Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20120629_Schwatrz_CTP Performing _Arts _CD_Stanped_Combined
PROJECT SITE PLANDRAWING INDEXCORNELL UNIVERSITYNETWORK CONNECTIVITY PROJECTSCHWARTZ CPA - 2016DRAWINGDESCRIPTIONT-COVERDRAWING INDEX AND PROJECT SITE PLANT-GENSTANDARD SYMBOLS, NOTES, ABBREVIATIONS (T-SERIES)T1T1-SZTR SERVING ZONES, PLAN VIEWS AND BLDG. SECTION VIEWT1-PLPATHWAYS LOGICAL RISER DIAGRAMST1-CLCOPPER LOGICAL RISER DIAGRAMST1-FLFIBER LOGICAL RISER DIAGRAMST2T2-SB.CA_CPSUB-BASEMENT PATHWAYS AND CABLINGT2-B.CA_CPBASEMENT PATHWAYS AND CABLINGT2-1.CA_CPFIRST FLOOR PATHWAYS AND CABLINGT2-2.CA_CPSECOND FLOOR PATHWAYS AND CABLINGT2-3.CA_CPTHIRD FLOOR PATHWAYS AND CABLINGT2-4.CA_CPFOURTH FLOOR PATHWAYS AND CABLINGT2-5_6_7.CA_CPFIFTH, SIXTH AND SEVENTH FLOOR PATHWAYS AND CABLINGT3T3-BAMTR-BA ENLARGED PLANS AND ELEVATIONST3-3AITR-3A ENLARGED PLANS AND ELEVATIONSAMEPAMEP-GENGENERAL NOTES, SYMBOLS AND ABBREVIATIONS (AMEP SERIES)T1-AMEPAMEP-AREAS OF WORKAMEP-BAMTR-BA PARTIAL PLANS AND KEYNOTESAMEP-3AITR-3A PARTIAL PLANS AND KEYNOTESA4ARCHITECTURAL DETAILSM4MECHANICAL DETAILSE4ELECTRICAL DETAILSAMEP-2-B_3_4MECHANICAL & ELECTRICAL PLANSDESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Schwartz CPA 2016\CAD\11103-2016--T-COVER.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY SCHWARTZ CPA - 2016 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2016754LP/EL/PKBDPBJLBDRAWING INDEXAND PROJECT SITEPLANT-COVERPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECT CEILING SCHEDULEGENERAL PROJECT NOTESGENERAL REMOVAL NOTESGENERAL DRAWING NOTES-EXISTING CONDITIONS/REMOVALS-ACCESS CONTROL SYMBOLS LEGENDGENERAL NEW WORK NOTESGENERAL DRAWING NOTES-HORIZONTAL CABLING-GENERAL DRAWING NOTES-PATHWAYS-GENERAL DRAWING NOTES-PATHWAYS-ABBREVIATIONS TELECOM SYMBOLS LEGEND (REV. 02/12)NEW / EXISTING OUTLET SUBSCRIPT KEYNEW PATHWAY TYPE KEYOUTLET DESCRIPTOR KEYEXISTING OUTLET NOTE KEYCABLING SYMBOLS LEGENDDESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY SCHWARTZ CPA - 2016 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2016754LP/EL/PKBDPBJLBSTANDARDSYMBOLS, NOTES,ABBREVIATIONS(T-SERIES)T-GENPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECT3$7+:$<6&+('8/(1(::25.&$%/(),//%$6('21&$%/(2'¸ 0.24DESIGNATIONDESCRIPTIONMANUFACTURERPART NO.APPROXIMATEOUTSIDEDIMENSIONAPPROXIMATEINSIDEDIMENSIONCABLE FILL&$3$&,7<¸MIN. BENDRADIUS&ʵCONDUITSEE SPEC. SECTION 27 05 28.75" DIA.44.5"1" C1" DIA.76"1.25" C1.25" DIA.137.5"1.5" C1.5" DIA.189"2" C2" DIA.2912"2.5" C2.5" DIA.5125"3" C3" DIA.7830"4" C4" DIA.13040"SR-1NOT USEDSR-2 **SURFACE RACEWAYSEE SPEC. SECTION27 05 282400 SERIESSEE SPEC. SECTION 27 05 2812SR-3 **SURFACE RACEWAY3000 SERIES32SR-4 **SURFACE RACEWAY4000 SERIES63SR-4D **SURFACE RACEWAY(DIVIDED)4000D SERIES30SR-5 **SURFACE RACEWAY5400 SERIES32SR-6 **SURFACE RACEWAY6000 SERIES140SR-6D **SURFACE RACEWAY(DIVIDED)6000D SERIES63SR-7SURFACE RACEWAY700 SERIES2CT-AENCLOSED TRAYSEE SPEC. SECTION 27 05 284"x6"211CT-B2"x12"211CT-C2"x18"316CT-D2"x24"419CT-ESEE SPEC. SECTION 27 05 284"x12"419CT-F6"x12"632CT-G4"x24"844CT-H6"x6"318CT-IWIRE DUCTNOT USED6"x6"318CT-J4"x6"212CT-K4"X9"318127(6¸0$;,080),//)25&$7(*25<,1',&$7('3(57,$(,$$ - CAT6A CABLING HAS AN OD OF 0.285.5('8&(),//5$7,2%<)25($&+%(1' - ENSURE THAT FILL RATIOS ARE NOT EXCEEDEDʵ&21'8,76+$//21/<%($//2:('$663(&,),&$//<127('21'5$:,1*6 ** REDUCE CAPACITY BY 50% FOR THE FOLLOWING CONDITIONS: - WHEN CONNECTORS ARE MOUNTED WITHIN RACEWAY - WHEN NON-RADIUS FITTINGS RESTRICT CROSS-SECTIONAL AREA - WHEN RACEWAY IS DIVIDED AND SHARED WITH ELECTRICALTER EXISTING SURFACE RACEWAY TO PROVIDE AT LEAST TWO 16"SECTIONS OF REMOVABLE COVERS TO ALLOW CABLE ROUGH-IN WITHOUTCONFLICT WITH EXISTING FURNITURE CONFIGURATIONS. ALSO REFER TOGENERAL NOTE "Z" ON T-GEN DRAWING FOR ADDITIONAL SCOPE FORSURFACE RACEWAYS.WHERE REQUIRED BY RACEWAY CAPACITY, OR AS DIRECTED, PROVIDESURFACE MOUNT EXTENSION BOX ON EXISTING RACEWAY OPENING TOPROVIDE ADEQUATE CAPACITY AND BEND RADIUS. ALSO REFER TORACEWAY DERATING REQUIREMENTS AT LEFT.WHERE REQUIRED BY RACEWAY CAPACITY, OR AS DIRECTED, PROVIDERETROFIT ENTRANCE END FITTING OR ALTER EXISTING BACKFED CONDUITWITH A NEW SPACE SAVER CONNECTOR TO PROVIDE ADEQUATE CAPACITYAND BEND RADIUS FOR NEW CABLING. ALSO REFER TO RACEWAYDERATING REQUIREMENTS AT LEFT. FIELD VERIFY EXISTING CONDITIONSAND PROPOSE ALTERATIONS THAT MINIMIZE SERVICE DISRUPTIONDURATION. PROVIDE ALL TEMPORARY PROVISIONS TO MAINTAIN EXISTINGSERVICES.CONDUIT AND CABLE TRAY TO BE ROUTED CONCEALED UNLESSOTHERWISE NOTED. SECOND FLOORFIRST FLOORBASEMENTSECOND FLOORFIRST FLOORBASEMENTSUB-BASEMENTSUB-BASEMENTTHIRD FLOORTHIRD FLOORFOURTH FLOORFOURTH