Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20120629_Day_Hall_CD_Combined
PROJECT SITE PLANDRAWING INDEXCORNELL UNIVERSITYNETWORK CONNECTIVITY PROJECTDAY HALL - 2026DRAWINGDESCRIPTIONT-COVERDRAWING INDEX AND PROJECT SITE PLANT-GENSTANDARD SYMBOLS, NOTES, ABBREVIATIONS (T-SERIES)T1T1-SZTR SERVING ZONES, PLAN VIEWS AND BLDG. SECTION VIEWT1-PLPATHWAYS LOGICAL RISER DIAGRAMST1-CLCOPPER LOGICAL RISER DIAGRAMST1-FLFIBER LOGICAL RISER DIAGRAMST2T2-B.CA_CPBASEMENT PATHWAYS AND CABLINGT2-1.CA_CPFIRST FLOOR PATHWAYS AND CABLINGT2-2.CA_CPSECOND FLOOR PATHWAYS AND CABLINGT2-3.CA_CPTHIRD FLOOR PATHWAYS AND CABLINGT2-4.CA_CPFOURTH FLOOR PATHWAYS AND CABLINGT2-5.CA_CPFIFTH FLOOR PATHWAYS AND CABLINGT3T3-BAMTR-BA ENLARGED PLANS AND ELEVATIONST3-BA.DBDF ROOM B53 -DEMOLITIONT3-BBITR-BB ENLARGED PLANS AND ELEVATIONST3-4ACTR-4A ENLARGED PLANS AND ELEVATIONSAMEPAMEP-GENGENERAL NOTES, SYMBOLS AND ABBREVIATIONS (AMEP SERIES)T1-AMEPAMEP-AREAS OF WORKAMEP-BAMTR-BA PARTIAL PLANS AND KEYNOTESAMEP-BBITR-BB PARTIAL PLANS AND KEYNOTESAMEP-4ACTR-4A PARTIAL PLANS AND KEYNOTESA4ARCHITECTURAL DETAILSM4MECHANICAL DETAILSE4ELECTRICAL DETAILSDESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Day 2026\CAD\11103-2026--T-COVER.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY DAY HALL - 2026 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2026754LP/ELJLBDPBDRAWING INDEXAND PROJECT SITEPLANT-COVERPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECT CEILING SCHEDULEACCESS CONTROL SYMBOLS LEGENDGENERAL PROJECT NOTESGENERAL REMOVAL NOTESGENERAL DRAWING NOTES-EXISTING CONDITIONS/REMOVALS-GENERAL NEW WORK NOTESGENERAL DRAWING NOTES-HORIZONTAL CABLING-GENERAL DRAWING NOTES-PATHWAYS-GENERAL DRAWING NOTES-PATHWAYS-ABBREVIATIONS TELECOM SYMBOLS LEGEND (REV. 02/12)NEW / EXISTING OUTLET SUBSCRIPT KEYNEW PATHWAY TYPE KEYOUTLET DESCRIPTOR KEYEXISTING OUTLET NOTE KEYCABLING SYMBOLS LEGENDDESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY DAY HALL - 2026 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2026754LP/ELJLBDPBSTANDARDSYMBOLS, NOTES,ABBREVIATIONS(T-SERIES)T-GENPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECT3$7+:$<6&+('8/(1(::25.&$%/(),//%$6('21&$%/(2'¸ 0.24DESIGNATIONDESCRIPTIONMANUFACTURERPART NO.APPROXIMATEOUTSIDEDIMENSIONAPPROXIMATEINSIDEDIMENSIONCABLE FILL&$3$&,7<¸MIN. BENDRADIUS&ʵCONDUITSEE SPEC. SECTION 27 05 28.75" DIA.44.5"1" C1" DIA.76"1.25" C1.25" DIA.137.5"1.5" C1.5" DIA.189"2" C2" DIA.2912"2.5" C2.5" DIA.5125"3" C3" DIA.7830"4" C4" DIA.13040"SR-1NOT USEDSR-2 **SURFACE RACEWAYSEE SPEC. SECTION27 05 282400 SERIESSEE SPEC. SECTION 27 05 2812SR-3 **SURFACE RACEWAY3000 SERIES32SR-4 **SURFACE RACEWAY4000 SERIES63SR-4D **SURFACE RACEWAY(DIVIDED)4000D SERIES30SR-5 **SURFACE RACEWAY5400 SERIES32SR-6 **SURFACE RACEWAY6000 SERIES140SR-6D **SURFACE RACEWAY(DIVIDED)6000D SERIES63SR-7SURFACE RACEWAY700 SERIES2CT-AWIRE MESH TRAYSEE SPEC. SECTION 27 05 284"x6"211CT-B2"x12"211CT-C2"x18"316CT-D2"x24"419CT-E4"x12"419CT-F4"x18"632CT-G4"x24"844CT-WENCLOSED TRAYETR3"x8"211CT-X6"X6"316CT-Y3"X12"316CT-Z4"X12"419127(6¸0$;,080),//)25&$7(*25<,1',&$7('3(57,$(,$$ - CAT6A CABLING HAS AN OD OF 0.285.5('8&(),//5$7,2%<)25($&+%(1' - ENSURE THAT FILL RATIOS ARE NOT EXCEEDEDʵ&21'8,76+$//21/<%($//2:('$663(&,),&$//<127('21'5$:,1*6 ** REDUCE CAPACITY BY 50% FOR THE FOLLOWING CONDITIONS: - WHEN CONNECTORS ARE MOUNTED WITHIN RACEWAY - WHEN NON-RADIUS FITTINGS RESTRICT CROSS-SECTIONAL AREA - WHEN RACEWAY IS DIVIDED AND SHARED WITH ELECTRICALTER EXISTING SURFACE RACEWAY TO PROVIDE AT LEAST TWO 16"SECTIONS OF REMOVABLE COVERS TO ALLOW CABLE ROUGH-IN WITHOUTCONFLICT WITH EXISTING FURNITURE CONFIGURATIONS. ALSO REFER TOGENERAL NOTE "Z" ON T-GEN DRAWING FOR ADDITIONAL SCOPE FORSURFACE RACEWAYS.WHERE REQUIRED BY RACEWAY CAPACITY, OR AS DIRECTED, PROVIDESURFACE MOUNT EXTENSION BOX ON EXISTING RACEWAY OPENING TOPROVIDE ADEQUATE CAPACITY AND BEND RADIUS. ALSO REFER TORACEWAY DERATING REQUIREMENTS AT LEFT.WHERE REQUIRED BY RACEWAY CAPACITY, OR AS DIRECTED, PROVIDERETROFIT ENTRANCE END FITTING OR ALTER EXISTING BACKFED CONDUITWITH A NEW SPACE SAVER CONNECTOR TO PROVIDE ADEQUATE CAPACITYAND BEND RADIUS FOR NEW CABLING. ALSO REFER TO RACEWAYDERATING REQUIREMENTS AT LEFT. FIELD VERIFY EXISTING CONDITIONSAND PROPOSE ALTERATIONS THAT MINIMIZE SERVICE DISRUPTIONDURATION. PROVIDE ALL TEMPORARY PROVISIONS TO MAINTAIN EXISTINGSERVICES.CONDUIT AND CABLE TRAY TO BE ROUTED CONCEALED UNLESSOTHERWISE NOTED. THIRD FLOORSECOND FLOORFIRST FLOORTHIRD FLOORSECOND FLOORFIRST FLOORBASEMENTBASEMENTFOURTH FLOORFOURTH FLOORFIFTH FLOORFIFTH FLOORTR SERVING ZONES - BUILDING SECTION VIEW7Scale: NONEBASEMENT - TR SERVING ZONE PLAN1Scale: 1/32" = 1'-0"DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY DAY HALL - 2026 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2026754LP/ELJLBDPBTR SERVING ZONES,PLAN VIEWS ANDBLDG. SECTIONVIEWT1-SZPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTFIRST FLOOR - TR SERVING ZONE PLAN2Scale: 1/32" = 1'-0"SECOND FLOOR - TR SERVING ZONE PLAN3Scale: 1/32" = 1'-0"THIRD FLOOR - TR SERVING ZONE PLAN4Scale: 1/32" = 1'-0"FIFTH FLOOR - TR SERVING ZONE PLAN6Scale: 1/32" = 1'-0"FOURTH FLOOR - TR SERVING ZONE PLAN5Scale: 1/32" = 1'-0"032'64'16'032'64'16'032'64'16'032'64'16'032'64'16'032'64'16' THIRD FLOORSECOND FLOORFIRST FLOORBASEMENTFOURTH FLOORFIFTH FLOORTHIRD FLOORSECOND FLOORFIRST FLOORBASEMENTFOURTH FLOORFIFTH FLOORTHIRD FLOORSECOND FLOORFIRST FLOORBASEMENTFOURTH FLOORFIFTH FLOORTHIRD FLOORSECOND FLOORFIRST FLOORBASEMENTFOURTH FLOORFIFTH FLOORScale: NONEPATHWAY LOGICAL RISER DIAGRAM - NEW WORK2Scale: NONEPATHWAY LOGICAL RISER DIAGRAM - EXISTING / REMOVAL1DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY DAY HALL - 2026 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2026754LP/ELJLBDPBPATHWAYS LOGICALRISER DIAGRAMST1-PLPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECT THIRD FLOORSECOND FLOORFIRST FLOORBASEMENTFOURTH FLOORFIFTH FLOORTHIRD FLOORSECOND FLOORFIRST FLOORBASEMENTFOURTH FLOORFIFTH FLOORTHIRD FLOORSECOND FLOORFIRST FLOORBASEMENTFOURTH FLOORFIFTH FLOORTHIRD FLOORSECOND FLOORFIRST FLOORBASEMENTFOURTH FLOORFIFTH FLOORScale: NONECOPPER LOGICAL RISER DIAGRAM - NEW WORK2Scale: NONECOPPER LOGICAL RISER DIAGRAM - EXISTING / REMOVAL1DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY DAY HALL - 2026 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2026754LP/ELJLBDPBCOPPER LOGICALRISER DIAGRAMST1-CLPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECT THIRD FLOORSECOND FLOORFIRST FLOORBASEMENTFOURTH FLOORFIFTH FLOORTHIRD FLOORSECOND FLOORFIRST FLOORBASEMENTFOURTH FLOORFIFTH FLOORTHIRD FLOORSECOND FLOORFIRST FLOORBASEMENTFOURTH FLOORFIFTH FLOORTHIRD FLOORSECOND FLOORFIRST FLOORBASEMENTFOURTH FLOORFIFTH FLOORScale: NONEDATA LOGICAL RISER DIAGRAM - NEW WORK2Scale: NONEDATA LOGICAL RISER DIAGRAM - EXISTING / REMOVAL1DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY DAY HALL - 2026 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2026754LP/ELJLBDPBFIBER LOGICALRISER DIAGRAMST1-FLPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECT KEY PLANBASEMENT - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 1/8" = 1'-0"08'16'4'DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Day 2026\CAD\11103-2026--T2-B.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY DAY HALL - 2026 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2026754LP/ELJLBDPBBASEMENTPATHWAYS ANDCABLINGT2-B.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTEXISTING OUTLET NOTE KEY KEY PLANFIRST FLOOR - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 1/8" = 1'-0"08'16'4'DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Day 2026\CAD\11103-2026--T2-1.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY DAY HALL - 2026 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2026754LP/ELJLBDPBFIRST FLOORPATHWAYS ANDCABLINGT2-1.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTEXISTING OUTLET NOTE KEY KEY PLANSECOND FLOOR - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 1/8" = 1'-0"08'16'4'DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Day 2026\CAD\11103-2026--T2-2.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY DAY HALL - 2026 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2026754LP/ELJLBDPBSECOND FLOORPATHWAYS ANDCABLINGT2-2.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTEXISTING OUTLET NOTE KEY KEY PLANTHIRD FLOOR - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 1/8" = 1'-0"08'16'4'DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Day 2026\CAD\11103-2026--T2-3.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY DAY HALL - 2026 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2026754LP/ELJLBDPBTHIRD FLOORPATHWAYS ANDCABLINGT2-3.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTEXISTING OUTLET NOTE KEY KEY PLANFOURTH FLOOR - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 1/8" = 1'-0"08'16'4'DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Day 2026\CAD\11103-2026--T2-4.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY DAY HALL - 2026 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2026754LP/ELJLBDPBFOURTH FLOORPATHWAYS ANDCABLINGT2-4.