HomeMy WebLinkAboutStone Quarry Apartments - PlumbingPLUMBING GENERA_ NOTES
A, DO NOT BASE ROUGH -IN DIMENSIONS ON INFORMATION SHOWN ON THE DRAWINGS. ROUGH -IN DIMENSIONS SHALL BE BASED ON ARCHITECTURAL INTERIOR PLANS, AND
DIMENSIONED MILLWORK AND FIXTURE CATALOG CUTS.
B. THIS CONTRACTOR SHALL PROVIDE ALL NECESSARY PIPING, CONNECTIONS, ACCESSORIES, SUPPORTS, HANGERS, ANCHORS, WIRING AND CONTROLS FOR CO P ETE AND
FUNCTIONAL INSTALLATION OF ALL THE ITEMS PROVIDED.
C. ALL FIXTURES AND EQUIPMENT SHALL BE INSTALLED IN STRICT CONFORMANCE WITH ALL APPLICABLE CODES AND MANUFACTURER'S INSTRUCTIONS AND RECOMMENDATIONS.
D. THE PIPING LAYOUT SHOWN ON THIS DRAWING IS SCHEMATIC IN NATURE. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CAREFULLY COORDINATE IN ORDER TO AVOID
INTERFERENCES WITH THE WORK OF ALL OTHER TRADES. THIS INCLUDES, BUT IS NOT LIMITED TO LIGH FIXTURES, ACCESS HATCHES, HVAC DUCTWORK AND PIPING, ELECTRICAL
CONDUITS, AND ARCHITECTURAL FEATURES. PROVIDE COORDINATION PRIOR TO THE FABRICATION OR INSTALLATION OF ANY WORK,
E ALL WORK SHALL BE PERFORMED IN COMPLIANCE WITH ALL LOCAL, STATEAND FEDERAL CODES. THIS CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED PERMITS,
F. ALL PENETRATIONS THROUGH OUTSIDE OR FOUNDATION WALLS SHALL BE SLEEVED WATERTIGHT.
G. UNLESS OTHERWISE NOTED, PITCH ALL SANITARY PIPING ON THIS DRAWING AS FOLLOWS: PIPING 2" AND SMALLER PITCH ATl/4^PER FOOT. PIPING LARGER THAN Z^ P|T[HATl/8'
PER FOOT.
H. ALL PENETRATIONS THROUGH FIRE RATED ASSEMBLIES SHALL BE FIRESTOPPED,
i
DUE TO THE SMALL SCALE OE THESE DRAWINGS IT IS NOT POSSIBLE TO SHOW ALL OFFSETS, FITTINGS, ETC. THE CONTRACTOR SHALL PROVIDE ALL OFFSETS, CONNECTIONS, FITTINGS,
HANGERS, ANCHORS, SUPPORTS, WIRING, AND ACCESSORIES FOR A COMPLETE, COORDINATED AND OPERATIONAL INSTALLATION.
J. FIELD VERIFY EXACT LOCATION, COMPOSITION AND CONDITION OF ALL SITE PIPING, VALVES AND SYSTE1S AS REQUIRED FOR WORK OF THIS CONTRCT,
K. ANY NECESSARY SHUTDOWNS WILL BE COORDINATED WITH OTHER TRADES,
M. PROVIDE CUTTING, CORING AND PATCHING OF ALL WALLS, CEILINGS, SLABS AND DECKS AS REQUIRED FOR WORK SHOWN. COORDINATE ALL WORK WITH OWNER AND GENERAL
CONTRACTOR.
AT COMPLETION OF WORK THESE DOCUME S SHALL BE MARKED UP TO PROV DE RECORD DOCUMENTS FOR THE BUILDING OWNER AND/OR TENANT.
0. ALL HORIZONTAL RUNS OF RADON PIPING SHALL BE SLOPED TO DRAIN CONDENSATE BACK TO SUBDRAIN,
ALL EXPOSED OR VISIBLE INTERIOR RADON VENT PIPE SHALL BE IDENTIFIED WITH AT LEAST ONE LABEL THAT SHALL READ "SUB SLAB DEPRESSURIZATION SYSTEM - DO NOT ALTER OR
DISCONNECT".
PLUMBING SPECIFICATIONS
INCLUDED IN BID ARE: LABORMATERIALS, TOOLS, PLANT, TRANSPORTATION, EQUIPMENT, INSURANCE, TEMPORARY PROTECTION, PERMITS, TAXES, AND ALL NECESSARY
AND RELATED ITEMS REQUIRED TO PROVIDE COMPLETE AND OPERATIONAL SYSTEMS SHOWN AND DESCRIBED,
2 P.C. SHALL PROVIDE ALL REQUIRED SUPPORTS, HANGERS, STRUCTURAL BRACES AND SUPPORTS, FIRE- STOPPING, FLASHING, SEALING AND PATCHING FOR ALL WORK
]
P.C. SHALL PROVIDE WORK IN COMPLIANCE WITH ALL NEW YORK STATE CODES, LOCAL CODES AND ORDINANCES, AND FEDERAL REGULATIONS,
4 P.C. SHALL PROVIDE ALL REQUIRED PERMITS AND INSPECTIONS.
5 P.C. SHALL PROVIDE FIRE STOPPING FOR ALL PENETRATIONS THROUGH FLOORS, WALLS AND ALL OTHER RELATED ASSEMBLIES, PROVIDE FIRE STOPPING SYSTEMS IN
ACCORDANCE WITH ASTM E814,
O AT COMPLETION, P.C. SHALL PROVIDE OPERATIONS AND MAINTENANCE (0 & MI MANUALS FOR ALL EQUIPMENT PROVIDED. OWNER WILL RECEIVE ALL SHOP AND
FABRICATION DRAWINGS GENERATED DURING CONSTRUCTION.
9 ALL DOMESTIC WATER PIPING DOWNSTREAM OF RPZ SHALL BE TYPE L COPPER TUBE WITH PRESSURE PATTERN FITTINGS AND LEAD-FREE SOLDER OR CRIMP STYLE
(PROPRESS) CONNECTIONS. REFER TO FINAL APPROVED BACKFLOW PLAN FOR PIPE SIZES AND MATEPIALS REGARDING PIPING UPSTREAM OF RPZ.
10 ALL STORM, SANITARY, AND VENT PIPING BELOW GROUND SHALL BE SERVICE WEIGHT CAST IRON PIPE WITH DWV PATTERN CAST IRON FITTINGS AND PUSH -JOINT BELL
AND SPIGOT CONNECTIONS. ALL STORM, SANITARY, AND VENT PIPING ABOVE GROUND SHALL BE DWV PVC PIPE WITH DWV PATTERN PVC FITTINGS AND
SOLVENT -WELDED CONNECTIONS.
11 BALL VALVES SHALL BE PROVIDED ON ALL DOMESTIC WATER PIPING BRANCH MAINS, MAKE: WATTS FBV-3, SHUTOFF VALVES SHALL BE PROVIDED AT EVERY PLUMBING
FIXTURE.
12 P.C. SHALL PROVIDE ACRYLIC WRAP AROUND PIPE LABELS (NOT ADHESIVE TYPE) FOR ALL PIPING AT 20-0"INTERVALS. ALL LABELS SHALL HAVE DIRECTIONAL FLOW
ARROWS AND SHALL BE INSTALLED ON BARE PIPE (WHEN PIPE IS NOT INSULATED) OR ON OUTSIDE OF INSULATED PIPING. MAKE: SETONCALPICO OR EQUAL. PROVIDE
LABEUNGFORALLRP|mG|NSTALL[DONPROJECT.ON2D''U^[ENTERS.
13 P.C. SHALL INSULATE ALL DOMESTIC HOT AND COLD WAT&R PIPING AND ALL CHILLED INDIRECT WASTE PIPING NOT CONCEALED IN INSULATED CAVITIES WITH 4 LB.
DENSITY FIBERGLASS AND ALL SERVICE JACKETS. ALL INSULATION SHALL HAVE A FLAME SPREAD RATING OF 25 OR LESS AND A SMOKE DEVELOPED RATING OF 50.
INSULATE ALL FITTINGS, VALVE BODIES AND AROUND ALL HANGERS.
14 INSULATION THICKNESSES AS FOLLOWS:
A. DOMESTIC COLD, 2^AND SMALLER 1/2" THICK, >2" 1" THICK
O. DOME3T|CHOTvvATER4NDRE[|RCULAT|DN.11/Z^ANDSMALLER l^THICK, >l l/Z^ ll/2'THICK
C. HORIZONTAL STORM PIPING 1/2" THICK.
D. ALL HOT WATER PIPING NOT IN PARTITIONS SHALL BE INSULATED TO AN R4 LEVEL.
15 P.C. SHALL TEST ALL DOMESTIC WATER PIPING AT 125 PSI HYDROSTATIC FOR TWO HOURS.
16 P.C. SHALL TEST ALL SANITARY, WASTE, STORM, VENT, AND INDIRECT WASTE PIPING WITH 10 FEET OF HEAD OF WATER ABOVE HIGHEST POINT OF EACH SYSTEM.
17 NATURAL GAS PIPING SHALL BE A53 T&C SCHEDULE 40 STEEL, WITH MATCHING MALLEABLE IRON FITTINGS. WHERE ROUTING PIPE HORIZONTALLY WOULD ENCOUNTER
SIGNIFICANT AMOUNTS OF STRUCTURAL MEMBERS PIPING SHALL BE APPROPRIATELY SIZED AND PROPERLY INSTALLED CSST PIPING WITH MATCHING FITTINGS.
