Loading...
HomeMy WebLinkAboutOlin Hall - General Permit Plansjefferymm : 4/21/2014 : 2:29:39 PM : pdf_L.plt : DPC_LARGE.TBL : L:\Jobs\CU-14007\PltSht\CS100.dgn KEY PLAN SCALE: NONE PROJECT LOCATION 22x34UPUPUP UP UP COPYRIGHT THIS DOCUMENTATION IN ANY WAY. ENGINEER. TO ALTER ANY ITEM ON UNDER THE DIRECTION OF THE ANY PERSON UNLESS ACTING IT IS A VIOLATION OF LAW FOR THE COPYRIGHT. RESERVED RIGHTS, INCLUDING LAW STATUTORY AND OTHER AND SHALL RETAIN ALL COMMON THE AUTHOR OF THESE DOCUMENTS THE ENGINEER SHALL BE DEEMED DRAWING ALTERATION GENERAL ARCHITECTURAL COVER SHEET DATE: 04/15/14 A100 P100 DATE: 04/15/14 DATE: 04/15/14 DATE: 04/15/14 DATE: 04/15/14 DATE: 04/15/14 DATE: 04/15/14 MECHANICAL ELECTRICAL PLUMBING: CS001 NOTATION SECTION CUT WALL SECTION CUT DETAIL-BLOW UP ELEVATION DETAIL-CUT GRID STRUCTURAL SCALE: x/x" = 1'-0"XXX 1 TITLE 1 XXX XXX 1 1 XXX 1 XXX XXX 1 1 1 DRAWING SYMBOLS E100 DATE: 04/15/14 E001 DETAIL NO. DRAWING NO. DETAIL NO. DRAWING NO. OFFSET CUT DETAIL NO. DRAWING NO. DIRECTION VIEWING DETAIL NO. DRAWING NO. DETAIL NO. DRAWING NO. DIRECTION VIEWING DRAWING NO. ELEVATION NO. REVISION KEY NOTE POINT OF CONNECTION D POINT OF DISCONNECTION 1 2 A B AS NOTED DPC ENGINEERING, P.C. (607) 734-8494 fax (607) 734-8492 phone Elmira Heights, NY 14903 145 Prescott Avenue PROJECT NUMBER: Consulting Engineers DRAWING NUMBER: PROJECT NAME: DESIGN:CHECKED:DRAWN: APPROVED:DATE:SCALE: DESCRIPTION DATE APPVDREV ISSD BY CS001 CAD MMJ CAD CAD OLIN HALL LAB 208 MODIFICATIONS CU-14007 LAB 208 MODIFICATIONS OLIN HALL ITHACA, NY 14853 CORNELL UNIVERSITY RC100 COVER SHEET - DEMOLITION AND NEW ARCHITECTURAL PLAN PARTIAL SECOND FLOOR - DEMOLITION AND NEW REFLECTED CEILING PLAN PARTIAL SECOND FLOOR M100 - DEMOLITION AND NEW MECHANICAL PLAN PARTIAL SECOND FLOOR M600 DATE: 04/15/14 M601 SCHEMATIC AIR FLOW/CONTROL DEMOLITION DATE: 04/15/14 M602 - DEMOLITION AND NEW PLUMBING PLAN PARTIAL SECOND FLOOR - DEMOLITION AND NEW ELECTRICAL PLAN PARTIAL SECOND FLOOR M001 SYMBOLS AND ABBREVIATIONS MECHANICAL SPECIFICATIONS, 04/15/14 DATE: 04/15/14 SPECIFICATIONS NOTES, SCHEDULES, SYMBOLS, ABBREVIATIONS, MECHANICAL SCHEDULES SCHEMATIC / CONTROL SEQUENCE LAB 208 AIR FLOW CONTROL jefferymm : 4/21/2014 : 2:29:41 PM : pdf_L.plt : DPC_LARGE.TBL : L:\Jobs\CU-14007\PltSht\A100.dgn KEY PLAN SCALE: NONE PROJECT LOCATION 22x34UPUPUP UP UP COPYRIGHT THIS DOCUMENTATION IN ANY WAY. ENGINEER. TO ALTER ANY ITEM ON UNDER THE DIRECTION OF THE ANY PERSON UNLESS ACTING IT IS A VIOLATION OF LAW FOR THE COPYRIGHT. RESERVED RIGHTS, INCLUDING LAW STATUTORY AND OTHER AND SHALL RETAIN ALL COMMON THE AUTHOR OF THESE DOCUMENTS THE ENGINEER SHALL BE DEEMED DRAWING ALTERATION TABLE TABLEFILECASEWORK REFRIG.REFRIG.CABINET CABINET CABINETCASEWORK 206208210 200CB BSC-01BSC-02TABLE TABLEFILEFH-OL-208CASEWORK REFRIG.REFRIG.CABINET CABINET CABINETCABINETCASEWORK 206208210 200CB BENCHSCALE: 1/4" = 1'-0" 2 A100 SCALE: 1/4" = 1'-0" 1 A100 - DEMOLITION PARTIAL SECOND FLOOR ARCHITECTURAL PLAN PARTIAL SECOND FLOOR ARCHITECTURAL PLAN AS NOTED DPC ENGINEERING, P.C. (607) 734-8494 fax (607) 734-8492 phone Elmira Heights, NY 14903 145 Prescott Avenue PROJECT NUMBER: Consulting Engineers DRAWING NUMBER: PROJECT NAME: DESIGN:CHECKED:DRAWN: APPROVED:DATE:SCALE: DESCRIPTION DATE APPVDREV ISSD BY A100 CAD MMJ CAD CAD PARTIAL SECOND FLOOR ARCHITECTURAL PLAN - DEMOLITION AND NEW CU-14007 OLIN HALL LAB 208 MODIFICATIONS 4'8'0 2'4'8'0 2' KEYED NOTES 1 2 3 EXISTING CASEWORK TO REMAIN EXISTING FIN TUBE RADIATION TO REMAIN 1 2 3 5 4 5 4 LIMIT OF PAINTING (PAINTING BY OWNER)04/15/14 6 6 6 6 6 6 PREPARE FOR PAINTING. PATCH EXISTING CMU WALL AT ALL EQUIPMENT, MECHANICAL AND ELECTRICAL REMOVALS AND WAX FLOOR PRIOR TO BSC INSTALLATION. COORDINATE SCHEDULE WITH OWNER. BENCH. PROVIDE NEW BASE TO MATCH EXISTING AS REQUIRED. OWNER WILL CLEAN & REPLACE DAMAGED VCT FLOOR TILE TO MATCH EXISTING AT REMOVAL OF FUME HOOD & STORAGE AREA. REMOVE WALL CABINETS IN THEIR ENTIRETY (SEE PHOTO). MOVE TO OWNER DESIGNATED OWNER DESIGNATED STORAGE AREA. REMOVE CASEWORK BENCH & COUNTER TOP IN ITS ENTIRETY (SEE PHOTO). MOVE TO AREA. REMOVE FUME HOOD IN ITS ENTIRETY (SEE PHOTO). MOVE TO OWNER DESIGNATED STORAGE AND TABLES OF LAB. OF BENJAMIN MOORE. PAINT CASEWORK PROVIDE PRIME COAT AND (2) FINISH COATS (1) COAT AND (2) COATS FINISH PAINT. COLOR SELECTED BY OWNER. PROVIDE PAINT LAB CASE WORK AND TABLES WITHCASEWORK/TABLES: OF LAB. BENJAMIN MOORE. PAINT ENTIRE TRIM PROVIDE (2) FINISH COATS OFTRIM: FOUR WALLS OF THE LAB. BENJAMIN MOORE. PAINT ENTIRE PROVIDE (2) FINISH COATS OF (2) COATS FINISH PAINT. COLOR SELECTED BY OWNER. PROVIDE PAINT ENTIRE LAB WALLS AND TRIM WITHWALLS: LAB PAINTING SCHEDULE jefferymm : 4/21/2014 : 2:29:46 PM : pdf_L.plt : DPC_LARGE.TBL : L:\Jobs\CU-14007\PltSht\RC100.dgn KEY PLAN SCALE: NONE PROJECT LOCATION 22x34UPUPUP UP UP COPYRIGHT THIS DOCUMENTATION IN ANY WAY. ENGINEER. TO ALTER ANY ITEM ON UNDER THE DIRECTION OF THE ANY PERSON UNLESS ACTING IT IS A VIOLATION OF LAW FOR THE COPYRIGHT. RESERVED RIGHTS, INCLUDING LAW STATUTORY AND OTHER AND SHALL RETAIN ALL COMMON THE AUTHOR OF THESE DOCUMENTS THE ENGINEER SHALL BE DEEMED DRAWING ALTERATION 206208210 200CB OC OC 206208210 200CB OC OC SCALE: 1/4" = 1'-0" 2 RC100 SCALE: 1/4" = 1'-0" 1 RC100 - DEMOLITION AS NOTED DPC ENGINEERING, P.C. (607) 734-8494 fax (607) 734-8492 phone Elmira Heights, NY 14903 145 Prescott Avenue PROJECT NUMBER: Consulting Engineers DRAWING NUMBER: PROJECT NAME: DESIGN:CHECKED:DRAWN: APPROVED:DATE:SCALE: DESCRIPTION DATE APPVDREV ISSD BY RC100 CAD MMJ CAD CAD - DEMOLITION AND NEW CU-14007 OLIN HALL LAB 208 MODIFICATIONS PARTIAL SECOND FLOOR REFLECTED CEILING PLAN PARTIAL SECOND FLOOR REFLECTED CEILING PLAN PARTIAL SECOND FLOOR REFLECTED CEILING PLAN 4'8'0 2'4'8'0 2' KEYED NOTES 1 2 3 1 2 4 3 4 PROVIDE 2x4 SUSPENSION SYSTEM, INCLUDING WALL ANGLE, TO MATCH EXISTING. PROVIDE 2x4 MYLAR FACED CLEANROOM PANELS IN ENTIRE ROOM. SYSTEM. REMOVE EXISTING SUSPENSION SYSTEM AS INDICATED. PREPARE AREA FOR NEW SUSPENSION NOTED. REMOVE EXISTING CEILING PANELS IN ENTIRE ROOM. GRID TO REMAIN UNLESS OTHERWISE 04/15/14 jefferymm : 4/21/2014 : 2:29:49 PM : pdf_L.plt : DPC_LARGE.TBL : L:\Jobs\CU-14007\PltSht\M001.dgn 22x34COPYRIGHT THIS DOCUMENTATION IN ANY WAY. ENGINEER. TO ALTER ANY ITEM ON UNDER THE DIRECTION OF THE ANY PERSON UNLESS ACTING IT IS A VIOLATION OF LAW FOR THE COPYRIGHT. RESERVED RIGHTS, INCLUDING LAW STATUTORY AND OTHER AND SHALL RETAIN ALL COMMON THE AUTHOR OF THESE DOCUMENTS THE ENGINEER SHALL BE DEEMED DRAWING ALTERATION AS NOTED DPC ENGINEERING, P.C. (607) 734-8494 fax (607) 734-8492 phone