Loading...
HomeMy WebLinkAbout09 65 36 - Resilient Tile FlooringBEARDSLEY DESIGN ASSOCIATES CORNELL – NCP RESILIENT TILE FLOORING STANDARD SPECIFICATIONS 09 65 36 PAGE 1 OF 6 NOVEMBER 2, 2012 SECTION 096536 – RESILIENT TILE FLOORING PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. Section Includes: 1. Conductive vinyl composition floor tile. 1.3 SUBMITTALS A. Product Data: For each type of product indicated. B. Shop Drawings: For each type of floor tile. Include floor tile layouts, edges, columns, doorways, and seaming plan for sheet flooring. C. Samples for Verification: Fullsize units of each color and pattern of floor tile required. D. Maintenance Data: For each type of floor tile to include in maintenance manuals. 1.4 QUALITY ASSURANCE A. FireTestResponse Characteristics: As determin ed by testing identical products according to ASTM E 648 or NFPA 253 by a qualified testing agency. 1. Critical Radiant Flux Classification: Class I, not less than 0.45 W/sq. cm. 1.5 DELIVERY, STORAGE, AND HANDLING A. Store floor tile and installation materials in dry spaces protected from the weather, with ambient temperatures maintained within range recommended by manufacturer, but not less than 50 deg F or more than 90 deg F Store floor tiles on flat surfaces. BEARDSLEY DESIGN ASSOCIATES CORNELL – NCP RESILIENT TILE FLOORING STANDARD SPECIFICATIONS 09 65 36 PAGE 2 OF 6 NOVEMBER 2, 2012 1.6 PROJECT CONDITIONS A. Maintain ambient temperatures within range recommended by manufacturer, but not less than 70 deg F or more than 95 deg F in spaces to receive floor tile during the following time periods: 1. 48 hours before installation. 2. During installation. 3. 48 hours after installation. B. Close spaces to traffic during floor tile installation. C. Close spaces to traffic for 48 hours after floor tile installation. D. Install floor tile after other finishing operations, including painting, have been completed. 1.7 EXTRA MATERIALS A. Furnish extra materials that match products installed and that are packaged with protective covering for storage and identified with labels describing contents. 1. Floor Tile: Furnish 1 box for every building, of each type, color, and pattern of floor tile installed. Deliver to Owner’s field office. PART 2 PRODUCTS 2.1 VINYL COMPOSITION FLOOR TILE A. Products: Subject to compliance with requirements, available products that may be incorporated into the Work include, but are not limited to, the following: 1. Armstrong World Industries, Inc.; Excelon 51903 Blue Gray. B. Tile Standard: ASTM F 1066, Class 2, throughpattern tile. C. Wearing Surface: Smooth. D. Thickness: 0.125 inch E. Size: 12 by 12 inches F. Colors and Patterns: As indicated by manufacturer’s designations. BEARDSLEY DESIGN ASSOCIATES CORNELL – NCP RESILIENT TILE FLOORING STANDARD SPECIFICATIONS 09 65 36 PAGE 3 OF 6 NOVEMBER 2, 2012 2.2 BASE MATERIALS A. Base: ASTM F 1861, Type TS rubber, vulcanized thermoset: top set Style B, Cove and as follows: 1. Height: 6 inch. 2. Thickness: 1/8 inch. 3. Finish: Satin. 4. Length: Roll. 5. Color: As selected by Architect from mfg. full range of colors. 6. Accessories: Premolded external corners and end stops. 7. Manufacturers: Johnsonite, Inc. or equal. 2.3 INSTALLATION MATERIALS A. Trowelable Leveling and Patching Compounds: Latexmodified, portland cement based or blended hydrauliccementbased form ulation provided or approved by manufacturer for applications indicated. .B. Adhesives: Waterresistant type recommended b y manufacturer to suit floor tile and substrate conditions indicated. 1. Use adhesives that comply with the following limits for VOC content when calculated according to 40 CFR 59, Subpart D (EPA Method 24): a. VCT and Asphalt Tile Adhesives: Not more than 50 g/L. b. Rubber Floor Adhesives: Not more than 60 g/L. C. Floor Polish: Provide protective liquid floor polish products as recommended by manufacturer. PART 3 EXECUTION 3.1 EXAMINATION A. Examine substrates, with Installer present, for compliance with requirements for maximum moisture content and other conditions affecting performance of the Work. B. Verify that finishes of substrates comply with tolerances and other requirements specified in other Sections and that substrates are free of cracks, ridges, depressions, scale, and foreign deposits that might interfere with adhesion of floor tile. C. Proceed with installation only after unsatisfactory conditions have been corrected. BEARDSLEY DESIGN ASSOCIATES CORNELL – NCP RESILIENT TILE FLOORING STANDARD SPECIFICATIONS 09 65 36 PAGE 4 OF 6 NOVEMBER 2, 2012 3.2 PREPARATION A. Prepare substrates according to manufacturer's written instructions to ensure adhesion of resilient products. B. Concrete Substrates: Prepare according to ASTM F 710. 