Loading...
HomeMy WebLinkAboutStone Quarry Apartments - Mechanical6 7 8 9 10 FURNACE SCHEDULE - NATURAL GAS TAG LOCATION MAX CFM ESP (in. wc) OA CFM AFUE MOTOR UNIT WIDTH (IN:) COOLING- DX EVAP. COL. HEATING MCA WEIGHT COMMENTS DESIGN EQUIPMENT VOLT PH HP O.A.T.D.B. E.A.T.D.B. L.A.T.D.B. TMBH SMBH MODEL STAGES FUEL MIN. INPUT (MBH) MIN. OUTPUT (MBH) MAX. INPUT (MBH) MAX. OUTPUT (MBH) FURN-A ALL DWELLING UNIT FURNACES 600 .9 0 96 115 1 ECM 14.5 N/A 80 67 17.9 12.8 MC18A3XC1 1 NAT. GAS N/A N/A 40 38 9.5 113 12,3,4,5,6,7,8,9,10 YORK TM9E040A10MP11 FURN-B HOUSE FURNACE 1600 .6 350 96 115 1 ECM 19.875 N/A 88.4 67 46.0 33.6 FC48C3XC1 2 NAT. GAS 52 50 80 77 11.5 136 1,2,3,4,6,7,8,9 YORK TM9V080C16MP11C 1. PROVIDE COMPATIBLE 5+2 DAY PROGRAMMABLE THERMOSTAT TO ACCOMMODATE CONTROL VOLTAGE AND FURNACE CONTROL BOARD. 2. PROVIDE UNIT WITH SIDE FILTER RACK AND 2" PLEATED FILTER MINIMUM MERV 8. 3. PROVIDE UNIT WITH CONCENTRIC VENT KIT. 4. PROVIDE UNIT WITH CONDENSATE NEUTRALIZER KIT. 5. CAPACITIES INDICATED FOR COOLING BASED ON ARI CONDITIONS AT 95°F OUTDOOR AND 80°F DB/67°F WB. INDOOR AT 400 CFM/TON. STATIC PRESSURE IS BASED ON COOLING WITH WET COIL. 6. FURNACE/EVAPORATOR COIL/AIR COOLED CONDENSER SYSTEM SHALL BE ARI CERTIFIED AND ENERGY STAR LISTED. ALL ENERGY STAR PRODUCTS SHALL BE VERIFIABLE ON THE ENERGY STAR WEB SITE. 7. PROVIDE UNIT WITH ECM FAN MOTOR AND SINGLE STAGE GAS VALVE. 8. COOLING COIL, DIRTY FILTER, AND CONSTANT AIRFLOW REGULATOR ARE ALL TO BE INCLUDED AS EXTERNAL STATIC PRESSURE LOSS. 9. FURNACES SHALL BE CONFIGURED AS FOLLOWS: DOWNFLOW UNITS AT TOWNHOMES, UPFLOW UNITS AT APARTMENT BUILDING. 10. OUTSIDE AIR REQUIREMENT AT APARTMENT AND TOWNHOME UNITS SHALL BE SATISFIED THROUGH OPERABLE WINDOWS AND BUILDING INFILTRATION. CEILING RECESSED DUCTLESS SPLIT AIR CONDITIONING SYSTEM TAG LOCATION MAX CFM ESP (in. wc) OA CFM AFUE MOTOR UNIT WIDTH COOLING - DX EVAP. COIL ELECTRICAL WEIGHT COMMENTS HEATING STAGES TYPE I WEIGHT COMMENTS DESIGN EQUIPMENT VOLT PH HPMCA O.A.T.D.B. E.A.T.D,B, L.A.T_D.B. TMBH SMBH MODEL STAGES SOURCE MIN. INPUT (MBH) MIN. OUTPUT (MBH) MAX, INPUT (MBH) MAX. OUTPUT (MBH) DSS -A CORRIDORS AT APARTMENT BUILDING, PUMPS IN ROOF RECESS] 247 FURN-B 4.0 75 44.5 230 I 1 - 23.625 1 26.3 208 1,2 YORK YCJF48S41S2 1,2,3,5,6 , CS KE12NB41 1 ELECTRIC 1 N/A N/A 13.6 13.6 15 1 r 35.3 123456789 PANASONIC KE12NB41 (AHRI#5052304) 1. PROVIDE LCD WIRELESS -TYPE TEMPERATURE (BUILT-IN) WITH IC THERMOSTAT (BY SAME MFG.) 2. PROVIDE UNIT WITH INTEGRAL FILTER. 