Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20120629_Olin_Lib_CD_Combined_Stamped
PROJECT SITE PLANDRAWING INDEXCORNELL UNIVERSITYNETWORK CONNECTIVITY PROJECTOLIN LIBRARY - 2047DRAWINGDESCRIPTIONT-COVERDRAWING INDEX AND PROJECT SITE PLANT-GENSTANDARD SYMBOLS, NOTES, ABBREVIATIONS (T-SERIES)T1T1-SZTR SERVING ZONES, PLAN VIEWS AND BLDG. SECTION VIEWT1-PLPATHWAYS LOGICAL RISER DIAGRAMST1-CLCOPPER LOGICAL RISER DIAGRAMST1-FLFIBER LOGICAL RISER DIAGRAMST2T2-SB.CA_CPSUB-BASEMENT PATHWAYS AND CABLINGT2-B.CA_CPBASEMENT PATHWAYS AND CABLINGT2-B.D.CA_CPBASEMENT PATHWAYS DEMOLITIONT2-1.CA_CPFIRST FLOOR PATHWAYS AND CABLINGT2-2.CA_CPSECOND FLOOR PATHWAYS AND CABLINGT2-3.CA_CPTHIRD FLOOR PATHWAYS AND CABLINGT2-4.CA_CPFOURTH FLOOR PATHWAYS AND CABLINGT2-5.CA_CPFIFTH FLOOR PATHWAYS AND CABLINGT2-6.CA_CPSIXTH FLOOR PATHWAYS AND CABLINGT2-7.CA_CPSEVENTH FLOOR PATHWAYS AND CABLINGT2-8.CA_CPEIGHTH FLOOR PATHWAYS AND CABLINGT3T3-SBAMTR-SBA ENLARGED PLANS AND ELEVATIONST3-3AITR-3A ENLARGED PLANS AND ELEVATIONST3-6AITR-6A ENLARGED PLANS AND ELEVATIONST3-SBEFSUB-BASEMENT ENTRANCE FACILITYAMEPAMEP-GENGENERAL NOTES, SYMBOLS AND ABBREVIATIONS (AMEP SERIES)T1-AMEPAMEP-AREAS OF WORKAMEP-SBAMTR-SBA PARTIAL PLANS AND KEYNOTESAMEP-3AITR-3A PARTIAL PLANS AND KEYNOTESAMEP-6AITR-6A PARTIAL PLANS AND KEYNOTESA4ARCHITECTURAL DETAILSM4MECHANICAL DETAILSE4ELECTRICAL DETAILSM-2AMEP ENLARGED PLANS-MECHANICALDESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Olin Library 2047\CAD\11103-2047--T-COVER.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY OLIN LIBRARY - 2047 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2047754PKBJLBGHSDRAWING INDEXAND PROJECT SITEPLANT-COVERPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECT CEILING SCHEDULEGENERAL PROJECT NOTESGENERAL REMOVAL NOTESGENERAL DRAWING NOTES-EXISTING CONDITIONS/REMOVALS-ACCESS CONTROL SYMBOLS LEGENDGENERAL NEW WORK NOTESGENERAL DRAWING NOTES-HORIZONTAL CABLING-GENERAL DRAWING NOTES-PATHWAYS-GENERAL DRAWING NOTES-PATHWAYS-ABBREVIATIONS TELECOM SYMBOLS LEGEND (REV. 02/12)NEW / EXISTING OUTLET SUBSCRIPT KEYNEW PATHWAY TYPE KEYOUTLET DESCRIPTOR KEYEXISTING OUTLET NOTE KEYCABLING SYMBOLS LEGENDDESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY OLIN LIBRARY - 2047 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2047754PKBJLBGHSSTANDARDSYMBOLS, NOTES,ABBREVIATIONS(T-SERIES)T-GENPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECT3$7+:$<6&+('8/(1(::25.&$%/(),//%$6('21&$%/(2'¸ 0.24DESIGNATIONDESCRIPTIONMANUFACTURERPART NO.APPROXIMATEOUTSIDEDIMENSIONAPPROXIMATEINSIDEDIMENSIONCABLE FILL&$3$&,7<¸MIN. BENDRADIUS&ʵCONDUITSEE SPEC. SECTION 27 05 28.75" DIA.44.5"1" C1" DIA.76"1.25" C1.25" DIA.137.5"1.5" C1.5" DIA.189"2" C2" DIA.2912"2.5" C2.5" DIA.5125"3" C3" DIA.7830"4" C4" DIA.13040"SR-1NOT USEDSR-2 **SURFACE RACEWAYSEE SPEC. SECTION27 05 282400 SERIESSEE SPEC. SECTION 27 05 2812SR-3 **SURFACE RACEWAY3000 SERIES32SR-4 **SURFACE RACEWAY4000 