Loading...
HomeMy WebLinkAboutPermit Plans - Olin Hall Alabi Lab Renovation6 4 I 13 I 12 I 11 I 10 t n all era ment of emical an a• enovation Cornell University Ithaca, New York Facilities Engineering Civil, Structural, Architecture, Mechanical Electrical, Environmental & Energy Engineering Humphreys Service Building; Ithaca, N.Y. PROJECT SCOPE The purpose of this project is to provide laboratory renovations in Olin Hall Labs 105,107 and 110 suitable for the research needs of Christopher Alabi, a new faculty hire in the Department of Chemical and Biomolecular Engineering in the College of Engineering. iomoiecuia DRAWING LIST T-001 TITLE SHEET ARCHITECTURAL, MECHANICAL AND ELECTRICAL ME -000 GENERAL NOTES, SCOPE OF WORK, SUBMITTAL SCHEDULES AND SYMBOLOGY MED -101 PARTIAL FIRST FLOOR MECHANICAL AND ELECTRICAL DEMOLITION PLAN AME -101 PARTIAL FIRST FLOOR ARCHITECTURAL, MECHANICAL AND ELECTRICAL CONSTRUCTION PLAN ME -102 PARTIAL FOURTH FLOOR MECHANICAL AND ELECTRICAL CONSTRUCTION PLAN M-301 CONTROLS SCHEMATIC, SEQUENCE OF OPERATIONS AND POINTS LIST MP -401 MECHANICAL DETAILS AND PARTIAL BASEMENT PLUMBING PLAN MP -501 MECHANICAL / PLUMBING SCHEDULES AND SPECIFICATIONS MP -502 MECHANICAL / PLUMBING SCHEDULES AND SPECIFICATIONS PLUMBING PD -101 PARTIAL FIRST FLOOR PLUMBING DEMOLITION PLAN P-101 PARTIAL FIRST FLOOR PLUMBING CONSTRUCTION PLAN En I ineerin LOCATION PLAN OLIN HALL I FIRST FLOOR PLAN AREA OF WORK z ARNING: IT IS A VIOLATION OF NEW YORK STATE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT OR ENGINEER, TO ALTER THIS DOCUMENT IN ANY WAY. IF THIS DOCUMENT IS ALTERED, THE ALTERING ARCHITECT OR ENGINEER SHALL AFFIX TO SUCH DOCUMENT HIS SEAL AND THE NOTATION 'ALTERED BY' FOLLOWED BY HIS SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. cjiiING ENVIRONMENT HEALTH AND S DATE: ARCH - CIVIL. ELEC: RCH-CIVIL- ELEC: MECH. REVISIONS: DATE: 12/24/13- ISSUE FOR CONSTRUCTION C s — Z : CDW 111101111111 V1 Co 0 br)E 73 Co C U E O 8, O 7 N E co ca:E5 0. _>- =z a DA December 24, 2013 FACILITY: 2024 DESIGN: FE DESIGN D cec TITLE SHEET A m J . V r l() 16 14 13 12 8 7 I 6 5 4 3 2 T-001 PO4O9 cc W CO 1— ,,,—.....r.... J W 0737 —ffl Cl 16 I 15 14 13 12 10 8 7 6 5 ELECTRICAL SUBMITTAL SCHEDULE DESCRIPTION MATERIAL 'SHOP DRAWINGS COORDINATION DRAWINGS AS BUILT DRAWINGS PRODUCT DATA WIRING DIAGRAMS STANDARDS QUALIFICATIONS CERTIFICATIONS MANUFACTURER'S INSTRUCTIONS INSPECTION & TEST REPORTS OPERATION & MAINTENANCE DATA SURFACE MOUNT Fl FCTRICAL BOXES ELECTRICAL BOXES INSPECTION & TEST REPORTS OPERATION & MAINTENANCE DATA 220523 X BALL VALVES FIRE ALARM sTROBEIHORN COMBO E FIRE ALARM HORN ONLY X FIRE ALARM PULL STATION CI FIRE ALARM DEVICE HORNS AND STROBES AUXILIARY POWER SUPPLY. IR►SI REMOTE TEST SWITCH/STATION X X PIPING INSULATION X X POWER POLE X X 221116 DOMESTIC WATER PIPING PIPES, TUBES, FITTINGS X X X MECHANICAL F MAGNETIC DOOR HOLDER SUBL SCHEDULE SECTION DESCRIPTION MATERIAL HOP DRAWINGS COORDINATION DRAWINGS AS BUILT DRAWINGS PRODUCT DATA WIRING DIAGRAMS J STANDARDS QUALIFICATIONS CERTIFICATIONS MANUFACTURER'S INSTRUCTIONS INSPECTION & TEST REPORTS OPERATION & MAINTENANCE DATA 220523 GENE DUTY VALVES FOR PLUMBING BALL VALVES FIRE ALARM sTROBEIHORN COMBO E FIRE ALARM HORN ONLY X FIRE ALARM PULL STATION CI REMOTE ALARM INDICATOR IAPS I AUXILIARY POWER SUPPLY. IR►SI REMOTE TEST SWITCH/STATION 220700 PLUMBING INSULATION PIPING INSULATION X X 221116 DOMESTIC WATER PIPING PIPES, TUBES, FITTINGS X X X JOINING MATERIALS X X X DIELECTRIC FITTINGS X X X 221119 DOMESTIC WATER PIPING SPECIALTIES BACKFLOW PREVENTERS X X X X 224000 PLUMBING FIXTURES FUME HOOD PLUMBING FIXTURES X X X X 224500 EMERGENCY PLUMBING FIXTURES EMERGENCY EYEWASH X X X X THERMOSTATIC IXING VALVES X X X X 226600 CH ICAL STE PIPE PIPES, TUBES, FITTINGS X X X JOINING MATERIALS X X X 230500 COMMON K RESULTS FOR HVAC WELDING CERTIFICATES X 230593 TESTING, ADJUSTING & B CING FOR HVAC CERTIFIED TEST REPORT X X EQUIPMENT CALIBRATION X 230700 HVAC INSULATION DUCTWORK INSULATION X X 230900 INSTRUMENTATION & CONTROL FOR HVAC CONTROLLERS & ENCLOSURES X X X X X POINTS / ALARM LIST X X SCHEMATIC CONTROL DIAGRAMS X X ARCHITECTURE DIAGRAM X X SEQUENCES OF OPERATION X X BILL OF MATERIALS X X ACTUATORS X X X LABORATORY AIRFLOW DEVICES X X X X FUME HOOD MONITORS I CONTROLLERS X X X SASH POSITION SENSORS X X X CABLING X X 233113 METAL DUCTS RECTANGULAR DUCTWORK X X X X ROUND DUCTWORK X X X X SEALING & GASKETING MATERIALS X X X X SHOP CONSTRUCTION STANDARDS X 233300 AIR DUCT ACCESSORIES VOLUME DAMPERS X X X X TURNING VANES X X X X ACCESS DOORS X X X X X >fte."..h..6"/%094...• MOTOR OPEN/CLOSE START/STOP MODULATING SPEED COMMAND ELECTRICAL INTERFACE ALARM RELAY DIFFERENT PRESSURE SENSOR AIRFLOW CONTROL VALVE SINGLE POINT SENSOR AVERAG ES V's RAG RETURN AIR GRILLE VD VOLUME DAMPER FD FIRE DAMPER BCU BLOWER COIL UNIT EA EXHAUST AIR SA SUPPLY AIR SAD SUPPLY AIR DIFFUSER EAG EXHAUST AIR GRILLE (E) EXISTING TO REMAIN CD CONDENSATE BINARY POINT ANALOG POINT Al ANALOG INPUT AO ANALOG OUTPUT BI BINARY INPUT BO BINARY OUTPUT BV BINARY VALUE AV ANALOG VALUE N.C. NORMALLY CLOSED N.O. NORMALLY OPEN F.L. FAIL LAST AIR FLOW NG SENSOR END SWITCH PRESSURE SENSOR STATIC PRESSURE SENSOR LOW LIMIT TEMPERATURE SWITCH I u COM C O .01 —sl-- HF- �� DN Lj UP HNT- T VFD J 4 3 2 POINT OF CONNECTION POINT OF DISCONNECTION PIPE DOWN PIPE UP PIPE CONNECTION PIPE CONNECTION UNION CONNECTION DIRECTION OF FLOW PITCH DOWN PITCH UP REDUCER (CONCENTRIC) CAP OR PLUG ISOLATION VALVE BALANCING VALVE CHECK VALVE BUTTERFLY VALVE STRAINER WITH BLOW DOWN VALVE AND CAP FLEX CONNECTOR PRESSURE/TEMPERATURE TEST PORT DOUBLE CHECK BACKFLOW PREVENTER VARIABLE FREQUENCY DRIVE LIQUID IMMERSION TEMPERATURE SENSOR TEMPERATURE SENSOR 2 -WAY CONTROL VALVE, DIGITAL 2 -WAY CONTROL VALVE, PNEUMATIC NETWORK COMMUNICATION INTERFACE POINT, BACnet MSTP I 1 MECHANICAL AND ELECTRICAL SCOPE OF WORK: 1.0 ROOM 105: 1.1 REPLACE EXISTING EYEWASH; PROVIDE SWING -AWAY UNIT WITH TEMPERING VALVE. 1.2 PROVIDE FIRE ALARM HORN/STROBE DEVICE 2.0 ROOM 107: 2.1 FINISHES: MINOR REPAIRS TO ACOUSTICAL CEILING AS NEEDED TO RECONFIGURE DUCTWORK ABOVE; PATCH/PAINT WALLS. 2.2 NEW 5 -FOOT NOMINAL ADA FUME HOOD, PROVIDED BY OWNER WITH ADJUSTABLE BASE, AND MOVEABLE STORAGE BELOW. 2.3 REPLACE EXISTING EYEWASH; PROVIDE SWING -AWAY UNIT WITH TEMPERING VALVE. 2.4 PROVIDE DUCT SNORKEL DROP TO SERVE BENCHTOP ROTOVAP. 2.5 PROVIDE A FUME HOOD MONITOR/CONTROLLER AND SASH POSITION SENSOR. 2.6 RE -WORK THE EXISTING BUILDING AUTOMATION AND CONTROL SYSTEM CONTROLLER. 