Elmira Heights, NY 14903 145 Prescott Avenue PROJECT NUMBER: Consulting Engineers DRAWING NUMBER: PROJECT NAME: DESIGN:CHECKED:DRAWN: APPROVED:DATE:SCALE: DESCRIPTION DATE APPVDREV ISSD BY M001 CAD MMJ CAD CAD OLIN HALL LAB 208 MODIFICATIONS CU-14007 MECHANICAL SPECIFICATIONS, SYMBOLS AND ABBREVIATIONS REQUIRED SHOP DRAWING SUBMITTALS SYMBOLS AND ABBREVIATIONS 6 1 350 AD HVAC I.D.INSIDE DIAMETER NIC NOT IN CONTRACT AIR CONDITIONING HEATING, VENTILATING & POSITIVE PRESSURE DUCTWORK TURNING VANES VOLUME DAMPER 6 INCH DIAMETER DUCTWORK 48" x 30" DUCTWORK POINT OF DISCONNECT POINT OF CONNECTION NEGATIVE PRESSURE DUCTWORK FLEXIBLE CONNECTION FIRE DAMPER EXISTING DAMPER ACCESS DOOR MC MER RA SA SUPPLY AIR RETURN AIR MECHANICAL EQUIPMENT ROOM MECHANICAL CONTRACTOR VD 6" DIA 48x30 D AHU BOD AIR HANDLING UNIT BOTTOM OF DUCT AFF B.O.S.BOTTOM OF STEEL CFM ACCESS DOORAD DN DWG DOWN DRAWING DD DUAL DUCT BOX CISP SULLIVAN PARK CORNING INCORPORATED- GA GALVANIZED ARROW AIR FLOW DIRECTION DEMOLITION NECK SIZE CFM DIFFUSER/GRILLE TYPE EXH EXHAUST EXIST EXISTING OBD OPPOSED BLADE DAMPER EV EXHAUST VENT SM SHEET METAL SD SINGLE DUCT BOXEEEXHAUST ENCLOSURE SINGLE DUCT BOX FLR FLOOR RHC REHEAT HEAT COIL EG EXHAUST GRILLE DIA DIAMETER LINED DUCTWORK DEF DILUTION EXHAUST FAN EF EXHAUST FAN CABINET BIOLOGICAL SAFETY PER MINUTE CUBIC FEET ABOVE FINISHED FLOOR IS TOO SMALL FOR A PERSON TO ENTER. WITH LATCHES OPERABLE FROM EITHER SIDE, EXCEPT OUTSIDE ONLY WHERE DUCT C. ACCESS DOORS: INSTALL ACCESS DOORS TO OPEN AGAINST SYSTEM AIR PRESSURE, ELBOWS IN SUPPLY AND EXHAUST AIR SYSTEMS, AND ELSEWHERE AS INDICATED. B. TURNING VANES: INSTALL TURNING VANES IN SQUARE OR RECTANGULAR 90 DEGREE FUNCTION. RECOGNIZED INDUSTRY PRACTICES TO ENSURE THAT PRODUCTS SERVE INTENDED CONSTRUCTION AS SHOWN IN SMACNA STANDARDS, AND IN ACCORDANCE WITH INSTALLATION INSTRUCTIONS, WITH APPLICABLE PORTIONS OF DETAILS OF A. GENERAL: INSTALL DUCT ACCESSORIES IN ACCORDANCE WITH MANUFACTURER'S IV INSTALLATION STANDARDS". RUNNERS, CONSTRUCTED IN ACCORDANCE WITH SMACNA "LOW PRESSURE DUCT A. FABRICATED TURNING VANES: PROVIDE FABRICATED TURNING VANES AND VANE III TURNING VANES SUPPLY AND EXHAUST AIR DUCTWORK MATERIALS. DUCT CONSTRUCTION STANDARDS" IN THE VOLUME DAMPER SECTION. MATCH A. PROVIDE SINGLE BLADE TYPE DAMPERS IN ACCORDANCE WITH "SMACNA" "HVAC II VOLUME DAMPERS INSULATION MANUFACTURER FOR APPLICATIONS INDICATED. PROTECTIVE FINISHES AND SIMILAR COMPOUNDS AS RECOMMENDED BY D. INSULATION COMPOUNDS: PROVIDE CEMENTS, ADHESIVES, COATINGS, SEALERS, MANUFACTURER FOR APPLICATIONS INDICATED. CORNER ANGLES AND SIMILAR ACCESSORIES AS RECOMMENDED BY INSULATION C. INSULATION ACCESSORIES: PROVIDE STAPLES, BANDS, WIRES, TAPE, ANCHORS, DUCTWORK UNLESS OTHERWISE INDICATED. B. JACKETS FOR INSULATION ASTM C 921, TYPE I, VAPOR BARRIER FOR ALL A. FLEXIBLE FIBERGLASS INSULATION: ASTM C 553, TYPE I, CLASS B-4 2.2 DUCTWORK INSULATION MATERIALS 4. KNAUF INSULATION. 3. OWENS-CORNING FIBERGLASS CORP. 2. JOHNS-MANSVILLE CORP. 1. CERTAINTEED CORP. PRODUCTS OF ONE OF THE FOLLOWING OR APPROVED EQUAL: A. MANUFACTURER - SUBJECT TO COMPLIANCE WITH REQUIREMENTS, PROVIDE 2.1 AVAILABLE MANUFACTURERS PART 2 PRODUCTS CONSTRUCTION PERIOD, TO AVOID DAMAGE AND DETERIORATION. REQUIRED PROTECTION FOR INSULATION WORK DURING REMAINDER OF B. PROTECTION - INSULATION INSTALLER SHALL ADVISE CONTRACTOR OF UNITS. INCLUDING UNITS WITH VAPOR BARRIER DAMAGE AND MOISTURE SATURATED A. REPLACE DAMAGED INSULATION WHICH CANNOT BE REPAIRED SATISFACTORILY, 3.4 PROTECTION AND REPLACEMENT SEALED OVER EXISTING. SAME THICKNESS AS EXISTING INSULATION, INSTALL NEW JACKET LAPPING AND DAMAGED OR DAMAGED DURING THIS CONSTRUCTION PERIOD. USE INSULATION OF A. REPAIR DAMAGED SECTIONS OF EXISTING MECHANICAL INSULATION, BOTH PREVIOUSLY 3.3 EXISTING INSULATION REPAIR AND SIMILAR DUCTWORK PENETRATIONS, EXCEPT WHERE OTHERWISE INDICATED. E. EXTEND DUCTWORK INSULATION WITHOUT INTERRUPTION THROUGH WALLS, FLOORS TO PREVENT PUNCTURE AND OTHER DAMAGE. D. MAINTAIN INTEGRITY OF VAPOR BARRIER ON DUCTWORK INSULATION AND PROTECT IT TOGETHER TO ENSURE COMPLETE AND TIGHT FIT OVER SURFACES TO BE COVERED. C. CLEAN AND DRY DUCTWORK PRIOR TO INSULATING. BUTT INSULATION JOINTS FIRMLY B. INSTALL INSULATION MATERIALS WITH SMOOTH AND EVEN SURFACES. PRACTICES TO ENSURE THAT INSULATION SERVES ITS INTENDED PURPOSE. WRITTEN INSTRUCTIONS, AND IN ACCORDANCE WITH RECOGNIZED INDUSTRY A. GENERAL - INSTALL INSULATION PRODUCTS IN ACCORDANCE WITH MANUFACTURER'S 3.2 INSTALLATION OF DUCTWORK INSULATION B. FLEXIBLE FIBERGLASS: 1-1/2" THICK, A. RIGID FIBERGLASS: 1-1/2" THICK. FOLLOWING TYPES AND THICKNESSES OF INSULATION: 2. INSULATE EACH DUCTWORK SYSTEM SPECIFIED ABOVE WITH ONE OF THE A. HVAC SUPPLY DUCTWORK. 1. APPLICATION REQUIREMENTS: INSULATE THE FOLLOWING COLD DUCTWORK: B. COLD & DUAL TEMPERATURE DUCTWORK (BELOW AMBIENT TEMPERATURE): LINED DUCTWORK. A. INSULATION OMITTED: DO NOT INSULATE FIBROUS GLASS DUCTWORK, OR INTERIOR 3.1 DUCTWORK SYSTEM INSULATION PART 3 EXECUTION UNLESS OTHERWISE RECOMMENDED. CONSTRUCTION STANDARDS" FOR THE STATIC PRESSURE CLASSES INDICATED, D. SEAL DUCTWORK TO SEAL CLASS AS PRESCRIBED IN SMACNA "HVAC DUCT STANDARD. C. SUPPORT DUCTWORK IN MANNER COMPLYING WITH APPROPRIATE SMACNA B. DUCT SIZING: DUCT SIZES INDICATED ON DRAWINGS ARE INSIDE DIMENSIONS. AND TO PREVENT BUCKLING. HANGERS AND ANCHORS OF TYPE WHICH WILL HOLD DUCTS TRUE-TO-SHAPE SURFACES SMOOTH. SUPPORT DUCTS RIGIDLY WITH SUITABLE TIES, BRACES, CONNECTIONS, WITHIN 1/8" MISALIGNMENT TOLERANCE AND WITH INTERNAL RUN WITH MINIMUM OF JOINTS. ALIGN DUCTWORK ACCURATELY AT SYSTEMS, CAPABLE OF PERFORMING EACH INDICATED SERVICE. INSTALL EACH AIR TIGHT (0% LEAKAGE) AND NOISELESS (NO OBJECTIONABLE NOISE) ACCORDANCE WITH RECOGNIZED INDUSTRY PRACTICES WHICH WILL ACHIEVE A. SUPPLY AND EXHAUST DUCTWORK: ASSEMBLE AND INSTALL DUCTWORK IN PART 4 EXECUTION 1. SUPPLY AIR (GA) GALVANIZED 4" WG FIBERGLASS STEEL STAINLESS -4" WG SERVICE MATERIAL VELOCITY CLASS PRESSURE REQUIREMENTS SPECIAL INSULATION DUCT WORK CONSTRUCTION SCHEDULE CLASS "B" SEAL CLASS "A" SEAL FPM 2,000 FPM 2,500 BSC TB TERMINAL BOX SS STAINLESS STEEL 2. EXHAUST AIR 04/15/14 ALL WELDED DO NOT INSTALL DAMAGED INSULATION, REMOVE FROM PROJECT SITE. B. PROTECT INSULATION AGAINST DIRT, WATER, CHEMICAL AND MECHANICAL DAMAGE. STAMP OR LABEL AFFIXED SHOWING FIRE HAZARD RATINGS OF PRODUCTS. A. DELIVER ALL REQUIRED MATERIALS TO SITE IN CONTAINERS WITH MANUFACTURER'S 1.3 DELIVERY, STORAGE AND HANDLING AND COMPRESSIVE STRENGTH. PROOF OF COMPLIANCE FOR TEST OF PRODUCTS FOR FIRE RATING, CORROSIVENESS COMPLIANCE WITH THESE SPECIFICATIONS AND GOVERNING REGULATIONS. INCLUDE C. CERTIFICATION - SUBMIT CERTIFICATIONS OR OTHER DATA AS NECESSARY TO SHOW MAINTENANCE MANUAL. LISTS FOR EACH TYPE OF MECHANICAL INSULATION. INCLUDE THIS DATA IN B. MAINTENANCE DATA - SUBMIT MAINTENANCE DATA AND REPLACEMENT MATERIAL ACCESSORIES FOR EACH MECHANICAL SYSTEM REQUIRING INSULATION. SHOWING MANUFACTURER'S PRODUCT NUMBER, THICKNESS, AND FURNISHED INSTRUCTIONS FOR EACH TYPE OF MECHANICAL INSULATION. SUBMIT SCHEDULE A. PRODUCT DATA - SUBMIT MANUFACTURER'S SPECIFICATIONS AND INSTALLATION 1.2 SUBMITTALS 50 OR LESS, AS TESTED BY ANSI/ASTM E 84 (NFPA 255) METHOD. FLAME-SPREAD RATING OF 25 OR LESS, AND SMOKE DEVELOPED RATING OF (INSULATION, JACKETS, COVERINGS, SEALERS, MASTICS AND ADHESIVES) WITH 2. FLAME/SMOKE RATINGS - PROVIDE COMPOSITE MECHANICAL INSULATION 1. MEET OR EXCEED ASHRAE 90-75 AND 90.1-75R AND NYS ENERGY CODE. B. REQUIRED CODES. A. DUAL TEMPERATURE DUCTWORK. 