18 RADON PIPING UNDER SLAB SHALL BE CHARLOTTE PIPE AND FOUNDRY ASTM D 2729 DOUBLE PERFORATED PVC PIPE WITH MATCHING FITTINGS. RADON PIPING ABOVE
SLAB SHALL BE CHARLOTTE PIPE AND FOUNDRY SCHEDULE 40 SOLID CORE DWV PVC WITH MATCHING FITTINGS. ALL JOINTS SHALL BE SOLVENT WELDED WITH LOW
VOC CLEANER/PRIMER AND CEMENT. PERFORATED PIPE SHALL BE LAYED IN THE GRANULAR FILL LAYER BELOW THE SLAB/GEOFOAM. REFER TO STRUCTURAL DRAWINGS
FOR DETAILS AND SLAB SEALING PROCEDURES,
PLLMBING MB|KJG F|X7-||RE EXECUTION
I
SCOPE AND MANUFACTURERS
A. MANUFACTURERS CATALOG NUMBERS ARE USED AS ILLUSTRATIONS. USE MANUFACTURERS AS INDICATED, UNLESS APPROVED BY OWNER,
2 INSTALLATION AND CARE
A. MANUFACTURERS INSTRUCTION SHALL BE FOLLOWED IN PREPARING FOR THE FIXTURE INSTALLATION. ALL ROUGHING FOR EQUIPMENT, SINKS, ETC. IS TO BE
CENTERED,
B. SEAL FIXTURES IN CONTACT WITH WALL, FLOORS AND COUNTERS USING A SANITARY TYPE, ONE PART MILDEW RESISTANT SILICONE CAULK, COLOR TO MATCH*
C. ALL FIXTURES SHALL BE PROPERLY DRAINED, VENTED AND SUPPLIED WITH COLD AND/OR HOT WATER AS REQUIRED ACCORDING TO THE LOCAL CODE.
D. AT COMPLETION OF WORK, CLEAN OUT ALL FIXTURES AND METAL WORK AND LEAVE IN POLISHED CONDITION,
COORDINATE ALL PLUMBING FIXTURE MOUNTING HEIGHTS WITH ARCHITECTURAL INTERIOR ELEVATIONS,
��
�
�
��
PLUMBING FIXTURE AND EQUIPMENT SPECIFICATIONS
DESIGNATION:
DESCRIPTION:
M�.COLD 8Z�
MIN.HOT3UPPLY
MIN.VENT�|ZE
MIN.DRAIN SIZE:
3|Z2
Lochinvar
Iw64NlZ5PM
Armor Wall Mounted Water Heater (x2). Units supp ied as packaged sys e ncluding a
Circulation Pumps to be Energy Star rated.
circulation pumps and con ro s.
BATHTUB ADAPTABLE, CLARION BATHWARE #MP7911L(R) ONE-PIECE FIBERGLASS
TUB AND SHOWER ENCLOSURE EQUIPPED WITH MOEN #8346 ADA COMPLIANT
BT -A SHOWER FAUCET HANDHELD SHOWER FLEXIBLE HOSE AND SLIDE BAR ALL UNITS
TO INCLUDE FACTORY INSTALLED REINFORCEMENT, SHOWER HEAD TO BE 1.75
GPM.
l/Z^
I/2^
Il/Z^
ll/Z^
GRADE,CLEANOUT TO�LEAN0UTF|TT|NGvV|TH8^0�|N|'MANH0LE|N3TALLED�T
COTG
GRADE.
-
12800I'2
Radon Pressure Alarm. Calibrated to trip at less than .25 InWc vacuum,
ay R. Smith 5010
M .[o*
DECK PLATE [LEANOU�SIOUX CHIEF ^�N|5HL|NEO3ZSERIES ov|THROUND
Dp[O -
N�KEL�RONZETOP
|
�
HPI90
� '
DS -A
OVERFLOW DOWNSPOUT CLOSURE ASSEMBLY, ZURN #Z199 -DC. MOUNT AT 18"
ABOVE FINISH GRADE, COORDINATE INSTALLATION WITH ARCHITECTURAL
ELEMENTS.
R E Williams
I GRRC'40
4"
BACKFLOW PREVEmTERINDIRECT WASTE FLAP vALvE.AGR|'DRAiNFGSER|B0R
DS -B | EQUAL.'
SP -A
Liberty Pumps, Inc
6''�
FLOOR DRAIN, SIOUX CHIEF "FINISH LINE" 832 SERIES WITH ROUND NICKEL BRONZE
FD -A STRAINER, EQUIP EACH DRAIN WITH PROSET SYSTEMS # TG-34SC WATERLESS TRAP
SEAL MAINTENANCE DEVICE.
WALL PLATE CLEAN OUT
-
2"
2"
WOOD DECK FLOOR DRAIN, SIOUX CHIEF "HALO" 822 SERIES DRAIN WITH INTEGRAL
FD -B FLASHING FLANGE AND WITH PROSET SYSTEMS # TG-34SC WAERLESS TRAP SEAL
MAINTENANCE DEVICE.
|
- -
2"
2"
KS -A
KITCHEN SINK - NON ADA ACCESSIBLE. ELKAY #LR3322-4 DOUBLE BOWL STAINLESS
.STEELDAOP'|NS|mKEOU|PPEDvV|THETERN|TY#33384FAVCET BASKET
' '
CHROME PLATED SHUTOFF VALVES, CHROME PLATED 3UPPL\'RISER TUBES, END
OUTLET WASTE, AND PVC P -TRAP ASSEMBLY. AERATOR TO BE 1.0 GPM.
|
/ I/2^
l/Z^
I l/Z^
l l/Z^
KS -B
KITCHEN SINK ADA ACCESSIBLE, ELKAY #LR3322-4 DOUBLE BOWL STAINLESS
STEEL DROP IN SINK EQUIPPED WITH ETERNITY #33384 FAUCET BASKET STRAINER
CHROME PLATED SHUTOFF VALVES, CHROME PLATED SUPPLY RISER TUBES, END
OUTLET WASTE, PVC P -TRAP ASSEMBLY, AND TRAP INSULATION KIT. INSTALL PER
ADA REQUIREMENTS, AERATOR TO BE 1.0 GPM.
| 1/2"
1/2"
1 1/2"
1 1/2"
LAV -A
LAVATORY NON ADA ACCESSIBLE, SOLID SURFACE TOP WITH INTEGRAL BOWL AND
OVERFLOW (BY OTHERS) EQUIPPED WITH CLEVELAND FAUCET #[A477l1LFAU[E�
POP-UP ASSEMBLY, CHROME PLATED SHUTOFF VALVES, CHROME PLATED SUPPLY
RISER TUBES, AND PVC P -TRAP ASSEMBLY. AERATOR TO BE .5 GPM,
�
I/2^
|
l/Z^
I I/2^
1 I/Z^
LAv'B
LAVATORY ADA ACCESSIBLE, SOLID SURFACE TOP WITH INTEGRAL BOWL AND
OVERFLOW (BY OTHERS) EQUIPPED W'TH CLEVELAND FAUCET #CA47713L FAUCET,
POP UP ASSEMBLY CHROME PLATED SHUTOFF VALVES CHROME PLATED SUPPLY
RISER TUBES, PVC P -TRAP ASSEMBLY, AND TRAP INSULATION KIT, INSTALL PER ADA
REQUIREMENTS. AERATOR TO BE .5 GPM.
l/Z^
1/2^
11/2^
1I/2^
LAV -C
LAVATORY ADA ACCESSIBLE,
WITH CLEVELAND FAUCET #CN47713L FAUCET, POP-UP ASSEMBLY, CHROME
PLATED SHUTOFF VALVES, CHROME PLi.'JED SUPPLY RISER TUBES, PVC P -TRAP
ASSEMBLY AND TRAP INSULATION KIT INSTALL PER ADA REQUIREMENTS AERATOR
TO8E�5GPM�
1/2^
|
1/2"
II/Z^
1 1/2"
/
U'A
INTERCEPTOR,IN-FLOOR LINT vVA��#U-Ol0 COORDINATEvv|TH
�INSTALLATION-
FINISH FLOOR HEIGHT AND SET FLUSH WITH FINAL FLOORING MATERIAL HEIGHT.
]^
MOP SERVICE SINK, EL. MUSTEE #63 WITH CHICAGO FAUCETS #897 -RCF TWO
MSS -A HANDLE FAUCET, PAIL HOOK, MOP HANGER, EXTENSION HOSE, VINYL BUMPER 1/2"
UARDS, AND STAINLESS STEEL WALL GUARDS.
1/2"
Z"
3"
PRIMARY ROOF DRAINWATTS |
FLANGE,
AND UNDEnDECKCLAMP. COORDINATE WITH ROOFING CONTRACTOR. / |
3"
OVERFLOW ROOF DRAIN, WATTS #RD -103W WITH INTEGRAL 4" HIGH INTERNAL
RD -B STANDPIPE AND INTEGRAL DOME STRAINER. COORDINATE INSTALLATION WITH
ROOFING CONTRACTOR.
3"
ROOF HYDRANT, vVOODFORDMANUFACTURING #3RH'M5FREEZEL SS ROOF
RH-A HYDRANT WITH INTEGRAL ROOF SUPPORT AUTO DRAIN AND DOUBLE CHECK
VALVE
|
3/4^
- .
`
/
| SHOWER ADA ACCESSIBLE, Cu\R|DN8ATHvVARE#MP6]]3BF]4ONE-PIECE
F|�ERGLA35HOw/EREN[—'—REvNl��DA'CO�PL|ANT�EAT.[OLLA�� E
�
SH -A THRESHOLD, AND GRAB BARS, EQUIPPED WITH MOEN #8346 ADA COMPLIANT
SHOWER FAUCET HANDHELD SHOWER FLEXIBLE HOSE AND SLIDE BAR INSTALL
PER ADA GUIDELINES. SHOWERHEAD TO BE 1.75 GPM.
| 1/2"
|
1/2"
2"
�
2"
WC-AWATER CLOSET NON ADA ACCESSIBLE, MANSFIELD ^ALrO^(BOWL #4z]O.
vVC'A TANK #]1Z1) ROUND BOWL 1286pFVITREOUS CHINA TOILET WITH SEAT &COVER,
CHROME SHUTOFF VALVE, CHROME SUPPLY RISER TUBE, WAX RING, AND BOLT SET,
|
l/Z^
Z^
3^
WATER CLO5ET ADA ACCESSIBLE, MANSFIELD ^ALTO^(BOWL #4I]7.TANK #3l21)
ADA -COMPLIANT HEIGHT ELONGATED BOWL ]LZ8GPFNTREOU3CHINA TOILET
vvC'B 1/2"
WITH SEAT & COVER, CHROME SHUTOFF VALVE, CHROME SUPPLY RISER TUBE, WAX
| 1 RING, AND BOLT SET.
