HomeMy WebLinkAboutVon Cramm Hall InformationCLOSET
1 09
37 5F
2'X2'
CLOSET
lESTIBULE
I 0042)
42 5F
1 05 5
101
149 5F
f49,-
LOUNGE
III
702 5F
LOBBY
0 004 I)
230 5F
CLOSET
�I 0000
23 5F
13'-2"
CLOSET STAIR
105
235E
AX10001
13 5E 191 5`
1 52 5F
CLOSET
04AA
9 5F
ROOM
STAIR
0030
)5 5F
ROOM
(100)
1115E
04
CLOSET
02A
O5F
ROOM
1 02
I575F
253 5F
GENERAL NOTES
A. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND EXISTING
CONDITIONS IN FIELD BEFORE COMMENCING ANY WORK AND NOTIFY
ARCHITECT IMMEDIATELY IF ANY DISCREPANCIES ARE FOUND.
THE CONTRACTOR SHALL PROVIDE A PROTECTIVE BARRIER AT ALL AREAS OF
DEMOLITION, AND KEEP ALL EXITS FREE AND CLEAR AT ALL TIMES.
C. THE OWNER RESERVES THE RIGHT TO RETAIN ANY REMOVED ITEMS AFTER
CONTRACTOR REMOVAL. THE CONTRACTOR SHALL REMOVE FROM THE SITE
AND DISPOSE OF ANY ITEMS THE OWNER DOES NOT WI511 TO RETAIN.
D. DIMENSIONS SHOWN FOR ALL NEW OPENINGS IN EXISTING CONSTRUCTION
SHALL 5E COORDINATED WITH THE NEW CONSTRUCTION PLANS AND
EXISTING CONDITIONS IN THE FIELD.
E. THE RESPONSIBLE CONTRACTOR 5hALL PATCH, REPAIR, PAINT OR REFINISH
EXISTING CONSTRUCTION, MATERIALS AND FINISHES DAMAGED DURING
DEMOLITION OR NEW CONSTRUCTION.
F. MAINTAIN EXISTING STRUCTURAL SYSTEM AT ALL TIMES. PROVIDE
TEMPORARY SHORING $ BRACING AT THE LOCATIONS WHERE THE EXISTING
STRUCTURE IS SCHEDULED TO REMAIN. PROTECT THE EXISTING STRUCTURE
SCHEDULED TO REMAIN FROM DAMAGE DURING DEMOLITION. MAINTAIN
SHORING $ BRACING UNTIL THE NEW STRUCTURE IS INSTALLED AND READY
TO ACCEPT NEW LOADS.
G. MAINTAIN ALL EXISTING FIRE SEPARATIONS.
ITEMS SHOWN ARE INTENDED TO GIVE APPROXIMATE QUANTITY.
LOCATION $ TYPE. THE CONTRACTOR 15 RESPONSIBLE FOR
VERIFYING ACTUAL QUANTITY $ EXISTING FIELD CONDITIONS.
TOILET
002 1
ALL NEW SURFACES 5hALL RECIEVE A FINISH COAT. GYPSUM
BOARD WALLS, CEILINGS, SOFFITS, ETC. SHALL 5E PAINTED IN
ACCORDANCE WITH SPECIFICATIONS. ALL CMU WALLS, EXCEPT
THOSE IN SHOWER ROOMS, SHALL RECIEVE A PAINTED FINISH IN
ACCORDANCE WITH SPECS WHERE PATCHING OCCURS. PAINTING
OF THE ENTIRE WALL IS REQUIRED IN ACCORDANCE WITH SPECS.
CONSTRUCTION DRAWING NOTES
INSTALL 54" GYP BOARD CEILING. TAPE, PRIME AND PAINT IN
ACCORDANCE WITH SPECS. COLOR SHALL MATCH ADJACENT SURFACES.
REFER TO RCP FOR EXTENT OF WORK ON FIRST $ SECOND FLOOR.
2. PROVIDE GYP SOFFIT A5 INDICATED BY DETAIL. TAPE, PRIME, PAINT IN
ACCORDANCE WITH SPECS. COLOR SHALL MATCH ADJACENT SURFACES.