1. Verify that substrates are dry and free of curing compounds, sealers, and hardeners. 2. Remove substrate coatings and other substances that are incompatible with adhesives and that contain soap, wax, oil, or silicone, using mechanical methods recommended by manufacturer. Do not use solvents. 3. Alkalinity and Adhesion Testing: Perform tests recommended by manufacturer. Proceed with installation only after substrates pass testing. C. Fill cracks, holes, and depressions in substrates with trowelable leveling and patching compound and remove bumps and ridges to produce a uniform and smooth substrate. D. Do not install floor tiles until they are same temperature as space where they are to be installed. 1. Move resilient products and installation materials into spaces where they will be installed at least 48 hours in advance of installation. E. Sweep and vacuum clean substrates to be covered by resilient products immediately before installation. 3.3 FLOOR TILE INSTALLATION A. Comply with manufacturer's written instructions for installing floor tile. B. Lay out floor tiles from center marks established with principal walls, discounting minor offsets, so tiles at opposite edges of room are of equal width. Adjust as necessary to avoid using cut widths that equal less than onehalf tile at perimeter. 1. Lay tiles square with room axis. C. Match floor tiles for color and pattern by selecting tiles from cartons in the same sequence as manufactured and packaged, if so numbered. Discard broken, cracked, chipped, or deformed tiles. D. Scribe, cut, and fit floor tiles to butt neatly and tightly to vertical surfaces and permanent fixtures including builtin furniture, ca binets, pipes, outlets, and door frames. BEARDSLEY DESIGN ASSOCIATES CORNELL – NCP RESILIENT TILE FLOORING STANDARD SPECIFICATIONS 09 65 36 PAGE 5 OF 6 NOVEMBER 2, 2012 E. Extend floor tiles into toe spaces, door reveals, closets, and similar openings. Extend floor tiles to center of door openings. F. Maintain reference markers, holes, and openings that are in place or marked for future cutting by repeating on floor tiles as marked on substrates. Use chalk or other nonpermanent, nonstaining marking device. G. Adhere floor tiles to flooring substrates using a full spread of adhesive applied to substrate to produce a completed installation without open cracks, voids, raising and puckering at joints, telegraphing of adhesive spreader marks, and other surface imperfections. 3.4 CLEANING AND PROTECTION A. Comply with manufacturer's written instructions for cleaning and protection of floor tile. B. Perform the following operations immediately after completing floor tile installation: 1. Remove adhesive and other blemishes from exposed surfaces. 2. Sweep and vacuum surfaces thoroughly. 3. Dampmop surfaces to remove marks and soil. C. Protect floor tile products from mars, marks, indentations, and other damage from construction operations and placement of equipment and fixtures during remainder of construction period. D. Cover floor tile with Ram Board Protective Card Board secured by painters tape and one layer of hard board or equal until substantial completion by Div 23 and Division 27 Contractors. E. After substantial completion by Division 27 Contractor, but prior to final project closeout, strip factory wax and burn in two coats of wax. Refer to Section 01 77 10 Final Cleaning, as applicable. F. Provide final cleaning – at final acceptance, as directed by Owner. END OF SECTION 096536 BEARDSLEY DESIGN ASSOCIATES CORNELL – NCP RESILIENT TILE FLOORING STANDARD SPECIFICATIONS 09 65 36 PAGE 6 OF 6 NOVEMBER 2, 2012 [ PAGE LEFT INTENTIONALLY BLANK ]