" A-131 Room Type 1.1 & 1.1A 9A 1/2 = 1'-0" Type 1.1A: Interior elevation 9B 1/2 = 1'-0" Type 1.1A: Interior elevation 1 Addendum 2: August 22, 20141 1 1 1 1 10 A-501 11 A-501 8 & 9 A-501 9 A-501 4 A-511 07 A-501 06 A-501 06 A-501 1 1/2"=1'-0" Demolition Plan 2 1/2"=1'-0" Construction Plan 3 1/2"=1'-0" Reflected Ceiling Plan 4 1/2"=1'-0" Floor Finish Plan 8 1/2"=1'-0" Interior Elevation 7 1/2"=1'-0" Interior Elevation 6 1/2"=1'-0" Interior Elevation 12 1/2"=1'-0" Interior Elevation 11 1/2"=1'-0" Interior Elevation 10 1/2"=1'-0" Interior Elevation Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 450 West 31 Street Floor 6 New York, NY 10001 212-245-5195 t 212-239-7130 f Richard McElhiney Architects LLC 161 Sixth Avenue Floor 3 New York, NY 10013 646-385-7625 HOK Key Plan: Notes: July 30, 2014 150 North Chestnut St. Rochester, NY 14604 585-202-5590 ME Engineering, PC N 100% CD Finish Plans, Int. Elevations 1/2" = 1'-0" A-132 Room Type 1.2 & 1.2A 5 1/2" = 1'-0" Type 1.2A: Interior Elevation 9A 1/2 = 1'-0" Type 1.2A: Interior elevation 9B 1/2 = 1'-0" Type 1.2A: Interior elevation 1 Addendum 2: August 22, 20141 1 1 1 1 1 A-512 06 A-501 1 1/2" = 1'-0" Demolition Plan 2 1/2" = 1'-0" Construction Plan 3 1/2" = 1'-0" Interior elevation 4 1/2" = 1'-0" Floor Finish Plan 8 1/2" = 1'-0" Interior Elevation51/2" = 1'-0" Reflected Ceiling Plan 6 1/2" = 1'-0" Interior Elevation 12 1/2" = 1'-0" Interior Elevation 11 Not Used Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 450 West 31 Street Floor 6 New York, NY 10001 212-245-5195 t 212-239-7130 f Richard McElhiney Architects LLC 161 Sixth Avenue Floor 3 New York, NY 10013 646-385-7625 HOK Key Plan: Notes: July 30, 2014 150 North Chestnut St. Rochester, NY 14604 585-202-5590 ME Engineering, PC N 100% CD Finish Plans, Int. Elevations 1/2" = 1'-0" A-133 Room Type 1.3 & 1.3A 9 1/2" = 1'-0" Interior Elevation 5 1/2" = 1'-0" Type 1.3A: Interior Elevation 10A 1/2 = 1'-0" Type 1.3A: Interior Elevation 10B 1/2 = 1'-0" Type 1.3A: Interior Elevation 1 1 1 1 Addendum 2: August 22, 20141 1 1 1 10 A-501 11 A-501 8 & 9 A-501 9 A-501 4 A-511 07 A-501 06 A-501 06 A-501 Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 450 West 31 Street Floor 6 New York, NY 10001 212-245-5195 t 212-239-7130 f Richard McElhiney Architects LLC 161 Sixth Avenue Floor 3 New York, NY 10013 646-385-7625 HOK Key Plan: Notes: July 30, 2014 150 North Chestnut St. Rochester, NY 14604 585-202-5590 ME Engineering, PC N 100% CD Finish Plans, Int. Elevations 1/2" = 1'-0" A-134 Room Type 1.4 & 1.4A 5 1/2" = 1'-0" Type 1.2A: Interior Elevation11/2"=1'-0" Demolition Plan 2 1/2"=1'-0" Construction Plan 3 1/2"=1'-0" Reflected Ceiling Plan 4 1/2"=1'-0" Floor Finish Plan 8 1/2"=1'-0" Interior Elevation 7 1/2"=1'-0" Interior Elevation 6 1/2"=1'-0" Interior Elevation 12 1/2"=1'-0" Interior Elevation 11 1/2"=1'-0" Interior Elevation 10 1/2"=1'-0" Interior Elevation 9A 1/2 = 1'-0" Type 1.4A: Interior elevation 9B 1/2 = 1'-0" Type 1.4A: Interior elevation 1 Addendum 2: August 22, 20141 1 1 1 1 10 A-501 11 A-501 8 & 9 A-501 9 A-501 4 A-511 07 A-501 Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 450 West 31 Street Floor 6 New York, NY 10001 212-245-5195 t 212-239-7130 f Richard McElhiney Architects LLC 161 Sixth Avenue Floor 3 New York, NY 10013 646-385-7625 HOK Key Plan: Notes: July 30, 2014 150 North Chestnut St. Rochester, NY 14604 585-202-5590 ME Engineering, PC N 100% CD Finish Plans, Int. Elevations 1/2" = 1'-0" A-135 Room Type 1.5 & 1.5A 1 1/2" = 1'-0" Demolition Plan 2 1/2" = 1'-0" Construction Plan 3 1/2" = 1'-0" Reflected Ceiling Plan 4 1/2" = 1'-0" Floor Finish Plan 8 1/2" = 1'-0" Interior Elevation 5 1/2" = 1'-0" Type 1.5A: Interior Elevation 7 1/2" = 1'-0" Interior Elevation 6 1/2" = 1'-0" Interior Elevation 12 1/2" = 1'-0" Interior Elevation 11 1/2" = 1'-0" Interior Elevation 10 1/2" = 1'-0" Interior Elevation 9A 1/2 = 1'-0" Type 1.5A: Interior elevation 9B 1/2 = 1'-0" Type 1.5A: Interior elevation 1 1 1 Addendum 2: August 22, 20141 1 1 1 10 A-501 11 A-501 8 & 9 A-501 9 A-501 07 A-501 06 A-501 06 A-501 Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 450 West 31 Street Floor 6 New York, NY 10001 212-245-5195 t 212-239-7130 f Richard McElhiney Architects LLC 161 Sixth Avenue Floor 3 New York, NY 10013 646-385-7625 HOK Key Plan: Notes: July 30, 2014 150 North Chestnut St. Rochester, NY 14604 585-202-5590 ME Engineering, PC N 100% CD Finish Plans, Int. Elevations 1/2" = 1'-0" A-136 Room Type 2.1 (ADA) 1 1/2" = 1'-0" Demolition Plan 2 1/2" = 1'-0" Construction Plan 3 1/2" = 1'-0" Reflected Ceiling Plan 4 1/2" = 1'-0" Floor Finish Plan 8 1/2" = 1'-0" Interior Elevation 5 Not used 7 1/2" = 1'-0" Interior Elevation 6 1/2" = 1'-0" Interior Elevation 12 1/2" = 1'-0" Interior Elevation 11 1/2" = 1'-0" Interior Elevation 10 1/2" = 1'-0" Interior Elevation 9 Not Used 1 Addendum 2: August 22, 20141 1 1 A-513 10 A-501 11 A-501 8 & 9 A-501 9 A-501 07 A-501 06 A-501 06 A-501 Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 450 West 31 Street Floor 6 New York, NY 10001 212-245-5195 t 212-239-7130 f Richard McElhiney Architects LLC 161 Sixth Avenue Floor 3 New York, NY 10013 646-385-7625 HOK Key Plan: Notes: July 30, 2014 150 North Chestnut St. Rochester, NY 14604 585-202-5590 ME Engineering, PC N 100% CD Finish Plans, Int. Elevations 1/2" = 1'-0" A-137 Room Type 2.2 & 2.2A (ADA) 1 1/2" = 1'-0" Demolition Plan 2 1/2" = 1'-0" Construction Plan 3 1/2" = 1'-0" Reflected Ceiling Plan 4 1/2" = 1'-0" Floor Finish Plan 8 1/2" = 1'-0" Interior Elevation 7 1/2" = 1'-0" Interior Elevation 6 1/2" = 1'-0" Interior Elevation 12 1/2" = 1'-0" Interior Elevation 11 1/2" = 1'-0" Interior Elevation 10A 1/2" = 1'-0" Interior Elevation 5 1/2" = 1'-0" Type 2.2A: Interior Elevation 9A 1/2 = 1'-0" Type 2.2A: Interior Elevation 9B 1/2 = 1'-0" Type 2.2A: Int. Elev. 10B 1/2" = 1'-0" Interior Elevation 1 Addendum 2: August 22, 20141 1 Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 450 West 31 Street Floor 6 New York, NY 10001 212-245-5195 t 212-239-7130 f Richard McElhiney Architects LLC 161 Sixth Avenue Floor 3 New York, NY 10013 646-385-7625 HOK Key Plan: Notes: July 30, 2014 150 North Chestnut St. Rochester, NY 14604 585-202-5590 ME Engineering, PC N 100% CD Finish Plans, Int. Elevations 1/2" = 1'-0" A-138 Room Type 3 1 1/2" = 1'-0" Demolition Plan 2 1/2" = 1'-0" Construction Plan 3 1/2" = 1'-0" Reflected Ceiling Plan 4A 1/2" = 1'-0" Interior Elevation 6 1/2" = 1'-0" Interior Elevation 5 1/2" = 1'-0" Interior Elevation 4B 1/2" = 1'-0" Interior Elevation Addendum 2: August 22, 20141 1 1 1 1 1 2 2 2 2 ASI No. 1: September 19, 20142 Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 450 West 31 Street Floor 6 New York, NY 10001 212-245-5195 t 212-239-7130 f Richard McElhiney Architects LLC 161 Sixth Avenue Floor 3 New York, NY 10013 646-385-7625 HOK Key Plan: Notes: July 30, 2014 150 North Chestnut St. Rochester, NY 14604 585-202-5590 ME Engineering, PC N 100% CD Finish Plans, Int. Elevations 1/2" = 1'-0" A-139 Room Type 4 1 1/2" = 1'-0" Demolition Plan 2 1/2" = 1'-0" Construction Plan 3 1/2" = 1'-0" Reflected Ceiling Plan 4A 1/2" = 1'-0" Interior Elevation 6 1/2" = 1'-0" Interior Elevation 5A 1/2" = 1'-0" Interior Elevation 4B 1/2" = 1'-0" Interior Elevation 5B 1/2" = 1'-0" Interior Elevation Addendum 2: August 22, 20141 1 1 2 2 2 2 ASI No. 1: September 19, 20142 Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 450 West 31 Street Floor 6 New York, NY 10001 212-245-5195 t 212-239-7130 f Richard McElhiney Architects LLC 161 Sixth Avenue Floor 3 New York, NY 10013 646-385-7625 HOK Key Plan: Notes: July 30, 2014 150 North Chestnut St. Rochester, NY 14604 585-202-5590 ME Engineering, PC N 100% CD Finish Plans, Int. Elevations 1/2" = 1'-0" A-140 Room Type 5 1 1/2" = 1'-0" Demolition Plan 2 1/2" = 1'-0" Construction & Power Plan 3 1/2" = 1'-0" Reflected Ceiling Plan 4A 1/2" = 1'-0" Interior Elevation 6 1/2" = 1'-0" Interior Elevation 5 1/2" = 1'-0" Interior Elevation 4B 1/2" = 1'-0" Interior Elevation Addendum 2: August 22, 20141 1 1 A-514 06 A-501 Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 450 West 31 Street Floor 6 New York, NY 10001 212-245-5195 t 212-239-7130 f Richard McElhiney Architects LLC 161 Sixth Avenue Floor 3 New York, NY 10013 646-385-7625 HOK Key Plan: Notes: July 30, 2014 150 North Chestnut St. Rochester, NY 14604 585-202-5590 ME Engineering, PC N 100% CD Finish Plans, Int. Elevations 1/2" = 1'-0" A-141 Room Type 6 (ADA) 1 1/2" = 1'-0" Demolition Plan 2 1/2" = 1'-0" Construction & Power Plan 3 1/2" = 1'-0" Reflected Ceiling Plan 4 1/2" = 1'-0" Floor Finish Plan 8 1/2" = 1'-0" Interior Elevation51/2" = 1'-0" Interior Elevation 7A 1/2 = 1'-0" Interior Elevation 6 1/2" = 1'-0" Interior Elevation 9 1/2" = 1'-0" Interior Elevation 7B 1/2 = 1'-0" Interior Elevation 1 Addendum 2: August 22, 20141 1 1 1 1/2"=1'-0" Demolition Plan 2 1/2"=1'-0" Construction & Power Plan 3 1/2"=1'-0" Reflected Ceiling Plan 4 Not Used 5 Not Used 8 1/2"=1'-0" Interior Elevation 7 1/2"=1'-0" Interior Elevation 6 1/2"=1'-0" Interior Elevation Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 450 West 31 Street Floor 6 New York, NY 10001 212-245-5195 t 212-239-7130 f Richard McElhiney Architects LLC 161 Sixth Avenue Floor 3 New York, NY 10013 646-385-7625 HOK Key Plan: Notes: July 30, 2014 150 North Chestnut St. Rochester, NY 14604 585-202-5590 ME Engineering, PC N 100% CD Finish Plans, Int. Elevations 1/2" = 1'-0" A-142 Room Type 7 1 Addendum 2: August 22, 20141 1 1 1 1 1 1 UL System No. C-AJ-1421 SECTION A-A A A 4B 2 3 4B 1 4A SECTION A-A A A 2 3 1A 3 2 3 1B 1A 1 3" = 1'-0" Detail At Headboards 2 1/2" = 1'-0" Headboard Relocation 3 3" = 1'-0" Firestop detail at Wall Penetrations (UL System No. W-L-1389) 4 NTS Firestop Detail at Floor Penetration (UL System No. C-AJ-1421) 10 3" = 1'-0" Detail 11 3" = 1'-0" Detail 8 3" = 1'-0" Detail 7 3" = 1'-0" Wall Detail at Shower at Chase Wall 5 3" = 1'-0" Wall Base Detail at Bathroom Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 450 West 31 Street Floor 6 New York, NY 10001 212-245-5195 t 212-239-7130 f Richard McElhiney Architects LLC 161 Sixth Avenue Floor 3 New York, NY 10013 646-385-7625 HOK Key Plan: Notes: July 30, 2014 150 North Chestnut St. Rochester, NY 14604 585-202-5590 ME Engineering, PC N 100% CD Details 3" = 1'-0" A-501 All Room Types 9 3" = 1'-0" Detail 12 3" = 1'-0" Mitered Corner at Bathroom Base Tile (Typical at Outside Corners) 6 3" = 1'-0" Wall Detail