Loading...
HomeMy WebLinkAbout20121102-Uris Hall_CDs_Combined and StampedPROJECT SITE PLAN DRAWING INDEX CORNELL UNIVERSITY NETWORK CONNECTIVITY PROJECT URIS HALL - 2087 DRAWING DESCRIPTION T-COVER DRAWING INDEX AND PROJECT SITE PLAN T-GEN STANDARD SYMBOLS, NOTES, ABBREVIATIONS (T-SERIES) T1 T1-SZ TR SERVING ZONES, PLAN VIEWS AND BLDG. SECTION VIEW T1-PL PATHWAYS LOGICAL RISER DIAGRAMS T1-CL COPPER LOGICAL RISER DIAGRAMS T1-FL FIBER LOGICAL RISER DIAGRAMS T2 T2-SB.CA_CP SUB-BASEMENT PATHWAYS AND CABLING T2-B.CA_CP BASEMENT PATHWAYS AND CABLING T2-G.CA_CP GROUND FLOOR PATHWAYS AND CABLING T2-1.CA_CP FIRST FLOOR PATHWAYS AND CABLING T2-2.CA_CP SECOND FLOOR PATHWAYS AND CABLING T2-3.CA_CP THIRD FLOOR PATHWAYS AND CABLING T2-4.CA_CP FOURTH FLOOR PATHWAYS AND CABLING T3 T3-SB ROOM 2B00UB ENLARGED PLANS AND ELEVATIONS T3-GA ITR-GA ENLARGED PLANS AND ELEVATIONS T3-3A ITR-3A ENLARGED PLANS AND ELEVATIONS AMEP AMEP-GEN GENERAL NOTES, SYMBOLS AND ABBREVIATIONS (AMEP SERIES) T1-AMEP AMEP-AREAS OF WORK AMEP-GA ITR-GA PARTIAL PLANS AND KEYNOTES AMEP-3A ITR-3A PARTIAL PLANS AND KEYNOTES M2-SB_3 THIRD FLOOR AND SUB BASEMENT MECHANICAL PLANS A4 ARCHITECTURAL DETAILS M4 MECHANICAL DETAILS E4 ELECTRICAL DETAILS DESCRIPTIONMARK DATE PROJECT MANAGER: DRAWN BY: AT PROJECT NO: CHECKED BY: SHEET TITLE: ISSUE DATE: CLIENT:PLOT DATE: November 1, 2012 PLOT BY: pbarrieOWNER PROJECT NO: J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Uris 2087\CAD\11103-2087--T-COVER.dwg Fax: 585.424.4239 115 METRO PARK ROCHESTER, NY 14623 www.archi-technology.com PHONE: 585.424.1952 LLC SCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.) Cornell UniversityCORNELL UNIVERSITYURIS HALL - 2087ITHACA, NYCONSTRUCTION DOCUMENTS 11103-2087 754 LP/EL/PKB DPB JLB DRAWING INDEX AND PROJECT SITE PLAN T-COVER PSD 20 SD 50 DD 100 DD CD      NETWORK CONNECTIVITY PROJECT CEILING SCHEDULEGENERAL PROJECT NOTES GENERAL REMOVAL NOTES GENERAL DRAWING NOTES -EXISTING CONDITIONS/REMOVALS-ACCESS CONTROL SYMBOLS LEGEND GENERAL REMOVAL NOTES GENERAL NEW WORK NOTES GENERAL DRAWING NOTES -HORIZONTAL CABLING- GENERAL DRAWING NOTES -PATHWAYS- GENERAL DRAWING NOTES -PATHWAYS- ABBREVIATIONS TELECOM SYMBOLS LEGEND (REV. 07/12) NEW / EXISTING OUTLET SUBSCRIPT KEY NEW PATHWAY TYPE KEY OUTLET DESCRIPTOR KEY EXISTING OUTLET NOTE KEY CABLING SYMBOLS LEGEND DESCRIPTIONMARK DATE PROJECT MANAGER: DRAWN BY: AT PROJECT NO: CHECKED BY: SHEET TITLE: ISSUE DATE: CLIENT: OWNER PROJECT NO: Fax: 585.424.4239 115 METRO PARK ROCHESTER, NY 14623 www.archi-technology.com PHONE: 585.424.1952 LLC Cornell UniversityCORNELL UNIVERSITYURIS HALL - 2087ITHACA, NYCONSTRUCTION DOCUMENTS 11103-2087 754 LP/EL/PKB DPB JLB STANDARD SYMBOLS, NOTES, ABBREVIATIONS (T-SERIES) T-GEN PSD 20 SD 50 DD 100 DD CD      NETWORK CONNECTIVITY PROJECT 3$7+:$<6&+('8/(1(::25. &$%/(),//%$6('21&$%/(2'¸ 0.24 DESIGNATION DESCRIPTION MANUFACTURER PART NO. APPROXIMATE OUTSIDE DIMENSION APPROXIMATE INSIDE DIMENSION CABLE FILL &$3$&,7<¸ MIN. BEND RADIUS &ʵ CONDUIT SEE SPEC. SECTION 27 05 28 .75" DIA. 4 4.5" 1" C 1" DIA. 7 6" 1.25" C 1.25" DIA. 13 7.5" 1.5" C 1.5" DIA. 18 9" 2" C 2" DIA. 29 12" 2.5" C 2.5" DIA. 