Loading...
HomeMy WebLinkAbout20120629_Caldwell_Hall_CD_CombinedPROJECT SITE PLANDRAWING INDEXCORNELL UNIVERSITYNETWORK CONNECTIVITY PROJECTCALDWELL HALL - 1025DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Caldwell 1025\CAD\11103-1025--T-COVER.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY CALDWELL HALL - 1025 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-1025754LP/EL/PKBGHSJLBDRAWING INDEXAND PROJECT SITEPLANT-COVERPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTDRAWINGDESCRIPTIONT-COVERDRAWING INDEX AND PROJECT SITE PLANT-GENSTANDARD SYMBOLS, NOTES, ABBREVIATIONS (T-SERIES)T1T1-SZTR SERVING ZONES, PLAN VIEWS AND BLDG. SECTION VIEWT1-PLPATHWAYS LOGICAL RISER DIAGRAMST1-CLCOPPER LOGICAL RISER DIAGRAMST1-FLFIBER LOGICAL RISER DIAGRAMST2T2-B.CA_CPBASEMENT PATHWAYS AND CABLINGT2-1.CA_CPFIRST FLOOR PATHWAYS AND CABLINGT2-2.CA_CPSECOND FLOOR PATHWAYS AND CABLINGT2-3.CA_CPTHIRD FLOOR PATHWAYS AND CABLINGT2-4.CA_CPFOURTH FLOOR PATHWAYS AND CABLINGT2-5.CA_CPATTIC PATHWAYS AND CABLINGT3T3-BAMTR-BA ENLARGED PLANS AND ELEVATIONSAMEPAMEP-GENGENERAL NOTES, SYMBOLS AND ABBREVIATIONS (AMEP SERIES)T1-AMEPAMEP-AREAS OF WORKAMEP-BAMTR-BA PARTIAL PLANS AND KEYNOTESA4ARCHITECTURAL DETAILSM4MECHANICAL DETAILSE4ELECTRICAL DETAILS CEILING SCHEDULEACCESS CONTROL SYMBOLS LEGENDGENERAL PROJECT NOTESGENERAL REMOVAL NOTESGENERAL DRAWING NOTES-EXISTING CONDITIONS/REMOVALS-GENERAL NEW WORK NOTESGENERAL DRAWING NOTES-HORIZONTAL CABLING-GENERAL DRAWING NOTES-PATHWAYS-GENERAL DRAWING NOTES-PATHWAYS-ABBREVIATIONS TELECOM SYMBOLS LEGEND (REV. 02/12)NEW / EXISTING OUTLET SUBSCRIPT KEYNEW PATHWAY TYPE KEYOUTLET DESCRIPTOR KEYEXISTING OUTLET NOTE KEYCABLING SYMBOLS LEGENDDESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY CALDWELL HALL - 1025 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-1025754LP/EL/PKBGHSJLBSTANDARDSYMBOLS, NOTES,ABBREVIATIONS(T-SERIES)T-GENPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECT3$7+:$<6&+('8/(1(::25.&$%/(),//%$6('21&$%/(2'¸ 0.24DESIGNATIONDESCRIPTIONMANUFACTURERPART NO.APPROXIMATEOUTSIDEDIMENSIONAPPROXIMATEINSIDEDIMENSIONCABLE FILL&$3$&,7<¸MIN. BENDRADIUS&ʵCONDUITSEE SPEC. SECTION 27 05 28.75" DIA.44.5"1" C1" DIA.76"1.25" C1.25" DIA.137.5"1.5" C1.5" DIA.189"2" C2" DIA.2912"2.5" C2.5" DIA.5125"3" C3" DIA.7830"4" C4" DIA.13040"SR-1NOT USEDSR-2 **SURFACE RACEWAYSEE SPEC. SECTION27 05 282400 SERIESSEE SPEC. SECTION 27 05 2812SR-3 **SURFACE RACEWAY3000 SERIES32SR-4 **SURFACE RACEWAY4000 SERIES63SR-4D **SURFACE RACEWAY(DIVIDED)4000D SERIES30SR-5 **SURFACE RACEWAY5400 SERIES32SR-6 **SURFACE RACEWAY6000 SERIES140SR-6D **SURFACE RACEWAY(DIVIDED)6000D SERIES63SR-7SURFACE RACEWAY700 SERIES2CT-AWIRE DUCTNOT USED2"x6"106CT-B2"x12"211CT-C2"x18"316CT-D2"x24"419CT-E4"x12"419CT-F4"x18"632CT-G4"x24"844CT-H6"x6"318CT-IENCLOSED TRAY6"x6"318CT-J4"x6"212CT-K4"X9"318127(6¸0$;,080),//)25&$7(*25<,1',&$7(' 3(57,$(,$$  - CAT6A CABLING HAS AN OD OF 0.285.5('8&(),//5$7,2%<)25($&+ƒ%(1' - ENSURE THAT FILL RATIOS ARE NOT EXCEEDEDʵ&21'8,76+$//21/<%($//2:('$663(&,),&$//<127('21'5$:,1*6 ** REDUCE CAPACITY BY 50% FOR THE FOLLOWING CONDITIONS: - WHEN CONNECTORS ARE MOUNTED WITHIN RACEWAY - WHEN NON-RADIUS FITTINGS RESTRICT CROSS-SECTIONAL AREA - WHEN RACEWAY IS DIVIDED AND SHARED WITH ELECTRICALTER EXISTING SURFACE RACEWAY TO PROVIDE AT LEAST TWO 16"SECTIONS OF REMOVABLE COVERS TO ALLOW CABLE ROUGH-IN WITHOUTCONFLICT WITH EXISTING FURNITURE CONFIGURATIONS. ALSO REFER TOGENERAL NOTE "Z" ON T-GEN DRAWING FOR ADDITIONAL SCOPE FORSURFACE RACEWAYS.WHERE REQUIRED BY RACEWAY CAPACITY, OR AS DIRECTED, PROVIDESURFACE MOUNT EXTENSION BOX ON EXISTING RACEWAY OPENING TOPROVIDE ADEQUATE CAPACITY AND BEND RADIUS. ALSO REFER TORACEWAY