REFER TO RCP FOR EXTENT OF WORK ON FIRST $ SECOND FLOOR.
3. INSTALL NEW 4" CMU CHASE WALL TO DECK ABOVE. INSTALL VINYL BASE
ON ENTIRE LENGTH OF WALL TO MATCH EXG. PAINT ENTIRE WALL TO
MATCH EXISTING COLOR IN ACCORDANCE WITH SPECS.
0
FIRST FLOOR RCP
1 /8"
4. PROVIDE NEW CERAMIC FLOOR AND WALL TILE WHERE WALL URINALS WERE
REMOVED BY ABATEMENT. TILE SHALL MATCH EXISTING A5 CLOSELY A5
PO5515LE. PROVIDE SAMPLE FOR OWNER SELECTION AT LEAST 3 SHADES
THAT CLOSELY RESEMBLE FIELD CONDITIONS.
5. PROVIDE SLOPED FLOOR AS SHOWN. FLOOR SHALL 5E SLOPED MINIMUM
I/8" PER FOOT. INSTALL NEW CERAMIC TILE MOSAIC FLOOR TO MATCH EXG.
0. INSTALL NEW 4" CMU CHASE WALL. INSTALL CERAMIC TILE $ MATCHING
BASE OVER ENTIRE NEW WALL, CERAMIC TILE COLOR TO BE SELECTED BY
OWNER. PATCH CEILING WORK TO MATCH NEW EXG. PAINT ENTIRE CEILING
7. INSTALL CERAMIC TILE WHERE WALL WAS REMOVED FOR ACCESS TO
BURIED PIPING. COLOR TO MATCH EXISTING.
3. INSTALL STAINLESS STEEL CURTAIN ROD SHOWER SYSTEM. SEE A I .5 FOR
DETAILS
9. INSTALL METAL ACCESS PANEL, SIZE A5 NOTED. INSTALL IN ACCORDANCE
WITH SPECS AT LOCATIONS WHERE MOST SUITABLE FOR ACCESS TO
PLUMBING VALVES. PAINT FINISH SHALL MATCH ADJACENT SURFACES.
10. INSTALL SUSPENDED ACOUSTIC CEILING TILE CEILING BY ALTNERATE # I .
THIS WORK INCLUDES, BUT NOT LIMITED TO DEMOLITION OF ENTIRE SPLINE
CEILING, LIGHTING AND CEILING MOUNTED ACCESSORIES (FIRE ALARM
DEVICES). INSTALL NEW 2X4 SUSPENDED CEILING, HEIGHT TO MATCH EXG,
NEW 2X2 LIGHTING, AND RE -INSTALL EXG CEILING MOUNTED ACCESSORIES
(FIRE ALARM DEVICES, ETC)
DRAWN by
JPM
ChIECCFD D'
JFM
DATE
.572012
SCALE
A5 SHOWN
REV151ON
. RELEASE °OR
CONSTk U C 1"ION
'111-Nautiionzeiril AlterotIon �-
Adation To l loNN BefinfiNI
A LiceinifiN, INnifiinNwANi Cr
AANNAAWN
hANwi
Of t ON Of rile New
Yorki NANA,Fdo�t Inni'
Conyr hl: 2012
RST FLOOR RCP
Z
0
H
9
0
W H
cL
J co
J W
Z
2U
Z
O
CORNELL
ITHACA, NY
ADI -Al
PROJECT NO:
5950 5
Airport Corporate Park 100 Hunt Center Horseheads, NY 14845
Tel.: 607.358.1000 Fax 358.1800 www.hunt-eas.com
Cornell University
Von Cramm Hall Renovations
HUNT 1595-088
BID ADDENDUM NO. 1
June 6, 2012
The following Addendum (Addenda) shall be considered a part of the contract documents prepared
by HUNT ENGINEERS, ARCHITECTS & LAND SURVEYORS; P.C., bid document date of 5/7/12.