51 25" 3" C 3" DIA. 78 30" 4" C 4" DIA. 130 40" SR-1 NOT USED SR-2 ** SURFACE RACEWAY SEE SPEC. SECTION 27 05 28 2400 SERIES SEE SPEC. SECTION 27 05 28 12 SR-3 ** SURFACE RACEWAY 3000 SERIES 32 SR-4 ** SURFACE RACEWAY 4000 SERIES 63 SR-4D **SURFACE RACEWAY (DIVIDED)4000D SERIES 30 SR-5 ** SURFACE RACEWAY 5400 SERIES 32 SR-6 ** SURFACE RACEWAY 6000 SERIES 140 SR-6D **SURFACE RACEWAY (DIVIDED)6000D SERIES 63 SR-7 SURFACE RACEWAY 700 SERIES 2 CT-A WIRE MESH TRAY SEE SPEC. SECTION 27 05 28 4"x6"211 CT-B 2"x12" 211 CT-C NOT USED NOT USED 2"x18" 316 CT-D 2"x24"419 CT-E 4"x12" 419 CT-F 4"x18" 632 CT-G 4"x24"844 CT-H 6"x12" 636 CT-I - - CT-J - - CT-K - - 127(6  ¸0$;,080),//)25&$7(*25<,1',&$7(' 3(57,$(,$$  - CAT6A CABLING HAS AN OD OF 0.285. 5('8&(),//5$7,2%<)25($&+ƒ%(1' - ENSURE THAT FILL RATIOS ARE NOT EXCEEDED ʵ&21'8,76+$//21/<%($//2:('$663(&,),&$//<127('21'5$:,1*6 ** REDUCE CAPACITY BY 50% FOR THE FOLLOWING CONDITIONS: - WHEN CONNECTORS ARE MOUNTED WITHIN RACEWAY - WHEN NON-RADIUS FITTINGS RESTRICT CROSS-SECTIONAL AREA - WHEN RACEWAY IS DIVIDED AND SHARED WITH ELECTRIC ALTER EXISTING SURFACE RACEWAY TO PROVIDE AT LEAST TWO 16" SECTIONS OF REMOVABLE COVERS TO ALLOW CABLE ROUGH-IN WITHOUT CONFLICT WITH EXISTING FURNITURE CONFIGURATIONS. ALSO REFER TO GENERAL NOTE "Z" ON T-GEN DRAWING FOR ADDITIONAL SCOPE FOR SURFACE RACEWAYS. WHERE REQUIRED BY RACEWAY CAPACITY, OR AS DIRECTED, PROVIDE SURFACE MOUNT EXTENSION BOX ON EXISTING RACEWAY OPENING TO PROVIDE ADEQUATE CAPACITY AND BEND RADIUS. ALSO REFER TO RACEWAY DERATING REQUIREMENTS AT LEFT. WHERE REQUIRED BY RACEWAY CAPACITY, OR AS DIRECTED, PROVIDE RETROFIT ENTRANCE END FITTING OR ALTER EXISTING BACKFED CONDUIT WITH A NEW SPACE SAVER CONNECTOR TO PROVIDE ADEQUATE CAPACITY AND BEND RADIUS FOR NEW CABLING. ALSO REFER TO RACEWAY DERATING REQUIREMENTS AT LEFT. FIELD VERIFY EXISTING CONDITIONS AND PROPOSE ALTERATIONS THAT MINIMIZE SERVICE DISRUPTION DURATION. PROVIDE ALL TEMPORARY PROVISIONS TO MAINTAIN EXISTING SERVICES. CONDUIT AND CABLE TRAY TO BE ROUTED CONCEALED UNLESS OTHERWISE NOTED. FIRST FLOOR GROUND FLOOR BASEMENT FIRST FLOOR GROUND FLOOR BASEMENT SUB-BASEMENT SUB-BASEMENT SECOND FLOOR SECOND FLOOR THIRD FLOOR THIRD FLOOR FOURTH FLOOR FOURTH FLOOR TR SERVING ZONES - BUILDING SECTION VIEW 8 Scale: NONE DESCRIPTIONMARK DATE PROJECT MANAGER: DRAWN BY: AT PROJECT NO: CHECKED BY: SHEET TITLE: ISSUE DATE: CLIENT: OWNER PROJECT NO: Fax: 585.424.4239 115 METRO PARK ROCHESTER, NY 14623 www.archi-technology.com PHONE: 585.424.1952 LLC Cornell UniversityCORNELL UNIVERSITYURIS HALL - 2087ITHACA, NYCONSTRUCTION DOCUMENTS 11103-2087 754 LP/EL/PKB DPB JLB TR SERVING ZONES, PLAN VIEWS AND BLDG. SECTION VIEW T1-SZ PSD 20 SD 50 DD 100 DD CD      NETWORK CONNECTIVITY PROJECT SUB-BASEMENT - TR SERVING ZONE PLAN 1 Scale: 1/32" = 1’-0" BASEMENT - TR SERVING ZONE PLAN 2 Scale: 1/32" = 1’-0" GROUND FLOOR TR SERVING ZONE PLAN 3 Scale: 1/32" = 1’-0" FIRST FLOOR TR SERVING ZONE PLAN 4 Scale: 1/32" = 1’-0" SECOND FLOOR - TR SERVING ZONE PLAN 5 Scale: 1/32" = 1’-0" THIRD FLOOR - TR SERVING ZONE PLAN 6 Scale: 1/32" = 1’-0" FOURTH FLOOR - TR SERVING ZONE PLAN 7 Scale: 1/32" = 