HomeMy WebLinkAbout14060 Construction Document_r2STAIR UPSTAIR DNSTAIR DNA.3A.2A.4PRIORITY 3WORK AREAPRIORITY 4WORK AREAPRIORITY 2WORK AREAWHERE SHADEDWHERE SHADEDB.3B.3G12G12AG10G0002G05G01G0041G0003G0004G0060G0040G0020G04G01AB.4SHORE EXISTING JOISTSAS SHOWN IN 1/S501 AND7/S501. SEE S101 NOTE 7 FOR SHORINGLOADS.A.1PRIORITY 1WORK AREAB.5B.6SHEET TITLE:SHEET NO.REVISIONSCHK. BY:DWG. BY:DATE:D101GROUND FLOORDEMOLITION PLANCHI PHI FRATERNITYSTRUCTURAL REMEDIATIONPHASE 3 - IMMEDIATE PRIORITY WORKCORNELL UNIVERSITY107 EDGEMOOR LANE, ITHACA, NYCNLCNLApril 8, 201410010-6 1/4" = 1'-0"D1011GROUND FLOOR DEMOLITION PLANNOTES:1. GROUND FLOOR WALLS AND ROOM NUMBERS ARE SHOWN. WALL AND CEILINGREMOVALS SHOWN OCCUR AT THE GROUND FLOOR.NO. ITEM DATEDEMOLITION NOTES:REMOVE PLASTER CEILING IN AREA INDICATED AND CROWN MOLDING OR PLASTER COVE AS REQUIRED TO INSTALL REINFORCMENTAND NEW CEILING. PATCH BORDERING WALLS AND CEILING AREAS DISTURBED DURING THIS PROCESS TO MATCH ADJACENTSURFACES. PREPARE FOR INSTALLATION OF NEW CEILING FINISH AS SCHEDULED.CAREFULLY REMOVE WOOD CROWN MOULDING AND VERTICAL WOOD TRIM. PROTECT MATERIALS IN A SECURE LOCATION WITHINTHE BUILDING.CAREFULLY REMOVE WOOD TRIM, WOOD CARVINGS AND FURRING AS REQUIRED TO PERFORM REINFORCEMENT WORK. PROTECTMATERIALS IN A SECURE LOCATION WITHIN THE BUILDING.CAREFULLY REMOVE WOOD PANELING ON NORTH SIDE OF SUSPENDED WALL. PROTECT MATERIALS IN A SECURE LOCATION WITHINTHE BUILDING.REMOVE CONCRETE SLAB AS REQUIRED TO INSTALL FOOTING AND HSS COL.REMOVE STUD WALL.CAREFULLY REMOVE CEILING AND WALL FINISHES ADJACENT TO THE HEADERS INCLUDING EXISTING CROWN, CORNICE AND DENTILMOULDINGS TO ALLOW THE HEADER REINFORCEMENT. PROTECT MATERIALS IN A SECURE LOCATION WITHIN THE BUILDING.CAREFULLY REMOVE WOOD PANELING AT JAMBS AND HEAD OF WINDOW NOOK AS REQUIRED TO INSTALL REINFORCEMENT.PROTECT MATERIALS IN A SECURE LOCATION WITHIN THE BUILDING.REMOVE WALL FINISHES AS REQUIRED TO INSTALL LVL SUPPORTS.REMOVE EXISTING WINDOW IF NECESSARY TO INSTALL HEADER REINFORCEMENT. PROVIDE UNIT PRICE IN BID FOR REMOVAL ANDREINSTALLATION.REMOVE EXISTING DAMAGED WOOD FLOOR AND SUBFLOOR AT NORTH BALCONY.A.1A.2A.3A.4B.1B.2B.3B.4B.5ASBESTOS CONTAINING MATERIALS WILL BE IDENTIFIED BY CORNELL UNIVERSITY AND ABATEDPRIOR TO THE COMMENCEMENT OF WORK. IF CONCEALED MATERIALS WHICH ARE SUSPECTED TOCONTAIN ASBESTOS ARE ENCOUNTERED, NOTIFY CORNELL UNIVERSITY PROJECT MANAGER TOSCHEDULE TESTING AND ABATEMENT AS REQUIRED. DO NOT DISTURB SUSPECTED ASBESTOSCONTAINING MATERIALS.MECHANICAL, ELECTRICAL AND PLUMBING REMOVALS:CONTRACTOR TO DETERMINE WHICH ITEMS MUST BE REMOVED TO FACILITATE STRUCTURAL WORKSHOWN ON S DRAWINGS. MAINTAIN EXIST M/E/P ITEMS WHERE POSSIBLE AND REMOVE ABANDONEDPIPES, CONDUITS, AND CONDUCTORS. STORE LIGHT FIXTURES AND OTHER ELEMENTS WHICH WILLBE REINSTALLED IN A SECURE LOCATION WITHIN THE BUILDING.ASBESTOS CONTAINING MATERIALS:B.6B.7
NO.ITEMDATESHEET NO.
www.ryanbiggs.com
4592 Jordan Road p. 315 685.4732
f. 315 685.4753
RYAN-BIGGS ASSOCIATES, P.C.CHI PHI FRATERNITYSTRUCTURAL REMEDIATIONCORNELL UNIVERSITY107 EDGEMOOR LANE, ITHACA, NYApril 8, 2014CNLREVISIONSDATE:DWG BY:CHK. BY:10010.6
SHEET TITLE:PHASE 3 - IMMEDIATE PRIORITY WORKS001
DESIGN DATA AND
GENERAL NOTES SJWABBREVIATIONS LEGEND
NO.ITEMDATESHEET NO.