DERATING REQUIREMENTS AT LEFT.WHERE REQUIRED BY RACEWAY CAPACITY, OR AS DIRECTED, PROVIDERETROFIT ENTRANCE END FITTING OR ALTER EXISTING BACKFED CONDUITWITH A NEW SPACE SAVER CONNECTOR TO PROVIDE ADEQUATE CAPACITYAND BEND RADIUS FOR NEW CABLING. ALSO REFER TO RACEWAYDERATING REQUIREMENTS AT LEFT. FIELD VERIFY EXISTING CONDITIONSAND PROPOSE ALTERATIONS THAT MINIMIZE SERVICE DISRUPTIONDURATION. PROVIDE ALL TEMPORARY PROVISIONS TO MAINTAIN EXISTINGSERVICES.CONDUIT AND CABLE TRAY TO BE ROUTED CONCEALED UNLESSOTHERWISE NOTED. THIRD FLOORSECOND FLOORFIRST FLOORTHIRD FLOORSECOND FLOORFIRST FLOORBASEMENTBASEMENTFOURTH FLOORFOURTH FLOORATTIC FLOORATTIC FLOORTR SERVING ZONES - BUILDING SECTION VIEW6Scale: NONEFIRST FLOOR - TR SERVING ZONE PLAN2Scale: 1/16" = 1'-0"BASEMENT - TR SERVING ZONE PLAN1Scale: 1/16" = 1'-0"SECOND FLOOR - TR SERVING ZONE PLAN3Scale: 1/16" = 1'-0"DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY CALDWELL HALL - 1025 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-1025754LP/EL/PKBGHSJLBTR SERVING ZONES,PLAN VIEWS ANDBLDG. SECTIONVIEWT1-SZPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTTHIRD FLOOR - TR SERVING ZONE PLAN4Scale: 1/16" = 1'-0"FOURTH FLOOR - TR SERVING ZONE PLAN5Scale: 1/16" = 1'-0"016'32'8'016'32'8'016'32'8'016'32'8'016'32'8'ATTIC FLOOR - TR SERVING ZONE PLAN5Scale: 1/16" = 1'-0"016'32'8' THIRD FLOORSECOND FLOORFIRST FLOORTHIRD FLOORSECOND FLOORFIRST FLOORBASEMENTBASEMENTFOURTH FLOORFOURTH FLOORATTICATTICTHIRD FLOORSECOND FLOORFIRST FLOORTHIRD FLOORSECOND FLOORFIRST FLOORBASEMENTBASEMENTFOURTH FLOORFOURTH FLOORATTICATTICScale: NONEPATHWAY LOGICAL RISER DIAGRAM - NEW WORK2Scale: NONEPATHWAY LOGICAL RISER DIAGRAM - EXISTING / REMOVAL1DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY CALDWELL HALL - 1025 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-1025754LP/EL/PKBGHSJLBPATHWAYS LOGICALRISER DIAGRAMST1-PLPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECT THIRD FLOORSECOND FLOORFIRST FLOORTHIRD FLOORSECOND FLOORFIRST FLOORBASEMENTBASEMENTFOURTH FLOORFOURTH FLOORATTICATTIC222THIRD FLOORSECOND FLOORFIRST FLOORTHIRD FLOORSECOND FLOORFIRST FLOORBASEMENTBASEMENTFOURTH FLOORFOURTH FLOORATTICATTICScale: NONECOPPER LOGICAL RISER DIAGRAM - NEW WORK2Scale: NONECOPPER LOGICAL RISER DIAGRAM - EXISTING / REMOVAL1DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY CALDWELL HALL - 1025 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-1025754LP/EL/PKBGHSJLBCOPPER LOGICALRISER DIAGRAMST1-CLPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECT THIRD FLOORSECOND FLOORFIRST FLOORTHIRD FLOORSECOND FLOORFIRST FLOORBASEMENTBASEMENTFOURTH FLOORFOURTH FLOORATTICATTIC1Scale: NONEFIBER LOGICAL RISER DIAGRAM - EXISTING / REMOVAL1DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY CALDWELL HALL - 1025 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-1025754LP/EL/PKBGHSJLBFIBER LOGICALRISER DIAGRAMST1-FLPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECT KEY PLANBASEMENT - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 3/16" = 1'-0"8'12'4'0DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Caldwell 1025\CAD\11103-1025--T2-B.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY CALDWELL HALL - 1025 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-1025754LP/EL/PKBGHSJLBBASEMENTPATHWAYS ANDCABLINGT2-B.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTEXISTING OUTLET NOTE KEY KEY PLANFIRST FLOOR - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 3/16" = 1'-0"8'12'4'0DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Caldwell 1025\CAD\11103-1025--T2-1.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY CALDWELL HALL - 1025 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-1025754LP/EL/PKBGHSJLBFIRST FLOORPATHWAYS ANDCABLINGT2-1.