SERIES63SR-4D **SURFACE RACEWAY(DIVIDED)4000D SERIES30SR-5 **SURFACE RACEWAY5400 SERIES32SR-6 **SURFACE RACEWAY6000 SERIES140SR-6D **SURFACE RACEWAY(DIVIDED)6000D SERIES63SR-7SURFACE RACEWAY700 SERIES2CT-AENCLOSED TRAYSEE SPEC. SECTION 27 05 284"x6"211CT-B2"x12"211CT-C2"x18"316CT-D2"x24"419CT-ESEE SPEC. SECTION 27 05 284"x12"419CT-F6"x12"632CT-G4"x24"844CT-H6"x6"318CT-IWIRE DUCTNOT USED6"x6"318CT-J4"x6"212CT-K4"X9"318127(6¸0$;,080),//)25&$7(*25<,1',&$7('3(57,$(,$$ - CAT6A CABLING HAS AN OD OF 0.285.5('8&(),//5$7,2%<)25($&+%(1' - ENSURE THAT FILL RATIOS ARE NOT EXCEEDEDʵ&21'8,76+$//21/<%($//2:('$663(&,),&$//<127('21'5$:,1*6 ** REDUCE CAPACITY BY 50% FOR THE FOLLOWING CONDITIONS: - WHEN CONNECTORS ARE MOUNTED WITHIN RACEWAY - WHEN NON-RADIUS FITTINGS RESTRICT CROSS-SECTIONAL AREA - WHEN RACEWAY IS DIVIDED AND SHARED WITH ELECTRICALTER EXISTING SURFACE RACEWAY TO PROVIDE AT LEAST TWO 16"SECTIONS OF REMOVABLE COVERS TO ALLOW CABLE ROUGH-IN WITHOUTCONFLICT WITH EXISTING FURNITURE CONFIGURATIONS. ALSO REFER TOGENERAL NOTE "Z" ON T-GEN DRAWING FOR ADDITIONAL SCOPE FORSURFACE RACEWAYS.WHERE REQUIRED BY RACEWAY CAPACITY, OR AS DIRECTED, PROVIDESURFACE MOUNT EXTENSION BOX ON EXISTING RACEWAY OPENING TOPROVIDE ADEQUATE CAPACITY AND BEND RADIUS. ALSO REFER TORACEWAY DERATING REQUIREMENTS AT LEFT.WHERE REQUIRED BY RACEWAY CAPACITY, OR AS DIRECTED, PROVIDERETROFIT ENTRANCE END FITTING OR ALTER EXISTING BACKFED CONDUITWITH A NEW SPACE SAVER CONNECTOR TO PROVIDE ADEQUATE CAPACITYAND BEND RADIUS FOR NEW CABLING. ALSO REFER TO RACEWAYDERATING REQUIREMENTS AT LEFT. FIELD VERIFY EXISTING CONDITIONSAND PROPOSE ALTERATIONS THAT MINIMIZE SERVICE DISRUPTIONDURATION. PROVIDE ALL TEMPORARY PROVISIONS TO MAINTAIN EXISTINGSERVICES.CONDUIT AND CABLE TRAY TO BE ROUTED CONCEALED UNLESSOTHERWISE NOTED. SECOND FLOORFIRST FLOORBASEMENTSECOND FLOORFIRST FLOORBASEMENTSUB-BASEMENTSUB-BASEMENTTHIRD FLOORTHIRD FLOORFOURTH FLOORFOURTH FLOORFIFTH FLOORFIFTH FLOORSIXTH FLOORSIXTH FLOORSEVENTH FLOORSEVENTH FLOOREIGHTH FLOOREIGHTH FLOORTR SERVING ZONES - BUILDING SECTION VIEW11Scale: NONEFIRST FLOOR - TR SERVING ZONE PLAN3Scale: 1/40" = 1'-0"SUB-BASEMENT - TR SERVING ZONE PLAN1Scale: 1/40" = 1'-0"BASEMENT - TR SERVING ZONE PLAN2Scale: 1/40" = 1'-0"DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY OLIN LIBRARY - 2047 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2047754PKBJLBGHSTR SERVING ZONES,PLAN VIEWS ANDBLDG. SECTIONVIEWT1-SZPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTSECOND FLOOR - TR SERVING ZONE PLAN4Scale: 1/40" = 1'-0"FIFTH FLOOR - TR SERVING ZONE PLAN7Scale: 1/40" = 1'-0"THIRD FLOOR - TR SERVING ZONE PLAN5Scale: 1/40" = 1'-0"FOURTH FLOOR - TR SERVING ZONE PLAN6Scale: 1/40" = 1'-0"SIXTH FLOOR - TR SERVING ZONE PLAN8Scale: 1/40" = 1'-0"SEVENTH FLOOR - TR SERVING ZONE PLAN9Scale: 1/40" = 1'-0"EIGHTH FLOOR - TR SERVING ZONE PLAN10Scale: 1/40" = 1'-0"080'40' SECOND FLOORFIRST FLOORBASEMENTSUB-BASEMENTTHIRD