HomeMy WebLinkAboutTeagle-Ward Electric Upgrades_ADD 1_5-15-17CORNELL UNIVERSITY TEAGLE HALL & WARD CENTER
FACILITIES CONTRACTS ELECTRIC SERVICE UPGRADES
121 HUMPHREYS SERVICE BUILDING
ITHACA, NEW YORK 14853-3701
ADDENDUM NO. 1
May 15, 2017
This Addendum contains changes to the requirements of the Contract Documents and Specifications.
Such changes are to be incorporated into the Construction Documents and shall apply to the work with
the same meaning and force as if they had been included in the original document. Wherever this
Addendum modifies a portion of a paragraph of the specifications or a portion of any Drawing, the
remainder of the Paragraph or Drawing shall remain in force.
NOTE: Provisions of all Contract Documents apply.
GENERAL REQUIREMENTS
Item 1. Section 01 35 29 GENERAL HEALTH & SAFETY
ADD the following Asbestos Survey Reports:
- Ward Center (2061) Electrical Service Upgrade Project Phase 1 Asbestos Inspection dated
April 25th, 2017, attached
- Teagle Hall (2611) Electrical Service Upgrade Project Phase 1 Asbestos Inspection dated
April 25th, 2017, attached
- Teagle Hall (2611) Electrical Service Upgrade Project Phase 2 Asbestos Inspection dated
May 10, 2017, attached
DRAWINGS
Item 2. Drawing E-000, Door / Hardware Schedule
DELETE in its entirety.
REPLACE with the Teagle Center Door Schedule and Ward Center Door Schedule,
attached.
Item 3. Drawing E-100, Detail 3, Text Note (9) for CB-2
DELETE
“50A, 208V…”
REPLACE with
“150A., 208V…”
Item 4. Attached is the Pre-Bid Sign-in sheet for Contractors reference only.
Project Title
Addendum No. X
Date
Page 2
Item 5. RFI Questions and Clarifications
See attached RFI Log (Items 1 - 8)
Attachments: Asbestos Survey Reports (3)
Teagle Hall Door/Hardware Schedule
Ward Center Door/Hardware Schedule
Pre-bid Meeting Sign-in Sheet
RFI Log (Items 1-8)
****END OF ADDENDUM****
860 Hooper Road
Endwell, NY 13760
Tel: 607.231.6600
Fax: 607.231.6650
www.delta-eas.com
AN ISO 9001:2008 CERTIFIED COMPANY
“We are a seamless extension of our clients’ organizations”
April 25th, 2017
Dale W. Houseknecht, Facilities Coordinator Projects II
Cornell University IPP-Facilities Management
FM Administration
116 Humphreys Service Building
Ithaca, New York 14853-3701
Re: Ward Center (2061) Electrical Service Upgrade Project Phase 1 Asbestos Inspection
Cornell Task Authorization No. TA-64, Work Order No. 9826231
Delta Project No.: 2017.003.062
Dear Mr. Houseknecht:
The following information is associated with the upcoming Ward Center Electrical Service Upgrade Project.
On Monday, April 24th, 2017 Delta Asbestos Inspector Stephen Prislupsky was onsite to perform a Pre-
Renovation Asbestos Survey for the Project, which included a visual inspection of the affected spaces and
associated suspect materials with the potential to be impacted by the project. No asbestos bulk sampling was
performed as a part of this Inspection/Survey based on the fact that all affected circuits were energized at the
time of the survey.
For the Electrical Room B09, all equipment/circuits were energized. The wall/floor/ceiling systems with the
potential to be impacted were observed to be non-suspect concrete/CMU Block. All visually accessible wiring
was observed to be non-suspect vinyl wrapped, with no other accessible suspect materials visually observed to
be present or associated with the Switches or Switch Board.
For the Transformer Room B17, all equipment/circuits were energized. The wall/floor/ceiling systems and
associated equipment pads with the potential to be impacted were observed to be non-suspect concrete. All
visually accessible wiring was observed to be non-suspect vinyl wrapped with the exception of one suspect line
at each transformer. Based on the fact that the equipment/circuits were energized at the time of this
survey, no samples of this suspect wire wrap could be collected. As such, it can either be “assumed” to be
asbestos containing or sampled once the affected circuits can be de-energized.