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTEXISTING OUTLET NOTE KEY KEY PLANSECOND FLOOR - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 3/16" = 1'-0"8'12'4'0DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Caldwell 1025\CAD\11103-1025--T2-2.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY CALDWELL HALL - 1025 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-1025754LP/EL/PKBGHSJLBSECOND FLOORPATHWAYS ANDCABLINGT2-2.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTEXISTING OUTLET NOTE KEY KEY PLANTHIRD FLOOR - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 3/16" = 1'-0"8'12'4'0DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Caldwell 1025\CAD\11103-1025--T2-3.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY CALDWELL HALL - 1025 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-1025754LP/EL/PKBGHSJLBTHIRD FLOORPATHWAYS ANDCABLINGT2-3.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTEXISTING OUTLET NOTE KEY KEY PLANFOURTH FLOOR - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 3/16" = 1'-0"8'12'4'0DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Caldwell 1025\CAD\11103-1025--T2-4.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY CALDWELL HALL - 1025 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-1025754LP/EL/PKBGHSJLBFOURTH FLOORPATHWAYS ANDCABLINGT2-4.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTEXISTING OUTLET NOTE KEY KEY PLANATTIC - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 3/16" = 1'-0"8'12'4'0DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Caldwell 1025\CAD\11103-1025--T2-5.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY CALDWELL HALL - 1025 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-1025754LP/EL/PKBGHSJLBATTIC PATHWAYSAND CABLINGT2-5.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTEXISTING OUTLET NOTE KEY KEY PLANDESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Caldwell 1025\CAD\11103-1025--T3-B.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY CALDWELL HALL - 1025 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-1025754LP/EL/PKBGHSJLBMTR-BA ENLARGEDPLANS ANDELEVATIONST3-BAPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTBASEMENT - ROOM B01ATELECOM EQUIPMENT PLAN - EXISTING / REMOVALS1Scale: 3/8" = 1'-0"4'6'2'0BASEMENT - MTR-BA (ROOM B02A)TELECOM EQUIPMENT PLAN - NEW WORK2Scale: 3/8" = 1'-0"4'6'2'001'2'1/2'BASEMENT - ROOM B01ABACKBOARD ELEVATION - EXISTING / REMOVALS5Scale: 1" = 1'-0"01'2'1/2'BASEMENT MTR-BA (ROOM B02A) RACK ELEVATIONS - NEW WORK4Scale: 1" = 1'-0"BASEMENT MTR-BA (RACK 1)FIBER HOUSING DETAIL7Scale: NONEBASEMENT MTR-BA (ROOM B02A)BACKBOARD ELEVATION - NEW WORK6Scale: 1" = 1'-0"01'2'1/2'01'2'1/2'BASEMENT MTR-BA (ROOM B01A)RACK ELEVATION - EXISTING\REMOVALS3Scale: 1" = 1'-0"6"4 PLACES(ERL)(ERL)(ERL)1'-6" 6'-0"3'-6"3'-6"6'-7"13'-4" DESCRIPTIONMARK DATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARK ROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY CALDWELL HALL - 1025 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-1025754LP/EL/PKBGHSJLBGENERAL NOTES,SYMBOLS ANDABBREVIATIONS(AMEP SERIES)AMEP-GENPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTELECTRICAL SYMBOLS LEGEND4Scale: NONEMECHANICAL SYMBOLS LEGEND3Scale: NONEARCHITECTURAL SYMBOLS LEGEND2Scale: NONEABBREVIATIONS1Scale: NONE DESCRIPTIONMARK DATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARK ROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY CALDWELL HALL - 1025 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-1025754LP/EL/PKBGHSJLBAMEP-AREAS