FLOORFIFTH FLOORFIFTH FLOORSIXTH FLOORSIXTH FLOORSEVENTH FLOORSEVENTH FLOORTR SERVING ZONES - BUILDING SECTION VIEW4Scale: NONEFIRST FLOOR - TR SERVING ZONE PLAN3Scale: 1/32" = 1'-0"BASEMENT - TR SERVING ZONE PLAN2Scale: 1/32" = 1'-0"SECOND FLOOR - TR SERVING ZONE PLAN4Scale: 1/32" = 1'-0"DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY SCHWARTZ CPA - 2016 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2016754LP/EL/PKBDPBJLBTR SERVING ZONES,PLAN VIEWS ANDBLDG. SECTIONVIEWT1-SZPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTSUB-BASEMENT - TR SERVING ZONE PLAN1Scale: 1/32" = 1'-0"THIRD FLOOR - TR SERVING ZONE PLAN5Scale: 1/32" = 1'-0"FOURTH FLOOR - TR SERVING ZONE PLAN6Scale: 1/32" = 1'-0"FIFTH FLOOR - TR SERVING ZONE PLAN7Scale: 1/32" = 1'-0"SIXTH FLOOR - TR SERVING ZONE PLAN8Scale: 1/32" = 1'-0"SEVENTH FLOOR - TR SERVING ZONE PLAN9Scale: 1/32" = 1'-0"032'64'16'032'64'16'032'64'16'032'64'16'032'64'16'032'64'16'032'64'16'032'64'16'032'64'16' SECOND FLOORFIRST FLOORBASEMENTSECOND FLOORFIRST FLOORBASEMENTSUB-BASEMENTSUB-BASEMENTTHIRD FLOORTHIRD FLOORFOURTH FLOORFOURTH FLOORFIFTH FLOORFIFTH FLOORSIXTH FLOORSIXTH FLOORSEVENTH FLOORSEVENTH FLOORSECOND FLOORFIRST FLOORBASEMENTSECOND FLOORFIRST FLOORBASEMENTSUB-BASEMENTSUB-BASEMENTTHIRD FLOORTHIRD FLOORFOURTH FLOORFOURTH FLOORFIFTH FLOORFIFTH FLOORSIXTH FLOORSIXTH FLOORSEVENTH FLOORSEVENTH FLOORScale: NONEPATHWAY LOGICAL RISER DIAGRAM - NEW WORK2Scale: NONEPATHWAY LOGICAL RISER DIAGRAM - EXISTING / REMOVAL1DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY SCHWARTZ CPA - 2016 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2016754LP/EL/PKBDPBJLBPATHWAYS LOGICALRISER DIAGRAMST1-PLPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECT SECOND FLOORFIRST FLOORBASEMENTSECOND FLOORFIRST FLOORBASEMENTSUB-BASEMENTSUB-BASEMENTTHIRD FLOORTHIRD FLOORFOURTH FLOORFOURTH FLOORFIFTH FLOORFIFTH FLOORSIXTH FLOORSIXTH FLOORSEVENTH FLOORSEVENTH FLOORSECOND FLOORFIRST FLOORBASEMENTSECOND FLOORFIRST FLOORBASEMENTSUB-BASEMENTSUB-BASEMENTTHIRD FLOORTHIRD FLOORFOURTH FLOORFOURTH FLOORFIFTH FLOORFIFTH FLOORSIXTH FLOORSIXTH FLOORSEVENTH FLOORSEVENTH FLOORScale: NONECOPPER LOGICAL RISER DIAGRAM - NEW WORK2Scale: NONECOPPER LOGICAL RISER DIAGRAM - EXISTING / REMOVAL1DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY SCHWARTZ CPA - 2016 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2016754LP/EL/PKBDPBJLBCOPPER LOGICALRISER DIAGRAMST1-CLPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECT SECOND FLOORFIRST FLOORBASEMENTSECOND FLOORFIRST FLOORBASEMENTSUB-BASEMENTSUB-BASEMENTTHIRD FLOORTHIRD FLOORFOURTH FLOORFOURTH FLOORFIFTH FLOORFIFTH FLOORSIXTH FLOORSIXTH FLOORSEVENTH FLOORSEVENTH FLOORSECOND FLOORFIRST FLOORBASEMENTSECOND FLOORFIRST FLOORBASEMENTSUB-BASEMENTSUB-BASEMENTTHIRD FLOORTHIRD FLOORFOURTH FLOORFOURTH FLOORFIFTH FLOORFIFTH FLOORSIXTH FLOORSIXTH FLOORSEVENTH FLOORSEVENTH FLOORScale: NONEFIBER LOGICAL RISER DIAGRAM - NEW WORK2Scale: NONEFIBER LOGICAL RISER DIAGRAM - EXISTING / REMOVAL1DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY SCHWARTZ CPA - 2016 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2016754LP/EL/PKBDPBJLBFIBER LOGICALRISER DIAGRAMST1-FLPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECT KEY PLANSUB-BASEMENT - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 3/32" = 1'-0"16'24'8'0DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Schwartz CPA 2016\CAD\11103-2016--T2-SB.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY SCHWARTZ CPA - 2016 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2016754LP/EL/PKBDPBJLBSUB-BASEMENTPATHWAYS ANDCABLINGT2-SB.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTEXISTING OUTLET NOTE KEY KEY PLANBASEMENT - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 3/32" = 1'-0"16'24'8'0DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Schwartz CPA 2016\CAD\11103-2016--T2-B.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY SCHWARTZ CPA - 2016 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2016754LP/EL/PKBDPBJLBBASEMENTPATHWAYS ANDCABLINGT2-B.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTEXISTING OUTLET NOTE KEY KEY PLANFIRST FLOOR - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 3/32" = 1'-0"16'24'8'0DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Schwartz CPA 2016\CAD\11103-2016--T2-1.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY SCHWARTZ CPA - 2016 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2016754LP/EL/PKBDPBJLBFIRST FLOORPATHWAYS ANDCABLINGT2-1.