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTEXISTING OUTLET NOTE KEY KEY PLANFIFTH FLOOR - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 1/8" = 1'-0"08'16'4'DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Day 2026\CAD\11103-2026--T2-5.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY DAY HALL - 2026 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2026754LP/ELJLBDPBFIFTH FLOORPATHWAYS ANDCABLINGT2-5.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTEXISTING OUTLET NOTE KEY KEY PLANDESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Day 2026\CAD\11103-2026--T3-B.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY DAY HALL - 2026 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2026754LP/ELJLBDPBMTR-BA ENLARGEDPLANS ANDELEVATIONST3-BAPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTBASEMENT MTR-BA (ROOM B53)TELECOM EQUIPMENT PLAN - NEW WORK1Scale: 1/4" = 1'-0"04'8'2'01'2'1/2'BASEMENT - MTR-BA (ROOM B53)BACKBOARD ELEVATION - NEW WORK3Scale: 1" = 1'-0"01'2'1/2'BASEMENT MTR-BA (ROOM B53) RACK ELEVATION - NEW WORK2Scale: 1" = 1'-0"BASEMENT MTR-BA (RACK 1)FIBER HOUSING (ERL) DETAIL4Scale: NONE KEY PLANDESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Day 2026\CAD\11103-2026--T3-B.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY DAY HALL - 2026 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2026754LP/ELJLBDPBBDF ROOM B53-DEMOLITIONT3-BA.DPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTBASEMENT (ROOM B53)TELECOM EQUIPMENT PLAN - EXISTING / REMOVALS1Scale: 1/4" = 1'-0"04'8'2'01'2'1/2'BASEMENT - ROOM B53BACKBOARD ELEVATION - EXISTING / REMOVALS3Scale: 1" = 1'-0"01'2'1/2'BASEMENT MTR-#A (ROOM B53) RACK ELEVATION2Scale: 1" = 1'-0"BASEMENT MTR-#A (RACK 2)FIBER HOUSING (ERL) DETAIL4Scale: NONE KEY PLANDESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Day 2026\CAD\11103-2026--T3-B.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY DAY HALL - 2026 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2026754LP/ELJLBDPBITR-BB ENLARGEDPLANS ANDELEVATIONST3-BBPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTBASEMENT - (ROOM B00UJ)TELECOM EQUIPMENT PLAN - EXISTING / REMOVALS1Scale: 1/2" = 1'-0"02'4'1'BASEMENT - ITR-BB (ROOM B09)TELECOM EQUIPMENT PLAN - NEW WORK2Scale: 1/2" = 1'-0"02'4'1'01'2'1/2'BASEMENT - ROOM B00UJBACKBOARD ELEVATION - EXISTING / REMOVALS5Scale: 1" = 1'-0"01'2'1/2'BASEMENT ITR-BB (ROOM B09) RACK ELEVATION - NEW WORK4Scale: 1" = 1'-0"BASEMENT ITR-BB (RACK 1)FIBER HOUSING (ERL) DETAIL6Scale: NONE01'2'1/2'BASEMENT ITR-BB (ROOM B00UJ) RACK ELEVATION -EXISTING REMOVALS3Scale: 1" = 1'-0" KEY PLANDESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Day 2026\CAD\11103-2026--T3-4.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY DAY HALL - 2026 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2026754LP/ELJLBDPBCTR-4A ENLARGEDPLANS ANDELEVATIONST3-4APSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTFOURTH FLOOR (ROOM 446)TELECOM EQUIPMENT PLAN - EXISTING / REMOVALS1Scale: 3/8" = 1'-0"4'6'2'0FOURTH FLOOR CTR-4A (ROOM 446)TELECOM EQUIPMENT PLAN - NEW WORK2Scale: 3/8" = 1'-0"4'6'2'001'2'1/2'FOURTH FLOOR CTR-4A (ROOM 446)RACK ELEVATION - NEW WORK4Scale: 1" = 1'-0"FOURTH FLOOR CTR-4AFIBER HOUSING (ETR) DETAIL5Scale: NONE01'2'1/2'FOURTH FLOOR CTR-4A (ROOM 446)RACK ELEVATION - NEW WORK3Scale: 1" = 1'-0" ELECTRICAL SYMBOLS LEGEND4Scale: NONEMECHANICAL SYMBOLS LEGEND3Scale: NONEARCHITECTURAL SYMBOLS LEGEND2Scale: NONEABBREVIATIONS1Scale: NONEDESCRIPTIONMARK DATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARK ROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY DAY HALL - 2026 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2026754LP/ELJLBDPBGENERAL NOTES,SYMBOLS ANDABBREVIATIONS(AMEP SERIES)AMEP-GENPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECT DESCRIPTIONMARK DATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARK ROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY DAY HALL - 2026 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2026754LP/ELJLBDPBAMEP-AREAS OFWORKT1-AMEPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTBASEMENT - AMEP AREAS OF WORK1Scale: 1/32" = 1'-0"FIRST FLOOR - AMEP AREAS OF WORK2Scale: 1/32" = 1'-0"SECOND FLOOR - AMEP AREAS OF WORK3Scale: 1/32" = 1'-0"THIRD FLOOR - AMEP AREAS OF WORK4Scale: 1/32" = 1'-0"FIFTH FLOOR - AMEP AREAS OF WORK6Scale: 1/32" = 1'-0"FOURTH FLOOR - AMEP AREAS OF WORK5Scale: 1/32" = 1'-0"032'64'16'032'64'16'032'64'16'032'64'16'032'64'16'032'64'16' DESCRIPTIONMARK DATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 21, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Day 2026\CAD\11103-2026--T3-B.dwgFax: 585.424.4239115 METRO PARK ROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY DAY HALL - 2026 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2026754LP/ELJLBDPBMTR-BA PARTIALPLANS ANDKEYNOTESAMEP-BAPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTBASEMENT (ROOM B00UJ)ARCHITECTURAL - EXISTING / DEMO1Scale: 1/4" = 1'-0"04'8'2'BASEMENT MTR-BA (ROOM B00UJ)ARCHITECTURAL - NEW WORK4Scale: 1/4" = 1'-0"04'8'2'BASEMENT (ROOM B00UJ)MECHANICAL - EXISTING / REMOVALS2Scale: 1/4" = 1'-0"04'8'2'BASEMENT (ROOM B00UJ)ELECTRICAL - EXISTING / REMOVALS3Scale: 1/4" = 1'-0"04'8'2'BASEMENT MTR-BA (ROOM B00UJ)ELECTRICAL - NEW WORK7Scale: 1/4" = 1'-0"04'8'2'BASEMENT MTR-BA (ROOM B00UJ)MECHANICAL - NEW WORK5Scale: 1/4" = 1'-0"04'8'2'KEY PLANBASEMENT (ROOM BOOUD)MECHANICAL - NEW WORK6Scale: 1/4" = 1'-0"04'8'2' BASEMENT (ROOM B00UJ)ARCHITECTURAL - EXISTING / DEMO1Scale: 1/2" = 1'-0"02'4'1'BASEMENT ITR-BB (ROOM B09)ARCHITECTURAL - NEW WORK4Scale: 1/2" = 1'-0"02'4'1'BASEMENT (ROOM B00UJ)MECHANICAL - EXISTING / REMOVALS2Scale: 1/4" = 1'-0"04'8'2'BASEMENT (ROOM B00UJ)ELECTRICAL - EXISTING / REMOVALS3Scale: 1/2" = 1'-0"02'4'1'BASEMENT ITR-BB (ROOM B09)ELECTRICAL - NEW WORK7Scale: 1/2" = 1'-0"02'4'1'BASEMENT ITR-BB (ROOMS BOOUJ,B09)MECHANICAL - NEW WORK5Scale: 1/4" = 1'-0"04'8'2'DESCRIPTIONMARK DATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 21, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Day 2026\CAD\11103-2026--T3-B.dwgFax: 585.424.4239115 METRO PARK ROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY DAY HALL - 2026 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2026754LP/ELJLBDPBITR-BB PARTIALPLANS ANDKEYNOTESAMEP-BBPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTKEY PLANSECTION/ELEVATION VIEW6Scale: NOT TO SCALE02'4'1' KEY PLANDESCRIPTIONMARK DATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 21, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Day 2026\CAD\11103-2026--T3-4.dwgFax: 585.424.4239115 METRO PARK ROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY DAY HALL - 2026 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2026754LP/ELJLBDPBCTR-4A PARTIALPLANS ANDKEYNOTESAMEP-4APSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTFOURTH FLOOR IDF (ROOM 446)ARCHITECTURAL - EXISTING / DEMO1Scale: 3/8" = 1'-0"4'6'2'0FOURTH FLOOR CTR-4A (ROOM 446)ARCHITECTURAL - NEW WORK4Scale: 3/8" = 1'-0"4'6'2'0FOURTH FLOOR IDF (ROOM 446)MECHANICAL - EXISTING / REMOVALS2Scale: 3/8" = 1'-0"4'6'2'0FOURTH FLOOR IDF (ROOM 446)ELECTRICAL - EXISTING / REMOVALS3Scale: 3/8" = 1'-0"4'6'2'0FOURTH FLOOR CTR-4A (ROOM 446)ELECTRICAL - NEW WORK6Scale: 3/8" = 1'-0"4'6'2'0FOURTH FLOOR CTR-4A (ROOM 446)MECHANICAL - NEW WORK5Scale: 3/8" = 1'-0"4'6'2'0 FULL-HEIGHT PARTITION ASSEMBLYSECTION DETAILSHEAD TYPESJAMB TYPESGENERAL NOTESDESCRIPTIONMARK DATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARK ROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY DAY HALL - 2026 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2026754LP/ELJLBDPBARCHITECTURALDETAILSA4PSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTPARTITION TYPES1Scale: NONEJAMB AND HEAD TYPES2Scale: NONENEW ACCESS PANEL - EXISTING GWB CEILING3Scale: NONEDOOR HARDWARE4Scale: NONE GENERAL NOTESDESCRIPTIONMARK DATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARK ROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY DAY HALL - 2026 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2026754LP/ELJLBDPBMECHANICALDETAILSM4PSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTCONCRETE ANCHOR DEVICE DETAIL3Scale: NONEPIPE HANGER4Scale: NONESQUARE OR RECTANGULAR ELBOW5Scale: NONENEW CHILLED WATER FAN COIL UNIT SCHEDULE8Scale: NONETWO-WAY CONTROL VALVECOIL PIPING DETAIL7Scale: NONETYPICAL COOLING COIL DRAIN6Scale: NONEFIRE RATED WALL PIPE PENETRATION2Scale: NONENON FIRE RATED WALL PIPE PENETRATION1Scale: NONE THIRD FLOORSECOND FLOORFIRST FLOORBASEMENTFOURTH FLOORFIFTH FLOORTHIRD FLOORSECOND FLOORFIRST FLOORBASEMENTFOURTH FLOORFIFTH FLOORGENERAL NOTESSE RATEDNOTES:HINGED TRIM200% NEUTRALCOMPUTER GRADE FEED-THRU LUGSSUB FEED LUGSSUB-FEED BREAKERISOLATED GND BUSSE RATEDNOTES:HINGED TRIM200% NEUTRALCOMPUTER GRADE FEED-THRU LUGSSUB FEED LUGSSUB-FEED BREAKERISOLATED GND BUSDESCRIPTIONMARK DATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARK ROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY DAY HALL - 2026 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2026754LP/ELJLBDPBELECTRICAL DETAILSE4PSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTPOWER & GROUNDING SYSTEM RISER DIAGRAM2Scale: NONELIGHTING FIXTURE SCHEDULE3Scale: NONEELECTRICAL PANELBOARD SCHEDULES1Scale: NONETELECOMMUNICATIONS