I have attached a drawing showing the Inspection/Survey Limits and several photos of the spaces. If you have
any questions, or require any other information, please feel free to contact me at your convenience.
Respectfully,
DELTA ENGINEERS, ARCHITECTS, & LAND SURVEYORS, P.C.
Stephen Prislupsky
Director of Environmental Services
“We are a seamless extension of our clients’ organizations”
DELTA ENGINEERS, ARCHITECTS, & LAND SURVEYORS, P.C. Page 2 of 4
AN ISO 9001:2008 CERTIFIED COMPANY
Attachment A
Inspection Area Location/Limits Drawing
“We are a seamless extension of our clients’ organizations”
DELTA ENGINEERS, ARCHITECTS, & LAND SURVEYORS, P.C. Page 3 of 4
AN ISO 9001:2008 CERTIFIED COMPANY
Attachment B
Photos
“We are a seamless extension of our clients’ organizations”
DELTA ENGINEERS, ARCHITECTS, & LAND SURVEYORS, P.C. Page 4 of 4
AN ISO 9001:2008 CERTIFIED COMPANY
Electrical Room B17 Transformers
Electrical Room B17 Suspect Wire Wrap
860 Hooper Road
Endwell, NY 13760
Tel: 607.231.6600
Fax: 607.231.6650
www.delta-eas.com
AN ISO 9001:2008 CERTIFIED COMPANY
“We are a seamless extension of our clients’ organizations”
April 25th, 2017
Dale W. Houseknecht, Facilities Coordinator Projects II
Cornell University
IPP-Facilities Management
FM Administration
116 Humphreys Service Building
Ithaca, New York 14853-3701
Re: Teagle Hall (2611) Electrical Service Upgrade Project Phase 1 Asbestos Inspection
Cornell Task Authorization No. TA-65, Work Order No. 9826229
Delta Project No.: 2017.003.061
Dear Mr. Houseknecht:
The following information is associated with the upcoming Teagle Hall Electrical Service
Upgrade Project. On Monday, April 24th, 2017 Delta Asbestos Inspector Stephen Prislupsky was
onsite to perform a Pre-Renovation Asbestos Survey for the Project, which included a visual
inspection of the affected spaces and associated suspect materials with the potential to be
impacted by the project. No asbestos bulk sampling was performed as a part of this
Inspection/Survey based on the fact that all affected circuits were energized at the time of the
survey.
For the Electrical Room B00UB, all equipment/circuits were energized. The wall/floor/ceiling
systems with the potential to be impacted were observed to be non-suspect concrete/CMU Block.
All visually accessible wiring was observed to be non-suspect vinyl wrapped, with no other
suspect materials visually observed to be present or associated with the Switches, Breakers or
Panels. The Room entry door to be removed as a part of the project was labeled as a “Fire Door”
but based on the fact that there were no openings or inspection ports in the door slab, the
presence of a suspect core material could not be verified (or sampled if present). As such,
the door can either be “assumed” to have an asbestos containing core or sampled once
arrangements can be made with the Cornell Lock Shop to pull the door hardware to access
the core material.
For the adjacent XFMR Vault Room B00UC, all equipment/circuits were energized. The
wall/floor/ceiling systems and associated equipment pads with the potential to be impacted were
observed to be non-suspect concrete/CMU Block. No suspect materials were observed on the
west wall louver bank to be replaced. All visually accessible wiring was observed to be non-
suspect vinyl wrapped with the exception of one un-coated suspect wire. Based on the fact that
the equipment/circuits were energized at the time of this survey, no samples of this suspect
wire could be collected. As such, it can either be “assumed” to be asbestos containing or
sampled once the affected circuits can be de-energized.
“We are a seamless extension of our clients’ organizations”
DELTA ENGINEERS, ARCHITECTS, & LAND SURVEYORS, P.C. Page 2 of 6
AN ISO 9001:2008 CERTIFIED COMPANY
I have attached a drawing showing the Inspection/Survey Limits and several photos of the
spaces. If you have any questions, or require any other information, please feel free to contact
me at your convenience.
