Loading...
HomeMy WebLinkAbout02_TOCs_6 Digit GRsInstructions to Bidders Bid Form General Conditions and Exhibits Exhibit A Change Order Exhibit A-1 Change Order Documentation Instructions Construction Contract Change Order Request Construction Contract Change Order Summary Exhibit B Schedule of Values for Contractor Payments Exhibit C Final Release Exhibit D Application and Certificate for Payment Exhibit E Guarantee Exhibit F – Form I Contractor’s Affirmative Action Plan Use of MBE/WBE Vendors Exhibit F – Form II Contractor’s Affirmative Action Plan Summary of Bid Activity with MBE and WBE Subcontractors and Vendors Exhibit F – Form III Affirmative Action Workforce Report Exhibit F – Form IV Minority – Women Utilization Report Exhibit G Labor Rate Breakdown Exhibit H Stored Materials Invoicing Documentation Exhibit I Contractor Performance Evaluation DIVISION 1 – GENERAL REQUIREMENTS Section 01 11 00 Summary of the Work Section 01 14 00 Work Restrictions Section 01 21 00 Allowances Section 01 22 00 Unit Pricing Section 01 23 00 Alternates Section 01 25 00 Substitutions and Product Options Section 01 31 19 Project Meetings Section 01 31 50 Electronic Project Management Section 01 32 16 Construction Schedules Section 01 32 33 Photographic Documentation Section 01 33 00 Submittal Procedures Section 01 35 29 General Health & Safety Requirements Section 01 35 43 General Environmental Requirements Section 01 35 44 Spill Control Section 01 41 00 Regulatory Requirements Section 01 42 00 References Section 01 45 00 Quality Control Section 01 45 29 Testing Laboratory Services Section 01 45 33 Code Required Special Inspections and Procedures Section 01 50 00 Temporary Facilities and Controls Section 01 51 00 Temporary Utilities Section 01 51 23 Heat During Construction Section 01 57 13 Soil Erosion and Sediment Control Section 01 66 00 Storage and Protection Section 01 73 29 Cutting, Patching and Repairing Section 01 74 00 Construction Waste Management Section 01 77 00 Project Close Out Section 01 78 22 Fixed Equipment Inventories Section 01 78 23 Operating and Maintenance Data Section 01 78 36 Warranties and Bonds Section 01 78 39 Record Documents DIVISION 2 – EXISTING CONDITIONS Section 02 41 19 Selective Demolition DIVISION 3 – CONCRETE Section 03 33 00 Cast In Place Concrete DIVISION 5 – METALS Section 05 12 00 Structural Steel Section 05 70 00 Decorative Metal DIVISION 6 – WOOD, PLASTICS, AND COMPOSITES Section 06 10 00 Rough Carpentry Section 06 20 23 Interior Finish Carpentry Section 06 41 13 Wood-Veneer-Faced Architectural Cabinets DIVISION 8 – OPENINGS Section 08 14 33 Stile and Rail Wood Doors Section 08 71 00 Door Hardware DIVISION 9 – FINISHES Section 09 22 16 Non-Structural Metal Framing Section 09 23 00 Gypsum Plastering Rehabilitation Section 09 26 13 Gypsum Veneer Plastering Section 09 29 00 Gypsum Board Section 09 30 13 Ceramic Tiling Section 09 64 00 Wood Flooring Section 09 91 23 Interior Painting DIVISION 10 – SPECIALTIES Section 10 28 00 Toilet, Bath and Laundry Accessories DIVISON 21 – FIRE PROTECTION Section 21 10 00 Fire Protection DIVISON 22 – PLUMBING Section 22 00 00 General Provisions for Plumbing Work Section 22 05 00 Plumbing Specialties Section 22 05 23 Valves Section 22 05 80 Firestopping for Plumbing Systems Section 22 07 16 Piping and Equipment Insulation Section 22 10 00 Plumbing Piping Section 22 40 00 Plumbing Fixtures DIVISON 23 – MECHANICAL Section 23 00 00 General Provisions for HVAC Work (Mechanical) Section 23 05 80 Firestopping for Mechanical Systems Section 23 07 19 Piping and Equipment Insulation Section 23 21 00 Piping and Pipe Fittings Section 23 31 00 Ductwork and Accessories DIVISON 26 – ELECTRICAL Section 26 00 00 General Provisions for Electrical Work Section 26 05 19 Wire and Cable Section 26 05 33 Raceways, Fittings and Accessories Section 26 05 34 Device and Junction Boxes Section 26 05 80 Firestopping for Electrical Systems Section 26 27 26 Wiring Devices DRAWING LIST T-10 Title Sheet CD-10 Code Study D100 Basement Demolition Plan D101 Ground Floor Demolition Plan D102 First Floor Demolition Plan S001 Design Data and General Notes S002 Basement and Ground Dimensioned Floor Plans S003 First and Second Dimensioned Floor Plans S100 Foundation Plan S101 Ground Floor Framing Plan S102 First Floor Framing Plan S103 Second Floor Framing Plan S500 Details S501 Details A-10 Foyer Floor Plans and Elevations A-11 Hallway and Toilet Rooms Floor Plans and Elevations A-12 Music Room Floor Plan and Elevations A-13 Dining Room Floor Plan and Elevations A-14 Living Room Floor Plans and Elevations A-50 Details A-51 Details F-11 Sprinkler Floor Plans M-11 Mechanical Floor Plans P-11 Plumbing Floor Plans E-11 Electrical First Floor Plan E-12 Electrical Notes & Details END OF DOCUMENT