GROUND BAR (TMGB,TGB) DETAIL4Scale: NONE FULL-HEIGHT PARTITION ASSEMBLYSECTION DETAILSHEAD TYPESJAMB TYPESGENERAL NOTESDESCRIPTIONMARK DATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARK ROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY DAY HALL - 2026 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2026754LP/ELJLBDPBARCHITECTURALDETAILSA4PSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTPARTITION TYPES1Scale: NONEJAMB AND HEAD TYPES2Scale: NONENEW ACCESS PANEL - EXISTING GWB CEILING3Scale: NONEDOOR HARDWARE4Scale: NONE KEY PLANDESCRIPTIONMARK DATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 21, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Day 2026\CAD\11103-2026--T3-4.dwgFax: 585.424.4239115 METRO PARK ROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY DAY HALL - 2026 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2026754LP/ELJLBDPBCTR-4A PARTIALPLANS ANDKEYNOTESAMEP-4APSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTFOURTH FLOOR IDF (ROOM 446)ARCHITECTURAL - EXISTING / DEMO1Scale: 3/8" = 1'-0"4'6'2'0FOURTH FLOOR CTR-4A (ROOM 446)ARCHITECTURAL - NEW WORK4Scale: 3/8" = 1'-0"4'6'2'0FOURTH FLOOR IDF (ROOM 446)MECHANICAL - EXISTING / REMOVALS2Scale: 3/8" = 1'-0"4'6'2'0FOURTH FLOOR IDF (ROOM 446)ELECTRICAL - EXISTING / REMOVALS3Scale: 3/8" = 1'-0"4'6'2'0FOURTH FLOOR CTR-4A (ROOM 446)ELECTRICAL - NEW WORK6Scale: 3/8" = 1'-0"4'6'2'0FOURTH FLOOR CTR-4A (ROOM 446)MECHANICAL - NEW WORK5Scale: 3/8" = 1'-0"4'6'2'0 DESCRIPTIONMARK DATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 21, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Day 2026\CAD\11103-2026--T3-B.dwgFax: 585.424.4239115 METRO PARK ROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY DAY HALL - 2026 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2026754LP/ELJLBDPBMTR-BA PARTIALPLANS ANDKEYNOTESAMEP-BAPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTBASEMENT (ROOM B00UJ)ARCHITECTURAL - EXISTING / DEMO1Scale: 1/4" = 1'-0"04'8'2'BASEMENT MTR-BA (ROOM B00UJ)ARCHITECTURAL - NEW WORK4Scale: 1/4" = 1'-0"04'8'2'BASEMENT (ROOM B00UJ)MECHANICAL - EXISTING / REMOVALS2Scale: 1/4" = 1'-0"04'8'2'BASEMENT (ROOM B00UJ)ELECTRICAL - EXISTING / REMOVALS3Scale: 1/4" = 1'-0"04'8'2'BASEMENT MTR-BA (ROOM B00UJ)ELECTRICAL - NEW WORK7Scale: 1/4" = 1'-0"04'8'2'BASEMENT MTR-BA (ROOM B00UJ)MECHANICAL - NEW WORK5Scale: 1/4" = 1'-0"04'8'2'KEY PLANBASEMENT (ROOM BOOUD)MECHANICAL - NEW WORK6Scale: 1/4" = 1'-0"04'8'2' BASEMENT (ROOM B00UJ)ARCHITECTURAL - EXISTING / DEMO1Scale: 1/2" = 1'-0"02'4'1'BASEMENT ITR-BB (ROOM B09)ARCHITECTURAL - NEW WORK4Scale: 1/2" = 1'-0"02'4'1'BASEMENT (ROOM B00UJ)MECHANICAL - EXISTING / REMOVALS2Scale: 1/4" = 1'-0"04'8'2'BASEMENT (ROOM B00UJ)ELECTRICAL - EXISTING / REMOVALS3Scale: 1/2" = 1'-0"02'4'1'BASEMENT ITR-BB (ROOM B09)ELECTRICAL - NEW WORK7Scale: 1/2" = 1'-0"02'4'1'BASEMENT ITR-BB (ROOMS BOOUJ,B09)MECHANICAL - NEW WORK5Scale: 1/4" = 1'-0"04'8'2'DESCRIPTIONMARK DATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 21, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Day 2026\CAD\11103-2026--T3-B.dwgFax: 585.424.4239115 METRO PARK ROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY DAY HALL - 2026 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2026754LP/ELJLBDPBITR-BB PARTIALPLANS ANDKEYNOTESAMEP-BBPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTKEY PLANSECTION/ELEVATION VIEW6Scale: NOT TO SCALE02'4'1' ELECTRICAL SYMBOLS LEGEND4Scale: NONEMECHANICAL SYMBOLS LEGEND3Scale: NONEARCHITECTURAL SYMBOLS LEGEND2Scale: NONEABBREVIATIONS1Scale: NONEDESCRIPTIONMARK DATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARK ROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY DAY HALL - 2026 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2026754LP/ELJLBDPBGENERAL NOTES,SYMBOLS ANDABBREVIATIONS(AMEP SERIES)AMEP-GENPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECT THIRD FLOORSECOND FLOORFIRST FLOORBASEMENTFOURTH FLOORFIFTH FLOORTHIRD FLOORSECOND FLOORFIRST FLOORBASEMENTFOURTH FLOORFIFTH FLOORGENERAL NOTESSE RATEDNOTES:HINGED TRIM200% NEUTRALCOMPUTER GRADE FEED-THRU LUGSSUB FEED LUGSSUB-FEED BREAKERISOLATED GND BUSSE RATEDNOTES:HINGED TRIM200% NEUTRALCOMPUTER GRADE FEED-THRU LUGSSUB FEED LUGSSUB-FEED BREAKERISOLATED GND BUSDESCRIPTIONMARK DATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARK ROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY DAY HALL - 2026 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2026754LP/ELJLBDPBELECTRICAL DETAILSE4PSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTPOWER & GROUNDING SYSTEM RISER DIAGRAM2Scale: NONELIGHTING FIXTURE