1’-0" FIRST FLOOR GROUND FLOOR BASEMENT FIRST FLOOR GROUND FLOOR BASEMENT SUB-BASEMENT SUB-BASEMENT SECOND FLOOR SECOND FLOOR THIRD FLOOR THIRD FLOOR FOURTH FLOOR FOURTH FLOOR FIRST FLOOR GROUND FLOOR BASEMENT FIRST FLOOR GROUND FLOOR BASEMENT SUB-BASEMENT SUB-BASEMENT SECOND FLOOR SECOND FLOOR THIRD FLOOR THIRD FLOOR FOURTH FLOOR FOURTH FLOOR Scale: NONE PATHWAY LOGICAL RISER DIAGRAM - NEW WORK2 Scale: NONE PATHWAY LOGICAL RISER DIAGRAM - EXISTING / REMOVAL1 DESCRIPTIONMARK DATE PROJECT MANAGER: DRAWN BY: AT PROJECT NO: CHECKED BY: SHEET TITLE: ISSUE DATE: CLIENT: OWNER PROJECT NO: Fax: 585.424.4239 115 METRO PARK ROCHESTER, NY 14623 www.archi-technology.com PHONE: 585.424.1952 LLC Cornell UniversityCORNELL UNIVERSITYURIS HALL - 2087ITHACA, NYCONSTRUCTION DOCUMENTS 11103-2087 754 LP/EL/PKB DPB JLB PATHWAYS LOGICAL RISER DIAGRAMS T1-PL PSD 20 SD 50 DD 100 DD CD      NETWORK CONNECTIVITY PROJECT FIRST FLOOR GROUND FLOOR BASEMENT FIRST FLOOR GROUND FLOOR BASEMENT SUB-BASEMENT SUB-BASEMENT SECOND FLOOR SECOND FLOOR THIRD FLOOR THIRD FLOOR FOURTH FLOOR FOURTH FLOOR 2 2 FIRST FLOOR GROUND FLOOR BASEMENT FIRST FLOOR GROUND FLOOR BASEMENT SUB-BASEMENT SUB-BASEMENT SECOND FLOOR SECOND FLOOR THIRD FLOOR THIRD FLOOR FOURTH FLOOR FOURTH FLOOR Scale: NONE COPPER LOGICAL RISER DIAGRAM - NEW WORK2 Scale: NONE COPPER LOGICAL RISER DIAGRAM - EXISTING / REMOVAL1 DESCRIPTIONMARK DATE PROJECT MANAGER: DRAWN BY: AT PROJECT NO: CHECKED BY: SHEET TITLE: ISSUE DATE: CLIENT: OWNER PROJECT NO: Fax: 585.424.4239 115 METRO PARK ROCHESTER, NY 14623 www.archi-technology.com PHONE: 585.424.1952 LLC Cornell UniversityCORNELL UNIVERSITYURIS HALL - 2087ITHACA, NYCONSTRUCTION DOCUMENTS 11103-2087 754 LP/EL/PKB DPB JLB COPPER LOGICAL RISER DIAGRAMS T1-CL PSD 20 SD 50 DD 100 DD CD      NETWORK CONNECTIVITY PROJECT FIRST FLOOR GROUND FLOOR BASEMENT FIRST FLOOR GROUND FLOOR BASEMENT SUB-BASEMENT SUB-BASEMENT SECOND FLOOR SECOND FLOOR THIRD FLOOR THIRD FLOOR FOURTH FLOOR FOURTH FLOOR FIRST FLOOR GROUND FLOOR BASEMENT FIRST FLOOR GROUND FLOOR BASEMENT SUB-BASEMENT SUB-BASEMENT SECOND FLOOR SECOND FLOOR THIRD FLOOR THIRD FLOOR FOURTH FLOOR FOURTH FLOOR Scale: NONE FIBER LOGICAL RISER DIAGRAM - NEW WORK2 Scale: NONE FIBER LOGICAL RISER DIAGRAM - EXISTING / REMOVAL1 DESCRIPTIONMARK DATE PROJECT MANAGER: DRAWN BY: AT PROJECT NO: CHECKED BY: SHEET TITLE: ISSUE DATE: CLIENT: OWNER PROJECT NO: Fax: 585.424.4239 115 METRO PARK ROCHESTER, NY 14623 www.archi-technology.com PHONE: 585.424.1952 LLC Cornell UniversityCORNELL UNIVERSITYURIS HALL - 2087ITHACA, NYCONSTRUCTION DOCUMENTS 11103-2087 754 LP/EL/PKB DPB JLB FIBER LOGICAL RISER DIAGRAMS T1-FL PSD 20 SD 50 DD 100 DD CD      NETWORK CONNECTIVITY PROJECT KEY PLAN SUB-BASEMENT - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 1/8" = 1’-0"0 8’ 16’4’ DESCRIPTIONMARK DATE PROJECT MANAGER: DRAWN BY: AT PROJECT NO: CHECKED BY: SHEET TITLE: ISSUE DATE: CLIENT:PLOT DATE: November 1, 2012 PLOT BY: pbarrieOWNER PROJECT NO: J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Uris 2087\CAD\11103-2087--T2-SB.dwg Fax: 585.424.4239 115 METRO PARK ROCHESTER, NY 14623 www.archi-technology.com PHONE: 