2"
|
3"
|
WH -A
WALLHYDRANT,mxJODFORD�ANUFA[TUR|NG�ODEL#55[AUTOM��C
—| 3/4"
DRAINING FREEZELESSWALL HYDRANT WITH LOOSE KEY STYLE CONTROL. |
|
''
/
| WASHING MACHINE F|TT|NG' SIOUX CHIEF ^OX'BOX,696 SERIES WITH DUAL
vMF'A 1/2^
1 SHUTOFF VALVES, 3/4" MALE HOSE OUTLETS, AND 2" WASTE RECEPTOR.
1/2"
2"
2"
m°—murr 'grupprIpmp
PLUMBIN - FOU|P���-,TS[HEOULE �~~
~ ��m��
,millimilliiii
Tag
Manufacturer
ode |
Description
Dw/H'A
Lochinvar
Iw64NlZ5PM
Armor Wall Mounted Water Heater (x2). Units supp ied as packaged sys e ncluding a
Circulation Pumps to be Energy Star rated.
circulation pumps and con ro s.
I DVVH'8
State Industries
IGSO-4O'YBPDT
40 gallon direct vent, sealed combustion water hea er.
I Double Check Detector Backflow Assembly
RA
RadonAway
12800I'2
Radon Pressure Alarm. Calibrated to trip at less than .25 InWc vacuum,
ay R. Smith 5010
M .[o*
1RF-A
Fantech
HPI90
Vertical Inline Radon Ventilation Fan. I2OVA[.l0'89.gWatts.
NATURAL GAS PIPING (G)
RVC
R E Williams
I GRRC'40
Schedule 40 PVC Radon Vent Cap. Paint to match roof finish color,
VTR
SP -A
Liberty Pumps, Inc
ELV280
1/2 HP Submersible sump pump with integral oil monitoring and alarming system.
WALL PLATE CLEAN OUT
ST -A
Lochinvar
RJS80
Vertical Round Jacketed Glass Lined Tanks
�� ��
'TMV'4
Powers
LPMM432'I
HYDROGUARD XP Hi/Lo Master Tempering Valve
2"
|XT'A
Amtrol
ST -12-C
Thermal expansion tankfor domestic hot water system
1 0
LINETYPE LEGEND
SYMBOL
PIPE ACCESSORY SCHEDULE
0— s—
COLD WATER PIPING (C)
I
Tag
Manufacturer Model
—cc--
Size Description
HOT WATER RETURN PIPING (HWR)
P -TRAP
DCDA
VENT PIPING (V}
WATTS 757DCDA-BFG
4"
I Double Check Detector Backflow Assembly
COMBINATION SEWER PIPING (COMB)
FLOOR SINK
HA
|
OVERFLOW STORM PIPING (OF)
ay R. Smith 5010
M .[o*
l^
RADON VENT PIPING (RADON)
1Hydrotm| water hammer arrester
N
NATURAL GAS PIPING (G)
PS
PLUMBING CONTRACTOR
INDIRECT WASTE PIPING (1W)
2"
VTR
WATER METER STRAINER, AS PRESCRIBED BY WATER PURVEYOR
--+~~---
WATER CLOSET
RPZ
WALL PLATE CLEAN OUT
WATTS ILF009'OSY
2 I/Z'
Reduced »ressupeZpne Backflow Assembly
�� ��
INSTALLATION KEYNOTE
VVM'l
POINT OF DISCONNECTION
-
2"
MUNICIPAL WATER ME iER, AS PRESCRIBED BY WATER PURJEYOR
I -2
BADGER M55
"
PRIVATE WATER METER TO BE READ BY OWNER TO RECORD TOWNHOUSE BUILDING
ATER CONSU
PTION
1 0
LINETYPE LEGEND
SYMBOL
DESCRIPTION
0— s—
COLD WATER PIPING (C)
—
DROP CONNECTION
HOT WATER PIPING (H)
—cc--
ROLL DOWN
HOT WATER RETURN PIPING (HWR)
P -TRAP
—————
VENT PIPING (V}
—]
SANITARY OR WASTE PIPING
(SAN or WI
+|+
COMBINATION SEWER PIPING (COMB)
FLOOR SINK
FLOOR DRAIN (FD)
OVERFLOW STORM PIPING (OF)
HOSE BIBB
LAVATORY
RADON VENT PIPING (RADON)
SHUT OFF VALVE
N
NATURAL GAS PIPING (G)
PC
PLUMBING CONTRACTOR
INDIRECT WASTE PIPING (1W)
SINK
VTR
DIRECTION OF FLOW
--+~~---
WATER CLOSET
EXISTING PIPING
WALL PLATE CLEAN OUT
PIPING TO BE REMOVED
PIPING SYMBOLS
SYMBOL
DESCRIPTION
0— s—
ELBOW UP, ELBOW DOWN
—
DROP CONNECTION
E[
—cc--
ROLL DOWN
cc--
P -TRAP
11
CLEANOUT (CO)
—]
CAPORPLUG
+|+
UNION
FLOOR SINK
FLOOR DRAIN (FD)
F-3
HOSE BIBB
LAVATORY
i Nii
SHUT OFF VALVE
N
CHECK VALVE
ABBREVIATIONS AND TAGS
SYMBOL
DESCRIPTION
AFF
ABOVE FINISHED FLOOR
(B
EXISTING
E[
ELECTRICAL CONTRACTOR
ERL
EXISTING TO RELOCATE
ETR
EXISTING TO REMAIN
FD
FLOOR DRAIN
FPC
F RE PROTECTION CONTRACTOR
FS
FLOOR SINK
GC
GENERAL CONTRACTOR
LAV
LAVATORY
MC
MECHANICAL CONTRACTOR
NTS
NOT TOSCALE
PC
PLUMBING CONTRACTOR
SK
SINK
VTR
VENT THROUGH ROOF
WC
WATER CLOSET
WPCO
WALL PLATE CLEAN OUT
REMOVALKEvNOTE
�� ��
INSTALLATION KEYNOTE
N
POINT OF DISCONNECTION
POINT OF CONNECTION
LECESSEOonabucnon
Di!ve
VISUALketmcta
FIDEL�|[l�||7�Ny�T�'T��|���T/~[�NT� CONTAINS U�\/
ITY / / /v�� / �—, THIS //./ DRAWING SET �.~^/v /r�//v./ �~���_��� �� xv �— /
���|���|NT�NT��RT/�����INTERPRETATION. IF THIS |Nj�����T|���/—�0�R
IN����N[l������������ ��0������NT��T�,��KJ���Vy�����0|�A| |N� �T
MONOCHROME .�- OR GRAYSCALE PLEASE CONTACT r��. / /�uv/v�-�� / / /�-�./ m/v/�.���_ //v�.. r�/
T���NU������T�����/�Q�/-��|/��[3C�|NT�[���T
// /�- NUMBER LISTED TO THE RIGHT FOR //n/n/�-�/.��-/.
Architecture
��n nxu�����U Ure
Planning
Interior Design
��~~~:�^^
217 North Aurora Street
Ithaca NY 14850
p 607.273.7600 f 607.273.0475
*4i.c.otmittA NcomEltDAsitITI
w*z4ni-sw��out m.O*1...4,mkt Vs.6h
//COWORTSTR5E'
ROCHESTER, NEW YORK 14620
565-232-2600
ESE DOCUMENTS AND AU. IDEAS, ARRANGEMENT.
DE5IGNS AND PLANS INDICATED THEREON OR
PRESENTED THEREBY ARE OWNED AND REMAJN THE
PROPERTY OF KENNEDY MECHANICAL INC. AND NO PART
THEP,EOF SHALL BE UTILIZED F3Y ANY PERSON, FIRM, OR
CORPORATION FOR. ANy PURPOSE WHATSOEVER EXCEF'T
v�v�eSPECIFIC WRITTEN PERMISSION urKENNEDY
CH ICAL INC. ALL RIGHTS RESERVED
Baumer Mechanical Design Service
625 Panorama Trail, Building 2, Suite 210
Rochester, NY 14625
585-313-5819
WARNING: It is a violation of
New York State Law for any
person, less actinunder the
direction of a licensed Architect,
to alter this document in any way.
If a document bearing the seal of
an Arhitect is altered, the
altering Architect shall affix to
such document his seal and the
notation altered by followed by
his , the date of such
alteration, and a specific
description of the alteration.
REVISION SCHEDULE
NAME
DATE
15 AUG 2014 �=
OWNER
CHANGES
11 SEP 2014
STONE QUARRY APARTMENTS
Lu
0
F -
DATE:
7/18/2014
PROJECT:
2012059
OTHER:
DRAWN BY:
TB
PLUMBING
-
GENERAL NOTES,
,
EGEND
,
SCHEDULES
�������
�~~K�K0 U
�
u�
�
��
�
��
6 / 7
�
��
9 ' 10
2
4
ISOMETRIC VIEW - TYPICAL TOWNHOME P
N.T.S.
U BING
WC -if 2C
A
5
6 7
8
9
10
1/2'C 1/2'H
KS -A
1/2"H
1/2"C
1/2T
1/2'H
1/2'C
1/2' H
1(2 C
1/2"H
3/4H
3/4C
1'C
•3/4"H
KS -A
SUPPLY PIPING
CONTINUED IN
2ND FLOOR CEILING
- REFER TO P102
112'Z
1/2"C.
1/2"C
WC -A
•1/2"C
•1,/2"
•1/2T.