at Shower at Corridor Wall and Non-chase Wall 1 1 ASI No. 1: September 19, 20141 9 A-511 9 A-511 8A-5117B A-511 7AA-5117B A-511 7AA-5117BA-5111 1" = 1'-0" Elevation 2 1" = 1'-0" Plan st Top 3 Not Used 4 1" = 1'-0" Elevation 8 3"=1'-0" Detail 9 3"=1'-0" Detail6Not Used 5 1" = 1'-0" Plan at Shelf Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 450 West 31 Street Floor 6 New York, NY 10001 212-245-5195 t 212-239-7130 f Richard McElhiney Architects LLC 161 Sixth Avenue Floor 3 New York, NY 10013 646-385-7625 HOK Key Plan: Notes: July 30, 2014 150 North Chestnut St. Rochester, NY 14604 585-202-5590 ME Engineering, PC N 100% CD Vanity Type A As Noted A-511 Plans, Elevations & Details 7A 3"=1'-0" Detail 7B 3"=1'-0" Detail 1 1 1 1 1 1 1 1 1 1 1 1 1 Addendum 2: August 22, 20141 1 1 1 7BA-5127A A-512 7BA-5127AA-512 7B A-512 9A-5129A-5128A-51211" = 1'-0"Elevation21" = 1'-0"Plan at Top3Not Used41" = 1'-0"Elevation83"=1'-0"Detail93"=1'-0"Detail6Not Used51" = 1'-0"Plan at ShelfCornell University Statler Hotel Guest Room RenovationIthaca, NY 14853Revisions:450 West 31 Street Floor 6New York, NY 10001212-245-5195 t212-239-7130 fRichard McElhiney Architects LLC161 Sixth Avenue Floor 3New York, NY 10013646-385-7625HOKKey Plan:Notes:July 30, 2014150 North Chestnut St.Rochester, NY 14604585-202-5590ME Engineering, PCN100% CDVanity Type BAs NotedA-512Plans, Elevations & Details7A3"=1'-0"Detail7B3"=1'-0"Detail111111111111Addendum 2: August 22, 201411111 7A-513 9A-5139A-5138A-513 6A-51311" = 1'-0"Elevation21" = 1'-0"Plan at Top3Not Used41" = 1'-0"Elevation83"=1'-0"Detail93"=1'-0"Detail63" = 1'-0"Detail51" = 1'-0"Plan at ShelfCornell University Statler Hotel Guest Room RenovationIthaca, NY 14853Revisions:450 West 31 Street Floor 6New York, NY 10001212-245-5195 t212-239-7130 fRichard McElhiney Architects LLC161 Sixth Avenue Floor 3New York, NY 10013646-385-7625HOKKey Plan:Notes:July 30, 2014150 North Chestnut St.Rochester, NY 14604585-202-5590ME Engineering, PCN100% CDVanity Type CAs NotedA-513Plans, Elevations & Details7A3"=1'-0"Detail7B3"=1'-0"Detail1111111111Addendum 2: August 22, 20141111111111 7A-514 9A-5149A-5148A-514 6A-51411" = 1'-0"Elevation21" = 1'-0"Plan at Top3Not Used41" = 1'-0"Elevation83"=1'-0"Detail93"=1'-0"Detail63" = 1'-0"Detail51" = 1'-0"Plan at ShelfCornell University Statler Hotel Guest Room RenovationIthaca, NY 14853Revisions:450 West 31 Street Floor 6New York, NY 10001212-245-5195 t212-239-7130 fRichard McElhiney Architects LLC161 Sixth Avenue Floor 3New York, NY 10013646-385-7625HOKKey Plan:Notes:July 30, 2014150 North Chestnut St.Rochester, NY 14604585-202-5590ME Engineering, PCN100% CDVanity Type DAs NotedA-514Plans, Elevations & Details73"=1'-0"Detail1111111111111111111 August 22, 2014Addendum 21 Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 450 West 31 Street Floor 6 New York, NY 10001 212-245-5195 t 212-239-7130 f Richard McElhiney Architects LLC 161 Sixth Avenue Floor 3 New York, NY 10013 646-385-7625 HOK Key Plan: Notes: July 30, 2014 150 North Chestnut St. Rochester, NY 14604 585-202-5590 ME Engineering, PC 100% CD Finish Schedule Not to Scale A-601 Guestroom Finish Schedule Bathroom Finish Schedule 1 Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 450 West 31 Street Floor 6 New York, NY 10001 212-245-5195 t 212-239-7130 f Richard McElhiney Architects LLC 161 Sixth Avenue Floor 3 New York, NY 10013 646-385-7625 HOK Key Plan: Notes: July 30, 2014 150 North Chestnut St. Rochester, NY 14604 585-202-5590 ME Engineering, PC 100% CD Finish Schedule Not to Scale A-601.1 August 22, 2014Addendum 21 1 Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 450 West 31 Street Floor 6 New York, NY 10001 212-245-5195 t 212-239-7130 f Richard McElhiney Architects LLC 161 Sixth Avenue Floor 3 New York, NY 10013 646-385-7625 HOK Key Plan: Notes: July 30, 2014 150 North Chestnut St. Rochester, NY 14604 585-202-5590 ME Engineering, PC 100% CD Finish Schedule Not to Scale A-601.2 August 22, 2014Addendum 21 1 1 Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 450 West 31 Street Floor 6 New York, NY 10001 212-245-5195 t 212-239-7130 f Richard McElhiney Architects LLC 161 Sixth Avenue Floor 3 New York, NY 10013 646-385-7625 HOK Key Plan: Notes: July 30, 2014 150 North Chestnut St. Rochester, NY 14604 585-202-5590 ME Engineering, PC 100% CD Plumbing Fixture Schedule Not to Scale A-602 August 22, 2014Addendum 21 1 Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 450 West 31 Street Floor 6 New York, NY 10001 212-245-5195 t 212-239-7130 f Richard McElhiney Architects LLC 161 Sixth Avenue Floor 3 New York, NY 10013 646-385-7625 HOK Key Plan: Notes: July 30, 2014 150 North Chestnut St. Rochester, NY 14604 585-202-5590 ME Engineering, PC 100% CD Plumbing Accessories Schedule Not to Scale A-603 Light Fixture Schedule August 22, 2014Addendum 21 1 1 1 Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 450 West 31 Street Floor 6 New York, NY 10001 212-245-5195 t 212-239-7130 f Richard McElhiney Architects LLC 161 Sixth Avenue Floor 3 New York, NY 10013 646-385-7625 HOK Key Plan: Notes: July 30, 2014 150 North Chestnut St. Rochester, NY 14604 585-202-5590 ME Engineering, PC 100% CD Door Schedule Not to Scale A-604 Door Schedule Door Types August 22, 2014Addendum 21 1 1 1 1 1 1 M-001 Schedule, & Specs General Notes, Symbols List, (E)EXISTING EXISTING WORK TO BE REMOVED NTS NOT TO SCALE CFM CUBIC FEET PER MINUTE REGISTER OR GRILLE RETURN OR EXHAUST VOLUME DAMPER HVAC SYMBOL LIST DUCT SECTION - EXHAUST WIDTH A x DEPTH B A B A B C C = CFM B = NECK SIZE A = TYPE REGISTER, GRILLE OR DIFFUSER TAG POINT OF CONNECTION POINT OF DISCONNECTION DESCRIPTIONSYMBOL SCHEDULE DIFFUSER AND GRILLEREGISTER TYPE APPLICATION MATERIAL FINISH No. MODEL &MANUFACTURER A ALUMINUMEXHAUST HART AND COOLEY MODEL ER45 GENERAL NOTES: SEE A-005 FOR CONSTRUCTION SCHEDULE AND PHASING. FOR EACH OF THE NEW TOILET EXHAUST GRILLES FOR BALANCING PURPOSES. THE INTENT IS TO HAVE A BALANCING DAMPER INSTALLED IN THE NECK OF THE NEW EXHAUST GRILLES OR IN THE DUCTWORK OF THE HVAC SYSTEMS. WATER, STEAM, CONDENSATE, AND CONTROL SYSTEMS) TO FACILITATE PHASING REQUIREMENTS WITHOUT INTERRUPTION CONTRACTOR TO PROVIDE FOR ALL TEMPORARY SERVICES (SUPPLY AIR, RETURN AIR, EXHAUST AIR, CHILLED WATER, HOT CONDITIONS AND THE ARCHITECTURAL BID DOCUMENTS FOR THE PHASING REQUIREMENTS. IT IS THE RESPONSIBILITY OF THE NORMAL OPERATION OF THE FACILITY. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO THOROUGHLY REVIEW THE GENERAL IT IS THE REQUIREMENT OF THE PROJECT THAT THE CONSTRUCTION WORK BE PHASED TO FACILITATE MINIMUM IMPACT TO THE WITH CORNELL UNIVERSITY FACILITY PERSONNEL FOR TIE-IN CONNECTIONS. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE ALL SHUTDOWNS OF TOILET EXHAUST SYSTEMS AND MATERIALS OFF SITE IN A PROPER LEGAL MANNER. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO DISPOSE OF ALL DEMOLITION DEBRIS E. D. C. B. A. ALUMINUM Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 212-239-7130 f 212-245-5195 t New York, NY 10001 450 West 31 Street Floor 6 Richard McElhiney Architects LLC 646-385-7625 New York, NY 10013 161 Sixth Avenue Floor 3 HOK Key Plan: Notes: July 30, 2014 585-202-5590 Rochester, NY 14604 150 North Chestnut St. ME Engineering, PC 716-831-0000 Blasdell, NY 14219 4588 South Park Avenue Baer & Associates LLC N 100% CD MD-101 0 1'2'4'SCALE: 1/2"=1'-0" 2 ROOM TYPE 1.2 & 1.2A 0 1'2'4'SCALE: 1/2"=1'-0" 1 ROOM TYPE 1.1 & 1.1A 0 1'2'4'SCALE: 1/2"=1'-0" 3 ROOM TYPE 1.3 & 1.3A 0 1'2'4'SCALE: 1/2"=1'-0" 4 ROOM TYPE 1.4 (ROOMS 411, 511, 611, 711, 811, & 911) & 1.4A (ROOM 311) 0 1'2'4'SCALE: 1/2"=1'-0" 5 ROOM TYPE 1.5 (ROOM 414, 514, 614, 714, 814, & 914) & 1.5A (ROOM 314) Room Types 1.1-1.5 Mechanical Demo Plans MD101 MD101 MD101 MD101 MD101 (E)4x4 2 1 DEMOLITION NOTES: AIR GRILLE PRIOR TO REMOVING THE EXISTING GRILLE. VERIFY THE AIRFLOW THROUGH THE EXISTING EXHAUST REMOVE THE EXISTING EXHAUST GRILLE. 1 2 1 2 (E)4x4 (E)4x41 2 (E)4x4 1 2 (E)4x4 1 2 Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 212-239-7130 f 212-245-5195 t New York, NY 10001 450 West 31 Street Floor 6 Richard McElhiney Architects LLC 646-385-7625 New York, NY 10013 161 Sixth Avenue Floor 3 HOK Key Plan: Notes: July 30, 2014 585-202-5590 Rochester, NY 14604 150 North Chestnut St. ME Engineering, PC 716-831-0000 Blasdell, NY 14219 4588 South Park Avenue Baer & Associates LLC N 100% CD MD-102 0 1'2'4'SCALE: 1/2"=1'-0" 2 0 1'2'4'SCALE: 1/2"=1'-0" 1 0 1'2'4'SCALE: 1/2"=1'-0" 3 0 1'2'4'SCALE: 1/2"=1'-0" 4 0 1'2'4'SCALE: 1/2"=1'-0" 5 ROOM TYPE 2.2 (ROOMS 426, 726, 826, & 926) & 2.2A (ROOM 326) ROOM TYPE 2.1 (ROOMS 526 & 626) ROOM TYPE 4 (ROOMS 702 & 802) ROOM TYPE 3 ROOM TYPE 5 (ROOM 502) 0 1'2'4'SCALE: 1/2"=1'-0" 6 ROOM TYPE 6 (ROOM 605) Room Types 2-6 Mechanical Demo Plans MD102 MD102 MD102 MD102 MD102 MD102 AIR GRILLE PRIOR TO REMOVING THE EXISTING GRILLE. VERIFY THE AIRFLOW THROUGH THE EXISTING EXHAUST REMOVE THE EXISTING EXHAUST GRILLE. 