2.7 FINAL BALANCING OF AIRFLOWS. 2.8 ELECTRICAL WORK IN SUPPORT OF BUILDING CONTROL MODIFICATIONS. 2.9 REWORK LABORATORY ELECTRICAL SYSTEM ON EXISTING ISLAND BENCH TO SUPPORT NEW EQUIPMENT. 2.10 PROVIDE FIRE ALARM HORN/STROBE DEVICE 2.11 PROVIDE NEW AIRFLOW CONTROL DEVICES. 3.0 ROOM 110: 3.1 REPLACE EXISTING EYEWASH; PROVIDE SWING -AWAY UNIT WITH TEMPERING VALVE. 3.2 PROVIDE FIRE ALARM HORN/STROBE DEVICE WARNING: IT IS A VIOLATION OF NEW YORK STATE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT OR ENGINEER, TO ALTER THIS DOCUMENT IN ANY WAY. IF THIS DOCUMENT IS ALTERED, THE ALTERING ARCHITECT OR ENGINEER SHALL AFFIX TO SUCH DOCUMENT HIS SEAL AND THE NOTATION "ALTERED BY' FOLLOWED BY HIS SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. DATE: t. ENVIRONMENT H TH AND SAFETY ARC ELEC. CX MECH. 5e> REVISIONS: DATE: 12/24/13 - ISSUE FOR CONSTRUCTION SCOPE OF WORK MECHANICAL SYMBOLOGY FIRE ALARM SYMBOLS F MAGNETIC DOOR HOLDER Mi HEAT DETECTOR 135 F OR 200 F FIXED TEMP SENSOR SD SMOKE DETECTOR PHOTOELECTRONIC SENSOR @)13T BT REMOVAL WORK (DASHED) TRANSMI e I .K BEAM DETECTOR SDS RECEIVER BEAM DETECTOR 0 DUCT DETECTOR FS FLOW PRESSURE SWITCH TS TAMPER SWITCH PS. LOW AIR SWITCH (14)GFI FIRE ALARM sTROBEIHORN COMBO E FIRE ALARM HORN ONLY FIRE ALARM PULL STATION CI REMOTE ALARM INDICATOR IAPS I AUXILIARY POWER SUPPLY. IR►SI REMOTE TEST SWITCH/STATION E FIRE ALARM STROBE GENERAL ELECTRICAL SYMBOLS POINT OF CONNECTION TO EXISTING WORK TO REMAIN Mi POINT OF DEMOLITION TO EXISTING WORK TO REMAIN EXISTING WORK TO REMAIN (GRAYSCALE) - REMOVAL WORK (DASHED) NEW WORK (BOLD) ODRAWING REMOVAL KE'/ ED NOTE INDICATOR DRAWING CONSTRUCTION KEYED NOTE INDICATOR mm PANELBOARD. 0 JUNCTION BOX. (14)GFI DUPLEX CONVENIENCE RECEPTACI F GF = GROUND FAULT INTERRUPTER PROTECTION. TWO DUPLEX CONVENIENCE RECEPTACI FR MOUNTED ON A SINGLE GANG PLATE. r GENERAL SYMBOL LEGEND ti F10 ,F10 ED EXTERIOR ELEVATION A103 INTERIOR ELEVATION D16 D16 A103 A103 O KEYNOTE DEMOLITION $9 KEYNOTE NEW WORK Q N MATCH LINE NORTH ARROW SECTION 1 GENERAL NOTES: 1.0 DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL ARRANGEMENT OF SYSTEMS AND WORK INCLUDED IN THE CONTRACT. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS. IF DIMENSIONS OR CONDITIONS ARE FOUND TO BE IN CONFLICT WITH THE DRAWINGS, THE CONTRACTOR SHALL IMMEDIATELY REFER THE CONFLICT TO THE ENGINEER. 2.0 UTILITY SHUTDOWNS: SHUTDOWN OF ANY BUILDING UTILITY SYSTEM SHALL BE COORDINATED WITH CUSTOMER SERVICE AT PH: 607-255-5322. THE CONTRACTOR SHALL BEAR THE COST OF THE UTILITY SHUTDOWN. SCHEDULE WORK TEN DAYS IN ADVANCE AND NOTIFY THE OWNER'S REPRESENTATIVE TO COORDINATE BUILDING FUNCTIONS WITH THE BUILDING COORDINATOR. 3.0 THE CONTRACTOR SHALL BE AWARE THAT SENSITIVE RESEARCH ACTIVITIES WILL CONTINUE IN ADJACENT SPACES. THE CONTRACTOR SHALL COORDINATE CONSTRUCTION ACTIVITIES AND CUTTING / PATCHING TO ENSURE THAT THE TRANSMISSION OF VIBRATIONS, NOISE, AND DUST WILL BE MINIMIZED. THIS MAY INVOLVE OFF -HOURS WORK, AND STARTING / STOPPING OF CONSTRUCTION ACTIVITIES TO COORDINATE WITH RESEARCH ACTIVITIES. 4.0 WORK IS REQUIRED IN VARIOUS PORTIONS OF THE FACILITY TO EXECUTE WORK OF OTHER TRADES (EG ELECTRICAL, MECHANICAL). ALTHOUGH NOT NECESSARILY SHOWN ON DRAWINGS, WORK IS REQUIRED IN THESE AREAS CONSISTING OF REMOVAL / REPLACEMENT OF CEILINGS, WALLS, FINISHES, PAVEMENT AND OTHER CONSTRUCTION AS NECESSARY TO PERFORM WORK AND RESTORE THESE SPACES OR AREAS TO ORIGINAL CONDITION. 5.0 ALL PENETRATIONS THROUGH FLOOR AND FULL HEIGHT WALLS ARE TO BE FIRESTOPPED IN ACCORDANCE WITH UL STANDARDS. ALL GAPS AND JOINTS AT RATED FLOORS, ROOFS AND WALLS ARE TO BE FIRE AND SMOKE STOPPED. CAPS AND JOINTS INCLUDE (BUT ARE NOT LIMITED TO) TOP OF WALL TO FLOOR OR ROOF DECK, WALL TO BEAMS, AND CONTROL OR EXPANSION JOINTS. FIRESTOPPING INCLUDES BOTH FORM OR PACKING MATERIAL AND THE FILL, VOID OR CAVITY MATERIAL. 6.0 ALL DUCT DIMENSIONS INDICATED ARE IN INCHES, AND ARE INSIDE FREE AND CLEAR DIMENSIONS. 7.0 INSTALL EQUIPMENT TO ENSURE PROPER ACCESS TO CONTROL DEVICES AND WITH SUFFICIENT SPACE TO PERFORM ROUTINE MAINTENANCE AND REPAIR. EQUIPMENT THAT IS NOT INSTALLED WITH THIS REQUIREMENT IN MIND SHALL BE RELOCATED AT NO EXPENSE TO THE UNIVERSITY UNTIL DEFICIENCIES ARE CORRECTED. 8.0 ALL SYSTEM TESTING SHALL BE CONDUCTED PRIOR TO INSULATION, FIREPROOFING, AND ENCLOSURE IN SHAFTS. ANY RESTORATION WORK REQUIRED AS A RESULT OF DISTURBING FINISHES OR STRUCTURE IN ORDER TO ACCESS SYSTEMS REQUIRING REPAIR SHALL BE AT NO COST TO THE UNIVERSITY. 9.0 VERIFY FINAL EQUIPMENT/FIXTURE LOCATIONS FOR ROUGHING -IN. Co E 0 �> y_ V W s® E CES LCD CL) Ct3 O DATE: December 24, 2013 FACILITY: 2024 DESIGN: E. KOLACKI, H. TRAN DRAWN: eak, cec GENERAL NOTES, SCOPE OF WORK, SUBMITTAL SCHEDULES AND SYMBOLOGY SUBMITTAL SCHEDULES ELECTRICAL SYMBOLOGY NOTES 16 I 15 I 14 13 12 11 10 9 8 7 6 5 3 2 ME -000 P0409 B D E F w u=0) ca 16 14 13 12 10 314" HWR RISER (E) UP AND DN BALANCE VALVE (E) TO REMAIN LIGHTING (E) TYPICAL 0 REMAIN FINTUBE (E) TO REMAIN FINTUBE (E) TO REMAIN EXH (E) 121EXH RISER (E) UP TO EXH. FAN EF -4 IN PENTHOUSE 3/4" HWS RISER (E UP AND DN LIGHTING (E) TYPICAL TO REMAIN ' HWS (E) 2" HWR (E) CHWS&R (E) 0 2 SCALE: 1/4"=1=0" KEYED GENERAL DEMOLITION NOTES: 0 REMOVE EXISTING BASE CABINET AND PLACE IN STORAGE AT LOCATION DESIGNATED BY OWNER. PROVIDE NEW FLOOR TILES TO MATCH EXISTING UNDER CABINET. G2 PATCH EXISTING COUNTER WITH EPDXY BASED REPAIR MATERIAL (BLACK) WHERE EYE WASH UNITS WERE REMOVED. SEE SHEET PD -101 FOR LOCATIONS. PATCHING MATERIAL SHALL BE COMPATIBLE WITH THE EXISTING COUNTERTOP AND INSTALLED AS PER MANUFACTURER'S INSTALLATION INSTRUCTIONS. C-.) PROVIDE NEW CEILING TILE, AT LOCATION SHOWN, TO MATCH EXISTING. KEYED MECHANICAL DEMOLITION NOTES: 0 REMOVE EXHAUST DUCT, VAV, GRILLE AND ASSOCIATED CONTROLS AS INDICATED ON PLAN. PREPARE FOR RECONNECTION TO EXISTING FUME HOOD. PREPARE EXISTING EXHAUST DUCT TO REMAIN FOR RECONNECTION AS NOTED ON PLAN. REMOVE HANGERS THAT WILL NOT BE RE -USED IN NEW WORK. C) REMOVE SUPPLY AIR VAV, DUCTWORK AND ASSOCIATED CONTROLS AS INDICATED ON PLAN. EXISTING REHEAT COIL TO REMAIN. M3 REMOVE EXISTING CONTROL VALVE AND ASSOCIATED PIPING SERVING EXISTING REHEAT COIL, AS REQUIRED, FOR INSTALLATION OF NEW CONTROL VALVE AND STRAINER. C") REMOVE EXISTING CONTROL VALVE AND ASSOCIATED PIPING FROM FIN TUBE BACK TO ISOLATION BALL VALVE IN PREPARATION FOR NEW CONTROL VALVE AND STRAINER INSTALLATION. M5 REMOVE EXISTING DUCTWORK, GRILLE AND HANGERS BACK TO LOCATION