585.424.1952 LLC SCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.) Cornell UniversityCORNELL UNIVERSITYURIS HALL - 2087ITHACA, NYCONSTRUCTION DOCUMENTS 11103-2087 754 LP/EL/PKB DPB JLB SUB-BASEMENT PATHWAYS AND CABLING T2-SB.CA_CP PSD 20 SD 50 DD 100 DD CD      NETWORK CONNECTIVITY PROJECT EXISTING OUTLET NOTE KEY KEY PLAN BASEMENT - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 1/8" = 1’-0"0 8’ 16’4’ DESCRIPTIONMARK DATE PROJECT MANAGER: DRAWN BY: AT PROJECT NO: CHECKED BY: SHEET TITLE: ISSUE DATE: CLIENT:PLOT DATE: November 1, 2012 PLOT BY: pbarrieOWNER PROJECT NO: J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Uris 2087\CAD\11103-2087--T2-B.dwg Fax: 585.424.4239 115 METRO PARK ROCHESTER, NY 14623 www.archi-technology.com PHONE: 585.424.1952 LLC SCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.) Cornell UniversityCORNELL UNIVERSITYURIS HALL - 2087ITHACA, NYCONSTRUCTION DOCUMENTS 11103-2087 754 LP/EL/PKB DPB JLB BASEMENT PATHWAYS AND CABLING T2-B.CA_CP PSD 20 SD 50 DD 100 DD CD      NETWORK CONNECTIVITY PROJECT SURFACE RACEWAY TO CEILING, CONDUIT TO HALL DETAIL2Scale: 1" = 1’-0"0 1’ 2’1/2’ EXISTING OUTLET NOTE KEY KEY PLAN GROUND FLOOR - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 1/8" = 1’-0"0 8’ 16’4’ DESCRIPTIONMARK DATE PROJECT MANAGER: DRAWN BY: AT PROJECT NO: CHECKED BY: SHEET TITLE: ISSUE DATE: CLIENT:PLOT DATE: November 1, 2012 PLOT BY: pbarrieOWNER PROJECT NO: J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Uris 2087\CAD\11103-2087--T2-G.dwg Fax: 585.424.4239 115 METRO PARK ROCHESTER, NY 14623 www.archi-technology.com PHONE: 585.424.1952 LLC SCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.) Cornell UniversityCORNELL UNIVERSITYURIS HALL - 2087ITHACA, NYCONSTRUCTION DOCUMENTS 11103-2087 754 LP/EL/PKB DPB JLB GROUND FLOOR PATHWAYS AND CABLING T2-G.CA_CP PSD 20 SD 50 DD 100 DD CD      NETWORK CONNECTIVITY PROJECT EXISTING OUTLET NOTE KEY KEY PLAN FIRST FLOOR - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 1/8" = 1’-0"0 8’ 16’4’ DESCRIPTIONMARK DATE PROJECT MANAGER: DRAWN BY: AT PROJECT NO: CHECKED BY: SHEET TITLE: ISSUE DATE: CLIENT:PLOT DATE: November 1, 2012 PLOT BY: pbarrieOWNER PROJECT NO: J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Uris 2087\CAD\11103-2087--T2-1.dwg Fax: 585.424.4239 115 METRO PARK ROCHESTER, NY 14623 www.archi-technology.com PHONE: 585.424.1952 LLC SCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.) Cornell UniversityCORNELL UNIVERSITYURIS HALL - 2087ITHACA, NYCONSTRUCTION DOCUMENTS 11103-2087 754 LP/EL/PKB DPB JLB FIRST FLOOR PATHWAYS AND CABLING T2-1.CA_CP PSD 20 SD 50 DD 100 DD CD      NETWORK CONNECTIVITY PROJECT EXISTING OUTLET NOTE KEY KEY PLAN SECOND FLOOR - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 1/8" = 1’-0"0 8’ 16’4’ DESCRIPTIONMARK DATE PROJECT MANAGER: DRAWN BY: AT PROJECT NO: CHECKED BY: SHEET TITLE: ISSUE DATE: CLIENT:PLOT DATE: November 1, 2012 PLOT BY: pbarrieOWNER PROJECT NO: J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Uris 2087\CAD\11103-2087--T2-2.dwg Fax: 585.424.4239 115 METRO PARK ROCHESTER, NY 14623 www.archi-technology.com PHONE: 585.424.1952 