Loading...
HomeMy WebLinkAboutMcGraw HouseHEAD TYPESJAMB TYPESGENERAL NOTESJAMB AND HEAD TYPES2Scale: NONENEW ACCESS PANEL - EXISTING GWB CEILING1Scale: NONEDESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY MCGRAW HALL - 2003 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2003754EL/PKBGHSJLBTYPICALARCHITECTURALDETAILSA4PSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECT KEY PLANDESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: December 3, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\McGraw 2003\CAD\11103-2003--T3-B.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY MCGRAW HALL - 2003 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2003754EL/PKBGHSJLBMTR-BA PARTIALPLANS ANDKEYNOTESAMEP-BAPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTBASEMENT IDF (ROOM B00JC) ARCHITECTURAL - EXISTING / DEMO1Scale: 1/4" = 1'-0"04'8'2'BASEMENT MTR-BA (ROOM B00JC) ARCHITECTURAL - NEW WORK4Scale: 1/4" = 1'-0"04'8'2'BASEMENT IDF (ROOM B00JC) MECHANICAL - EXISTING / REMOVALS2Scale: 3/16" = 1'-0"8'12'4'0BASEMENT IDF (ROOM B00JC) ELECTRICAL - EXISTING / REMOVALS3Scale: 3/16" = 1'-0"8'12'4'0BASEMENT MTR-BA (ROOM B00JC) ELECTRICAL - NEW WORK6Scale: 3/16" = 1'-0"8'12'4'0BASEMENT MTR-BA (ROOM B00JC) MECHANICAL - NEW WORK5Scale: 3/16" = 1'-0"8'12'4'0͟͟в͟͟в͟͟͟в͟´´´´´6'-8 1/2" 9'-0"7'-6 1/2" DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY MCGRAW HALL - 2003 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2003754EL/PKBGHSJLBGENERAL NOTES,SYMBOLS ANDABBREVIATIONS(AMEP SERIES)AMEP-GENPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTELECTRICAL SYMBOLS LEGEND4Scale: NONEMECHANICAL SYMBOLS LEGEND3Scale: NONEARCHITECTURAL SYMBOLS LEGEND2Scale: NONEABBREVIATIONS1Scale: NONE SECOND FLOORFIRST FLOORSECOND FLOORFIRST FLOORBASEMENTBASEMENTGENERAL NOTESSE RATEDNOTES:HINGED TRIM200% NEUTRALCOMPUTER GRADEFEED-THRU LUGSSUB FEED LUGSSUB-FEED BREAKERISOLATED GND BUSPOWER AND GROUNDING SYSTEM RISER DIAGRAM2Scale: NONETELECOMMUNICATIONS GROUND BAR (TMGB, TGB) DETAIL4Scale: NONEDESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY MCGRAW HALL - 2003 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2003754EL/PKBGHSJLBTYPICAL ELECTRICALDETAILSE4PSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTLIGHTING FIXTURE SCHEDULE3Scale: NONEPANEL SCHEDULE1Scale: NONE GENERAL NOTESDESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY MCGRAW HALL - 2003 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2003754EL/PKBGHSJLBTYPICALMECHANICALDETAILSM4PSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTCONCRETE ANCHOR DEVICE DETAIL3Scale: NONEPIPE HANGER4Scale: NONEREFRIGERANT PIPEWALL SUPPORT DETAIL5Scale: NONETYPICAL EXTERIOR EQUIPMENT PAD2Scale: NONENON FIRE RATED WALL PIPE PENETRATION1Scale: NONENEW DUCTLESS SPLIT AIR CONDITIONING UNIT SCHEDULE8Scale: NONEEQUIPMENT SUPPORT FRAME DETAIL7Scale: NONEREFRIGERATION PIPETHROUGH EXTERIOR WALL6Scale: NONE DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY MCGRAW HALL - 2003 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2003754EL/PKBGHSJLBAMEP-AREAS