SCHEDULE3Scale: NONEELECTRICAL PANELBOARD SCHEDULES1Scale: NONETELECOMMUNICATIONS GROUND BAR (TMGB,TGB) DETAIL4Scale: NONE GENERAL NOTESDESCRIPTIONMARK DATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARK ROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY DAY HALL - 2026 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2026754LP/ELJLBDPBMECHANICALDETAILSM4PSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTCONCRETE ANCHOR DEVICE DETAIL3Scale: NONEPIPE HANGER4Scale: NONESQUARE OR RECTANGULAR ELBOW5Scale: NONENEW CHILLED WATER FAN COIL UNIT SCHEDULE8Scale: NONETWO-WAY CONTROL VALVECOIL PIPING DETAIL7Scale: NONETYPICAL COOLING COIL DRAIN6Scale: NONEFIRE RATED WALL PIPE PENETRATION2Scale: NONENON FIRE RATED WALL PIPE PENETRATION1Scale: NONE DESCRIPTIONMARK DATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARK ROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY DAY HALL - 2026 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2026754LP/ELJLBDPBAMEP-AREAS OFWORKT1-AMEPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTBASEMENT - AMEP AREAS OF WORK1Scale: 1/32" = 1'-0"FIRST FLOOR - AMEP AREAS OF WORK2Scale: 1/32" = 1'-0"SECOND FLOOR - AMEP AREAS OF WORK3Scale: 1/32" = 1'-0"THIRD FLOOR - AMEP AREAS OF WORK4Scale: 1/32" = 1'-0"FIFTH FLOOR - AMEP AREAS OF WORK6Scale: 1/32" = 1'-0"FOURTH FLOOR - AMEP AREAS OF WORK5Scale: 1/32" = 1'-0"032'64'16'032'64'16'032'64'16'032'64'16'032'64'16'032'64'16' THIRD FLOORSECOND FLOORFIRST FLOORBASEMENTFOURTH FLOORFIFTH FLOORTHIRD FLOORSECOND FLOORFIRST FLOORBASEMENTFOURTH FLOORFIFTH FLOORTHIRD FLOORSECOND FLOORFIRST FLOORBASEMENTFOURTH FLOORFIFTH FLOORTHIRD FLOORSECOND FLOORFIRST FLOORBASEMENTFOURTH FLOORFIFTH FLOORScale: NONECOPPER LOGICAL RISER DIAGRAM - NEW WORK2Scale: NONECOPPER LOGICAL RISER DIAGRAM - EXISTING / REMOVAL1DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY DAY HALL - 2026 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2026754LP/ELJLBDPBCOPPER LOGICALRISER DIAGRAMST1-CLPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECT THIRD FLOORSECOND FLOORFIRST FLOORBASEMENTFOURTH FLOORFIFTH FLOORTHIRD FLOORSECOND FLOORFIRST FLOORBASEMENTFOURTH FLOORFIFTH FLOORTHIRD FLOORSECOND FLOORFIRST FLOORBASEMENTFOURTH FLOORFIFTH FLOORTHIRD FLOORSECOND FLOORFIRST FLOORBASEMENTFOURTH FLOORFIFTH FLOORScale: NONEDATA LOGICAL RISER DIAGRAM - NEW WORK2Scale: NONEDATA LOGICAL RISER DIAGRAM - EXISTING / REMOVAL1DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY DAY HALL - 2026 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2026754LP/ELJLBDPBFIBER LOGICALRISER DIAGRAMST1-FLPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECT THIRD FLOORSECOND FLOORFIRST FLOORBASEMENTFOURTH FLOORFIFTH FLOORTHIRD FLOORSECOND FLOORFIRST FLOORBASEMENTFOURTH FLOORFIFTH FLOORTHIRD FLOORSECOND FLOORFIRST FLOORBASEMENTFOURTH FLOORFIFTH FLOORTHIRD FLOORSECOND FLOORFIRST FLOORBASEMENTFOURTH FLOORFIFTH FLOORScale: NONEPATHWAY LOGICAL RISER DIAGRAM - NEW WORK2Scale: NONEPATHWAY LOGICAL RISER DIAGRAM - EXISTING / REMOVAL1DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY DAY HALL - 2026 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2026754LP/ELJLBDPBPATHWAYS LOGICALRISER DIAGRAMST1-PLPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECT THIRD FLOORSECOND FLOORFIRST FLOORTHIRD FLOORSECOND FLOORFIRST FLOORBASEMENTBASEMENTFOURTH FLOORFOURTH FLOORFIFTH FLOORFIFTH FLOORTR SERVING ZONES - BUILDING SECTION VIEW7Scale: NONEBASEMENT - TR SERVING ZONE PLAN1Scale: 1/32" = 1'-0"DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY DAY HALL - 2026 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2026754LP/ELJLBDPBTR SERVING ZONES,PLAN VIEWS ANDBLDG. SECTIONVIEWT1-SZPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTFIRST FLOOR - TR SERVING ZONE PLAN2Scale: 1/32" = 1'-0"SECOND FLOOR - TR SERVING ZONE PLAN3Scale: 1/32" = 1'-0"THIRD FLOOR - TR SERVING ZONE PLAN4Scale: 1/32" = 1'-0"FIFTH FLOOR - TR SERVING ZONE PLAN6Scale: 1/32" = 1'-0"FOURTH FLOOR - TR SERVING ZONE PLAN5Scale: 1/32" = 1'-0"032'64'16'032'64'16'032'64'16'032'64'16'032'64'16'032'64'16' KEY PLANFIRST FLOOR - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 1/8" = 1'-0"08'16'4'DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Day 2026\CAD\11103-2026--T2-1.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY DAY HALL - 2026 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2026754LP/ELJLBDPBFIRST FLOORPATHWAYS ANDCABLINGT2-1.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTEXISTING OUTLET NOTE KEY KEY PLANSECOND FLOOR - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 1/8" = 1'-0"08'16'4'DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Day 2026\CAD\11103-2026--T2-2.