www.ryanbiggs.com
4592 Jordan Road p. 315 685.4732
f. 315 685.4753
RYAN-BIGGS ASSOCIATES, P.C.CHI PHI FRATERNITYSTRUCTURAL REMEDIATIONCORNELL UNIVERSITY107 EDGEMOOR LANE, ITHACA, NYApril 8, 2014CNLREVISIONSDATE:DWG BY:CHK. BY:10010.6
SHEET TITLE:PHASE 3 - IMMEDIATE PRIORITY WORKS002
BASEMENT AND GROUND
DIMENSIONED FLOOR PLANS CGM
NO.ITEMDATESHEET NO.
www.ryanbiggs.com
4592 Jordan Road p. 315 685.4732
f. 315 685.4753
RYAN-BIGGS ASSOCIATES, P.C.CHI PHI FRATERNITYSTRUCTURAL REMEDIATIONCORNELL UNIVERSITY107 EDGEMOOR LANE, ITHACA, NYApril 8, 2014CNLREVISIONSDATE:DWG BY:CHK. BY:10010.6
SHEET TITLE:PHASE 3 - IMMEDIATE PRIORITY WORKS003
FIRST AND SECOND
DIMENSIONED FLOOR PLANS CGM
LOW ROOFOPENSTAIR DNSTAIR UPLOW ROOF/ BALCONYREPAIR DAMAGEDFLOOR WHERE SHADEDMATCH EXIST THICKNESSAND FINISH. BLEND INTOADJACENT FLOORSC8X11.5 SISTERED TOEXIST DAMAGED JOIST(INCLUDE 8 LOCS IN BID)(2) C8X11.5(BELOW EXIST FIRSTFLOOR WALL ABOVE)(2) C9X13.4(BELOW EXIST FIRSTFLOOR WALL ABOVE)C9X13.4 AT 2'-0" OC +/-(EVERY OTHER EXIST JOIST)EXIST W10EXIST W14EXIST W14EXIST W14EXIST W147S500G12G12AG10(BELOW)G0002G05G01G0041G0003G0004G0060G0040G0020G04..EXIST W16..WALLS ABOVE (NOT SHOWN IN ALL LOCS)LOW ROOFEXIST 1ST FLOORWALLSTAIRSSTAIRSEXIST BRICKCHIMNEYBEAR LVL IN EXISTWALL. PROVIDE JACKSTUD BELOW BEARING5S500S50183S500EXIST 2X12 +/- JOISTSAT 16" +/- OCREINF EXIST JOISTSIN AREA BETWEENWALLS ON 2ND FLOOR(SEE S103 FOR WALLLOCS) REINF W/C8X11.5 (INCLUDE 5LOCS IN BID).EXIST STUDWALL ABOVEENLARGE POCKETSIN EXIST BRICK WALLWHERE C8'S BEAREXIST LOW ROOFL6X6X1/2 HEADER REINF3AS5002S5004S501EXIST 2X12 +/- JOISTS AT12" OC +/- TYP3S500SIM(2) LVL 1 3/4 X 9 1/2HEADER WITH 3 1/2 X 3 1/2PARALLAM POSTS EACH ENDPRIORITY 3WORK AREAPRIORITY 4WORK AREAPRIORITY 2WORK AREAMC10X22 AND L8X4X1/2" (LLV)HEADER REINFS5013JAMB REINF(2) LOCSC8X13.72AS5002AS500G01A1 3/4X16 LVLPRIORITY 1WORK AREAEXIST CHIMNEYEXIST5S5011S5012S501SHORE EXISTING JOISTSAS SHOWN IN 1/S501 AND7/S501. SEE S101 NOTE 7FOR SHORING LOADS.FIRST FLOOR FRAMING REINFORCEMENT DESIGNEDFOR A LIVE LOAD OF 40 PSF UNLESS OTHERWISE NOTEDSHEET TITLE:SHEET NO.REVISIONSCHK. BY:DWG. BY:DATE:S102FIRST FLOOR FRAMINGPLANCHI PHI FRATERNITYSTRUCTURAL REMEDIATIONPHASE 3 - IMMEDIATE PRIORITY WORKCORNELL UNIVERSITY107 EDGEMOOR LANE, ITHACA, NYCNLCNLApril 8, 201410010-6 1/4" = 1'-0"S1021FIRST FLOOR FRAMING PLANNOTES1.T/ EXIST FINISH FLOOR (13'-5"+/-) IN PRIORITY 2 WORK AREA. T/EXIST FINISHFLOOR (11'-0"+/-) IN OTHER PRIORITY WORK AREAS.2.GROUND FLOOR WALLS AND GROUND FLOOR ROOM NUMBERS BELOW THEFIRST FLOOR FRAMING ARE SHOWN UNLESS NOTED OTHERWISE.3.SEE S001 AND S101 FOR ADDITIONAL NOTES.REINSTALL EXIST MECHANICAL, ELECTRICAL AND PLUMBINGEQUIPMENT AFTER CEILING FINSIHES ARE INSTALLED.NO. ITEM DATE
NO.ITEMDATESHEET NO.
www.ryanbiggs.com
4592 Jordan Road p. 315 685.4732
f. 315 685.4753
RYAN-BIGGS ASSOCIATES, P.C.CHI PHI FRATERNITYSTRUCTURAL REMEDIATIONCORNELL UNIVERSITY107 EDGEMOOR LANE, ITHACA, NYApril 8, 2014CNLREVISIONSDATE:DWG BY:CHK. BY:10010.6
SHEET TITLE:PHASE 3 - IMMEDIATE PRIORITY WORKS500
DETAILS SJW