SHOWN ON PLAN. SAVE GRILLE FOR REINSTALLATION. M6 MODIFY EXISTING CONTROLS AS NEEDED FOR NEW CONTROL DEVICES. KEYED ELECTRICAL DEMOLITION NOTES: E1. EXISTING PANELBOARD TO REMAIN. INSIDE EXISTING PANEL, REMOVE (2) 20A / 2P CIRCUIT BREAKERS AND INSTALL (4) 20A / 1P CIRCUIT BREAKERS. THE 20A / 1P CIRCUIT BREAKERS ARE LOCATED ABOVE THE EXISTING PANELBOARD. O REMOVE (2) SECTIONS OF WIREMOLD 4000 AND ASSOCIATED RECEPTACLES. EXISTING CIRCUIT #2 POWER WIRING SHALL BE RE -USED TO FEED THE NEW RECPTACLES. EXISTING CONDUITS RUNNING FROM THE WIREMOLD TO THE EXISTING PANELBOARD ARE TO REMAIN AND SHALL BE RE -USED FOR NEW POWER WIRING TO FEED NEW RECEPTACLES. SEE NEW WORK PLAN, SHEET ME -101, FOR ADDITIONAL INFORMATION. PATCH THE SURFACE OF THE LAB BENCH. E3 REMOVE PORTION OF EXISTING WIREMOLD 3000 AND ASSOCIATED RECEPTACLES, AS INDICATED ON PLAN. E4 COORDINATE REMOVAL OF THE EXISTING WIREMOLD 3000 WITH THE INSTALLATION OF THE NEW FUME HOOD. WIREMOLD WILL BE USED TO HOUSE WIRING FOR FUME HOOD POWER CIRCUIT. WARNING: IT IS A VIOLATION OF NEW YORK STATE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT OR ENGINEER, TO ALTER THIS DOCUMENT IN ANY WAY. IF THIS DOCUMENT IS ALTERED, THE ALTERING ARCHITECT OR ENGINEER SHALL AFFIX TO SUCH DOCUMENT HIS SEAL AND THE NOTATION 'ALTERED BY' FOLLOWED BY HIS SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. DATE: ENVIRONMENTAL HEALTH AND SAFETY ELEC• CAG MECH. REVISIONS: DATE: 12/24/13 - ISSUE FOR CONSTRUCTION C) a) a) Co U O EC)E -o 0 C Co CLQ -4.+ cti 0 46 (7) CD _Ca = ca < DATE: December 24, 2013 FACILITY: 2024 DESIGN: E. KOLACKI D eak, cec PARTIAL FIRST FLOOR MECHANICAL AND ELECTRICAL DEMOLITION PLAN A D F 16 15 14 13 12 11 10 9 PARTIAL FIRST FLOOR MECHANICAL AND ELECTRICAL DEMOLITION PLAN 8 I 7 I 6 I 5 I SCALE: 1/4" = 1'-0" NOTES 3 2 I 1 MED -101 P0409 ,r.37-/13 C5 16 15 14 13 12 10 314' HWR RISER (E) UP AND DN BALANCE VALVE (E) TO REMAIN RELOCATES? CABINET FLAMM FRIDGE FREEZE ELECTRICAL PANEL LP1A1 (E) TSTAT (E) TO REMAIN 20x12 SA (E) FINTUBE (E) TO REMAIN EXISTING P. OF 2 NEW 20x10 DUCT CAP FINTUBE (E) TO REMAIN 3/4" HWS RISER (E) UP AND DN FUME HOOD HWS&R (E) I 12"0 EXH RISER (E) UP TO EXH. FAN EF -4 IN PENTHOUSE 2-1/2' HWS (E) 1-1/2" HWR (E) CHWS&R (E) 2 SCALE: 1I4' =1-O 1 2 I GENERAL ARCHITECTURAL CONSTRUCTION NOTES: Al REPLACE ACOUSTICAL CEILING TILES DAMAGED DURING THE COURSE OF CONSTRUCTION ACTIVITIES TO MATCH EXISTING. 0 ROOM 107: PATCH AND PAINT WALLS IN ENTIRE ROOM. COORDINATE COLOR WITH OWNER'S REPRESENTATIVE. 0 ROOM 107: PAINT EXISTING CABINETRY. COORDINATE COLOR WITH OWNER'S REPRESENTATIVE. KEYED MECHANICAL CONSTRUCTION NOTES: C> NEW ADA FUME HOOD TO BE PROVIDED BY OWNER AT APPROXIMATE LOCATION SHOWN. SEE DETAIL 3, SHEET MP -401 FOR INSTALLATION DETAILS. CONNECT DCW, CA, LAB WASTE AND VENT. SEE SHEET M-301 FOR CONTROLS DETAILS. 4J> CONNECT NEW EXHAUST DUCTWORK TO EXISTING 12"0 SS EXHAUST AT LOCATION SHOWN. M3 PROVIDE NEW SUPPLY AIR VALVE. CONNECT TO EXISTING SUPPLY AIR DUCTWORK AND EXISTING REHEAT COIL. PROVIDE NEW CONTROL VALVE (CV -2) AND STRAINER (S-1). PROVIDE NEW CONTROL VALVE (CV -1), STRAINER (S-1) AND ASSOCIATED PIPING FOR EXISTING FINTUBE RADIATION. 0 PROVIDE NEW SA BRANCH CONNECTION AS INDICATED ON PLAN. RE -USE EXISTING 18x12 SA GRILLE. INSULATE DUCTWORK AS PER DUCT STANDARDS AND SPECIFICATIONS. ci REBALANCE EXISTING SA GRILLES UTILIZING FLOWS INDICATED IN AIR BALANCE SCHEDULE, SHEET M-501. MS PROVIDE NEW EXHAUST SNORKEL AT LOCATION SHOWN AND MOUNT AT CEILING. PROVIDE 3"Q TYPE 316 SS EXHAUST DUCT ROUTED ABOVE CEILING AND MAKE CONNECTION, BELOW CEILING, TO NEW SNORKEL. SNORKEL HEIGHT ABOVE COUNTER SHALL BE COORDINATED WITH OWNER. PROVIDE TYPE 316 SS BLAST GATE WITH LOCKING MECHANISM AND BALANCE TO 75 CFM WITH SNORKEL IN FINAL OPERATING POSITION. SNORKEL: MANUFACTURER - FISHER HAMILTON; MODEL: 90L22100 (3"I). GENERAL ELECTRICAL NOTES: 1.0 PRIOR TO INSTALLATION OF NEW ELECTRICAL WORK, THE ELECTRICAL CONTRACTOR IS TO COORDINATE ALL NEW WORK WITH THE OLIN HALL FACILITY MANAGER, PAUL PELLETIER (PH. (607) 255-3540. KEYED ELECTRICAL CONSTRUCTION NOTES: E1 REMAINING WIREMOLD 3000 TO BE RECONNECTED FOR USE IN PROVIDING POWER CIRCUIT FOR NEW FUME HOOD. SEE KEYED ELECTRICAL DEMOLITION NOTES SHEET MED -101 FOR ADDITIONAL INFORMATION. E2 NEW FUME HOOD - PROVIDE POWER CONNECTION (HARD WIRED). CIRCUIT TO (1) 20A / 1P SPARE CIRCUIT BREAKER LOCATED IN EXISTING PANEL. PROVIDE (2) 12 AWG AND (1)12 AWG GROUND VIA NEW 3/4" EMT AND EXISTING WIREMOLD.PAINT CONDUIT TO MATCH EXISTING WALL. E3 IN THE MIDDLE OF COUNTER, DRILL A 1"0 HOLE. ON TOP OF HOLE, PROVIDE A POWER POLE TO A POINT ABOVE ABOVE CEILING. FROM THE TOP OF THE POWER POLE (WIREMOLD CATALOG NO. 30TC-2V). PROVIDE 1" EMT TO EXISTING PANEL LP1A1. FROM THE PANEL, PROVIDE (2) 20A / 1P CIRCUITS (BREAKERS #23 AND #25) TO THE COUNTER TO FEED THE NEW SURFACE MOUNTED RECEPTACLES. E4 ON THE TOP OF THE COUNTER AND THE EXISTING PRE- DRILLED HOLE, PROVIDE A NEW SURFACE BOX (WATERSAVER, CAT. NO. VRE633SA-WS). IN THE BOX, PROVIDE A TOTAL OF (4) DUPLEX RECEPTACLES (HUBBEL 5362) - TWO (2) ON EACH SIDE OF THE BOX.. E5 EXISTING FCI FIRE ALARM HORN / STROBE. HORN IS AN FCI, MODEL: HP1303115B, SERIES B4. STROBE IS AN FCI, MODEL: FSL E6 AT THE APPROXIMATE LOCATION SHOWN, PROVIDE NEW FCI FIRE ALARM HORN / STROBE. THE DEVICE SHALL BE MOUNTED AT 80" A.F.F. TO BOTTOM OF STROBE. NEW DEVICE SHALL BE COMPATIBLE TO THE EXISTING FIRE ALARM SYSTEM. CIRCUIT TO THE EXISTING CIRCUIT FEEDING THE FIRE ALARM HORN STROBE LOCATED IN THE CORRIDOR OUTSIDE OF ROOM 105. PROVIDE LABELING, TESTING AND PROGRAMMING OF THE NEW DEVICE, AS REQUIRED. COORDINATE WITH EH&S AS REQUIRED. E7 ON THE TOP OF THE COUNTER AND OVER THE EXISTING PRE -DRILLED HOLE, PROVIDE A NEW SURFACE BOX (WATERSAVER, CAT. NO. VRE633SA-WS). IN THE BOX, PROVIDE A TOTAL OF (4) DUPLEX RECEPTACLES (HUBBEL GFR 5352A) - TWO (2) ON EACH SIDE OF THE BOX. CIRCUIT THE RECEPTACLES TO EXISTING CIRCUIT BREAKER NO.2 VIA (2) 12 AWG AND (1) 12 AWG GROUND. E8 ON THE TOP OF THE COUNTER AND OVER THE EXISTING PRE -DRILLED HOLE, PROVIDE A NEW SURFACE BOX (WATERSAVER, CAT. NO. VRE633SA-WS). IN THE BOX, PROVIDE A TOTAL OF (4) DUPLEX RECEPTACLES (HUBBEL 5362) - TWO (2) ON EACH SIDE OF THE BOX. CIRCUIT THE RECEPTACLES TO EXISTING CIRCUIT BREAKER NO. 15 VIA (2) 12 AWG AND (1) 12 AWG GROUND IN EXISTING CONDUIT. WARNING: IT IS A VIOLATION OF NEW YORK STATE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT OR ENGINEER, TO ALTER THIS DOCUMENT IN ANY WAY. IF THIS DOCUMENT IS ALTERED, THE ALTERING ARCHITECT OR ENGINEER SHALL AFFIX TO SUCH DOCUMENT HIS SEAL AND THE NOTATION 'ALTERED BY FOLLOWED BY HIS SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. DATE: RON ARCH: CIVIL. D SAFETY ELEC. L-46- ECH` REVISIONS: DATE: 12/24/13 - ISSUE FOR CONSTRUCTION DATE: i— a) W . C a) -o E 0 Co C V Q 00> aI (7) Ct E 5.3 FACILITY: DESIGN: D 2024 eak, hpt, cec A B F PARTIAL FIRST FLOOR — ARCHITECTURAL, MECHANICAL AND ELECTRICAL CONSTRUCTION PLAN PARTIAL FIRST FLOORMECHANICAL AND ELECTRICAL CONSTRUCTION PLAN SCALE: 1/4 -1-0 NOTES 16 15 14 13 12 10 9 8 f 7 6 5 3 1 1 AME -101 P0409 07.37 —/SPX Cy 6 5 4 2 10 12"0 EXH (E) DN TO ROOM 107 12"0 EXH (E) 4POUA 12"0 EXH (E) BY-PASS 00 EXISTING EXHAUST FAN (EF -4) 12"0 EXH (E) i NEW DDC CONTROL PANEL 0 SCALE: 1/4".