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY DAY HALL - 2026 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2026754LP/ELJLBDPBSECOND FLOORPATHWAYS ANDCABLINGT2-2.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTEXISTING OUTLET NOTE KEY KEY PLANTHIRD FLOOR - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 1/8" = 1'-0"08'16'4'DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Day 2026\CAD\11103-2026--T2-3.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY DAY HALL - 2026 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2026754LP/ELJLBDPBTHIRD FLOORPATHWAYS ANDCABLINGT2-3.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTEXISTING OUTLET NOTE KEY KEY PLANFOURTH FLOOR - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 1/8" = 1'-0"08'16'4'DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Day 2026\CAD\11103-2026--T2-4.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY DAY HALL - 2026 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2026754LP/ELJLBDPBFOURTH FLOORPATHWAYS ANDCABLINGT2-4.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTEXISTING OUTLET NOTE KEY KEY PLANFIFTH FLOOR - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 1/8" = 1'-0"08'16'4'DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Day 2026\CAD\11103-2026--T2-5.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY DAY HALL - 2026 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2026754LP/ELJLBDPBFIFTH FLOORPATHWAYS ANDCABLINGT2-5.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTEXISTING OUTLET NOTE KEY KEY PLANBASEMENT - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 1/8" = 1'-0"08'16'4'DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Day 2026\CAD\11103-2026--T2-B.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY DAY HALL - 2026 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2026754LP/ELJLBDPBBASEMENTPATHWAYS ANDCABLINGT2-B.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTEXISTING OUTLET NOTE KEY KEY PLANDESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Day 2026\CAD\11103-2026--T3-4.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY DAY HALL - 2026 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2026754LP/ELJLBDPBCTR-4A ENLARGEDPLANS ANDELEVATIONST3-4APSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTFOURTH FLOOR (ROOM 446)TELECOM EQUIPMENT PLAN - EXISTING / REMOVALS1Scale: 3/8" = 1'-0"4'6'2'0FOURTH FLOOR CTR-4A (ROOM 446)TELECOM EQUIPMENT PLAN - NEW WORK2Scale: 3/8" = 1'-0"4'6'2'001'2'1/2'FOURTH FLOOR CTR-4A (ROOM 446)RACK ELEVATION - NEW WORK4Scale: 1" = 1'-0"FOURTH FLOOR CTR-4AFIBER HOUSING (ETR) DETAIL5Scale: NONE01'2'1/2'FOURTH FLOOR CTR-4A (ROOM 446)RACK ELEVATION - NEW WORK3Scale: 1" = 1'-0" KEY PLANDESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Day 2026\CAD\11103-2026--T3-B.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY DAY HALL - 2026 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2026754LP/ELJLBDPBMTR-BA ENLARGEDPLANS ANDELEVATIONST3-BAPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTBASEMENT MTR-BA (ROOM B53)TELECOM EQUIPMENT PLAN - NEW WORK1Scale: 1/4" = 1'-0"04'8'2'01'2'1/2'BASEMENT - MTR-BA (ROOM B53)BACKBOARD ELEVATION - NEW WORK3Scale: 1" = 1'-0"01'2'1/2'BASEMENT MTR-BA (ROOM B53) RACK ELEVATION - NEW WORK2Scale: 1" = 1'-0"BASEMENT MTR-BA (RACK 1)FIBER HOUSING (ERL) DETAIL4Scale: NONE KEY PLANDESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Day 2026\CAD\11103-2026--T3-B.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY DAY HALL - 2026 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2026754LP/ELJLBDPBBDF ROOM B53-DEMOLITIONT3-BA.DPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTBASEMENT (ROOM B53)TELECOM EQUIPMENT PLAN - EXISTING / REMOVALS1Scale: 1/4" = 1'-0"04'8'2'01'2'1/2'BASEMENT - ROOM B53BACKBOARD ELEVATION - EXISTING / REMOVALS3Scale: 1" = 1'-0"01'2'1/2'BASEMENT MTR-#A (ROOM B53) RACK ELEVATION2Scale: 1" = 1'-0"BASEMENT MTR-#A (RACK 2)FIBER HOUSING (ERL) DETAIL4Scale: NONE KEY PLANDESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Day 2026\CAD\11103-2026--T3-B.