Loading...
HomeMy WebLinkAboutVon Cramm Hall InformationCLOSET 1 09 37 5F 2'X2' CLOSET lESTIBULE I 0042) 42 5F 1 05 5 101 149 5F f49,- LOUNGE III 702 5F LOBBY 0 004 I) 230 5F CLOSET �I 0000 23 5F 13'-2" CLOSET STAIR 105 235E AX10001 13 5E 191 5` 1 52 5F CLOSET 04AA 9 5F ROOM STAIR 0030 )5 5F ROOM (100) 1115E 04 CLOSET 02A O5F ROOM 1 02 I575F 253 5F GENERAL NOTES A. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS IN FIELD BEFORE COMMENCING ANY WORK AND NOTIFY ARCHITECT IMMEDIATELY IF ANY DISCREPANCIES ARE FOUND. THE CONTRACTOR SHALL PROVIDE A PROTECTIVE BARRIER AT ALL AREAS OF DEMOLITION, AND KEEP ALL EXITS FREE AND CLEAR AT ALL TIMES. C. THE OWNER RESERVES THE RIGHT TO RETAIN ANY REMOVED ITEMS AFTER CONTRACTOR REMOVAL. THE CONTRACTOR SHALL REMOVE FROM THE SITE AND DISPOSE OF ANY ITEMS THE OWNER DOES NOT WI511 TO RETAIN. D. DIMENSIONS SHOWN FOR ALL NEW OPENINGS IN EXISTING CONSTRUCTION SHALL 5E COORDINATED WITH THE NEW CONSTRUCTION PLANS AND EXISTING CONDITIONS IN THE FIELD. E. THE RESPONSIBLE CONTRACTOR 5hALL PATCH, REPAIR, PAINT OR REFINISH EXISTING CONSTRUCTION, MATERIALS AND FINISHES DAMAGED DURING DEMOLITION OR NEW CONSTRUCTION. F. MAINTAIN EXISTING STRUCTURAL SYSTEM AT ALL TIMES. PROVIDE TEMPORARY SHORING $ BRACING AT THE LOCATIONS WHERE THE EXISTING STRUCTURE IS SCHEDULED TO REMAIN. PROTECT THE EXISTING STRUCTURE SCHEDULED TO REMAIN FROM DAMAGE DURING DEMOLITION. MAINTAIN SHORING $ BRACING UNTIL THE NEW STRUCTURE IS INSTALLED AND READY TO ACCEPT NEW LOADS. G. MAINTAIN ALL EXISTING FIRE SEPARATIONS. ITEMS SHOWN ARE INTENDED TO GIVE APPROXIMATE QUANTITY. LOCATION $ TYPE. THE CONTRACTOR 15 RESPONSIBLE FOR VERIFYING ACTUAL QUANTITY $ EXISTING FIELD CONDITIONS. TOILET 002 1 ALL NEW SURFACES 5hALL RECIEVE A FINISH COAT. GYPSUM BOARD WALLS, CEILINGS, SOFFITS, ETC. SHALL 5E PAINTED IN ACCORDANCE WITH SPECIFICATIONS. ALL CMU WALLS, EXCEPT THOSE IN SHOWER ROOMS, SHALL RECIEVE A PAINTED FINISH IN ACCORDANCE WITH SPECS WHERE PATCHING OCCURS. PAINTING OF THE ENTIRE WALL IS REQUIRED IN ACCORDANCE WITH SPECS. CONSTRUCTION DRAWING NOTES INSTALL 54" GYP BOARD CEILING. TAPE, PRIME AND PAINT IN ACCORDANCE WITH SPECS. COLOR SHALL MATCH ADJACENT SURFACES. REFER TO RCP FOR EXTENT OF WORK ON FIRST $ SECOND FLOOR. 2. PROVIDE GYP SOFFIT A5 INDICATED BY DETAIL. TAPE, PRIME, PAINT IN ACCORDANCE WITH SPECS. COLOR SHALL MATCH ADJACENT SURFACES. REFER TO RCP FOR EXTENT OF WORK ON FIRST $ SECOND FLOOR. 