Drawings Issued:
AD1-A1 FIRST FLOOR RCP
AD1-A2 SECOND FLOOR PLAN
AD1-A3 DETAILS
Modifications to Drawings
AD1-A1 Refer to Drawing AD1-A1 issued by this addendum
ADD Note 9 as shown, Install 2’x2’ access panel. Patch ceiling around access panel to
accommodate new access panel. Paint entire ceiling and new access panel.
AD1-A2 Refer to Drawing AD1-A2 issued by this addendum
ADD Note 9 as shown. Install 2’x2’ access panel. Patch ceiling around access panel to
accommodate new access panel. Paint entire ceiling and new access panel.
AD1-A3 Refer to Drawing AD1-A3 issued by this addendum
ADD Vertical post and escutcheon plates adjacent to exterior wall in lieu of attaching to
exterior wall. Provide blocking as necessary in ceiling for post attachment
End of Addendum No. 1
PROVIDE OPENING FOR BLOCKING
AT CONNECTION LOCATIONS FOR
CURTAIN SUPPORTS. PATCH AND PAINT
ENTIRE CEILING
- I/41' STAINLESS STEEL CURTAIN ROD SYSTEM,
WITH STAINLESS STEEL HARDWARE, ESCUTCHEON
PLATES AND ACCESSORIES. CURTAINS BY OWNER
3'-I"
3'-I"
3'-I"
FRONT ELEVATION
SIDE ELEVATION
SHOWER CURTAIN ROD SYSTEM
3 1/2°=1'-0
EXG WALL
CERAMIC TILE SET -SLOPE%" PER FOOT
MUD BED SET DEEP ENOUGH
TO ALLOW FOR DRAIN TO BE
RECESSED IN MUD BED SLAB
LINEAR DRAIN -CORE DRILL SLAB
FOR DRAINS WHERE APPLICABLE
WATER -PROOFING MEMBRANE
2ND FLOOR SHOWER FLOOR
1 /2"=1'-0"
EXG SPLINE CEILING
3-5/8" MTL STUD SOFFIT
IG"0.C.
5/8" GYP
3-5/8" MTL STUD KICKER
PAINTED MTL
ACCESS DOOR
BASEMENT SOFFIT DETAIL
1 /2"=1'-0'
PROVIDE OPENING IN EXG PLASTER CEILING TO ACCOMODATE EXHAUST FAN MOUNTING.
NEW DUCTWORK TO DIFFUSERS CAN BE MOUNTED TO THE PLASTER CEILING. ENSURE THAT
FASTENERS FOR DUCTWORK, AND SOFFIT FRAMING ATTACH APPROPRIATELY TO STRUCTURE
ABOVE PLASTER CEILING. TO MINIMIZE HEAD CLEARANCE, MOUNT EXHAUST FAN AND DUCTWORK
SUCH THAT THE MAXIMUM AMOUNT THE SOFFIT DROPS BELOW EXIG PLASTER CEILING I5 8'1±.
AT WINDOW, ENSURE THAT DUCTWORK/ NEW SOFFIT DRYWALL TRANSITION 15 CLEAN. CAULK AT
EDGE OF DUCTWORK. ALL EXPOSED GALVANIZED DUCTWORK SHALL BE PAINTED THE SAME
COLOR AS THE SOFFIT. THE EXTERIOR PENETRATION SHALL NOT BE MODIFIED. MODIFY DUCTWORK
AS NECESSARY TO FIT EXISTING OPENING IN PLYWOOD PANEL. INSTALL DISCHARGE WALL CAP ON EXTERIOR
EXG WALL
MTL. STUD SOFFIT
EXG CONCRETE DECK
PLASTER CEILING
3-5/8" MTL STUD
5/6" GYPSUM BOARD
DUCTWORK OFFSET
DRYWALL SOFFIT, APPROX 5" CLEAR
SPACE BELOW PLASTER CEILING HEIGHT
BLOCKING
J -BEAD AND CAULK FOK TIGHT
FINISH AROUND PAINTED ALUMINUM DUCT
DISCHARGE WALL CAP
SOFFIT DETAIL
1 /2"=1'-0"
DRAWN by
JPM
CHECKED DY:
JPM
DATE:
SCALE
5-7-2012
AS SHOWN
REVI5ION
. RELEASE MR.