2 1 DEMOLITION NOTES: (E)4x4 1 2 (E)4x4 1 2 (E)4x4 1 2 (E)4x4 1 2 (E)4x4 1 2 (E)4x4 1 2 (E)4x4 1 2 (E)4x4 1 2 Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 212-239-7130 f 212-245-5195 t New York, NY 10001 450 West 31 Street Floor 6 Richard McElhiney Architects LLC 646-385-7625 New York, NY 10013 161 Sixth Avenue Floor 3 HOK Key Plan: Notes: July 30, 2014 585-202-5590 Rochester, NY 14604 150 North Chestnut St. ME Engineering, PC 716-831-0000 Blasdell, NY 14219 4588 South Park Avenue Baer & Associates LLC N 100% CD M-101 Room Types 1.1-1.5 Mechanical Plans 0 1'2'4'SCALE: 1/2"=1'-0" 2 M101 ROOM TYPE 1.2 & 1.2A 0 1'2'4'SCALE: 1/2"=1'-0" 1 M101 ROOM TYPE 1.1 & 1.1A 0 1'2'4'SCALE: 1/2"=1'-0" 3 M101 ROOM TYPE 1.3 & 1.3A 0 1'2'4'SCALE: 1/2"=1'-0" 4 M101 ROOM TYPE 1.4 (ROOMS 411, 511, 611, 711, 811, & 911) & 1.4A (ROOM 311) 0 1'2'4'SCALE: 1/2"=1'-0" 5 M101 ROOM TYPE 1.5 (ROOM 414, 514, 614, 714, 814, & 914) & 1.5A (ROOM 314) DRAWING NOTES: A 4x4 50 21 21 21 21 21 A 4x4 50 A 4x4 50 A 4x4 50 A 4x4 50 3 2 1 3 3 3 3 3 INSTALLATION OF NEW GRILLE. CLEAN EXISTING DUCT 5'-0" OR AS POSSIBLE PRIOR TO OF THE NEW EXHAUST GRILLE TO BALANCE THE AIRFLOW. PROVIDE AN OPPOSED BLADE VOLUME DAMPER IN THE NECK EXHAUST GRILLE SHALL POINT TOWARD THE CHASE WALL. PROVIDE NEW 4x4 EXHAUST GRILLE. THE BLADES OF THE NEW Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 212-239-7130 f 212-245-5195 t New York, NY 10001 450 West 31 Street Floor 6 Richard McElhiney Architects LLC 646-385-7625 New York, NY 10013 161 Sixth Avenue Floor 3 HOK Key Plan: Notes: July 30, 2014 585-202-5590 Rochester, NY 14604 150 North Chestnut St. ME Engineering, PC 716-831-0000 Blasdell, NY 14219 4588 South Park Avenue Baer & Associates LLC N 100% CD (E)4x4 (E)4x4 (E)4x4(E)4x4 (E)4x4 M-102 0 1'2'4'SCALE: 1/2"=1'-0" 2 M102 0 1'2'4'SCALE: 1/2"=1'-0" 1 M102 0 1'2'4'SCALE: 1/2"=1'-0" 3 M102 0 1'2'4'SCALE: 1/2"=1'-0" 4 M102 0 1'2'4'SCALE: 1/2"=1'-0" 5 M102 Room Types 2-6 Mechanical Plans ROOM TYPE 2.2 (ROOMS 426, 726, 826, & 926) & 2.2A (ROOM 326) ROOM TYPE 2.1 (ROOMS 526 & 626) ROOM TYPE 4 (ROOMS 702 & 802) ROOM TYPE 3 ROOM TYPE 5 (ROOM 502) 0 1'2'4'SCALE: 1/2"=1'-0" 6 M102 ROOM TYPE 6 (ROOM 605) DRAWING NOTES: 21 21 21 21 21 21 21 21 A 4x4 50 A 4x4 50 A 4x4 50 A 4x4 50 A 4x4 50 A 4x4 50 A 4x4 50 A 4x4 50 3 2 1 3 3 3 3 3 3 3 3 CLEAN EXISTING DUCT 5'-0" OR AS POSSIBLE PRIOR TO INSTALLATION OF NEW GRILLE. OF THE NEW EXHAUST GRILLE TO BALANCE THE AIRFLOW. PROVIDE AN OPPOSED BLADE VOLUME DAMPER IN THE NECK EXHAUST GRILLE SHALL POINT TOWARD THE CHASE WALL. PROVIDE NEW 4x4 EXHAUST GRILLE. THE BLADES OF THE NEW Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 212-239-7130 f 212-245-5195 t New York, NY 10001 450 West 31 Street Floor 6 Richard McElhiney Architects LLC 646-385-7625 New York, NY 10013 161 Sixth Avenue Floor 3 HOK Key Plan: Notes: July 30, 2014 585-202-5590 Rochester, NY 14604 150 North Chestnut St. ME Engineering, PC 716-831-0000 Blasdell, NY 14219 4588 South Park Avenue Baer & Associates LLC N 100% CD (E)4x4 (E)4x4 (E)4x4 (E)4x4 (E)4x4 (E)4x4 (E)4x4 (E)4x4 M-201 Riser Diagram Toilet Exhaust TYP. OF 161 TO 50 CFM EXHAUST GRILLE BALANCE TOILET (E)EF-5 (E)EF-6 (E)EF-7 (E)EF-8 (E)EF-9 (E)EF-10 (E)EF-10A TO 1400 CFM BALANCE (E)EF-5 TO 1150 CFM BALANCE (E)EF-6 TO 1400 CFM BALANCE (E)EF-8 TO 1400 CFM BALANCE (E)EF-9 TO 1050 CFM BALANCE (E)EF-10 TO 350 CFM BALANCE (E)EF-10A TO 1050 CFM BALANCE (E)EF-7 3RD FLOOR 4TH FLOOR 5TH FLOOR 6TH FLOOR 7TH FLOOR 8TH FLOOR 9TH FLOOR 301 401 501 601 701 702 602 502 402 302 305 405 505 605 705 805802 902A901 801 905 906 806 706 606 506 406 306 309A 310 311 314 317 318 321 322 324320319316315312308307304303 403 503 603 703 803 903 902E 404 504 604 704 804 407 408 508 608 708 808 908 909A 409A 509A 609A 709A 809A 410 510 710 810 910 412 512 612 712 812 912 911 411 511 611 711 811 915 815 715 615 515 610 415 414 514 614 714 814 914 916 816 716 616 516 416 417 517 617 717 817 917 919 819 719 619 519 419 418 618 718 818 918 420 520 620 720 820 920 421 521 621 721 821 921 422 522 622 722 822 922 424 524 624 724 824 924 326 426 526 626 726 826 926 518 12x12 12x12 12x12 10x12 10x12 10x8 10x8 10x8 10x8 10x8 10x8 10x8 10x8 10x8 10x8 10x8 10x8 10x8 10x8 10x8 10x12 10x8 10x12 10x12 10x12 10x12 10x12 10x8 10x12 10x8 10x12 10x12 10x12 10x12 10x12 10x12 10x12 10x12 10x12 10x12 10x12 10x12 10x12 10x12 12x12 10x12 12x12 12x12 12x12 12x12 12x12 12x1210x12 10x12 10x12 10x1210x12 10x12 10x12 10x12 12x12 12x12 10x12 10x12 12x12 12x12 12x12 12x12 12x12 12x12 12x12 12x12 12x12 10x12 10x12 12x12 12x1212x12 507 707 807 907 Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 212-239-7130 f 212-245-5195 t New York, NY 10001 450 West 31 Street Floor 6 Richard McElhiney Architects LLC 646-385-7625 New York, NY 10013 161 Sixth Avenue Floor 3 HOK Key Plan: Notes: July 30, 2014 585-202-5590 Rochester, NY 14604 150 North Chestnut St. ME Engineering, PC 716-831-0000 Blasdell, NY 14219 4588 South Park Avenue Baer & Associates LLC N 100% CD E-000 ,DASHED LIGHT IS EXISTING TO BE REMOVED. EXISTING ELECTRICAL OR EQUIPMENT OR DEVICE, ,RELOCATED. EXISTING TO REMAIN OR EXISTING TO BE EXISTING WIRING OR EQUIPMENT, SOLID LIGHT IS HEAVY SOLID IS NEW, SYMBOL DESCRIPTION GENERAL CONSTRUCTION SYMBOLS EXISTING DEVICE TO REMAIN(E) EXISTING DEVICE TO BE RELOCATED (ER) PANELBOARD ONE LINE DIAGRAM SYMBOLS SYMBOL DESCRIPTION NON-FUSED DISCONNECT SWITCH MTS = MANUAL ATS = AUTOMATIC TRANSFER SWITCH, RATING AS INDICATED. GROUND CONNECTION CIRCUIT BREAKER THERMAL MAGNETIC MOLDED CASE TRANSFORMER SYMBOL DESCRIPTION AND CONTROL POWER DISTRIBUTION T AND TYPE AND TRANSFORMER SCHEDULE FOR SIZE TRANSFORMER, REFER TO ONE LINE DIAGRAM 208/120 VOLT PANELBOARD 480/277 VOLT PANELBOARD SYMBOL DESCRIPTION FIRE ALARM MANUAL PULL STATIONF WIRE GUARD SMOKE DETECTOR SUBSCRIPT "WG" INDICATES S RATE OF RISE HEAT DETECTOR H VISUAL SIGNAL DEVICEF TS TAMPER SWITCH SPRINKLER WATERFLOW SWITCHWF FIRE ALARM CONTROL PANELFACP FIRE ALARM ANNUNCIATION PANELFAAP REMOTE DUCT SMOKE DETECTOR TEST STATIONRTS FSD FAN SHUT DOWN SPEAKER/STROBE ALARM SIGNALF INDIVIDUAL ADDRESSABLE MODULEIAM FIRE ALARM TRANSPONDER NODEFATN SYMBOL DESCRIPTION LUMINAIRES SWITCHING DESIGNATION. SCHEDULE, LOWER CASE LETTER INDICATES LETTERS INDICATE FIXTURE TYPE ON CEILING MOUNTED LUMINAIRE. UPPER CASE SWITCHING DESIGNATION. SCHEDULE, LOWER CASE LETTER INDICATES LETTERS INDICATE FIXTURE TYPE ON WALL MOUNTED LUMINAIRE. UPPER CASE NL CEILING MOUNTED EXIT LUMINAIRE WALL MOUNTED EXIT LUMINAIRE FA d FA d SYMBOL DESCRIPTION BASIC MATERIALS AND METHODS ELECTRICAL SYMBOLS LIST J JUNCTION BOX COMPLETE CONNECTION TO EQUIPMENT LP-404 FOR RACEWAY TYPE. TO MATCH HOMERUN. REFER TO SPEC'S BRANCH CIRCUIT WIRING SIZE AND NUMBER EG., IN ƒ" C, UNLESS NOTED OTHERWISE. SHALL BE 20 AMP, 120 VOLT, 2-#12, 1-#12 EQUALS NUMBER OF CIRCUITS. CIRCUIT INDICATE CIRCUITS. NUMBER OF ARROWS NUMBERS INDICATE PANEL. NUMBERS HOME RUN TO PANELBOARD. LETTERS/ X - MATCH EQUIPMENT CAP T - TWISTLOCK SUBSCRIPT INDICATES TYPE: PROVIDE CORD AND CAP. EQUIPMENT BEING FURNISHED BY OTHERS. BRANCH CIRCUIT AND/OR MATCH CAP ON AND NEMA CONFIGURATION AS REQUIRED BY PROPER VOLTAGE, CLASS, CURRENT RATING SPECIAL PURPOSE RECEPTACLE. PROVIDE SWITCHES LETTERS EQUALS NO. OF GANGED a,b,c - SWITCHING DESIGNATIONS NUMBER OF OS - OCCUPANCY SENSOR 3 - THREE WAY SWITCH INDICATE TYPE: ON FIXTURE SCHEDULE, SUBSCRIPTS TOGGLE SWITCH, VOLTAGE AS INDICATED 3 a,b,c UC - UNDER THE COUNTER GFI - GROUND FAULT INTERUPT WP - WEATHER PROOF OC - OVER COUNTER SUBSCRIPTS INDICATE TYPE: DUPLEX RECEPTACLE, 20 AMP, 125 VOLT OS UNLESS NOTED OTHERWISE. CIRCUIT TO SINGLE POLE CIRCUIT BREAKER(S), SOLID HALF ARROW(S) INDICATES 120 VOLT UNLESS NOTED OTHERWISE. CIRCUIT TO MULTI-POLE CIRCUIT BREAKER, SOLID FULL ARROW INDICATES 208 VOLT UNLESS NOTED OTHERWISE. CIRCUIT TO SINGLE POLE CIRCUIT BREAKER(S), OPEN HALF ARROW(S) INDICATES 277 VOLT UNLESS NOTED OTHERWISE. CIRCUIT TO MULTI-POLE CIRCUIT BREAKER, OPEN FULL ARROW INDICATES 480 VOLT ABOVE. DDC ALARM WIRING BY DIV 15A. PROVIDE•"C STUBBED TO CEILING SPACE SINGLE GANG BOX WITH BLANK COVER PLATE. DDC SURFACE RACEWAY WITH DEVICES AS INDICATED COMBINATION POWER AND COMMUNICATION POWER RACEWAY WITH DEVICES AS INDICATED INTELLIGENT MONITOR MODULEIMM S IMM INTELLIGENT MONITORING MODULE SMOKE DETECTOR WITH "IMM" INDICATES DUCT SMOKE DETECTORDSD SCHEDULE ON ELECTRIC EQUIPMENT AND CONTROL MAGNETIC STARTER AMP RATING AS INDICATED COMBINATION FUSED DISCONNECT SWITCH AND SYMBOL DESCRIPTION AND CONTROL POWER DISTRIBUTION EQUIPMENT AND CONTROL SCHEDULE FOR SIZE. MOTOR CONNECTION. REFER TO ELECTRIC M AND CONTROL SCHEDULE INDICATED ON ELECTRIC EQUIPMENT DISCONNECT SWITCH AMP RATING AS VARIABLE FREQUENCY DRIVEVFD 208/120 VOLT PANELBOARD 480 VOLT PANELBOARD SMOKE DAMPER GENERAL DEMOLITION NOTES:GENERAL NOTES: MOUNTING HEIGHT & MISC. INFO. 1 DESIGNATION PANEL TYPICAL FOR ALL DEVICES AND HOMERUNS GFI NUMBER INDICATES CIRCUIT NUMBER NUMBER CIRCUIT IDENTIFICATION BRANCH CIRCUITING SWITCH LEG FIXTURE TYPE a B NUMBER INDICATES CIRCUIT2 NOTE: 1 NLGP-B CIRCUIT BREAKER GROUND FAULT INTERRUPTING MLO MAIN LUG ONLY MICRO AFF CB GFI MCB EG EQUIPMENT GROUND FCU FAN COIL UNIT AFG AWG AMERICAN WIRE GAGE ABOVE FINISHED GRADE ABBREVIATIONS UOI OFCI WP TSP UC OC TWISTED SHIELDED PAIR UNLESS OTHERWISE INDICATED OWNER FURNISHED, CONTRACTOR INSTALLED CLG.CEILING A.AMPERE EXIST.EXISTING MAIN CIRCUIT BREAKER GND. KW. GROUND KILOWATT ABBREV. C. HP. CONDUIT ABOVE FINISHED FLOOR PH.PHASE PNL.PANEL REFRIG. TYP. SP.SPACE POLE SW. 4 W.WIRE 3P.15A. ABBREV. P. PP REFRIGERATOR POWER PANEL SWITCH TYPICAL WEATHERPROOF MOUNTED UNDER COUNTER HEIGHT MOUNTED OVER COUNTER HEIGHT P = POLE A = AMPERE DESCRIPTION NIC NOT IN CONTRACT LS LIFE SAFETY BRANCH CR EQ CRITICAL BRANCH EQUIPMENT BRANCH HORSEPOWER MICROWAVE DESCRIPTION VOLTV. VAV VARIABLE AIR VOLUME K. J. I. H. G. F. E. D. C. B. A. TMGB TELECOMMUNICATIONS MAIN GROUND BAR BMGB BUILDING MAIN GROUND BAR PROVIDE PULLBOX FOR EVERY 180° OF BENDS FOR TEL/DATA AND 360° OF BENDS FOR POWER CONDUITS. ALL CONDUITS AND SUPPORTS SHALL BE AS TIGHT TO DECK AS POSSIBLE. NEW YORK STATE, BUILDING CODE OF NEW YORK STATE AND CORNELL UNIVERSITY DESIGN STANDARDS. ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF NFPA CODES, FIRE CODE OF TO CIRCUIT(S) AS INDICATED. PROVIDE CONDUIT/WIRING (CIRCUITING) AND REQUIRED EQUIPMENT CONNECTIONS TO ALL DEVICES/EQUIPMENT. CONNECT SEPARATE NEUTRALS (CIRCUITS SHALL NOT SHARE NEUTRALS). SAME EQUIPMENT GROUND) FOR EACH 20 AMPERE CIRCUIT UNLESS OTHERWISE NOTED. ALL CIRCUITS SHALL HAVE CIRCUITING TO DEVICES/EQUIPMENT SHALL BE 2-#12AWG & 1-#12EG (MULTIPLE HOME RUNS IN SAME CONDUIT MAY SHARE AND NOT GREATER THAN 96 INCHES ABOVE THE FINISHED FLOOR. FIRE ALARM SIGNALING APPLIANCES SHALL BE MOUNTED SUCH THAT THE ENTIRE LENS IS NOT LESS THAN 80 INCHES PROVIDE NYLON PULLSTRING IN ALL EMPTY CONDUITS. MINIMUM CONDUIT SIZE SHALL BE ƒ" FOR POWER CIRCUITS UOI. TO CONSTRUCTION. COORDINATE EXACT LOCATION OF ALL CONDUIT ROUTES, EQUIPMENT AND DEVICES WITH EXISTING CONDITIONS PRIOR MAINTAIN SERVICE CLEARANCES OF ALL EQUIPMENT. NON RATED PENETRATIONS. ALL FIRE RATINGS SHALL BE MAINTAINED. UTILIZE REMOVABLE FIRESTOPPING MATERIAL AT CABLE TRAY PENETRATIONS. PROVIDE ACOUSTICAL SEALANT FOR ALL SLEEVE AND SEAL ALL WALL AND FLOOR PENETRATIONS. PROVIDE FIRESTOPPING FOR ALL FIRE-RATED PENETRATIONS. U - ULTRASONIC SUBSCRIPTS INDICATE TYPE: (DUAL TECHNOLOGY WITH 360° VIEW) CEILING MOUNTED OCCUPANCY SENSOR 9" C/T W FACEPLATE AND BDF. CAT 6 UTP CABLE, TERMINATE IN OTHERWISE NOTED). PROVIDE ONE(1) NEAREST CABLE TRAY (UNLESS BOX. 1" EMT CONDUIT EXTENDED TO WAP - WALL MOUNT AT 90"AFF 4"x2"x 1-3/4" BDF. 46"AFF. PROVIDE (1) CAT 6 CABLE TO FOR DATA/VOICE. WALL MOUNT AT CABLE TRAY (UNLESS OTHERWISE NOTED) AND 1" CONDUIT EXTENDED TO NEAREST W - SINGLE GANG BACK BOX WITH MUD RING TERMINATE AT PATCH PANEL IN BDF. CONDUIT BUSHING. PULL (3) CAT 6 CABLES TERMINATE CONDUIT AT CABLE TRAY WITH (UNLESS OTHERWISE NOTED) FOR DATA/VOICE. EXTENDED TO NEAREST CABLE TRAY OR BDF FACEPLATE WITH TRIPLEX DESIGN. 