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTEXISTING OUTLET NOTE KEY KEY PLANSECOND FLOOR - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 3/32" = 1'-0"16'24'8'0DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Schwartz CPA 2016\CAD\11103-2016--T2-2.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY SCHWARTZ CPA - 2016 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2016754LP/EL/PKBDPBJLBSECOND FLOORPATHWAYS ANDCABLINGT2-2.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTEXISTING OUTLET NOTE KEY KEY PLANTHIRD FLOOR - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 3/32" = 1'-0"16'24'8'0DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Schwartz CPA 2016\CAD\11103-2016--T2-3.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY SCHWARTZ CPA - 2016 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2016754LP/EL/PKBDPBJLBTHIRD FLOORPATHWAYS ANDCABLINGT2-3.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTEXISTING OUTLET NOTE KEY KEY PLANFOURTH FLOOR - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 3/32" = 1'-0"16'24'8'0DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Schwartz CPA 2016\CAD\11103-2016--T2-4.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY SCHWARTZ CPA - 2016 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2016754LP/EL/PKBDPBJLBFOURTH FLOORPATHWAYS ANDCABLINGT2-4.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTEXISTING OUTLET NOTE KEY KEY PLANFIFTH FLOOR - COMMUNICATION PATHWAYS /HORIZONTAL CABLING1Scale: 1/16" = 1'-0"016'32'8'DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Schwartz CPA 2016\CAD\11103-2016--T2-5_6_7.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY SCHWARTZ CPA - 2016 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2016754LP/EL/PKBDPBJLBFIFTH, SIXTH ANDSEVENTH FLOORPATHWAYS ANDCABLINGPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTSIXTH FLOOR - COMMUNICATION PATHWAYS /HORIZONTAL CABLING2Scale: 1/16" = 1'-0"016'32'8'SEVENTH FLOOR - COMMUNICATION PATHWAYS /HORIZONTAL CABLING3Scale: 1/16" = 1'-0"016'32'8'EXISTING OUTLET NOTE KEY KEY PLANBASEMENT - ROOM B0071TELECOM EQUIPMENT PLAN - EXISTING / REMOVALS1Scale: 3/8" = 1'-0"4'6'2'0BASEMENT - MTR-BA (ROOM B0071)TELECOM EQUIPMENT PLAN - NEW WORK2Scale: 3/8" = 1'-0"4'6'2'0DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Schwartz CPA 2016\CAD\11103-2016--T3-B.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY SCHWARTZ CPA - 2016 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2016754LP/EL/PKBDPBJLBMTR-BA ENLARGEDPLANS ANDELEVATIONST3-BAPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECT01'2'1/2'BASEMENT - ROOM B0071BACKBOARD ELEVATION - EXISTING / REMOVALS5Scale: 1" = 1'-0"01'2'1/2'BASEMENT MTR-BA (ROOM B0071)RACK ELEVATION - NEW WORK4Scale: 1" = 1'-0"BASEMENT MTR-BA (RACK 1)FIBER HOUSING DETAIL7Scale: NONEBASEMENT MTR-BA (ROOM B0071)BACKBOARD ELEVATION - NEW WORK6Scale: 1" = 1'-0"01'2'1/2'01'2'1/2'BASEMENT MTR-BA (ROOM B0071)RACK ELEVATION - EXISTING / REMOVALS3Scale: 1" = 1'-0"4'-0"8'-0"8'-0" KEY PLANTHIRD FLOOR - ROOM 30040TELECOM EQUIPMENT PLAN - EXISTING / REMOVALS1Scale: 3/8" = 1'-0"4'6'2'0THIRD FLOOR - ITR-3A (ROOM 319)TELECOM EQUIPMENT PLAN - NEW WORK2Scale: 3/8" = 1'-0"4'6'2'0DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Schwartz CPA 2016\CAD\11103-2016--T3-3.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY SCHWARTZ CPA - 2016 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2016754LP/EL/PKBDPBJLBITR-3A ENLARGEDPLANS ANDELEVATIONST3-3APSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECT01'2'1/2'THIRD FLOOR ITR-3A (ROOM 319)RACK ELEVATION - NEW WORK3Scale: 1" = 1'-0"THIRD FLOOR ITR-3A (RACK 1)FIBER HOUSING DETAIL5Scale: NONETHIRD FLOOR ITR-3A (ROOM 319)BACKBOARD ELEVATION - NEW WORK4Scale: 1" = 1'-0"01'2'1/2' DESCRIPTIONMARK DATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARK ROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY SCHWARTZ CPA - 2016 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2016754LP/EL/PKBDPBJLBGENERAL NOTES,SYMBOLS ANDABBREVIATIONS(AMEP SERIES)AMEP-GENPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTELECTRICAL SYMBOLS LEGEND4Scale: NONEMECHANICAL SYMBOLS LEGEND3Scale: NONEARCHITECTURAL SYMBOLS LEGEND2Scale: NONEABBREVIATIONS1Scale: NONE DESCRIPTIONMARK DATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARK ROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY SCHWARTZ CPA - 2016 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2016754LP/EL/PKBDPBJLBAMEP-AREAS OFWORKT1-AMEPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTFIRST FLOOR - AMEP AREAS OF WORK3Scale: 1/32" = 1'-0"BASEMENT - AMEP AREAS OF WORK2Scale: 1/32" = 1'-0"SECOND FLOOR - AMEP AREAS OF WORK4Scale: 1/32" = 1'-0"SUB-BASEMENT - AMEP AREAS OF WORK1Scale: 1/32" = 1'-0"THIRD FLOOR - AMEP AREAS OF WORK5Scale: 1/32" = 1'-0"FOURTH FLOOR - AMEP AREAS OF WORK6Scale: 1/32" = 1'-0"032'64'16'032'64'16'032'64'16'032'64'16'032'64'16'032'64'16' DESCRIPTIONMARK DATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 19, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Schwartz CPA 2016\CAD\11103-2016--T3-B.dwgFax: 585.424.4239115 METRO PARK ROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY SCHWARTZ CPA - 2016 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2016754LP/EL/PKBDPBJLBMTR-BA PARTIALPLANS ANDKEYNOTESAMEP-BAPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTBASEMENT MDF (ROOM B0071)ARCHITECTURAL - EXISTING / DEMO1Scale: 3/8" = 1'-0"4'6'2'0BASEMENT MTR-BA (ROOM B0071)ARCHITECTURAL - NEW WORK4Scale: 3/8" = 1'-0"4'6'2'0BASEMENT MDF (ROOM B0071)MECHANICAL - EXISTING / REMOVALS2Scale: 3/8" = 1'-0"4'6'2'0BASEMENT MDF (ROOM B0071)ELECTRICAL - EXISTING / REMOVALS3Scale: 3/8" = 1'-0"4'6'2'0BASEMENT MTR-BA (ROOM B0071)ELECTRICAL - NEW WORK6Scale: 3/8" = 1'-0"4'6'2'0BASEMENT MTR-BA (ROOM B0071)MECHANICAL - NEW WORK5Scale: 3/8" = 1'-0"4'6'2'0KEY PLAN4'-0" 8'-0" 4'-0" 8'-0" DESCRIPTIONMARK DATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 19, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Schwartz CPA 2016\CAD\11103-2016--T3-3.dwgFax: 585.424.4239115 METRO PARK ROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY SCHWARTZ CPA - 2016 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2016754LP/EL/PKBDPBJLBITR-3A PARTIALPLANS ANDKEYNOTESAMEP-3APSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTTHIRD FLOOR (ROOM 30040)ARCHITECTURAL - EXISTING / DEMO1Scale: 3/8" = 1'-0"4'6'2'0THIRD FLOOR ITR-3A (ROOM 319)ARCHITECTURAL - NEW WORK4Scale: 3/8" = 1'-0"4'6'2'0THIRD FLOOR (ROOM 30040)MECHANICAL - EXISTING / REMOVALS2Scale: 3/8" = 1'-0"4'6'2'0THIRD FLOOR (ROOM 30040)ELECTRICAL - EXISTING / REMOVALS3Scale: 3/8" = 1'-0"4'6'2'0THIRD FLOOR ITR-3A (ROOM 319)ELECTRICAL - NEW WORK6Scale: 3/8" = 1'-0"4'6'2'0THIRD FLOOR ITR-3A (ROOM 319)MECHANICAL - NEW WORK5Scale: 3/8" = 1'-0"4'6'2'0 HEAD TYPESJAMB TYPESGENERAL NOTESGENERAL NOTESDESCRIPTIONMARK DATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARK ROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY SCHWARTZ CPA - 2016 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2016754LP/EL/PKBDPBJLBARCHITECTURALDETAILSA4PSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTJAMB AND HEAD TYPES1Scale: NONENEW ACCESS PANEL - EXISTING GWB CEILING2Scale: NONE GENERAL NOTESGENERAL NOTESDESCRIPTIONMARK DATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARK ROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY SCHWARTZ CPA - 2016 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2016754LP/EL/PKBDPBJLBMECHANICALDETAILSM4PSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTCONCRETE ANCHOR DEVICE DETAIL3Scale: NONEPIPE HANGER4Scale: NONEREFRIGERANT PIPE THROUGH EXTERIOR WALL5Scale: NONEREFRIGERANT PIPE WALL SUPPORT DETAIL6Scale: NONEFIRE RATED WALL PENETRATION DETAIL1Scale: NONENON-FIRE RATED WALL PENETRATION DETAIL2Scale: NONENEW DUCTLESS SPLIT AIR CONDITIONING UNIT SCHEDULE7Scale: NONE SECOND FLOORFIRST FLOORBASEMENTSECOND FLOORFIRST FLOORBASEMENTSUB-BASEMENTSUB-BASEMENTTHIRD FLOORTHIRD FLOORFOURTH FLOORFOURTH FLOORFIFTH FLOORFIFTH FLOORSIXTH FLOORSIXTH FLOORSEVENTH FLOORSEVENTH FLOORGENERAL NOTESGENERAL NOTESSE RATEDNOTES:HINGED TRIM200% NEUTRALCOMPUTER GRADE FEED-THRU LUGSSUB FEED LUGSSUB-FEED BREAKERISOLATED GND BUSSE RATEDNOTES:HINGED TRIM200% NEUTRALCOMPUTER GRADE FEED-THRU LUGSSUB FEED LUGSSUB-FEED BREAKERISOLATED GND BUSDESCRIPTIONMARK DATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARK ROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY SCHWARTZ CPA - 2016 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2016754LP/EL/PKBDPBJLBELECTRICAL DETAILSE4PSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTPOWER & GROUNDING SYSTEM RISER DIAGRAM3Scale: NONELIGHTING FIXTURE SCHEDULE4Scale: NONEELECTRICAL PANELBOARD SCHEDULES2Scale: NONETELECOMMUNICATIONS GROUND BAR (TGB) DETAIL5Scale: NONE BASEMENT PLAN1Scale: 1/16" = 1'-0"DESCRIPTIONMARK DATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARK ROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY SCHWARTZ CPA - 2016 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2016754LP/EL/PKBDPBJLBMECHANICAL &ELECTRICAL PLANSPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTTHIRD FLOOR MECHANICAL & ELECTRICAL PLAN2Scale: 1/4" = 1'-0"16'24'8'0032'64'16'PARTIAL FOURTH FLOOR MECHANICAL PLAN4Scale: 1/4" = 1'-0"04'8'2'PARTIAL FOURTH FLOOR ELECTRICAL