HomeMy WebLinkAbout14060.BidSet-Drawings.0201INACCESSIBLE
A.1
PRIORITY 1 WORK
AREA
B.2
WHERE SHADED
B11
B10
B0065
B06
B01
B0064
B0002
B.1
B02
B03
B0040
B20
B20A
B0063
B0061
B0062
B0006
B002
4592 JORDAN ROAD
SKANEATELES FALLS, NY 13153
p 315.685.4732 f 315.685.4753
www.ryanbiggs.com
SHEET TITLE:
SHEET NO.REVISIONSCHK. BY:DWG. BY:DATE:D100
BASEMENT DEMOLITION
PLANCHI PHI FRATERNITYINTERIOR FINISHES RESTORATIONPHASE 2CORNELL UNIVERSITY107 EDGEMOOR LANE, ITHACA, NYCNLCNLJanuary 20, 201510010-7
1/4" = 1'-0"D100
1 BASEMENT DEMOLITION PLAN
NOTES:
1. BASEMENT WALLS AND ROOM NUMBERS ARE SHOWN. WALL AND CEILING
REMOVALS SHOWN OCCUR AT THE BASEMENT LEVEL.
DEMOLITION NOTES:
REMOVE PLASTER CEILING IN AREA INDICATED AND CROWN MOLDING OR PLASTER COVE AS REQUIRED TO INSTALL REINFORCMENT
AND NEW CEILING. PATCH BORDERING WALLS AND CEILING AREAS DISTURBED DURING THIS PROCESS TO MATCH ADJACENT
SURFACES. PREPARE FOR INSTALLATION OF NEW CEILING FINISH AS SCHEDULED.
CAREFULLY REMOVE WOOD CROWN MOULDING AND VERTICAL WOOD TRIM. PROTECT MATERIALS IN A SECURE LOCATION WITHIN
THE BUILDING.
CAREFULLY REMOVE WOOD TRIM, WOOD CARVINGS AND FURRING AS REQUIRED TO PERFORM REINFORCEMENT WORK. PROTECT
MATERIALS IN A SECURE LOCATION WITHIN THE BUILDING.
CAREFULLY REMOVE WOOD PANELING ON NORTH SIDE OF SUSPENDED WALL. PROTECT MATERIALS IN A SECURE LOCATION WITHIN
THE BUILDING.
REMOVE CONCRETE SLAB AS REQUIRED TO INSTALL FOOTING AND HSS COL.
REMOVE STUD WALL.
CAREFULLY REMOVE CEILING AND WALL FINISHES ADJACENT TO THE HEADERS INCLUDING EXISTING CROWN, CORNICE AND DENTIL
MOULDINGS TO ALLOW THE HEADER REINFORCEMENT. PROTECT MATERIALS IN A SECURE LOCATION WITHIN THE BUILDING.
CAREFULLY REMOVE WOOD PANELING AT JAMBS AND HEAD OF WINDOW NOOK AS REQUIRED TO INSTALL REINFORCEMENT.
PROTECT MATERIALS IN A SECURE LOCATION WITHIN THE BUILDING.
REMOVE WALL FINISHES AS REQUIRED TO INSTALL LVL SUPPORTS.
REMOVE EXISTING WINDOW IF NECESSARY TO INSTALL HEADER REINFORCEMENT. PROVIDE UNIT PRICE IN BID FOR REMOVAL AND
REINSTALLATION.
REMOVE EXISTING DAMAGED WOOD FLOOR AND SUBFLOOR AT NORTH BALCONY.
A.1
A.2
A.3
A.4
B.1
B.2
B.3
B.4
B.5
ASBESTOS CONTAINING MATERIALS WILL BE IDENTIFIED BY CORNELL UNIVERSITY AND ABATED
PRIOR TO THE COMMENCEMENT OF WORK. IF CONCEALED MATERIALS WHICH ARE SUSPECTED TO
CONTAIN ASBESTOS ARE ENCOUNTERED, NOTIFY CORNELL UNIVERSITY PROJECT MANAGER TO
SCHEDULE TESTING AND ABATEMENT AS REQUIRED. DO NOT DISTURB SUSPECTED ASBESTOS
CONTAINING MATERIALS.