LLC SCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.) Cornell UniversityCORNELL UNIVERSITYURIS HALL - 2087ITHACA, NYCONSTRUCTION DOCUMENTS 11103-2087 754 LP/EL/PKB DPB JLB SECOND FLOOR PATHWAYS AND CABLING T2-2.CA_CP PSD 20 SD 50 DD 100 DD CD      NETWORK CONNECTIVITY PROJECT EXISTING OUTLET NOTE KEY KEY PLAN THIRD FLOOR - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 1/8" = 1’-0"0 8’ 16’4’ DESCRIPTIONMARK DATE PROJECT MANAGER: DRAWN BY: AT PROJECT NO: CHECKED BY: SHEET TITLE: ISSUE DATE: CLIENT:PLOT DATE: November 1, 2012 PLOT BY: pbarrieOWNER PROJECT NO: J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Uris 2087\CAD\11103-2087--T2-3.dwg Fax: 585.424.4239 115 METRO PARK ROCHESTER, NY 14623 www.archi-technology.com PHONE: 585.424.1952 LLC SCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.) Cornell UniversityCORNELL UNIVERSITYURIS HALL - 2087ITHACA, NYCONSTRUCTION DOCUMENTS 11103-2087 754 LP/EL/PKB DPB JLB THIRD FLOOR PATHWAYS AND CABLING T2-3.CA_CP PSD 20 SD 50 DD 100 DD CD      NETWORK CONNECTIVITY PROJECT EXISTING OUTLET NOTE KEY KEY PLAN FOURTH FLOOR - COMMUNICATION PATHWAYS / HORIZONTAL CABLING1Scale: 1/8" = 1’-0"0 8’ 16’4’ DESCRIPTIONMARK DATE PROJECT MANAGER: DRAWN BY: AT PROJECT NO: CHECKED BY: SHEET TITLE: ISSUE DATE: CLIENT:PLOT DATE: November 1, 2012 PLOT BY: pbarrieOWNER PROJECT NO: J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Uris 2087\CAD\11103-2087--T2-4.dwg Fax: 585.424.4239 115 METRO PARK ROCHESTER, NY 14623 www.archi-technology.com PHONE: 585.424.1952 LLC SCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.) Cornell UniversityCORNELL UNIVERSITYURIS HALL - 2087ITHACA, NYCONSTRUCTION DOCUMENTS 11103-2087 754 LP/EL/PKB DPB JLB FOURTH FLOOR PATHWAYS AND CABLING T2-4.CA_CP PSD 20 SD 50 DD 100 DD CD      NETWORK CONNECTIVITY PROJECT EXISTING OUTLET NOTE KEY SUB BASEMENT - ROOM 2B00UB TELECOM EQUIPMENT PLAN - EXISTING / REMOVALS1Scale: 1/2" = 1’-0"0 2’ 4’1’ SUB BASEMENT - ROOM 2B00U BACKBOARD ELEVATION - EXISTING / REMOVALS /NEW WORK3Scale: 1" = 1’-0"0 1’ 2’1/2’ DESCRIPTIONMARK DATE PROJECT MANAGER: DRAWN BY: AT PROJECT NO: CHECKED BY: SHEET TITLE: ISSUE DATE: CLIENT:PLOT DATE: November 1, 2012 PLOT BY: pbarrieOWNER PROJECT NO: J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Uris 2087\CAD\11103-2087--T3-SB.dwg Fax: 585.424.4239 115 METRO PARK ROCHESTER, NY 14623 www.archi-technology.com PHONE: 585.424.1952 LLC SCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.) Cornell UniversityCORNELL UNIVERSITYURIS HALL - 2087ITHACA, NYCONSTRUCTION DOCUMENTS 11103-2087 754 LP/EL/PKB DPB JLB ROOM 2B00UB ENLARGED PLANS AND ELEVATIONS T3-SB PSD 20 SD 50 DD 100 DD CD      NETWORK CONNECTIVITY PROJECT KEY PLAN 0 1’ 2’1/2’ SUB BASEMENT ROOM 2B00UB EXISTING RACK2Scale: 1" = 1’-0" GROUND FLOOR - ROOM G30 TELECOM EQUIPMENT PLAN - EXISTING / REMOVALS1Scale: 1/4" = 1’-0"0 4’ 8’2’ GROUND FLOOR - ITR-GA (ROOM G30) TELECOM EQUIPMENT PLAN - NEW WORK2Scale: 1/4" = 1’-0"0 4’ 8’2’0 1’ 2’1/2’ GROUND FLOOR - ROOM G30 BACKBOARD ELEVATION - EXISTING / REMOVALS6Scale: 1" = 1’-0"0 1’ 2’1/2’ GROUND FLOOR ITR-GA (ROOM G30) RACK ELEVATION - NEW WORK5Scale: 1" = 1’-0" GROUND