FLOORFOURTH FLOORFIFTH FLOORSIXTH FLOORSEVENTH FLOOREIGHTH FLOORSECOND FLOORFIRST FLOORBASEMENTSUB-BASEMENTTHIRD FLOORFOURTH FLOORFIFTH FLOORSIXTH FLOORSEVENTH FLOOREIGHTH FLOORSECOND FLOORFIRST FLOORBASEMENTSUB-BASEMENTTHIRD FLOORFOURTH FLOORFIFTH FLOORSIXTH FLOORSEVENTH FLOOREIGHTH FLOORSECOND FLOORFIRST FLOORBASEMENTSUB-BASEMENTTHIRD FLOORFOURTH FLOORFIFTH FLOORSIXTH FLOORSEVENTH FLOOREIGHTH FLOORScale: NONEPATHWAY LOGICAL RISER DIAGRAM - NEW WORK2Scale: NONEPATHWAY LOGICAL RISER DIAGRAM - EXISTING / REMOVAL1DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY OLIN LIBRARY - 2047 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2047754PKBJLBGHSPATHWAYS LOGICALRISER DIAGRAMST1-PLPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECT SECOND FLOORFIRST FLOORBASEMENTSUB-BASEMENTTHIRD FLOORFOURTH FLOORFIFTH FLOORSIXTH FLOORSEVENTH FLOOREIGHTH FLOORSECOND FLOORFIRST FLOORBASEMENTSUB-BASEMENTTHIRD FLOORFOURTH FLOORFIFTH FLOORSIXTH FLOORSEVENTH FLOOREIGHTH FLOORSECOND FLOORFIRST FLOORBASEMENTSUB-BASEMENTTHIRD FLOORFOURTH FLOORFIFTH FLOORSIXTH FLOORSEVENTH FLOOREIGHTH FLOORSECOND FLOORFIRST FLOORBASEMENTSUB-BASEMENTTHIRD FLOORFOURTH FLOORFIFTH FLOORSIXTH FLOORSEVENTH FLOOREIGHTH FLOORScale: NONECOPPER LOGICAL RISER DIAGRAM - NEW WORK2Scale: NONECOPPER LOGICAL RISER DIAGRAM - EXISTING / REMOVAL1DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY OLIN LIBRARY - 2047 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2047754PKBJLBGHSCOPPER LOGICALRISER DIAGRAMST1-CLPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECT SECOND FLOORFIRST FLOORBASEMENTSUB-BASEMENTTHIRD FLOORFOURTH FLOORFIFTH FLOORSIXTH FLOORSEVENTH FLOOREIGHTH FLOORSECOND FLOORFIRST FLOORBASEMENTSUB-BASEMENTTHIRD FLOORFOURTH FLOORFIFTH FLOORSIXTH FLOORSEVENTH FLOOREIGHTH FLOORSECOND FLOORFIRST FLOORBASEMENTSUB-BASEMENTTHIRD FLOORFOURTH FLOORFIFTH FLOORSIXTH FLOORSEVENTH FLOOREIGHTH FLOORSECOND FLOORFIRST FLOORBASEMENTSUB-BASEMENTTHIRD FLOORFOURTH FLOORFIFTH FLOORSIXTH FLOORSEVENTH FLOOREIGHTH FLOORScale: NONEFIBER LOGICAL RISER DIAGRAM - NEW WORK2Scale: NONEFIBER LOGICAL RISER DIAGRAM - EXISTING / REMOVAL1DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY OLIN LIBRARY - 2047 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2047754PKBJLBGHSFIBER LOGICALRISER DIAGRAMST1-FLPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECT KEY PLANSUB-BASEMENT - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 3/32" = 1'-0"16'24'8'0DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Olin Library 2047\CAD\11103-2047--T2-SB.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY OLIN LIBRARY - 2047 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2047754PKBJLBGHSSUB-BASEMENTPATHWAYS ANDCABLINGT2-SB.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTEXISTING OUTLET NOTE KEY KEY PLANBASEMENT - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 3/32" = 1'-0"16'24'8'0DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Olin Library 2047\CAD\11103-2047--T2-B.