MECHANICAL, ELECTRICAL AND PLUMBING REMOVALS:
CONTRACTOR TO DETERMINE WHICH ITEMS MUST BE REMOVED TO FACILITATE STRUCTURAL WORK
SHOWN ON S DRAWINGS. MAINTAIN EXIST M/E/P ITEMS WHERE POSSIBLE AND REMOVE ABANDONED
PIPES, CONDUITS, AND CONDUCTORS. STORE LIGHT FIXTURES AND OTHER ELEMENTS WHICH WILL
BE REINSTALLED IN A SECURE LOCATION WITHIN THE BUILDING.
ASBESTOS CONTAINING MATERIALS:
B.6
B.7 NO.ITEMDATE
STAIR UP
STAIR DN STAIR DNA.3
A.4
PRIORITY 3
WORK AREA
PRIORITY 2
WORK AREA
WHERE SHADED
B.3
B.3
G12
G12A
G10
G0002
G05
G01
G0041
G0003
G0004
G0060 G0040 G0020
G04
G01A
B.4
SHORE EXISTING JOISTS
AS SHOWN IN 1/S501 AND
7/S501. SEE S101 NOTE 7 FOR SHORING
LOADS.
PRIORITY 1
WORK AREA
B.5
B.6
4592 JORDAN ROAD
SKANEATELES FALLS, NY 13153
p 315.685.4732 f 315.685.4753
www.ryanbiggs.com
SHEET TITLE:
SHEET NO.REVISIONSCHK. BY:DWG. BY:DATE:D101
GROUND FLOOR
DEMOLITION PLANCHI PHI FRATERNITYINTERIOR FINISHES RESTORATIONPHASE 2CORNELL UNIVERSITY107 EDGEMOOR LANE, ITHACA, NYCNLCNLJanuary 20, 201510010-7
1/4" = 1'-0"D101
1 GROUND FLOOR DEMOLITION PLAN
NOTES:
1. GROUND FLOOR WALLS AND ROOM NUMBERS ARE SHOWN. WALL AND CEILING
REMOVALS SHOWN OCCUR AT THE GROUND FLOOR.
DEMOLITION NOTES:
REMOVE PLASTER CEILING IN AREA INDICATED AND CROWN MOLDING OR PLASTER COVE AS REQUIRED TO INSTALL REINFORCMENT
AND NEW CEILING. PATCH BORDERING WALLS AND CEILING AREAS DISTURBED DURING THIS PROCESS TO MATCH ADJACENT
SURFACES. PREPARE FOR INSTALLATION OF NEW CEILING FINISH AS SCHEDULED.
CAREFULLY REMOVE WOOD CROWN MOULDING AND VERTICAL WOOD TRIM. PROTECT MATERIALS IN A SECURE LOCATION WITHIN
THE BUILDING.
CAREFULLY REMOVE WOOD TRIM, WOOD CARVINGS AND FURRING AS REQUIRED TO PERFORM REINFORCEMENT WORK. PROTECT
MATERIALS IN A SECURE LOCATION WITHIN THE BUILDING.
CAREFULLY REMOVE WOOD PANELING ON NORTH SIDE OF SUSPENDED WALL. PROTECT MATERIALS IN A SECURE LOCATION WITHIN
THE BUILDING.
REMOVE CONCRETE SLAB AS REQUIRED TO INSTALL FOOTING AND HSS COL.
REMOVE STUD WALL.
CAREFULLY REMOVE CEILING AND WALL FINISHES ADJACENT TO THE HEADERS INCLUDING EXISTING CROWN, CORNICE AND DENTIL
MOULDINGS TO ALLOW THE HEADER REINFORCEMENT. PROTECT MATERIALS IN A SECURE LOCATION WITHIN THE BUILDING.
CAREFULLY REMOVE WOOD PANELING AT JAMBS AND HEAD OF WINDOW NOOK AS REQUIRED TO INSTALL REINFORCEMENT.
PROTECT MATERIALS IN A SECURE LOCATION WITHIN THE BUILDING.
REMOVE WALL FINISHES AS REQUIRED TO INSTALL LVL SUPPORTS.
REMOVE EXISTING WINDOW IF NECESSARY TO INSTALL HEADER REINFORCEMENT. PROVIDE UNIT PRICE IN BID FOR REMOVAL AND
REINSTALLATION.