OFWORKT1-AMEPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTFIRST FLOOR - AMEP AREAS OF WORK PLAN2Scale: NONEGROUND FLOOR - AMEP AREAS OF WORK PLAN1Scale: NONESECOND FLOOR - AMEP AREAS OF WORK PLAN3Scale: NONE SECOND FLOORFIRST FLOORMEZZANINEFIRST FLOORSECOND FLOORFIRST FLOORMEZZANINEFIRST FLOORBASEMENTBASEMENTTHIRD FLOORTHIRD FLOORFOURTH FLOORFOURTH FLOORFIFTH FLOORFIFTH FLOORSNSECOND FLOORFIRST FLOORMEZZANINEFIRST FLOORSECOND FLOORFIRST FLOORMEZZANINEFIRST FLOORBASEMENTBASEMENTTHIRD FLOORTHIRD FLOORFOURTH FLOORFOURTH FLOORFIFTH FLOORFIFTH FLOORSNScale: NONECOPPER LOGICAL RISER DIAGRAM - NEW WORK2Scale: NONECOPPER LOGICAL RISER DIAGRAM - EXISTING / REMOVAL1DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY MCGRAW HALL - 2003 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2003754EL/PKBGHSJLBCOPPER LOGICALRISER DIAGRAMST1-CLPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECT SECOND FLOORFIRST FLOORMEZZANINEFIRST FLOORSECOND FLOORFIRST FLOORMEZZANINEFIRST FLOORBASEMENTBASEMENTTHIRD FLOORTHIRD FLOORFOURTH FLOORFOURTH FLOORFIFTH FLOORFIFTH FLOORSNScale: NONEFIBER LOGICAL RISER DIAGRAM - EXISTING / REMOVAL1DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY MCGRAW HALL - 2003 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2003754EL/PKBGHSJLBFIBER LOGICALRISER DIAGRAMST1-FLPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECT SECOND FLOORFIRST FLOORMEZZANINEFIRST FLOORSECOND FLOORFIRST FLOORMEZZANINEFIRST FLOORBASEMENTBASEMENTTHIRD FLOORTHIRD FLOORFOURTH FLOORFOURTH FLOORFIFTH FLOORFIFTH FLOORSNSECOND FLOORFIRST FLOORMEZZANINEFIRST FLOORSECOND FLOORFIRST FLOORMEZZANINEFIRST FLOORBASEMENTBASEMENTTHIRD FLOORTHIRD FLOORFOURTH FLOORFOURTH FLOORFIFTH FLOORFIFTH FLOORSNScale: NONEPATHWAY LOGICAL RISER DIAGRAM - NEW WORK2Scale: NONEPATHWAY LOGICAL RISER DIAGRAM - EXISTING / REMOVAL1DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY MCGRAW HALL - 2003 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2003754EL/PKBGHSJLBPATHWAYS LOGICALRISER DIAGRAMST1-PLPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECT SECOND FLOORFIRST FLOORMEZZANINEFIRST FLOORSECOND FLOORFIRST FLOORMEZZANINEFIRST FLOORBASEMENTBASEMENTTHIRD FLOORTHIRD FLOORFOURTH FLOORFOURTH FLOORFIFTH FLOORFIFTH FLOORSNTR SERVING ZONES - BUILDING SECTION VIEW8Scale: NONEFIRST FLOOR - TR SERVING ZONE PLAN2Scale: 1/32" = 1'-0"BASEMENT - TR SERVING ZONE PLAN1Scale: 1/32" = 1'-0"FIRST FLOOR MEZZANINE - TR SERVING ZONE PLAN3Scale: 1/32" = 1'-0"DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY MCGRAW HALL - 2003 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2003754EL/PKBGHSJLBTR SERVING ZONES,PLAN VIEWS ANDBLDG. SECTIONVIEWT1-SZPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTTHIRD FLOOR - TR SERVING ZONE PLAN5Scale: 1/32" = 1'-0"SECOND FLOOR - TR SERVING ZONE PLAN4Scale: 1/32" = 1'-0"FOURTH FLOOR - TR SERVING ZONE PLAN6Scale: 1/32" = 1'-0"FIFTH FLOOR - TR SERVING ZONE PLAN7Scale: 1/32" = 1'-0" KEY PLANFIRST FLOOR - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 1/8" = 1'-0"08'16'4'DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: December 3, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\McGraw 2003\CAD\11103-2003--T2-1.