1" CONDUIT 4"x4"x2.5D" BOX WITH A 2-GANG MUD RING & ON DRAWINGS CABLE TRAY: SIZE AS CALLED FOR B AIR TERMINAL SMOKE DETECTOR, BEAM TYPE TRANSMITTERSTX SMOKE DETECTOR, BEAM TYPE RECEIVERSRX EXISTING FLOOR BOX WITH POWER ONLY FAR FIRE ALARM RELEASE RELAY SD HH UNDERGROUND ELECTRIC HANDHOLE TERMINATE AT BDF & RJ45 JACKS. RJ45 JACKS TO BDF. PULL CAT 6 CABLE RECEPTACLES AND (4) CAT 6 CABLES WITH PATCH PANEL. PROVIDE (2) DUPLEX TEL/DATA BACK TO NEAREST CABLE TRAY OR DRAWINGS AND (1) 1-1/4'' CONDUIT FOR PANELBOARD, CONDUIT(S) FOR A/V PER CONDUITS FOR POWER BACK TO DESIGNATED FLOORING SELECTION). PROVIDE (2)3/4'' COVER(VERIFY FINAL COVER WITH FINAL FLOOR BOX FSR FL-500P-6 WITH FL-500P-B-C DH DOOR HOLD OPEN Electrical Symbol List & Notes O. N. M. L. K. J. I. H. G. F. E. D. C. B. A. EQUIPMENT WILL OPERATE PROPERLY. AFTER RENOVATING EXISTING ELECTRICAL WORK, THE CONTRACTOR SHALL ENSURE THAT ALL REMAINING AND NEW OUTSIDE OF THE SCOPE OF WORK. OF DEMOLITION, CONTRACTOR SHALL FIELD VERIFY ALL BRANCH CIRCUITS AND MAINTAIN THOSE CIRCUITS THAT EXTEND DISCONNECT AND REMOVE PANEL, FEEDERS AND BRANCH CIRCUITS BACK TO POINT OF SOURCE PRIOR TO THE START DISCONNECT, MAKE SAFE AND REMOVE ALL TEMPORARY AND ABANDONED WIRE WITHIN THE SPACE. PROPERTY OF THE CONTRACTOR AND SHALL BE REMOVED FROM THE SITE. INDICATED TO BE REMOVED UNLESS OTHERWISE INDICATED. ALL ITEMS REJECTED BY THE OWNER SHALL BECOME THE OF ITEMS TO BE RETAINED. TURN OVER TO OWNER THE EXISTING ZONED "FACP" AND EXISTING FIRE ALARM DEVICES INVENTORY MAJOR ELECTRICAL ITEMS THAT ARE REMOVED AND PROVIDE A LIST TO THE OWNER FOR THEIR SELECTION IN ACCORDANCE WITH THE PLANS AND/OR AS DIRECTED AFTER COMPLETION OF OTHER TRADE'S WORK IN THAT AREA. AND STORE ANY OR ALL ELECTRICAL ITEMS IN PATH OF WORK, REINSTALLING AND RECONNECTING SAME AS REQUIRED, IN ANY AREA REQUIRING THE PERFORMANCE OF ANY TRADE'S WORK, THIS CONTRACTOR SHALL CAREFULLY REMOVE TO BE REUSED, SHALL BE CUT OFF FLUSH WITH SLAB LEVEL WITH CONCRETE. ALL EXISTING CONDUITS STUBBED THROUGH FLOOR SERVING ITEMS TO BE REMOVED AND NOT SHOWN OR REQUIRED AND FEEDERS PASSING THROUGH AND SERVING UNDISTURBED AREAS (SHOWN OR NOT SHOWN). MAINTAIN AND RESTORE, IF INTERRUPTED BY REMOVALS OR IN PATH OF NEW CONSTRUCTION, ALL CIRCUITS, CONDUITS DEMOLITION. SAFE ANY EQUIPMENT TO BE REMOVED BY OTHERS. COORDINATE REMOVAL OF EQUIPMENT WITH OTHER TRADES PRIOR TO SHALL BE REUSED AS DETERMINED BY CONTRACTOR. ALL UNUSED CONDUITS SHALL BE REMOVED. DISCONNECT AND MAKE DRAWINGS SHALL BE DISCONNECTED AND REMOVED UNLESS NOTED OTHERWISE. WALLBOXES, BACKBOXES AND CONDUIT FEEDERS AND CONDUITS BACK TO POINT OF SOURCE UNLESS OTHERWISE NOTED. ALL ITEMS SHOWN ON THE DEMOLITION THE EXISTING ELECTRICAL EQUIPMENT AND DEVICES WITHIN DEMOLITION AREA SHALL BE DEMOLISHED ALONG WITH ALL ELECTRICAL CONTRACTOR SHALL PROVIDE. OTHER PERIODS. ANY SHUTDOWNS REQUIRE APPROVAL FROM THE UNIVERSITY. IF A FIRE WATCH IS REQUIRED THE DISCRETION OF THE FIRE DEPARTMENT AND THE OWNER'S REPRESENTATIVE, BUT MUST BE PLACED BACK ON LINE DURING RENOVATION MAY BE DISCONNECTED FROM SERVICE DURING THE HOURS THE CONTRACTOR IS WORKING, AT THE EXISTING FIRE ALARM SYSTEM SHALL BE KEPT OPERATIONAL DURING THE CONSTRUCTION PERIOD. THE BUILDING UNDER THE ELECTRICAL CONTRACTOR. EQUIPMENT BEING ABANDONED OR REMOVED, WHICH WILL REQUIRE DE-ENERGIZATION, REMOVAL AND BLANK-OFF BY REFER TO PLUMBING CONTRACT DRAWINGS AND SPECIFICATIONS FOR EXACT QUANTITIES AND LOCATIONS OF ALL PLUMBING NOT ALL DEVICES TERMINATIONS, JUNCTION BOXES AND WIRING HAVE BEEN SHOWN. WORK. PARTICULAR CARE SHALL BE TAKEN TO AVOID CREATING HAZARD OR CAUSING DISRUPTION IN ADJOINING AREAS. AND CAP ALL SERVICE LINES TO BE DISCONNECTED FOR THOSE SERVICES WHICH NORMALLY ARE INCLUDED IN HIS FIELD OF CONTRACTOR SHALL PARTICIPATE IN SURVEY OF THE EXISTING ELECTRICAL SYSTEMS. THE CONTRACTOR SHALL DISCONNECT UNFAMILIARITY WITH SITE CONDITIONS THAT ARE VISIBLE OR READILY CONSTRUED BY EXPERIENCED OBSERVERS. THIS THAT WILL AFFECT THE DEMOLITION WORK. NO COMPENSATION WILL BE GRANTED FOR ADDITIONAL WORK CAUSED BY AND ARE NOT GUARANTEED. PRIOR TO SUBMITTING BID, VISIT SITE AND IDENTIFY EXISTING CONDITIONS AND DIFFICULTIES EXISTING CONDITIONS ARE TAKEN FROM FIELD OBSERVATIONS AND PRIOR CONSTRUCTION DOCUMENTS WHEN AVAILABLE COORDINATE ALL SHUTDOWNS WITH UNIVERSITY PRIOR TO DEMOLITION. SEE A-005 FOR CONSTRUCTION SCHEDULE AND PHASING. NEW WORK. THE CONTRACTOR IS TO PROTECT BUILDING AND FURNISHINGS FROM DAMAGE. THE CONTRACTOR IS RESPONSIBLE FOR THE REMOVAL AND REPLACEMENT OF EXISTING CONSTRUCTION IN THE WAY OF AS POSSIBLE, SUBJECT TO THE OWNER'S APPROVAL. OF THE CONTRACTOR'S WORK, IT SHALL BE REPAIRED AND/OR REPLACED WITH SIMILAR OR LIKE MATERIALS, AS MUCH WHEN EXISTING CONSTRUCTION, WHICH IS TO REMAIN, IS DAMAGED DURING THE COURSE OF DEMOLITION AS A RESULT 'NL' DENOTES UNSWITCHED SAFETY CIRCUIT LUMINAIRE CONNECTED TO EMERGENCY LIFE Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 212-239-7130 f 212-245-5195 t New York, NY 10001 450 West 31 Street Floor 6 Richard McElhiney Architects LLC 646-385-7625 New York, NY 10013 161 Sixth Avenue Floor 3 HOK Key Plan: Notes: July 30, 2014 585-202-5590 Rochester, NY 14604 150 North Chestnut St. ME Engineering, PC 716-831-0000 Blasdell, NY 14219 4588 South Park Avenue Baer & Associates LLC N 100% CD ED-101 0 1'2'4' NORTH SCALE: 1/2"=1'-0" 2 ROOM TYPE 1.2 & 1.2A 0 1'2'4' NORTH SCALE: 1/2"=1'-0" 1 ROOM TYPE 1.1 & 1.1A 0 1'2'4' NORTH SCALE: 1/2"=1'-0" 3 ROOM TYPE 1.3 & 1.3A 0 1'2'4' NORTH SCALE: 1/2"=1'-0" 4 ROOM TYPE 1.4 (ROOMS 411, 511, 611, 711, 811, & 911) & 1.4A (ROOM 311) 0 1'2'4' NORTH SCALE: 1/2"=1'-0" 5 ROOM TYPE 1.5 (ROOM 414, 514, 614, 714, 814, & 914) & 1.5A (ROOM 314) Room Types 1.1-1.5 Electrical Demo Plans ED101 ED101 ED101 ED101 ED101 J J JJ J DEMOLITION NOTES: 1 2 G. F. E. D. C. B. A. GENERAL NOTES: AND CIRCUIT SALVAGED FOR EXTENSION. REMOVE EXISTING DUPLEX OUTLET ON WALL IN VESTIBULE OUTSIDE BATHROOM AS SHOWN. BACKBOX TO REMAIN ROOM FROM OLD SPEAKER SYSTEM. DISCONNECT AND REMOVE EXISTING JUNCTION BOX IN EACH BATHROOM AND WIRING BACK TO ELECTRICAL OTHERWISE NOTED. EXISTING BATHROOM LIGHT FIXTURES AND CIRCUITING BACK TO LIGHT SWITCH SHALL BE DEMOLISHED UNLESS UNLESS OTHERWISE NOTED. EACH BATHROOM RECEPTACLE AND BACK BOX SHALL BE REMOVED AND CIRCUITING SHALL REMAIN FOR REUSE UNLESS OTHERWISE NOTED. EACH BATHROOM LIGHT SWITCH AND BACK BOX SHALL BE REMOVED AND CIRCUITING SHALL REMAIN FOR REUSE ALL WIRING BETWEEN DEVICES BEING DEMOLISHED AND UP TO BRANCH CIRCUIT HOMERUN SHALL BE REMOVED. SALVAGE EXISTING CIRCUITS WITHIN BATHROOMS FOR REWORK AND EXTENSION AS SHOWN ON NEW PLANS. EXISTING BRANCH WIRING FROM BATHROOM TO ELECTRICAL PANEL TO REMAIN. 0 1'2'4' NORTH SCALE: 1/2"=1'-0" 6 ED101 ROOM TYPE 7 (ROOM 718) GFI (E) (E) (E) (E) (E)(E) 3 EXISTING CIRCUIT INSTALLED TO BE REWORKED TO MATCH FINAL ROOM DESIGN. REFER TO E-101 FOR FINAL LAYOUT. DISCONNECT AND REMOVE EXISTING LIGHT SWITCH, RECEPTACLE AND ASSOCIATED BACK BOX FROM MODEL ROOM. NO ELECTRICAL DEMOLITION WITHIN THIS BATHROOM. CIRCUIT FOR REUSE AND EXTENSION FOR NEW JACUZZI TUB BEING INSTALLED. EXISTING JACUZZI TUB BEING REMOVED. DISCONNECT AND REMOVE CONNECTION TO JACUZZI TUB AND SALVAGE 3 Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 212-239-7130 f 212-245-5195 t New York, NY 10001 450 West 31 Street Floor 6 Richard McElhiney Architects LLC 646-385-7625 New York, NY 10013 161 Sixth Avenue Floor 3 HOK Key Plan: Notes: July 30, 2014 585-202-5590 Rochester, NY 14604 150 North Chestnut St. ME Engineering, PC 716-831-0000 Blasdell, NY 14219 4588 South Park Avenue Baer & Associates LLC N 100% CD ED-102 0 1'2'4' NORTH SCALE: 1/2"=1'-0" 2 0 1'2'4' NORTH SCALE: 1/2"=1'-0" 1 0 1'2'4' NORTH SCALE: 1/2"=1'-0" 3 0 1'2'4' NORTH SCALE: 1/2"=1'-0" 4 0 1'2'4' NORTH SCALE: 1/2"=1'-0" 5 ROOM TYPE 2.2 (ROOMS 426, 726, 826, & 926) & 2.2A (ROOM 326) ROOM TYPE 2.1 (ROOMS 526 & 626) ROOM TYPE 4 (ROOMS 702 & 802) ROOM TYPE 3 ROOM TYPE 5 (ROOM 502) 0 1'2'4' NORTH SCALE: 1/2"=1'-0" 6 ROOM TYPE 6 (ROOM 605) Room Types 2-6 Electrical Demo Plans ED102 ED102 ED102 ED102 ED102 ED102 F(ER) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E)(E)(E)(E) (E) (E) (E) (E) (E) (E) (E) (E)(E) J J A. NOTE: REFER TO DRAWING ED-101 FOR GENERAL AND DEMOLITION NOTES FOR THIS DRAWING. 2 22 2 1 (ER) (E) Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 212-239-7130 f 212-245-5195 t New York, NY 10001 450 West 31 Street Floor 6 Richard McElhiney Architects LLC 646-385-7625 New York, NY 10013 161 Sixth Avenue Floor 3 HOK Key Plan: Notes: July 30, 2014 585-202-5590 Rochester, NY 14604 150 North Chestnut St. ME Engineering, PC 716-831-0000 Blasdell, NY 14219 4588 South Park Avenue Baer & Associates LLC N 100% CD E-101 Room Types 1.1-1.5 Electrical Plans 0 1'2'4' NORTH SCALE: 1/2"=1'-0" 2 E101 ROOM TYPE 1.2 & 1.2A 0 1'2'4' NORTH SCALE: 1/2"=1'-0" 1 E101 ROOM TYPE 1.1 & 1.1A 0 1'2'4' NORTH SCALE: 1/2"=1'-0" 3 E101 ROOM TYPE 1.3 & 1.3A 0 1'2'4' NORTH SCALE: 1/2"=1'-0" 4 E101 ROOM TYPE 1.4 (ROOMS 411, 511, 611, 711, 811, & 911) & 1.4A (ROOM 311) 0 1'2'4' NORTH SCALE: 1/2"=1'-0" 5 E101 ROOM TYPE 1.5 (ROOM 414, 514, 614, 714, 814, & 914) & 1.5A (ROOM 314) DRAWING NOTES: 1 2 3 4 5 6 7 8 GFI 1 1 2 3 4 5 6 8 GFI GFI 1 1 2 3 4 5 6 8 GFI 1 1 23 4 5 6 8 4 6 1 8 1 5 23 GFI 1 1 2 3 5 8 6 4 M1 M1 M1 M1 M1L5 L5 L5 L5 L5 L1 L1 L1 L1 L1 L2 L2 L2 L2 L2 9 7 7 7 7 E. D. C. B. A. GENERAL NOTES: SEE LIGHTING SCHEDULE A-603 FOR LIGHT FIXTURE DESIGNATIONS. INFORMATION. SEE SHEETS A-131 THROUGH A-141 FOR ALL ELECTRICAL LOCATION DIMENSIONS AND ALL WIRING SHALL BE (2)#12AWG & (1)#12EG IN ƒ" CONDUIT. CIRCUIT HOMERUNS TO LIGHTING AND DEVICES AS SHOWN. SALVAGED DURING DEMOLITION. PROVIDE NEW WIRING FROM POINT OF EXISTING BRANCH CONNECT ALL BATHROOM ELECTRICAL DEVICES AND LIGHTING INTO EXISTING CIRCUITS THESE NOTES AND DRAWING NOTES BELOW APPLY TO BOTH E-101 AND E-102 DRAWINGS. COORDINATE WORK WITH JACUZZI TUB MANUFACTURER'S INSTRUCTIONS. PROVIDE REWORKING AND EXTENSION OF CIRCUIT AS REQUIRED TO CONNECT TO NEW JACUZZI. PROVIDE CONNECTION OF NEW JACUZZI TUB TO EXISTING CIRCUIT MADE SPARE DURING DEMOLITION. MANUFACTURER AND OWNER PRIOR TO ROUGH IN. REQUIREMENTS. COORDINATE EXACT LOCATION OF CONNECTION POINT AT MIRROR WITH MIRROR CONDUIT FROM WALL SWITCH TO MIRROR FOR INSTALLATION OF WIRING PER MANUFACTURER'S GENERAL CONTRACTOR. SHALL BE CONNECTED INTO ROOM LIGHTING CONTROLS. PROVIDE 1/2" PROVIDE CONNECTION TO VANITY MIRROR DEFOGGER PURCHASED BY OWNER AND DELIVERED BY TO A JUNCTION BOX. PROVIDE FEED TO MATCH EXISTING. PROVIDE