Respectfully,
DELTA ENGINEERS, ARCHITECTS, & LAND SURVEYORS, P.C.
Stephen Prislupsky
Director of Environmental Services
“We are a seamless extension of our clients’ organizations”
DELTA ENGINEERS, ARCHITECTS, & LAND SURVEYORS, P.C. Page 3 of 6
AN ISO 9001:2008 CERTIFIED COMPANY
Attachment A
Inspection Area Location/Limits Drawing
“We are a seamless extension of our clients’ organizations”
DELTA ENGINEERS, ARCHITECTS, & LAND SURVEYORS, P.C. Page 4 of 6
AN ISO 9001:2008 CERTIFIED COMPANY
Attachment B
Photos
“We are a seamless extension of our clients’ organizations”
DELTA ENGINEERS, ARCHITECTS, & LAND SURVEYORS, P.C. Page 5 of 6
AN ISO 9001:2008 CERTIFIED COMPANY
Room B00UC Transformers
Room B00UC Louvers
“We are a seamless extension of our clients’ organizations”
DELTA ENGINEERS, ARCHITECTS, & LAND SURVEYORS, P.C. Page 6 of 6
AN ISO 9001:2008 CERTIFIED COMPANY
Room B00UB Fire-Rated Entry Door
860 Hooper Road
Endwell, NY 13760
Tel: 607.231.6600
Fax: 607.231.6650
www.delta-eas.com
AN ISO 9001:2008 CERTIFIED COMPANY
“We are a seamless extension of our clients’ organizations”
May 10, 2017
Dale W. Houseknecht, Facilities Coordinator Projects II
Cornell University
IPP-Facilities Management
FM Administration
116 Humphreys Service Building
Ithaca, New York 14853-3701
Re: Teagle Hall (2611) Electrical Service Upgrade Project
Phase 2 Asbestos Inspection
Cornell Task Authorization No. TA-65, Work Order No. 9826229
Delta Project No.: 2017.003.061
Dear Mr. Houseknecht:
The following information is associated with the Phase 2 Asbestos Inspection for the upcoming
Teagle Hall Electrical Service Upgrade Project. On Wednesday, May 10th, 2017 Delta Asbestos
Inspector Stephen Prislupsky met with Representatives from the Cornell Lock Shop and Line
Crew onsite to inspect the various suspect materials with the potential to be impacted by the
project. These materials were identified in the initial April 24th, 2017 inspection but could not be
accessed. This included the core material for the doors being removed and an unwrapped wire
type. The core material for the 2 affected doors was found to be non-suspect fiberglass. The
unwrapped ground wire was found to be a non-suspect metal braided ground line.
Based on the above and the information from the April 24th Phase 1 inspection, no asbestos
containing materials are anticipated to be impacted by the Teagle Hall Electrical Service
Upgrade Project. If you have any questions, or require any other information, please feel free to
contact me at your convenience.
Respectfully,
DELTA ENGINEERS, ARCHITECTS, & LAND SURVEYORS, P.C.
Stephen Prislupsky
Director of Environmental Services
“We are a seamless extension of our clients’ organizations”
DELTA ENGINEERS, ARCHITECTS, & LAND SURVEYORS, P.C. Page 2 of 4
AN ISO 9001:2008 CERTIFIED COMPANY
Attachment A
Photos
“We are a seamless extension of our clients’ organizations”
DELTA ENGINEERS, ARCHITECTS, & LAND SURVEYORS, P.C. Page 3 of 4
AN ISO 9001:2008 CERTIFIED COMPANY
Non-Suspect Fiberglass Core from Room B00UB Fire-rated Entry Door
Non-Suspect Fiberglass Core from Room B00UC “Un-rated” Entry Door
“We are a seamless extension of our clients’ organizations”
DELTA ENGINEERS, ARCHITECTS, & LAND SURVEYORS, P.C. Page 4 of 4
AN ISO 9001:2008 CERTIFIED COMPANY
Non-Suspect Metal Braided Ground Wire
Teagle Hall Door Schedule
Door Door Location Door Type Frame TypeDoor WidthDoor HeightUnequal pair Hand Fire Rating Hinges McKinney TA2714 x 4.5 x 4.5 x 26D x NRPSelf Latching Flush Bolt set DCI 845 x 26DSargent 12-8904 x F x 814-PTB x LHRB x 32D x 36"Cylinders to be provided by the Cornell University Lock ShopDoor Coordinators DCI # 600 SeriesMounting Bracket DCI 600D SeriesCloser Sargent 351 x P9 x EN Silencers DCI 8S1 B00C from B00UB HM HM 5'7'3' x 2'LHRBA Y 6 1 1 1 1 2 2 2
2 B00UB from B00UC HM HM 5'7'3' x 2'LHRBA Y 6 1 1 1 1 2 2 2
Notes
Both door to be fire rated
2" face frame on door frames
Door frames shall be 16 gauge welded. Doors shall be 18 gauge seamless edge
Both doors and frames shall be reinforced for the door hardware.