FLOOR ITR-GA (RACK 1) FIBER HOUSING DETAIL9Scale: NONE GROUND FLOOR ITR-GA (ROOM G30) BACKBOARD ELEVATION - NEW WORK7Scale: 1" = 1’-0"0 1’ 2’1/2’ DESCRIPTIONMARK DATE PROJECT MANAGER: DRAWN BY: AT PROJECT NO: CHECKED BY: SHEET TITLE: ISSUE DATE: CLIENT:PLOT DATE: November 1, 2012 PLOT BY: pbarrieOWNER PROJECT NO: J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Uris 2087\CAD\11103-2087--T3-G.dwg Fax: 585.424.4239 115 METRO PARK ROCHESTER, NY 14623 www.archi-technology.com PHONE: 585.424.1952 LLC SCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.) Cornell UniversityCORNELL UNIVERSITYURIS HALL - 2087ITHACA, NYCONSTRUCTION DOCUMENTS 11103-2087 754 LP/EL/PKB DPB JLB ITR-GA ENLARGED PLANS AND ELEVATIONS T3-GA PSD 20 SD 50 DD 100 DD CD      NETWORK CONNECTIVITY PROJECT KEY PLAN 0 1’ 2’1/2’ GROUND FLOOR (ROOM G30) EXISTING RACK4Scale: 1" = 1’-0" GROUND FLOOR MTR (ROOM G40) BACKBOARD ELEVATION - EXISTING/REMOVALS8Scale: 1" = 1’-0"0 1’ 2’1/2’ 8’ 12’4’0 GROUND FLOOR - MTR (ROOM G40) TELECOM EQUIPMENT PLAN - EXISTING / REMOVALS3Scale: 3/16" = 1’-0" 15’-4" THIRD FLOOR - ITR-3A (ROOM 307A) TELECOM EQUIPMENT PLAN - NEW WORK2Scale: 1/4" = 1’-0"0 4’ 8’2’ 0 1’ 2’1/2’ THIRD FLOOR ITR-3A (ROOM 307A) RACK ELEVATION - NEW WORK3Scale: 1" = 1’-0" THIRD FLOOR ITR-3A (RACK 2) FIBER HOUSING (ERL) DETAIL5Scale: NONE THIRD FLOOR ITR-3A (ROOM 307A) BACKBOARD ELEVATION - NEW WORK4Scale: 1" = 1’-0"0 1’ 2’1/2’ DESCRIPTIONMARK DATE PROJECT MANAGER: DRAWN BY: AT PROJECT NO: CHECKED BY: SHEET TITLE: ISSUE DATE: CLIENT:PLOT DATE: November 1, 2012 PLOT BY: pbarrieOWNER PROJECT NO: J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Uris 2087\CAD\11103-2087--T3-3.dwg Fax: 585.424.4239 115 METRO PARK ROCHESTER, NY 14623 www.archi-technology.com PHONE: 585.424.1952 LLC SCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.) Cornell UniversityCORNELL UNIVERSITYURIS HALL - 2087ITHACA, NYCONSTRUCTION DOCUMENTS 11103-2087 754 LP/EL/PKB DPB JLB ITR-3A ENLARGED PLANS AND ELEVATIONS T3-3A PSD 20 SD 50 DD 100 DD CD      NETWORK CONNECTIVITY PROJECT KEY PLAN THIRD FLOOR - (ROOM 307) TELECOM EQUIPMENT PLAN -EXISTING/REMOVALS1Scale: 1/4" = 1’-0"0 4’ 8’2’6’-0"1’-6"15’-3"9’-0" DESCRIPTIONMARK DATE PROJECT MANAGER: DRAWN BY: AT PROJECT NO: CHECKED BY: SHEET TITLE: ISSUE DATE: CLIENT: OWNER PROJECT NO: Fax: 585.424.4239 115 METRO PARK ROCHESTER, NY 14623 www.archi-technology.com PHONE: 585.424.1952 LLC Cornell UniversityCORNELL UNIVERSITYURIS HALL - 2087ITHACA, NYCONSTRUCTION DOCUMENTS 11103-2087 754 LP/EL/PKB DPB JLB GENERAL NOTES, SYMBOLS AND ABBREVIATIONS (AMEP SERIES) AMEP-GEN PSD 20 SD 50 DD 100 DD CD      NETWORK CONNECTIVITY PROJECT ELECTRICAL SYMBOLS LEGEND4Scale: NONE MECHANICAL SYMBOLS LEGEND3Scale: NONE ARCHITECTURAL SYMBOLS LEGEND2Scale: NONE ABBREVIATIONS1Scale: NONE DESCRIPTIONMARK DATE PROJECT MANAGER: DRAWN BY: AT PROJECT NO: CHECKED BY: SHEET TITLE: ISSUE DATE: CLIENT: OWNER PROJECT NO: Fax: 585.424.4239 115 METRO PARK ROCHESTER, NY 14623 www.archi-technology.com PHONE: 585.424.1952 LLC Cornell UniversityCORNELL UNIVERSITYURIS HALL - 2087ITHACA, NYCONSTRUCTION DOCUMENTS 11103-2087 754 LP/EL/PKB DPB JLB