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY MCGRAW HALL - 2003 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2003754EL/PKBGHSJLBFIRST FLOORPATHWAYS ANDCABLINGT2-1.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTEXISTING OUTLET NOTE KEY KEY PLANFIRST FLOOR MEZZANINE - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 1/8" = 1'-0"08'16'4'DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: December 3, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\McGraw 2003\CAD\11103-2003--T2-1M.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY MCGRAW HALL - 2003 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2003754EL/PKBGHSJLBFIRST FLOORMEZZANINEPATHWAYS ANDCABLINGT2-1M.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTEXISTING OUTLET NOTE KEY KEY PLANSECOND FLOOR - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 1/8" = 1'-0"08'16'4'DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: December 3, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\McGraw 2003\CAD\11103-2003--T2-2.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY MCGRAW HALL - 2003 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2003754EL/PKBGHSJLBSECOND FLOORPATHWAYS ANDCABLINGT2-2.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTEXISTING OUTLET NOTE KEY KEY PLANTHIRD FLOOR - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 1/8" = 1'-0"08'16'4'DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: December 3, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\McGraw 2003\CAD\11103-2003--T2-3.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY MCGRAW HALL - 2003 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2003754EL/PKBGHSJLBTHIRD FLOORPATHWAYS ANDCABLINGT2-3.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTEXISTING OUTLET NOTE KEY KEY PLANFOURTH FLOOR - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 1/8" = 1'-0"08'16'4'DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: December 3, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\McGraw 2003\CAD\11103-2003--T2-4.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY MCGRAW HALL - 2003 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2003754EL/PKBGHSJLBFOURTH FLOORPATHWAYS ANDCABLINGT2-4.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTEXISTING OUTLET NOTE KEY KEY PLANFIFTH FLOOR - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 1/8" = 1'-0"08'16'4'DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: December 3, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\McGraw 2003\CAD\11103-2003--T2-5.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY MCGRAW HALL - 2003 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2003754EL/PKBGHSJLBFIFTH FLOORPATHWAYS ANDCABLINGT2-5.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTEXISTING OUTLET NOTE KEY KEY PLANBASEMENT - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 1/8" = 1'-0"08'16'4'DESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: December 3, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\McGraw 2003\CAD\11103-2003--T2-B.