REMOVE EXISTING DAMAGED WOOD FLOOR AND SUBFLOOR AT NORTH BALCONY.
A.1
A.2
A.3
A.4
B.1
B.2
B.3
B.4
B.5
ASBESTOS CONTAINING MATERIALS WILL BE IDENTIFIED BY CORNELL UNIVERSITY AND ABATED
PRIOR TO THE COMMENCEMENT OF WORK. IF CONCEALED MATERIALS WHICH ARE SUSPECTED TO
CONTAIN ASBESTOS ARE ENCOUNTERED, NOTIFY CORNELL UNIVERSITY PROJECT MANAGER TO
SCHEDULE TESTING AND ABATEMENT AS REQUIRED. DO NOT DISTURB SUSPECTED ASBESTOS
CONTAINING MATERIALS.
MECHANICAL, ELECTRICAL AND PLUMBING REMOVALS:
CONTRACTOR TO DETERMINE WHICH ITEMS MUST BE REMOVED TO FACILITATE STRUCTURAL WORK
SHOWN ON S DRAWINGS. MAINTAIN EXIST M/E/P ITEMS WHERE POSSIBLE AND REMOVE ABANDONED
PIPES, CONDUITS, AND CONDUCTORS. STORE LIGHT FIXTURES AND OTHER ELEMENTS WHICH WILL
BE REINSTALLED IN A SECURE LOCATION WITHIN THE BUILDING.
ASBESTOS CONTAINING MATERIALS:
B.6
B.7 NO.ITEMDATE
LOW ROOF
OPEN STAIR DN
STAIR
UP
LOW ROOF/ BALCONY
PRIORITY 3
WORK AREA
PRIORITY 5
WORK AREA
LOW ROOF
A.1
WHERE SHADED
WHERE POSSIBLE MAINTAIN EXIST WALL
FINISHES AND SOFFIT TRIM BELOW THE
EXIST COVE. TYP AT PERIMETER.
112
111
110
10003
10041
G10
108 107 106
10002
105
101
10020
102103104
113
10B
10040
A.2
B.7
4592 JORDAN ROAD
SKANEATELES FALLS, NY 13153
p 315.685.4732 f 315.685.4753
www.ryanbiggs.com
SHEET TITLE:
SHEET NO.REVISIONSCHK. BY:DWG. BY:DATE:D102
FIRST FLOOR
DEMOLITION PLANCHI PHI FRATERNITYINTERIOR FINISHES RESTORATIONPHASE 2CORNELL UNIVERSITY107 EDGEMOOR LANE, ITHACA, NYCNLCNLJanuary 20, 201510010-7
1/4" = 1'-0"D102
1 FIRST FLOOR DEMOLITION PLAN
NOTES:
1. FIRST FLOOR WALLS AND ROOM NUMBERS ARE SHOWN. WALL AND CEILING
REMOVALS SHOWN OCCUR AT THE FIRST FLOOR LEVEL.
ASBESTOS CONTAINING MATERIALS WILL BE IDENTIFIED BY CORNELL UNIVERSITY AND ABATED
PRIOR TO THE COMMENCEMENT OF WORK. IF CONCEALED MATERIALS WHICH ARE SUSPECTED TO
CONTAIN ASBESTOS ARE ENCOUNTERED, NOTIFY CORNELL UNIVERSITY PROJECT MANAGER TO
SCHEDULE TESTING AND ABATEMENT AS REQUIRED. DO NOT DISTURB SUSPECTED ASBESTOS
CONTAINING MATERIALS.
MECHANICAL, ELECTRICAL AND PLUMBING REMOVALS:
CONTRACTOR TO DETERMINE WHICH ITEMS MUST BE REMOVED TO FACILITATE STRUCTURAL WORK
SHOWN ON S DRAWINGS. MAINTAIN EXIST M/E/P ITEMS WHERE POSSIBLE AND REMOVE ABANDONED
PIPES, CONDUITS, AND CONDUCTORS. STORE LIGHT FIXTURES AND OTHER ELEMENTS WHICH WILL
BE REINSTALLED IN A SECURE LOCATION WITHIN THE BUILDING.