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY OLIN LIBRARY - 2047 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2047754PKBJLBGHSBASEMENTPATHWAYS ANDCABLINGT2-B.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTEXISTING OUTLET NOTE KEY KEY PLANDESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: July 6, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Olin Library 2047\CAD\11103-2047--T2-B.D.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY OLIN LIBRARY - 2047 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2047754PKBJLBGHS----T2-B.D.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTBASEMENT FLOOR - COMMUNICATION PATHWAYS / REMOVALS & REWORK1Scale: 3/32" = 1'-0"016'32'8' KEY PLANFIRST FLOOR - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 3/32" = 1'-0"16'24'8'0DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Olin Library 2047\CAD\11103-2047--T2-1.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY OLIN LIBRARY - 2047 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2047754PKBJLBGHSFIRST FLOORPATHWAYS ANDCABLINGT2-1.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTEXISTING OUTLET NOTE KEY KEY PLANSECOND FLOOR - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 3/32" = 1'-0"16'24'8'0DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Olin Library 2047\CAD\11103-2047--T2-2.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY OLIN LIBRARY - 2047 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2047754PKBJLBGHSSECOND FLOORPATHWAYS ANDCABLINGT2-2.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTEXISTING OUTLET NOTE KEY KEY PLANTHIRD FLOOR - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 3/32" = 1'-0"16'24'8'0DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Olin Library 2047\CAD\11103-2047--T2-3.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY OLIN LIBRARY - 2047 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2047754PKBJLBGHSTHIRD FLOORPATHWAYS ANDCABLINGT2-3.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTEXISTING OUTLET NOTE KEY KEY PLANFOURTH FLOOR - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 3/32" = 1'-0"16'24'8'0DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Olin Library 2047\CAD\11103-2047--T2-4.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY OLIN LIBRARY - 2047 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2047754PKBJLBGHSFOURTH FLOORPATHWAYS ANDCABLINGT2-4.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTEXISTING OUTLET NOTE KEY KEY PLANFIFTH FLOOR - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 3/32" = 1'-0"16'24'8'0DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Olin Library 2047\CAD\11103-2047--T2-5.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY OLIN LIBRARY - 2047 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2047754PKBJLBGHSFIFTH FLOORPATHWAYS ANDCABLINGT2-5.