CO NSTRIJCTL N
Aona �rt,�A�t ,t� or
Ad loon, ,1 Plar� Bearing
A ung, .rs Or
X00
Or se��on 7zo9 of r° Ne,v
York `�tat� Eduction (aw.`
Copynght: 2012
CORNELL
ITHACA, NY
ADI -A3
PROJECT NO:
1595-088
CLOSET
ROOM
1
152 5F
ROOM
)215
1 47 5F
CLOSET
2 1 5A)
1 4 5F
CLOSET
C213A)
1 4 5F
1 55 5F
ROOM
20 1
161 5F
CLOSET
1 57 5F
20000
CLOSET
14 5F
JANITOR
2006 I)
1 7 5F
STAIR
(20001)
185 5F
0212)
1 55 5F
CLOSET
2I OA
14 5F
ROOM
(210-)
1 47 5F
GENERAL NOTES
A. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND EXISTING
CONDITIONS IN FIELD BEFORE COMMENCING ANY WORK AND NOTIFY
ARCHITECT IMMEDIATELY IF ANY DISCREPANCIES AKE FOUND.
5.
C.
THE CONTRACTOR SHALL PROVIDE A PROTECTIVE BARRIER AT ALL AREAS OF
DEMOLITION, AND KEEP ALL EXITS FREE AND CLEAR AT ALL TIMES.
THE OWNER RESERVES THE RIGHT TO RETAIN ANY REMOVED ITEMS AFTER
CONTRACTOR REMOVAL. THE CONTRACTOR SHALL REMOVE FROM THE SITE
AND DISPOSE OF ANY ITEMS THE OWNER DOES NOT WISH TO RETAIN.
D. DIMENSIONS SHOWN FOR ALL NEW OPENINGS IN EXISTING CONSTRUCTION
SHALL 5E COORDINATED WITh THE NEW CONSTRUCTION PLANS AND
EXISTING CONDITIONS IN THE FIELD.
THE RESPONSIBLE CONTRACTOR SHALL PATCH, REPAIR, PAINT OR REFINISH
EXISTING CONSTRUCTION, MATERIALS AND FINISHES DAMAGED DURING
DEMOLITION OK NEW CONSTRUCTION.
MAINTAIN EXISTING STRUCTURAL SYSTEM AT ALL TIMES. PROVIDE
TEMPORARY SHORING $ BRACING AT THE LOCATIONS WHERE THE EXISTING
STRUCTURE IS SCHEDULED TO REMAIN. PROTECT THE EXISTING STRUCTUKE
SCHEDULED TO REMAIN FROM DAMAGE DURING DEMOLITION. MAINTAIN
SHORING $ BRACING UNTIL THE NEW STRUCTURE IS INSTALLED AND READY
TO ACCEPT NEW LOADS.
G. MAINTAIN ALL EXISTING FIRE SEPARATIONS.
ROOM
C 2083
1 49 5F
CLOSET
(208Ay
1 4 5F
CLOSET
200A)
4 5F
ROOM
200 )
1 50 5F
C 204
1 50 5F
CLOSET
C204A�
1 4 5F
CLOSET
202A
1 4 5F
ROOM
202
192 SF
H. ITEMS SHOWN ARE INTENDED TO GIVE APPROXIMATE QUANTITY,
LOCATION $ TYPE. THE CONTRACTOR IS RESPONSIBLE FOR
VERIFYING ACTUAL QUANTITY* EXISTING FIELD CONDITIONS.
ALL NEW SURFACES SHALL RECIEVE A FINISH COAT. GYPSUM
BOARD WALLS, CEILINGS, SOFFITS, ETC. SHALL BE PAINTED IN
ACCORDANCE WITH SPECIFICATIONS. ALL CMU WALLS, EXCEPT
THOSE IN SHOWER ROOMS, SHALL RELIEVE A PAINTED FINISH IN
ACCORDANCE WITH SPECS WHERE PATCHING OCCURS. PAINTING
OF THE ENTIRE WALL 15 REQUIRED IN ACCORDANCE WITH SPECS.