3. INSTALL NEW 4" CMU CHASE WALL TO DECK ABOVE. INSTALL VINYL BASE ON ENTIRE LENGTH OF WALL TO MATCH EXG. PAINT ENTIRE WALL TO MATCH EXISTING COLOR IN ACCORDANCE WITH SPECS. 0 FIRST FLOOR RCP 1 /8" 4. PROVIDE NEW CERAMIC FLOOR AND WALL TILE WHERE WALL URINALS WERE REMOVED BY ABATEMENT. TILE SHALL MATCH EXISTING A5 CLOSELY A5 PO5515LE. PROVIDE SAMPLE FOR OWNER SELECTION AT LEAST 3 SHADES THAT CLOSELY RESEMBLE FIELD CONDITIONS. 5. PROVIDE SLOPED FLOOR AS SHOWN. FLOOR SHALL 5E SLOPED MINIMUM I/8" PER FOOT. INSTALL NEW CERAMIC TILE MOSAIC FLOOR TO MATCH EXG. 0. INSTALL NEW 4" CMU CHASE WALL. INSTALL CERAMIC TILE $ MATCHING BASE OVER ENTIRE NEW WALL, CERAMIC TILE COLOR TO BE SELECTED BY OWNER. PATCH CEILING WORK TO MATCH NEW EXG. PAINT ENTIRE CEILING 7. INSTALL CERAMIC TILE WHERE WALL WAS REMOVED FOR ACCESS TO BURIED PIPING. COLOR TO MATCH EXISTING. 3. INSTALL STAINLESS STEEL CURTAIN ROD SHOWER SYSTEM. SEE A I .5 FOR DETAILS 9. INSTALL METAL ACCESS PANEL, SIZE A5 NOTED. INSTALL IN ACCORDANCE WITH SPECS AT LOCATIONS WHERE MOST SUITABLE FOR ACCESS TO PLUMBING VALVES. PAINT FINISH SHALL MATCH ADJACENT SURFACES. 10. INSTALL SUSPENDED ACOUSTIC CEILING TILE CEILING BY ALTNERATE # I . THIS WORK INCLUDES, BUT NOT LIMITED TO DEMOLITION OF ENTIRE SPLINE CEILING, LIGHTING AND CEILING MOUNTED ACCESSORIES (FIRE ALARM DEVICES). INSTALL NEW 2X4 SUSPENDED CEILING, HEIGHT TO MATCH EXG, NEW 2X2 LIGHTING, AND RE -INSTALL EXG CEILING MOUNTED ACCESSORIES (FIRE ALARM DEVICES, ETC) DRAWN by JPM ChIECCFD D' JFM DATE .572012 SCALE A5 SHOWN REV151ON . RELEASE °OR CONSTk U C 1"ION '111-Nautiionzeiril AlterotIon �- Adation To l loNN BefinfiNI A LiceinifiN, INnifiinNwANi Cr AANNAAWN hANwi Of t ON Of rile New Yorki NANA,Fdo�t Inni' Conyr hl: 2012 RST FLOOR RCP Z 0 H 9 0 W H cL J co J W Z 2U Z O CORNELL ITHACA, NY ADI -Al PROJECT NO: 5950 5 Airport Corporate Park 100 Hunt Center Horseheads, NY 14845 Tel.: 607.358.1000 Fax 358.1800 www.hunt-eas.com Cornell University Von Cramm Hall Renovations HUNT 1595-088 BID ADDENDUM NO. 1 June 6, 2012 The following Addendum (Addenda) shall be considered a part of the contract documents prepared by HUNT ENGINEERS, ARCHITECTS & LAND SURVEYORS; P.C., bid document date of 5/7/12. Drawings Issued: AD1-A1 