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTEXISTING OUTLET NOTE KEY KEY PLANSIXTH FLOOR - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 3/32" = 1'-0"16'24'8'0DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Olin Library 2047\CAD\11103-2047--T2-6.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY OLIN LIBRARY - 2047 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2047754PKBJLBGHSSIXTH FLOORPATHWAYS ANDCABLINGT2-6.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTEXISTING OUTLET NOTE KEY KEY PLANSEVENTH FLOOR - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 3/32" = 1'-0"16'24'8'0DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Olin Library 2047\CAD\11103-2047--T2-7.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY OLIN LIBRARY - 2047 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2047754PKBJLBGHSSEVENTH FLOORPATHWAYS ANDCABLINGT2-7.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTEXISTING OUTLET NOTE KEY KEY PLANEIGHTH FLOOR - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 3/32" = 1'-0"16'24'8'0DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Olin Library 2047\CAD\11103-2047--T2-8.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY OLIN LIBRARY - 2047 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2047754PKBJLBGHSEIGHTH FLOORPATHWAYS ANDCABLINGT2-8.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTEXISTING OUTLET NOTE KEY KEY PLANDESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Olin Library 2047\CAD\11103-2047--T3-SB.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY OLIN LIBRARY - 2047 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2047754PKBJLBGHSMTR-SBA ENLARGEDPLANS ANDELEVATIONST3-SBAPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECT01'2'1/2'SUB-BASEMENT MTR-SBA(RACK 2) FIBER HOUSINGDETAIL4Scale: NONE01'2'1/2'SUB-BASEMENT - MTR-SBA (ROOM 2B01A)TELECOM EQUIPMENT PLAN - NEW WORK1Scale: 1/2" = 1'-0"04'8'2'SUB-BASEMENT MTR-SBA (ROOM 2B01A) RACK ELEVATION - NEW WORK2Scale: 1" = 1'-0"SUB-BASEMENT MTR-SBA (ROOM 2B01A)BACKBOARD ELEVATION - NEW WORK3Scale: 1" = 1'-0"1'-6" 6'-0" KEY PLANTHIRD FLOOR - (ROOM 325)TELECOM EQUIPMENT PLAN - EXISTING / REMOVALS1Scale: 1/4" = 1'-0"04'8'2'THIRD FLOOR - ITR-3A (ROOM 325A)TELECOM EQUIPMENT PLAN - NEW WORK2Scale: 1/4" = 1'-0"04'8'2'01'2'1/2'THIRD FLOOR ITR-3A (ROOM 325A) RACK ELEVATION - NEW WORK3Scale: 1" = 1'-0"THIRD FLOOR ITR-3A (RACK 2)FIBER HOUSING DETAIL5Scale: NONETHIRD FLOOR ITR-3A (ROOM 325A)BACKBOARD ELEVATION - NEW WORK4Scale: 1" = 1'-0"01'2'1/2'DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Olin Library 2047\CAD\11103-2047--T3-3B.