1.1 DUCTWORK SYSTEM INSULATION: DUCTWORK INSULATION 5. CONTROL VALVES. 4. DUCTWORK INSULATION. 3. AIR SYSTEMS BALANCE REPORT. 2. TEMPERATURE CONTROLS. 1. TERMINAL BOXES. LAMINATED PLASTIC TAGS ADHERED OR CHAINED TO EQUIPMENT. PROVIDE TERMINAL BOX, CONTROL VALVE MECHANICAL IDENTIFICATION TAGS, VI MECHANICAL IDENTIFICATION OCCUPIED/UNOCCUPIED CONDITIONS. D. CALCULATE SPACE AIR CHANGE RATES FOR EXHAUST FLOW DURING DIFFERENTIAL PRESSURE, ETC. TO WITHIN 10% OF VALUES INDICATED. C. BALANCE ALL GRILLES, DIFFUSERS, TERMINAL BOXES, FAN, EXHAUST VENTS, 4. EXHAUST FANS EF-20. 3. SUPPLY AIR DIFFUSERS. 2. EXHAUST, GRILLES, ETC. 1. TERMINAL BOXES (SUPPLY AND EXHAUST) FORMAT BALANCE REPORT. B. BALANCE EQUIPMENT AND SYSTEMS LISTED BELOW AND PROVIDE ELECTRONIC PDF ORDER. BEGIN UNTIL HEATING CONTRACTOR HAS SYSTEM COMPLETED, IN FULL WORKING SHOWN ON DRAWINGS CAN BE MET. SYSTEM ADJUSTING AND TESTING SHALL NOT DEMONSTRATE THAT SPECIFIED CAPACITIES OF VARIOUS PARTS OF SYSTEM AS A. ALL HEATING, VENTILATION AND AIR CONDITIONING SYSTEMS SHALL BE TESTED TO 3.2 STARTUP AND COMMISSIONING OF AIR SYSTEMS PAINT OR OTHER SUITABLE PERMANENT IDENTIFICATION MATERIALS. TO SHOW FINAL SETTINGS AT COMPLETION OF TAB WORK. PROVIDE MARKINGS WITH INDICATORS, FAN SPEED CONTROL LEVERS, AND SIMILAR CONTROLS' AND DEVICES, D. MARK EQUIPMENT SETTINGS, INCLUDING DAMPER CONTROL POSITIONS, VALVE INSTALLER. OR DRILLED FOR TEST PURPOSES, IN MANNER RECOMMENDED BY ORIGINAL C. PATCH HOLES IN INSULATION, DUCTWORK AND HOUSINGS, WHICH HAVE BEEN CUT REPORTS, IN FORMAT RECOMMENDED BY APPLICABLE STANDARDS. B. PREPARE REPORT OF TEST RESULTS, INCLUDING INSTRUMENTATION CALIBRATION VOLUMES AND/ OR PRESSURES INDICATED. A. TEST, ADJUST AND BALANCE HVAC AIR SYSTEMS AND COMPONENTS, TO AIR 3.1 TESTING PART 3 - EXECUTION 1. AABC'S MANUAL MN1 "AABC NATIONAL STANDARDS". PRECISION, AND CAPACITY AS RECOMMENDED IN THE FOLLOWING TAB STANDARDS: A. UTILIZE TEST INSTRUMENTS AND EQUIPMENT FOR TAB WORK REQUIRED, OF TYPE, 2.2 TEST INSTRUMENTS DUCTWORK AND HOUSINGS. B. PLASTIC PLUGS WITH RETAINERS SHALL BE USED TO PATCH DRILLED HOLES IN TEST INSTRUMENTS, ATTACHING JIGS, AND SIMILAR PURPOSES. WHICH HAVE BEEN CUT OR DRILLED FOR TEST PURPOSES, INCLUDING ACCESS FOR INSTALLER FOR PATCHING HOLES IN INSULATION, DUCTWORK AND HOUSINGS A. EXCEPT AS OTHERWISE INDICATED, USE SAME PRODUCTS AS USED BY ORIGINAL 2.1 PATCHING MATERIALS PART 2 - PRODUCTS MATERIALS. BALANCING IS CLEAN AND FREE FROM DEBRIS, DIRT AND DISCARDED BUILDING B. DO NOT PROCEED UNTIL WORK SCHEDULED FOR TESTING, ADJUSTING AND THAT THERE IS NO LATENT RESIDUAL WORK STILL TO BE COMPLETED. HAS BEEN COMPLETED, SATISFACTORILY LEAK TESTED AND IS OPERABLE. ENSURE A. DO NOT PROCEED WITH TESTING, ADJUSTING, AND BALANCING WORK UNTIL WORK 1.4 JOB CONDITIONS AND BALANCE SUPERVISOR WHO PERFORMED TAB WORK. A. SUBMIT IN ELECTRONIC FORMAT (PDF) CERTIFIED TEST REPORTS SIGNED BY TEST 1.3 SUBMITTALS EQUIPMENT AND APPARATUS. AS APPLICABLE TO MECHANICAL AIR DISTRIBUTION SYSTEMS AND ASSOCIATED B. AABC COMPLIANCE: COMPLY WITH AABC'S MANUAL MN1 "AABC NATIONAL STANDARDS", (AABC). AND BALANCING EXPERIENCE AND CERTIFIED BY ASSOCIATED AIR BALANCE COUNCIL A. INSTALLER: A FIRM WITH AT LEAST 3 YEARS OF SUCCESSFUL TESTING, ADJUSTING, 1.2 QUALITY ASSURANCE PROVIDE ROOM AIR CHANGE REPORT FOR OCCUPIED AND UNOCCUPIED CONDITIONS. C. 4. EXHAUST FANS EF-20. 3. SUPPLY AIR DIFFUSERS. 2. EXHAUST, GRILLES. 1. TERMINAL BOXES (SUPPLY AND EXHAUST) SECTION INCLUDES THE FOLLOWING AS APPLIED TO MECHANICAL EQUIPMENT: B. COMPONENT TYPES OF TESTING, ADJUSTING, AND BALANCING SPECIFIED IN THIS TO WORK AS REQUIRED BY CONTRACT DOCUMENTS. TESTS, PREPARING AND SUBMITTING REPORTS, AND RECOMMENDING MODIFICATIONS ADJUSTING FACILITIES PROVIDED FOR SYSTEMS, RECORDING DATA, CONDUCTING A. THE WORK CONSISTS OF LEAK TESTING, SETTING SPEED AND VOLUME (FLOW) 1.1 DESCRIPTION OF WORK PART 1 - GENERAL V SHEET METAL HVAC TESTING, ADJUSTING AND BALANCING CONICAL TYPE TEES. USE 1 TO 1.5 RADIUS ELBOWS. CONNECTIONS. WHERE 90 DEGREE BRANCHES ARE INDICATED, PROVIDE LATERALS AND 45 DEGREE ELBOWS FOR BRANCH TAKE-OFF SECTION. UNLESS SPECIFICALLY DETAILED OTHERWISE, USE 45 DEGREE SECTIONS WITH MAXIMUM 15 DEGREE CHANGE OF DIRECTION PER 1. FITTINGS: PROVIDE RADIUS TYPE FITTINGS FABRICATED OF MULTIPLE CONTRACTING TAPERS AND 20 DEGREES FOR EXPANDING TAPERS. ASSOCIATED DUCT WIDTH. LIMIT ANGULAR TAPERS TO 30 DEGREES FOR OTHERWISE INDICATED, FABRICATE ELBOWS WITH INSIDE RADIUS EQUAL TO WITH DUCT REQUIREMENTS AS APPLICABLE TO FITTINGS. EXCEPT AS G. FABRICATE DUCT FITTINGS TO MATCH ADJOINING DUCTS, AND TO COMPLY WITH APPLICABLE SMACNA STANDARD. F. SHOP FABRICATE DUCTWORK OF GAUGES AND REINFORCEMENT COMPLYING SUPPORT MATERIAL. 2. FOR STAINLESS STEEL DUCTWORK, PROVIDE MATCHING STAINLESS STEEL STRAPS, TRIM AND ANGLES. PROVIDE HOT DIPPED GALVANIZED STEEL FASTENERS, ANCHORS, RODS, 1. FOR GALVANIZED STEEL DUCTWORK AND THERMOPLASTIC DUCTWORK, E. DUCTWORK SUPPORT MATERIALS. JOINTS ONLY. SEALING JOINTS AND SEAMS IN DUCTWORK. LIQUID ALLOWED FOR SLIP COMPOUNDED AND RECOMMENDED BY MANUFACTURER SPECIFICALLY FOR SEALANT (TYPE APPLICABLE FOR FABRICATION/INSTALLATION DETAIL) AS D. DUCT SEALANT: NON-HARDENING, NON-MIGRATING ELASTIC MASTIC LIMIT LENGTHS TO FIVE (5) FEET. SUPPORT ACCORDING TO SMACNA. CEILING TERMINAL BOX ONLY. EXTEND FLEXIBLE DUCT COMPLETELY AND USED FOR CONNECTING ROOM DIFFUSER TO SHEET METAL DUCT AND/OR FIBERGLASS REINFORCED METALLIZED LAMINATE. FLEXIBLE DUCT MAY BE FIBERGLASS BLANKET AND A LOW PERMEABILITY OUTER VAPOR BARRIER OF HELIX. THE INNER CORE SHALL BE COVERED BY A MINIMUM OF 1" THICK BONDED PERMANENTLY TO CORROSION RESISTANT COATED SPRING STEEL WIRE FABRICATED WITH AN INNER LINER OF WOVEN AND COATED FIBERGLASS C. FLEXIBLE DUCT: WHERE INDICATED, PROVIDE INSULATED FLEXIBLE DUCT ANSI/ASTM A 167, AISI TYPE 302/304/316 WITH 2B NATURAL FINISH. 