--1'-0' KEYED DEMOLITION NOTES: Q REMOVE EXISTING PNEUMATIC CONTROL DAMPER IN 12"0 EXHAUST INCLUDING ASSOCIATED CONTROLS TUBING. PREPARE DUCT FOR NEW INSTALLATION OF NEW BY-PASS AIR VALVE (BAV-107). KEYED CONSTRUCTION NOTES: OPROVIDE NEW BY-PASS AIR VALVE (BAV-107) IN VERTICAL 12"0 EXHAUST DUCT. PROVIDE DUCT TRANSITIONS, AS REQUIRED. RE -INSULATE DUCTWORK AFTER COMPLETION OF VALVE INSTALLATION. Q PROVIDE NEW CONTROL PANEL AT APPROXIMATE LOCATION SHOWN ON PLAN. COORDINATE WITH NEW WORK AND EXISTING FEATURES TO REMAIN. 03 ELECTRICAL CONTRACTOR TO PROVIDE POWER TO THE NEW CONTROL PANEL. FROM EXISTING PANEL PPPH, PROVIDE (2) 12 AWG AND (1) 12 AWG GROUND IN 3/4" EMT TO THE CONTROL PANEL AND MAKE FINAL CONNECTIONS. CIRCUIT TO (1) EXISTING 20A / 1P CIRCUIT BREAKER IN THE PANELBOARD. WARNING: IT ISA VIOLATION OF NEW YORK STATE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT OR ENGINEER, TO ALTER THIS DOCUMENT IN ANY WAY. IF THIS DOCUMENT IS ALTERED, THE ALTERING ARCHITECT OR ENGINEER SHALL AFFIX TO SUCH DOCUMENT HIS SEAL AND THE NOTATION 'ALTERED BY' FOLLOWED BY HIS SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. RONM' HEALTH AND S ARCH CIVIL: ELECara- - DATE: 14 (L( MECH• REVISIONS: DATE: 1224/13 - ISSUE FOR CONSTRUCTION 0 a) .=NNW W S.� E C Co C E w > 0 Earl co T"'a ..ice Q DAT December 24, 2013 FACILITY: 2024 DESIGN: E. KOLACKI, H. TRAN DRAWN: eak, hpt, cec PARTIAL FOURTH FLOOR MECHANICAL AND ELECTRICAL CONSTRUCTIONPLAN PARTIAL FOURTH FLOOR (PENTHOUSE) MECHANICAL AND ELECTRICAL CONSTRUCTION PLAN SCALE: 114" =1'-0" NOTES 16 14 13 12 10 9 8 7 6 5 3 2 1 ME -102 P0409 A C E F J-'7 /85 C5 16 15 14 13 12 1 10 8 7 I 6 4 3 SAV -107 Al AO FLOW COMMAND 0 EXHAUST AIR Al FLOW AO BYPASS AIR BAV 107 COMMAND Al SP AI AO OUTSIDE AIR CONDITIONS ANI ANI BI SASH PosmoN Al { Al EAV 107-1 SASH POSITION SENSOR Al AO FLOW COMMAND FUME HOOD MONITOR EXISTING 6' FUME HOOD T AI FACE VELOCITY >BIALARM BO HOOD SETBACK COMMAND ROTAVAP EXHAUST PPOOSH II11ON Al EAV-107-2 SASH POSITION SENSOR Al AO FLOW COMMAND FUME HOOD MONITOR - A NEW 5' FUME HOOD FACE VELOCITY BI ALARM BO HOOD SETBACK COMMAND AO BI CONTROLS SCHEMATIC SCALE: NONE WET RATORY R 107, LAB EXHAUST FAN EF -4 HARDWARE POINTS SOFTWARE POINTS SHOW ON GRAPHIC NOTES BI BO Al AO AV BV SCH TREND ALARM BACS I EMCS DESCRIPTION EXISTING POINTS OUTSIDE AIR TEMPERATURE X X ANALOG NETWORK INPUT, EXISTING TO REMAIN OUTSIDE AIR RELATIVE HUMIDITY X X ANALOG NETWORK INPUT, EXISTING TO REMAIN D AND LiEVEL X ANALOG NETWORK INPUT, WHAT IS THIS?? SPACE TEMPERATURE SETPOINT, HEATING X X X SPACE TEMPERATURE SETPOINT, COOLING X X X SPACE TEMPERATURE X X X EXISTING POINT TO REMAIN SPACE TEMPERATURE SETPOINT X X SPACE OCCUPANCY X X X X OCCUPANCY SENSOR TROUBLE ALARM X EXISTING POINT TO REMAIN TOTAL EXHAUST AIRFLOW (CFM) X X TOTAL SUPPLY AIRFLOW (CFM) X X FUME HOOD EXHAUST FLOW(CFM) X X X EXISTING POINT TO REMAIN GEN UST AIRFLOW (CFM) X X X USE EXISTING POINT FOR NEW FUME HOOD GENERAL EXHAUST AIR VALVE POSITION COMMAND (CFM) X X USE EXISTING POINT FOR NEW FUME HOOD GENERAL EXHAUST AIR VALVEAIRFLOW SEiPOINT (CFM) X X USE EXISTING POINT FOR NEW FUME HOOD SUPPLY AIRFLOW (CFM) X X X EXISTING POINT TO REMAIN, CONNECT TO NEW DEVICE SUPPLY AIR VALVE POSITION COMMAND (CFM) X X EXISTING POINT TO REMAIN, CONNECT TO NEW DEVICE SUPPLY AIR VALVE AIRFLOW SETPOINT (CFM) X X RE -HEAT! RADIATION VALVE POSITION C D (%) X X X USE EXISTING POINT FOR NEW REHEAT COIL CONTROL VALVE RE -HEAT COIL LEA NG AIR TEMPERATURE X X X EXISTING POINT TO REMAIN FUME HOOD UNOCC COMMAND X X EXISTING POINT TO REMAIN EXTEND EXISTING CONTROLLER AS NEEDED TO PROVIDE THE FOLLOWING ADDITIONAL POINTS,RCK}M 107 STEAM LOAD SHED X (6) BINARY NETWORK INPUTS FROM EMCS SPACE TEMPERATURE X +1- 4 °F FROM SETPOINT ADD BACS ALARM TO EXISTING POINT RE -HEAT COIL VALVE POSITION C MAND (%) X 5 °F AT ACROSS COIL WITH VALVE COMMANDED CLOSED ADD BACS ALARM TO EXISTING POINT SUPPLY AIR VALVE RF OW (CFM) X 10% DEVIATION FROM SETPOINT ADD BAGS ALARM TO EXISTING POINT FUME HOOD EXHAUST AIR VALVE AIRFLOW SET POINT (CFM) X 10% DEVIATION FROM SETPOINT ADD BACS ALARM TO EXISTING POINT NEW FUME HOOD UNOCC C MAND X X FUME HOOD AIR VALVE POSITION COMMAND (CFM) X X SERVES NEW EXHAUST AIR VALVE ON EXISTING FUME HOOD FUME HOOD EXHAUST AIR VALVE AIRFLOW SETPOINT (CFM) X 10% DEVIATION FROM SETPOINT SERVES NEW EXHAUST AIR VALVE ON EXISTING FUME HOOD FUME HOOD SASH POSITION X X X SASH OPEN (18") FOR 24 CONTINUOUS HOURS OR MORE X PROVIDE SASH SENSOR ON EXISTING FUME HOOD FUME HOOD SASH POSITION X X X SASH OPEN (18°) FOR 24 CONTINUOUS HOURS OR MORE X PROVIDE SASH SENSOR ON NEW FUME HOOD FUME HOOD FACE VELOCITY (FPM) X X PROVIDE NEW FUME HOOD MONITOR ON EXISTING FUME HOOD FUME HOOD FACE VELOCITY(FPM) X X PROVIDE FUME HOOD MONITOR ON NEW FUME HOOD FUME HOOD STATUS (ALARM) X X X LOW FACE VELOCITY X SERVES EXISTING FUME HOOD FUME HOOD STATUS (ALARM) X X X LOW FACE VELOCITY X SERVES NEW FUME HOOD RADIATION VALVE POSITION C MAND (%) X X X PROVIDE NEW CONTROLLER TO PROVIDE THE FOLLOIMNG ADDITIONAL POINTS, PENTHOUSE BYPASS AIR VALVE POSITION C MAND (CFM) X X DOWNSTREAM DUCT STATIC PRESSURE X X X X DEVIATION FROM SETPOINT X DOWNSTREAM DUCT STATIC PRESSURE SETPOINT X X X SEQUENCE OF OPERATION: SYSTEM DESCRIPTION EXISTING 6' FUME HOOD WITH NEW EXHAUST AIR VALVE, EAV-107-1 NEW 5' FUME HOOD WITH EXHAUST AIR VALVE, EAV-107-2 NEW SUPPLY AIR VALVE, SAV -107 EXISTING DUCT MOUNTED RE -HEAT COIL AND BASEBOARD HEATING GENERAL ALL SETPOINTS SHALL BE ADJUSTABLE. LABORATORY AIR CHANGE RATES ARE BASED ON TOTAL EXHAUST AIR FLOW FROM THE SPACE. THIS LABORATORY IS CURRENTLY SERVED BY AN EXISTING AUTOMATED LOGIC CONTROL SYSTEM. EXISTING POINTS ARE TO BE RE -UTILIZED FOR THE NEW SEQUENCE OF OPERATION WHERE FEASIBLE. THE BASIS OF DESIGN