FIRST FLOOR RCP AD1-A2 SECOND FLOOR PLAN AD1-A3 DETAILS Modifications to Drawings AD1-A1 Refer to Drawing AD1-A1 issued by this addendum ADD Note 9 as shown, Install 2’x2’ access panel. Patch ceiling around access panel to accommodate new access panel. Paint entire ceiling and new access panel. AD1-A2 Refer to Drawing AD1-A2 issued by this addendum ADD Note 9 as shown. Install 2’x2’ access panel. Patch ceiling around access panel to accommodate new access panel. Paint entire ceiling and new access panel. AD1-A3 Refer to Drawing AD1-A3 issued by this addendum ADD Vertical post and escutcheon plates adjacent to exterior wall in lieu of attaching to exterior wall. Provide blocking as necessary in ceiling for post attachment End of Addendum No. 1 PROVIDE OPENING FOR BLOCKING AT CONNECTION LOCATIONS FOR CURTAIN SUPPORTS. PATCH AND PAINT ENTIRE CEILING - I/41' STAINLESS STEEL CURTAIN ROD SYSTEM, WITH STAINLESS STEEL HARDWARE, ESCUTCHEON PLATES AND ACCESSORIES. CURTAINS BY OWNER 3'-I" 3'-I" 3'-I" FRONT ELEVATION SIDE ELEVATION SHOWER CURTAIN ROD SYSTEM 3 1/2°=1'-0 EXG WALL CERAMIC TILE SET -SLOPE%" PER FOOT MUD BED SET DEEP ENOUGH TO ALLOW FOR DRAIN TO BE RECESSED IN MUD BED SLAB LINEAR DRAIN -CORE DRILL SLAB FOR DRAINS WHERE APPLICABLE WATER -PROOFING MEMBRANE 2ND FLOOR SHOWER FLOOR 1 /2"=1'-0" EXG SPLINE CEILING 3-5/8" MTL STUD SOFFIT IG"0.C. 5/8" GYP 3-5/8" MTL STUD KICKER PAINTED MTL ACCESS DOOR BASEMENT SOFFIT DETAIL 1 /2"=1'-0' PROVIDE OPENING IN EXG PLASTER CEILING TO ACCOMODATE EXHAUST FAN MOUNTING. NEW DUCTWORK TO DIFFUSERS CAN BE MOUNTED TO THE PLASTER CEILING. ENSURE THAT FASTENERS FOR DUCTWORK, AND SOFFIT FRAMING ATTACH APPROPRIATELY TO STRUCTURE ABOVE PLASTER CEILING. TO MINIMIZE HEAD CLEARANCE, MOUNT EXHAUST FAN AND DUCTWORK SUCH THAT THE MAXIMUM AMOUNT THE SOFFIT DROPS BELOW EXIG PLASTER CEILING I5 8'1±. AT WINDOW, ENSURE THAT DUCTWORK/ NEW SOFFIT DRYWALL TRANSITION 15 CLEAN. CAULK AT EDGE OF DUCTWORK. ALL EXPOSED GALVANIZED DUCTWORK SHALL BE PAINTED THE SAME COLOR AS THE SOFFIT. THE EXTERIOR PENETRATION SHALL NOT BE MODIFIED. MODIFY DUCTWORK AS NECESSARY TO FIT EXISTING OPENING IN PLYWOOD PANEL. INSTALL DISCHARGE WALL CAP ON EXTERIOR EXG WALL MTL. STUD SOFFIT EXG CONCRETE DECK PLASTER CEILING 3-5/8" MTL STUD 5/6" GYPSUM BOARD DUCTWORK OFFSET DRYWALL SOFFIT, APPROX 5" CLEAR SPACE BELOW