ASBESTOS CONTAINING MATERIALS:
DEMOLITION NOTES:
REMOVE PLASTER CEILING IN AREA INDICATED AND CROWN MOLDING OR PLASTER COVE AS REQUIRED TO INSTALL REINFORCMENT
AND NEW CEILING. PATCH BORDERING WALLS AND CEILING AREAS DISTURBED DURING THIS PROCESS TO MATCH ADJACENT
SURFACES. PREPARE FOR INSTALLATION OF NEW CEILING FINISH AS SCHEDULED.
CAREFULLY REMOVE WOOD CROWN MOULDING AND VERTICAL WOOD TRIM. PROTECT MATERIALS IN A SECURE LOCATION WITHIN
THE BUILDING.
CAREFULLY REMOVE WOOD TRIM, WOOD CARVINGS AND FURRING AS REQUIRED TO PERFORM REINFORCEMENT WORK. PROTECT
MATERIALS IN A SECURE LOCATION WITHIN THE BUILDING.
CAREFULLY REMOVE WOOD PANELING ON NORTH SIDE OF SUSPENDED WALL. PROTECT MATERIALS IN A SECURE LOCATION WITHIN
THE BUILDING.
REMOVE CONCRETE SLAB AS REQUIRED TO INSTALL FOOTING AND HSS COL.
REMOVE STUD WALL.
CAREFULLY REMOVE CEILING AND WALL FINISHES ADJACENT TO THE HEADERS INCLUDING EXISTING CROWN, CORNICE AND DENTIL
MOULDINGS TO ALLOW THE HEADER REINFORCEMENT. PROTECT MATERIALS IN A SECURE LOCATION WITHIN THE BUILDING.
CAREFULLY REMOVE WOOD PANELING AT JAMBS AND HEAD OF WINDOW NOOK AS REQUIRED TO INSTALL REINFORCEMENT.
PROTECT MATERIALS IN A SECURE LOCATION WITHIN THE BUILDING.
REMOVE WALL FINISHES AS REQUIRED TO INSTALL LVL SUPPORTS.
REMOVE EXISTING WINDOW IF NECESSARY TO INSTALL HEADER REINFORCEMENT. PROVIDE UNIT PRICE IN BID FOR REMOVAL AND
REINSTALLATION.
REMOVE EXISTING DAMAGED WOOD FLOOR AND SUBFLOOR AT NORTH BALCONY.
A.1
A.2
A.3
A.4
B.1
B.2
B.3
B.4
B.5
B.6
B.7 NO.ITEMDATE
INACCESSIBLE
B11
B10
B0065
B06
B01 B02 B03
B20
B20A
B0063
B0061
B0064
B0002
B0040
B0062
B0005
T/EXIST CONC SLAB
(-10' - 10" +/-)
PRIORITY 1 WORK AREA
COL = EXIST
(2) 2X12 ABOVE
12
S500
HSS3x3x5/16 COL
REBUILD STUD WALLS TO MATCH
EXISTING WITH 2X STUDS AT 16" OC
WITH PRESSURE TREATED
BOTTOM PLATE AND 1/2" GYPSUM
BOARD EACH SIDE (PAINTED)
COL = EXIST
(2) 2X12 ABOVE
T/SLAB ON GRADE ( -10'-0" +/-)
UNO
T/SLAB ON GRADE ( -8'-8" +/-) TYPICAL UNO
SLAB ELEVATION VARIES THROUGHOUT
BASEMENT. VERIFY IN FIELD.
''
HSS3x3x5/16 COL
EXIST WOOD FRAMED FLOOR
(-8'-8" +/-)STAIRSDOWN.
6
S501
4592 JORDAN ROAD
SKANEATELES FALLS, NY 13153
p 315.685.4732 f 315.685.4753
www.ryanbiggs.com
SHEET TITLE:
SHEET NO.REVISIONSCHK. BY:DWG. BY:DATE:S100
FOUNDATION PLANCHI PHI FRATERNITYINTERIOR FINISHES RESTORATIONPHASE 2CORNELL UNIVERSITY107 EDGEMOOR LANE, ITHACA, NYCNLCNLJanuary 20, 201510010-7
1/4" = 1'-0"S100
1 FOUNDATION PLAN
NOTES;
1. ELEVATIONS NOTED ARE WITH RESPECT TO REFERENCE ELEVATION (0'-0")
WHICH EQUALS (T/GROUND FLOOR SHEATHING) FIELD VERIFY ALL ELEVATIONS.NO.ITEMDATE
STAIR UP
STAIR DN
EXIST TRAP DOOR STAIRDN..