MAXIMUM AIRFLOWS ARE DESIGNED TO MAINTAIN A 100 FPM FACE VELOCITY AT THE FUME HOOD. HOWEVER, IT MAY BE POSSIBLE TO OPERATE THE FUME HOODS WITH A FACE VELOCITY OF 80 FPM. THIS WILL BE DETERMINED AT THE TIME OF FUME HOOD CERTIFICATION. THE BACS CONTRACTOR WILL BE RESPONSIBLE FOR BEING ON-SITE DURING FUME HOOD CERTIFICATION, AND RE -PROGRAM AS NEEDED TO RESET THE AIRFLOW SETPOINTS BASED ON THE CERTIFICATION PROCESS. SETPOINTS SPACE TEMPERATURE SETPOINTS: OCCUPIED: 72 °F +/-1.5 �F OCCUPIED SETBACK: 72 °F - 3 °F UNOCCUPIED: 72 °F - 6 �F AIRFLOW SETPOINTS ARE DETAILED IN THE AIRFLOW SCHEDULE, SEE M-501. DOWNSTREAM STATIC PRESSURE SETPOINT: DETERMINE DURING TESTING AND BALANCING EFFORTS. LABORATORY AIRFLOW CONTROL AIR VALVE POSITIONS SHALL BE BASED ON MODE. UNDER NORMAL CONTROL, ROOM OCCUPANCY SHALL BE DETERMINED VIA ROOM OCCUPANCY SENSORS. WHEN THE ROOM IS OCCUPIED, THE BACS SHALL SEND AN OCCUPIED COMMAND TO THE FUME HOOD MONITORS. THE FUME HOOD EXHAUST AIR VALVES SHALL MODULATE BETWEEN THE MINIMUM AND MAXIMUM POSITIONS AS NEEDED TO MAINTAIN THE FACE VELOCITY SETPOINT BASED ON THE SASH POSITION. THE SUPPLY AIR VALVE SHALL MODULATE AS NEEDED TO MAINTAIN THE SPACE AT 100 CFM NEGATIVE. WHEN THE ROOM IS UNOCCUPIED, AND THE SASHES ARE AT OR BELOW 18 -INCHES, THE BACS SHALL SEND AN UNOCCUPIED COMMAND TO THE FUME HOOD MONITORS. THE FUME HOOD EXHAUST AIR VALVES SHALL MODULATE BETWEEN MINIMUM AND MAXIMUM UNOCCUPIED POSITIONS AS NEEDED TO MAINTAIN A 65 FPM FACE VELOCITY SETPOINT BASED ON THE SASH POSITION. THE SUPPLY AIR VALVE SHALL MODULATE AS NEEDED TO MAINTAIN THE SPACE AT 100 CFM NEGATIVE. WHEN THE ROOM IS UNOCCUPIED AND ANY OF THE FUME HOOD SASHES ARE ABOVE 18 -INCHES, THE BACS SHALL NOT SEND THE SPACE UNOCCUPIED COMMAND TO THOSE PARTICULAR FUME HOOD EXHAUST AIR VALVES. THE FUME HOOD EXHAUST AIR VALVES WHOSE SASHES ARE ABOVE 18 -INCHES SHALL MAINTAIN THE OCCUPIED SASH OPEN AIRFLOW SETPOINT. THE BACS WILL SEND THE UNOCCUPIED COMMAND TO THOSE FUME HOODS WHOSE SASHES ARE AT OR BELOW 18 -INCHES AND THE FUME HOOD EXHAUST AIR VALVES WHOSE SASHES ARE AT 18 -INCHES OR BELOW SHALL MODULATE TO MAINTAIN A 65 FPM FACE VELOCITY SETPOINT. THE SUPPLY AIR VALVE SHALL MODULATE AS NEEDED TO MAINTAIN THE SPACE AT 100 CM NEGATIVE. ZONE TEMPERATURE CONTROL TEMPERATURE SETPOINTS SHALL BE DETERMINED BASED ON A COMBINATION OF PROGRAMMED SCHEDULE AND SPACE OCCUPANCY SENSORS. OCCUPIED HEATING: IF THE SPACE IS OCCUPIED DURING THE SCHEDULED OCCUPIED PERIOD AND THE SPACE TEMPERATURE FALLS BELOW THE OCCUPIED HEATING TEMPERATURE SETPOINT, THE BASEBOARD RADIATION CONTROL VALVE SHALL MODULATE TO MAINTAIN THE SPACE TEMPERATURE SETPOINT. IF THE SPACE TEMPERATURE IS NOT AT SETPOINT WITH THE BASE BOARD RADIATION CONTROL VALVE FULLY OPEN, THE REHEAT CONTROL VALVE SHALL MODULATE TO MAINTAIN THE SPACE TEMPERATURE SETPOINT. WHEN THE SPACE TEMPERATURE IS AT SETPOINT, THE BASEBOARD RADIATION AND REHEAT COIL CONTROL VALVES SHALL BE CLOSED. OCCUPIED SETBACK: IF THE SPACE BECOMES UNOCCUPIED DURING THE SCHEDULED OCCUPIED PERIOD, THE ABOVE OCCUPIED HEATING SEQUENCE SHALL APPLY, BUT THE SPACE SHALL BE MAINTAINED AT THE OCCUPIED SETBACK TEMPERATURE SETPOINT. UNOCCUPIED HEATING: IF THE SPACE IS UNOCCUPIED DURING THE SCHEDULED UNOCCUPIED PERIOD AND THE SPACE TEMPERATURE FALLS BELOW THE UNOCCUPIED HEATING TEMPERATURE SETPOINT, THE BASEBOARD RADIATION CONTROL VALVE SHALL MODULATE AS REQUIRED TO MAINTAIN SETPOINT. COOLING: THERE ARE NO COOLING MODE SEQUENCES REQUIRED FOR THIS SPACE. EXHAUST FAN AND BYPASS VALVE CONTROL THE EXHAUST FAN SHALL BE ENABLED AT ALL TIMES AND RUN AT CONSTANT SPEED. IF THE EXHAUST DUCT STATIC PRESSURE FALLS MORE NEGATIVE THAN SE POINT, THE BYPASS AIR VALVE WILL OPEN AND MODULATE TO MAINTAIN SETPOINT. IF THE EXHAUST DUCT STATIC PRESSURE RISES MORE POSITIVE THAN SETPOINT, THE BYPASS AIR VALVE SHALL MODULATE CLOSED AS NEEDED TO MAINTAIN SETPOINT. HEATING LOAD SHED UPON A STEAM LOAD SHED 1, 2, 3, OR 4 INPUT, THE ZONE SHALL INDEX TO UNOCCUPIED MODE, BUT SHALL BE RESETTABLE TO OCCUPIED MODE UPON OCCUPANCY. UPON A STEAM LOAD SHED 5 OR 6 INPUT, THE ZONE SHALL INDEX TO UNOCCUPIED MODE AIR CHANGE RATES, AND THE SPACE TEMPERATURE SETPOINT SHALL BE 60 °F. WARNING: IT IS A VIOLATION OF NEW YORK STATE LAW FOR ANY PERSON, UNI PPS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT OR ENGINEER, TO ALTER THIS DOCUMENT IN ANY WAY. IF THIS DOCUMENT IS ALTERED, THE ALTERING ARCHITECT OR ENGINEER SHALL AFFIX TO SUCH DOCUMENT HIS SEAL AND THE NOTATION 'ALTERED BY' FOLLOWED BY HIS SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. APPROVAL: DATE: II614/ ENVIR• XLTH AND SAFETY ARCH- CIVIL. ELEC• { Cr MECH. REVISIONS: DATE: 12/24/13 - ISSUE FOR CONSTRUCTION Co U Ec.,o c V > 0 (7, a) as 00< 0 >- = Z ca O -25 ttO to w O UIS•I DATE: December 24, 2013 FACILITY: 2024 DESIGN: E. KOLACKI DRA eak POINTS LIST NOTES CONTROLS SCHEMATIC, SEQUENCE OF OPERATIONS AND POINTS LIST M-301 P0409 B E F G 00 m N LO 16 I 15 14 13 12 11 10 9 8 7 6 5 4 2 � 37 eh 16 15 14 13 12 11 10 9 8 7 5 4 3 2 BOOCB " E - 4" LW (E) B05 2" 2" LW (E) DN FROM LAB SINK IN RM. 107 PROVIDE CONNECTION OF NEW 2" LW TO EXISTING 3" L' FROM FLOOR DRAIN 3" LW (E) E <1\ UTILITY CHASE FIRST FLOOR R I0 I 3" LW (E) 3" LW (E) STRUCTURAL BEAM (E) 3" LW (E) DN FROM FLOOR DRAIN IN RM. 107 STRUCTURAL BEAM (E) 2" LW - BOOCB —NEW 2" LW UP TO NEW ADA FUME HOOD. COORDINATE LOCATION OF CORE WITH EXISTING STRUCTURAL BEAM. PROVIDE CORE PLACEMENT AS CLOSE TO STRUCTURAL BEAM AS POSSIBLE. CONSTRUCTION NOTES: 1.0 COORDINATE NEW LW DRAIN INSTALLATION WITH NEW WORK AND EXISTING FEATURES TO REMAIN. 2.0 WHERE FIREPROOFING ON EXISTING SURFACES IN BASEMENT IS DISTURBED DURING CONSTRUCTION ACTIVITIES, THE CONTRACTOR SHALL REPAIR FIREPROOFING TO MATCH EXISTING. B11 0e ADA FUME HOOD INSTALLATION DETAIL KEYED NOTES: ADJUSTABLE FUME HOOD BASE PROVIDED BY OWNER AND INSTALLED UNDER THIS CONTRACT. BASE SHALL HAVE 6 -INCHES OF ADJUSTABILITY. Q FUME HOOD WITH WORK SURFACE AT NON -ADA HEIGHT, 36 -INCHES ABOVE FINISHED FLOOR. Q FUME HOOD WITH WORK SURFACE AT ADA HEIGHT, 30 -INCHES ABOVE FINISHED FLOOR. Q FLEXIBLE EXHAUST DUCT CONNECTION, FULLY COMPRESSED TO ALLOW FOR 36" WORK SURFACE HEIGHT. COORDINATE WITH CASEGOODS VENDOR FOR SIZE. Q FLEXIBLE EXHAUST DUCT CONNECTION, FULLY EXTENDED TO ALLOW FOR 30" WORK SURFACE HEIGHT. COORDINATE WITH CASEGOODS VENDOR FOR SIZE. Q FLEXIBLE EXHAUST DUCT SHALL BE BLO-R-VAC PVC HOSE MCMASTER-CARR NUMBER 5718K82. HOSE IS COMPRESSIBLE TO 60% OF ITS LENGTH. COLOR SHALL BE CLEAR. Q 2" DRUM TRAP. PROVIDE SUFFICIENT PIPE ON INLET TO ALLOW 6" OF WORKSURFACE ADJUSTMENT. COORDINATE INSTALLATION WITH MOBILE FUME HOOD BASE CABINETS. 