HomeMy WebLinkAboutAddendum #1CORNELL UNIVERSITY FACILITIES CONTRACTS 121 HUMPHREYS SERVICE BUILDING ITHACA, NEW YORK 14853-3701 URIS HALL DASNY COMPLIANCE PROJECT ADDENDUM NO. I July 24, 2013 This Addendum contains changes to the requirements of the Contract Documents and Specifications. Such changes are to be incorporated into the Construction Documents and shall apply to the work with the same meaning and force as if they had been included in the original document. Wherever this Addendum modifies a portion of a paragraph of the specifications or a portion of any Drawing, the remainder of the Paragraph or Drawing shall remain in force. NOTE: Provisions of all Contract Documents apply. Item 1. Attached is the Pre -Bid Sign -In Sheet for reference. BID FORM Item 2. Bid Form, Page BF -2, Item 3.a. DELETE "....December 26, 3013." REPLACE with "....December 26, 2013." GENERAL REQUIREMENTS Item 3. Section 01 73 29, "Cutting, Patching and Repairing", Item 1.4 ADD Item 1.4 B as follows: `B. The existing Uris Hall roof is a Carlisle EPDM roof installed in 2010 and is presently under warranty (serial number 10057380). The Contractor shall ensure that any and all roofing modifications performed under this Contract shall meet Carlisle's warranty requirements." TECHNICAL SPECIFICATIONS Item 4. Section 07 72 00, "Roof Accessories", Item 1.6 ADD item 1.6B as follows: "B. Any roofing modifications performed under this Contract shall be performed by a Carlisle Authorized Roofing Applicator after obtaining written authorization from Carlisle for the proposed work." Item 5. Section 28 31 11, "Fire -Alarm System", Item 2.1.A. DELETE ".... or comparable products by one of the following: 1. Notifier. 2. Edwards System Technologies (EST)." This system is limited to Gamewell-FCI in order to integrate the existing Basement Animal Facility fire alarm equipment to remain, and to maintain the UL listings. Item 6. Section 28 31 11, "Fire -Alarm System", Item 3.2 DELETE Item 3.2.B. in its entirety. REPLACE Item 3.2.C. with Item 3.2.B. to read as follows: "B. Exposed conduit in finished spaces shall be painted to match existing ceiling/wall color of the surface to which they are mounted. Exposed conduits/junction boxes in mechanical rooms or electrical closets shall be red." Item 7. Existing Building Drawings The following archive drawings are attached for Bidder's Information Only under this Addendum: ADD 050-390 A01 Sub -basement Roof Pin & Schd A ADD 050-391 A02 Bsmnt Flr Pln & Schd A ADD 050-392 A03 Grnd Flr Pln & Schds A ADD 050-394 A05 2nd Flr Pin & Schds A ADD 050-395 A06 3rd Flr Pln & Schds_A ADD 050-396_A07 4th Flr Pin & Schds A ADD 104-055 A01 l st Flr Lobby Flr Pln Rm 100CA C2 Item 8. RFI Questions and Clarifications See attached RFI Log (Items 1-3) Attachments: Pre -Bid Sign -In Sheet Existing Building Drawings (7 sheets) RFI Log (Items 1-3) ****END OF ADDENDUM NO. 1**** Uris Hall DASNY Compliance Project RFI Form Date: July 24 2013 S S » ' -'0V'' —»&» S `-'' S v S 7-- - '' j ',.1,.' - " V ' ,-, - .»»» - =., ,Fa -',--2 „ ..,,_ — ... - 1 Section 28 31 11 3.2 The specs read that no MC type cable is allowed, however, in areas above concealed spline ceilings where EMT conduit is not feasible can we use Red Fire Alarm Type MC cable? All wiring shall be in EMT. 2 Section 28 3111 Are there any fan shutdown requirements for existing AHU's or mechanical equipment? There is no motor control schedule showing fan shut down, Specification Section 283111 describes requirements for HVAC unit shutdown. Duct smoke detectors and smoke damper connections indciated on the drawings are associated with HVAC units that require shutdown. There are approixatmely 25 HVAC units that require replacement of existing fan shutdown components and wiring. 3 Drawings A148 through A154 Can you confirm that the only ceiling work to be done is removal and replacement work where the architectural work is (noted explicitly on the RCP)? I notice that there is spline existing in the rooms where the new partitions are going up and it shows 2x2 ACT going in on the RCP (i.e. Rill 252A). If that tile i s supposed to be new are you looking for the Armstrong Cirrus Angled Tegular tile per Spec 09 51 13? The scope of ceiling work includes items shown in the RCP and any required cutting and patching to install and/or remove fire alarm system. Ceiling manufacturers are noted in specification Section 09 51 13, "Acoustical Ceiling Panels" article 2.3. Per Reflected Ceiling Plan Notes (see note #6) and Section 09 51 23, "Acoustic Tile Ceilings" article 2.1, the ceiling tiles are to match existing conditions in the area of work.