..
REINF EXIST DAMAGED JOISTS
W/ LVL 1 3/4X9 1/4 SISTERS
ASSUME EVERY OTHER JOIST
REQUIRES REINF FOR BID
REINFORCE EXIST DAMAGED
JOISTS W/ LVL 1 3/4 X 9 1/4
SISTERS. ASSUME EVERY OTHER
JOIST REQUIRES REINF FOR BID
PRIORITY 1 WORK AREA
11
S500
INACCESSIBLE
B11
B10
B0065
B06
B01
B02 B03
B20
B20A
B0063
B0061
B0064
B0002
B0040
B0062
B0021 B0005
EXIST 18"
STONE WALLS
(TYP EXT WALLS UNO)
EXIST BRICK INTERIOR
WALLS (THICKNESS
VARIES) TYP UNO
EXISTING FRAMING ABOVE LAUNDRY
ROOM UNKNOWN (STAIR INFILL).
REINFORCE FLOOR WITH LVL 1 3/4" X 9 1/4" JOISTS
AT 16" OC +/- WHERE SHADED
9
S500
HSS COLS BELOW
1
S500
REMOVE AND RESET LOOSE STONES IN TYPE N
MORTAR ALONG THE FULL LENGTH AND HEIGHT OF THE
INTERIOR FACE OF THE NORTH WALL OF ROOM B0065.
REPOINT DETERIORATED MORTAR JOINTS. SEE 8/S500
AT EXISTING HEADERS, PROVIDE SIMPSON W46 OR ACCEPTED EQUIVALENT
JOIST HANGER WITH (4) 10D NAILS TO SUPPORT SISTERED RAFTERS.
SEE NOTE 2 IN 9/S500 REGARDING JOIST HANGER SUBMITTALS
(5) HEADERS IN PRIORITY 1 WORK AREA.
..
..
REINF EXIST DOUBLE JOIST W/ (2) LVL 1 3/4X9 1/4.
BOLT REINF TO EXIST W/ 1/2" DIA THRU-BOLTS AT
2'-0" OC STAGGERED TOP AND BOT. BEAR
ALTERNATE ENDS OF EACH PLY ON EXIST WALLS
ENLARGE POCKETS AS REQUIRED
(2) 1 3/4X11 1/4 LVL
SEE 10/S500 FOR LVL BRG ON
EXIST BRICK WALL
7
S501
SHORE EXISTING JOISTS
AS SHOWN IN 1/S501 AND
7/S501. SEE NOTE 7 BELOW.REINFORCEMENT OF GROUND FLOOR FRAMING DESIGNED
FOR 100 PSF LIVE LOAD UNLESS OTHERWISE NOTED.
6
S501
4592 JORDAN ROAD
SKANEATELES FALLS, NY 13153
p 315.685.4732 f 315.685.4753
www.ryanbiggs.com
SHEET TITLE:
SHEET NO.REVISIONSCHK. BY:DWG. BY:DATE:S101
GROUND FLOOR
FRAMING PLANCHI PHI FRATERNITYINTERIOR FINISHES RESTORATIONPHASE 2CORNELL UNIVERSITY107 EDGEMOOR LANE, ITHACA, NYCNLCNLJanuary 20, 201510010-7
1/4" = 1'-0"S101
1 GROUND FLOOR FRAMING PLAN
NOTES
1.TOP OF EXISTING SHEATHING AT THE GROUND FLOOR EQUALS
(0'-0").
2.BASEMENT WALLS AND BASEMENT ROOM NUMBERS BELOW THE GROUND
FLOOR FRAMING ARE SHOWN UNLESS NOTED OTHERWISE.
3.EXPOSE EXISTING FRAMING AND SCHEDULE INSPECTION. ENGINEER WILL
DETERMINE LOCATIONS OF JOIST SISTERING IN THE FIELD. SUBMIT PROPOSED
JOIST HANGERS BASED ON THICKNESSES OF EXISTING FRAMING MEMBERS AND
SUPPORTED SISTER REINFORCEMENT. JOIST HANGER SIZES SHOWN ARE
BASED ON ASSUMED FRAMING CONDITIONS AND MAY NEED TO BE ADJUSTED
BASED ON FIELD CONDITIONS.