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY DAY HALL - 2026 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2026754LP/ELJLBDPBITR-BB ENLARGEDPLANS ANDELEVATIONST3-BBPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTBASEMENT - (ROOM B00UJ)TELECOM EQUIPMENT PLAN - EXISTING / REMOVALS1Scale: 1/2" = 1'-0"02'4'1'BASEMENT - ITR-BB (ROOM B09)TELECOM EQUIPMENT PLAN - NEW WORK2Scale: 1/2" = 1'-0"02'4'1'01'2'1/2'BASEMENT - ROOM B00UJBACKBOARD ELEVATION - EXISTING / REMOVALS5Scale: 1" = 1'-0"01'2'1/2'BASEMENT ITR-BB (ROOM B09) RACK ELEVATION - NEW WORK4Scale: 1" = 1'-0"BASEMENT ITR-BB (RACK 1)FIBER HOUSING (ERL) DETAIL6Scale: NONE01'2'1/2'BASEMENT ITR-BB (ROOM B00UJ) RACK ELEVATION -EXISTING REMOVALS3Scale: 1" = 1'-0" PROJECT SITE PLANDRAWING INDEXCORNELL UNIVERSITYNETWORK CONNECTIVITY PROJECTDAY HALL - 2026DRAWINGDESCRIPTIONT-COVERDRAWING INDEX AND PROJECT SITE PLANT-GENSTANDARD SYMBOLS, NOTES, ABBREVIATIONS (T-SERIES)T1T1-SZTR SERVING ZONES, PLAN VIEWS AND BLDG. SECTION VIEWT1-PLPATHWAYS LOGICAL RISER DIAGRAMST1-CLCOPPER LOGICAL RISER DIAGRAMST1-FLFIBER LOGICAL RISER DIAGRAMST2T2-B.CA_CPBASEMENT PATHWAYS AND CABLINGT2-1.CA_CPFIRST FLOOR PATHWAYS AND CABLINGT2-2.CA_CPSECOND FLOOR PATHWAYS AND CABLINGT2-3.CA_CPTHIRD FLOOR PATHWAYS AND CABLINGT2-4.CA_CPFOURTH FLOOR PATHWAYS AND CABLINGT2-5.CA_CPFIFTH FLOOR PATHWAYS AND CABLINGT3T3-BAMTR-BA ENLARGED PLANS AND ELEVATIONST3-BA.DBDF ROOM B53 -DEMOLITIONT3-BBITR-BB ENLARGED PLANS AND ELEVATIONST3-4ACTR-4A ENLARGED PLANS AND ELEVATIONSAMEPAMEP-GENGENERAL NOTES, SYMBOLS AND ABBREVIATIONS (AMEP SERIES)T1-AMEPAMEP-AREAS OF WORKAMEP-BAMTR-BA PARTIAL PLANS AND KEYNOTESAMEP-BBITR-BB PARTIAL PLANS AND KEYNOTESAMEP-4ACTR-4A PARTIAL PLANS AND KEYNOTESA4ARCHITECTURAL DETAILSM4MECHANICAL DETAILSE4ELECTRICAL DETAILSDESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Day 2026\CAD\11103-2026--T-COVER.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY DAY HALL - 2026 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2026754LP/ELJLBDPBDRAWING INDEXAND PROJECT SITEPLANT-COVERPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECT CEILING SCHEDULEACCESS CONTROL SYMBOLS LEGENDGENERAL PROJECT NOTESGENERAL REMOVAL NOTESGENERAL DRAWING NOTES-EXISTING CONDITIONS/REMOVALS-GENERAL NEW WORK NOTESGENERAL DRAWING NOTES-HORIZONTAL CABLING-GENERAL DRAWING NOTES-PATHWAYS-GENERAL DRAWING NOTES-PATHWAYS-ABBREVIATIONS TELECOM SYMBOLS LEGEND (REV. 02/12)NEW / EXISTING OUTLET SUBSCRIPT KEYNEW PATHWAY TYPE KEYOUTLET DESCRIPTOR KEYEXISTING OUTLET NOTE KEYCABLING SYMBOLS LEGENDDESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY DAY HALL - 2026 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2026754LP/ELJLBDPBSTANDARDSYMBOLS, NOTES,ABBREVIATIONS(T-SERIES)T-GENPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECT3$7+:$<6&+('8/(1(::25.&$%/(),//%$6('21&$%/(2'¸ 0.24DESIGNATIONDESCRIPTIONMANUFACTURERPART NO.APPROXIMATEOUTSIDEDIMENSIONAPPROXIMATEINSIDEDIMENSIONCABLE FILL&$3$&,7<¸MIN. BENDRADIUS&ʵCONDUITSEE SPEC. SECTION 27 05 28.75" DIA.44.5"1" C1" DIA.76"1.25" C1.25" DIA.137.5"1.5" C1.5" DIA.189"2" C2" DIA.2912"2.5" C2.5" DIA.5125"3" C3" DIA.7830"4" C4" DIA.13040"SR-1NOT USEDSR-2 **SURFACE RACEWAYSEE SPEC. SECTION27 05 282400 SERIESSEE SPEC. SECTION 27 05 2812SR-3 **SURFACE RACEWAY3000 SERIES32SR-4 **SURFACE RACEWAY4000 SERIES63SR-4D **SURFACE RACEWAY(DIVIDED)4000D SERIES30SR-5 **SURFACE RACEWAY5400 SERIES32SR-6 **SURFACE RACEWAY6000 SERIES140SR-6D **SURFACE RACEWAY(DIVIDED)6000D SERIES63SR-7SURFACE RACEWAY700 SERIES2CT-AWIRE MESH TRAYSEE SPEC. SECTION 27 05 284"x6"211CT-B2"x12"211CT-C2"x18"316CT-D2"x24"419CT-E4"x12"419CT-F4"x18"632CT-G4"x24"844CT-WENCLOSED TRAYETR3"x8"211CT-X6"X6"316CT-Y3"X12"316CT-Z4"X12"419127(6¸0$;,080),//)25&$7(*25<,1',&$7('3(57,$(,$$ - CAT6A CABLING HAS AN OD OF 0.285.5('8&(),//5$7,2%<)25($&+%(1' - ENSURE THAT FILL RATIOS ARE NOT EXCEEDEDʵ&21'8,76+$//21/<%($//2:('$663(&,),&$//<127('21'5$:,1*6 ** REDUCE CAPACITY BY 50% FOR THE FOLLOWING CONDITIONS: - WHEN CONNECTORS ARE MOUNTED WITHIN RACEWAY - WHEN NON-RADIUS FITTINGS RESTRICT CROSS-SECTIONAL AREA - WHEN RACEWAY IS DIVIDED AND SHARED WITH ELECTRICALTER EXISTING SURFACE RACEWAY TO PROVIDE AT LEAST TWO 16"SECTIONS OF REMOVABLE COVERS TO ALLOW CABLE ROUGH-IN WITHOUTCONFLICT WITH EXISTING FURNITURE CONFIGURATIONS. ALSO REFER TOGENERAL NOTE "Z" ON T-GEN DRAWING FOR ADDITIONAL SCOPE FORSURFACE RACEWAYS.WHERE REQUIRED BY RACEWAY CAPACITY, OR AS DIRECTED, PROVIDESURFACE MOUNT EXTENSION BOX ON EXISTING RACEWAY OPENING TOPROVIDE ADEQUATE CAPACITY AND BEND RADIUS. ALSO REFER TORACEWAY DERATING REQUIREMENTS AT LEFT.WHERE REQUIRED BY RACEWAY CAPACITY, OR AS DIRECTED, PROVIDERETROFIT ENTRANCE END FITTING OR ALTER EXISTING BACKFED CONDUITWITH A NEW SPACE SAVER CONNECTOR TO PROVIDE ADEQUATE CAPACITYAND BEND RADIUS FOR NEW CABLING. ALSO REFER TO RACEWAYDERATING REQUIREMENTS AT LEFT. FIELD VERIFY EXISTING CONDITIONSAND PROPOSE ALTERATIONS THAT MINIMIZE SERVICE DISRUPTIONDURATION. PROVIDE ALL TEMPORARY PROVISIONS TO MAINTAIN EXISTINGSERVICES.CONDUIT AND CABLE TRAY TO BE ROUTED CONCEALED UNLESSOTHERWISE NOTED.