1-1/2" DRAIN FROM CUP SINK. PROVIDE SUFFICIENT TAILPIECE ON OUTLET TO ALLOW FOR 6" OF WORK SURFACE ADJUSTMENT. DRAIN IS TO BE SLEEVED WITHIN THE 2" INLET PIPE PROVIDED ON THE DRUM TRAP. QDRAIN IS TO RUN ALONG EXISTING WALL. COORDINATE LOCATION WITH LABORATORY WASTE FROM OTHER LABORATORY FIXTURES. C> VENT SERVING CUP SINK DRAIN. C> DOMESTIC COLD WATER CONNECTION: PROVIDE A FLEXIBLE PIPING CONNECTION TO ALLOW FOR 6 -INCHES OF FLEXIBILITY. 0 LABORATORY AIR CONNECTION: PROVIDE A FLEXIBLE PIPING CONNECTION TO ALLOW FOR 6 -INCHES OF FLEXIBILITY. WARNING: IT IS A VIOLATION OF NEW YORK STATE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT OR ENGINEER, TO ALTER THIS DOCUMENT IN ANY WAY. IF THIS DOCUMENT IS ALTERED, THE ALTERING ARCHITECT OR ENGINEER SHALL AFFIX TO SUCH DOCUMENT HIS SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY HIS SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. DATE: 14. (14 ENVIRONMENTAL H TH AND SAFETY ARC CIVIL' ELEC• CA MECH: REVISIONS: DATE: 12/24/13 - ISSUE FOR CONSTRUCTION 3 ADA FUME HOOD SERVICE CONNECTION DETAIL SCALE: NONE SCHEDULE 40 PIPE SLEEVE PIPE INSULATION, IF APPLICABL PIPE (S) MINERAL WOOL INSULATION FIRE RESISTIVE SEALANT MASONRY WALL 2 WALL PIPING PENETRATION DETAIL SCALE: NONE NOTE: USE R -METER TO LOCATE IN -SLAB REBAR PRIOR TO DRILLING CORES / HOLES. DO NOT CORE / DRILL REBAR. ADJUST FINAL LOCATION OF HOLES AND CONFIRM WITH ENGINEER PRIOR TO BEGINNING THE WORK. FLOOR CEILING PIPE (S) 2"— • CORE DRILL HOLE SCHEDULE 40 PIPE SLEEVE 1/8" STEEL PLATE WELDED TO SLEEVE MINERAL WOOL INSULATION FIRE BARRIER CAULKING & PUTTY 0 a) a) CD W Co E O Er) Co U_ E o U 14a-4Eaa) E ca -(13 • a) cti 0 0 < DATE: December 24, 2013 FACILITY: 2024 DESIGN: DRAWN: E. KOLACKI eak, cec MECHANICAL DETAILS AND PARTIAL BASEMENT PLUMBING PLAN PARTIAL BASEMENT PLUMBING DEMOLITION AND CONSTRUCTION PLAN SCALE: NONE 1 FLOOR PIPING PENETRATION DETAIL SCALE: 16 14 I 13 12 11 10 9 8 7 I 6 5 4 2 NONE 1 MP -401 P0409 A C D F G r CO r z N 437 — /87 C7 6 I 15 I 14 I 13 I 12 ( 11 I 10 AIR BALANCE SCHEDULE DESCRIPTION ROOM DIMENSIONS EXHAUST AIR SUPPLY AIR TRANSFER AIR CHANGES AREA (SF) HEIGHT (FT) EXHAUST POINT SERVICE OCC SASH OPEN (CFM) (NOTE 1) OCC SASH OPEN (CFM) (NOTE 2) OCC SASH CLOSED (CFM) UNOCC SASH - OPEN (CFM) UNOCC SASH CLOSED (CFM) SUPPLY POINT OCC SASH OPEN (CFM) (NOTE 1) OCC SASH OPEN (CFM) (NOTE 2) OCC SASH CLOSED (CFM) UNOCC SASH OPEN (CFM) UNOCC SASH CLOSED (CFM) AIR ALL MODES (CFM) OCC SASH OPEN (CFM) (NOTE 1) OCC SASH OPEN (CFM) (NOTE 2) OCC SASH CLOSED (CFM) UNOCC SASH OPEN (CFM) UNOCC SASH CLOSED (CFM) ROOM 107 572 9 EAV-107-1 EXISTING 6' FUME HOOD 785 628 371 510 187 SAV -107 1350 1060 585 843 245 -100 16.9 13.5 8.0 11.0 4.0 EAV-107-2 NEW 5' FUME HOOD 665 532 314 432 158 TOTAL 120 1450 1160 685 943 345 NOTES 1 OCC SASH OPEN MODE: FUME HOOD EXHAUST AIRFLOW REPRESENTS A 100 FPM FACE VELOCITY AT 18 -INCH SASH HEIGHT. 2 COORDINATE WITH EH&S DURING FUME HOOD TESTING AND CERTIFICATION. REDUCTION IN FUME HOOD FACE VELOCITY TO 80 FPM MAY POSSIBLE. 3 IF THE SPACE IS UNOCCUPIED, AND THE SASH IS ABOVE 18 -INCHES, THE FUME HOOD EXHAUST VALVE SHALL NOT INDEX TO UNOCCUPIED MODE. 4 UNOCC SASH OPEN MODE: FUME HOOD EXHAUST AIRFLOW REPRESENTS A 65 FPM FACE VELOCITY, SASH IS AT OR BELOW 18 -INCHES. FUME HOOD EXHAUST VALVE SHALL INDEX TO UNOCCUPIED MODE. VARIABLE AIR VOLUME SCHEDULE AND SPECIFICATIONS UNIT NO SERVES SUP EXH MANF BOD MODEL BOD SIZE BALANCING SETPOINTS FACTORY CALIBRATION MIN ©Pt (IN WC) REHEAT COIL TAG DAMPER POSITION NOTES MAX (CFM) MIN (CFM) MAX (CFM) MIN (CFM) SAV -107 ROOM 107 SUPPLY X BRONZE BODY x#20 MESH 304 STAINLESS STEEL SCREEN, THREAD OR SWEAT CONNECTION. TEK-AIR AV3114-12-IF 12" DIA 1350 245 1450 180 0.3 EXISTING N.C. 1, 2, 3 EAV-107-1 ROOM 107, EXISTING 6' FUME HOOD BRASS X TEK AIR AV 3124-10-F 10" DIA 785 187 1000 120 0.3 N/A N.O. 1, 3 EAV-107-2 ROOM 107, NEW 5' FUME HOOD BRASS X TEK-AIR AV 3124-10-F 10" DIA 665 158 1000 120 0.3 N/A N.O. 1, 3 BAV-107 BYPASS AIR VALVE FOR EF -4 N/A N/A TEK-AIR AV 3114-12 12" DIA 1105 0 1450 0 0.3 N/A N.C. 1, 3 NOTES 1 THE AIRFLOW DEVICES SHALL BE CALIBRATED AT THE FACTORY TO THE FULL RANGE OF RECOMMENDED AIRFLOWS. ACTUAL AIRFLOWS WILL BE SET IN SOFTWARE. 2 OPTION: INSULATION 3 SETPOINTS REPRESENT FUME HOOD FACE VELOCITY AT 100 FPM. FINAL SETPOINTS WILL BE ADJUSTED IF FACE VELOCITIES ARE REDUCED TO 80 FPM AS A RESULT OF FUME HOOD TESTING AND CERTIFICATION. SPECS 1 ACCEPTABLE MANUFACTURERS: TEK-AIR 2 CONFIGURATION: PRESSURE INDEPENDENT 3 SUPPLY VALVE BODY: 20 GA GALVANIZED STEEL, NO COATING, INSULATED 5 HOOD EXHAUST VALVE BODY: 20 GA 304 STAINLESS STEEL. 6 INSTALLATION: LEVEL & PLUMB, PER NFPA 90A, SMACNA DUCT CONSTRUCTION STANDARDS, AND MANUFACTURERS RECOMMENDED INSTRUCTIONS PIPING SPECIALTIES SCHEDULE AND SPECIFICATIONS TAG COMPONENT ACCEPTABLE MANUFACTURERS BOD MANUFACTURER BOD MODEL PRESSURE RATING SPECIFICATIONS V-5 SHUT-OFF BALL VALVE, NPS 172- 2 INCH, POTABLE WATER SERVICE APOLLO, WATTS WATTS B6000 -SS 300 PSIG WOG,150 PSIG WSP MSS SP -110, NSF 61 FOR POTABLE WATER SERVICE, 2 -PIECE, STANDARD PORT, BRONZE BODY, 316 SS BALL & STEM, PTFE OR TFE SEAT S 1 S STTRAINERS, WYE PATTERN, NPS 112 - 2 INCH', RAIN RDRONIC SERVICE APOLLO, KECKLEY, WATTS WATTS SERIES 777 200 PSIG @ 210 °F WOG; 125 PSIG @ 353 °F WSP BRONZE BODY x#20 MESH 304 STAINLESS STEEL SCREEN, THREAD OR SWEAT CONNECTION. SPECS 1 FOR VALVES INSTALLED IN INSULATED PIPING SYSTEMS, PROVIDE EXTENDED HANDLE 2 PROVIDE VALVES WITH UNIONS OR FLANGES AT EACH PIECE OF EQUIPMENT ARRANGED TO ALLOW SERVICE, MAINTENANCE AND EQUIPMENT REMOVAL WITHOUT SYSTEM SHUTDOWN 3 PROVIDE UNIONS ADJACENT TO VALVES AND AT FINAL EQUIPMENT CONNECTIONS. 4 BEFORE PLACING SYSTEM IN SERVICE, REMOVE MESH FROM ALL STRAINERS, CLEAN MESH AND FLUSH SYSTEM, RE -INSTALL AFTER FINAL FLUSHING. 5 PROVIDE STRAINERS AT INLET OF CONTROL VALVES, AND WHERE INDICATED. 