4 EXISTING FRAMING LAYOUT IN AREAS BEYOND WORK SCOPE IS SHOWN FOR
REFERENCE ONLY AND IS BASED ON LIMITED OBSERVATIONS. FRAMING
CONDITIONS MAY VARY.
6.DO NOT SUBMIT STEEL FRAMING SHOP DRAWINGS UNTIL EXISTING FRAMING HAS
BEEN OBSERVED.
7.SHORING SHALL BE DESIGNED BY NEW YORK STATE LICENSED P.E. SUBMIT
STAMPED SHORING PLANS AND DETAILS FOR RECORD. DESIGN SHORING
COMPONENTS TO SUPPORT 1000 PLF LIVE LOAD AND 500 PLF DEAD LOAD.
REINSTALL EXIST MECHANICAL, ELECTRICAL AND PLUMBING
EQUIPMENT AFTER CEILING FINSIHES ARE INSTALLED.NO.ITEMDATE
LOW ROOF
OPEN
STAIR DN
STAIR UP
LOW ROOF/ BALCONY
REPAIR DAMAGED
FLOOR WHERE SHADED
MATCH EXIST THICKNESS
AND FINISH. BLEND INTO
ADJACENT FLOORS
C8X11.5 SISTERED TO
EXIST DAMAGED JOIST
(INCLUDE 8 LOCS IN BID)
(2) C8X11.5
(BELOW EXIST FIRST
FLOOR WALL ABOVE)
(2) C9X13.4
(BELOW EXIST FIRST
FLOOR WALL ABOVE)
C9X13.4 AT 2'-0" OC +/-
(EVERY OTHER EXIST JOIST)
EXIST W10 EXIST W14 EXIST W14 EXIST W14 EXIST W14
7
S500
G12
G12A
G10
(BELOW)
G0002
G05
G01
G0041
G0003
G0004
G0060 G0040 G0020
G04
..
EXIST W16
..
WALLS ABOVE (NOT SHOWN IN ALL LOCS)
LOW ROOF
EXIST 1ST FLOOR
WALL
STAIRS
STAIRS
EXIST BRICK
CHIMNEY
BEAR LVL IN EXIST
WALL. PROVIDE JACK
STUD BELOW BEARING
5
S500
S501
8
EXIST 2X12 +/- JOISTS
AT 16" +/- OC
EXIST STUD
WALL ABOVE
EXIST LOW ROOF
L6X6X1/2 HEADER REINF
3A
S500
2
S500
4
S501
EXIST 2X12 +/- JOISTS AT
12" OC +/- TYP
3
S500
SIM
(2) LVL 1 3/4 X 9 1/2
HEADER WITH 3 1/2 X 3 1/2
PARALLAM POSTS EACH END
PRIORITY 3
WORK AREA
PRIORITY 2
WORK AREA
MC10X22 AND L8X4X1/2" (LLV)
HEADER REINFS501
3JAMB REINF
(2) LOCS
C8X13.7
2A
S500
2A
S500
G01A
1 3/4X16 LVL
PRIORITY 1
WORK AREA
EXIST CHIMNEY
EXIST
5
S501
1
S501
2
S501
SHORE EXISTING JOISTS
AS SHOWN IN 1/S501 AND
7/S501. SEE S101 NOTE 7
FOR SHORING LOADS.
FIRST FLOOR FRAMING REINFORCEMENT DESIGNED
FOR A LIVE LOAD OF 40 PSF UNLESS OTHERWISE NOTED
4592 JORDAN ROAD
SKANEATELES FALLS, NY 13153
p 315.685.4732 f 315.685.4753
www.ryanbiggs.com
SHEET TITLE:
SHEET NO.REVISIONSCHK. BY:DWG. BY:DATE:S102
FIRST FLOOR FRAMING
PLANCHI PHI FRATERNITYINTERIOR FINISHES RESTORATIONPHASE 2CORNELL UNIVERSITY107 EDGEMOOR LANE, ITHACA, NYCNLCNLJanuary 20, 201510010-7
1/4" = 1'-0"S102
1 FIRST FLOOR FRAMING PLAN
NOTES
1.T/ EXIST FINISH FLOOR (13'-5"+/-) IN PRIORITY 2 WORK AREA. T/EXIST FINISH
FLOOR (11'-0"+/-) IN OTHER PRIORITY WORK AREAS.