AMEP-AREAS OF WORK T1-AMEP PSD 20 SD 50 DD 100 DD CD      NETWORK CONNECTIVITY PROJECT SUB-BASEMENT - AMEP AREAS OF WORK 1 Scale: 1/32" = 1’-0" BASEMENT - AMEP AREAS OF WORK 2 Scale: 1/32" = 1’-0" GROUND FLOOR AMEP AREAS OF WORK 3 Scale: 1/32" = 1’-0" FIRST FLOOR AMEP AREAS OF WORK 4 Scale: 1/32" = 1’-0" SECOND FLOOR - AMEP AREAS OF WORK 5 Scale: 1/32" = 1’-0" THIRD FLOOR - AMEP AREAS OF WORK 6 Scale: 1/32" = 1’-0" FOURTH FLOOR - AMEP AREAS OF WORK 7 Scale: 1/32" = 1’-0" DESCRIPTIONMARK DATE PROJECT MANAGER: DRAWN BY: AT PROJECT NO: CHECKED BY: SHEET TITLE: ISSUE DATE: CLIENT:PLOT DATE: October 29, 2012 PLOT BY: pbarrieOWNER PROJECT NO: J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Uris 2087\CAD\11103-2087--T3-G.dwg Fax: 585.424.4239 115 METRO PARK ROCHESTER, NY 14623 www.archi-technology.com PHONE: 585.424.1952 LLC SCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.) Cornell UniversityCORNELL UNIVERSITYURIS HALL - 2087ITHACA, NYCONSTRUCTION DOCUMENTS 11103-2087 754 LP/EL/PKB DPB JLB ITR-GA PARTIAL PLANS AND KEYNOTES AMEP-GA PSD 20 SD 50 DD 100 DD CD      NETWORK CONNECTIVITY PROJECT GROUND FLOOR IDF (ROOM G30) ARCHITECTURAL - EXISTING /REMOVALS1Scale: 1/4" = 1’-0"0 4’ 8’2’ GROUND FLOOR ITR-GA (ROOM G30) ARCHITECTURAL - NEW WORK4Scale: 1/4" = 1’-0"0 4’ 8’2’ GROUND FLOOR IDF (ROOM G30) MECHANICAL - EXISTING / REMOVALS2Scale: 1/4" = 1’-0"0 4’ 8’2’ GROUND FLOOR IDF (ROOM G30) ELECTRICAL - EXISTING / REMOVALS3Scale: 1/4" = 1’-0"0 4’ 8’2’ GROUND FLOOR ITR-GA (ROOM G30) ELECTRICAL - NEW WORK6Scale: 1/4" = 1’-0"0 4’ 8’2’ GROUND FLOOR ITR-GA (ROOM G30) MECHANICAL - NEW WORK5Scale: 1/4" = 1’-0"0 4’ 8’2’ KEY PLAN 15’-4"13’-2" DESCRIPTIONMARK DATE PROJECT MANAGER: DRAWN BY: AT PROJECT NO: CHECKED BY: SHEET TITLE: ISSUE DATE: CLIENT:PLOT DATE: October 29, 2012 PLOT BY: pbarrieOWNER PROJECT NO: J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Uris 2087\CAD\11103-2087--T3-3.dwg Fax: 585.424.4239 115 METRO PARK ROCHESTER, NY 14623 www.archi-technology.com PHONE: 585.424.1952 LLC SCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.) Cornell UniversityCORNELL UNIVERSITYURIS HALL - 2087ITHACA, NYCONSTRUCTION DOCUMENTS 11103-2087 754 LP/EL/PKB DPB JLB ITR-3A PARTIAL PLANS AND KEYNOTES AMEP-3A PSD 20 SD 50 DD 100 DD CD      NETWORK CONNECTIVITY PROJECT THIRD FLOOR IDF (ROOM 307) ARCHITECTURAL - EXISTING / REMOVAL1Scale: 1/4" = 1’-0"0 4’ 8’2’ THIRD FLOOR ITR-3A (ROOM 307A) ARCHITECTURAL - NEW WORK4Scale: 1/4" = 1’-0"0 4’ 8’2’ THIRD FLOOR IDF (ROOM 307) MECHANICAL - EXISTING / REMOVALS2Scale: 1/4" = 1’-0"0 4’ 8’2’ THIRD FLOOR IDF (ROOM 307) ELECTRICAL - EXISTING / REMOVALS3Scale: 1/4" = 1’-0"0 4’ 8’2’ THIRD FLOOR ITR-3A (ROOM 307A) ELECTRICAL - NEW WORK6Scale: 1/4" = 1’-0"0 4’ 8’2’ THIRD FLOOR ITR-3A (ROOM 307A) MECHANICAL - NEW WORK5Scale: 1/4" = 1’-0"0 4’ 8’2’ KEY PLAN 15’-3"9’-0"SR-4 DESCRIPTIONMARK DATE PROJECT MANAGER: DRAWN BY: AT PROJECT NO: CHECKED BY: SHEET TITLE: ISSUE DATE: CLIENT:PLOT DATE: October 29, 2012 PLOT BY: pbarrieOWNER PROJECT NO: J:\PROJECTS-Ithaca\2011\11103 CORNELL - NCP\Uris 2087\CAD\11103-2087--M2-3.dwg Fax: 585.424.4239 115 METRO PARK ROCHESTER, NY 14623 www.archi-technology.com