PLAN3Scale: 1/4" = 1'-0"04'8'2'FOURTH FLOOR KEY PLAN HEAD TYPESJAMB TYPESGENERAL NOTESGENERAL NOTESDESCRIPTIONMARK DATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARK ROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY SCHWARTZ CPA - 2016 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2016754LP/EL/PKBDPBJLBARCHITECTURALDETAILSA4PSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTJAMB AND HEAD TYPES1Scale: NONENEW ACCESS PANEL - EXISTING GWB CEILING2Scale: NONE BASEMENT PLAN1Scale: 1/16" = 1'-0"DESCRIPTIONMARK DATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARK ROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY SCHWARTZ CPA - 2016 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2016754LP/EL/PKBDPBJLBMECHANICAL &ELECTRICAL PLANSPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTTHIRD FLOOR MECHANICAL & ELECTRICAL PLAN2Scale: 1/4" = 1'-0"16'24'8'0032'64'16'PARTIAL FOURTH FLOOR MECHANICAL PLAN4Scale: 1/4" = 1'-0"04'8'2'PARTIAL FOURTH FLOOR ELECTRICAL PLAN3Scale: 1/4" = 1'-0"04'8'2'FOURTH FLOOR KEY PLAN DESCRIPTIONMARK DATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 19, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Schwartz CPA 2016\CAD\11103-2016--T3-3.dwgFax: 585.424.4239115 METRO PARK ROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY SCHWARTZ CPA - 2016 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2016754LP/EL/PKBDPBJLBITR-3A PARTIALPLANS ANDKEYNOTESAMEP-3APSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTTHIRD FLOOR (ROOM 30040)ARCHITECTURAL - EXISTING / DEMO1Scale: 3/8" = 1'-0"4'6'2'0THIRD FLOOR ITR-3A (ROOM 319)ARCHITECTURAL - NEW WORK4Scale: 3/8" = 1'-0"4'6'2'0THIRD FLOOR (ROOM 30040)MECHANICAL - EXISTING / REMOVALS2Scale: 3/8" = 1'-0"4'6'2'0THIRD FLOOR (ROOM 30040)ELECTRICAL - EXISTING / REMOVALS3Scale: 3/8" = 1'-0"4'6'2'0THIRD FLOOR ITR-3A (ROOM 319)ELECTRICAL - NEW WORK6Scale: 3/8" = 1'-0"4'6'2'0THIRD FLOOR ITR-3A (ROOM 319)MECHANICAL - NEW WORK5Scale: 3/8" = 1'-0"4'6'2'0 DESCRIPTIONMARK DATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 19, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Schwartz CPA 2016\CAD\11103-2016--T3-B.dwgFax: 585.424.4239115 METRO PARK ROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY SCHWARTZ CPA - 2016 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2016754LP/EL/PKBDPBJLBMTR-BA PARTIALPLANS ANDKEYNOTESAMEP-BAPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTBASEMENT MDF (ROOM B0071)ARCHITECTURAL - EXISTING / DEMO1Scale: 3/8" = 1'-0"4'6'2'0BASEMENT MTR-BA (ROOM B0071)ARCHITECTURAL - NEW WORK4Scale: 3/8" = 1'-0"4'6'2'0BASEMENT MDF (ROOM B0071)MECHANICAL - EXISTING / REMOVALS2Scale: 3/8" = 1'-0"4'6'2'0BASEMENT MDF (ROOM B0071)ELECTRICAL - EXISTING / REMOVALS3Scale: 3/8" = 1'-0"4'6'2'0BASEMENT MTR-BA (ROOM B0071)ELECTRICAL - NEW WORK6Scale: 3/8" = 1'-0"4'6'2'0BASEMENT MTR-BA (ROOM B0071)MECHANICAL - NEW WORK5Scale: 3/8" = 1'-0"4'6'2'0KEY PLAN4'-0" 8'-0" 4'-0" 8'-0" DESCRIPTIONMARK DATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARK ROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY SCHWARTZ CPA - 2016 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2016754LP/EL/PKBDPBJLBGENERAL NOTES,SYMBOLS ANDABBREVIATIONS(AMEP SERIES)AMEP-GENPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTELECTRICAL SYMBOLS LEGEND4Scale: NONEMECHANICAL SYMBOLS LEGEND3Scale: NONEARCHITECTURAL SYMBOLS LEGEND2Scale: NONEABBREVIATIONS1Scale: NONE SECOND FLOORFIRST FLOORBASEMENTSECOND FLOORFIRST FLOORBASEMENTSUB-BASEMENTSUB-BASEMENTTHIRD FLOORTHIRD FLOORFOURTH FLOORFOURTH FLOORFIFTH FLOORFIFTH FLOORSIXTH FLOORSIXTH FLOORSEVENTH FLOORSEVENTH FLOORGENERAL NOTESGENERAL NOTESSE RATEDNOTES:HINGED TRIM200% NEUTRALCOMPUTER GRADE FEED-THRU LUGSSUB FEED LUGSSUB-FEED BREAKERISOLATED GND BUSSE RATEDNOTES:HINGED TRIM200% NEUTRALCOMPUTER GRADE FEED-THRU LUGSSUB FEED LUGSSUB-FEED BREAKERISOLATED GND BUSDESCRIPTIONMARK DATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARK ROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY SCHWARTZ CPA - 2016 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2016754LP/EL/PKBDPBJLBELECTRICAL DETAILSE4PSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTPOWER & GROUNDING SYSTEM RISER DIAGRAM3Scale: NONELIGHTING FIXTURE SCHEDULE4Scale: NONEELECTRICAL PANELBOARD SCHEDULES2Scale: NONETELECOMMUNICATIONS GROUND BAR (TGB) DETAIL5Scale: NONE GENERAL NOTESGENERAL NOTESDESCRIPTIONMARK DATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARK ROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY SCHWARTZ CPA - 2016 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2016754LP/EL/PKBDPBJLBMECHANICALDETAILSM4PSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTCONCRETE ANCHOR DEVICE DETAIL3Scale: NONEPIPE HANGER4Scale: NONEREFRIGERANT PIPE THROUGH EXTERIOR WALL5Scale: NONEREFRIGERANT PIPE WALL SUPPORT DETAIL6Scale: NONEFIRE RATED WALL PENETRATION DETAIL1Scale: NONENON-FIRE RATED WALL PENETRATION DETAIL2Scale: NONENEW DUCTLESS SPLIT AIR CONDITIONING UNIT SCHEDULE7Scale: NONE DESCRIPTIONMARK DATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARK ROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY SCHWARTZ CPA - 2016 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2016754LP/EL/PKBDPBJLBAMEP-AREAS OFWORKT1-AMEPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTFIRST FLOOR - AMEP AREAS OF WORK3Scale: 1/32" = 1'-0"BASEMENT - AMEP AREAS OF WORK2Scale: 1/32" = 1'-0"SECOND FLOOR - AMEP AREAS OF WORK4Scale: 1/32" = 1'-0"SUB-BASEMENT - AMEP AREAS OF WORK1Scale: 1/32" = 1'-0"THIRD FLOOR - AMEP AREAS OF WORK5Scale: 1/32" = 1'-0"FOURTH FLOOR - AMEP AREAS OF WORK6Scale: 1/32" = 1'-0"032'64'16'032'64'16'032'64'16'032'64'16'032'64'16'032'64'16' SECOND FLOORFIRST FLOORBASEMENTSECOND FLOORFIRST FLOORBASEMENTSUB-BASEMENTSUB-BASEMENTTHIRD FLOORTHIRD FLOORFOURTH FLOORFOURTH FLOORFIFTH FLOORFIFTH FLOORSIXTH FLOORSIXTH FLOORSEVENTH FLOORSEVENTH FLOORSECOND FLOORFIRST FLOORBASEMENTSECOND FLOORFIRST FLOORBASEMENTSUB-BASEMENTSUB-BASEMENTTHIRD FLOORTHIRD FLOORFOURTH FLOORFOURTH FLOORFIFTH FLOORFIFTH FLOORSIXTH FLOORSIXTH FLOORSEVENTH FLOORSEVENTH FLOORScale: NONECOPPER LOGICAL RISER DIAGRAM - NEW WORK2Scale: NONECOPPER LOGICAL RISER DIAGRAM - EXISTING / REMOVAL1DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY SCHWARTZ CPA - 2016 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2016754LP/EL/PKBDPBJLBCOPPER LOGICALRISER DIAGRAMST1-CLPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECT SECOND FLOORFIRST FLOORBASEMENTSECOND FLOORFIRST FLOORBASEMENTSUB-BASEMENTSUB-BASEMENTTHIRD FLOORTHIRD FLOORFOURTH FLOORFOURTH FLOORFIFTH FLOORFIFTH FLOORSIXTH FLOORSIXTH FLOORSEVENTH FLOORSEVENTH FLOORSECOND FLOORFIRST FLOORBASEMENTSECOND FLOORFIRST FLOORBASEMENTSUB-BASEMENTSUB-BASEMENTTHIRD FLOORTHIRD FLOORFOURTH FLOORFOURTH FLOORFIFTH FLOORFIFTH FLOORSIXTH FLOORSIXTH FLOORSEVENTH FLOORSEVENTH FLOORScale: NONEFIBER LOGICAL RISER DIAGRAM - NEW WORK2Scale: NONEFIBER LOGICAL RISER DIAGRAM - EXISTING / REMOVAL1DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY SCHWARTZ CPA - 2016 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2016754LP/EL/PKBDPBJLBFIBER LOGICALRISER DIAGRAMST1-FLPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECT SECOND FLOORFIRST FLOORBASEMENTSECOND FLOORFIRST FLOORBASEMENTSUB-BASEMENTSUB-BASEMENTTHIRD FLOORTHIRD FLOORFOURTH FLOORFOURTH FLOORFIFTH FLOORFIFTH FLOORSIXTH FLOORSIXTH FLOORSEVENTH FLOORSEVENTH FLOORSECOND FLOORFIRST FLOORBASEMENTSECOND FLOORFIRST FLOORBASEMENTSUB-BASEMENTSUB-BASEMENTTHIRD FLOORTHIRD FLOORFOURTH FLOORFOURTH FLOORFIFTH FLOORFIFTH FLOORSIXTH FLOORSIXTH FLOORSEVENTH FLOORSEVENTH FLOORScale: NONEPATHWAY LOGICAL RISER DIAGRAM - NEW WORK2Scale: NONEPATHWAY LOGICAL RISER DIAGRAM - EXISTING / REMOVAL1DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY SCHWARTZ CPA - 2016 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2016754LP/EL/PKBDPBJLBPATHWAYS LOGICALRISER DIAGRAMST1-PLPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECT SECOND FLOORFIRST FLOORBASEMENTSECOND FLOORFIRST FLOORBASEMENTSUB-BASEMENTSUB-BASEMENTTHIRD FLOORTHIRD FLOORFOURTH FLOORFOURTH FLOORFIFTH FLOORFIFTH FLOORSIXTH FLOORSIXTH FLOORSEVENTH FLOORSEVENTH FLOORTR SERVING ZONES - BUILDING SECTION VIEW4Scale: NONEFIRST FLOOR - TR SERVING ZONE PLAN3Scale: 1/32" = 1'-0"BASEMENT - TR SERVING ZONE PLAN2Scale: 1/32" = 1'-0"SECOND FLOOR - TR SERVING ZONE PLAN4Scale: 1/32" = 1'-0"DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY SCHWARTZ CPA - 2016 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2016754LP/EL/PKBDPBJLBTR SERVING ZONES,PLAN VIEWS ANDBLDG. SECTIONVIEWT1-SZPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTSUB-BASEMENT - TR SERVING ZONE PLAN1Scale: 1/32" = 1'-0"THIRD FLOOR - TR SERVING ZONE PLAN5Scale: 1/32" = 1'-0"FOURTH FLOOR - TR SERVING ZONE PLAN6Scale: 1/32" = 1'-0"FIFTH FLOOR - TR SERVING ZONE PLAN7Scale: 1/32" = 1'-0"SIXTH FLOOR - TR SERVING ZONE PLAN8Scale: 1/32" = 1'-0"SEVENTH FLOOR - TR SERVING ZONE PLAN9Scale: 1/32" = 1'-0"032'64'16'032'64'16'032'64'16'032'64'16'032'64'16'032'64'16'032'64'16'032'64'16'032'64'16' KEY PLANFIRST FLOOR - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 3/32" = 1'-0"16'24'8'0DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Schwartz CPA 2016\CAD\11103-2016--T2-1.