NEW DUPLEX OUTLET FED FROM EXISTING DUPLEX OUTLET BEING REMOVED AND CONVERTED INTO NEW ROOM LIGHTING CONTROLS. INSTALL LIGHT FIXTURE FURNISHED BY OWNER. CONTRACTOR. INSTALLATION LOCATION PER ARCHITECTURAL DRAWING. CONNECT NEW FIXTURE INSTALL NEW CEILING MOUNTED LIGHT FIXTURE PURCHASED BY OWNER & DELIVERED BY GENERAL FOR FINAL MOUNTING LOCATION OF MIRROR. HARDWIRE MAKE-UP MIRROR TO RECEPTACLE POWER. REFER TO ARCHITECTURAL DRAWINGS DOWNLIGHT. SHOWER AND CONNECT TO NEW ROOM LIGHTING CONTROLS. ELECTRICAL CONTRACTOR TO INSTALL INSTALL NEW DOWN LIGHT (PURCHASED BY OWNER & DELIVERED BY GENERAL CONTRACTOR) OVER STYLE WHEN OFF AND AMBER IN COLOR. LIGHTING AND MIRROR DEFOGGER AS SHOWN ON PLANS. LIGHT SWITCHES SHALL BE AN ILLUMINATED WILL CONTROL OVERHEAD LIGHTING LIGHTING AND ONE SWITCH WILL CONTROL THE REMAINING PROVIDE NEW SWITCHES IN EXISTING SWITCH LOCATION WITHIN A NEW 3-GANG BOX. ONE NEW SWITCH PROVIDE NEW GFI RECEPTACLE WITHIN NEW 3-GANG BOX. HEIGHTS OF JUNCTION BOXES FOR WALL SCONCES. CONTRACTOR TO INSTALL SCONCES. REFER TO ARCHITECTURAL DRAWINGS FOR FINAL MOUNTING INSTALL SCONCES PURCHASED BY OWNER & DELIVERED BY GENERAL CONTRACTOR. ELECTRICAL 0 1'2'4' NORTH SCALE: 1/2"=1'-0" 6 E101 ROOM TYPE 7 (ROOM 718) GFI (E) (E) (E) (E) (E)(E) 7 3 2 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 212-239-7130 f 212-245-5195 t New York, NY 10001 450 West 31 Street Floor 6 Richard McElhiney Architects LLC 646-385-7625 New York, NY 10013 161 Sixth Avenue Floor 3 HOK Key Plan: Notes: July 30, 2014 585-202-5590 Rochester, NY 14604 150 North Chestnut St. ME Engineering, PC 716-831-0000 Blasdell, NY 14219 4588 South Park Avenue Baer & Associates LLC N 100% CD E-102 0 1'2'4' NORTH SCALE: 1/2"=1'-0" 2 E102 0 1'2'4' NORTH SCALE: 1/2"=1'-0" 1 E102 0 1'2'4' NORTH SCALE: 1/2"=1'-0" 3 E102 0 1'2'4' NORTH SCALE: 1/2"=1'-0" 4 E102 0 1'2'4' NORTH SCALE: 1/2"=1'-0" 5 E102 Room Types 2-6 Electrical Plans ROOM TYPE 2.2 (ROOMS 426, 726, 826, & 926) & 2.2A (ROOM 326) ROOM TYPE 2.1 (ROOMS 526 & 626) ROOM TYPE 4 (ROOMS 702 & 802) ROOM TYPE 3 ROOM TYPE 5 (ROOM 502) 0 1'2'4' NORTH SCALE: 1/2"=1'-0" 6 E102 ROOM TYPE 6 (ROOM 605) GFI 2 3 5 A. GENERAL NOTES: REFER TO DRAWING E-101 FOR GENERAL NOTES AND DRAWING NOTES FOR THIS DRAWING. 4 6 1 8 1 3 4 6 1 8 1 F (ER) 1 1 8 GFI 25 3 6 4 6 (E) (E) (E) (E) (E) (E)(E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E)(E)(E)(E) (E) (E) 5 5 5 GFI 2 5 M1 M1 L2 L2 L2 L2L2 L2 M1 L1 L1 L1 L5 L5 L5 L5 9 (ER) 7 7 (E) L3 L3 L3 L3 L3 L3 Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 212-239-7130 f 212-245-5195 t New York, NY 10001 450 West 31 Street Floor 6 Richard McElhiney Architects LLC 646-385-7625 New York, NY 10013 161 Sixth Avenue Floor 3 HOK Key Plan: Notes: July 30, 2014 585-202-5590 Rochester, NY 14604 150 North Chestnut St. ME Engineering, PC 716-831-0000 Blasdell, NY 14219 4588 South Park Avenue Baer & Associates LLC N 100% CD 1 P100 SCALE: „"=1'-0" EXISTING WORK TO BE REMOVED POINT OF CONNECTION POINT OF DISCONNECTION NTS NOT TO SCALE (E)EXISTING (ETR)EXISTING TO REMAIN AFF ABOVE FINISHED FLOOR BFF BELOW FINISHED FLOOR VTR VENT THRU ROOF GC GENERAL CONTRACTOR MC MECHANICAL CONTRACTOR PC PLUMBING CONTRACTOR EC ELECTRICAL CONTRACTOR (E)EXISTING PIPING COLD WATER PIPING (CW) HOT WATER PIPING (HW) SANITARY SEWER PIPINGSAN DESCRIPTION PLUMBING SYMBOL LIST SYMBOL ELBOW DOWN 45°OFFSET ELBOW UP BOTTOM/TEE CONNECTION TOP TEE CONNECTION "P" TRAP PIPE CONTINUATION CAP OR PLUG WALL PLATE CLEANOUT (WPCO) CLEANOUT (CO) SHUT OFF VALVE BALANCING VALVE CHECK VALVE UNION SHOWER HEAD VENT PIPING X22 X19 X17 X18 X20 X16 X14 X12 X09 X11 X15 X10 X08 X06 X05 X07 X02 X01 X03 P-100 & General Notes Key Plan, Symbols, Key Floor Plan Rm #605 1/2 P104 3/4 P104 1/2 P104 9 9 3/4 P104 1/2 P107 1/2 P104 9 3/4 P104 1/2 P104 9 3/4 P104 1 11 1 1 1/2 P104 1 1 3/4 P104 9 4,&3 8,7,6,5, 4,&3 8,7,6,5, 1/2 P104 3/4 P104 9 4,&3 8,7,6,5, 1/2 P104 9 3/4 P104 4,&3 8,7,6,5, X24 X21 1/2 P104 3/4 P104 9 4,&3 8,7,6,5, 1/2 P105 3/4 P105 4,&3 8,7,6,5, 9 1 1 1 1 1/2 P106 3/4 P106 9 X26 1 3/4 P107 9 4,&3 8,7,6,5, 4,&3 8,7,6,5, 4,&3 8,7,6,5, 1/2 P104 3/4 P1049 4,&3 8,7,6,5, ONLY # 502 ROOM NEW PIPING 1 2 2 2 3 3 4,&3 8,7,5, 1/2 P102 1/2 P102 1/2 P102 1/2 P102 1/2 P102 1/2 P102 1/2 P102 1/2 P102 1/2 P102 1/2 P103 1/2 P101 1/2 P103 DEMOLITION NOTES: 11. 10. 9. 8. 7. 6. 5. 4. 3. 2. 1. ALL COSTS FOR CUTTING, PATCHING, AND PAINTING OF EXISTING WALLS, CEILINGS AND FLOORS TO ACCOMMODATE PIPING AND EQUIPMENT REMOVALS SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR UNLESS INDICATED OTHERWISE. MATERIALS FOR RESTORATION OF EXISTING SURFACES SHALL MATCH THE EXISTING SURFACES. WHERE EXISTING PIPING IS ENCOUNTERED DURING CONSTRUCTION THAT ACTIVELY SERVES ADJACENT AREAS,THE FLOORS ABOVE OR THE FLOORS BELOW THE CONSTRUCTION AREA, THE PIPING SHALL BE RELOCATED TO AVOID THE WORK OF OTHER TRADES OR TO ACCOMODATE THE NEW FLOOR PLAN LAYOUT. ACTIVE PIPING SHALL NOT BE DISCONNECTED. RELOCATE THE PIPING INTO NEW FLOOR PLAN AND RECONNECT TO EXISTING PIPING. 12. 13. SPRINKLERS, HOSE CABINETS AND LEGAL DISPOSAL OFF SITE. VALVES, FIXTURES, EQUIPMENT, HANGERS, SUPPORTS, DEMOLITION SHALL INCLUDE, BUT NOT BE LIMITED TO: PIPING, RATING OF EXISTING CONSTRUCTION. REMOVAL OF PIPING OR EQUIPMENT. MAINTAIN THE FIRE/SMOKE PLUG HOLES IN EXISTING CONSTRUCTION LEFT BY THE PIPING BACK TO BEHIND THE FINISHED WALL SURFACE AND CAP. IS INACTIVE. NO DEAD LEGS PERMITTED. REMOVE THE INACTIVE TO REMAIN MAY BE ABANDONED IN PLACE PROVIDING THE PIPING ALL PIPING TO BE REMOVED THAT IS LOCATED WITHIN A WALL GAS, VACUUM PIPING. REMOVE ALL INACTIVE PIPING UNLESS NOTED. PIPING AND CAPPED. VALVE AND CAP ALL WATER, GAS, MEDICAL ALL PIPING TO BE REMOVED SHALL BE REMOVED BACK TO ACTIVE ACTIVE SERVICE PIPING. ALL EXISTING PIPING TO REMAIN SHALL BE RECONNECTED TO OWNER AND OTHER TRADES PRIOR TO DEMOLITION. COORDINATE AND SCHEDULE WORK AND SHUTDOWNS WITH THE ALL MATERIALS TO A LOCATION OFF SITE. CAUSED BY WORK OF THIS CONTRACTOR. LEGALLY DISPOSE DISPOSE OF ALL DEMOLITION AND/OR OTHER WASTE MATERIALS MATERIALS SUBJECT TO ARCHITECTS APPROVAL. THIS CONTRACTOR, REPAIR AND/OR REPLACE WITH SIMILAR OR WHEN EXISTING CONSTRUCTION IS DAMAGED DURING WORK BY NOTED ON THE DRAWINGS. OR PIPING SHALL BE ABANDONED IN PLACE UNLESS OTHERWISE AND PIPING ACCESORIES WHERE DISCONNECTED. NO EQUIPMENT AND PIPING REMOVALS. REMOVE ALL MISCELLANEOUS PIPING THE DEMOLITION DRAWINGS SHOW, IN GENERAL, MAJOR EQUIPMENT AND DETERMINE SCOPE OF WORK. VISIT SITE PRIOR TO BID AND REVIEW EXISTING CONDITIONS LOCATIONS SHOWN MUST BE CONSIDERED APPROXIMATE. AND PRIOR CONSTRUCTION DOCUMENTS WHEN AVAILABLE. THE EXISTING CONDITIONS ARE TAKEN FROM FIELD OBSERVATIONS CONTRACT DRAWINGS. THESE NOTES ARE APPLICABLE TO THE FULL SET OF 1/2 P102 5 P104 6 P104 6 6 NUMBERS. REFER TO ARCHITECTURAL PLANS FOR FIXTURE TYPES AND MODEL SEE DRAWING A-005 FOR CONSTRUCTION SCHEDULE AND PHASING. 15 14 ARE NOT COMPLETE.) AREA- (FLOORS 9, 8, 6, 5, 4, & 3 WORK FOR ROOM #720 IN THIS COORDINATE ALL ASSOCIATED THE MODEL ROOM PROJECT, PREVIOUSLY COMPLETED UNDER NOTE: WORK IN ROOM #718 WAS DIAGRAM RISER DIAGRAM RISER DIAGRAM RISER DIAGRAM RISER DIAGRAM RISER DIAGRAM RISERDIAGRAM RISER DIAGRAM RISER DIAGRAM RISER DIAGRAM RISER DIAGRAM RISER DIAGRAM RISER WITH OTHER TRADES. COORDINATE ALL WORK CONNECTIONS IN CHASE. WALL AND MAKE NEW RUN DRAIN AND SUPPLIES IN DRAIN, HW, & CW SUPPLIES. REWORK ROOM # 718 LAVATORY 43 802, & 902 402, 602, 702, ROOMS 302, 302, 402, 602, 702, 802, & 902 CONNECTIONS FOR REPLACEMENT IN ROOMS REMOVE SPA JET NOZZLES AND CLEAN LAVATORY EACH). (ROOMS 702 & 802 HAVE ONLY ONE WATER CLOSET AND LAVATORIES TO REMAIN. TERMINATE FOR RECONNECTION. EXISTING P-TRAP ANGLE STOPS & SUPPLIES; REMOVE FAUCET, POP-UP WASTE, TAILPIECE, AND SPA TUB; TERMINATE FOR RECONNECTION. SHOWER DIVERTER, TUB SPOUT, FAUCET, DISCONNECT AND REMOVE SHOWER HEAD, DRAWING NOTES: DEMOLITION NOTES: 3 2 1 3" FD-A 2" FD-A 5 ONLY # 502 ROOM 5 4 3 2 1 DIAGRAM RISER 5/6 P106 6&5 4,&3 8,7, TUB SPOUT, FAUCET AND NEW SPA TUB. INSTALL SHOWER HEAD, SHOWER DIVERTER, 302, 402, 602, 702,802 & 902. INSTALL NEW SPA JET NOZZLES IN ROOMS ONLY ONE LAVATORY EACH). LAVATORY (LAV), (NOTE: ROOMS 702 AND 802 & SUPPLIES AS SPECIFIED FOR POP-UP WASTE, TAILPIECE, P-TRAP, ANGLE STOPS, INSTALL FAUCET, PROVIDE AND INSTALL VALVE AS SPECIFIED FOR SHOWER (SHR). SHOWER HEAD, HYDRORAIL, & MIXING INSTALL SHOWER HEAD , HANDHELD FLOOR. REVISIONS CONCERNING THE THIRD REFER TO SPECIFIC DETAIL FOR TUB UNIT ON THE THIRD FLOOR ONLY REPLACE EXISTING TUB UNIT WITH NEW Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 212-239-7130 f 212-245-5195 t New York, NY 10001 450 West 31 Street Floor 6 Richard McElhiney Architects LLC 646-385-7625 New York, NY 10013 161 Sixth Avenue Floor 3 HOK Key Plan: Notes: July 30, 2014 585-202-5590 Rochester, NY 14604 150 North Chestnut St. ME Engineering, PC 716-831-0000 Blasdell, NY 14219 4588 South Park Avenue Baer & Associates LLC N 100% CD P-101 Diagrams-Plumbing Typical Guest Room Riser 3" 4" 2" 2" 2" 1•" 2" 2" 1•" 1•" WC BT LAV 7th Floor 8th Floor 6th Floor 9th Floor 5th Floor 4th Floor 3RD Floor LAVATORY (TYPICAL) INSTALLATION OF NEW PLUG PIPING PENDING TO WITHIN CHASE & WASTE PIPING BACK REMOVE LAVATORY PIPING AND FITTING. CLOSET, CLEAN REMOVE WATER 1•" 2" 4" 3" 4"3" 2"2" 2" 2" 2" 1•" (TYPICAL) AND WASTE PIPING REMOVE BATHTUB,1•" LAV WC LAV 1•" WC BT BT 1•" PIPING AND FITTING. CLOSET, CLEAN REMOVE WATER 2" LAVATORY (TYPICAL) INSTALLATION OF NEW PLUG PIPING PENDING TO WITHIN CHASE & WASTE PIPING BACK REMOVE LAVATORY 1•" 2" 2" 2"2" 4" (TYPICAL) AND WASTE PIPING REMOVE BATHTUB, (TYPICAL) AND WASTE PIPING REMOVE BATHTUB, PIPING AND FITTING. CLOSET, CLEAN REMOVE WATER 1•" LAVATORY (TYPICAL) INSTALLATION OF NEW PLUG PIPING PENDING TO WITHIN CHASE & WASTE PIPING BACK REMOVE LAVATORY LAVATORY (TYPICAL) INSTALLATION OF NEW PLUG PIPING PENDING TO WITHIN CHASE & WASTE PIPING BACK REMOVE LAVATORY 4"2" 2" 2"2" 3" 2"2"2" 2" 2" 2" 4" 1•" 1•" WC PIPING AND FITTING. CLOSET, CLEAN REMOVE WATER LAV LAVATORY (TYPICAL) INSTALLATION OF NEW PLUG PIPING PENDING TO WITHIN CHASE & WASTE PIPING BACK REMOVE LAVATORY LAVATORY (TYPICAL) INSTALLATION OF NEW PLUG PIPING PENDING TO WITHIN CHASE & WASTE PIPING BACK REMOVE LAVATORY LAV 1•" 1•" WC BT 1•" 2" 4" 2" 2"2"2" PIPING AND FITTING. CLOSET, CLEAN REMOVE WATER (TYPICAL) AND WASTE PIPING REMOVE BATHTUB, LAV WC BT PIPING AND FITTING. CLOSET, CLEAN REMOVE WATER LAVATORY (TYPICAL) INSTALLATION OF NEW PLUG PIPING PENDING TO WITHIN CHASE & WASTE PIPING BACK