304 STAINLESS STEEL: PROVIDE STAINLESS STEEL SHEET COMPLYING WITH B. EXHAUST DUCTWORK: INSTALLATION. ADHESIVE PROTECTIVE PAPER, MAINTAINED THROUGH FABRICATION AND FOR EXPOSED LOCATIONS. PROTECT FINISHED SURFACES WITH MILL APPLIED QUALITY, WITH ANSI/ASTM A 525, G90 ZINC COATING, MILL PHOSPHATIZED GALVANIZED SHEET STEEL COMPLYING WITH ANSI/ASTM A 527, LOCKFORMING GALVANIZED - EXCEPT AS OTHERWISE INDICATED, FABRICATE DUCTWORK FROM A. HVAC SUPPLY AIR: PART 3 PRODUCTS INSTALLED DUCTWORK, DUCT ACCESSORIES, AND OUTLETS AND INLETS. C. AS-BUILT DRAWINGS: AT PROJECT CLOSEOUT, SUBMIT AS-BUILT DRAWINGS OF CONTRACT DRAWINGS. SPACE TO INCLUDE LINING AND MAINTAIN INTERNAL DIMENSIONS INDICATED ON ENCLOSURE. DUCT DIMENSIONS SHALL BE EXTERNAL AND PROVIDE ADEQUATE BOTH THE ACCURATELY SCALED DUCTWORK AND ITS RELATION TO SPACE B. SHOP DRAWINGS: SUBMIT DIMENSIONED LAYOUTS OF DUCTWORK SHOWING PRODUCTS AND FACTORY FABRICATED DUCTWORK. A. PRODUCT DATA: SUBMIT MANUFACTURER'S SPECIFICATIONS ON MANUFACTURED PART 2 SUBMITTALS COMMERCIAL COOKING EQUIPMENT". EQUIPMENT FOR THE REMOVAL OF SMOKE AND GREASE LADEN VAPORS FROM CONDITIONING SYSTEMS", AND NFPA 96 "STANDARDS FOR INSTALLATION OF 90 B "STANDARD FOR THE INSTALLATION OF WARM AIR HEATING AND AIR INSTALLATION OF AIR CONDITIONING AND VENTILATING SYSTEMS" AND NFPA D. NFPA COMPLIANCE: COMPLY WITH NFPA 90 A "STANDARD FOR THE OF INDUSTRIAL DUCTWORK. CONSTRUCTION", LATEST EDITIONS, FOR FABRICATION AND INSTALLATION "ACCEPTED INDUSTRY PRACTICE FOR SQUARE INDUSTRIAL DUCT INDUSTRY PRACTICE FOR ROUND INDUSTRIAL DUCT CONSTRUCTION"; AND INDUSTRY PRACTICE FOR INDUSTRIAL DUCT CONSTRUCTION"; "ACCEPTED C. SMACNA STANDARDS (INDUSTRIAL DUCT) - COMPLY WITH SMACNA "ACCEPTED INSTALLATION OF METAL AND FLEXIBLE DUCTWORK. DUCT CONSTRUCTION STANDARDS: LATEST EDITION FOR FABRICATION AND SMACNA "HVAC DUCT CONSTRUCTION STANDARDS AND ROUND INDUSTRIAL B. SMACNA STANDARDS (METAL AND FLEXIBLE DUCTWORK) - COMPLY WITH A. SPECIFIC DUCT SYSTEM CLASSIFICATIONS: I PART 1 GENERAL DUCTWORK jefferymm : 4/21/2014 : 2:29:53 PM : pdf_L.plt : DPC_LARGE.TBL : L:\Jobs\CU-14007\PltSht\M100.dgn KEY PLAN SCALE: NONE PROJECT LOCATION 22x34UPUPUP UP UP COPYRIGHT THIS DOCUMENTATION IN ANY WAY. ENGINEER. TO ALTER ANY ITEM ON UNDER THE DIRECTION OF THE ANY PERSON UNLESS ACTING IT IS A VIOLATION OF LAW FOR THE COPYRIGHT. RESERVED RIGHTS, INCLUDING LAW STATUTORY AND OTHER AND SHALL RETAIN ALL COMMON THE AUTHOR OF THESE DOCUMENTS THE ENGINEER SHALL BE DEEMED DRAWING ALTERATION 1 1/4" HS 2 1/2" HR 2 1/2" HR 1 1/4" HS 2 1/2" HR 1 1/2" HS 1" HR DN 3/4" HR UP 1" HS DN 3/4" HS UP 3/4" CHWS 3/4" CHWR T 12" DIA EXH24" DIA SA 18"x10" SA 12" DIA EXH 14" DIA EXHTB-59 (N)(EA)TB-58 (N)(SA)BSC-01BSC-02FH-OL-208CABINET1 1/4" HS 2 1/2" HR 2 1/2" HR 1 1/4" HS 2 1/2" HR 1 1/2" HS 1" HR DN 3/4" HR UP 1" HS DN 3/4" HS UP 3/4" CHWS 3/4" CHWR T 12" DIA EXH 12" DIA EXH24" DIA SA 18"x10" SA 12" DIA EXH 10" DIA EXHBENCHSCALE: 1/4" = 1'-0" 2 M100 SCALE: 1/4" = 1'-0" 1 M100 - DEMOLITION AS NOTED DPC ENGINEERING, P.C. (607) 734-8494 fax (607) 734-8492 phone Elmira Heights, NY 14903 145 Prescott Avenue PROJECT NUMBER: Consulting Engineers DRAWING NUMBER: PROJECT NAME: DESIGN:CHECKED:DRAWN: APPROVED:DATE:SCALE: DESCRIPTION DATE APPVDREV ISSD BY M100 CAD MMJ CAD CAD - DEMOLITION AND NEW CU-14007 OLIN HALL LAB 208 MODIFICATIONS PARTIAL SECOND FLOOR MECHANICAL PLAN PARTIAL SECOND FLOOR MECHANICAL PLAN PARTIAL SECOND FLOOR MECHANICAL PLAN 4'8'0 2'4'8'0 2' D DBOX AND DUCT REMOVE EA TB-59 D D FROM TC PANEL CONTROLS REMOVE FUMEHOOD CONTROLS 12" DIA DUCT AND REMOVE FH, SD BOX, LAB 208 LAB 210 LAB 206 LAB 206 LAB 208 LAB 210 D RHC TO REMAIN REMOVE TB-58 BOX SEE DWG M600 EXISTING TC PANEL 12" DIA SA CONNECT TO EXISTING EXISTING RHC CONNECT TO 12" DIA SS EXH AIR CONNECT TO EXISTING TO 1,000 CFM (OCCUP) BALANCE EXISTING EXH REG (TYP OF 4) TO 225 CFM (OCCUP) EACH BALANCE EXISTING SA DIFF EXISTING SPACE SENSOR TO REMAIN 04/15/14 D PNEUMATIC TUBING CONTROL VALVE AND REMOVE EXISTING FTR D PNEUMATIC TUBING CONTROL VALVE AND REMOVE EXISTING RHC CV-FTR CONTROL VALVE INSTALL ELECTRIC CV-TB58-RHC CONTROL VALVE INSTALL ELECTRIC jefferymm : 4/21/2014 : 2:29:55 PM : pdf_L.plt : DPC_LARGE.TBL : L:\Jobs\CU-14007\PltSht\M600.dgn 22x34COPYRIGHT THIS DOCUMENTATION IN ANY WAY. ENGINEER. TO ALTER ANY ITEM ON UNDER THE DIRECTION OF THE ANY PERSON UNLESS ACTING IT IS A VIOLATION OF LAW FOR THE COPYRIGHT. RESERVED RIGHTS, INCLUDING LAW STATUTORY AND OTHER AND SHALL RETAIN ALL COMMON THE AUTHOR OF THESE DOCUMENTS THE ENGINEER SHALL BE DEEMED DRAWING ALTERATION AS NOTED DPC ENGINEERING, P.C. (607) 734-8494 fax (607) 734-8492 phone Elmira Heights, NY 14903 145 Prescott Avenue PROJECT NUMBER: Consulting Engineers DRAWING NUMBER: PROJECT NAME: DESIGN:CHECKED:DRAWN: APPROVED:DATE:SCALE: DESCRIPTION DATE APPVDREV ISSD BY M600 CAD MMJ CAD CAD OLIN HALL LAB 208 MODIFICATIONS CU-14007 04/15/14 MECHANICAL SCHEDULES jefferymm : 4/21/2014 : 2:30:00 PM : pdf_L.plt : DPC_LARGE.TBL : L:\Jobs\CU-14007\PltSht\M601.dgn 22x34COPYRIGHT THIS DOCUMENTATION IN ANY WAY. ENGINEER. TO ALTER ANY ITEM ON UNDER THE DIRECTION OF THE ANY PERSON UNLESS ACTING IT IS A VIOLATION OF LAW FOR THE COPYRIGHT. RESERVED RIGHTS, INCLUDING LAW STATUTORY AND OTHER AND SHALL RETAIN ALL COMMON THE AUTHOR OF THESE DOCUMENTS THE ENGINEER SHALL BE DEEMED DRAWING ALTERATION AF AF C M C M P P O/C T SA DAMPER EXH DAMPER RHC RAD. AIR FLOW HOOD AIR FLOW SUPPLY AIR FLOW GEN. EXH 12" DIA GALV SA TB-58 TB-59 12" DIA SS EXH LAB RM. 208 CONTROL CABINET FUME HOOD CONTROLLER FUME HOOD SUPPLY AIREXHAUST AIR RHC RADIATION (FTR) EP EP P EP SE6104 CONTROLLER AUTOMATED LOGIC EXISTING O/C (XAHU-1/2)(XEF-20) SENSOR EXISTING OCCUPANCY SENSOR EXISTING SPACE SENSOR EXISTING OCCUPANCY FUME HOOD EP AS NOTED DPC ENGINEERING, P.C. (607) 734-8494 fax (607) 734-8492 phone Elmira Heights, NY 14903 145 Prescott Avenue PROJECT NUMBER: Consulting Engineers DRAWING NUMBER: PROJECT NAME: DESIGN:CHECKED:DRAWN: APPROVED:DATE:SCALE: DESCRIPTION DATE APPVDREV ISSD BY M601 CAD MMJ CAD CAD OLIN HALL LAB 208 MODIFICATIONS CU-14007 1 M601 AIR FLOW/CONTROL DEMOLITION SCHEMATIC SCALE: NTS AIR FLOW/CONTROL DEMOLITION SCHEMATIC D D D D 04/15/14 REMOVE REMOVE CONTROL REMOVE EP D AND PNEUMATIC TUBING REMOVE FTR CONTROL VALVE AND PNEUMATIC TUBING REMOVE RHC CONTROL VALVE D TO REMAIN TO MAIN AND CAP REMOVE PNEUMATIC TUBING AND CONTROLS AS SHOWN IN BOLD REMOVE SUPPLY AIR DUCT, TB AND CONTROLS AS SHOWN IN BOLD