•1/2"
1/2T
ISOMETRIC VIEW - TYPICAL APARTMENT UNIT DOMESTIC WATER DISTRIBUTION
N.T.S.
GENERAL ISOMETRIC VIEW NOTES: THESE VIEWS REPRESENT TYPICAL
CONDITIONS IN THE PROJECT. WHILE FIXTURE LOCATION MAY VARY
THROUGH THE BUILDING, PIPE SIZES INDICATED SHALL BE MAINTAINED.
VENT PIPING
CONTINUED IN ATTIC
- REFER TO P104
SANITARY PIPING
CONTINUED UNDERSLAB
- REFER TO P100
WC -A
SAN
ISOMETRIC VIEW - TYPICAL APART
N.T.S.
ENT UNIT SANITARY DRAINAGE
LEGESSE Ceiiinetriterairerin
715 iiihruway iffCkffr.
West Henrietta, intrialiii388
..1.1K4.17.1,44.41%3 "
•
Architecture
Planning
Interior Design
217 North Aurora Street
Ithaca NY 14850
p 607.273.7600 f 607.273.0475
KENNEDY
met,NANCCAt CONI1AC
q,42 #.0t1.,f
11 COMFORT STREET
ROCHESTER, NEW YORK 14620
565-232-2600
ESE DOCUMENTS AND All IDEAS, ARRANGEMENT,
DESIGNS AND PLANS INDICATED THEREON OR
PRESENTED THEREBY ARE OWNED AND REMAIN THE
PROPERTY OF KENNEDY MECHANICAL INC. AND NO PART
EREOP SHALL BE UTILIZED BY ANY PERSON, FIRM, OR
CORPORATION FOR, ANY PURPOSE WHATSOEVER EXCEPT
WITH THE SPECIFIC WRITTEN PERMISSION OF KENNEDY
MECHANICAL INC. AU. RIGHTS RESERVED
Baumer Mechanical Design Services
625 Panorama Trail, Building 2, Suite 210
Rochester, NY 14625
585-313-5819
WARNING: It is a violation of
New York State Law for any
person, unless acting under the
direction of a licensed Architect,
to alter this document in any way.
If a document bearing the seal of
an Architect is altered, the
altering Architect shall affix to
such document his seal and the
notation "altered by" followed by
his signature, the date of such
alteration, and a specific
description of the alteration.
REVISION SCHEDULE
NAME
DATE
STONE QUARRY APARTMENTS
STONE QUARRY APARTMENTS, L
DATE:
7/18/2014
PROJECT:
2012059
OTHER:
DRAWN BY:
TB
ISOMETRIC
VIEWS -
PLUMBING
P106
2
4 5
6 7
8
9
10
4 10:22:56
�
��
�
��
�
��
��
«
�
��
DS
-A
ED -A
1m=
oro
orr
cDW
zmz
2 1/2"C
"-1
�
PRPZ
DItt
METER BYPASS
LOOP VALVES
(IF REQUIRED BY
WATER
PURVEYOR)
SECTION AT DOMESTIC WATER SERVICE
GENERAL NOTE
BACKFLOW PREVENTERS TO BE
INSTALLED PER DRAWINGS AS
SUBMITTED AND APPROVED BY WATER
PURVEYOR AND THE DEPARTMENT OF
HEALTH. THIS VIEW IS FOR REFERENCE
ONLY.
FIRST FLOOR
399'-6"
1/4" = 1'-0"
441
�m
3/4"C
A
WH -A
2"SA,
SP-
ENLARGE PARTIAL APARTMENT BLDG. FIRST FLOOR PLAN - PLUMBING
2' DS
mo
0
=�=_�
.4_'__
4"STmn
1/4" = 11-0"
HA 'A
PDI "E" SIZE HAMMER ARRESTER 1><21
-REFER TO POD1 FOR MAKE AND MODEL
/2^6TODRYER. PROVIDE
SHUTOFF VALVE, UNION,
DIRT LEG, AND POINT OF
CONNECTION FOR UNIT.
(TYPICAL OF 7)
ors 114
o"C
xS-
SECTION THROUGH LAUNDRY ROOM
COORDINATE LINT INTERCEPTOR AND LAUNDRY
ROOM PIPING WITH STRUCTURAL DRAWINGS
AND GOFOAM, CONTRACTOR,
*SAN
6'11N mw
FIRST FLOOR
399'-8'
3/8"=,1'-0"
SHUTOFF VALVE
UNION, AND DIRT LEG
- INSTALL PER FUEL
GAS CODE (TYPICAL)
2
4
5
6
��
�
PARTIAL ENLARGED FIRST FLOOR PLAN DRAWING NOTES
DROP 4" OVERFLOW STORM TO OVERFLOW DOWNSPOUT. MOUNT DOWNSPOUT 24" ABOVE FINISHED GRADE AND PROVIDE SPLASH BLOCK,
4" O\'ERFLOW STORM UP.
4" STORM UP, 4^STORM DOWN.
]/4^CUP(ROOF HYDRANT SUPPLY).
10
DROP 2" PUMPED WASTE TO SUMP PUMP. PROVIDE CHECK VALVE AND ISOLATION VALVE ON RISE. ROUTE DISCHARGE PIPING OVERHEAD ABOVE CORRIDOR CEILING. COORDINATE SUMP
PUMP INSTALLATION WITH MASONRY CONTRACTOR, ELEVATOR VENDOR, AND ALL APPLICABLE TRADES.
4" SANITARY UP, BRANCH 4" SANITARY TO P -TRAP WITH STANDPIPE WITH INCREASER FUNNEL, RISE 2" VENT. SPILL PUMPED WASTE FROM SUMP PUMP THROUGH 4" AIR GAP TO FUNNEL
ON STANDPIPE.
7 2^VENT DOWN.
8 2" SANITARY DOWN,
9 Z^SANITARY UP.
10 Z^VENT DOWN.
11 DROP I/Z^H&C.Z^WASTE DOWN, Z^VENT RISE TO SINK, ROUTE PIPING FROM RISERS TO SINK THROUGH WALL.
12 3/4^GUP.
13 2" SANITARY WITH P -TRAP UP.
14 ]^ SANITARY UP, ]'' SANITARY DOWN.
15 ]^ SANITARY UP.
16 DROP 1 1/4" G TO (2) WATER HEATERS. BRANCH 3/4" G TO EACH UNIT AND PROVIDE SHUTOFF VALVE, UNION, DIRT LEG, AND FINAL CONNECTION TO UNIT.
17 DROP 3/4" G TO FURNACE. PROVIDE SHUTOFF VALVE, UNION, DIRT LEG, AND FINAL CONNECTION TO UNIT.
18 2 1/2^[.2' H, AND 3/4" HWR UP.
19 REFER TO WATER HEATER SCHEMATIC THIS PAGE FOR WATER HEATER PIPING.
20 DROP 1/2" H&C, 2" WASTE DOWN, AND 2" VENT RISE TO LAVATORY. BRANCH 1/2" C IN WALL TO ADJACENT WATER CLOSET.
21 DROP 1/2 C, 4" WASTE DOWN TO WATER CLOSET.
22 DROP 1/2H&C'Z^WASTE DOWN, AND Z^VENT RISE TOSINK.
23 3" COMBUSTION AIR INTAKE AND EXHAUST UP IN WALL REFER TO MECHANICAL DRAWINGS FOR ROUTING.
EXPANSION TANK (XT A)
RECIRC. PUMP
CW
101
G
GAS SUPPLY
RECIRC. PUMP
+
�
6 I
8
� 1
WATER HEATER (D H -A)
WATER HEATER(DWH+A)
WATER HEATER SCHEMATIC
1/2" =
RECIRC. PUMP
TEMP. GAUGE
B.V.
CHK. V.
MIXING VALVE (TMV-A)
STORAGE TANK IST -A)
CW
1 1/2"
CW SUPPLY
110° HW
CIRCUIT SETTER
— 2"
— 1"
(
)
llO°HNR
I
0onm��o8on
YVem1Henria�8,HY1�S8�
GENERAL NOTES
-INSTALL ALL EQUIPMENT PER MANUFACTURERS STRICT INSTRUCTIONS,
-MAINTAIN EQUIDISTANT PIPING LENGTHS AT WATER HEATERS FOR
BALANCED OPERATION.
FIN. FLOOR
lett
14
f-n�s�/o�on
Architecture
Planning
Interior Design
", .~.�. ..~.
217 North Aurora Street
Ithaca NY 14850
p 607.273.7600 f 607.273.0475
il!!!4!!!i444ii!;!414!!'414!!!!?,11414i!
Ai
// COMFORT STREET
ROCHESTER, NEW YORK /4620
555-232-2
THESE DOCUMENTS AND AU_ IDEAS, ARRANGEMENT,
DESIGNS AND PLANS INDICATED THEREON OR
PRESENTED THEREBY ARE OWNED AND REMAIN THE
R.OPERTY OF KENNEDY MECHANICAL INC, AND NO PART
THEREOF SHALL BE UTIUZED BY ANY PERSON, FIRM, OR
CORPORATION FOR ANY PURPOSE WHATSOEVER IXCEPT
WITH 17IE SPECIFIC WR,ITTEN PERMISSION OF KENNEDY
MECHANICAL INC. ALL RIGHTS RESERVED
Baumer Mechanical Design Services
625Panorama Trail, Building 2, Suite 210
Rochester, NY 14625
585-313-5819
WARNING: It is a violation of
New YorState Law for any
person, unless acting under the
direction of a licensed Architect,
to alter this document in any way.
If a document bearing the seal of
an Architect is altered, the
altering Architect shall affix to
such document his seal and the
notation "altered by" followed by
his signature, the date of such
alteration, and a specific
description of the alteration.
REVISION SCHEDULE
NAME
DATE
STONE QUARRY APARTMENTS
0
DATE:
7/18/2014
PROJECT:
2012059
OTHER:
DRAWN BY.