REMOVE LAVATORY 1•"2" 2" 4" 4" 1•" 1•" 2"2"2" 2" 3" 4" 2" 2" 2" 2" 1•" 1•" WC LAV 7th Floor 8th Floor 6th Floor 9th Floor 5th Floor 4th Floor 3RD Floor 1•" 4" 3" 4"3" 2"2" 2" 1•" LAV WC LAV 1•" WC 1•" 2" 2" 4" WC LAV 1•" 1•" 4"2" 2" 2"2" 3" 1•" WC LAV 1•" 1•" WC WC 2"2" 4" 2" 2"2"2" LAV WC 4" 4" 1•" 1•" 2"2"2" 2" CLOSET INSTALL WATER SHR 2" PLUG SHR CLOSET INSTALL WATER CLOSET INSTALL WATER CLOSET INSTALL WATER CLOSET INSTALL WATER CLOSET INSTALL WATER CLOSET INSTALL WATER SHR 2" 2" SHR TUB 2" 2 P101 NO SCALE 1 P101 NO SCALE 2" 2" 2" 1•" 2"(E)(E)(E) (E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E) (E) (E)(E)(E)(E)(E)(E)(E)(E)(E)(E) (E)(E)(E)(E)(E) NOTE: Sanitary Riser Diagram- Single-Plumbing- Demolition Sanitary Riser Diagram-Single- Plumbing- New Work X26 3" FD SHOWER DRAIN 2" 2" 2" 4" 1•" WC PIPING AND FITTING. CLOSET, CLEAN REMOVE WATER LAV 3" FD SHOWER DRAIN626 526 RENOVATED WHILE FLOOR IS BEING REMOVE FLOOR DRAIN RENOVATED WHILE FLOOR IS BEING REMOVE SHOWER DRAIN RENOVATED WHILE FLOOR IS BEING REMOVE SHOWER DRAIN RENOVATED WHILE FLOOR IS BEING REMOVE FLOOR DRAIN (E) 2"2"2" 2" 2" 2" 4" 1•" 1•" LAV 3" FD 2" 2" LAV 3" FD SHOWER DRAIN626 526 1. AT THIRD FLOOR ONLY) & WASTE PIPING (TYPICAL INSTALL NEW TUB AND P-TRAP. CLEAN PIPING WASTE PIPING (TYPICAL) REMOVE BATHTUB AND BT (TYPICAL) DRILL AND SEAL INDICATES CORE (TYPICAL) CHASE & CONNECT. WITHIN WALL BACK TO AND RUN WASTE PIPING CONNECT TO LAVATORY (TYPICAL) CHASE & CONNECT. WITHIN WALL BACK TO AND RUN WASTE PIPING CONNECT TO LAVATORY (TYPICAL) CHASE & CONNECT. WITHIN WALL BACK TO AND RUN WASTE PIPING CONNECT TO LAVATORY (TYPICAL) CHASE & CONNECT. WITHIN WALL BACK TO AND RUN WASTE PIPING CONNECT TO LAVATORY (TYPICAL) CHASE & CONNECT. WITHIN WALL BACK TO AND RUN WASTE PIPING CONNECT TO LAVATORY & CONNECT. (TYPICAL) BACK TO WING WALL AND RUN WASTE PIPING CONNECT TO LAVATORY & CONNECT. (TYPICAL) BACK TO WING WALL AND RUN WASTE PIPING CONNECT TO LAVATORY SCHEDULE & PHASING INFORMATION. REFER TO DRAWING A-005 FOR CONSTRUCTION Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 212-239-7130 f 212-245-5195 t New York, NY 10001 450 West 31 Street Floor 6 Richard McElhiney Architects LLC 646-385-7625 New York, NY 10013 161 Sixth Avenue Floor 3 HOK Key Plan: Notes: July 30, 2014 585-202-5590 Rochester, NY 14604 150 North Chestnut St. ME Engineering, PC 716-831-0000 Blasdell, NY 14219 4588 South Park Avenue Baer & Associates LLC N 100% CD P-102 3" 4" 2" 2" 2" 1•" 2"2" 2" 1•" 1•" 1•" WC WC BT BT LAVLAV 7th Floor 8th Floor 6th Floor 9th Floor 5th Floor 4th Floor 3RD Floor LAVATORY (TYPICAL) INSTALLATION OF NEW PLUG PIPING PENDING TO WITHIN CHASE & WASTE PIPING BACK REMOVE LAVATORY PIPING AND FITTING. CLOSET, CLEAN REMOVE WATER LAV WC BT 1•" 2" 4" 3" 4"3" 2"2" 2" 2" 2" 1•" (TYPICAL) AND WASTE PIPING REMOVE BATHTUB,1•"1•" LAV WC LAVLAV 1•"1•" WCWC BT BT BT 1•" PIPING AND FITTING. CLOSET, CLEAN REMOVE WATER 2" LAVATORY (TYPICAL) INSTALLATION OF NEW PLUG PIPING PENDING TO WITHIN CHASE & WASTE PIPING BACK REMOVE LAVATORY 1•" 2" 2" 2"2" 4" (TYPICAL) AND WASTE PIPING REMOVE BATHTUB, (TYPICAL) AND WASTE PIPING REMOVE BATHTUB, PIPING AND FITTING. CLOSET, CLEAN REMOVE WATER (TYPICAL) AND WASTE PIPING REMOVE BATHTUB, BT 1•" 2" WCWC BT 1•" LAVLAV 1•" 1•" LAVATORY (TYPICAL) INSTALLATION OF NEW PLUG PIPING PENDING TO WITHIN CHASE & WASTE PIPING BACK REMOVE LAVATORY LAVATORY (TYPICAL) INSTALLATION OF NEW PLUG PIPING PENDING TO WITHIN CHASE & WASTE PIPING BACK REMOVE LAVATORY 4"2" 2" 2"2" 3" 2" PIPING AND FITTING. CLOSET, CLEAN REMOVE WATER 2"2"2" 2" 2"2" 4" 1•" BTBT 1•" 1•" 1•" (TYPICAL) AND WASTE PIPING REMOVE BATHTUB, WC WC PIPING AND FITTING. CLOSET, CLEAN REMOVE WATER LAVLAV LAVATORY (TYPICAL) INSTALLATION OF NEW PLUG PIPING PENDING TO WITHIN CHASE & WASTE PIPING BACK REMOVE LAVATORY LAVATORY (TYPICAL) INSTALLATION OF NEW PLUG PIPING PENDING TO WITHIN CHASE & WASTE PIPING BACK REMOVE LAVATORY LAVLAV 1•" 1•" 1•" WC WC BT BT 1•" 2"2" 4" 2" 2"2"2" PIPING AND FITTING. CLOSET, CLEAN REMOVE WATER (TYPICAL) AND WASTE PIPING REMOVE BATHTUB, LAV LAV WC WC BT BT PIPING AND FITTING. CLOSET, CLEAN REMOVE WATER LAVATORY (TYPICAL) INSTALLATION OF NEW PLUG PIPING PENDING TO WITHIN CHASE & WASTE PIPING BACK REMOVE LAVATORY 1•"2" 2" 4" 4" 1•" 1•" 2"2"2" 2" 3" 4" 2" 2" 2" 2" 2" 2" 1•" 1•" 1•" WC WC LAVLAV 7th Floor 8th Floor 6th Floor 9th Floor 5th Floor 4th Floor 3RD Floor LAV WC 1•" 4" 3" 4"3" 2"2" 2" 2" 1•"1•" LAV WC LAVLAV 1•"1•" WCWC 2" 1•" 2" 2"2" 2" 4" WCWC 1•" LAVLAV 1•" 1•" 4"2" 2" 2"2" 3" 2"2"2" 2" 2"2" 4" 1•" 1•" 1•" WC WCLAVLAV LAVLAV 1•" 1•" 1•" WC WC 2"2" 4" 2" 2"2"2" LAV LAV WC WC 4" 4" 1•" 1•" 2"2"2" 2" CLOSET INSTALL WATER SHR SHR 2" PLUG SHR SHR CLOSET INSTALL WATER CLOSET INSTALL WATER CLOSET INSTALL WATER CLOSET INSTALL WATER CLOSET INSTALL WATER CLOSET INSTALL WATER SHR SHR 2" 2"2" SHR SHR SHR SHR SHR SHR 2" 2 P102 NO SCALE 1 P102 NO SCALE Diagrams-Plumbing Typical Guest Room Riser 2" 2" 2" 2" 2" 2"2" 2"2" 1•"1•" 2"2" Sanitary Riser Diagram- Back to Back-Plumbing- New WorkSanitary Riser Diagram-Back to Back- Plumbing- Demolition 2"2" (E) (E) (E) (E)(E)(E)(E) (E) (E) (E)(E)(E)(E)(E)(E)(E) (E) (E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E) (E)(E)(E)(E)(E)(E)(E)(E)(E)(E) (E)(E)(E) (E) AND P-TRAP. CLEAN PIPING (E)FOR PHASE 2 PRELIMINARY WORK NEW TUB INSTALL NEW TUB INSTALL X01/X03 X11/X15 X017/X19 X22/X24 X18/X20 X06/X08 X10/X12 X14/X16 X05/X07 605 6th Floor 5th Floor 2"2"2" 2" 2"2" 4" 1•" 1•" 1•" WC WCLAVLAV SHR SHR SHR SHR 2"2"(E)(E) (E)(E)(E)(E)(E) 3 P102 NO SCALE Sanitary Riser Diagram- Phased Construction Riser Diagram 2" 7th Floor 6th Floor WC LAV 1•" 1•" 4"2" 2"2" 3" CONNECT. (TYPICAL) OFFSET FROM WALL & BACK TO WITHIN CHASE, AND RUN WASTE PIPING CONNECT TO LAVATORY CLOSET INSTALL WATER SHR SHR 2"2" 2" 2" (E)(E)(E) (E) (E)(E)(E)(E)# 605 4 P102 NO SCALE Sanitary Riser Diagram- Room # 605 Riser DiagramDRAWING P-104 (REFER TO DETAILS 5 & 6 ON A BACK TO BACK ARRANGEMENT NOTE: ROOM # 607 IS NOT (TYPICAL) AND WASTE PIPING REMOVE BATHTUB, NOTE: 1. BT (TYPICAL) DRILL AND SEAL INDICATES CORE IN PHASE 2 (TYP) TO BE COMPLETED CORE DRILLS SHR FD (E)3" 2" 4" 3" IN PHASE 2 (TYP) TO BE COMPLETED CORE DRILLS (TYPICAL) CHASE & CONNECT. WITHIN WALL BACK TO AND RUN WASTE PIPING CONNECT TO LAVATORY (TYPICAL) CHASE & CONNECT. WITHIN WALL BACK TO AND RUN WASTE PIPING CONNECT TO LAVATORY (TYPICAL) CHASE & CONNECT. WITHIN WALL BACK TO AND RUN WASTE PIPING CONNECT TO LAVATORY (TYPICAL) CHASE & CONNECT. WITHIN WALL BACK TO AND RUN WASTE PIPING CONNECT TO LAVATORY (TYPICAL) CHASE & CONNECT. WITHIN WALL BACK TO AND RUN WASTE PIPING CONNECT TO LAVATORY (TYPICAL) CHASE & CONNECT. WITHIN WALL BACK TO AND RUN WASTE PIPING CONNECT TO LAVATORY (TYPICAL) CHASE & CONNECT. WITHIN WALL BACK TO AND RUN WASTE PIPING CONNECT TO LAVATORY SCHEDULE & PHASING INFORMATION. REFER TO DRAWING A-005 FOR CONSTRUCTION DURING PHASE 2 CONSTRUCTION. ADDITIONAL WORK WILL BE REQUIRED WITHIN 5TH FLOOR SPACE CONSTRUCTION WITHIN 5TH FLOOR CHASE AND ABOVE CEILING. 5, 4, & 3. PROVIDE PIPING TO ACCOMMODATE PHASE 2 PHASE 1 CONSTRUCTION RENOVATIONS ARE FOR FLOORS DURING PHASE 2 CONSTRUCTION. ADDITIONAL WORK WILL BE REQUIRED WITHIN 5TH FLOOR SPACE CONSTRUCTION WITHIN 5TH FLOOR CHASE AND ABOVE CEILING. 5, 4, & 3. PROVIDE PIPING TO ACCOMMODATE PHASE 2 PHASE 1 CONSTRUCTION RENOVATIONS ARE FOR FLOORS Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 212-239-7130 f 212-245-5195 t New York, NY 10001 450 West 31 Street Floor 6 Richard McElhiney Architects LLC 646-385-7625 New York, NY 10013 161 Sixth Avenue Floor 3 HOK Key Plan: Notes: July 30, 2014 585-202-5590 Rochester, NY 14604 150 North Chestnut St. ME Engineering, PC 716-831-0000 Blasdell, NY 14219 4588 South Park Avenue Baer & Associates LLC N 100% CD P-103 3" 4" 2" 2" 2" 1•" 2" 2" 1•" 1•" WC BT LAV 7th Floor 8th Floor 6th Floor 9th Floor 5th Floor 4th Floor 3RD Floor LAVATORY (TYPICAL) INSTALLATION OF NEW PLUG PIPING PENDING TO WITHIN CHASE & WASTE PIPING BACK REMOVE LAVATORY PIPING AND FITTING. CLOSET, CLEAN REMOVE WATER 1•" 2" 4" 3" 4"3" 2"2" 2" 2" 2" 1•" (TYPICAL) AND WASTE PIPING REMOVE BATHTUB,1•" LAV WC LAV 1•" WC BT BT 1•" PIPING AND FITTING. CLOSET, CLEAN REMOVE WATER 2" LAVATORY (TYPICAL) INSTALLATION OF NEW PLUG PIPING PENDING TO WITHIN CHASE & WASTE PIPING BACK REMOVE LAVATORY 1•" 2" 2" 2"2" 4" (TYPICAL) AND WASTE PIPING REMOVE BATHTUB, (TYPICAL) AND WASTE PIPING REMOVE BATHTUB, PIPING AND FITTING. CLOSET, CLEAN REMOVE WATER (TYPICAL) AND WASTE PIPING REMOVE BATHTUB, BT 1•" 2" WC LAV 1•" 1•" LAVATORY (TYPICAL) INSTALLATION OF NEW PLUG PIPING PENDING TO WITHIN CHASE & WASTE PIPING BACK REMOVE LAVATORY LAVATORY (TYPICAL) INSTALLATION OF NEW PLUG PIPING PENDING TO WITHIN CHASE & WASTE PIPING BACK REMOVE LAVATORY 4"2" 2" 2"2" 3" PIPING AND FITTING. CLOSET, CLEAN REMOVE WATER 2"2"2" 2" 2"2" 4" 1•" BT 1•" 1•" (TYPICAL) AND WASTE PIPING REMOVE BATHTUB, WC PIPING AND FITTING. CLOSET, CLEAN REMOVE WATER LAV LAVATORY (TYPICAL) INSTALLATION OF NEW PLUG PIPING PENDING TO WITHIN CHASE & WASTE PIPING BACK REMOVE LAVATORY LAVATORY (TYPICAL) INSTALLATION OF NEW PLUG PIPING PENDING TO WITHIN CHASE & WASTE PIPING BACK REMOVE LAVATORY LAV 1•" 1•" WC BT 1•" 2" 4" 2" 2"2"2" PIPING AND FITTING. CLOSET, CLEAN REMOVE WATER (TYPICAL) AND WASTE PIPING REMOVE BATHTUB, LAV WC BT PIPING AND FITTING. CLOSET, CLEAN REMOVE WATER LAVATORY (TYPICAL) INSTALLATION OF NEW PLUG PIPING PENDING TO WITHIN CHASE & WASTE PIPING BACK REMOVE LAVATORY 1•" 2"2" 4" 4" 1•" 1•" 2"2"2" 2" 3" 4" 2" 2" 2" 2" 1•" 1•" WC LAV 7th Floor 8th Floor 6th Floor 9th Floor 5th Floor 4th Floor 3RD Floor 1•" 4" 3" 4"3" 2"2" 2" 1•" LAV WC LAV 1•" WC 1•" 2" 2" 4" WC LAV 1•" 1•" 4"2" 2" 2"2" 3" 2"2"2" 2" 2" 4" 1•" 1•" WC LAV LAV 1•" 1•" WC WC 2"2" 4" 2" 2"2"2" LAV WC 4" 4" 1•" 1•" 2"2"2" 2" CLOSET INSTALL WATER SHR 2" PLUG SHR CLOSET INSTALL WATER SHR 2" 2" SHR SHR SHR 2" 2 P103 NO SCALE 1 P103 NO SCALE Diagrams-Plumbing Typical Guest Room Riser 2" 2" 2" 2"2" 2" 2" 1•" 2" 2"(E)(E)(E) (E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E) (E)(E)(E) (E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E) (E) (E)(E)(E)(E)(E)(E)(E)(E)(E)(E) (E)(E)(E)(E)(E) X09 Sanitary Riser Diagram- Single-Plumbing- Demolition Sanitary Riser Diagram-Single-Plumbing- New Work X21 3 P102 NO SCALE Sanitary Riser Diagram- Phased Construction Riser Diagram 6th Floor 5th Floor 2"2"2" 2" 2" 4" 1•" 1•" WC LAV CLOSET INSTALL WATER SHR SHR 2"2"(E)(E) (E)(E)(E)(E)AND P-TRAP. CLEAN PIPING NEW TUB INSTALL NOTE: 1. WHEN PHASE 2 COMMENCES. ADDITIONAL WORK WILL BE REQUIRED WITHIN 5TH FLOOR SPACE CONSTRUCTION WITHIN 5TH FLOOR CHASE AND ABOVE CEILING. 