Ithaca, New York SECTION 22 00 00 - PLUMBI NG GENERAL PROVISIONS
CLARA DICKSON HALL PLUMBING GENERAL PROVISIO NS 22 00 00 - 1
WASTE & STORM LINE REPLACEMENT DECEMBER 31, 2014
SECTION 22 00 00 PLUMBING GENERAL PROVISI ONS
1.0 GENERAL
1.1 SUMMARY
A.This Section includes general administrative and procedural requirements for Division 22 Plumbing
Work.
B.The Contract Drawings and the General Provisions of the Contract, including the General Conditions of
the Con tract for Cons truct ion, Su pplemen tary Con ditio ns, Spec ial Con ditio ns and Di vision 1 throu gh
Division 19 Specification Sections apply to the work of this Division.
1.2 DIVISION 22 - DESCRIPTION
A.The technical specifications of this Contract are arranged for the convenience of the Owner and
Contractor into Divisions of work. The work of Division 22, Plumbing, is further described in
Specification Sections of the 22 00 00 Series and on Contract Drawings of the “P” series.
B.The organization of this work into Divisions shall not relieve the prime Contractor from providing all of
the work shown on the complete set of drawings or specified in the complete set of specifications,
whether or not the individual subcontractors correctly identify their respective responsibilities.
1.3 OTHER DIVISION SPECI FICATIONS APP LICABLE TO THIS WORK
A.The work of Section 22 05 00 - Plumbing Basic Materials and methods applies to the work of this
Section.
B.To the extent that the work of this Division or Contract includes the work of other trades, the Contractor
for this Division shall adhere to the requirements of other specifications. All General Construction work
shall be performed in accordance with the provisions of the appropriate Division 1 through Division 19
Sections. All electrical work shall be performed in accordance with appropriate Division 26 Sections and
The National Electrical Code.
1.4 WORK INCLUDED
The work of this Division shall include providing all materials, labor, services, permits and related work
to furnish a complete, operating, tested, functioning, documented, Underfloor Sanitary and Storm Pipe
Replacement Project including all work shown, specified or required for proper system operation
inclu ding but not limi ted to t he foll owing:
A.Demolition and removal of existing plumbing work as required, and removal of all debris from site and
proper disposal of same.
B.Provide and install piping, fittings and cleanouts as specified herein and as shown on the Drawings.
C.Provide Plumbing Basic Materials & Methods. (Section 22 05 00)
CORNELL DIVISION 22 - PLUMB ING
Ithaca, New York SECTION 22 00 00 - PLUMBI NG GENERAL PROVISIONS
CLARA DICKSON HALL PLUMBING GENERAL PROVISIO NS 22 00 00 - 2
WASTE & STORM LINE REPLACEMENT DECEMBER 31, 2014
D.Provide Sanitary Drainage System. (Section 22 13 00)
E.Provide Storm drainage System. (Section 22 14 00)
F.Provide Submittals.
G.Provide replacement of deteriorated underfloor sanitary and storm piping connecting to existing risers as
shown on the Plumbing Drawings.
H.Provide Maintenance of systems in good condition until final acceptance.
I.Provide Permits and Inspections.
J.Operation and Maintenance Manuals.
K.Owner’s Operation Instruction.
L.Guarantee.
M.Record Drawings.
1.5 RELATED WORK NOT INCLUDED
A.Testing Laboratory Services (Sec 01 45 29).
1.6 SPECIAL CHARACTER OF CLARA DICKSON H ALL
A.The highest degree of quality of materials and professionalism of workmanship is required for the
Plumb ing Sys tem.
B.The Con tract or shal l init iate a nd maint ain a wor ker inst ructi on and qu ality mon itori ng campaign
throughout the duration of the project directed at enlisting each worker in maintaining the highest quality
of work and the maximum protection of the existing and proposed facilities from unintentional,
neglec tful o r inte ntion al damage a nd to pr ovide th e best p ossib le plumb ing syste m for the b uildi ng.
2.0 PRODUCTS
2.1 GENERAL
A.Refer to specific Technical Specification Sections.
3.0 EXECUTION
3.1 QUALITY OF WO RK
A.Conform to the Execution provisions of the various 22 series Technical Specifications.
***END OF SECTION 22 00 00***