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY SCHWARTZ CPA - 2016 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2016754LP/EL/PKBDPBJLBFIRST FLOORPATHWAYS ANDCABLINGT2-1.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTEXISTING OUTLET NOTE KEY KEY PLANSECOND FLOOR - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 3/32" = 1'-0"16'24'8'0DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Schwartz CPA 2016\CAD\11103-2016--T2-2.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY SCHWARTZ CPA - 2016 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2016754LP/EL/PKBDPBJLBSECOND FLOORPATHWAYS ANDCABLINGT2-2.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTEXISTING OUTLET NOTE KEY KEY PLANTHIRD FLOOR - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 3/32" = 1'-0"16'24'8'0DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Schwartz CPA 2016\CAD\11103-2016--T2-3.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY SCHWARTZ CPA - 2016 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2016754LP/EL/PKBDPBJLBTHIRD FLOORPATHWAYS ANDCABLINGT2-3.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTEXISTING OUTLET NOTE KEY KEY PLANFOURTH FLOOR - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 3/32" = 1'-0"16'24'8'0DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Schwartz CPA 2016\CAD\11103-2016--T2-4.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY SCHWARTZ CPA - 2016 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2016754LP/EL/PKBDPBJLBFOURTH FLOORPATHWAYS ANDCABLINGT2-4.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTEXISTING OUTLET NOTE KEY KEY PLANFIFTH FLOOR - COMMUNICATION PATHWAYS /HORIZONTAL CABLING1Scale: 1/16" = 1'-0"016'32'8'DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Schwartz CPA 2016\CAD\11103-2016--T2-5_6_7.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY SCHWARTZ CPA - 2016 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2016754LP/EL/PKBDPBJLBFIFTH, SIXTH ANDSEVENTH FLOORPATHWAYS ANDCABLINGPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTSIXTH FLOOR - COMMUNICATION PATHWAYS /HORIZONTAL CABLING2Scale: 1/16" = 1'-0"016'32'8'SEVENTH FLOOR - COMMUNICATION PATHWAYS /HORIZONTAL CABLING3Scale: 1/16" = 1'-0"016'32'8'EXISTING OUTLET NOTE KEY KEY PLANBASEMENT - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 3/32" = 1'-0"16'24'8'0DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Schwartz CPA 2016\CAD\11103-2016--T2-B.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY SCHWARTZ CPA - 2016 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2016754LP/EL/PKBDPBJLBBASEMENTPATHWAYS ANDCABLINGT2-B.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTEXISTING OUTLET NOTE KEY KEY PLANSUB-BASEMENT - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 3/32" = 1'-0"16'24'8'0DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Schwartz CPA 2016\CAD\11103-2016--T2-SB.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY SCHWARTZ CPA - 2016 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2016754LP/EL/PKBDPBJLBSUB-BASEMENTPATHWAYS ANDCABLINGT2-SB.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTEXISTING OUTLET NOTE KEY KEY PLANTHIRD FLOOR - ROOM 30040TELECOM EQUIPMENT PLAN - EXISTING / REMOVALS1Scale: 3/8" = 1'-0"4'6'2'0THIRD FLOOR - ITR-3A (ROOM 319)TELECOM EQUIPMENT PLAN - NEW WORK2Scale: 3/8" = 1'-0"4'6'2'0DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Schwartz CPA 2016\CAD\11103-2016--T3-3.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY SCHWARTZ CPA - 2016 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2016754LP/EL/PKBDPBJLBITR-3A ENLARGEDPLANS ANDELEVATIONST3-3APSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECT01'2'1/2'THIRD FLOOR ITR-3A (ROOM 319)RACK ELEVATION - NEW WORK3Scale: 1" = 1'-0"THIRD FLOOR ITR-3A (RACK 1)FIBER HOUSING DETAIL5Scale: NONETHIRD FLOOR ITR-3A (ROOM 319)BACKBOARD ELEVATION - NEW WORK4Scale: 1" = 1'-0"01'2'1/2' KEY PLANBASEMENT - ROOM B0071TELECOM EQUIPMENT PLAN - EXISTING / REMOVALS1Scale: 3/8" = 1'-0"4'6'2'0BASEMENT - MTR-BA (ROOM B0071)TELECOM EQUIPMENT PLAN - NEW WORK2Scale: 3/8" = 1'-0"4'6'2'0DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Schwartz CPA 2016\CAD\11103-2016--T3-B.