PLASTER CEILING HEIGHT BLOCKING J -BEAD AND CAULK FOK TIGHT FINISH AROUND PAINTED ALUMINUM DUCT DISCHARGE WALL CAP SOFFIT DETAIL 1 /2"=1'-0" DRAWN by JPM CHECKED DY: JPM DATE: SCALE 5-7-2012 AS SHOWN REVI5ION . RELEASE MR. CO NSTRIJCTL N Aona �rt,�A�t ,t� or Ad loon, ,1 Plar� Bearing A ung, .rs Or X00 Or se��on 7zo9 of r° Ne,v York `�tat� Eduction (aw.` Copynght: 2012 CORNELL ITHACA, NY ADI -A3 PROJECT NO: 1595-088 CLOSET ROOM 1 152 5F ROOM )215 1 47 5F CLOSET 2 1 5A) 1 4 5F CLOSET C213A) 1 4 5F 1 55 5F ROOM 20 1 161 5F CLOSET 1 57 5F 20000 CLOSET 14 5F JANITOR 2006 I) 1 7 5F STAIR (20001) 185 5F 0212) 1 55 5F CLOSET 2I OA 14 5F ROOM (210-) 1 47 5F GENERAL NOTES A. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS IN FIELD BEFORE COMMENCING ANY WORK AND NOTIFY ARCHITECT IMMEDIATELY IF ANY DISCREPANCIES AKE FOUND. 5. C. THE CONTRACTOR SHALL PROVIDE A PROTECTIVE BARRIER AT ALL AREAS OF DEMOLITION, AND KEEP ALL EXITS FREE AND CLEAR AT ALL TIMES. THE OWNER RESERVES THE RIGHT TO RETAIN ANY REMOVED ITEMS AFTER CONTRACTOR REMOVAL. THE CONTRACTOR SHALL REMOVE FROM THE SITE AND DISPOSE OF ANY ITEMS THE OWNER DOES NOT WISH TO RETAIN. D. DIMENSIONS SHOWN FOR ALL NEW OPENINGS IN EXISTING CONSTRUCTION SHALL 5E COORDINATED WITh THE NEW CONSTRUCTION PLANS AND EXISTING CONDITIONS IN THE FIELD. THE RESPONSIBLE CONTRACTOR SHALL PATCH, REPAIR, PAINT OR REFINISH EXISTING CONSTRUCTION, MATERIALS AND FINISHES DAMAGED DURING DEMOLITION OK NEW CONSTRUCTION. MAINTAIN EXISTING STRUCTURAL SYSTEM AT ALL TIMES. PROVIDE TEMPORARY SHORING $ BRACING AT THE LOCATIONS WHERE THE EXISTING STRUCTURE IS SCHEDULED TO REMAIN. PROTECT THE EXISTING STRUCTUKE SCHEDULED TO REMAIN FROM DAMAGE DURING DEMOLITION. MAINTAIN SHORING $ BRACING UNTIL THE NEW STRUCTURE IS INSTALLED AND READY TO ACCEPT NEW LOADS. G. MAINTAIN ALL EXISTING FIRE SEPARATIONS. ROOM C 2083 1 49 5F CLOSET (208Ay 1 4 5F CLOSET 200A) 4 5F ROOM 200 ) 1 50 5F C 204 1 50 5F CLOSET C204A� 1 4 5F CLOSET 202A 1 4 5F ROOM 202 192 SF H. ITEMS SHOWN ARE INTENDED TO GIVE APPROXIMATE QUANTITY, LOCATION $ TYPE. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ACTUAL QUANTITY* EXISTING FIELD CONDITIONS. ALL NEW SURFACES SHALL RECIEVE A FINISH COAT. GYPSUM BOARD WALLS, CEILINGS, SOFFITS, ETC. SHALL BE PAINTED IN ACCORDANCE WITH SPECIFICATIONS. ALL CMU WALLS, EXCEPT THOSE IN SHOWER ROOMS, SHALL RELIEVE A PAINTED FINISH IN ACCORDANCE WITH SPECS WHERE PATCHING OCCURS. PAINTING OF THE ENTIRE WALL 15 REQUIRED IN ACCORDANCE WITH SPECS. CONSTRUCTION DRAWING NOTES INSTALL 5/8" GYP BOARD CEILING. TAPE, PRIME AND PAINT IN ACCORDANCE WITh SPECS. COLOR. SHALL MATCH ADJACENT SURFACES. REFER TO RCP FOR EXTENT OF WORK ON FIRST $ SECOND FLOOR. 2. PROVIDE GYP SOFFIT AS INDICATED BY DETAIL. TAPE, PRIME, PAINT IN ACCORDANCE WITH SEPCS. COLOR SHALL MATCH ADJACENT SURFACES. REFER TO RCP FOR. EXTENT OF WORK ON FIRST $ SECOND FLOOR. 3. INSTALL NEW 411 CMU CHASE WALL TO DECK ABOVE. INSTALL VINYL BASE ON ENTIRE LENGTH OF WALL TO MATCH EXG. PAINT ENTIRE WALL TO MATCH EXISTING COLOR IN ACCORDANCE WITH SPECS. 1 SECOND FLOOR PLAN V / 1/8"=1'-0" 4. PROVIDE NEW CERAMIC FLOOR AND WALL TILE WHERE WALL URINALS WERE REMOVED BY ABATEMENT. TILE SHALL MATCH EXISTING AS CLOSELY AS POSSIBLE. PROVIDE SAMPLE FOR OWNER SELECTION AT LEAST 3 SHADES THAT CLOSELY RESEMBLE FIELD CONDITIONS. 5. PROVIDE SLOPED FLOOR A5 SHOWN. FLOOR SHALL BE SLOPED MINIMUM 1/8" PER FOOT. INSTALL NEW CERAMIC TILE MOSAIC FLOOR TO MATCH EXG. 0. INSTALL NEW 4° CMU CHASE WALL. INSTALL CERAMIC TILE $ MATCHING BASE OVER ENTIRE NEW WALL, CERAMIC TILE COLOR TO BE SELECTED BY OWNER. PATCH CEILING WORK TO MATCH NEW EXG. PAINT ENTIRE CEILING 7. INSTALL CERAMIC TILE WHERE WALL WAS REMOVED FOR ACCESS TO BURIED PIPING. COLOR TO MATCH EXISTING. INSTALL STAINLESS STEEL CURTAIN ROD SHOWER SYSTEM. SEE AI .5 FOR DETAILS 9. INSTALL METAL ACCESS PANEL, SIZE AS NOTED. INSTALL IN ACCORDANCE WITH SPECS AT LOCATIONS WHERE MOST SUITABLE FOR ACCESS TO PLUMBING VALVES. PAINT FINISH SHALL MATCH ADJACENT SURFACES. 10. INSTALL SUSPENDED ACOUSTIC CEILING TILE CEILING BY ALTNERATE # . THIS WORK INCLUDES, BUT NOT LIMITED TO DEMOLITION OF ENTIRE SPLINE CEILING, LIGHTING AND CEILING MOUNTED ACCESSORIES (FIRE ALARM DEVICES). INSTALL NEW 2X4 SUSPENDED CEILING, HEIGHT TO MATCH EXG, NEW 2X2 LIGHTING, AND RE -INSTALL EXG CEILING MOUNTED ACCESSORIES (FIRE ALARM DEVICES, ETC) DRAWN by JFM CY1 ECKfD by JPM DATE 5-7-20(2 SCALE AS SHOWN RVRfV151CN RELEASE rC k CO N5TRJCfiON Aterato2 4,99,4249r Iv 1212194, Licarng Lice9<>ed 4,4,9,2 r9 Or 04 524,,or 9209 O 7,44 New York 5,4, 12c4,99.2911 Law." Copyr ght: 2012 SECOND FLOOR PLAN 11- N ccW Z CORNELL ITHACA, NY ADI -A2 PROD CCT NO: 595-Oa6