Ward Center Door Schedule
Door Door Location Door Type Frame TypeOpening width Door WidthDoor HeightHand Fire Rating Sargent LD-8904 x F x 814-PTB x RHRB x US10 x 36"1 Exterior From B17 HM HM 6' x 7'3'7' RHRB No 1
Notes
Installer shall reuse existing cylinder
Strike may need to be modified to accept panic device
PROJECT: Teagle Hall & Ward Center Electric Service Upgrades Date: May 16, 2017
RFI Form
RFI/Page/
Response Dwg./Spec./Rep.Section/Design Team
Index Number Paragraph/Topic RFI Response
1 Detail 3/E-100 Text Note at CB-
2 Should 50A be changed to 150A?See Addendum No. 1, Item 3.
2 E-100, E-101 Is any metering work required?All metering work at Ward will be performed by the
Cornell Line Crew.
3 E-201, E-202
E-201 - Keyed
Note #4,#7, #12
/ E-202 - Keyed
Note #6
How many existing CT's are there? What are the existing,
Phase 1, Phase 2, Phase 3, Phase 4 and final locations of the
metering CT's?
Each existing transformer bank has 3 CT's. The
existing 480V service CT's are in the cable tray above
the transformer and will stay there for all phases. The
existing 208V service CT's are at the transformers,
these will be relocated (E-201 Phase 2 Keyed Note 4)
to the existing cable tray above the transformers in
Phase 2 and remain there. There is enough slack in
the wiring for the meters to be relocated without
splicing.
4 E-101
Would you provide us with additional information on the
three PCB transformers in Ward Center? If they were tested
can we get the test results? We need to know if the PCB
levels are 0-49 or 50-499 ppm. We would also like to know
how many gallons of oil are in each one?
The transformers at Ward Center have PCB levels of
50-499 ppm, and are 75 gallons each.
5 E-201
Since the six transformers in Teagle Hall have not been tested
and there is no mention of PCB's in the summary of work
should our base bid include disposal of transformers without
PCB oil? We would also need to know how many gallons of
oil are in each transformer.
Teagle Hall is not listed on Cornell's building list for
PCB oil containing transformers (over 50ppm).
However, EHS will still need to test the transformers
once they are de-energized, prior to removal as
indicated on the drawings. The transformers at
Teagle Hall are 50 gallons each.
6 E-201
If you want us to include disposal of PCB oil for the six
transformers in Teagle Hall, could you tell us what PCB
levels you want us to use. The level choices would be 0-49 or
50-499 ppm. Please advise.
Teagle Hall is not listed on Cornell's building list for
PCB oil containing transformers (over 50ppm).
However, EHS will still need to test the transformers
prior to removal as indicated on the drawings.
Removal/disposal is required if test results come back
50-499 ppm.
7 E-300 Detail 1
Drawing E-300 Detail 1 Shows a stand for the Cornell
furnished 15.5kv 3 way switch. Is this furnished with the
switch or is it furnished by the Electrical contractor? If the
stand is furnished by the Electrical contractor can you
provide us with a detail.
The stand/frame shown below the switch is furnished
with the switch.
8 E-000 Door/Hardware
Schedule
Is Panic Hardware being added to the electric room door at
Ward Center since the door is not being replaced.See Addendum No. 1, Item 2.