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY OLIN LIBRARY - 2047 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2047754PKBJLBGHSITR-3A ENLARGEDPLANS ANDELEVATIONST3-3APSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECT KEY PLANSIXTH FLOOR - ROOM 625TELECOM EQUIPMENT PLAN - EXISTING / REMOVALS1Scale: 1/4" = 1'-0"04'8'2'SIXTH FLOOR - ITR-6A (ROOM 625A)TELECOM EQUIPMENT PLAN - NEW WORK2Scale: 1/2" = 1'-0"04'8'2'01'2'1/2'SIXTH FLOOR ITR-6A (ROOM 625A) RACK ELEVATION - NEW WORK3Scale: 1" = 1'-0"SIXTH FLOOR ITR-6A (RACK 2)FIBER HOUSING DETAIL6Scale: NONESIXTH FLOOR ITR-6A (ROOM 625A)BACKBOARD ELEVATION - NEW WORK4Scale: 1" = 1'-0"01'2'1/2'DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Olin Library 2047\CAD\11103-2047--T3-6.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY OLIN LIBRARY - 2047 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2047754PKBJLBGHSITR-6A ENLARGEDPLANS ANDELEVATIONST3-6APSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECT KEY PLANDESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 28, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Olin Library 2047\CAD\11103-2047--T3-SB-EF.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY OLIN LIBRARY - 2047 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2047754PKBJLBGHSSUB-BASEMENTENTRANCE FACILITYPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECT01'2'1/2'FLOOR - ROOM 2B03 (BDF)TELECOM EQUIPMENT PLAN - EXISTING / REMOVALS1Scale: 1/2" = 1'-0"02'4'1'FLOOR - ROOM 2B03BACKBOARD ELEVATION - NEW WORK5Scale: 1" = 1'-0"01'2'1/2'FLOOR - ROOM 2B03 (BDF)BACKBOARD ELEVATION - EXISTING / REMOVALS3Scale: 3/4" = 1'-0"01'2'1/2'FLOOR - ROOM 2B03 (BDF)BACKBOARD ELEVATION - EXISTING / REMOVALS4Scale: 3/4" = 1'-0"01'2'1/2'FLOOR - ROOM 2B03TELECOM EQUIPMENT PLAN - NEW WORK2Scale: 1/2" = 1'-0"02'4'1' DESCRIPTIONMARK DATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARK ROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY OLIN LIBRARY - 2047 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2047754PKBJLBGHSGENERAL NOTES,SYMBOLS ANDABBREVIATIONS(AMEP SERIES)AMEP-GENPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTELECTRICAL SYMBOLS LEGEND4Scale: NONEMECHANICAL SYMBOLS LEGEND3Scale: NONEARCHITECTURAL SYMBOLS LEGEND2Scale: NONEABBREVIATIONS1Scale: NONE DESCRIPTIONMARK DATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARK ROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY OLIN LIBRARY - 2047 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2047754PKBJLBGHSAMEP-AREAS OFWORKT1-AMEPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTFIRST FLOOR - AMEP AREAS OF WORK3Scale: 1/40" = 1'-0"SUB-BASEMENT - AMEP AREAS OF WORK1Scale: 1/40" = 1'-0"BASEMENT - AMEP AREAS OF WORK2Scale: 1/40" = 1'-0"SECOND FLOOR - AMEP AREAS OF WORK4Scale: 1/40" = 1'-0"FIFTH FLOOR - AMEP AREAS OF WORK7Scale: 1/40" = 1'-0"THIRD FLOOR - AMEP AREAS OF WORK5Scale: 1/40" = 1'-0"FOURTH FLOOR - AMEP AREAS OF WORK6Scale: 1/40" = 1'-0"SIXTH FLOOR - AMEP AREAS OF WORK8Scale: 1/40" = 1'-0"SEVENTH FLOOR - AMEP AREAS OF WORK9Scale: 1/40" = 1'-0"EIGHTH FLOOR - AMEP AREAS OF WORK10Scale: 1/40" = 1'-0"080'40' DESCRIPTIONMARK DATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 21, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Olin Library 2047\CAD\11103-2047--T3-SB.dwgFax: 585.424.4239115 METRO PARK ROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY OLIN LIBRARY - 2047 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2047754PKBJLBGHSMTR-SBA PARTIALPLANS ANDKEYNOTESAMEP-SBAPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTSUB-BASEMENT IDF (ROOM 2B01A)ARCHITECTURAL - EXISTING / DEMO1Scale: 1/4" = 1'-0"04'8'2'SUB-BASEMENT MTR-SBA (ROOM 2B01A)ARCHITECTURAL - NEW WORK4Scale: 1/4" = 1'-0"04'8'2'SUB-BASEMENT IDF (ROOM 2B01A)MECHANICAL - EXISTING / REMOVALS2Scale: 1/4" = 1'-0"04'8'2'SUB-BASEMENT IDF (ROOM 2B01A)ELECTRICAL - EXISTING / REMOVALS3Scale: 1/4" = 1'-0"04'8'2'SUB-BASEMENT MTR-SBA (ROOM 2B01A)ELECTRICAL - NEW WORK6Scale: 1/4" = 1'-0"04'8'2'SUB-BASEMENT MTR-SBA (ROOM 2B01A)MECHANICAL - NEW WORK5Scale: 1/4" = 1'-0"04'8'2'KEY PLAN DESCRIPTIONMARK DATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 19, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Olin Library 2047\CAD\11103-2047--T3-3B.dwgFax: 585.424.4239115 METRO PARK ROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY OLIN LIBRARY - 2047 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2047754PKBJLBGHSITR-3A PARTIALPLANS ANDKEYNOTESAMEP-3APSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTTHIRD FLOOR (ROOM 325)ARCHITECTURAL - EXISTING / DEMO1Scale: 1/4" = 1'-0"04'8'2'THIRD FLOOR ITR-3A (ROOM 325A)ARCHITECTURAL - NEW WORK4Scale: 1/4" = 1'-0"04'8'2'THIRD FLOOR (ROOM 325)MECHANICAL - EXISTING / REMOVALS2Scale: 1/4" = 1'-0"04'8'2'THIRD FLOOR (ROOM 325)ELECTRICAL - EXISTING / REMOVALS3Scale: 1/4" = 1'-0"04'8'2'THIRD FLOOR ITR-3A (ROOM 325A)ELECTRICAL - NEW WORK6Scale: 1/4" = 1'-0"04'8'2'THIRD FLOOR ITR-3A (ROOM 325A)MECHANICAL - NEW WORK5Scale: 1/4" = 1'-0"04'8'2'KEY PLAN DESCRIPTIONMARK DATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 19, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Olin Library 2047\CAD\11103-2047--T3-6.dwgFax: 585.424.4239115 METRO PARK ROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY OLIN LIBRARY - 2047 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2047754PKBJLBGHSITR-6A PARTIALPLANS ANDKEYNOTESAMEP-6APSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTSIXTH FLOOR (ROOM 625)ARCHITECTURAL - EXISTING / DEMO1Scale: 1/4" = 1'-0"04'8'2'SIXTH FLOOR ITR-6A (ROOM 625A)ARCHITECTURAL - NEW WORK4Scale: 1/4" = 1'-0"04'8'2'SIXTH FLOOR (ROOM 625)MECHANICAL - EXISTING / REMOVALS2Scale: 1/4" = 1'-0"04'8'2'SIXTH FLOOR (ROOM 625)ELECTRICAL - EXISTING / REMOVALS3Scale: 1/4" = 1'-0"04'8'2'SIXTH FLOOR ITR-6A (ROOM 625A)ELECTRICAL - NEW WORK6Scale: 1/4" = 1'-0"04'8'2'SIXTH FLOOR ITR-6A (ROOM 625A)MECHANICAL - NEW WORK5Scale: 1/4" = 1'-0"04'8'2'KEY PLAN FULL-HEIGHT PARTITION ASSEMBLYSECTION DETAILSHEAD TYPESJAMB TYPESGENERAL NOTESDESCRIPTIONMARK DATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARK ROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY OLIN LIBRARY - 2047 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2047754PKBJLBGHSARCHITECTURALDETAILSA4PSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTPARTITION TYPES1Scale: NONEJAMB AND HEAD TYPES2Scale: NONECHASE DETAIL3Scale: NONEFIRE RATED ACCESS DOOR DETAIL4Scale: NONEENLARGED PLAN-BASEMENT ROOM B00TA5Scale: 1/2" = 1'-0"02'4'1' GENERAL NOTESDESCRIPTIONMARK DATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARK ROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY OLIN LIBRARY - 2047 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2047754PKBJLBGHSMECHANICALDETAILSM4PSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTCONCRETE ANCHOR DEVICE DETAIL2Scale: NONENOT USED1Scale: NONEPIPE HANGER4Scale: NONETWO-WAY CONTROL VALVECOIL PIPING DETAIL3Scale: NONECHILLED WATER PIPING WALL SUPPORT DETAIL6Scale: NONENEW CHILLED WATER FAN COIL UNIT SCHEDULE10Scale: NONETYPICAL COOLING COIL DRAIN9Scale: NONEFIRE RATED WALL PIPE PENETRATION7Scale: NONENON FIRE RATED WALL PIPE PENETRATION5Scale: NONEFC-3 CONDENSATE DETAIL8Scale: NONE SECOND FLOORFIRST FLOORBASEMENTSUB-BASEMENTTHIRD FLOORFOURTH FLOORFIFTH FLOORSIXTH FLOORSEVENTH FLOOREIGHTH FLOORSECOND FLOORFIRST FLOORBASEMENTSUB-BASEMENTTHIRD FLOORFOURTH FLOORFIFTH FLOORSIXTH FLOORSEVENTH FLOOREIGHTH FLOORGENERAL NOTESSE RATEDNOTES:HINGED TRIM200% NEUTRALCOMPUTER GRADE FEED-THRU LUGSSUB FEED LUGSSUB-FEED BREAKERISOLATED GND BUSSE RATEDNOTES:HINGED TRIM200% NEUTRALCOMPUTER GRADE FEED-THRU LUGSSUB FEED LUGSSUB-FEED BREAKERISOLATED GND BUSSE RATEDNOTES:HINGED TRIM200% NEUTRALCOMPUTER GRADE FEED-THRU LUGSSUB FEED LUGSSUB-FEED BREAKERISOLATED GND BUSDESCRIPTIONMARK DATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARK ROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY OLIN LIBRARY - 2047 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2047754PKBJLBGHSELECTRICAL DETAILSE4PSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTPOWER & GROUNDING SYSTEM RISER DIAGRAM2Scale: NONELIGHTING FIXTURE SCHEDULE3Scale: NONETELECOMMUNICATIONS GROUND BAR (TMGB,TGB) DETAIL4Scale: NONEELECTRICAL PANELBOARD SCHEDULES1Scale: NONE DESCRIPTIONMARK DATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: June 19, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Olin Library 2047\CAD\M-2 AMEP ENLARGED PLAN-MECHANICAL.dwgFax: 585.424.4239115 METRO PARK ROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY OLIN LIBRARY - 2047 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2047754PKBJLBGHSAMEP ENLARGEDPLANS-MECHANICALM-2PSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTTHIRD FLOORMECHANICAL - NEW WORK1Scale: 3/32" = 1'-0"08'16'4'THIRD FLOOR KEY PLANSECOND FLOOR (ROOM 236)MECHANICAL - NEW WORK4Scale: 3/32" = 1'-0"04'8'2'SUB BASEMENT FLOORMECHANICAL - NEW WORK3Scale: 3/32" = 1'-0"08'16'4'SIXTH FLOORMECHANICAL - NEW WORK2Scale: 3/32" = 1'-0"08'16'4'SUB BASEMENT KEY PLANSECOND FLOOR KEY PLANSIXTH FLOOR KEY PLAN