6 PROVIDE TAGS FOR ALL NEW CONTROL AND SHUT-OFF VALVES. TAGS SHALL BE BRASS, 1 -1/2 -INCH ROUND, WITH STAMPED LETTERS AND NUMBERS. PROVIDE VALVE CHART. FIXTURE SCHEDULE AND SPECIFICATIONS TAG COMPONENTS MANUFACTURER MODEL DESCRIPTION MATERIAL FINISH / COLOR COLD WATER HOT WATER TEMP WATER AIR WASTE / SANITARY VENT SPECIFICATIONS STANDARDS S5 ADA HOOD CUP SINK N/A N/A STANDARD BENCHTOP CUP SINK POLYOLEFIN BLACK 1/2" - - 1-112" 1-114" FAUCET WATERSAVER L035WSA PANEL MOUNTED REMOTE SPOUT BRASS CHROME PANEL MOUNT REMOTE SPOUT WITH 30° SERRATED NOZZLE OUTLET ASME A112.18.1 TRIM WATERSAVER L4285 REMOTE CONTROL VALVE BRASS CHROME REMOTE CONTROL VALVE, CW BUTTON, WRIST BLADE HANDLES ANSI A117.1 WATERSAVER L102WSA VACUUM BREAKER BRASS CHROME ELEVATED VACUUM BREAKER ASSEMBLY ASME A112.18.1, ASSE 1001 DRAIN FITTING DURCON S03 -R SINK OUTLET EPDXY RESIN BLACK ONYX DRAIN TRAPWAY GEORG FISCHER 527248 DEEP SEAL P -TRAP (9") OR DRUM TRAP POLYPROPYLENE N/A SUPPLIES & STOPS WATTS B6000 -SS QUARTER TURN BALL VALVE BRONZE N/A 2 -PIECE, STANDARD PORT, 316 SS BALL AND STEM, PTFE OR RFE SEAT MSS SP -110 A2 ADA HOOD COMPRESSED AIR WATERSAVER L022WSA PANEL MOUNTED REMOTE SPOUT BRASS CHROME - - - 1/2" - PANEL MOUNT REMOTE SPOUT WITH 30° SERRATED NOZZLE OUTLET TRIM WATERSAVER L4285 REMOTE CONTROL VALVE BRASS CHROME REMOTE CONTROL VALVE, AIR BUTTON, WRIST BLADE HANDLES ANSI A117.1 SUPPLIES & STOPS WATTS B6000 -SS QUARTER TURN BALL VALVE BRONZE N/A 2 -PIECE, STANDARD PORT, 316 SS BALL AND STEM, PTFE OR RFE SEAT MSS SP -110 EYE WASH ENCON 1040127 SWING AWAY COUNTERTOP EYEWASH N/A N/A - - 1/2" - - ANSI Z358.1-2004 TEMPERING VALVE BRADLEY S19-2000 THERMOSTATIC MIXING VALVE BRASS CHROME 1/2" 1/2" - - - 4.5 GPM @ 10 PSI PRESSURE DROP ANSI Z358.1-2004 BF DOUBLE CHECK VALVE WATTS SERIES 007 LABORATORY POTABLE WATER CONNECTION CAST BRONZE N/A - - - - - - WITHOUT SHUTOFF VALVES, PROVIDE BRONZE (V-1) SHUTOFF VALVES, SEE ACCESSORIES SCHEDULE ASSE 1015, AWWA C510 NOTES 1 ACCEPTABLE MANUFACTURERS, PLUMBING TRIM: CHICAGO, WATERSAVER 2 ACCEPTABLE MANUFACTURERS, EMERGENCY FIXTURES: ENCON, BRADLEY, GUARDIAN, HAW'S, SPEAKMAN 3 ACCEPTABLE MANUFACTURERS, TEMPERING VALVES: ENCON, LAWLER, BRADLEY, LAB SAFETY SUPPLY WARNING: IT IS A VIOLATION OF NEW YORK STATE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT OR ENGINEER, TO ALTER THIS DOCUMENT IN ANY WAY. IF THIS DOCUMENT IS ALTERED, THE ALTERING ARCHITECT OR ENGINEER SHALL AFFIX TO SUCH DOCUMENT HIS SEAL AND THE NOTATION 'ALTERED BY" FOLLOWED BY HIS SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. DATE: 16.114 ENVIRONMENTAL HEALTH AND SAFETY ARCH.�ii° CIVIL ELEC. Cog MECH. 44/. REVISIONS: DATE: 12/24/13 - ISSUE FOR CONSTRUCTION C a) G) — C) w Co C..) a) E E CO co -1-a co ��►— '4— O E co o o Q • El 44 Ufa DA December 24, 2013 FACILITY: 2024 DESIGN: E. KOLACKI D eak, cec MECHANICAL / PLUMBING SCHEDULES AND SPECIFICATIONS 16 14 I 13 I 12 11 I 10 I 9 I 8 7 6 5 4 I 3 I 2 I 1 MECHANICAL / PLUMBING SCHEDULES AND SPECIFICATIONS MP -501 A B E P0409 X37 -/88 e8 M 16 I 15 I 14 I 13 I 12 I 11 I 10 PIPING SCHEDULE AND SPECIFICATIONS PIPE SERVICE ABBREVIATION PIPE SIZE MATERIAL FITTINGS JOINT INSULATION THICKNESS (IN) MATERIAL FIELD JACKET VAPOR RETARDER DOMESTIC COLD WATER DCW ALL SIZES ASTM B88 TYPE L COPPER ASTM B16.22 STD WROUGHT COPPER ASTM B32 SOLDER 0.5 A, B ASJ YES DOMESTIC HOT WATER DHW, DHWR ALL SIZES ASTM B• TYPE L COPPER ASTM B16.22 STD WROUGHT COPPER ASTM B32 SOLDER 0.5 A, B ASJ NO TEMPERED WATER TW ALL SIZES ASTM B88 TYPE L COPPER ASTM B16.22 STD WROUGHT COPPER ASTM B32 SOLDER N/A N/A N/A NO ACID WASTE & VENT AW/ AWV ALL SIZES ASTM D4101 ASTM D635 POLYPROPYLENE, SCH 40 ASTM D4101 POLYPROPYLENE MECHANICAL N/A N/A N/A NO COMPRESSED AIR A ALL SIZES ASTM B TYPE L COPPER ANSI B1622 LONG RADIUS WROUGHT COPPER ASTM B32 SOLDER N/A N/A N/A NO SPECS 1 SOWER FILLER METALS: ASTM B32, LEAD-FREE ALLOYS. INCLUDE WATER FLUSHABLE FLUX ACCORDING TO ASTM B813. 2 DIELECTRIC FITTINGS: USE FLANGES OR COUPLINGS. UNIONS ARE UNACCEPTABLE 3 INSTALL PLUMBING SYSTEMS TO FACILITATE SERVICE, MAINTENANCE AND REPAIR OR REPLACEMENT OF COMPONENTS. 4 ALL WASTE PIPING SHALL BE PITCHED AT 1/8" PER FOOT. ALL SUPPLY PIPING SHALL BE PITCHED BACK TOWARDS CONNECTION TO THE ROOM ENTRANCE 5 POLYPROPYLENE PIPING SHALL BE FLAME RETARDANT 6 MAINTAIN INDICATED FIRE RATING OF WALLS, PARITIONS, CEILINGS, AND FLOORS AT PIPE PENETRATIONS. SEAL PIPE PENETRATIONS WITH FIRESTOP MATERIALS 7 PROVIDE PIPE LABLES AND DIRECTIONAL ARROWS ON ALL NEW PIPING SYSTEMS. LABELS SHALL BE PRINTED PLASTIC WITH CONTACT -TYPE, PERMANENT ADHESIVE BACKING. 8 ALL INSULATION AND ADHESIVE SHALL HAVE A MAXIMUM FLAME -SPREAD INDEX OF 25 AND A MAXIMUM SMOKE -DEVELOPED INDEX OF 50 WHEN TESTED IN ACCORDANCE WITH ASTM E84. TYPE A INSULATION: PRE -FORMED MINERAL FIBERGLASS, ASTM C547 TYPE I, ASTM C1136 FACTORY APPLIED SELF-SEALING ALL SERVICE JACKET, MAX K OF 0.27 BTU-IN/HR-FT2-°F @ 75 °F. TYPE B INSULATION: EXPANDED CLOSED CELL FLEXIBLE ELASTOMERIC, ASTM C534 TYPE I FOR TUBULAR MATERIALS, TYPE II FOR SHEET MATERIALS, MAX K OF 0.27 BTU-IN/HR-FT2-°F @ 75 'F. 9 TESTING OF DOMESTIC WATER PIPING: CAP AND SUBJECT DOMESTIC WATER PIPING TO STATIC WATER PRESSURE OF 50 PSIG ABOVE OPERATING PRESSURE, WITHOUT EXCEEDING PRESSURE RATING OF PIPING SYSTEM MATERIALS ISOLATE TEST SOURCE AND ALLOW TO STAND FOR FOUR HOURS. LEAKS AND LOSS IN TEST PRESSURE CONSTITUTE DEFECTS THAT MUST BE REPAIRED REPAIR LEAKS AND DEFECTS WITH NEW MATERIALS AND RETEST PIPING UNTIL SATISFACTORY RESULTS ARE OBTAINED. 10 TESTING OF DOMESTIC WASTE AND VENT PIPING: CAP AND SUBJECT DOMESTIC WATER PIPING TO STATIC WATER PRESSURE OF 10 FEET HEAD PRESSURE ABOVE HIGHEST POINT OF SYSTEM UNDERGOING TEST ISOLATE TEST SOURCE AND ALLOW TO STAND UNTIL SYSTEM CAN BE VISUALLY INSPECTED BY AUTHORITY HAVING JURISDICTION. LEAKS CONSTITUTE DEFECTS THAT MUST BE REPAIRED REPAIR LEAKS AND DEFECTS WITH NEW MATERIALS AND RETEST PIPING UNTIL SATISFACTORY RESULTS ARE OBTAINED. CONTROL VALVE SCHEDULE AND SPECIFICATIONS TAG BOD MANF BOD VALVE MODEL SERVICE VALVE TYPE VALVE SIZE (IN) CV ACTUATOR MANF ACTUATOR MODEL CONTROL CAPACITY (GPM) PD (PSIG) FAIL POS CV -1 BELIMO B211 ROOM 107, BASEBOARD RADIATION 2 -WAY 0.5 1.9 BELIMO TR24-SR-T US MOD 0.75 0.2 FAIL LAST CV -2 BELIMO B212 ROOM 107, REHEAT COIL 2 -WAY 0.5 3 BELIMO TR24-SR-T US MOD 4.0 1.8 FAIL LAST SPECS 1 ACCEPTABLE MANUFACTURERS: BEUMO, VSI. NO SUBSTITUTIONS. 2 ELECTRIC INPUT: 4-20mA OR 0-10VDC 3 CONSTRUCTION: CHARACTERIZING DISK, FORGED BRASS, NICKEL PLATED BODY, STAINLESS STEEL BALL AND STEM, FIBERGLASS REINFORCED PTFE SEAT 4 2 -WAY VALVES: EQUAL PERCENTAGE FLOW CHARACTERISTIC DUCT STANDARDS AND SPECIFICATIONS DUCT SERVICE LOCATION PRESSURE CLASS SEAL CLASS LEAKAGE CLASS RECT ROUND MATERIAL LINING INSULATION FINISH THICKNESS (IN) MATERIAL JACKET VAPOR RETARDER SUPPLY 2" POS C 24 12 G90 GALVANIZED NONE 1.5 A FSK YES NONE EXHAUST 4" NEG B 12 6 316 STAINLESS STEEL, WELDED NONE N/A N/A N/A N/A NONE SPECS 1 ALL DUCTWORK AND ACCESSORIES SHALL BE FABRICATED AND INSTALLED IN COMPLIANCE WITH THE LATEST ISSUE OF SMACNA'S HVAC DUCT CONSTRUCTION STANDARDS- METAL AND FLEXIBLE. 