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY MCGRAW HALL - 2003 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2003754EL/PKBGHSJLBBASEMENTPATHWAYS ANDCABLINGT2-B.CA_CPPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTBASEMENT - COMMUNICATION PATHWAYS / HORIZONTAL CABLING-DEMO WORK2Scale: 1/8" = 1'-0"08'16'4'CABLE TRAY INSTALLATION DETAIL3Scale: 1/2" = 1'-0"02'4'1'EXISTING OUTLET NOTE KEY KEY PLANDESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: December 3, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\McGraw 2003\CAD\11103-2003--T3-B.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY MCGRAW HALL - 2003 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2003754EL/PKBGHSJLBMTR-BA ENLARGEDPLANS ANDELEVATIONST3-BAPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECTBASEMENT - ROOM B00JATELECOM EQUIPMENT PLAN - EXISTING / REMOVALS1Scale: 1/4" = 1'-0"04'8'2'BASEMENT - MTR-BA (ROOM B00JA)TELECOM EQUIPMENT PLAN - NEW WORK2Scale: 1/4" = 1'-0"04'8'2'01'2'1/2'BASEMENT - ROOM B00JABACKBOARD ELEVATION - EXISTING / REMOVALS5Scale: 1" = 1'-0"01'2'1/2'BASEMENT MTR-BA (ROOM B00JA) RACK ELEVATION - NEW WORK4Scale: 1" = 1'-0"BASEMENT MTR-BA (RACK 1)FIBER HOUSING DETAIL7Scale: NONEBASEMENT MTR-BA (ROOM B00JA)BACKBOARD ELEVATION - NEW WORK6Scale: 1" = 1'-0"01'2'1/2'01'2'1/2'BASEMENT (ROOM B00JA) RACK ELEVATION -EXISTING /REMOVALS3Scale: 1" = 1'-0"I7'-0 1/2"9'-0"7'-6 1/2" PROJECT SITE PLANDRAWING INDEXCORNELL UNIVERSITYNETWORK CONNECTIVITY PROJECTMCGRAW HALL - 2003DRAWINGDESCRIPTIONT-COVERDRAWING INDEX AND PROJECT SITE PLANT-GENSTANDARD SYMBOLS. NOTES, ABBREVIATIONS (T-SERIES)T1T1-SZTR SERVING ZONES, PLAN VIEWS AND BLDG. SECTION VIEWT1-PLPATHWAYS LOGICAL RISER DIAGRAMST1-CLCOPPER LOGICAL RISER DIAGRAMST1-FLFIBER LOGICAL RISER DIAGRAMST2T2-B.CA_CPBASEMENT PATHWAYS AND CABLINGT2-1.CA_CPFIRST FLOOR PATHWAYS AND CABLINGT2-1M.CA_CPFIRST FLOOR MEZZANINE PATHWAYS AND CABLINGT2-2.CA_CPSECOND FLOOR PATHWAYS AND CABLINGT2-3.CA_CPTHIRD FLOOR PATHWAYS AND CABLINGT2-4.CA_CPFOURTH FLOOR PATHWAYS AND CABLINGT2-5.CA_CPFIFTH FLOOR PATHWAYS AND CABLINGT3T3-BAMTR-BA ENLARGED PLANS AND ELEVATIONSAMEPAMEP-GENT1-AMEPAMEP-AREAS OF WORKAMEP-BAMTR-BA PARTIAL PLANS AND KEYNOTESA4TYPICAL ARCHITECTURAL DETAILSM4TYPICAL MECHANICAL DETAILSE4TYPICAL ELECTRICAL DETAILSDESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:PLOT DATE: December 3, 2012 PLOT BY: pbarrie OWNER PROJECT NO:J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\McGraw 2003\CAD\11103-2003--T-COVER.dwgFax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCSCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.)Cornell UniversityCORNELL UNIVERSITY MCGRAW HALL - 2003 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2003754EL/PKBGHSJLBDRAWING INDEXAND PROJECT SITEPLANT-COVERPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECT CEILING SCHEDULEGENERAL PROJECT NOTESGENERAL REMOVAL NOTESGENERAL