REMOVE SUPPLY AIR DUCT, TB TO MAIN AND CAP REMOVE PNEUMATIC TUBING REMOVE FUME HOOD jefferymm : 4/21/2014 : 2:30:02 PM : pdf_L.plt : DPC_LARGE.TBL : L:\Jobs\CU-14007\PltSht\M602.dgn 22x34COPYRIGHT THIS DOCUMENTATION IN ANY WAY. ENGINEER. TO ALTER ANY ITEM ON UNDER THE DIRECTION OF THE ANY PERSON UNLESS ACTING IT IS A VIOLATION OF LAW FOR THE COPYRIGHT. RESERVED RIGHTS, INCLUDING LAW STATUTORY AND OTHER AND SHALL RETAIN ALL COMMON THE AUTHOR OF THESE DOCUMENTS THE ENGINEER SHALL BE DEEMED DRAWING ALTERATION AS NOTED DPC ENGINEERING, P.C. (607) 734-8494 fax (607) 734-8492 phone Elmira Heights, NY 14903 145 Prescott Avenue PROJECT NUMBER: Consulting Engineers DRAWING NUMBER: PROJECT NAME: DESIGN:CHECKED:DRAWN: APPROVED:DATE:SCALE: DESCRIPTION DATE APPVDREV ISSD BY M602 CAD MMJ CAD CAD OLIN HALL LAB 208 MODIFICATIONS CU-14007 04/15/14 SEQUENCE OF OPERATION SETPOINT AVAO FLOW AI ALARM AI REHEAT COILAO AI T MOD ANALOG ELECTRIC CONTROLLER N.C. SETPOINT AVAO FLOW AI ALARM AI MOD ANALOG ELECTRIC CONTROLLER TB-59 N.C. PP AI T OS BI SETPOINT AV sa d OS BI F.L. F.L. DAT = XX DEG F FROM AHU-XX FTR-EXISTING SPACE SENSOR EXISTING OCC SENSOR EXISTING S4V TB-59 EXISTING RHC TO EF XEF-20 M PENTHOUSE MECHANICAL ROOM LAB 208 AIR FLOW-CONTROL SCHEMATIC / CONTROL SEQUENCE READINGS FOR OCCUPIED/UNOCCUPIED CONDITIONS. AND UNOCCUPIED AIR FLOWS. TAKE TAB XEF-20 TO RIDE FAN CURVE FOR OCCUPIED WHEN TB-59 IS SET FOR 440 CFM BALANCE EXISTING BYPASS TO 760 CFM S S MS M BO AO F.L.COOLING COILFCU-1 VALVE SHALL BE CLOSED WHEN THE FAN COIL UNIT FAN IS OFF. SIMULTANEOUS HEATING AND COOLING. THE COOLING CONTROL THE HEATING CONTROL VALVES ARE OPEN TO PREVENT THE COOLING COIL VALVE SHALL BE CLOSED WHENEVER SCHEDULED MINIMUM. EXHAUST AIR VALVES SHALL BE POSITIONED TO THEIR SIMULTANEOUS HEATING AND COOLING. THE SUPPLY AND THE HEATING CONTROL VALVES ARE OPEN TO PREVENT THE COOLING SEQUENCE SHALL BE OFF WHENEVER UNOCCUPIED MODE. UNOCCUPIED PERIOD, THE SPACE SHALL INDEX BACK TO BECOMES UNOCCUPIED AGAIN DURING THE SCHEDULED MODE FOR THE DURATION OF OCCUPANCY. WHEN THE SPACE UNOCCUPIED PERIOD, THE SPACE SHALL INDEX TO OCCUPIED IF THE SPACE BECOMES OCCUPIED DURING THE SCHEDULED MODULATE TO MAINTAIN SETPOINT. AND THE FAN COIL UNIT COOLING CONTROL VALVE SHALL TEMPERATURE SETPOINT, THE FAN COIL UNIT SHALL START, TEMPERATURE RISES ABOVE THE UNOCCUPIED COOLING THE SCHEDULED UNOCCUPIED PERIOD AND THE ZONE UNOCCUPIED COOLING: IF THE SPACE IS UNOCCUPIED DURING VALVE SHALL MODULATE AS REQUIRED TO MAINTAIN SETPOINT. TEMPERATURE SETPOINT, THE BASEBOARD RADIATION CONTROL TEMPERATURE FALLS BELOW THE UNOCCUPIED HEATING THE SCHEDULED UNOCCUPIED PERIOD AND THE SPACE UNOCCUPIED HEATING: IF THE SPACE IS UNOCCUPIED DURING TEMPERATURE SETPOINTS. THE SPACE SHALL BE MAINTAINED AT THE OCCUPIED SETBACK OCCUPIED HEATING/COOLING SEQUENCES SHALL APPLY, BUT DURING THE SCHEDULED OCCUPIED PERIOD, THE ABOVE OCCUPIED SETBACK: IF THE SPACE BECOMES UNOCCUPIED CHILLED WATER CONTROL VALVE SHALL CLOSE. SETPOINT, THE FAN COIL UNIT SHALL SHUT OFF AND THE MAINTAIN SETPOINT. WHEN THE SPACE TEMPERATURE IS AT AND THE COOLING COIL CONTROL VALVE SHALL MODULATE TO TEMPERATURE SETPOINT, THE FAN COIL UNIT SHALL START, SPACE TEMPERATURE RISES ABOVE THE OCCUPIED COOLING OCCUPIED DURING THE SCHEDULED OCCUPIED PERIOD AND THE SHALL PROVIDE SUPPLEMENTAL SPACE COOLING. IF THE SPACE IS OCCUPIED COOLING: THE SPACE SHALL HAVE A FAN COIL UNIT CONTROL VALVES SHALL BE CLOSED. AT SETPOINT, THE BASEBOARD RADIATION AND REHEAT COIL TEMPERATURE SETPOINT. WHEN THE SPACE TEMPERATURE IS CONTROL VALVE SHALL MODULATE TO MAINTAIN THE SPACE BOARD RADIATION CONTROL VALVE FULLY OPEN, THE REHEAT SPACE TEMPERATURE IS NOT AT SETPOINT WITH THE BASE TO MAINTAIN THE SPACE TEMPERATURE SETPOINT. IF THE THE BASEBOARD RADIATION CONTROL VALVE SHALL MODULATE FALLS BELOW THE OCCUPIED HEATING TEMPERATURE SETPOINT, SCHEDULED OCCUPIED PERIOD AND THE SPACE TEMPERATURE OCCUPIED HEATING: IF THE SPACE IS OCCUPIED DURING THE OCCUPANCY SENSORS. COMBINATION OF PROGRAMMED SCHEDULE AND SPACE TEMPERATURE SETPOINTS SHALL BE DETERMINED BASED ON A ZONE TEMPERATURE CONTROL: DIFFERENTIAL. MODULATE AS NEEDED TO MAINTAIN THE SPECIFIED AIRFLOW UNOCCUPIED AIR CHANGE RATE. THE SUPPLY AIR VALVE SHALL VALVE SHALL MODULATE AS NEEDED TO MAINTAIN THE WHEN THE ROOM IS UNOCCUPIED, THE GENERAL EXHAUST AIR DIFFERENTIAL. MODULATE AS NEEDED TO MAINTAIN THE SPECIFIED AIRFLOW OCCUPIED AIR CHANGE RATE. THE SUPPLY AIR VALVE SHALL THAT SHALL MODULATE AS NEEDED TO MAINTAIN THE OCCUPIED COMMAND TO THE GENERAL EXHAUST AIR VALVE WHEN THE ROOM IS OCCUPIED, THE BACS SHALL SEND AN VIA ROOM OCCUPANCY SENSORS (MINIMUM 2 PER LAB). NORMAL CONTROL, ROOM OCCUPANCY SHALL BE DETERMINED AIR VALVE POSITIONS SHALL BE BASED ON MODE. UNDER LABORATORY AIRFLOW CONTROL ZONE OCCUPANCY SCHEDULE: 6 AM TO 8 PM, MON-FRI MINIMUM LABORATORY OCCUPANCY INDEX TIME: 30 MINUTES REQUIRED = -100 CFM FOR NEGATIVE PRESSURE LABS REFER TO AIRFLOW SCHEDULE SPACE AIR DIFFERENTIAL OFFSET (CFM) TOTAL EXHAUST CFM REFER TO AIRFLOW SCHEDULE GENERAL EXHAUST AIRFLOW RATE (CFM) TYPICALLY = TOTAL EXHAUST AIRFLOW RATE + OFFSET REFER TO AIRFLOW SCHEDULE SUPPLY AIRFLOW RATE (CFM) REFER TO AIRFLOW SCHEDULE TOTAL EXHAUST AIRFLOW RATE (CFM) ACPH = TOTAL EXHAUST CFM X 60/ROOM VOLUME TYPICALLY = 5 ACPH OCC / 3 ACPH UNOCC TOTAL EXHAUST AIR CHANGE RATE (ACPH) 75 DEG F - 6 DEG FUNOCCUPIED: 75 DEG F - 3 DEG FOCCUPIED SETBACK: 75 DEG F +/- 1.5 DEG FOCCUPIED: SPACE HEATING TEMPERATURE SETPOINTS 75 DEG F + 6 DEG FUNOCCUPIED: 75 DEG F + 3 DEG FOCCUPIED SETBACK: 75 DEG F +/- 1.5 DEG FOCCUPIED: SPACE COOLING TEMPERATURE SETPOINTS SETPOINTS: AUTOMATICALLY INITIATED VIA THE BACS. THE AIRFLOW CONTROL DEVICES. THESE MODES WILL NOT BE DESIGN TO INDICATE THE MAXIMUM TURNDOWN POSSIBLE OF THE HIBERNATION AND VACANT MODES ARE INCLUDED IN THE (-100 CFM). WHILE MAINTAINING THE REQUIRED EXHAUST FLOW OFFSET THE PRIMARY AIR FROM THE CENTRAL SYSTEM SHALL INCREASE RATE. IF THE REQUIRED COOLING LOAD EXCEEDS THAT WHICH THE DRIVING FACTOR IS THE ROOM MINIMUM AIR CHANGE DESIGN INTENT: THIS SEQUENCE IS FOR LABORATORIES IN ROOM GROSS VOLUME (AREA X CEILING HEIGHT). THE BACS SHALL CALCULATE THE REQUIRED CFM USING THE THE SPACE SHALL BE CONTROLLED TO AN AIR CHANGE RATE. EXHAUST AIR FLOW FROM THE SPACE. LABORATORY AIR CHANGE RATES ARE BASED ON TOTAL AS REQUIRED. SHALL BE REUSED FOR CONTROL. MODIFY CONTROL SEQUENCE EXISTING AUTOMATED LOGIC CONTROLLER, MODEL SE6104, ALL SETPOINTS SHALL BE ADJUSTABLE. AUTOMATION AND CONTROL SYSTEM (BACS). SYSTEM SHALL BE CONTROLLED THROUGH THE BUILDING GENERAL: BASEBOARD RADIATION HEATING (FTR-EXISTING) FAN COIL