2 CONSTRUCT TEES, BENDS, AND ELBOWS WITH RADIUS OF NOT LESS THAN 1.5 TIMES THE WIDTH OF DUCT ON CENTER LINES. 3 WHERE RECTANGULAR ELBOWS ARE USED, PROVIDE AIR FOIL TYPE TURNING VANES. 4 INCREASE DUCT SIZES GRADUALLY, AND IN COMPLIANCE WITH FIGURE 4-7 OF SMACNA'S HVAC DUCT CONSTRUCTION STANDARDS - METAL AND FLEXIBLE. BRANCH CONNECTIONS SHALL BE MADE WITH A 45 DEGREE ENTRY. STRAIGHT TEES ARE NOT ACCEPTABLE. 5 SEALANTS AND GASKETS: SURFACE BURNING CHARACTERISTICS SHALL BE A MAXIMUM FLAME -SPREAD INDEX OF 25, AND MAXIMUM SMOKE -DEVELOPED INDEX OF 50 WHEN TESTED TO UL 723. 6 CONNECT DIFFUSERS TO SUPPLY DUCTS WITH MAXIMUM OF 36 -INCHES OF FLEXIBLE DUCT CLAMPED OR STRAPPED IN PLACE.. 7 INSTALL VOLUME DAMPERS AT POINTS ON SUPPLY, RETURN, AND EXHAUST SYSTEMS WHERE BRANCHES EXTEND FROM LARGER DUCTS. 8 REMOVE SURFACE CONTAMINANTS AND DEPOSITS FROM DUCTWORK AND EQUIPMENT PRIOR TO TESTING AND BALANCING. 9 ALL INSULATION AND ADHESIVE SHALL HAVE A MAXIMUM FLAME -SPREAD INDEX OF 25 AND A MAXIMUM SMOKE -DEVELOPED INDEX OF 50 WHEN TESTED IN ACCORDANCE WITH ASTM E84. TYPE A INSULATION: MINERAL FIBERGLASS BLANKET, ASTM C55 TYPE I, ASTM C1136 TYPE I FACTORY APPLIED FSK JACKET, K -VALUE BETWEEN 0.22 - 025 BTU-INIHR-FT2-°F @ 75 °F, 0.75 PCF, R-5 WARNING: IT IS A VIOLATION OF NEW YORK STATE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT OR ENGINEER, TO ALTER THIS DOCUMENT IN ANY WAY. IF THIS DOCUMENT IS ALTERED, THE ALTERING ARCHITECT OR ENGINEER SHALL AFFIX TO SUCH DOCUMENT HIS SEAL AND THE NOTATION "ALTERED BY FOLLOWED BY HIS SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. FACILITIES ENVIRO ARC CML: ELEC: GINEERiNG D DATE: 4 h.114 MECH. d5 7 REVISIONS: DATE: 12/24/13 - ISSUE FOR CONSTRUCTION DATE: December 24, 2013 FACILITY: 2024 DESIGN: E. KOLACKI D eak, cec MECHANICAL / PLUMBING SCHEDULES AND SPECIFICATIONS 16 I 15 I 14 13 I 12 8 6 5 4 3 I 2 I MECHANICAL PLUMBING SCHEDULES AND SPECIFICATIONS MP -502 A B D E F P0409 �7 - ��y C9 � � 16 I '15 4 2 1 10 3 EXISTING LAB SINK AND FIXTURES TO REMAIN 1"RO/DISSLR(E FUME HOOD (E) TO REMAIN 1/2" DCW (E) SERVING FH CUPSINK EXISTING LAB SINK AND FIXTURES I0 F s 2 E: 114"=1 KEYED DEMOLITION NOTES: Q REMOVE EXISTING DCW PIPING AND APPURTENANCES BACK TO 1/2" DCW BRANCH PIPING DOWN FROM CEILING AS REQUIRED TO PROVIDE 1/2" DCW SERVICE FOR CUPSINK IN FUME HOOD. O DISCONNECT AND REMOVE EXISTING EMERGENCY EYEWASH UNIT. O REMOVE PIPING AS REQUIRED TO PROVIDE INSTALLATION OF NEW DOUBLE CHECK VALVES ON DCW AND DHW BRANCHES SERVING ROOM 107. O DISCONNECT MILLIPORE WATER SUPPLY FROM RO / DI FAUCET AND SAVE FOR RE -INSTALLATION. REMOVE EXISTING RO / DI FAUCET AND RETURN TO OWNER. WARNING: IT IS A VIOLATION OF NEW YORK STATE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT OR ENGINEER, TO ALTER THIS DOCUMENT IN ANY WAY. IF THIS DOCUMENT IS ALTERED. THE ALTERING ARCHITECT OR ENGINEER SHALL AFFIX TO SUCH DOCUMENT HIS SEAL AND THE NOTATION 'ALTERED BY' FOLLOWED BY HIS SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. APPROVA ENVIRONMENT r EALTHAND Oki 40 ARC CIVIL: ELEC: MECH. DATE: Girt{ REVISIONS: DATE: 12/24/13 - ISSUE FOR CONSTRUCTION CD CD 0) w Co C.) W E 0 s � 0 Co C o � yip 0 co 125 s "la' fts:i= as E co00< .Y 0 Z . DATE: December 24, 2013 FACILITY: 2024 DESIGN: E. KOLACKI DRA eak, cec PARTIAL FIRST FLOOR PLUMBING DEMOLITION PLAN A B E G 16 1 15 1 14 12 11 10 9 8 PARTIAL FIRST FLOOR PLUMBING DEMOLITION PLAN 7 I 6 I 5 SCALE: 1/4" =11-0" NOTES PD -101 P0409 o, C3) 2 I 1 0,7.37 - /D C/4 16 I 15 4 2 10 CONSTRUCTION NOTE: FINAL ADA FUME HOOD PLACEMENT SHALL BE COORDINATED WITI-I 2" LW INSTALLATION FOR CUPSINK DRAIN. SEE SHEET P-101 FOR ADDITIONAL INFORMATION. 1/2" DCW AN DHW (E) REVCO FREEZER 2 SCALE: /4'=1'-0" KEYED CONSTRUCTION NOTES: QMODIFY AND EXTEND EXISTING 1/2" DCW SERVICE TO SERVE DCW FIXTURE IN FUME HOOD AND MAKE CONNECTION. INSTALLATION SHALL CONFORM TO DETAIL 4, SHEET M-401. PROVIDE 1/2" ISOLATION BALL VALVE AT BRANCH CONNECTION, BELOW CEILING. Q PROVIDE LW CONNECTION TO NEW ADA FUME HOOD CUP SINK (S5). INSTALLATION SHALL CONFORM TO DETAIL 3, SHEET MP -401. FOR PIPING CONTINUATION BELOW FLOOR, SEE PANEL 4, SHEET MP -401. ROUTE 2" LW DOWN AS CLOSE TO EXISTING STRUCTURAL BEAM AS POSSIBLE. SEE FIXTURE SCHEDULE AND SPECIFICATIONS, SHEET M-501 FOR MATERIALS. • PROVIDE 1-1/4" LWV CONNECTIONS AND ROUTE UP, ABOVE CEILING TO CHASE LOCATION AS SHOWN ON PLAN. COORDINATE ROUTE IN FIELD WITH NEW WORK AND EXISTING FEATURES TO REMAIN. MAKE CONNECTION TO EXISTING 3"0 LWV IN CHASE. PROVIDE SLEEVES WHERE PIPE PASSES THROUGH WALL AS PER DETAIL 2, SHEET M-401. PATCH AND PAINT WALLS TO MATCH EXISTING. • PROVIDE NEW EMERGENCY EYE WASH (EW) AT LOCATION SHOWN. INSTALLATION SHALL BE IN ACCORDANCE WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS TO ASSURE ACCESSIBILITY. PROVIDE NEW TEMPERING VALVE UNDER LAB SINK IN BASE CABINET. PROVIDE 1/2" RUNOUT CONNECTIONS WITH ISOLATION VALVES TO TEMPERING VALVE FROM EXISTING 1/2" DCW AND 1/2" DHW BRANCHES. PROVIDE 1/2" TEMPERED WATER CONNECTION TO EMERGENCY EYEWASH (EW) COORDINATE MOUNTING SUPPORT FOR TEMPERING VALVE WITH FACILITY MANAGER PRIOR TO STARTING THE WORK. Q PROVIDE NEW 1/2" AIR CONNECTION TO EXISTING 1/2"A BRANCH AT LOCATION SHOWN ON PLAN. ROUTE ABOVE CEILING AND DN TO SERVE NEW ADA FUME HOOD. INSTALLATION SHALL CONFORM TO DETAIL 3, SHEET MP -401. O PROVIDE DOUBLE CHECK VALVE BACKFLOW PREVENTERS ON EXISTING 1/2" DCW AND 1/2" DHW BRANCH CONNECTIONS SERVING ROOM 107. Q INSTALL NEW RO / DI FAUCET (WATERSAVER, MODEL: L611) FURNISHED BY OWNER. REMOVE SERRATED TIP AND REINSTALL MILLPORE SUPPLY UNIT REMOVED FROM EXISTING FAUCET. WARNING: IT IS A VIOLATION OF NEW YORK STATE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT OR ENGINEER, TO ALTER THIS DOCUMENT IN ANY WAY. IF THIS DOCUMENT IS ALTERED, THE ALTERING ARCHITECT OR ENGINEER SHALL AFFIX TO SUCH DOCUMENT HIS SEAL AND THE NOTATION 'ALTERED BY' FOLLOWED BY HIS SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION. APPROV, FACT ES ENGIN ENVIRONMENT ARC CIVIL ELEC- MECH. DATE: le6 fit RING , I • HEALTH AND REVISIONS: DATE: 12!24!13 - ISSUE FOR CONSTRUCTION 0) a) CY) S-. U a) O E Q co c1:i 4-- 0 a9 Q3 1=1"-c1; E 25- 0 • °)) C..).0 w 2 754 O U ct44 DATE: December 24, 2013 FACILITY: 2024 DESIGN: E. KOLACKI DRAWN: eak, cec PARTIAL FIRST FLOOR PLUMBING CONSTRUCTION PLAN PARTIAL FIRST FLOOR PLUMBING CONSTRUCTION PLAN 7 16 14 13 12 11 10 9 SCALE: /4" =1'-0" NOTES P-101 P0409 A B D E F 6 I 5 3 2