CONSTRUCTION DRAWING NOTES
INSTALL 5/8" GYP BOARD CEILING. TAPE, PRIME AND PAINT IN
ACCORDANCE WITh SPECS. COLOR. SHALL MATCH ADJACENT SURFACES.
REFER TO RCP FOR EXTENT OF WORK ON FIRST $ SECOND FLOOR.
2. PROVIDE GYP SOFFIT AS INDICATED BY DETAIL. TAPE, PRIME, PAINT IN
ACCORDANCE WITH SEPCS. COLOR SHALL MATCH ADJACENT SURFACES.
REFER TO RCP FOR. EXTENT OF WORK ON FIRST $ SECOND FLOOR.
3. INSTALL NEW 411 CMU CHASE WALL TO DECK ABOVE. INSTALL VINYL BASE
ON ENTIRE LENGTH OF WALL TO MATCH EXG. PAINT ENTIRE WALL TO
MATCH EXISTING COLOR IN ACCORDANCE WITH SPECS.
1 SECOND FLOOR PLAN
V / 1/8"=1'-0"
4. PROVIDE NEW CERAMIC FLOOR AND WALL TILE WHERE WALL URINALS WERE
REMOVED BY ABATEMENT. TILE SHALL MATCH EXISTING AS CLOSELY AS
POSSIBLE. PROVIDE SAMPLE FOR OWNER SELECTION AT LEAST 3 SHADES
THAT CLOSELY RESEMBLE FIELD CONDITIONS.
5. PROVIDE SLOPED FLOOR A5 SHOWN. FLOOR SHALL BE SLOPED MINIMUM
1/8" PER FOOT. INSTALL NEW CERAMIC TILE MOSAIC FLOOR TO MATCH EXG.
0. INSTALL NEW 4° CMU CHASE WALL. INSTALL CERAMIC TILE $ MATCHING
BASE OVER ENTIRE NEW WALL, CERAMIC TILE COLOR TO BE SELECTED BY
OWNER. PATCH CEILING WORK TO MATCH NEW EXG. PAINT ENTIRE CEILING
7. INSTALL CERAMIC TILE WHERE WALL WAS REMOVED FOR ACCESS TO
BURIED PIPING. COLOR TO MATCH EXISTING.
INSTALL STAINLESS STEEL CURTAIN ROD SHOWER SYSTEM. SEE AI .5 FOR
DETAILS
9. INSTALL METAL ACCESS PANEL, SIZE AS NOTED. INSTALL IN ACCORDANCE
WITH SPECS AT LOCATIONS WHERE MOST SUITABLE FOR ACCESS TO
PLUMBING VALVES. PAINT FINISH SHALL MATCH ADJACENT SURFACES.
10. INSTALL SUSPENDED ACOUSTIC CEILING TILE CEILING BY ALTNERATE # .
THIS WORK INCLUDES, BUT NOT LIMITED TO DEMOLITION OF ENTIRE SPLINE
CEILING, LIGHTING AND CEILING MOUNTED ACCESSORIES (FIRE ALARM
DEVICES). INSTALL NEW 2X4 SUSPENDED CEILING, HEIGHT TO MATCH EXG,
NEW 2X2 LIGHTING, AND RE -INSTALL EXG CEILING MOUNTED ACCESSORIES
(FIRE ALARM DEVICES, ETC)
DRAWN by
JFM
CY1 ECKfD by
JPM
DATE
5-7-20(2
SCALE
AS SHOWN
RVRfV151CN
RELEASE rC k
CO N5TRJCfiON
Aterato2
4,99,4249r Iv 1212194, Licarng
Lice9<>ed 4,4,9,2 r9 Or
04 524,,or 9209 O 7,44 New
York 5,4, 12c4,99.2911 Law."
Copyr ght: 2012
SECOND FLOOR PLAN
11-
N
ccW
Z
CORNELL
ITHACA, NY
ADI -A2
PROD CCT NO:
595-Oa6