JTB
ENLARGED
u_. ��������_��
FLOOR PLAN
SECTIONS AND
ELEVATIONS -
PLUMBING
UMBING
�����8�
�� UK���
V�
A
��
1 0
10
Al I IC/ROOF PLAN DRAWING NOTES
1 2" VENT DOWN.
2 3" VENT DOWN.
3 3" VENT UP THROUGH ROOF. EXTEND VENT 18" ABOVE ROOF SURFACE. COORDINATE FLASHING INSTALLATION WITH ROOFING CONTRACTOR. PAINT RISER TO MATCH ROOF FINISH COLOR.
4 4" RADON VENT DOWN.
4" RADON VENT UP TO RADON FAN. INSTALL FAN PER MANUFACTURER HEIGHT AND CLEARANCE. SECURE PIPE ON RISE WITH RISER CLAMP, THREADED ROD, AND APPROPRIATE FASTENER
TO PREVENT LATERAL MOVEMENT. PROVIDE SUPPORT UNDER AND ABOVE FAN. PROVIDE RADON VENT CAP AT PIPE TERMINUS.
6 3" STORM UP TO ROOF DRAIN. COORDINATE ROOF DRAIN INSTALLATION WITH ROOFING CONTRACTOR AND MECHANICAL EQUIPMENT.
7 3" OVERFLOW STORM UP TO OVERFLOW ROOF DRAIN. COORDINATE OVERFLOW ROOF DRAIN INSTALLATION WITH ROOFING CONTRACTOR AND MECHANICAL EQUIPMENT.
8 4" STORM DOWN.
9 4" OVERFLOW STORM DOWN.
10 3/4"C DOWN FROM FROST -FREE ROOF HYDRANT. COORDINATE INSTALLATION WITH ROOF CONTRACTOR. COORDINATE CHASE HEIGHT TO DECK WITH FRAMING. ENSURE UNDERSIDE OF
ROOF DECK IS INSULATED AND DRAFTSTOPPING IN PLACE.
NOTE: PIPING SHOWN ON THIS PLAN TO BE LOCATED IN ATTIC SPACE BETWEEN ROOF DECK AND THIRD FLOOR CEILING.
DASHED AREA REPRESENTS
MECHANICAL ROOF RECESS
- DRAINAGE AREA = 510 SQ. FT.
- ALL OTHER ROOFS SLOPE
AWAY
APARTMENT BUILDING ROOF PLAN - PLUMBING
1/8" =
5
7
10
Architecture
Planning
Interior Design
217 North Aurora Street
Ithaca NY 14850
p 607.273.7600 f 607.273.0475
ENNEDY
Ae CONtlt$11,1001
/ / COMFORT ST ET
ROCHESTER, NEW YORK 14620
585-232-2800
THESE DOCUMENTS AND ALL IDEAS,ARRANGEMENT,
DESIGNS. AND PLANS INDICATED THEREON OR
PRESENTED THEREBY ARE OWNED AND REMAIN THE
PROPERTY OF KENNEDY MECHANICAL INC. AND NO PART
THEREOF SHALL BE UTILIZED BY ANY PERSON, FIRM, OR
CORPORATION FOR ANY PURPOSE WHATSOEVER EXCEPT
WITH THE SPECIFIC WRITTEN PERMISSION OF KENNEDY
MECHANICAL INC. ALL RIGHTS RESERVED
Baumer Mechanical Design Services
625 Panorama Traii, Building 2, Suite 210
Rochester, NY 14625
585-313-5819
WARNING: It is a violation of
New York State Law for any
person, unless acting under the
direction of a licensed Architect,
to alter this document in any way.
If a document bearing the seal of
an Architect is altered, the
altering Architect shall affix to
such document his seal and the
notation "altered by" followed by
his signature, the date of such
alteration, and a specific
description of the alteration.
REVISION SCHEDULE
NAME
DATE
15 AUG 2014
STONE QUARRY APARTMENTS
U
J
J
RTMENTS
DATE:
7/18/2014
PROJECT:
2012059
OTHER:
DRAWN BY:
TB
APARTMENT
BLDG. ROOF
/ATTIC PLAN -
PLUMBING
P104
B
G
F
1
2
4
5
6 7
8
9
10
APARTMENT BLDG, THIRD FLOOR PLAN - PLUMBING
1/8" =
2
THIRD FLOOR PLAN DRAWING NOTES
DROP 1/2" H&C DOWN. ROUTE WASTE HORIZONTALLY THOUGH WALL TO ADJACENT WASTE STACK VENT RISER.
3" WASTE STACK VENT. 3" WASTE DOWN, 3" VENT UP ABOVE BRANCH CONNECTION. ROUTE PER ALL APPLICABLE WASTE STACK VENT REGULATIONS.
1/2" G DOWN. PROVIDE SHUTOFF VALVE (TIGHT TO WALL), UNION, DIRT LEG, AND FINAL CONNECTION POINT FOR APPLIANCE. COORDINATE LOCATION AND TERMINATION WITH APPLIANCE
MANUFACTURER, MILLWORK DRAWINGS, AND BUILDING OWNER. RANGE MUST BE ABLE TO SIT FLUSH WITH REAR WALL WHEN INSTALLED.
4 DROP 1/2" H&C, 2" WASTE DOWN, 2" VENT RISE TO LAVATORY. RISE 2" VENT ADJACENT TO LAVATORY AND CONNECT TO FIXTURE VENT RISE A 6" ABOVE FIXTURE FLOOD RIM.
S DROP 1/2" C, 3" WASTE DOWN TO WATER CLOSET.
6 DROP 1/2" H&C, 1 1/2" WASTE WITH P -TRAP DOWN TO TUB. VALVE END OF TUB TO BE AWAY FROM ENCLOSED CHASE FOR SERVICE PURPOSES.
7 4" RADON VENT UP, 4" RADON VENT DOWN.
8 DROP 3/4" INDIRECT WASTE FROM FURNACE AND SPILL TO FLOOR DRAIN THROUGH 1 1/2" PHYSICAL AIR GAP. PROVIDE ALL TRAPS AND NEUTRALIZERS PER MECHANICAL EQUIPMENT
MANUFACTURERS INSTRUCTIONS AND ALL APPLICABLE CODES.
1/2" G DOWN. 1/2" G TO FURNACE. PROVIDE SHUTOFF VALVE, UNION, DIRT LEG, AND FINAL CONNECTION TO APPLIANCE IN ACCORDANCE WITH ALL FUEL GAS CODES AND REGULATIONS.
2" WASTE STACK VENT. 2" WASTE DOWN, 2" VENT UP ABOVE BRANCH CONNECTION. ROUTE PER ALL APPLICABLE WASTE STACK VENT REGULATIONS.
3/4" C UP, 3/4" C DOWN (ROOF HYDRANT SUPPLY).
4" OVERFLOW STORM UP, 4" OVERFLOW STORM DOWN.
4" STORM UP, 4" STORM DOWN.
2" VENT UP, 2" VENT DOWN.
(2) 2" VENTS DOWN, (1) 2" VENT UP. CONNECT VENTS TOGETHER AT 42" AFF,
INCREASE VENT BELOW TO 3" BELOW ROOF DECK AND RISE TO 18ABOVE ROOF SURFACE. PAINT VENT RISER TO MATCH ROOF FINISH COLOR.
4" RADON VENT DOWN.
9
10
11
12
13
14
15
16
17
18
INSTALL RF -A NEAR ACCESS HATCH (IN CEILING BELOW). RISE 4" RADON VENT THROUGH FAN, RISE THROUGH ROOF, AND INSTALL RADON VENT CAP AT TERMINUS OF RISER (18" ABOVE
ROOF SURFACE). PAINT RISER AND CAP TO MATCH ROOF FINISH COLOR.
19 CONCENTRIC VENT KIT FOR WATER HEATER COMBUSTION AIR INTAKE AND EXHAUST. REFER TO MECHANICAL PLANS. SIZE PER MANUFACTURERS REQUIREMENTS BASED ON RUN LENGTH
AND EQUIVALENT FITTING LENGTH.
20 PROVIDE DISHWASHER BRANCH TEE INLINE WITH WASTE ABOVE P -TRAP AND PROVIDE SHUTOFF VALVE WITH 3/8" COMPRESSION OUTLET ON HOT WATER SUPPLY FOR DISHWASHER.
21 ROUTE 3/4" CONDENSATE DRAIN FROM DSS (BY OTHERS) TO MECHANICAL RM 332D AND SPILL TO FLOOR DRAIN THROUGH 1 1/2" PHYSICAL AIR GAP.
NOTE: RADON MITIGATION SYSTEM TO BE INSTALLED AT UNITS INDICATED ON P100A.
TYPICAL TOWNHOME ROOF PLAN - PLU BING
1/8" = 1'-0"
10
Architecture
Planning
Interior Design
217 North Aurora Street
Ithaca NY 14850
p 607.273.7600 f 607.273.0475
NNEDY
n 0` ,14021
/ / COMFORT 5T ET
ROCHESTER, NEW YORK /4G20
585-232-2800
THESE
DOCUMENTS AND ALL. IDEAS, ARRANGEMENT,
DESIGNS AND PLANS INDICATED THEREON OR
PRESENTED THEREBY ARE OWNED AND REMAIN THE
RCFPERTY OF KENNEDY MECHANICAL INC. AND NO PART
11EFEOF SHALL BE UTILIZED BY ANY PERSON, FIRM, OR,
;ORPORATION FOR ANY PURPOSE WHATSOEVER EXCEPT
wrni THE SPECIFIC WRITTEN PERMISSION OF KENNEDY
MECHANICAL INC. ALL RIGHTS RESERVED
Baumer Mechanical Design Services
625 Panorama Trail, Building 2, Suite 210
Rochester, NY 14625
585-313-5819
WARNING: It is a violation of
New York State Law for any
person, unless acting under the
direction of a licensed Architect,
to alter this document in any way.
If a document bearing the seal of
an Architect is altered, the
altering Architect shall affix to
such document his seal and the
notation "altered by" followed by
his signature, the date of such
alteration, and a specific
description of the alteration.