PHONE: 585.424.1952 LLC SCALES ON THIS DRAWING ACCURATE WHEN PLOTTED TO: ARCH E1 (30X42 IN.) Cornell UniversityCORNELL UNIVERSITYURIS HALL - 2087ITHACA, NYCONSTRUCTION DOCUMENTS 11103-2087 754 LP/EL/PKB DPB JLB THIRD FLOOR AND SUB BASEMENT MECHANICAL PLANS M2-SB_3 PSD 20 SD 50 DD 100 DD CD      NETWORK CONNECTIVITY PROJECT THIRD FLOOR MECHANICAL - NEW WORK1Scale: 1/4" = 1’-0"0 4’ 8’2’ SUB BASEMENT KEY PLANSUB BASEMENT MECHANICAL - NEW WORK2Scale: 1/4" = 1’-0"0 4’ 8’2’ THIRD FLOOR KEY PLAN ROOM 307 PARTITION ASSEMBLY SECTION DETAILS HEAD TYPES JAMB TYPES GENERAL NOTESGENERAL NOTES CORRIDOR CORRIDOR RM B47A RM G30 AUDITORIUM G01 FLOOR DESCRIPTIONMARK DATE PROJECT MANAGER: DRAWN BY: AT PROJECT NO: CHECKED BY: SHEET TITLE: ISSUE DATE: CLIENT: OWNER PROJECT NO: Fax: 585.424.4239 115 METRO PARK ROCHESTER, NY 14623 www.archi-technology.com PHONE: 585.424.1952 LLC Cornell UniversityCORNELL UNIVERSITYURIS HALL - 2087ITHACA, NYCONSTRUCTION DOCUMENTS 11103-2087 754 LP/EL/PKB DPB JLB ARCHITECTURAL DETAILS A4 PSD 20 SD 50 DD 100 DD CD      NETWORK CONNECTIVITY PROJECT PARTITION TYPES - SECTION 1 Scale: NONE JAMB AND HEAD TYPES 2 Scale: NONE NEW ACCESS PANEL - EXISTING SPLINE TILE CEILING 3 Scale: NONE ALCOVE SOFFIT DETAIL 4 Scale: NONE GENERAL NOTESGENERAL NOTES DESCRIPTIONMARK DATE PROJECT MANAGER: DRAWN BY: AT PROJECT NO: CHECKED BY: SHEET TITLE: ISSUE DATE: CLIENT: OWNER PROJECT NO: Fax: 585.424.4239 115 METRO PARK ROCHESTER, NY 14623 www.archi-technology.com PHONE: 585.424.1952 LLC Cornell UniversityCORNELL UNIVERSITYURIS HALL - 2087ITHACA, NYCONSTRUCTION DOCUMENTS 11103-2087 754 LP/EL/PKB DPB JLB MECHANICAL DETAILS M4 PSD 20 SD 50 DD 100 DD CD      NETWORK CONNECTIVITY PROJECT CONCRETE ANCHOR DEVICE DETAIL 3 Scale: NONE PIPE HANGER 4 Scale: NONE CHILLED WATER PIPING WALL SUPPORT DETAIL 5 Scale: NONE TYPICAL COOLING COIL DRAIN 7 Scale: NONE FIRE RATED WALL PIPE PENETRATION 2 Scale: NONE NON FIRE RATED WALL PIPE PENETRATION 1 Scale: NONE TWO-WAY CONTROL VALVE COIL PIPING DETAIL 6 Scale: NONE NEW CHILLED WATER FAN COIL UNIT SCHEDULE 8 Scale: NONE FIRST FLOOR GROUND FLOOR BASEMENT FIRST FLOOR GROUND FLOOR BASEMENT SUB-BASEMENT SUB-BASEMENT SECOND FLOOR SECOND FLOOR THIRD FLOOR THIRD FLOOR FOURTH FLOOR FOURTH FLOOR GENERAL NOTESGENERAL NOTES SE RATED NOTES: HINGED TRIM 200% NEUTRAL COMPUTER GRADE FEED-THRU LUGS SUB FEED LUGS SUB-FEED BREAKER ISOLATED GND BUS SE RATED NOTES: HINGED TRIM 200% NEUTRAL COMPUTER GRADE FEED-THRU LUGS SUB FEED LUGS SUB-FEED BREAKER ISOLATED GND BUS DESCRIPTIONMARK DATE PROJECT MANAGER: DRAWN BY: AT PROJECT NO: CHECKED BY: SHEET TITLE: ISSUE DATE: CLIENT: OWNER PROJECT NO: Fax: 585.424.4239 115 METRO PARK ROCHESTER, NY 14623 www.archi-technology.com PHONE: 585.424.1952 LLC Cornell UniversityCORNELL UNIVERSITYURIS HALL - 2087ITHACA, NYCONSTRUCTION DOCUMENTS 11103-2087 754 LP/EL/PKB DPB JLB ELECTRICAL DETAILS E4 PSD 20 SD 50 DD 100 DD CD      NETWORK CONNECTIVITY PROJECT POWER & GROUNDING SYSTEM RISER DIAGRAM 2 Scale: NONE LIGHTING FIXTURE SCHEDULE 3 Scale: NONE ELECTRICAL PANELBOARD SCHEDULES 1 Scale: NONE TELECOMMUNICATIONS GROUND BAR (TMGB,TGB) DETAIL 4 Scale: NONE