5, 4, & 3. PROVIDE PIPING TO ACCOMMODATE PHASE 2 PHASE 1 CONSTRUCTION RENOVATIONS ARE FOR FLOORS (TYPICAL) AND WASTE PIPING REMOVE BATHTUB, BT (TYPICAL) CHASE & CONNECT. WITHIN WALL BACK TO AND RUN WASTE PIPING CONNECT TO LAVATORY (TYPICAL) DRILL AND SEAL INDICATES CORE (TYPICAL) CHASE & CONNECT. WITHIN WALL BACK TO AND RUN WASTE PIPING CONNECT TO LAVATORY (TYPICAL) CHASE & CONNECT. WITHIN WALL BACK TO AND RUN WASTE PIPING CONNECT TO LAVATORY (TYPICAL) CHASE & CONNECT. WITHIN WALL BACK TO AND RUN WASTE PIPING CONNECT TO LAVATORY (TYPICAL) CHASE & CONNECT. WITHIN WALL BACK TO AND RUN WASTE PIPING CONNECT TO LAVATORY (TYPICAL) CHASE & CONNECT. WITHIN WALL BACK TO AND RUN WASTE PIPING CONNECT TO LAVATORY (TYPICAL) CHASE & CONNECT. WITHIN WALL BACK TO AND RUN WASTE PIPING CONNECT TO LAVATORY SCHEDULE & PHASING INFORMATION. REFER TO DRAWING A-005 FOR CONSTRUCTION Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 212-239-7130 f 212-245-5195 t New York, NY 10001 450 West 31 Street Floor 6 Richard McElhiney Architects LLC 646-385-7625 New York, NY 10013 161 Sixth Avenue Floor 3 HOK Key Plan: Notes: July 30, 2014 585-202-5590 Rochester, NY 14604 150 North Chestnut St. ME Engineering, PC 716-831-0000 Blasdell, NY 14219 4588 South Park Avenue Baer & Associates LLC N 100% CD P-104 and Details-Plumbing Guest Room Plans9"CL FLOOR FINISHED 4" ABOVE 1•" @ FLOOR DRAIN PIPING 4" •" 4" 4" 2" 2 P104 SCALE: •"=1'-0" BELOW 2" WASTE W/ P-TRAP ON FLOOR 9th Floor Enlarged Guest Room Plan - Plumbing- New Work 2" DRAIN FITTING 2" VENT DOWN @ FLOOR PIPING 2"DRAIN (TYP) (TYP)(TYP) CO (TYP) •"9"CL 2" 1•" @ FLOOR DRAIN PIPING 4" ƒ" •" 1•" 4" 4" @ FLOOR DRAIN PIPING 2" 1•" RECONNECTION (TYPICAL). TUB WASTE, VENT, CW & HW FOR TUB UNIT AND TRIM. TERMINATE DISCONNECT AND REMOVE FLOOR ABOVE FINISHED CENTERLINE 4" 1•" WASTE 1 P104 SCALE: •"=1'-0" FLOOR BELOW WITHOUT PENETRATING INSTALLATION MODIFIED TO SUIT TRAP CONCRETE FLOOR IS 2" CAST IRON P-TRAP; CLOSET (TYPICAL). FOR RECONNECTION TO NEW WATER CLOSET AND CW SUPPLY, TERMINATE DISCONNECT AND REMOVE WATER 9th Floor Back to Back Enlarged Guest Room Plan - Plumbing- Demolition STOPPER & DRAIN FITTING REMOVE POP-UP FOR RECONNECTION. P-TRAP, PLUG WASTE.TERMINATE REMOVE BRASS WASTE PIPING AND FLOOR OUTLET IS 4" ABOVE FINISHED CENTERLINE OF FIXTURE 9"CL 2" 1•" @ FLOOR DRAIN PIPING 4" ƒ" •" 1•" 4" 4" @ FLOOR DRAIN PIPING (TYPICAL) RECONNECTION TO LAVATORY. TERMINATE FOR SUPPLIES, AND STOPS. LAVATORY TRIM, CW, & HW DISCONNECT AND REMOVE 2" 1•" RECONNECTION (TYPICAL). TUB WASTE, VENT, CW & HW FOR TUB UNIT AND TRIM. TERMINATE DISCONNECT AND REMOVE 1•" WASTE 3 P104 SCALE: •"=1'-0" FOR RECONNECTION (TYPICAL) TO WITHIN CHASE &TERMINATE SUPPLIES & STOPS BACK REMOVE CW, & HW FOR RECONNECTION BACK TO WALL & TERMINATE REMOVE WASTE PIPING FLOOR BELOW WITHOUT PENETRATING INSTALLATION MODIFIED TO SUIT TRAP CONCRETE FLOOR IS 2" CAST IRON P-TRAP; CLOSET (TYPICAL). FOR RECONNECTION TO NEW WATER CLOSET AND CW SUPPLY, TERMINATE DISCONNECT AND REMOVE WATER STOPPER & DRAIN FITTING REMOVE POP-UP FOR RECONNECTION. P-TRAP, PLUG WASTE.TERMINATE REMOVE BRASS WASTE PIPING AND FLOOR OUTLET IS 4" ABOVE FINISHED CENTERLINE OF FIXTURE9"CL FLOOR FINISHED 4" ABOVE @ FLOOR DRAIN PIPING 4" •" 1•" 4" 4" 2" ANGLE STOP. TO CW SUPPLY, PROVIDE NEW EXISTING 4" SANITARY. CONNECT CONNECT WATER CLOSET TO 4 P104 SCALE: •"=1'-0" 2" DRAIN FITTING @ FLOOR PIPING 2"DRAIN (TYP) (TYP)PROVIDED BY OWNER. SHOWER ASSEMBLY AND TRIM TO BE ASSE 1016), SHOWER HEAD, HAND HELD THERMOSTATIC MIXING VALVE (PER SURROUND TO BE INSTALLED. NEW UNIT DRAIN. SHOWER BASE AND CONNECT TO NEW SHOWER (TYP) 2" 2" AND CAP AT WYE FITTING REMOVE VENT RISER Back to Back Enlarged Guest Room Plan - Plumbing- Demolition Back to Back Enlarged Guest Room Plan - Plumbing- New Work 2" VENT UP 2" VENT DOWN 2" VENT DOWN FLOOR ABOVE 2" WASTE W/ P-TRAP FOR RECONNECTION REMOVE P-TRAP, TERMINATE FOR FLOORS 8, 7, 6, 5, 4, & 3 1 FLOORS 8, 7, 6, 5, 4, & 3 1 1 X22/X24 X18/X20 X10/X12 X14/X16 X06/X08 X11/X15 X017/X19 X01/X03 X05/X07 605 2 1 AND STOPS. NEW SUPPLIES PROVIDE LAVATORY. SUPPLIES TO AND CW& HW CONNECT WASTE G.C. PIPING WITH ROUTING OF COORDINATE (TYPICAL) TO LAVATORY. FOR RECONNECTION STOPS. TERMINATE SUPPLIES, AND TRIM, CW, & HW REMOVE LAVATORY DISCONNECT AND (TYPICAL) RECONNECTION &TERMINATE FOR WITHIN CHASE STOPS BACK TO HW SUPPLIES & REMOVE CW, & FOR RECONNECTION WALL & TERMINATE PIPING BACK TO REMOVE WASTE 4" STACK BACK TO DRAIN & PIPING RISER, 2" WYE REMOVE VENT PROVIDE NEW ANGLE STOP. CONNECT TO CW SUPPLY, TO EXISTING 4" SANITARY. CONNECT WATER CLOSET PROVIDED BY OWNER. AND TRIM TO BE SHOWER ASSEMBLY HEAD, HAND HELD ASSE 1016), SHOWER MIXING VALVE (PER THERMOSTATIC INSTALLED. NEW SURROUND TO BE SHOWER BASE AND SHOWER UNIT DRAIN. CONNECT TO NEW 6 P104 SCALE: •"=1'-0" Room 605 Enlarged Plan - Plumbing- New Work 5 P104 SCALE: •"=1'-0" Room 605 Enlarged Plan - Plumbing- Demolition 2" 4" 1•" TUB TUB LAV LAV WC WC LAV LAV WC WC TUB TUB 1•" WASTE @ FLOOR DRAIN PIPING FOR RECONNECTION BACK TO WALL & TERMINATE REMOVE WASTE PIPING FOR RECONNECTION (TYPICAL) TO WITHIN CHASE &TERMINATE SUPPLIES & STOPS BACK REMOVE CW, & HW (TYPICAL) RECONNECTION TO LAVATORY. TERMINATE FOR SUPPLIES, AND STOPS. LAVATORY TRIM, CW, & HW DISCONNECT AND REMOVE CLOSET (TYPICAL). TO NEW WATER FOR RECONNECTION SUPPLY, TERMINATE CLOSET AND CW REMOVE WATER DISCONNECT AND (TYPICAL). & HW FOR RECONNECTION TUB WASTE, VENT, CW AND TRIM. TERMINATE REMOVE TUB UNIT DISCONNECT AND FOR RECONNECTION. WASTE.TERMINATE P-TRAP, PLUG WASTE PIPING AND REMOVE BRASS FITTING & DRAIN STOPPER POP-UP REMOVE FLOOR BELOW WITHOUT PENETRATING INSTALLATION TO SUIT TRAP FLOOR IS MODIFIED P-TRAP; CONCRETE 2" CAST IRON CENTERLINE VERIFY FIXTURE LAV WC SHR LAV LAV SHR WC WCWC WC SHR SHR LAV LAV TUB WC 2" 4" 2" WASTE UP. 2" VENT DOWN 2" VENT DOWN •" PROVIDE NEW ANGLE STOP. CONNECT TO CW SUPPLY, TO EXISTING 4" SANITARY. CONNECT WATER CLOSET EXISTING 4" SAN RISER (VIF) 2" WASTE UP TERMINATION. REMOVE VENT ELBOW AND CAP NOTES: AND DIMENSIONAL INFORMATION. DESIGNATIONS, LOCATIONS, A-141 FOR PLUMBING FIXTURE SEE DRAWINGS A-131 TROUGH AND DIMENSIONAL INFORMATION. DESIGNATIONS, LOCATIONS, A-141 FOR PLUMBING FIXTURE SEE DRAWINGS A-131 TROUGH AND DIMENSIONAL INFORMATION. DESIGNATIONS, LOCATIONS, A-141 FOR PLUMBING FIXTURE SEE DRAWINGS A-131 TROUGH •" 1•" CO •" LAV •" 1•" 4" CO (TYP) •" AND STOPS. NEW SUPPLIES PROVIDE LAVATORY. SUPPLIES TO AND CW& HW CONNECT WASTE G.C. PIPING WITH ROUTING OF COORDINATE •" 1•" CO •" •" CO AND STOPS. NEW SUPPLIES PROVIDE LAVATORY. SUPPLIES TO AND CW& HW CONNECT WASTE G.C. PIPING WITH ROUTING OF COORDINATE •" 2" FD-A 3" FD-A VENT CAP 3" 2" NO SHOWER PAN WITHIN WALL RUN PIPING FOR SPECIFIC ROOM TYPES REFER TO ARCHITECTURAL DRAWINGS FOR SPECIFIC ROOM TYPES REFER TO ARCHITECTURAL DRAWINGS FOR SPECIFIC ROOM TYPES REFER TO ARCHITECTURAL DRAWINGS FOR SPECIFIC ROOM TYPES REFER TO ARCHITECTURAL DRAWINGS FOR SPECIFIC ROOM TYPES REFER TO ARCHITECTURAL DRAWINGS FOR SPECIFIC ROOM TYPES REFER TO ARCHITECTURAL DRAWINGS FLOOR ABOVE FINISHED CENTERLINE 4" TUB ON THIRD FLOOR. PROVIDE AND INSTALL DRAIN ASSEMBLY FOR NEW CLEAN TUB CAST IRON DRAIN AND SCHEDULE & PHASING INFORMATION. REFER TO DRAWING A-005 FOR CONSTRUCTION Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 212-239-7130 f 212-245-5195 t New York, NY 10001 450 West 31 Street Floor 6 Richard McElhiney Architects LLC 646-385-7625 New York, NY 10013 161 Sixth Avenue Floor 3 HOK Key Plan: Notes: July 30, 2014 585-202-5590 Rochester, NY 14604 150 North Chestnut St. ME Engineering, PC 716-831-0000 Blasdell, NY 14219 4588 South Park Avenue Baer & Associates LLC N 100% CD P-105 and Details-Plumbing Guest Room Plans9"CL FLOOR FINISHED 4" ABOVE 1•" @ FLOOR DRAIN PIPING 4" •" 4"4" 2" ANGLE STOP. TO CW SUPPLY, PROVIDE NEW EXISTING 4" SANITARY. CONNECT CONNECT WATER CLOSET TO 2 P105 SCALE: •"=1'-0" PIPING WITH G.C. COORDINATE ROUTING OF 9th Floor Enlarged Guest Room Plan - Plumbing- New Work 921 2" DRAIN FITTING 2" VENT DOWN PROVIDED BY OWNER. SHOWER ASSEMBLY AND TRIM TO BE ASSE 1016), SHOWER HEAD, HAND HELD THERMOSTATIC MIXING VALVE (PER SURROUND TO BE INSTALLED. NEW UNIT DRAIN. SHOWER BASE AND CONNECT TO NEW SHOWER (TYP) CO •"9"CL 2" 1•" @ FLOOR DRAIN PIPING 4" ƒ" •" 4" @ FLOOR DRAIN PIPING (TYPICAL) RECONNECTION TO LAVATORY. TERMINATE FOR SUPPLIES, AND STOPS. LAVATORY TRIM, CW, & HW DISCONNECT AND REMOVE 2" FLOOR ABOVE FINISHED CENTERLINE 4" 1•" WASTE 1 P105 SCALE: •"=1'-0" FOR RECONNECTION (TYPICAL) TO WITHIN CHASE &TERMINATE SUPPLIES & STOPS BACK REMOVE CW, & HW FOR RECONNECTION BACK TO WALL & TERMINATE REMOVE WASTE PIPING FLOOR BELOW WITHOUT PENETRATING INSTALLATION MODIFIED TO SUIT TRAP CONCRETE FLOOR IS 2" CAST IRON P-TRAP; VENT ELL. REMOVE STOPPER & DRAIN FITTING REMOVE POP-UP FOR RECONNECTION. P-TRAP, PLUG WASTE.TERMINATE REMOVE BRASS WASTE PIPING AND 3 P105 SCALE: •"=1'-0" 4 P105 SCALE: •"=1'-0" X21 9th Floor Enlarged Guest Room Plan - Plumbing- Demolition Enlarged Guest Room Plan - Plumbing- Demolition Enlarged Guest Room Plan - Plumbing- New Work FLOOR BELOW 2" WASTE W/ P-TRAP ON CLOSET. FOR RECONNECTION TO NEW WATER CLOSET AND CW SUPPLY, TERMINATE DISCONNECT AND REMOVE WATER RECONNECTION. TUB WASTE, VENT, CW & HW FOR TUB UNIT AND TRIM. TERMINATE DISCONNECT AND REMOVE 9"CL 2" 1•" @ FLOOR DRAIN PIPING 4" ƒ" •" 4" @ FLOOR DRAIN PIPING (TYPICAL) RECONNECTION TO LAVATORY. TERMINATE FOR SUPPLIES, AND STOPS. LAVATORY TRIM, CW, & HW DISCONNECT AND REMOVE 2" FLOOR ABOVE FINISHED CENTERLINE 4" 1•" WASTE FOR RECONNECTION (TYPICAL) TO WITHIN CHASE &TERMINATE SUPPLIES & STOPS BACK REMOVE CW, & HW FOR RECONNECTION BACK TO WALL & TERMINATE REMOVE WASTE PIPING FLOOR BELOW WITHOUT PENETRATING INSTALLATION MODIFIED TO SUIT TRAP CONCRETE FLOOR IS 2" CAST IRON P-TRAP; VENT ELL. REMOVE STOPPER & DRAIN FITTING REMOVE POP-UP FOR RECONNECTION. P-TRAP, PLUG WASTE.TERMINATE REMOVE BRASS WASTE PIPING AND CLOSET. FOR RECONNECTION TO NEW WATER CLOSET AND CW SUPPLY, TERMINATE DISCONNECT AND REMOVE WATER RECONNECTION. TUB WASTE, VENT, CW & HW FOR TUB UNIT AND TRIM. TERMINATE DISCONNECT AND REMOVE PIPING BACK TO 4" STACK & CAP REMOVE VENT RISER, DRAIN & 921 X219"CL FLOOR FINISHED 4" ABOVE @ FLOOR DRAIN PIPING 4" •" 4" 4" 2" ANGLE STOP. TO CW SUPPLY, PROVIDE NEW EXISTING 4" SANITARY. CONNECT CONNECT WATER CLOSET TO 2" DRAIN FITTING PROVIDED BY OWNER. SHOWER ASSEMBLY AND TRIM TO BE ASSE 1016), SHOWER HEAD, HAND HELD THERMOSTATIC MIXING VALVE (PER SURROUND TO BE INSTALLED. NEW UNIT DRAIN. SHOWER BASE AND CONNECT TO NEW SHOWER FLOOR BELOW 2" WASTE W/ P-TRAP ON 2" VENT UP 2" VENT DOWN 2" FLOORS 8, 7, 6, 5, 4, & 3 FLOORS 8, 7, 6, 5, 4, & 3 X21 •"•" TUB WC LAV TUB WC LAV SHR WC SHR WC LAV NOTE: 1. 