UNIT COOLING (FCU-EXISTING) DUCT MOUNTED RE-HEAT COIL (RHC-EXISTING) GENERAL EXHAUST AIR VALVE (TB-59(N)(EX) SUPPLY AIR VALVE (TB-58(N)(SA) SYSTEM DESCRIPTION: BO - CLOSED BO - OPEN jefferymm : 4/21/2014 : 2:30:10 PM : pdf_L.plt : DPC_LARGE.TBL : L:\Jobs\CU-14007\PltSht\P100.dgn KEY PLAN SCALE: NONE PROJECT LOCATION 22x34UPUPUP UP UP COPYRIGHT THIS DOCUMENTATION IN ANY WAY. ENGINEER. TO ALTER ANY ITEM ON UNDER THE DIRECTION OF THE ANY PERSON UNLESS ACTING IT IS A VIOLATION OF LAW FOR THE COPYRIGHT. RESERVED RIGHTS, INCLUDING LAW STATUTORY AND OTHER AND SHALL RETAIN ALL COMMON THE AUTHOR OF THESE DOCUMENTS THE ENGINEER SHALL BE DEEMED DRAWING ALTERATION TABLE TABLEFILECASEWORK REFRIG.REFRIG.CABINET CABINET CABINETCASEWORK FH-OL-2081/2" CA 1/2" ROS 1/2" CA 1/2" CA 3" AND DN 4" LDR UP FD 2" W DN 1/2" DCW 1/2" DHW 1/2" DHW 1/2" DCW 1/2" AW DN 1/2" NG FD FD 1/2" DCW 1/2" NG 1/2" CA BSC-01BSC-02FH-OL-208CABINET1/2" CA 1/2" ROS 1/2" CA 1/2" CA 1/2" CA 3" 3" LDR UP AND DN 4" LDR UP FD 2" W DN 1/2" DCW 1/2" DHW 1/2" DHW 1/2" DCW 1/2" DCW 1/2" AW DN 1/2" NG FD FD 1/2" DCW 1/2" NG 1/2" NG 1/2" NG BENCHSCALE: 1/4" = 1'-0" 2 P100 SCALE: 1/4" = 1'-0" 1 P100 - DEMOLITION AS NOTED DPC ENGINEERING, P.C. (607) 734-8494 fax (607) 734-8492 phone Elmira Heights, NY 14903 145 Prescott Avenue PROJECT NUMBER: Consulting Engineers DRAWING NUMBER: PROJECT NAME: DESIGN:CHECKED:DRAWN: APPROVED:DATE:SCALE: DESCRIPTION DATE APPVDREV ISSD BY P100 SAD MMJ CAD CAD - DEMOLITION AND NEW CU-14007 OLIN HALL LAB 208 MODIFICATIONS 4'8'0 2'4'8'0 2' PARTIAL SECOND FLOOR PIPING PLAN PARTIAL SECOND FLOOR PIPING PLAN PARTIAL SECOND FLOOR PIPING PLAN LAB 208 LAB 210 LAB 208 LAB 210 D D PIPING SPECIFICATIONS OR APPROVED EQUAL. NATURAL GAS SERVICE. VALVES TO BE APOLLO SERIES GB15 THREADED END CONNECTION. ASME B16.44, FOR SHUT OFF VALVES FOR NATURAL GAS TO BE BRONZE BODY BALL VALVES,5. FOR DOMESTIC WATER APPLICATIONS. SERIES WITH SS BALL AND STEM. USE LEAD FREE (LF SERIES) THREADED END CONNECTION. VALVES TOB E APOLLO 70-140 VALVES FOR COPPER SYSTESM TO BE BRONZE BODY, WITH4. COUPLINGS AND FITTINGS. TO MATCH EXISTING SYSTEM. JOINTS TO BE NO-HUB DRAIN PIPING TO BE POLYPROPYLENE ACID WASTE SYSTEM3. CARBON STEEL WITH MALLABLE IRON, THREADED FITTINGS. NATURAL GAS PIPING TO BE SCHEDULE 40, ASTM-A53 2. SOLDER JOINT. SOLDER TO BE 96% TIN, 4% SILVER. COMPRESSED AIR PIPING TO BE "TYPE-L" COPPER WITH1. PLUMBING NOTES PROVIDE REGULATOR AND VALVE FOR EXISTING NEWPORT TABLE. TIE 1/2" CA INTO EXISTING CA SERVICE IN ROOM 210.6. OVER TO OWNER FOR SPARE. GAS COCKS TO BE REMOVED FROM TABLE TOP AND TURNED5. POLYPROPYLENE CAP ON STUB, 3" ABOVE FLOOR. REMOVE EXISTING ACID WASTE DRAIN FROM HOOD. INSTALL4. EXISTING. WITH FIRE CAULK. PAINT WALL ON BOTH SIDES TO MATCH REMOVE 1/2" CA AND NG LINES ON WALL. SEAL WALL 3. BALL VALVE ABOVE CEILING AND CAP REMOVE 1/2" NG FROM FUME HOOD. PROVIDE 1/2" 2. BALL VALVE ABOVE CEILING AND CAP. REMOVE 1/2" CW FROM FUME HOOD. PROVIDE 1/2" 1. NOTE 5 NOTE 3 D NOTE 4 NOTE 2 NOTE 6 NOTE 6 3 P100 COMPRESSED AIR DROP SCALE: NTS 3 P100 1/2" CA SURFACE MOUNTED ON WALL MOUNT AT 42" AFF. WITH 5 MM FILTER AND 0-100 PSIG PRESSURE GAUGE. 1/4" FILTER/REGULATOR. NORGREN MODEL B07-202-M1KA WITHOUT LOSS OF PRESSURE. 9. TEST ALL PIPING AT 125% WORKING PRESSURE FOR 1 HOUR REPAIR INSULATION ON WATER LINES TO MATCH EXISTING.8. SUPPORT PIPING EVERY 5'-0" O.C. PROVIDE COPPER CLAD HANGERS FOR COPPER PIPE SYSTEMS.7. GAUGE 0-100 PSIG. B07-202-M1KA OR APPROVED EQUAL. PROVIDE PRESSURE REGULATORS TO BE NORGREN, 1/4" FILTER/REGULATOR, MODEL6. 1/2" BALL VALVE. APOLLO OR APPROVED EQUAL F/R NOTE 1 PI EXISTING 04/15/14 (COORDINATE) EQUIPMENT TO OWNERS CONNECTION 1/2" FNPT jefferymm : 4/21/2014 : 2:30:13 PM : pdf_L.plt : DPC_LARGE.TBL : L:\Jobs\CU-14007\PltSht\E001.dgn 22x34COPYRIGHT THIS DOCUMENTATION IN ANY WAY. ENGINEER. TO ALTER ANY ITEM ON UNDER THE DIRECTION OF THE ANY PERSON UNLESS ACTING IT IS A VIOLATION OF LAW FOR THE COPYRIGHT. RESERVED RIGHTS, INCLUDING LAW STATUTORY AND OTHER AND SHALL RETAIN ALL COMMON THE AUTHOR OF THESE DOCUMENTS THE ENGINEER SHALL BE DEEMED DRAWING ALTERATION ELECTRIC SYMBOLS LEGEND SYMBOL DESCRIPTION DUPLEX RECEPTACLE ABBREVIATIONS - GROUND FAULT CIRCUIT INTERRUPTER - GROUND - ELECTRICAL METALLIC TUBING - EXHAUST FAN - ELECTRICAL CONTRACTOR - EXISTING TO REMAIN - DRAWING - CENTERLINE - CONDUIT - BUILDING - ABOVE FINISHED FLOOR - AMPERE GFI G EMT EF EC E DWG CL C BLDG AFF A PANELBOARD 2x4 LIGHT FIXTURE W V RM RL RI REL RE R PH P OC JB - WIRE - VOLT - ROOM - RELOCATE EXISTING - REMOVE AND REINSTALL - RELOCATED - REPLACE EXISTING - REMOVE - PHASE - POLE - OVER COUNTER - JUNCTION BOX AS NOTED DPC ENGINEERING, P.C. (607) 734-8494 fax (607) 734-8492 phone Elmira Heights, NY 14903 145 Prescott Avenue PROJECT NUMBER: Consulting Engineers DRAWING NUMBER: PROJECT NAME: DESIGN:CHECKED:DRAWN: APPROVED:DATE:SCALE: DESCRIPTION DATE APPVDREV ISSD BY E001 PWT PWT PWT CAD OLIN HALL LAB 208 MODIFICATIONS CU-14007 SYMBOLS, ABBREVIATIONS,NOTES OC OCCUPANCY SENSOR X ELECTRICAL NOTESELECTRICAL DEMOLITION NOTES WALL SHALL BE REMOVED AND THE RESULTING OPENING FIRESTOPPED. 7. ANY EXISTING CONDUITS THAT REQUIRE REMOVAL AND THAT PASS THROUGH A FIRE RATED SHALL BE CUT OFF AT THE FLOOR AND FILLED WITH GROUT. 6. ANY EXISTING CONDUITS THAT REQUIRE REMOVAL AND THAT PASS THROUGH THE FLOOR SLAB OF DEVICES AND/OR WIRING. 5. COORDINATE ALL DEMOLITION WORK WITH OWNER PRIOR TO ANY SHUTDOWNS OR REMOVALS THE PROJECT AREA. EXTEND WIRING AS REQUIRED, MATCH EXISTING TYPES. EXISTING CIRCUITS THAT ARE AFFECTED BY THIS PROJECT AND THAT EXTEND OUTSIDE OF 4. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING SERVICE TO THE BALANCE OF ANY TO THE SOURCE PANEL. SHALL DISCONNECT AND REMOVE THE DEVICE, ASSOCIATED WIRING AND CONTROLS BACK 3. UNLESS OTHERWISE NOTED, WHERE A DEVICE OR WIRING IS REMOVED, THE CONTRACTOR AND TO LEAVE SITE FREE OF ALL DEBRIS. 