OFWORKT1-AMEPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTFIRST FLOOR - AMEP AREAS OF WORK2Scale: 1/16" = 1'-0"BASEMENT - AMEP AREAS OF WORK1Scale: 1/16" = 1'-0"SECOND FLOOR - AMEP AREAS OF WORK3Scale: 1/16" = 1'-0"THIRD FLOOR - AMEP AREAS OF WORK4Scale: 1/16" = 1'-0"FOURTH FLOOR - AMEP AREAS OF WORK5Scale: 1/16" = 1'-0"016'32'8'016'32'8'016'32'8'016'32'8'016'32'8'FIFTH FLOOR - AMEP AREAS OF WORK6Scale: 1/16" = 1'-0"016'32'8' DESCRIPTIONMARK DATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 19, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Caldwell 1025\CAD\11103-1025--T3-B.dwgFax: 585.424.4239115 METRO PARK ROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY CALDWELL HALL - 1025 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-1025754LP/EL/PKBGHSJLBMTR-BA PARTIALPLANS ANDKEYNOTESAMEP-BAPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTBASEMENT (ROOM B02) ARCHITECTURAL - EXISTING / DEMO1Scale: 3/16" = 1'-0"8'12'4'0BASEMENT MTR-BA (ROOM B02A) ARCHITECTURAL - NEW WORK4Scale: 3/16" = 1'-0"8'12'4'0BASEMENT MECHANICAL - EXISTING / REMOVALS2Scale: 3/16" = 1'-0"8'12'4'0BASEMENT (ROOM B02) ELECTRICAL - EXISTING / REMOVALS3Scale: 3/16" = 1'-0"8'12'4'0BASEMENT MTR-BA (ROOM B02A) ELECTRICAL - NEW WORK6Scale: 3/16" = 1'-0"8'12'4'0BASEMENT MTR-BA RELATED MECHANICAL - NEW WORK5Scale: 3/16" = 1'-0"8'12'4'0KEY PLAN HEAD TYPESJAMB TYPESGENERAL NOTESALLOW SPACE FOR 4" CONDUIT PENETRATION DESCRIPTIONMARK DATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARK ROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY CALDWELL HALL - 1025 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-1025754LP/EL/PKBGHSJLBARCHITECTURALDETAILSA4PSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTSOFFIT DETAIL3Scale: 1" =1' -0"JAMB AND HEAD TYPES1Scale: NONENOT USED2Scale: NONEDETAIL FOR CLOSING OFFEND OF CHASE AT ATTIC4Scale: 3" =1' -0"FIRE RATED ACCESS DOOR5Scale: 3" =1' -0"METAL STUD FRAME DETAIL6Scale: 1" =1' -0"BASEMENT FLOOR PLAN ENLARGEMENTCHASE - ACCESS PANEL7Scale: 1/4" = 1'-0"FIRST FLOOR PLAN ENLARGEMENTCHASE - ACCESS PANEL8Scale: 1/4" = 1'-0"SECOND FLOOR PLAN ENLARGEMENTCHASE - ACCESS PANEL9Scale: 1/4" = 1'-0"THIRD FLOOR PLAN ENLARGEMENTCHASE - ACCESS PANEL10Scale: 1/4" = 1'-0"FOURTH FLOOR PLAN ENLARGEMENTCHASE - ACCESS PANEL11Scale: 1/4" = 1'-0"FIFTH FLOOR PLAN ENLARGEMENTCHASE - ACCESS PANEL12Scale: 1/8" = 1'-0" GENERAL NOTESDESCRIPTIONMARK DATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARK ROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY CALDWELL HALL - 1025 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-1025754LP/EL/PKBGHSJLBMECHANICALDETAILSM4PSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTCONCRETE ANCHOR DEVICE DETAIL3Scale: NONEDUCTWORK TAKEOFF2Scale: NONEPIPE HANGER4Scale: NONESQUARE OR RECTANGULAR ELBOW5Scale: NONENON-FIRE RATED WALL PENETRATION DETAIL1Scale: NONETYPICAL COOLING COIL DRAIN7Scale: NONEIN LINE PUMP DETAIL6Scale: NONENEW CHILLED WATER FAN COIL UNIT SCHEDULE8Scale: NONEPUMP SCHEDULE9Scale: NONE THIRD FLOORSECOND FLOORFIRST FLOORTHIRD FLOORSECOND FLOORFIRST FLOORBASEMENTBASEMENTFOURTH FLOORFOURTH FLOORGENERAL NOTESSE RATEDNOTES:HINGED TRIM200% NEUTRALCOMPUTER GRADE FEED-THRU LUGSSUB FEED LUGSSUB-FEED BREAKERISOLATED GND BUSDESCRIPTIONMARK DATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARK ROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY CALDWELL HALL - 1025 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-1025754LP/EL/PKBGHSJLBELECTRICAL DETAILSE4PSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTPOWER & GROUNDING SYSTEM RISER DIAGRAM2Scale: NONELIGHTING FIXTURE SCHEDULE3Scale: NONEELECTRICAL PANELBOARD SCHEDULES1Scale: NONETELECOMMUNICATIONS GROUND BAR (TMGB, TGB) DETAIL4Scale: NONE HEAD TYPESJAMB TYPESGENERAL NOTESALLOW SPACE FOR 4" CONDUIT PENETRATION DESCRIPTIONMARK DATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARK ROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY CALDWELL HALL - 1025 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-1025754LP/EL/PKBGHSJLBARCHITECTURALDETAILSA4PSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTSOFFIT DETAIL3Scale: 1" =1' -0"JAMB AND HEAD TYPES1Scale: NONENOT USED2Scale: NONEDETAIL FOR CLOSING OFFEND OF CHASE AT ATTIC4Scale: 3" =1' -0"FIRE RATED ACCESS DOOR5Scale: 3" =1' -0"METAL STUD FRAME DETAIL6Scale: 1" =1' -0"BASEMENT FLOOR PLAN ENLARGEMENTCHASE - ACCESS PANEL7Scale: 1/4" = 1'-0"FIRST FLOOR PLAN ENLARGEMENTCHASE - ACCESS PANEL8Scale: 1/4" = 1'-0"SECOND FLOOR PLAN ENLARGEMENTCHASE - ACCESS PANEL9Scale: 1/4" = 1'-0"THIRD FLOOR PLAN ENLARGEMENTCHASE - ACCESS PANEL10Scale: 1/4" = 1'-0"FOURTH FLOOR PLAN ENLARGEMENTCHASE - ACCESS PANEL11Scale: 1/4" = 1'-0"FIFTH FLOOR PLAN ENLARGEMENTCHASE - ACCESS PANEL12Scale: 1/8" = 1'-0" DESCRIPTIONMARK DATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 19, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Caldwell 1025\CAD\11103-1025--T3-B.dwgFax: 585.424.4239115 METRO PARK ROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY CALDWELL HALL - 1025 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-1025754LP/EL/PKBGHSJLBMTR-BA PARTIALPLANS ANDKEYNOTESAMEP-BAPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTBASEMENT (ROOM B02) ARCHITECTURAL - EXISTING / DEMO1Scale: 3/16" = 1'-0"8'12'4'0BASEMENT MTR-BA (ROOM B02A) ARCHITECTURAL - NEW WORK4Scale: 3/16" = 1'-0"8'12'4'0BASEMENT MECHANICAL - EXISTING / REMOVALS2Scale: 3/16" = 1'-0"8'12'4'0BASEMENT (ROOM B02) ELECTRICAL - EXISTING / REMOVALS3Scale: 3/16" = 1'-0"8'12'4'0BASEMENT MTR-BA (ROOM B02A) ELECTRICAL - NEW WORK6Scale: 3/16" = 1'-0"8'12'4'0BASEMENT MTR-BA RELATED MECHANICAL - NEW WORK5Scale: 3/16" = 1'-0"8'12'4'0KEY PLAN DESCRIPTIONMARK DATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARK ROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY CALDWELL HALL - 1025 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-1025754LP/EL/PKBGHSJLBGENERAL NOTES,SYMBOLS ANDABBREVIATIONS(AMEP SERIES)AMEP-GENPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTELECTRICAL SYMBOLS LEGEND4Scale: NONEMECHANICAL SYMBOLS LEGEND3Scale: NONEARCHITECTURAL SYMBOLS LEGEND2Scale: NONEABBREVIATIONS1Scale: NONE THIRD FLOORSECOND FLOORFIRST FLOORTHIRD FLOORSECOND FLOORFIRST FLOORBASEMENTBASEMENTFOURTH FLOORFOURTH FLOORGENERAL NOTESSE RATEDNOTES:HINGED TRIM200% NEUTRALCOMPUTER GRADE FEED-THRU LUGSSUB FEED LUGSSUB-FEED BREAKERISOLATED GND BUSDESCRIPTIONMARK DATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARK ROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY CALDWELL HALL - 1025 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-1025754LP/EL/PKBGHSJLBELECTRICAL DETAILSE4PSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTPOWER & GROUNDING SYSTEM RISER DIAGRAM2Scale: NONELIGHTING FIXTURE SCHEDULE3Scale: NONEELECTRICAL PANELBOARD SCHEDULES1Scale: NONETELECOMMUNICATIONS GROUND BAR (TMGB, TGB) DETAIL4Scale: NONE GENERAL NOTESDESCRIPTIONMARK DATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARK ROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY CALDWELL HALL - 1025 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-1025754LP/EL/PKBGHSJLBMECHANICALDETAILSM4PSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTCONCRETE ANCHOR DEVICE DETAIL3Scale: NONEDUCTWORK TAKEOFF2Scale: NONEPIPE HANGER4Scale: NONESQUARE OR RECTANGULAR ELBOW5Scale: NONENON-FIRE RATED WALL PENETRATION DETAIL1Scale: NONETYPICAL