Loading...
HomeMy WebLinkAbout0_02_Table of Contents_6 Digit GRsInstructions to Bidders Bid Form General Conditions and Exhibits Exhibit A Change Order Exhibit A-1 Change Order Documentation Instructions Construction Contract Change Order Request Construction Contract Change Order Summary Exhibit B Schedule of Values for Contractor Payments Exhibit C Final Release Exhibit D Application and Certificate for Payment Exhibit E Guarantee Exhibit F – Form I Contractor’s Affirmative Action Plan Use of MBE/WBE Vendors Exhibit F – Form II Contractor’s Affirmative Action Plan Summary of Bid Activity with MBE and WBE Subcontractors and Vendors Exhibit F – Form III Affirmative Action Workforce Report Exhibit F – Form IV Minority – Women Utilization Report Exhibit G Labor Rate Breakdown Exhibit H Stored Materials Invoicing Documentation Exhibit I Contractor Performance Evaluation DIVISION 1  GENERAL REQUIREMENTS Section 01 11 00 Summary of the Work Section 01 14 00 Work Restrictions Section 01 21 00 Allowances Section 01 22 00 Unit Pricing Section 01 23 00 Alternates Section 01 25 00 Substitutions and Product Options Section 01 31 19 Project Meetings Section 01 31 50 Electronic Project Management Section 01 32 16 Construction Schedules Section 01 32 33 Photographic Documentation Section 01 33 00 Submittal Procedures Section 01 35 29 General Health & Safety Requirements Section 01 35 43 General Environmental Requirements Section 01 35 44 Spill Control Section 01 41 00 Regulatory Requirements Section 01 42 00 References Section 01 45 00 Quality Control Section 01 45 29 Testing Laboratory Services Section 01 50 00 Temporary Facilities and Controls Section 01 51 00 Temporary Utilities Section 01 57 13 Soil Erosion and Sediment Control Section 01 66 00 Storage and Protection Section 01 73 29 Cutting, Patching and Repairing Section 01 74 00 Construction Waste Management Section 01 74 23 Final Cleaning Section 01 77 00 Project Close Out Section 01 78 22 Fixed Equipment Inventory Section 01 78 23 Operating and Maintenance Data Section 01 78 36 Warranties and Bonds Section 01 78 39 Record Documents DIVISION 2 – EXISTING CONDITIONS Section 02 01 00 Maintenance of Existing Conditions DIVISION 3 – CONCRETE Section 03 30 05 Concrete Slab On Grade DIVISION 4 – MASONRY Section 04 22 00 Concrete Unit Masonry DIVISION 9 – FINISHES Section 09 29 00 Gypsum Board Section 09 30 00 Ceramic Tile Section 09 65 16 Linoleum Sheet Flooring Section 09 65 19 Resilient Tile Flooring Section 09 68 00 Carpeting Section 09 91 00 Paint DIVISION 22 – PLUMBING Section 22 00 00 Plumbing General Provisions Section 22 05 00 Plumbing Basic Materials & Methods Section 22 13 00 Sanitary Drainage System Section 22 14 00 Interior Storm Drainage System Section 26 05 00 Electrical Basic Materials & Methods DIVISION 31 – EARTHWORK Section 31 11 00 Clearing and Grubbing Section 31 23 16.13 Trenching Section 31 23 23.13 Backfill Section 31 23 23.23 Compaction Section 31 25 13 Temporary Soil Erosion and Sedimentation Controls DIVISION 32 – EXTERIOR IMPROVEMENTS Section 32 92 00 Turfs and Grasses Section 32 93 00 Plants DIVISION 33 – UTILITIES Section 33 31 00 Sanitary Utility Sewerage Piping (Outdoors) DRAWING LIST CONTRACT DRAWINGS: PHASE: P001 TITLE SHEET, SYMBOLS, SCHEDULES, NOTES & DETAILS YEAR 1 & 2 P100 UNDERFLOOR PIPING REMOVAL PLAN – NORTH YEAR 1 & 2 P101 UNDERFLOOR PIPING REPLACEMENT PLAN – NORTH YEAR 1 & 2 P102 FINISHES REPLACEMENT PLAN – NORTH YEAR 1 P200 UNDERFLOOR PIPING REMOVAL PLAN – SOUTH YEAR 2 P201 UNDERFLOOR PIPING REPLACEMENT PLAN – SOUTH YEAR 2 P202 FINISHES REPLACEMENT PLAN – SOUTH YEAR 2 EXISTING CONDITION DRAWAINGS – FOR INFORMATION ONLY: P301 EXISTING FIRST FLOOR PLUMBING PLAN – SOUTH P302 EXISTING FIRST FLOOR PLUMBING PLAN – NORTH P303 EXISTING SECOND FLOOR PLUMBING PLAN – SOUTH P304 EXISTING SECOND FLOOR PLUMBING PLAN – NORTH P305 EXISTING THIRD FLOOR PLUMBING PLAN – SOUTH P306 EXISTING THIRD FLOOR PLUMBING PLAN - NORTH END OF DOCUMENT