2. CONTRACTOR IS RESPONSIBLE FOR REMOVAL OF ALL WASTE MATERIALS IN A LAWFUL MANNER ASSOCIATED WIRING/DEVICES WITHIN PROJECT AREA. VERIFY PROJECT LOCATION AND PROVIDE ALL REMOVALS/RELOCATIONS OF ELECTRICALLY ALL DEMOLITION WORK IS BY THE ELECTRICAL CONTRACTOR. THE CONTRACTOR SHALL FIELD PLANS. DEMOLITION WORK IS INDICATED AS BOLD AND DASHED. UNLESS OTHERWISE NOTED, 1. ELECTRICAL DEMOLITION WORK INCLUDES, BUT IS NOT LIMITED TO, THE WORK SHOWN ON DRAWINGS AND PROVIDE WIRING AS NOTED. REMOVE EXISTING ASSOCIATED WIRING. PROVIDE RELOCATION OF DEVICE PER CONSTRUCTION 18. WHERE A DEVICE IS RELOCATED, DISCONNECT, REMOVE AND STORE THE NOTED DEVICE AND AS BOLD. 17. ON DRAWINGS, EXISTING CONDITIONS ARE SHOWN GRAYSCALED, PROJECT WORK IS SHOWN REQUIREMENTS. ACCOMMODATE WALL AND CEILING WORK. REFER TO ARCHITECTURAL PLANS FOR ADDITIONAL 16. ADJUST ANY / ALL WALL MOUNTED ELECTRICAL DEVICES LOCATED IN PROJECT AREAS TO IS 2#12, 1#12G - 1/2"C. 15. THE TERM 'WIRING' DENOTES WIRE AND RACEWAY. UNLESS OTHERWISE NOTED, ALL WIRING 14. THE TERM 'PROVIDE' DENOTES TO FURNISH AND INSTALL. JUNCTION (PULL) BOXES WHERE REQUIRED. ALL CONDUITS SHALL BE 1/2" MINIMUM. SHALL BE GALVANIZED RIGID STEEL (GRS). SUPPLY APPROPRIATE FITTINGS AND CODE SIZED ELECTRICAL METALLIC TUBING (EMT). CONDUIT INSTALLED IN EXTERIOR LOCATIONS STRUCTURAL MEMBERS. CONDUIT INSTALLED IN INTERIOR LOCATIONS SHALL BE MEMBERS. ALL CONDUITS SHALL BE INDEPENDENTLY SUPPORTED FROM THE BUILDING 13. ALL CONDUITS SHALL BE RUN PARALLEL TO, OR AT RIGHT ANGLES TO, STRUCTURAL TO ORIGINAL CONDITION. REFINISHING OF WORK AREA RELATED TO ELECTRICAL PROJECT WORK. RESTORE AREA 12. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING, PATCHING AND SCHEDULING WITH ALL TRADES. 11. CONTRACTOR SHALL COORDINATE PROJECT WORK WITH ALL TRADES AND ASSIST IN OTHER FORMS OF DAMAGE. CLEAN AND RESTORE DAMAGED FINISHES. AGAINST HARMFUL EXPOSURE OR ACCUMULATION OF DUST/MOISTURE, CORROSION, OR 10. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING ALL EQUIPMENT AND SYSTEMS CONNECTION, EQUIPMENT, OR APPARATUS NECESSARY FOR MAKING ALL TESTS. 9. THE ELECTRICAL CONTRACTOR SHALL FURNISH ALL METERS, INSTRUMENTS, CABLE OR GROUNDED, SHALL BE REPLACED. THE SYSTEM SHALL BE TESTED FOR SHORTS AND GROUNDS. ALL WIRING, IF SHORTED 8. TESTING AFTER WIRES ARE IN PLACE AND CONNECTED TO DEVICES AND EQUIPMENT, AND UNDERWRITERS LABORATORIES (UL) STANDARDS. ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA), NATIONAL ELECTRIC CODE (NEC), 7. ALL PURCHASED EQUIPMENT SHALL BE NEW AND SHALL CONFORM TO THE NATIONAL CONFORM TO ALL APPLICABLE CODES. 6. ALL WIRE AND CABLE SHALL BE COPPER. CLEARANCES AROUND EQUIPMENT SHALL HEREIN, OR SHOWN ON THE DRAWINGS. SHALL BE FURNISHED AND INSTALLED ALTHOUGH NOT SPECIFICALLY MENTIONED COMPLETE IN DETAILS, READY FOR OPERATION AND SERVICE. APPARATUS REQUIRED 5. IT IS INTENDED THAT ALL ITEMS OF WORK AND SYSTEMS BE FURNISHED AND INSTALLED WORK SHOWN ON THE DRAWINGS AND REQUIRED BY CODE. ACCESSORIES NECESSARY FOR THE COMPLETE INSTALLATION OF THE ELECTRICAL INSTALLATION OF ALL LABOR, TOOLS, MATERIAL, EQUIPMENT, SERVICES AND RELATED THE EXISTING FIELD CONDITIONS. THE BID SHALL INCLUDE THE FURNISHING AND 4. PRIOR TO BID, THE CONTRACTOR SHALL VISIT THE SITE TO FAMILIARIZE THEMSELVES WITH 3. CONTRACTORS SHALL PAY FOR AND SECURE ALL PERMITS AND UNDERWRITERS CERTIFICATES. NATIONAL ELECTRIC CODE. 2. ALL EQUIPMENT SHALL BE GROUNDED IN ACCORDANCE WITH ARTICLE 250 OF THE AND STANDARDS HAVING JURISDICTION. CORNELL UNIVERSITY CONSTRUCTION STANDARDS, AND ANY OTHER GOVERNING CODES EDITION OF THE NATIONAL ELECTRIC CODE (NFPA 70), NEW YORK STATE BUILDING CODE, 1. ALL WORK SHALL BE PERFORMED AND INSTALLED IN ACCORDANCE WITH THE LATEST SPECIAL DUTY RECEPTACLE KEYNOTE HOMERUN TO PANEL ELECTRICAL SPECIFICATIONS PART 1 GENERAL 1.01 SCOPE THE WORK OF THIS PROJECT SHALL CONSIST OF THE COMPLETE ELECTRICAL WORK FOR THE LAB 208 RENOVATIONS PROJECT IN OLIN HALL AT CORNELL UNIVERSITY PROJECT. THIS WORK SHALL INCLUDE, BUT NOT BE LIMITED TO THE FOLLOWING: 1. SELECTIVE DEMOLITION OF ELECTRICAL WIRING / DEVICES 2. BRANCH CIRCUIT WIRING AND WIRING DEVICES 3. LIGHTING CONTROLS RELOCATIONS 1.02 COMPLIANCE 1. CODES - ALL WORK OF THIS PROJECT SHALL COMPLY WITH BUT NOT BE LIMITED TO THE LATEST VERSIONS OF THE FOLLOWING CODES: NATIONAL ELECTRICAL CODE - NFPA 70 (NEC) NATIONAL ELECTRICAL MANUFACTURERS' ASSOCIATION (NEMA) LIFE SAFETY CODE - NFPA 101 NEW YORK STATE UNIFORM BUILDING CODE ALL OTHER APPLICABLE FEDERAL, STATE AND LOCAL CODES. 2. COMPLY WITH ALL SPECIFICATIONS AND DRAWING REQUIREMENTS WHEN IN EXCESS OF GOVERNING CODES OR REGULATIONS. PART 2 PRODUCTS 2.01 RACEWAYS 1. ELECTRICAL METALLIC TUBING (EMT) a. STEEL, GALVANIZED ON THE OUTSIDE AND LOW FRICTION CORROSION RESISTANT INTERIOR COATING. b. MINIMUM SIZE 1/2 INCH. 2. FLEXIBLE METAL CONDUIT (FMC) a. METALLIC OR NON-METALLIC CORE, NON-METALLIC SUNLIGHT RESISTANT OUTER JACKET. b. MINIMUM SIZE 1/2 INCH. 3. METALLIC SURFACE RACEWAY a. STEEL CONSTRUCTION. b. 2 PIECE CONSTRUCTION - BASE AND COVER. c. PROVIDE COMPLETE WITH COVER, ENDCAPS, DEVICE MOUNTING BRACKETS AND FACEPLATES. d. MINIMUM SIZE: 0.75" DEEP X 1.28" WIDE e. MANUFACTURER: WIREMOLD f. MODEL: G2000 2.02 WIRES AND CABLES 1. BUILDING WIRE a. COPPER CONDUCTOR. b. MINIMUM SIZE #12 AWG. c. AMPACITIES BASED ON "THHN" TYPE INSULATION FOR CONDUCTOR SIZES #12 THRU #1 AWG. 2.03 WIRING DEVICES 1. DUPLEX RECEPTACLES a. DUPLEX RECEPTACLE - HEAVY DUTY, HOSPITAL GRADE b. 20 AMP RATED 125VAC c. NEMA CONFIGURATION 5-20R d. COLOR: IVORY e. MANUFACTURER: HUBBELL OR EQUAL 2. COVER PLATES a. INTERIOR - STANDARD SIZE, BRUSHED STAINLESS STEEL 2.04 BOXES 1. INTERIOR WIRING BOXES a. STAMPED STEEL CONSTRUCTION CODE GAUGE b. STANDARD SIZE KNOCKOUTS c. TAPPED HOLES FOR GROUNDING d. CUBIC INCH CAPACITY AS REQUIRED e. MANUFACTURER: RACO OR EQUAL 2.05 LABELS 1. ADHESIVE FILM LABEL a. MACHINE PRINTED b. BLACK LETTERING ON CLEAR FILM c. LETTER HEIGHT - 3/8" d. ADHESIVE BACKED PART 3 EXECUTION 3.01 RACEWAYS 1. ELECTRICAL METALLIC TUBING (EMT) SHALL BE USED FOR INTERIOR, CONCEALED WORK. 2. SURFACE METALLIC RACEWAY SHALL BE USED FOR ALL INTERIOR, EXPOSED WORK. 3. USE FLEXIBLE METALLIC CONDUIT FOR ALL FINAL CONCEALED CONNECTIONS TO THE FUME HOODS. 4. A SEPARATE EQUIPMENT GROUNDING CONDUCTOR SHALL BE INSTALLED IN ALL FLEXIBLE CONNECTIONS. 5. PAINT ALL EXPOSED RACEWAYS TO MATCH ADJACENT SURFACES. COORDINATE PAINT SELECTION WITH OWNER. 3.02 WIRES AND CABLES 1. HANDLE WIRE AND CABLE CAREFULLY TO AVOID ABRASING, PUNCTURING OR TEARING WIRE AND CABLE INSULATION AND SHEATHING. ENSURE THAT DIELECTRIC RESISTANCE INTEGRITY IS MAINTAINED. 2. PROVIDE FACTORY FABRICATED METALLIC AND NON-METALLIC CONNECTORS OF SIZED, RATINGS, MATERIALS, TYPES AND CLASSED AS REQUIRED FOR EACH SERVICE. PROVIDE PROPER SELECTION AS DETERMINED BY THE INSTALLER TO COMPLY WITH INSTALLATION REQUIREMENTS AND NEC STANDARDS. SOLDER AND TAPE CONNECTIONS ARE PROHIBITED. 3. WIRES AND CABLES SHALL NOT BE INSTALLED UNTIL THE RACEWAY SYSTEM INSTALLATION IS COMPLETE. 4. BRANCH CIRCUIT AND FEEDER CIRCUIT CONDUCTORS COLOR CODING SHALL BE AS FOLLOWS: a. 208/120 VOLT CIRCUITS - PHASE CONDUCTORS - BLACK, RED, BLUE - NEUTRAL CONDUCTOR - WHITE OR GRAY 3.03 WIRING DEVICES 1. COORDINATE WITH OTHER WORK, INCLUDING PAINTING, ELECTRICAL BOX AND WIRING WORK, AS NECESSARY TO INTERFACE INSTALLATION OF WIRING DEVICES WITH OTHER WORK. 2. INSTALL WIRING DEVICES ONLY IN ELECTRICAL BOXES WHICH ARE CLEAN, FREE FROM EXCESS BUILDING MATERIALS, DIRT AND DEBRIS. 