1•" NEW SUPPLIES AND STOPS. SUPPLIES TO LAVATORY. PROVIDE CONNECT WASTE AND CW& HW PIPING WITH G.C. COORDINATE ROUTING OF (TYP) CO •" LAV 4" NEW SUPPLIES AND STOPS. SUPPLIES TO LAVATORY. PROVIDE CONNECT WASTE AND CW& HW FOR SPECIFIC ROOM TYPES REFER TO ARCHITECTURAL DRAWINGS FOR SPECIFIC ROOM TYPES REFER TO ARCHITECTURAL DRAWINGS AND DIMENSIONAL INFORMATION. DESIGNATIONS, LOCATIONS, A-141 FOR PLUMBING FIXTURE SEE DRAWINGS A-131 TROUGH AND DIMENSIONAL INFORMATION. DESIGNATIONS, LOCATIONS, A-141 FOR PLUMBING FIXTURE SEE DRAWINGS A-131 TROUGH SCHEDULE & PHASING INFORMATION. REFER TO DRAWING A-005 FOR CONSTRUCTION 2 1 NOTES: TUB ON THIRD FLOOR. PROVIDE AND INSTALL DRAIN ASSEMBLY FOR NEW CLEAN TUB CAST IRON DRAIN AND SCHEDULE & PHASING INFORMATION. REFER TO DRAWING A-005 FOR CONSTRUCTION 1 Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 212-239-7130 f 212-245-5195 t New York, NY 10001 450 West 31 Street Floor 6 Richard McElhiney Architects LLC 646-385-7625 New York, NY 10013 161 Sixth Avenue Floor 3 HOK Key Plan: Notes: July 30, 2014 585-202-5590 Rochester, NY 14604 150 North Chestnut St. ME Engineering, PC 716-831-0000 Blasdell, NY 14219 4588 South Park Avenue Baer & Associates LLC N 100% CD P-106 and Details-Plumbing Guest Room Plans CL FLOOR FINISHED 4" ABOVE @ FLOOR DRAIN PIPING NEW SUPPLIES AND STOPS. SUPPLIES TO LAVATORY. PROVIDE CONNECT WASTE AND CW& HW 2 P106 SCALE: •"=1'-0" PIPING WITH G.C. COORDINATE ROUTING OF 9th Floor Enlarged Guest Room Plan - Plumbing- New Work 2" DRAIN FITTING 2" VENT DOWN PROVIDED BY OWNER. SHOWER ASSEMBLY AND TRIM TO BE ASSE 1016), SHOWER HEAD, HAND HELD THERMOSTATIC MIXING VALVE (PER SURROUND TO BE INSTALLED. NEW UNIT DRAIN. SHOWER BASE AND CONNECT TO NEW SHOWER (TYP) 1 P106 SCALE: •"=1'-0" X26 3 P106 SCALE: •"=1'-0" 4 P106 SCALE: •"=1'-0" 9th Floor Enlarged Guest Room Plan - Plumbing- Demolition Enlarged Guest Room Plan - Plumbing- Demolition Enlarged Guest Room Plan - Plumbing- New Work 4" @ FLOOR DRAIN PIPING (TYPICAL) RECONNECTION TO LAVATORY. TERMINATE FOR SUPPLIES, AND STOPS. LAVATORY TRIM, CW, & HW DISCONNECT AND REMOVE 1•" WASTE FOR RECONNECTION (TYPICAL) TO WITHIN CHASE &TERMINATE SUPPLIES & STOPS BACK REMOVE CW, & HW FLOOR BELOW WITHOUT PENETRATING INSTALLATION MODIFIED TO SUIT TRAP CONCRETE FLOOR IS 2" CAST IRON P-TRAP; VENT ELL. REMOVE STOPPER & DRAIN FITTING REMOVE POP-UP FOR RECONNECTION. P-TRAP, PLUG WASTE.TERMINATE REMOVE BRASS WASTE PIPING AND RECONNECTION. TUB WASTE, VENT, CW & HW FOR TUB UNIT AND TRIM. TERMINATE DISCONNECT AND REMOVE •" WC TUB LAV •" 1 •" •" WC TUB LAV •" 1 •" 6 P106 SCALE: •"=1'-0" 5 P106 SCALE: •"=1'-0" Enlarged Guest Room Plan - Plumbing- Demolition Rooms 526 & 626 Enlarged Guest Room Plan - Plumbing- New Work- Rooms 526 & 626 RECONNECTION TERMINATE FOR BACK TO WALL & REMOVE WASTE PIPING TO 4" STACK & CAP DRAIN & PIPING BACK REMOVE VENT RISER, 4" @ FLOOR DRAIN PIPING (TYPICAL) RECONNECTION TO LAVATORY. TERMINATE FOR SUPPLIES, AND STOPS. LAVATORY TRIM, CW, & HW DISCONNECT AND REMOVE 1•" WASTE FOR RECONNECTION (TYPICAL) TO WITHIN CHASE &TERMINATE SUPPLIES & STOPS BACK REMOVE CW, & HW FLOOR BELOW WITHOUT PENETRATING INSTALLATION MODIFIED TO SUIT TRAP CONCRETE FLOOR IS 2" CAST IRON P-TRAP; VENT ELL. REMOVE STOPPER & DRAIN FITTING REMOVE POP-UP FOR RECONNECTION. P-TRAP, PLUG WASTE.TERMINATE REMOVE BRASS WASTE PIPING AND RECONNECTION. TUB WASTE, VENT, CW & HW FOR TUB UNIT AND TRIM. TERMINATE DISCONNECT AND REMOVE •" TUB LAV •" 1 •" RECONNECTION TERMINATE FOR BACK TO WALL & REMOVE WASTE PIPING TO 4" STACK & CAP DRAIN & PIPING BACK REMOVE VENT RISER, 4" •"•" 1 •" VALVE AIR ADMITTANCE FLOOR BELOW W/ P-TRAP ON 2" WASTE•" CL FLOOR FINISHED 4" ABOVE @ FLOOR DRAIN PIPING 2"NEW SUPPLIES AND STOPS. SUPPLIES TO LAVATORY. PROVIDE CONNECT WASTE AND CW& HW PIPING WITH G.C. COORDINATE ROUTING OF 2" DRAIN FITTING PROVIDED BY OWNER. SHOWER ASSEMBLY AND TRIM TO BE ASSE 1016), SHOWER HEAD, HAND HELD THERMOSTATIC MIXING VALVE (PER SURROUND TO BE INSTALLED. NEW UNIT DRAIN. SHOWER BASE AND CONNECT TO NEW SHOWER 4" @ FLOOR DRAIN PIPING •"•" 1 •" •" 2" VENT UP FLOOR ABOVE W/ P-TRAP FOR 2" WASTE BELOW 2" VENT FROM FROM ABOVE DRAIN PIPING OWNER SUPPLIED BY LAV TO BE OWNER SUPPLIED BY SHR TO BE OWNER SUPPLIED BY SHR TO BE OWNER SUPPLIED BY LAV TO BE WC 4" (TYPICAL) RECONNECTION TO LAVATORY. TERMINATE FOR SUPPLIES, AND STOPS. LAVATORY TRIM, CW, & HW DISCONNECT AND REMOVE SHRLAV •" 1 •" RECONNECTION TERMINATE FOR BACK TO WALL & REMOVE WASTE PIPING ASSEMBLY VALVE AND SHOWER FITTING, SHR MIXING REMOVE DRAIN 4" •" 1 •" OWNER SUPPLIED BY LAV TO BE FLOOR FINISHED 4" ABOVE LC PIPING WITH G.C. COORDINATE ROUTING OF REWORK TO SUIT FLOOR REMOVE STRAINER (E) FD TO REMAIN, LAV SHRLAVSHR LAV (3RD FLR ) INSTALL TUB AT TYPE 2.2A PROVIDE NEW ANGLE STOP. CONNECT TO CW SUPPLY, OWNER BE SUPPLIED BY ASSEMBLY TO SHOWER STRAINER FLOOR DRAIN FLOOR, REINSTALL DRAIN TO SUIT NEW READJUST FLOOR REWORK TO SUIT FLOOR REMOVE STRAINER TO REMAIN, (E) DRAIN BODY DRAIN STRAINER FLOOR, REINSTALL DRAIN TO SUIT NEW READJUST SHOWER FOR SPECIFIC ROOM TYPES REFER TO ARCHITECTURAL DRAWINGS AND DIMENSIONAL INFORMATION. DESIGNATIONS, LOCATIONS, A-141 FOR PLUMBING FIXTURE SEE DRAWINGS A-131 TROUGH FOR SPECIFIC ROOM TYPES REFER TO ARCHITECTURAL DRAWINGS AND DIMENSIONAL INFORMATION. DESIGNATIONS, LOCATIONS, A-141 FOR PLUMBING FIXTURE SEE DRAWINGS A-131 TROUGH FOR SPECIFIC ROOM TYPES REFER TO ARCHITECTURAL DRAWINGS AND DIMENSIONAL INFORMATION. DESIGNATIONS, LOCATIONS, A-141 FOR PLUMBING FIXTURE SEE DRAWINGS A-131 TROUGH Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 212-239-7130 f 212-245-5195 t New York, NY 10001 450 West 31 Street Floor 6 Richard McElhiney Architects LLC 646-385-7625 New York, NY 10013 161 Sixth Avenue Floor 3 HOK Key Plan: Notes: July 30, 2014 585-202-5590 Rochester, NY 14604 150 North Chestnut St. ME Engineering, PC 716-831-0000 Blasdell, NY 14219 4588 South Park Avenue Baer & Associates LLC N 100% CD P-107 and Details-Plumbing Guest Room Plans ANGLE STOP. TO CW SUPPLY, PROVIDE NEW EXISTING 4" SANITARY. CONNECT CONNECT WATER CLOSET TO 2 P107 SCALE: •"=1'-0" PIPING WITH G.C. COORDINATE ROUTING OF 9th Floor Enlarged Guest Room Plan - Plumbing- New Work 2" DRAIN FITTING 2" VENT DOWN PROVIDED BY OWNER. SHOWER ASSEMBLY AND TRIM TO BE ASSE 1016), SHOWER HEAD, HAND HELD THERMOSTATIC MIXING VALVE (PER SURROUND TO BE INSTALLED. NEW UNIT DRAIN. SHOWER BASE AND CONNECT TO NEW SHOWER 1 P107 SCALE: •"=1'-0" 3 P107 SCALE: •"=1'-0" 4 P107 SCALE: •"=1'-0" X09 9th Floor Enlarged Guest Room Plan - Plumbing- Demolition Enlarged Guest Room Plan - Plumbing- Demolition Enlarged Guest Room Plan - Plumbing- New Work X09 FLOORS 8, 7, 6, 5, 4, & 3 1 FLOORS 8, 7, 6, 5, 4, & 3 CL 2" @ FLOOR DRAIN PIPING ƒ" •" 4" @ FLOOR DRAIN PIPING 2" FLOOR ABOVE FINISHED CENTERLINE 4"FOR RECONNECTION (TYPICAL) TO WITHIN CHASE &TERMINATE SUPPLIES & STOPS BACK REMOVE CW, & HW FOR RECONNECTION BACK TO WALL & TERMINATE REMOVE WASTE PIPING FLOOR BELOW WITHOUT PENETRATING INSTALLATION MODIFIED TO SUIT TRAP CONCRETE FLOOR IS 2" CAST IRON P-TRAP; VENT ELL. REMOVE FOR RECONNECTION. P-TRAP, PLUG WASTE.TERMINATE REMOVE BRASS WASTE PIPING AND CLOSET. FOR RECONNECTION TO NEW WATER CLOSET AND CW SUPPLY, TERMINATE DISCONNECT AND REMOVE WATER RECONNECTION. TUB WASTE, VENT, CW & HW FOR TUB UNIT AND TRIM. TERMINATE DISCONNECT AND REMOVE 909 X09 LAVATORY. (TYPICAL) RECONNECTION TO NEW TERMINATE FOR SUPPLIES, AND STOPS. LAVATORY TRIM, CW, & HW DISCONNECT AND REMOVE & 1•" DRAIN FITTING REMOVE POP-UP STOPPER CL 2" @ FLOOR DRAIN PIPING •" •" 4" @ FLOOR DRAIN PIPING 2" 909 NEW SUPPLIES AND STOPS. SUPPLIES TO LAVATORY. PROVIDE CONNECT WASTE AND CW & HW ON FLOOR BELOW 2" WASTE W/ P-TRAP UNKNOWN) (EXACT LOCATION 4" VENT STACK CL 2" @ FLOOR DRAIN PIPING ƒ" •" 4" @ FLOOR DRAIN PIPING 2" FLOOR ABOVE FINISHED CENTERLINE 4"FOR RECONNECTION (TYPICAL) TO WITHIN CHASE &TERMINATE SUPPLIES & STOPS BACK REMOVE CW, & HW FOR RECONNECTION BACK TO WALL & TERMINATE REMOVE WASTE PIPING FLOOR BELOW WITHOUT PENETRATING INSTALLATION MODIFIED TO SUIT TRAP CONCRETE FLOOR IS 2" CAST IRON P-TRAP; VENT ELL. REMOVE FOR RECONNECTION. P-TRAP, PLUG WASTE.TERMINATE REMOVE BRASS WASTE PIPING AND CLOSET. FOR RECONNECTION TO NEW WATER CLOSET AND CW SUPPLY, TERMINATE DISCONNECT AND REMOVE WATER RECONNECTION. TUB WASTE, VENT, CW & HW FOR TUB UNIT AND TRIM. TERMINATE DISCONNECT AND REMOVE LAVATORY. (TYPICAL) RECONNECTION TO NEW TERMINATE FOR SUPPLIES, AND STOPS. LAVATORY TRIM, CW, & HW DISCONNECT AND REMOVE & 1•" DRAIN FITTING REMOVE POP-UP STOPPER ANGLE STOP. TO CW SUPPLY, PROVIDE NEW EXISTING 4" SANITARY. CONNECT CONNECT WATER CLOSET TO PIPING WITH G.C. COORDINATE ROUTING OF 2" DRAIN FITTING 2" VENT DOWN PROVIDED BY OWNER. SHOWER ASSEMBLY AND TRIM TO BE ASSE 1016), SHOWER HEAD, HAND HELD THERMOSTATIC MIXING VALVE (PER SURROUND TO BE INSTALLED. NEW UNIT DRAIN. SHOWER BASE AND CONNECT TO NEW SHOWER CL 2" @ FLOOR DRAIN PIPING •" •" 4" @ FLOOR DRAIN PIPING 2" NEW SUPPLIES AND STOPS. SUPPLIES TO LAVATORY. PROVIDE CONNECT WASTE AND CW & HW UNKNOWN) (EXACT LOCATION 4" VENT STACK FOR FLOOR ABOVE 2" WASTE W/ P-TRAP X09 X09 SHR WC LAV LAV WC SHR LAV WC TUBTUB WC LAV FOR SPECIFIC ROOM TYPES REFER TO ARCHITECTURAL DRAWINGS AND DIMENSIONAL INFORMATION. DESIGNATIONS, LOCATIONS, A-141 FOR PLUMBING FIXTURE SEE DRAWINGS A-131 TROUGH FOR SPECIFIC ROOM TYPES REFER TO ARCHITECTURAL DRAWINGS AND DIMENSIONAL INFORMATION. DESIGNATIONS, LOCATIONS, A-141 FOR PLUMBING FIXTURE SEE DRAWINGS A-131 TROUGH 1 NOTE: 1. SCHEDULE & PHASING INFORMATION. REFER TO DRAWING A-005 FOR CONSTRUCTION 2 1 NOTES: TUB ON THIRD FLOOR. PROVIDE AND INSTALL DRAIN ASSEMBLY FOR NEW CLEAN TUB CAST IRON DRAIN AND SCHEDULE & PHASING INFORMATION. REFER TO DRAWING A-005 FOR CONSTRUCTION Cornell University Statler Hotel Guest Room Renovation Ithaca, NY 14853 Revisions: 212-239-7130 f 212-245-5195 t New York, NY 10001 450 West 31 Street Floor 6 Richard McElhiney Architects LLC 646-385-7625 New York, NY 10013 161 Sixth Avenue Floor 3 HOK Key Plan: Notes: July 30, 2014 585-202-5590 Rochester, NY 14604 150 North Chestnut St. ME Engineering, PC 716-831-0000 Blasdell, NY 14219 4588 South Park Avenue Baer & Associates LLC N 100% CD