REVISION SCHEDULE
NA E
DATE
5 AUG 2014
STONE QUARRY APARTMENTS
RTMENTS
STONE QUA
G
F
E
D
C
DATE:
7/18/2014
PROJECT:
2012059
OTHER:
DRAWN BY:
JTB
APARTMENT
BLDG./TH THIRD
FLOOR AND
ROOF /ATTIC A
PLANS -
PLUMBING
P103
10
2"SAN
691139,6 ROOM
3/4"H
3/4'C
/ 4''NWR
19
l''C
3' SA
2211 11
254
1JViNG/6 ROOM
13/4'H
1/2.'
i 3/4N I
2"SA
3 4"H
112°C
3'SAN
LIVING/ - BOHM
3/4'H
1 1/2' SA,
-A
2236
20091
/4"H
3/4'C
11/2'SAN
LIVING,' 9" ROOM
UMW ROOM
3/4N
•11/4"H
2"SA,
2'SAN
3/4°C
3/4 I
2/RADON
/21°C
/4'C
3126H
3/4'H
9,6,66612
LIVING, 3
02,031
®APARTMENT BLDG. SECOND FLOOR PLAN - PLUMBING
1/8" =
2
SECOND FLOOR PLAN DRAWING NOTES
3/4" G DOWN, 1/2" G UP. BRANCH 1/2" G TO RANGE. PROVIDE SHUTOFF
VALVE (TIGHT TO WALL), UNION, DIRT LEG, AND FINAL CONNECTION POINT
FOR APPLIANCE, COORDINATE LOCATION AND TERMINATION WITH
APPLIANCE MANUFACTURER, MILLWORK DRAWINGS, AND BUILDING OWNER,
RANGE MUST BE ABLE TO SIT FLUSH WITH REAR WALL WHEN :NSTALLED.
3/4" G DOWN, 1/2" G UP, BRANCH 1/2" G TO FURNACE. PROVIDE SHUTOFF
VALVE, UNION, DIRT LEG, AND FINAL CONNECTION TO APPLIANCE IN
ACCORDANCE WITH ALL FUEL GAS CODES AND REGULATIONS,
2" VENT UP, 2" VENT DOWN,
24 3" WASTE STACK VENT UP, 3" WASTE STACK VENT DOWN, BRANCH 1 1/2" TO
ADJACENT KITCHEN SINK, ROUTE WASTE STACK VENT PER ALL APPLICABLE
CODES AND REGULATIONS,
5
6
7
8
9
10
11
12
13
14
15
ROUTE 1/2" HOC AND 1 1/2" SANITARY HORIZONTALLY THROUGH WALL,
1/2" H&C UP TO SINK ON FLOOR ABOVE,
PROVIDE BALANCING STATION CONSISTING OF CHECK VALVE, CIRCUIT
BALANCING VALVE, AND SHUTOFF VALVE, SET CBV FOR .5 GPM.
2" WASTE STACK VENT UP, 2" WASTE STACK DOWN. BRANCH 1 1/2" TO
ADJACENT KITCHEN SINK, ROUTE PER ALL APPLICABLE WASTE STACK VENT
REGULATIONS.
DROP 3/4" INDIRECT WASTE FROM FURNACE AND SPILL TO FLOOR DRAIN
THROUGH 1 1/2" PHYSICAL AIR GAP, PROVIDE ALL TRAPS AND NEUTRALIZERS
PER MECHANICAL EQUIPMENT MANUFACTURERS INSTRUCTIONS AND ALL
APPLICABLE CODES.
1/2" H&C DOWN TO HALF BATH ON FLOOR BELOW,
4" RADON VENT UP, 4" RADON VENT DOWN.
3/4" G UP, 3/4" G DOWN.
3" SAN:TARY UP.
2" SANITARY WITH P -TRAP UP.
1/2" H&C UP, 1/2" H&C DOWN. BRANCH 1/2" H&C TO TUB/SHOWER. DROP 1
1/2" WASTE WITH P--rfRAP DOWN. VALVE END OF TUB TO BE AWAY FROM
ENCLOSED CHASE FOR SERVICE PURPOSES,
16 1/2" C UP, 1/2" C DOWN. BRANCH 1/2" C TO WATER CLOSET, DROP 3" WASTE
DOWN FROM WATER CLOSET.
17 1/2" H&C UP, 1/2" H&C DOWN. BRANCH 1/2" H&C TO LAVATORY DROP 2"
WASTE DOWN AND 2" VENT RISE TO AVATORY
18
19
21
2" SANITARY UP,
3" SANITARY DOWN.
H&C SUPPLIES TO UNIT TOILET ROOMS. REFER TO P106 FOR TYPICAL LINE
SIZING AND DISTRIBUTION.
22 H&C SUPPLIES TO UNIT KITCHENS, REFER TO P106 FOR TYPICAL LINE SIZING
AND DISTRIBUTION.
23 2" SANITARY UP, 2" SANITARY DOWN.
24
25
26
27
28
29
30
SECOND FLOOR PLAN DRAWING NOTES
3/4" C UP, 3/4" C DOWN (ROOF HYDRANT SUPPLY).
4" STORM UP, 4" STORM DOWN.
4" OVERFLOW STORM UP, 4" OVERFLOW STORM DOWN,
2 1/2" C, 2" H, 3/4" HWR DOWN,
DROP 1/2" C, 3" WASTE DOWN TO WATER CLOSET.
DROP 1/2" H&C, 2" WASTE DOWN, AND 2" VENT RISE TO LAVATORY.
DROP 1/2" H&C, 1 1/2" WASTE WITH P -TRAP DOWN TO TUB. VALVE END OF
TUB TO BE AWAY FROM ENCLOSED CHASE FOR SERVICE PURPOSES.
31 ROUTE 1/2" G FROM ADJACENT ROOM TO FURNACE. PROVIDE SHUTOFF
VALVE, UNION, DIRT LEG, AND FINAL CONNECTION TO APPLIANCE IN
ACCORDANCE WITH ALL FUEL GAS CODES AND REGULATIONS.
32
33
34
35
36
1/2" G DOWN.
1" C, 1/2" H DOWN.
3/4" H&C DOWN
1" G DOWN,
PROVIDE DISHWASHER BRANCH TEE INLINE WITH WASTE ABOVE P -TRAP AND
PROVIDE SHUTOFF VALVE WITH 3/8" COMPRESSION OUTLET ON HOT WATER
SUPPLY FOR DISHWASHER.
37 ROUTE 3/4" CONDENSATE DRAIN FROM DSS (BY OTHERS) TO MECHANICAL RM
224E AND SPILL TO FLOOR DRAIN THROUGH 1 1/2" PHYSICAL AIR GAP,
NOTE: ALL TOWNHOME UNITS ARE
TYPICAL OF UNIT TO THE RIGHT
9 .)M 2
20.91°21
1"G
1/2'G
1/2°C
B 913
2013.
NOTE: RADON MITIGATION SYSTEM TO BE INSTALLED AT UNITS INDICATED ON P100A.
®TYPICAL. TOWNHOME SECOND FLOOR PLAN - PLUMBING
1/8" =
2
4
5
6
7
LECIESSE Construcjon
2 Thrs,Na.v arty°
V'Vest Hen netua., y
Architecture
Planning
Interior Design
217 North Aurora Street
Ithaca NY 14.850
p 607.273.7600 f 607.273.0475
KENNEDY'
r(ocAritt-At comr*Attovl
30R ktRattmtliRIL BU0 2021, It
I I COMPORT STREET
ROCHESTER, NEW YORK 14620
585-232-2
THESE DOCUMENTS AND ALL IDEAS, ARRANGEMENT,
DESIGNS AND PLANS INDICATED THEREON OR
PRESENTED THEREBY ARE OWNED AND REMAIN PIE
PROPERTY OF KENNEDY MECHANICAL INC. AND NO PART
THEREOF SHALL B UTIUZED BY ANY PERSON, FIRM, OR
CORPORATION FOR ANY PURPOSE WHATSOEVER. EXCEFT
WM1 THE SPECIFIC WRITTEN PERMISSION OF KENNEDY
MECHANICAL INC. ALL RJGHTS RESERVED
Baumer Mechanical Design Services
625 Panorama Trail, Budding 2, Suite 210
Rochester, NY 14625
565-313-5819
WARNING: It is a violation of
New York State Law for any
person, unless acting under the
direction of a licensed Architect,
to alter this document in any way.
If a document bearing the seal of
an Architect is altered, the
altering Architect shall affix to
such document his seal and the
notation "altered by" followed by
his signature, the date of such
alteration, and a specific
description of the alteration.
REVISION SCHEDULE
NAME
DATE
15 AUG 2014
STONE QUARRY APARTMENTS
RTMENTS, LL
0
Lu
0
DATE:
7/18/2014
PROJECT:
2012059
OTHER:
DRAWN BY:
TB
G
F
E
D
B
APARTMENT
BLDG./TH
SECOND FLOOR A
PLANS -
PLUMBING
P102
10
4 10:22:03
�
��
�
~�
OTG
/ xxoo�o,x^
onoo/x000
n
11/2`SAN
REF.
�AT
B22 ',NI�
wr
ELEV CH
LIZSAN
wn
1uzSAN
2 1/2'G
rSAN
'SAN
2' SAN
ra
WH -A
APARTMENT BLDG. FIRST FLOOR PLAN - PLUMBING
�
��
��
�
FIRST FLOOR PLAN DRAWING NOTES
1 l/2^5DOWN TORANGE. 3/4 GyP PROVIDE SHUTOFF VALVE (TIGHT TO WALL),
UNION, DIRT LEG, AND FINAL CONNECTION POINT FOR APPLIANCE. COORDINATE
LOCATION AND TERMINATION WITH APPLIANCE MANUFACTURER, MILLWORK
DRAWINGS, AND BUILDING OWNER. RANGE MUST BE ABLE TO SIT FLUSH WITH REAR
WALL WHEN INSTALLED.
