1 Specification Section
09 68 00 - Carpeting
F.E. Jones 03/02/15 9:41 a.m. "Please provide the basis of
design carpet manufacturer and the "Quality Name" as these
cannot be found either in the specifications or on the
drawings."
See Addendum No. 1, Item 5.
2 Specification Section
31 23 16.13 - Trenching
L.C. Ames 02/27/15 1:57 p.m. "Please confirm that the
Owner will not provide a dump site as suggested by Spec
312316."See Addendum No. 1, Item 7.
3 Specification Section
31 23 16.13 - Trenching
Disposal of
Materials
L.C. Ames 02/27/15 1:57 p.m. "Are there any special disposal
requirements for the existing pipe that is removed (hazardous
or contaminated waste requirements)?"See Addendum No. 1, Item 8.
4 Specification Section
31 23 23.13 - Backfill Offsite Materials
L.C. Ames 02/27/15 1:57 p.m. "Do the stone aggregate
products have to be limestone (imported from Syracuse area)
or can they be made by the local pits from crushed cobbles?"See Addendum No. 1, Item 8 and Item 9.
5
Drawing P001 - Title
Sheet, Symbols,
Schedules, Notes &
Details
Detail 1/P001
L.C. Ames 03/02/15 9:20:05 a.m. "Can flowable fill be used
in lieu of the specified bedding and backfill? Any shrinkage
could be addressed with a leveling top layer below the slab."See Addendum No. 1, Item 10.
6
Drawing P001 - Title
Sheet, Symbols,
Schedules, Notes &
Details
Detail 1/P001
L.C. Ames 02/27/15 1:57 p.m. "Please clarify your trench
sections to indicate width."
See Addendum No. 1, Item 10 and Item 11.
7
Drawing P100 -
Underfloor Piping
Removal Plan - North
L.C. Ames 02/27/15 3:19:22 p.m. "Would you please provide
invert for storm line."See Addendum No. 1, Item 12.
8
Drawing P100 -
Underfloor Piping
Removal Plan - North
L.C. Ames 03/02/15 11:28 a.m. "We see some locations
where it appears that piping connections are made close to
columns. Is any excavation/coring, etc. into the structural
concrete (footers, etc.) required to make the required piping
connections to existing? If so, please advise the locations
where this is required and also provide the structural details
so we can assess what is required."
See Addendum No. 1, Item 13 and Item 14.