COOLING COIL DRAIN7Scale: NONEIN LINE PUMP DETAIL6Scale: NONENEW CHILLED WATER FAN COIL UNIT SCHEDULE8Scale: NONEPUMP SCHEDULE9Scale: NONE DESCRIPTIONMARK DATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARK ROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY CALDWELL HALL - 1025 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-1025754LP/EL/PKBGHSJLBAMEP-AREAS OFWORKT1-AMEPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTFIRST FLOOR - AMEP AREAS OF WORK2Scale: 1/16" = 1'-0"BASEMENT - AMEP AREAS OF WORK1Scale: 1/16" = 1'-0"SECOND FLOOR - AMEP AREAS OF WORK3Scale: 1/16" = 1'-0"THIRD FLOOR - AMEP AREAS OF WORK4Scale: 1/16" = 1'-0"FOURTH FLOOR - AMEP AREAS OF WORK5Scale: 1/16" = 1'-0"016'32'8'016'32'8'016'32'8'016'32'8'016'32'8'FIFTH FLOOR - AMEP AREAS OF WORK6Scale: 1/16" = 1'-0"016'32'8' THIRD FLOORSECOND FLOORFIRST FLOORTHIRD FLOORSECOND FLOORFIRST FLOORBASEMENTBASEMENTFOURTH FLOORFOURTH FLOORATTICATTIC222THIRD FLOORSECOND FLOORFIRST FLOORTHIRD FLOORSECOND FLOORFIRST FLOORBASEMENTBASEMENTFOURTH FLOORFOURTH FLOORATTICATTICScale: NONECOPPER LOGICAL RISER DIAGRAM - NEW WORK2Scale: NONECOPPER LOGICAL RISER DIAGRAM - EXISTING / REMOVAL1DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY CALDWELL HALL - 1025 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-1025754LP/EL/PKBGHSJLBCOPPER LOGICALRISER DIAGRAMST1-CLPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECT THIRD FLOORSECOND FLOORFIRST FLOORTHIRD FLOORSECOND FLOORFIRST FLOORBASEMENTBASEMENTFOURTH FLOORFOURTH FLOORATTICATTIC1Scale: NONEFIBER LOGICAL RISER DIAGRAM - EXISTING / REMOVAL1DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY CALDWELL HALL - 1025 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-1025754LP/EL/PKBGHSJLBFIBER LOGICALRISER DIAGRAMST1-FLPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECT THIRD FLOORSECOND FLOORFIRST FLOORTHIRD FLOORSECOND FLOORFIRST FLOORBASEMENTBASEMENTFOURTH FLOORFOURTH FLOORATTICATTICTHIRD FLOORSECOND FLOORFIRST FLOORTHIRD FLOORSECOND FLOORFIRST FLOORBASEMENTBASEMENTFOURTH FLOORFOURTH FLOORATTICATTICScale: NONEPATHWAY LOGICAL RISER DIAGRAM - NEW WORK2Scale: NONEPATHWAY LOGICAL RISER DIAGRAM - EXISTING / REMOVAL1DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY CALDWELL HALL - 1025 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-1025754LP/EL/PKBGHSJLBPATHWAYS LOGICALRISER DIAGRAMST1-PLPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECT THIRD FLOORSECOND FLOORFIRST FLOORTHIRD FLOORSECOND FLOORFIRST FLOORBASEMENTBASEMENTFOURTH FLOORFOURTH FLOORATTIC FLOORATTIC FLOORTR SERVING ZONES - BUILDING SECTION VIEW6Scale: NONEFIRST FLOOR - TR SERVING ZONE PLAN2Scale: 1/16" = 1'-0"BASEMENT - TR SERVING ZONE PLAN1Scale: 1/16" = 1'-0"SECOND FLOOR - TR SERVING ZONE PLAN3Scale: 1/16" = 1'-0"DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY CALDWELL HALL - 1025 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-1025754LP/EL/PKBGHSJLBTR SERVING ZONES,PLAN VIEWS ANDBLDG. SECTIONVIEWT1-SZPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTTHIRD FLOOR - TR SERVING ZONE PLAN4Scale: 1/16" = 1'-0"FOURTH FLOOR - TR SERVING ZONE PLAN5Scale: 1/16" = 1'-0"016'32'8'016'32'8'016'32'8'016'32'8'016'32'8'ATTIC FLOOR - TR SERVING ZONE PLAN5Scale: 1/16" = 1'-0"016'32'8' KEY PLANFIRST FLOOR - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 3/16" = 1'-0"8'12'4'0DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Caldwell 1025\CAD\11103-1025--T2-1.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY CALDWELL HALL - 1025 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-1025754LP/EL/PKBGHSJLBFIRST FLOORPATHWAYS ANDCABLINGT2-1.