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY SCHWARTZ CPA - 2016 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2016754LP/EL/PKBDPBJLBMTR-BA ENLARGEDPLANS ANDELEVATIONST3-BAPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECT01'2'1/2'BASEMENT - ROOM B0071BACKBOARD ELEVATION - EXISTING / REMOVALS5Scale: 1" = 1'-0"01'2'1/2'BASEMENT MTR-BA (ROOM B0071)RACK ELEVATION - NEW WORK4Scale: 1" = 1'-0"BASEMENT MTR-BA (RACK 1)FIBER HOUSING DETAIL7Scale: NONEBASEMENT MTR-BA (ROOM B0071)BACKBOARD ELEVATION - NEW WORK6Scale: 1" = 1'-0"01'2'1/2'01'2'1/2'BASEMENT MTR-BA (ROOM B0071)RACK ELEVATION - EXISTING / REMOVALS3Scale: 1" = 1'-0"4'-0"8'-0"8'-0" PROJECT SITE PLANDRAWING INDEXCORNELL UNIVERSITYNETWORK CONNECTIVITY PROJECTSCHWARTZ CPA - 2016DRAWINGDESCRIPTIONT-COVERDRAWING INDEX AND PROJECT SITE PLANT-GENSTANDARD SYMBOLS, NOTES, ABBREVIATIONS (T-SERIES)T1T1-SZTR SERVING ZONES, PLAN VIEWS AND BLDG. SECTION VIEWT1-PLPATHWAYS LOGICAL RISER DIAGRAMST1-CLCOPPER LOGICAL RISER DIAGRAMST1-FLFIBER LOGICAL RISER DIAGRAMST2T2-SB.CA_CPSUB-BASEMENT PATHWAYS AND CABLINGT2-B.CA_CPBASEMENT PATHWAYS AND CABLINGT2-1.CA_CPFIRST FLOOR PATHWAYS AND CABLINGT2-2.CA_CPSECOND FLOOR PATHWAYS AND CABLINGT2-3.CA_CPTHIRD FLOOR PATHWAYS AND CABLINGT2-4.CA_CPFOURTH FLOOR PATHWAYS AND CABLINGT2-5_6_7.CA_CPFIFTH, SIXTH AND SEVENTH FLOOR PATHWAYS AND CABLINGT3T3-BAMTR-BA ENLARGED PLANS AND ELEVATIONST3-3AITR-3A ENLARGED PLANS AND ELEVATIONSAMEPAMEP-GENGENERAL NOTES, SYMBOLS AND ABBREVIATIONS (AMEP SERIES)T1-AMEPAMEP-AREAS OF WORKAMEP-BAMTR-BA PARTIAL PLANS AND KEYNOTESAMEP-3AITR-3A PARTIAL PLANS AND KEYNOTESA4ARCHITECTURAL DETAILSM4MECHANICAL DETAILSE4ELECTRICAL DETAILSAMEP-2-B_3_4MECHANICAL & ELECTRICAL PLANSDESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Schwartz CPA 2016\CAD\11103-2016--T-COVER.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY SCHWARTZ CPA - 2016 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2016754LP/EL/PKBDPBJLBDRAWING INDEXAND PROJECT SITEPLANT-COVERPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECT CEILING SCHEDULEGENERAL PROJECT NOTESGENERAL REMOVAL NOTESGENERAL DRAWING NOTES-EXISTING CONDITIONS/REMOVALS-ACCESS CONTROL SYMBOLS LEGENDGENERAL NEW WORK NOTESGENERAL DRAWING NOTES-HORIZONTAL CABLING-GENERAL DRAWING NOTES-PATHWAYS-GENERAL DRAWING NOTES-PATHWAYS-ABBREVIATIONS TELECOM SYMBOLS LEGEND (REV. 02/12)NEW / EXISTING OUTLET SUBSCRIPT KEYNEW PATHWAY TYPE KEYOUTLET DESCRIPTOR KEYEXISTING OUTLET NOTE KEYCABLING SYMBOLS LEGENDDESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY SCHWARTZ CPA - 2016 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2016754LP/EL/PKBDPBJLBSTANDARDSYMBOLS, NOTES,ABBREVIATIONS(T-SERIES)T-GENPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECT3$7+:$<6&+('8/(1(::25.&$%/(),//%$6('21&$%/(2'¸ 0.24DESIGNATIONDESCRIPTIONMANUFACTURERPART NO.APPROXIMATEOUTSIDEDIMENSIONAPPROXIMATEINSIDEDIMENSIONCABLE FILL&$3$&,7<¸MIN. BENDRADIUS&ʵCONDUITSEE SPEC. SECTION 27 05 28.75" DIA.44.5"1" C1" DIA.76"1.25" C1.25" DIA.137.5"1.5" C1.5" DIA.189"2" C2" DIA.2912"2.5" C2.5" DIA.5125"3" C3" DIA.7830"4" C4" DIA.13040"SR-1NOT USEDSR-2 **SURFACE RACEWAYSEE SPEC. SECTION27 05 282400 SERIESSEE SPEC. SECTION 27 05 2812SR-3 **SURFACE RACEWAY3000 SERIES32SR-4 **SURFACE RACEWAY4000 SERIES63SR-4D **SURFACE RACEWAY(DIVIDED)4000D SERIES30SR-5 **SURFACE RACEWAY5400 SERIES32SR-6 **SURFACE RACEWAY6000 SERIES140SR-6D **SURFACE RACEWAY(DIVIDED)6000D SERIES63SR-7SURFACE RACEWAY700 SERIES2CT-AENCLOSED TRAYSEE SPEC. SECTION 27 05 284"x6"211CT-B2"x12"211CT-C2"x18"316CT-D2"x24"419CT-ESEE SPEC. SECTION 27 05 284"x12"419CT-F6"x12"632CT-G4"x24"844CT-H6"x6"318CT-IWIRE DUCTNOT USED6"x6"318CT-J4"x6"212CT-K4"X9"318127(6¸0$;,080),//)25&$7(*25<,1',&$7('3(57,$(,$$ - CAT6A CABLING HAS AN OD OF 0.285.5('8&(),//5$7,2%<)25($&+%(1' - ENSURE THAT FILL RATIOS ARE NOT EXCEEDEDʵ&21'8,76+$//21/<%($//2:('$663(&,),&$//<127('21'5$:,1*6 ** REDUCE CAPACITY BY 50% FOR THE FOLLOWING CONDITIONS: - WHEN CONNECTORS ARE MOUNTED WITHIN RACEWAY - WHEN NON-RADIUS FITTINGS RESTRICT CROSS-SECTIONAL AREA - WHEN RACEWAY IS DIVIDED AND SHARED WITH ELECTRICALTER EXISTING SURFACE RACEWAY TO PROVIDE AT LEAST TWO 16"SECTIONS OF REMOVABLE COVERS TO ALLOW CABLE ROUGH-IN WITHOUTCONFLICT WITH EXISTING FURNITURE CONFIGURATIONS. ALSO REFER TOGENERAL NOTE "Z" ON T-GEN DRAWING FOR ADDITIONAL SCOPE FORSURFACE RACEWAYS.WHERE REQUIRED BY RACEWAY CAPACITY, OR AS DIRECTED, PROVIDESURFACE MOUNT EXTENSION BOX ON EXISTING RACEWAY OPENING TOPROVIDE ADEQUATE CAPACITY AND BEND RADIUS. ALSO REFER TORACEWAY DERATING REQUIREMENTS AT LEFT.WHERE REQUIRED BY RACEWAY CAPACITY, OR AS DIRECTED, PROVIDERETROFIT ENTRANCE END FITTING OR ALTER EXISTING BACKFED CONDUITWITH A NEW SPACE SAVER CONNECTOR TO PROVIDE ADEQUATE CAPACITYAND BEND RADIUS FOR NEW CABLING. ALSO REFER TO RACEWAYDERATING REQUIREMENTS AT LEFT. FIELD VERIFY EXISTING CONDITIONSAND PROPOSE ALTERATIONS THAT MINIMIZE SERVICE DISRUPTIONDURATION. PROVIDE ALL TEMPORARY PROVISIONS TO MAINTAIN EXISTINGSERVICES.CONDUIT AND CABLE TRAY TO BE ROUTED CONCEALED UNLESSOTHERWISE NOTED.