Loading...
HomeMy WebLinkAbout14060_02_Table of ContentsInstructions to Bidders Bid Form General Conditions and Exhibits Exhibit A Change Order Exhibit A-1 Change Order Documentation Instructions Construction Contract Change Order Request Construction Contract Change Order Summary Exhibit B Schedule of Values for Contractor Payments Exhibit C Final Release Exhibit D Application and Certificate for Payment Exhibit E Guarantee Exhibit F – Form I Contractor’s Affirmative Action Plan Use of MBE/WBE Vendors Exhibit F – Form II Contractor’s Affirmative Action Plan Summary of Bid Activity with MBE and WBE Subcontractors and Vendors Exhibit F – Form III Affirmative Action Workforce Report Exhibit F – Form IV Minority – Women Utilization Report Exhibit G Labor Rate Breakdown Exhibit H Stored Materials Invoicing Documentation Exhibit I Contractor Performance Evaluation DIVISION 1  GENERAL REQUIREMENTS Section 01 11 00 Summary of the Work Section 01 21 00 Allowances Section 01 23 00 Alternates Section 01 25 00 Substitutions and Product Options Section 01 31 19 Project Meetings Section 01 32 16 Construction Schedules Section 01 32 33 Photographic Documentation Section 01 33 00 Submittal Procedures Section 01 35 29 General Health & Safety Requirements Section 01 35 43 General Environmental Requirements Section 01 35 44 Spill Control Section 01 41 00 Regulatory Requirements Section 01 45 00 Quality Control Section 01 50 00 Temporary Facilities and Controls Section 01 51 00 Temporary Utilities Section 01 51 23 Heat During Construction(s) Section 01 57 13 Soil Erosion and Sediment Control Section 01 66 00 Storage and Protection Section 01 73 29 Cutting, Patching and Repairing Section 01 77 00 Project Close Out Section 01 78 22 Inventories Section 01 78 23 Operating and Maintenance Data Section 01 78 36 Warranties and Bonds Section 01 78 39 Record Documents DIVISION 2 – EXISTING CONDITIONS Section 02 41 19 Selective Demolition DIVISION 5 – METALS Section 05 12 00 Structural Steel Section 05 70 00 Decorative Metal DIVISION 6 - WOOD, PLASTICS, AND COMPOSITES Section 06 10 53 Miscellaneous Rough Carpentry Section 06 20 23 Interior Finish Carpentry Section 06 42 14 Stile and Rail Wood Paneling DIVISION 7 – THERMAL AND MOISTURE PROTECTION Section 07 84 13 Penetration Firestopping DIVISION 9 – FINISHES Section 09 22 16 Non-structural Metal Framing Section 09 23 00 Gypsum Plastering Section 09 29 00 Gypsum Board Section 09 64 00 Wood Flooring Section 09 91 23 Interior Painting Section 09 93 00 Staining and Transparent Finishing DIVISION 21 – FIRE SUPRESSION Section 21 10 00 Fire Protection DIVISION 23 – HEATING VENTILATING AND AIR CONDITIONING Section 23 00 00 General Provisions for HVAC Work (Mechanical) Section 23 05 23 Valves Section 23 05 80 Firestopping for Mechanical Systems Section 23 07 19 Piping and Equipment Insulation Section 23 21 00 Pipe and Pipe Fittings DIVISION 26 - ELECTRICAL Section 26 00 00 General Provisions for Electrical Work Section 26 05 19 Wire and Cable Section 26 05 33 Raceways, Fittings and Accessories Section 26 05 34 Device and Junction Boxes Section 26 05 80 Through-Penetration Firestopping for Electrical Systems Section 26 27 26 Wiring Devices DRAWING LIST T-10 Title Sheet A-10 Demolition Plans, Floor Plans, Work Notes A-50 Details A-51 Alternate No. 1, Plans and Details D101 Ground Floor Demolition Plan S001 Design Data and General Notes S002 Basement & Ground Dimensioned Floor Plans S003 First & Second Dimensioned Floor Plans S102 First Floor Framing Plan S500 Details M-11 Mechanical Floor Plans E-11 Electrical Floor Plans F-11 Sprinkler Floor Plans END OF DOCUMENT