2
J4"GUP
1/2^GUP.
4 DROP 1/2" G TO FURNACE, PROVIDE SHUTOFF VALVE,UNION, DIRT LEG, AND FINAL
CONNECTION TO APPLIANCE IN ACCORDANCE WITH ALL FUEL C -AS CODES AND
REGULATIONS.
1/2" G DOWN TO RANGE. PROVIDE SHUTOFF VALVE (TIGHT TO WALL), UNION, DIRT LEG,
AND FINAL CONNECTION POINT FOR APPLIANCE. COORDINATE LOCATION AND
TERMINATION WITH APPLIANCE MANUFACTURER, MILLWORK DRAWINGS, AND
BUILDING OWNER, RANGE MUST BE ABLE TO SIT FLUSH WITH REAR WALL WHEN
INSTALLED.
6 2 1/2" G DOWN IN WALL CAVITY. COORDINATE PENETRATION HEIGHT THROUGH
EXTERIOR WALL WITH GAS UTILITY COMPANY. PROVIDE MAIN SHUTOFF VALVE AND
FINAL CONNECTION TO METER.
7 1/2^GDOWN nJFURNACE. 3/4" G UP. PROVIDE SHUTOFF VALVE, UNION, DIRT LEG,
AND FINAL CONNECTION TO APPLIANCE IN ACCORDANCE WITH ALL FUEL GAS CODES
AND REGULATIONS.
8 ]^ WASTE STACK VENT UP, ]^ WASTE STACK VENT DOWN. BRANCH II/2.TO
ADJACENT SINK. I/Z,H&C UP.
9 ROUTE 1/2" H&C AND 1 1/2" SANITARY HORIZONTALLY THROUGH WALL.
10 DROP 3/4'CTOWALL HYDRANT.
11 DROP l/Z^H&C.Z^WASTE DOWN, AND Z^VENT RISE TOLAVATORY.
12 DROP I/Z^C.]^WASTE DOWN TQWATER CLOSET.
13 Z^SANITARY UP.
14 Z''VFNTDOWN.
16 DROP l/Z^H&C AND 3^WASTE WITH P-TRAPTOMOP SERVICE S|Ni
17 2" SAN ITAR',' WITH P -TRAP UP,
18 ]^ SANITARY UP.
19 3^SANITARY UP, J^SANITARY DOWN.
20 DROP 3/4" INDIRECT WASTE FROM FURNACE AND SPILL TO FLOOR DRAIN THROUGH 1
1/2" PHYSICAL AIR GAP. PROVIDE ALL TRAPS AND NEUTRALIZERS PER MECHANICAL
EQUIPMENT MANUFACTURERS INS1 RUCTIONS AND ALL APPLICABLE CODES,
21 DROP 1/2H&C.I1/2^WASTE WITH 2^P-TRAPDOWN T0TUB VALVE END DFTUB TO
BE AWAY FROM ENCLOSED CHASE FOR SERVICE PURPOSES.
22 DROP 1/2"H&C, 2" WASTE WITH P -TRAP DOWN TO SHOWER. SHOWER AND VALVE
MUST BE INSTALLED PER ADA REQUIREMENTS.
23 DROP l/2^H&C,Z^SANITARY DOWN, AND 2^VENT RISE |NWALL. BRANCH ll/2^
SANITARY TO ADJACENT SINK.
24 Z^VENT UP.
25 4^RADON VENT UP, 4^RADON VENT DOWN.
26 4" RADON VENT DOWN.
NOTE: ALL STORM, SANITARY, AND VENT STACKS SHALL HAVE A TWO-WAY CLEANOUT TEE INSTALLED AT
THE BASE OF THE STACKI12" AFF TO CL OF TEE) PER THE PLUMBING CODE OF NEW YORK STATE, WHICH
WILL ACT AS A STACK CLEANOUT AND AS A CHANGE OF DIRECTION CLEANOUT FOR PIPING UP TO 40'
DOWNSTREAM.
«
;rpNOTE: ALL TOWNHOME UNITS ARE 11
�
TYPICAL OF UNIT TO THE RIGHT
�
��
FIRST FLOOR PLAN DRAWING NOTES
27 4^RADON VENT UP.
28 ROUTE 1/2" H&C AND 1 1/2" WASTE THROUGH BACK OF CABINET.
29 DROP 3/4 C TO WALL HYDRANT. ROUTE 3/4 C THROUGH JOIST CAVITY AND DROP TO
WALL BEHIND KITCHEN CABINET. CONNECT WITH SHUTOFF VALVE TO MAIN COLD
WATER SUPPLY IN KITCHEN SINK BASE CABINET. WALL HYDRANT TO BE LOCATED IN
BUILDING END UNITS ONLY.
30 I/2"H&C AND 1I/2"SANITARY WITH P-TRAPUPT0SHOWER.
31 I/Z^CAND 3^SANITARY UPTOWATER CLOSET.
32 l/Z^H&C AND Z SANITARY UP TO LAVATORY.
33 ]/4''H&C UPT0MECHANICAL ROOM.
34 l/2''H.3/4''C.Z^VENT UP.
35 ROUTE l/Z^H.I'C.2^SANITARY UPTHROUGH WALL. BRANCH ll/Z^SANITARY TO
KITCHEN SINK.
36 3/4" DOMESTIC WATER SERVICE UP IN SINK BASE CABINET. PROVIDE MAIN SHUTOFF
VALVE IN CABINET. COORDINATE RISER AND VALVE LOCATIONS WITH FINAL MILLWORK
VENDOR DRAWINGS.
37 COORDINATE GAS METER AND RISER INSTALLATION AND LOCATION WITH FUEL GAS
SUPPLIER, CIVIL DRAWINGS, AND ALL OTHER APPLICABLE TRADES. RISERS AND
DISTRIBUTION LINES TO BE SIZED AS INDICATED ON P100.
38 1" G DOWN TO SHUTOFF VALVE AND GAS SUPPLY RISER.
39 PROVIDE DISHWASHER BRANCH TEE INLINE WITH WASTE ABOVE P -TRAP AND PROVIDE
SHUTOFF VALVE WITH 3/8" COMPRESSION OUTLET ON HOT WATER SUPPLY FOR
DISHWASHER.
40 4" SANITARY WALL PLATE CLEANOUT.
41 ROUTE 3/4" CONDENSATE DRAIN FROM DSS (BY OTHERS) TO MECHANICAL RM 10DB
AND SPILL TO FLOOR DRAIN THROUGH 1 1/2" PHYSICAL AIR GAP.
SANITARY SEWER TO HAVE CLEANOUT AT
CONNECTION TO SITE SEWER AS PART OF
REQUIRED HOUSE TRAPS. REFER TO SITE
DRAWINGS FOR DETAIL.
LIVING ROOM
um
�
3/4"C
»2"C
aa
GAS METER MY UTILITY
COMPANY COORDINATE
FINAL LOCATION WITH
__�
NOTE: RADON MITIGATION SYSTEM TO BE INSTALLED AT UNITS INDICATED ON P100A.
TYPICAL TOWNHOMEFIRSTFLOOR PLAN - PLUMBING
1/8" =
10
1:EC,ESGEConsmc6nn
75Thrum�yF�ukDrh��
VV8st14586:
Architecture
nouecuune
Planning �o���U���
~~^ ^^ ^^^ ^%�
Interior Design
217 North Aurora Street
Ithaca NY 14850
p 607.273.7600 f 607.273.0475
KENNEDY
// COMFORT STREET
ROCHESTER, NEW YORK 14620
565-232-2600
ThESE DOCUMENTS AND ALL IDEAS, ARRANGEMENT,
DESIGNS AND PLANS INDICATED THEREON OR
PRESENTED THEREBY ARE OWNED AND REMAIN 111E
PROPERTY OF KENNEDY MECHANICAL INC. AND NO PART
THEREOF SHALL DE UTIUZED DY ANY PERSON, FIRM, OR
CORPORATION FOR ANY PURPOSE WHATSOEVER ISCEFT
111 THE SPECIFIC WRITTEN PERMISSION OF KENNEDY
MECHANICAL INC. ALL RJGHTS RESERVED
Baumer Mechanical Design Services
625 Panorama Trail, Building 2, Suite 210
Rochester, NY 14625
585-313-5819
WARNING: It is a violation of
New York State Law for any
person, unless acting under the
direction of a licensed Architect,
to alter this document in any way.
If a document bearing the seal of
an Architect is altered, the
altering Architect shall affix to
such document his seal and the
notation "altered by" followed by
his signature, the date of such
alteration, and a specific
description of the alteration.
REVISION SCHEDULE
NAME
DATE
5 AUG 2014
STONE QUARRY APARTMENT
STONE QUARRY APARTMENTS
DATE:
7/18/2014
PROJECT:
201205
OTHER:
DRAWN BY:
JTB
APARTMENT
BDG./TFIRST
FLOOR ANS - A
PLUMBING
UMBUNG
P101
��
�
10
2
4
5 6 7 8
9
10
•>k NN
\
.7/ -EX,R..X>KIR
1 - '•
. ... . . ... _
</,24.-7/'=.7
NN,.'•‘
.;„
X.X.E",,RE.,:.
/ /
,
/
/ /
W'RADON
4"RA DO
NOTE: REFER TO P101, P102, P103 FOR RADON
SYSTEM RISER CONTINUATION. EACH RISER SHALL BE
ROUTED THROUGH THE UNIT ABOVE IT.
AS INDICATED ON THE PARTIAL TOWNHOME
FLOOR PLANS. THE SYSTEMS AS INDICATED ARE TYPICAL
OF BOTH TOWNHOME BUILDINGS.
4' RADON
ENIIIIENAXX>BX
/
2
•/ \\>7 \„„,
KIIRADON
v
4' RADON
RADON
Le.RADON
CONLER SI_AF3 ON 8"
ST RLI(T, FILL \A„/„I
67/RA-4x-W4 V,,ANNI: (SEE
TypICAL SI AB 1/0/0L)
/ . . .