DRAWING NOTES-EXISTING CONDITIONS/REMOVALS-ACCESS CONTROL SYMBOLS LEGENDGENERAL NEW WORK NOTESGENERAL DRAWING NOTES-HORIZONTAL CABLING-GENERAL DRAWING NOTES-PATHWAYS-GENERAL DRAWING NOTES-PATHWAYS-ABBREVIATIONS TELECOM SYMBOLS LEGENDNEW / EXISTING OUTLET SUBSCRIPT KEYNEW PATHWAY TYPE KEYOUTLET DESCRIPTOR KEYEXISTING OUTLET NOTE KEYCABLING SYMBOLS LEGENDDESCRIPTIONMARKDATEPROJECT MANAGER:DRAWN BY:AT PROJECT NO:CHECKED BY:SHEET TITLE:ISSUE DATE:CLIENT:OWNER PROJECT NO:Fax: 585.424.4239115 METRO PARKROCHESTER, NY 14623www.archi-technology.comPHONE: 585.424.1952LLCCornell UniversityCORNELL UNIVERSITY MCGRAW HALL - 2003 ITHACA, NYCONSTRUCTIONDOCUMENTS11103-2003754EL/PKBGHSJLBSTANDARDSYMBOLS. NOTES,ABBREVIATIONS(T-SERIES)T-GENPSD20 SD50 DD100 DDCDNETWORK CONNECTIVITY PROJECT3$7+:$<6&+('8/(1(::25.&$%/(),//%$6('21&$%/(2'¸ 0.24DESIGNATIONDESCRIPTIONMANUFACTURERPART NO.APPROXIMATEOUTSIDEDIMENSIONAPPROXIMATEINSIDEDIMENSIONCABLE FILL&$3$&,7<¸MIN. BENDRADIUS&ʵCONDUITSEE SPEC. SECTION 27 05 28.75" DIA.44.5"1" C1" DIA.76"1.25" C1.25" DIA.137.5"1.5" C1.5" DIA.189"2" C2" DIA.2912"2.5" C2.5" DIA.5125"3" C3" DIA.7830"4" C4" DIA.13040"SR-1NOT USEDSR-2 **SURFACE RACEWAYSEE SPEC. SECTION27 05 282400 SERIESSEE SPEC. SECTION 27 05 2812SR-3 **SURFACE RACEWAY3000 SERIES32SR-4 **SURFACE RACEWAY4000 SERIES63SR-4D **SURFACE RACEWAY(DIVIDED)4000D SERIES30SR-5 **SURFACE RACEWAY5400 SERIES32SR-6 **SURFACE RACEWAY6000 SERIES140SR-6D **SURFACE RACEWAY(DIVIDED)6000D SERIES63SR-7SURFACE RACEWAY700 SERIES2CT-AWIRE MESH TRAYSEE SPEC. SECTION 27 05 284"x6"211CT-BSOLID BOTTOM TRAYWITH COVER4"x12"419CT-CNOT USED2"x18"316CT-D2"x24"419CT-E4"x12"419CT-F4"x18"632CT-G4"x24"844CT-H6"x12"636CT-I--CT-J--CT-K--127(6¸0$;,080),//)25&$7(*25<,1',&$7(' 3(57,$(,$$  - CAT6A CABLING HAS AN OD OF 0.285.5('8&(),//5$7,2%<)25($&+ƒ%(1' - ENSURE THAT FILL RATIOS ARE NOT EXCEEDEDʵ&21'8,76+$//21/<%($//2:('$663(&,),&$//<127('21'5$:,1*6 ** REDUCE CAPACITY BY 50% FOR THE FOLLOWING CONDITIONS: - WHEN CONNECTORS ARE MOUNTED WITHIN RACEWAY - WHEN NON-RADIUS FITTINGS RESTRICT CROSS-SECTIONAL AREA - WHEN RACEWAY IS DIVIDED AND SHARED WITH ELECTRICALTER EXISTING SURFACE RACEWAY TO PROVIDE AT LEAST TWO 16"SECTIONS OF REMOVABLE COVERS TO ALLOW CABLE ROUGH-IN WITHOUTCONFLICT WITH EXISTING FURNITURE CONFIGURATIONS. ALSO REFER TOGENERAL NOTE "Z" ON T-GEN DRAWING FOR ADDITIONAL SCOPE FORSURFACE RACEWAYS.WHERE REQUIRED BY RACEWAY CAPACITY, OR AS DIRECTED, PROVIDESURFACE MOUNT EXTENSION BOX ON EXISTING RACEWAY OPENING TOPROVIDE ADEQUATE CAPACITY AND BEND RADIUS. ALSO REFER TORACEWAY DERATING REQUIREMENTS AT LEFT.WHERE REQUIRED BY RACEWAY CAPACITY, OR AS DIRECTED, PROVIDERETROFIT ENTRANCE END FITTING OR ALTER EXISTING BACKFED CONDUITWITH A NEW SPACE SAVER CONNECTOR TO PROVIDE ADEQUATE CAPACITYAND BEND RADIUS FOR NEW CABLING. ALSO REFER TO RACEWAYDERATING REQUIREMENTS AT LEFT. FIELD VERIFY EXISTING CONDITIONSAND PROPOSE ALTERATIONS THAT MINIMIZE SERVICE DISRUPTIONDURATION. PROVIDE ALL TEMPORARY PROVISIONS TO MAINTAIN EXISTINGSERVICES.CONDUIT AND CABLE TRAY TO BE ROUTED CONCEALED UNLESSOTHERWISE NOTED.