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTEXISTING OUTLET NOTE KEY KEY PLANSECOND FLOOR - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 3/16" = 1'-0"8'12'4'0DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Caldwell 1025\CAD\11103-1025--T2-2.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY CALDWELL HALL - 1025 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-1025754LP/EL/PKBGHSJLBSECOND FLOORPATHWAYS ANDCABLINGT2-2.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTEXISTING OUTLET NOTE KEY KEY PLANTHIRD FLOOR - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 3/16" = 1'-0"8'12'4'0DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Caldwell 1025\CAD\11103-1025--T2-3.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY CALDWELL HALL - 1025 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-1025754LP/EL/PKBGHSJLBTHIRD FLOORPATHWAYS ANDCABLINGT2-3.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTEXISTING OUTLET NOTE KEY KEY PLANFOURTH FLOOR - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 3/16" = 1'-0"8'12'4'0DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Caldwell 1025\CAD\11103-1025--T2-4.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY CALDWELL HALL - 1025 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-1025754LP/EL/PKBGHSJLBFOURTH FLOORPATHWAYS ANDCABLINGT2-4.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTEXISTING OUTLET NOTE KEY KEY PLANATTIC - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 3/16" = 1'-0"8'12'4'0DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Caldwell 1025\CAD\11103-1025--T2-5.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY CALDWELL HALL - 1025 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-1025754LP/EL/PKBGHSJLBATTIC PATHWAYSAND CABLINGT2-5.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTEXISTING OUTLET NOTE KEY KEY PLANBASEMENT - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 3/16" = 1'-0"8'12'4'0DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Caldwell 1025\CAD\11103-1025--T2-B.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY CALDWELL HALL - 1025 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-1025754LP/EL/PKBGHSJLBBASEMENTPATHWAYS ANDCABLINGT2-B.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTEXISTING OUTLET NOTE KEY KEY PLANDESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Caldwell 1025\CAD\11103-1025--T3-B.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY CALDWELL HALL - 1025 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-1025754LP/EL/PKBGHSJLBMTR-BA ENLARGEDPLANS ANDELEVATIONST3-BAPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTBASEMENT - ROOM B01ATELECOM EQUIPMENT PLAN - EXISTING / REMOVALS1Scale: 3/8" = 1'-0"4'6'2'0BASEMENT - MTR-BA (ROOM B02A)TELECOM EQUIPMENT PLAN - NEW WORK2Scale: 3/8" = 1'-0"4'6'2'001'2'1/2'BASEMENT - ROOM B01ABACKBOARD ELEVATION - EXISTING / REMOVALS5Scale: 1" = 1'-0"01'2'1/2'BASEMENT MTR-BA (ROOM B02A) RACK ELEVATIONS - NEW WORK4Scale: 1" = 1'-0"BASEMENT MTR-BA (RACK 1)FIBER HOUSING DETAIL7Scale: NONEBASEMENT MTR-BA (ROOM B02A)BACKBOARD ELEVATION - NEW WORK6Scale: 1" = 1'-0"01'2'1/2'01'2'1/2'BASEMENT MTR-BA (ROOM B01A)RACK ELEVATION - EXISTING\REMOVALS3Scale: 1" = 1'-0"6"4 PLACES(ERL)(ERL)(ERL)1'-6" 6'-0"3'-6"3'-6"6'-7"13'-4" PROJECT SITE PLANDRAWING INDEXCORNELL UNIVERSITYNETWORK CONNECTIVITY PROJECTCALDWELL HALL - 1025DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Caldwell 1025\CAD\11103-1025--T-COVER.