3. PROVIDE ELECTRICALLY CONTINUOUS, TIGHT GROUNDING CONNECTIONS FOR WIRING DEVICES, UNLESS OTHERWISE INDICATED. 4. PRIOR TO ENERGIZING CIRCUITRY, TEST WIRING DEVICES FOR ELECTRICAL CONTINUITY AND PROPER POLARITY CONNECTIONS. AFTER ENERGIZING CIRCUITRY, TEST WIRING DEVICES TO DEMONSTRATE COMPLIANCE WITH REQUIREMENTS. 3.04 IDENTIFICATION 1. CABLE / CONDUCTOR IDENTIFICATION a. APPLY IDENTIFICATION ON EACH CABLE / CONDUCTOR, IN EACH BOX / ENCLOSURE / CABINET WHERE WIRES OF MORE THAN ONE CIRCUIT OR SYSTEM ARE PRESENT. 2. EQUIPMENT / SYSTEM IDENTIFICATION a. PROVIDE SELF ADHESIVE PLASTIC SIGNS ON EACH MAJOR UNITS OF ELECTRICAL EQUIPMENT. PROVIDE TEXT MATCHING EXISTING STYLES AND SIZES. WHERE APPLICABLE, LABEL SHALL INCLUDE ELECTRICAL FEED SOURCE (PANEL - CIRCUIT NUMBER). b. UNITS THAT RECEIVE IDENTIFICATION INCLUDE, BUT ARE NOT LIMITED TO, THE FOLLOWING: 1. WIRING DEVICES c. PROVIDE ADHESIVE FILM LABEL TO WIRING DEVICES INDICATING SOURCE PANEL AND CIRCUIT NUMBER (1LP24C-2) 3. PANELBOARDS a. PROVIDE TYPE WRITTEN PANEL SCHEDULES ON THE INSIDE OF ALL PANELBOARDS REFLECTING THE AS-BUILT CIRCUIT ASSIGNMENTS. 3.05 RECORD DRAWINGS 1. CONTRACTOR SHALL PROVIDE RED LINE DRAWINGS AT THE COMPLETION OF THE PROJECT INDICATING FINAL DEVICE LOCATIONS, DEVICE LABELS AND CIRCUIT ROUTING. PART 4 CODE REVIEW 4.01 NATIONAL ELECTRICAL CODE (NFPA 70) 1. CHAPTER 1 - GENERAL 2. CHAPTER 2 - WIRING AND PROTECTION 3. CHAPTER 3 - WIRING METHODS AND MATERIALS 4. CHAPTER 4 - EQUIPMENT FOR GENERAL USE 5. CHAPTER 6 - SPECIAL EQUIPMENT 4.02 NATIONAL FIRE ALARM CODE (NPFA 72) 4.03 LIFE SAFETY CODE (NFPA 101) 4.04 NEW YORK STATE UNIFORM FIRE PREVENTION AND BUILDING CODE SCHEDULES, SPECIFICATIONS 04/15/14 jefferymm : 4/21/2014 : 2:30:17 PM : pdf_L.plt : DPC_LARGE.TBL : L:\Jobs\CU-14007\PltSht\E100.dgn KEY PLAN SCALE: NONE PROJECT LOCATION 22x34UPUPUP UP UP COPYRIGHT THIS DOCUMENTATION IN ANY WAY. ENGINEER. TO ALTER ANY ITEM ON UNDER THE DIRECTION OF THE ANY PERSON UNLESS ACTING IT IS A VIOLATION OF LAW FOR THE COPYRIGHT. RESERVED RIGHTS, INCLUDING LAW STATUTORY AND OTHER AND SHALL RETAIN ALL COMMON THE AUTHOR OF THESE DOCUMENTS THE ENGINEER SHALL BE DEEMED DRAWING ALTERATION TABLE TABLEFILECASEWORK REFRIG.REFRIG.CABINET CABINET CABINETCASEWORK 206208210 200CB OC OC -10 LP2AP -12 LP2AP -14 LP2AP 18" OC LP2A9 OC BSC-01BSC-02TABLE TABLEFILEFH-OL-208CASEWORK REFRIG.REFRIG.CABINET CABINET CABINETCABINETCASEWORK 206208210 200CB OC LP2A9 OC BENCHSCALE: 1/4" = 1'-0" 2 E100 SCALE: 1/4" = 1'-0" 1 E100 - DEMOLITION AS NOTED DPC ENGINEERING, P.C. (607) 734-8494 fax (607) 734-8492 phone Elmira Heights, NY 14903 145 Prescott Avenue PROJECT NUMBER: Consulting Engineers DRAWING NUMBER: PROJECT NAME: DESIGN:CHECKED:DRAWN: APPROVED:DATE:SCALE: DESCRIPTION DATE APPVDREV ISSD BY E100 PWT PWT PWT CAD - DEMOLITION AND NEW CU-14007 OLIN HALL LAB 208 MODIFICATIONS 4'8'0 2'4'8'0 2' PARTIAL SECOND FLOOR ELECTRICAL PLAN PARTIAL SECOND FLOOR ELECTRICAL PLAN PARTIAL SECOND FLOOR ELECTRICAL PLAN 1 WORK IS SHOWN BOLD AND DASHED, PROJECT WORK IS SHOWN BOLD. 1. UNLESS OTHERWISE NOTED, EXISTING CONDITIONS ARE SHOWN GRAYSCALED, DEMOLITION GENERAL NOTES 1 1 2 3 4 2 3 4 4 RL RLREL REL 4 4 5 6 5 KEYED NOTES VACUUM PUMP CONNECTION. PROVIDE SURFACE MOUNTED RECEPTACLE ON WALL, BETWEEN HOODS. RECEPTACLE IS FOR (RECEPTACLES, LIGHTS, SWITCHES) THAT ARE FURNISHED WITH HOOD. PROVIDE 120V/20A CIRCUIT TO FUMEHOOD. PROVIDE CONNECTIONS TO PRE-WIRED DEVICES WIRING. CEILING WORK. REINSTALL DEVICES IN FORMER LOCATIONS AND RECONNECT TO EXISTING RELOCATE EXISTING OCCUPANCY SENSOR AND ASSOCIATED SWITCHPACK TO ACCOMMODATE TO PANEL LP2A9. DISCONNECT EXISTING HVAC CONTROL PANEL AND REMOVE ASSOCIATED WIRING BACK LOCATED ABOVE DROP CEILING. RETAIN WIRING FOR CONNECTION TO REPLACEMENT HOOD. DISCONNECT WIRNG TO EXISTING FUME HOOD AND REMOVE BACK TO JUNCTION BOX TO PANEL LP2A9. DISCONNECT AND REMOVE RECEPTACLES, SURFACE RACEWAY AND ASSOCIATED WIRING BACK 5 6 04/15/14 CORNELL UNIVERSITY OLIN HALL LAB 208 HUMPHREYS SERVICE BUILDING MODIFICATIONS ITHACA, NEW YORK 14853 ADDENDUM NO. 1 April 30, 2014 This Addendum contains changes to the requirements of the Contract Documents and Specifications. Such changes are to be incorporated into the Construction Documents and shall apply to the work with the same meaning and force as if they had been included in the original document. Wherever this Addendum modifies a portion of a paragraph of the specifications or a portion of any Drawing, the remainder of the Paragraph or Drawing shall remain in force. NOTE: Provisions of all Contract Documents apply. Item 1 Delete entire bid set. Replace with attached signed and stamped drawing set dated April 15, 2014. The attached drawings are being issued to include the stamp and seal of the Architect of Record in accordance with requirements of the Authority Having Jurisdiction. There have been no other changes to the originally issued version. Item 2 Asbestos Survey Report Add Limited Pre-Renovation Asbestos Survey Report Olin Hall (Building 2024) For the Room 208 Lab Modifications Project to the bid document package. Item 3 RFI – 1 “Keyed note 3 on A100 says that painting is by Owner. Note 6 on the same drawing is specific enough to make it seem as though the painting is by the General Contractor. Please clarify the intended scope of work here.” Response: “All painting shall be by the contractor, no painting shall be performed by owner. Painting scope is entire room as noted in key note 6. On floor plan remove reference to "Limit of painting (painting by owner)".” Attachments: Drawing CS001 Title Sheet Drawing A100 Partial Second Floor Architectural Plan - Demolition and New Drawing RC100 Partial Second Floor Reflected Ceiling Plan – Demolition and New Drawing M001 Mechanical Specifications Symbols and Abbreviations Drawing M100 Partial Second Floor Mechanical Plan – Demolition and New Drawing M600 Mechanical Schedules Drawing M601 Air Flow/Control Demolition Schematic Drawing M602 Lab 208 Air Flow-Control Schematic/Control Sequence Drawing P100 Partial Second Floor Piping Plan – Demolition and New Drawing E001 Symbols, Abbreviations, Notes, Schedules, Specifications Olin Hall Lab 208 Modifications Addendum No. 1 April 30, 2014 Page 2 Drawing E100 Partial Second Floor Electrical Plan – Demolition and New Limited Pre- Renovation Asbestos Survey Report Olin Hall (Building 2024) For the Room 208 Lab Modifications Project ***END OF ADDENDUM NO. 1***