:IR I; •,E
„7": ...„••••-• :„. •„;„
.,
„„/ „2„:„„,„„;..„:„,„,„,7.,„„,„„„\\„5zy
.• • 2. V,•,:z.4•••/•••4••'•'•••
TOWNHOME FOUNDATION PLAN - RADON PIPING
3/16" = 1' 0"
0
.........................................................„.„„„.„...... ._ .......................„..„„..............„„.... .
NN SILB\B OVEIR
GE(I)Fat„,M, REINF VVI1',„„--1
6x6-,\Alitx‘Atel WAN (SEE
YPICII/AL ISLAB ON C>I3E0FC)AM
TOWNHOME FOUNDATION PLAN RADON SYSTEM DRAWING NOTES
1 CAP END OF PERFORATED RADON PIPING (TYPICAL).
2 ALL HORIZONTAL RADON PIPING BELOW SLAB SHALL HAVE PERFORATIONS FACING DOWN.
3 4" RADON VENT UP. ALL VERTICAL RADON VENT PIPE SHALL BE WITHOUT PERFORATIONS,
ESSE Con >ruo :00
1,45a5
Architecture
Planning
Interior Design
217 North Aurora Street
Ithaca NY 14850
p 607.273.7600 f 607.273.0475
NNEDY
mccRANttA, ComroAtIOSI
af Itt• f,e1"1. ..P.*61` 1
11 COMFORT STREET
ROCHESTER, NEW YORK 14620
555-232-2500
THESE DOCUMENTS AND AIL IDEAS, ARRANGEMENT,
DESIGNS AND PLANS INDICATED THEREON OR
PRESENTED THEREBY ARE OWNED AND REMAIN THE
PRORTY OF KENNEDY MECHANICAL INC, AND NO PART
EREOF SHALL SE UTIUZED BY ANY PERSON, FIRM, OR
CORPORATION FOR ANY PURPOSE WHATSOEVER E<CEPT
WM1 THE SPECIFIC WRITTEN PERMISSION OF KENNEDY
MECHANICAL INC. ALL RJGHTS RESERVE)
Baumer Mechanical Design Services
625 Panorama Tra4 Building 2, Suite 210
Rochester, NY 14625
585-313-5819
WARNING: It is a violation of
New York State Law for any
person, unless acting under the
direction of a licensed Architect,
to alter this document in any way.
If a document bearing the seal of
an Architect is altered, the
altering Architect shall affix to
such document his seal and the
notation "altered by" followed by
his signature, the date of such
alteration, and a specific
description of the alteration.
REVISION SCHEDULE
NAME
DATE
5 AUG 2014
STONE QUARRY APARTMENTS
STONE QUARRY APARTMENTS
G
F
D
C
>-
zB
0
F-
DATE:
7 18/2014
PROJECT:
2012059
OTHER:
DRAWN BY:
TB
TOWNHOME
BUILDING
FOUNDATION A
PLAN - RADON
LAYOUT
P100A
10
10
COTG
0
FOUNDATION PLAN DRAWING NOTES
1 4" SANITARY TO SITE. REFER TO CIVIL PLANS FOR CONTINUATION. COORDINATE INVERT WITH FOUNDATION COMPONENTS AND INVERT INDICATED ON CIVIL DRAWINGS,
2 3/4" C TO SITE. SEE CIVIL PLANS FOR CONTINUATION.
CAP END OF PERFORATED RADON PIPING (TYPICAL).
4 ALL HORIZONTAL RADON PIPING BELOW SLAB SHALL HAVE PERFORATIONS FACING DOWN.
5 4" RADON VENT UP. ALL VERTICAL RADON VENT PIPE SHALL BE WITHOUT PERFORATIONS.
6 GAS RISER UP. MAINTAIN LINE SIZE INDICATED (TYPICAL).
7 1 1/4" G UP TO METER. COORDINATE RISER LOCATION WITH FUEL GAS SUPPLIER, SITE CONTRACTOR, AND ALL APPLICABLE TRADES.
8 1" G UP TO METER. COORDINATE RISER LOCATION WITH FUEL GAS SUPPLIER, SITE CONTRACTOR, AND ALL APPLICABLE TRADES.
9 3/4" G UP TO METER. COORDINATE RISER LOCATION WITH FUEL GAS SUPPLIER, SITE CONTRACTOR, AND ALL APPLICABLE TRADES.
10 3" SANITARY UP.
11 2" SANITARY UP.
12 3/4" C UP. COORDINATE RISER LOCATION AS NOTED ON P101, NOTE 36.
13 2" SANITARY UP.
14 4" SANITARY UP TO DECK PLATE CLEANOUT OR CLEANOUT TO GRADE.
15 4" SANITARY UP.
16 3" SANITARY UP.
17 2" SANITARY WITH P -TRAP UP
18 2" VENT UP.
19 2" SANITARY WITH P -TRAP UP TO FLOOR DRAIN.
20 ROLL SANITARY SEWER DOWN WITH 45° ELBOWS SO PIPE DOWNSTREAM OF THIS POINT SHALL BE UNDER GEOFOAM FILL. COORDINATE WITH STRUCTURAL DRAWINGS.
21 ALL PIPING IN GRAY DIAGONALLY HATCHED AREA (EXCEPT LAUNDRY ROOM PIPING) SHALL BE INSTALLED UNDER GEOFOAM FILL. REFER TO STRUCTURAL DRAWINGS FOR DEPTH AND
CONFIGURATION. COORDINATE WITH GEOFOAM CONTRACTOR TO AVOID RISER DISTURBANCE.
22 4" STORM UP.
23 3" SANITARY WITH P -TRAP UP TO MOP SERVICE SINK.
24 4" SANITARY WITH P -TRAP UP TO FLOOR DRAIN.
25 3" SANITARY UP TO LAUNDRY CONNECTIONS.
26 PIPING AND LINT INTERCEPTOR FROM THIS POINT UPSTREAM SHALL BE ON TOP OF GEOFOAM. REFER TO STRUCTURAL DRAWINGS. COORDINATE PIPING AND LINT INTERCEPTOR
INSTALLATION WITH GEOFOAM CONTRACTOR.
27 2"CUP.
28 3" W UP (DOMESTIC WATER SERVICE).
29 4" W UP (FIRE SERVICE).
30 2" C TO SITE. REFER TO CIVIL DRAWINGS FOR CONTINUATION.
31 3" W TO SITE. REFER TO CIVIL PLANS FOR CONTINUATION.
32 4" W TO SITE. REFER TO CIVIL PLANS FOR CONTINUATION.
33 4" STORM TO SITE. REFER TO CIVIL PLANS FOR CONTINUATION.
34 4" SANITARY UP TO WALL PLATE CLEANOUT.
35 6" FRESH AIR VENT FOR REQUIRED HOUSE TRAP. REFER TO CIVIL DRAWING C201, DETAIL 7 FOR REQUIREMENTS.
FD -A
8
RAoot
3'5At
A' SAN
SANITARY SEWER TO HAVE CLEANOUT AT
CONNECTION TO SITE SEWER AS PART OF
REQUIRED HOUSE TRAPS. REFER TO SITE
DRAWINGS FOR DETAIL.
reitOidl! -i1•4�� • •
a�.��4
IV
��
/NOTE: REFER TO P100A FOR TOWNHOME
/BUILDING RADON PIPING BELOW SLAB
f i
r4 bri C.T.740 tr.
NOTE: ALL STORM, SANITARY, AND VENT STACKS SHALL HAVE A TWO-WAY CLEANOUT TEE INSTALLED AT
THE BASE OF THE STACK (12" AFF TO CL OF TEE) PER THE PLUMBING CODE OF NEW YORK STATE, WHICH
WILL ACT AS A STACK CLEArIOUT AND AS A CHANGE OF DIRECTION CLEANOUT FOR PIPING UP TO 40'
DOWNSTREAM.
NOTE: RADON MITIGATION SYSTEM TO BE INSTALLED AT UNITS INDICATED ON P100A.
OAPARTMENT BLDG. FOUNDATION PLAN - PLUMBING
1/8" =11-0"
4
5 6
TYPICAL TOWNHOME FOUNDATION PLAN - PLUMBING
1/8" = 1-0"
7
9
10
Architecture
Planning
Interior Design
217 North Aurora Street
Ithaca NY 14850
p 607.273.7600 f 607.273.0475
ENNEDV
t 'L T1,1
11 COMFORT STREET
ROCt1E5TER NEW YORK 14620
555-232-2500
THESE. DOCUMENTS AND ALL IDEAS, ARRANGEMENT,
DESIGNS AND PLANS INDICATED. THEREON OR.
PRESENTED THEREBY ARE OWNED AND REMAIN THE
PROPERTY OF KENNEDY MECHANICAL INC. AND NO PART
THEREOF SHALL BE UTILIZED BY ANY PERSON, FIRM, OR.
CORPORATION FOR ANY PURPOSE :WHATSOEVER EXCEPT
WITH THE SPECIFIC WRITTEN PERMISSION OF KENNEDY
MECHANICAL INC. ALL RIGHTS RESERVED
aumer Mechanical Design Services
625 Panorama Trail, Building 2, Suite 210
Rochester, NY 14625
585-313-5819
WARNING: It is a violation of
New York State Law for any
person, unless acting under the
direction of a licensed Architect,
to alter this document in any way.
If a document bearing the seal of
an Architect is altered, the
altering Architect shall affix to
such document his seal and the
notation "altered by" followed by
his signature, the date of such
alteration, and a specific
description of the alteration.
REVISION SCHEDULE
NAME
DATE
G
F
E
15 AUG 2014 D
STONE QUARRY APARTMENT
RTMENTS
STONE QUA
ITHACA, NY
DATE:
7/18/2014
PROJECT:
2012059
OTHER:
DRAWN BY:
JTB
C
B
APARTMENT
BLDG./TH
FOUNDATION A
PLANS -
PLUMBING
P100