HomeMy WebLinkAboutMN-SJC-2009-06-10 SJC MEETING
June 10, 2009
SJC Members Staff
Wade Wykstra, Chair Bill Gray
Mayor Carolyn Peterson
Supervisor Herb Engman
Erik Whitney
Scott Gibson
Supervisor MaryAnn Sumner
Pat Leary
Rich DePaolo
Jeff Soule
Dan Ramer
Steve Thayer
Mary Tomlan
Joel Zumoff
Absent
Guests
Christopher Kalwara, Johnson Controls
Kathy Pomponio, Verizon Wireless
Jarod Lusk, Nixon Peabody
Ken Cowley, Aerosmith
Wade called the meeting to order at 12:40PM.
Approval of May minutes – Mary Tomlan noted that Fred Gillette represents the DEC which is
the regulatory body that oversees the discharge permit for the plant and he is satisfied that we’re
going about evaluating the hydolysate correctly.
Carolyn motioned to approve the minutes with the above changes. Seconded by Mary, the
motion passed without dissent. MaryAnn abstained.
Verizon Monopole – Wade introduced representatives from Verizon Wireless and briefly
explained that there have been discussions regarding a site on the IAWWTF property to place a
cellular monopole.
Kathy Pomponio introduced herself as project manager, and Jarod Lusk as Verizon’s attorney.
Kathy gave a brief background on discussions that have previously been held with the City of
Ithaca. Ken Cowley has done most of the research for finding a suitable location.
Ken passed out a conceptual plan put together on the recommendation of the Board of Public
Works and stated that he and Erik Whitney walked around the facility and came up with a
location that would best suit all parties involved. Verizon is proposing a 120 foot monopole.
It was noted that we are slated for a coal tar clean-up in 2010 that could affect the construction
process.
1
Herb asked who would be served by adding a new tower. Kathy responded that Verizon has
a need to expand its capacity for the entire Ithaca area and is looking for multiple sites to attain
that goal.
Carolyn asked about future expansion of the plant and how that would be affected by a
tower. Bill and Dan Ramer explained that there are options available for any future expansion
needs.
Joel asked if other companies (Sprint, AT&T) would be able to use the same tower as
opposed to building their own to expand their capacities. Ken explained that the towers are
designed to serve multiple carriers.
Rich asked why add additional towers as opposed to upgrading computer capacity on the
existing towers. Kathy responded that with cellular technology, there are only a certain number
of channels available. Once those channels are used up, a different facility must be provided to
add more channels (increase capacity).
Scott asked how the tower will be powered. Ken said that they will have to investigate that
further once they know that there is an interest in the project.
Kathy said that the construction time is around 3 months and the Ithaca sites are top priority once
the approval process is completed and a lease agreement has been negotiated.
The discussion was tabled for the next SJC meeting.
Waterfront Trail Resolution – Herb questioned the 20-30 foot placing of the fence. Jeff said
that after walking the site, it does not seem to be an issue. He also noted that the width of the
permanent easement is not mentioned in the resolution.
Herb proposed adding a 16’ permanent easement to the language in the RESOLVED (paragraph
8) portion of the resolution.
Bill noted that Tim must have site control to submit the drawings and get the approvals from
DOT. He proposed that the first RESOLVED state that “the IAWWTP endorses the City’s
proposal in concept to establish” which would give Tim the site control which he needs to
proceed while giving the SJC the ability to change and fine tune the language in the resolution.
Herb made a motion to add as a final RESOLVED:
RESOLVED, that the City will provide a draft of such instrument to the SJC and counsel for the
SJC for review and approval prior to its execution.
Seconded by MaryAnn, the motion passed unanimously.
Energy Reduction – Chris Kalwara, Johnson Controls
Chris updated the Board on the progress of the Energy Reduction study and stated that they have
submitted the grant application to the EFC. He said it was confirmed that the application has
been received by the EFC. The announcement for the grant recipients has been scheduled for
2
June 24, 2009. There is $38M available in the Federal Stimulus package for New York State and
we have requested $6M based on an estimated $6.7M project cost.
The EFC schedule states that contracts must be executed and construction started by January 1,
2010.
Johnson Controls still has to do detailed engineering. They are now requesting authorization to
do the detailed engineering on the items previously identified.
This will entail 3.5 weeks starting Monday, June 15th of detailed engineering on the identified
measures only at a cost of $24,000 which would be applied to the Project Development
Agreement, which will hopefully be acted upon at the July meeting.