2.GROUND FLOOR WALLS AND GROUND FLOOR ROOM NUMBERS BELOW THE
FIRST FLOOR FRAMING ARE SHOWN UNLESS NOTED OTHERWISE.
3.SEE S001 AND S101 FOR ADDITIONAL NOTES.
REINSTALL EXIST MECHANICAL, ELECTRICAL AND PLUMBING
EQUIPMENT AFTER CEILING FINSIHES ARE INSTALLED.NO.ITEMDATE
STAIR DNSTAIRUPSTAIRDNSTAIRUPSTAIR UPFIRE ESCAPEC8X11.5 CHANNELS SISTEREDTO EXIST JOIST. ENGINEER TO DETERMINESISTER LOCS IN FIELD. (INCLUDE 14 LOCS IN BID(INCLUDING (4) LOCS BELOW CORRIDOR WALLS )SEE 4/S500 FOR MC6 OPTION WHERE EXIST PIPINGIS ROUTED THROUGH EXIST FRAMINGC8X11.5C8X11.5C8X11.5C8X11.5C8X11.5C8X11.5C8X11.5C8X11.5C8X11.52S500MAINTAIN EXIST STL STRAPPING ATTACHED TOUNDERSIDE OF JOISTS. MAINTAIN EXISTBLOCKING/BRIDGING WHERE POSSIBLE. DO NOTREMOVE EXIST BLOCKING/BRIDGING IN MORE THAN ONEJOIST BAY AT A TIMEBOLTED C8 SPLICE AT MIDSPAN OF C8 JOIST REINFAS REQD TO AVOID EXIST STL STRAPPING AND/OREXISTING UTILITIES (INCLUDE 8 LOCS IN BID)6S500G10(BELOW)1121111101091071061000210510110020102120103104113108C8X11.5PROVIDE (2) C8 CHANNELSBELOW EXISTING CORRIDORWALLS ABOVE (4 LOCS)EXIST LOWROOF BELOW10040SECOND FLOOR WALLS ABOVE(NOT ALL WALLS ABOVEARE SHOWN)PRIORITY 3WORK AREAPRIORITY 5WORK AREAEXIST 3X12 +/- JOISTS AT12" +/- OCEXIST 2X12 +/- JOISTS AT16" +/- OCC8X11.5C8X11.5C8X11.5C8X11.5C8X11.5C8X11.5C8X11.5C8X11.5REINFORCE EXISTING JOISTSON EACH SIDE OF CORRIDORWALLS ABOVE WITH C8. BEAR2 INCHES MIN ON EXIST WALLSES SIM TO 3/S5002AS5004S500FLOOR JOISTSCANTENLARGE POCKETS IN EXIST BRICKWALL TO PROVIDE BRG FOR C8'S4S500.2AS500FIRST FLOOR FRAMING REINFORCEMENT DESIGNEDFOR A LIVE LOAD OF 40 PSF UNLESS OTHERWISE NOTED4592 JORDAN ROADSKANEATELES FALLS, NY 13153p 315.685.4732 f 315.685.4753www.ryanbiggs.comSHEET TITLE:SHEET NO.REVISIONSCHK. BY:DWG. BY:DATE:S103SECOND FLOORFRAMING PLANCHI PHI FRATERNITYINTERIOR FINISHES RESTORATIONPHASE 2CORNELL UNIVERSITY107 EDGEMOOR LANE, ITHACA, NYCNLCNLJanuary 20, 201510010-7 1/4" = 1'-0"S1031SECOND FLOOR FRAMING PLANNOTES1.T/EXISTING FINISH FLOOR IN PRIORITY 5 WORK AREA (22'-4" +/-) VIF.2.FIRST FLOOR WALLS AND FIRST FLOOR ROOM NUMBERS BELOW THE SECONDFLOOR FRAMING ARE SHOWN UNLESS NOTED OTHERWISE.3.SEE S001 AND S101 FOR ADDITIONAL NOTES.REINSTALL EXIST MECHANICAL, ELECTRICAL AND PLUMBINGEQUIPMENT AFTER CEILING FINSIHES ARE INSTALLED.NO.ITEMDATE