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY CALDWELL HALL - 1025 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-1025754LP/EL/PKBGHSJLBDRAWING INDEXAND PROJECT SITEPLANT-COVERPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTDRAWINGDESCRIPTIONT-COVERDRAWING INDEX AND PROJECT SITE PLANT-GENSTANDARD SYMBOLS, NOTES, ABBREVIATIONS (T-SERIES)T1T1-SZTR SERVING ZONES, PLAN VIEWS AND BLDG. SECTION VIEWT1-PLPATHWAYS LOGICAL RISER DIAGRAMST1-CLCOPPER LOGICAL RISER DIAGRAMST1-FLFIBER LOGICAL RISER DIAGRAMST2T2-B.CA_CPBASEMENT PATHWAYS AND CABLINGT2-1.CA_CPFIRST FLOOR PATHWAYS AND CABLINGT2-2.CA_CPSECOND FLOOR PATHWAYS AND CABLINGT2-3.CA_CPTHIRD FLOOR PATHWAYS AND CABLINGT2-4.CA_CPFOURTH FLOOR PATHWAYS AND CABLINGT2-5.CA_CPATTIC PATHWAYS AND CABLINGT3T3-BAMTR-BA ENLARGED PLANS AND ELEVATIONSAMEPAMEP-GENGENERAL NOTES, SYMBOLS AND ABBREVIATIONS (AMEP SERIES)T1-AMEPAMEP-AREAS OF WORKAMEP-BAMTR-BA PARTIAL PLANS AND KEYNOTESA4ARCHITECTURAL DETAILSM4MECHANICAL DETAILSE4ELECTRICAL DETAILS CEILING SCHEDULEACCESS CONTROL SYMBOLS LEGENDGENERAL PROJECT NOTESGENERAL REMOVAL NOTESGENERAL DRAWING NOTES-EXISTING CONDITIONS/REMOVALS-GENERAL NEW WORK NOTESGENERAL DRAWING NOTES-HORIZONTAL CABLING-GENERAL DRAWING NOTES-PATHWAYS-GENERAL DRAWING NOTES-PATHWAYS-ABBREVIATIONS TELECOM SYMBOLS LEGEND (REV. 02/12)NEW / EXISTING OUTLET SUBSCRIPT KEYNEW PATHWAY TYPE KEYOUTLET DESCRIPTOR KEYEXISTING OUTLET NOTE KEYCABLING SYMBOLS LEGENDDESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY CALDWELL HALL - 1025 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-1025754LP/EL/PKBGHSJLBSTANDARDSYMBOLS, NOTES,ABBREVIATIONS(T-SERIES)T-GENPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECT3$7+:$<6&+('8/(1(::25.&$%/(),//%$6('21&$%/(2'¸ 0.24DESIGNATIONDESCRIPTIONMANUFACTURERPART NO.APPROXIMATEOUTSIDEDIMENSIONAPPROXIMATEINSIDEDIMENSIONCABLE FILL&$3$&,7<¸MIN. BENDRADIUS&ʵCONDUITSEE SPEC. SECTION 27 05 28.75" DIA.44.5"1" C1" DIA.76"1.25" C1.25" DIA.137.5"1.5" C1.5" DIA.189"2" C2" DIA.2912"2.5" C2.5" DIA.5125"3" C3" DIA.7830"4" C4" DIA.13040"SR-1NOT USEDSR-2 **SURFACE RACEWAYSEE SPEC. SECTION27 05 282400 SERIESSEE SPEC. SECTION 27 05 2812SR-3 **SURFACE RACEWAY3000 SERIES32SR-4 **SURFACE RACEWAY4000 SERIES63SR-4D **SURFACE RACEWAY(DIVIDED)4000D SERIES30SR-5 **SURFACE RACEWAY5400 SERIES32SR-6 **SURFACE RACEWAY6000 SERIES140SR-6D **SURFACE RACEWAY(DIVIDED)6000D SERIES63SR-7SURFACE RACEWAY700 SERIES2CT-AWIRE DUCTNOT USED2"x6"106CT-B2"x12"211CT-C2"x18"316CT-D2"x24"419CT-E4"x12"419CT-F4"x18"632CT-G4"x24"844CT-H6"x6"318CT-IENCLOSED TRAY6"x6"318CT-J4"x6"212CT-K4"X9"318127(6¸0$;,080),//)25&$7(*25<,1',&$7(' 3(57,$(,$$  - CAT6A CABLING HAS AN OD OF 0.285.5('8&(),//5$7,2%<)25($&+ƒ%(1' - ENSURE THAT FILL RATIOS ARE NOT EXCEEDEDʵ&21'8,76+$//21/<%($//2:('$663(&,),&$//<127('21'5$:,1*6 ** REDUCE CAPACITY BY 50% FOR THE FOLLOWING CONDITIONS: - WHEN CONNECTORS ARE MOUNTED WITHIN RACEWAY - WHEN NON-RADIUS FITTINGS RESTRICT CROSS-SECTIONAL AREA - WHEN RACEWAY IS DIVIDED AND SHARED WITH ELECTRICALTER EXISTING SURFACE RACEWAY TO PROVIDE AT LEAST TWO 16"SECTIONS OF REMOVABLE COVERS TO ALLOW CABLE ROUGH-IN WITHOUTCONFLICT WITH EXISTING FURNITURE CONFIGURATIONS. ALSO REFER TOGENERAL NOTE "Z" ON T-GEN DRAWING FOR ADDITIONAL SCOPE FORSURFACE RACEWAYS.WHERE REQUIRED BY RACEWAY CAPACITY, OR AS DIRECTED, PROVIDESURFACE MOUNT EXTENSION BOX ON EXISTING RACEWAY OPENING TOPROVIDE ADEQUATE CAPACITY AND BEND RADIUS. ALSO REFER TORACEWAY DERATING REQUIREMENTS AT LEFT.WHERE REQUIRED BY RACEWAY CAPACITY, OR AS DIRECTED, PROVIDERETROFIT ENTRANCE END FITTING OR ALTER EXISTING BACKFED CONDUITWITH A NEW SPACE SAVER CONNECTOR TO PROVIDE ADEQUATE CAPACITYAND BEND RADIUS FOR NEW CABLING. ALSO REFER TO RACEWAYDERATING REQUIREMENTS AT LEFT. FIELD VERIFY EXISTING CONDITIONSAND PROPOSE ALTERATIONS THAT MINIMIZE SERVICE DISRUPTIONDURATION. PROVIDE ALL TEMPORARY PROVISIONS TO MAINTAIN EXISTINGSERVICES.CONDUIT AND CABLE TRAY TO BE ROUTED CONCEALED UNLESSOTHERWISE NOTED.