The items to be investigated under this authorization to proceed include:
Updating Co-Gens Dissolved Oxygen Controls
Digester Mixer Pump Monitoring Software
Digester Feed Pumps Process Control Improvements
Lighting Facility Management System
Variable Frequency Drives on HV’s Hot Water Pumps
Jeff asked to include the digester covers.
Herb moved to authorize the Notice to Proceed, noting that it may be a risk that is worth taking.
The motion was seconded by Carolyn and approved unanimously with digester covers added.
Carolyn noted Erik’s (E-Mail) letter to elected officials in higher offices regarding this project
and encouraged everyone to do the same.
Financial Report – Steve Thayer
Steve distributed the current financial reports. Septage collection has been slow. All quarterly
payments have been received from the partners. Revenues exceeded expenditures by $469,000.
He said that if anyone has any questions, he will answer them at anytime.
Miscellaneous Plant Improvements is the only active Capital Project as far as expenditures.
The 2010 Budget planning is beginning in July.
Operators Report Summary– Dan Ramer
Kruger is analyzing the Actiflow computer for hardware and/or software problems and we have a
spare at this time.
Auburn Armature is constructing a replacement Actiflow Poly Control Panel.
A series of blockages in the primary scum suction line have been removed and the grease tank
has been cleaned.
3
We have met with Stearns & Wheler to discuss the final design of the septage receiving facility.
We are planning to visit other facilities to learn more about different septage screening
equipment.
A contractor for DEC has inspected the underground fuel tank system and identified three
deficiencies in our current operation. We are in process of rectifying the deficiencies.
Rich asked for elaboration on the identified deficiencies. Dan responded that it was found
that the sump has collected some rain water due to a faulty top cover. This was
immediately corrected the next day. We will need to inspect that once a month. We also
learned that our small tanks must be registered in the facilities quantity. There were no
integrity issues with the tanks.
A contract for the purchase and installation of the Fire Alarm Panel upgrade is currently in the
City Attorney’s office for review.
A second final tank is currently out of service.
One of the control diversion pumps failed and was pulled out by a crane and taken for diagnosis
and repair.
JCI submitted a proposal to EFC for a $6M grant for Facility Improvement Modifications.
Ed Gottlieb continues to pursue the unwanted medicine collection day.
Carolyn asked if this is a county-wide effort based on the location of Triphammer Mall.
Dan replied that the County will be involved and that the site is free and large enough for
such an effort. It will require security and police involvement.
Staff met with Susan Brock regarding Emerson enforcement proceedings.
Dan and Ed G. inspected the NYSEG MGP clean up site.
The Operator/Instrumentation Trainee position is currently posted.
Jim Goodreau, Operator Trainee has passed his Basic Operations course with a score of 99 and
has completed the Basic Laboratory course at SUNY Morrisville.
We have given tours to approximately 120 people during the month of May.
The Doppler Current Profiler has been deployed in the Cayuga Lake Inlet between Cass Park and
the Golf Course.
Septage Received YTD = 1.1M gallons
Grease received YTD = 0.1M gallons
Carolyn noted that she was pleased that Jose’s presentation was well prepared to respond
to the Ithaca Journal’s article on Cornell and Lake Source Cooling.
4
5
Engineering Report Summary – Scott Gibson
Phosphorous Removal – Nothing new to report regarding Crane Hogan’s claims.
Head-works Loading Study – Round 1 of the study results has been prepared by the laboratory
and should be issued this week. We are awaiting the quality control and evaluation report.
Jimmie Joe Carl should be invited to the July meeting to give a short presentation on the results.
Cornell Hydrolysate Resolution – Pat Leary
The current draft includes:
#4 will require a full characterization of the waste from Cornell prior to disposal
#8 this version includes the condition of the results of the Maximum Allowable Head-works
Loading study. If we wait for these results, the final resolution will have this condition taken
out.
The final WHEREAS also references the results of the HW Loading study.
It was agreed to leave the resolution as is for now.
On the Findings Statement that was received from Susan Brock, there is a change on the second
to last page which deletes references to the phenols. Phenols will be included with any other
pollutant and not mentioned specifically.
Also, the mention of incineration from the old Findings Statement has been stricken.
Pat noted that the name of the Chief Operator should be changed.
Wade noted that he would like to be prepared to vote on this in August.
On a motion, the meeting was adjourned.
The next meeting is scheduled for July 8, 2009 at 12:30PM.