3. CAPACITIES INDICATED FOR COOLING BASED ON ARI CONDITIONS AT 95°F OUTDOOR AND 80°F DB/67°F WB. INDOOR AT 400 CFM/TON. STATIC 4. PRESSURE IS BASED ON COOLING WITH WET COIL. 5, FURNACE/EVAPORATOR COIL/AIR COOLED CONDENSER SYSTEM SHALL BE ARI CERTIFIED AND ENERGY STAR LISTED. ALL ENERGY STAR PRODUCTS SHALL BE VERIFIABLE ON THE ENERGY STAR WEB SITE. AIR-COOLED CONDENSING UNIT SCHEDULE TAG LOCATION SERVICE NOM. CAPACITY TONS ARI SEER AHRI MBH AHRI REF # COMPRESSOR ELECTRICAL WEIGHT COMMENTS DESIGN EQUIPMENT STAGES TYPE VOLT PH MCA ACC -1 OUTSIDE, AS INDICATED FURN-A 1.5 14.7 17.6 7142705 1 SCROLL 208 1 12 133 1,2 YORK YCJF18S41S1 ACC -2 OUTSIDE, AS INDICATED FURN-B 4.0 14.5 44.5 5434466 1 SCROLL ? 208 1 26.3 208 1,2 YORK YCJF48S41S2 1. PROVIDE UNIT WITH 5 MINUTE RESTART TIME DELAY. 2. PROVIDE UNIT WITH TXV KIT. FAN SCHEDL LE TAG LOCATION SERVICE CFM ESP (in. wc) BLADE TYPE MAX FAN RPM DRIVE TYPE MOTOR WATTS HP VOLT PH CONTROL MAX SONES COMMENTS DESIGN EQUIPMENT EF -1 ALL DWELLING UNITS EXCEPT HALF -BATHS EXHAUST 90/30 0.10 FC 580 DIRECT 6.2 - 120 1 SWITCH <0.3 1,2,3,4,5 PANASONIC FV-05-11VKSL EF -2 ALL DWELLING UNITS - HALF -BATHS ONLY, CORRIDORS EXHAUST 80 0.10 FC 829 DIRECT 14.7 - 120 1 1 SWITCH <0.3 1,2,3,5,6 , PANASONIC FV-05-11VK1 EF -3 ALL NON -DWELLING UNIT LOCATIONS EXHAUST 80 0.10 FC 829 DIRECT 14.7 - 120 1 I SWITCH <0.3 1,2,3,4,5 \ PANASONIC FV-08VQ5 1. PROVIDE UNIT WITH UNIT MOUNTED FAN SPEED CONTROLS. ADJUSTED TO AIRFLOW INDICATED AND PERMANENTLY MARKED AFTER FINAL AIR BALANCE. CONTROL MOUNTED IN FAN CASING. 2, PROVIDE UNIT WITH INTEGRAL DISCONNECT. 3. PROVIDE UNIT WITH ROOF JACK BACKDRAFT DAMPER OR HOODED WALL CAP AS CALLED FOR ON PLANS. 4. FAN SHALL BE WIRED TO ELECTRICAL CIRCUIT TO OPERATE CONTINUOUSLY AT 30 CFM AND 80 CFM DURING OCCUPIED MODE. 5. PROVIDE PANASONIC PN#, PC-RD05C4 RADIATION DAMPER AT ALL APARTMENT UNIT LOCATIONS. 6. FAN SHALL BE WIRED TO ELECTRICAL CIRCUIT TO OPERATE CONTINUOUSLY AT CORRIDORS, AND WIRED TO A SWITCHED CIRCUIT AT TOILET ROOMS. ELECTRIC WALL HEATER SCHEDULE TAG LOCATION TYPE CFM AIR HEATING ELEMENT COMMENTS DESIGN EQUIPMENT KW VOLT PH CUH-L1 LOBBY RECESSED 45 2 208 1 1,2,3,4,5,7 QMARK HT2024SS CUH-51 STAIRWELLS (2) SURFACE 45 2 208 1 1,2,3,4,6,7 QMARK HT2024SS 1. UNIT SHALL BE COMPLETE WITH METAL BACKBOX SUITABLE FOR SURFACE OR RECESSED -MOUNTING. 2. UNIT SHALL INCLUDE FAN DELAY, THERMAL CUTOUT, DISCONNECT SWITCH AND INTEGRAL TAMPER -PROOF THERMOSTAT. 3. UNIT TO BE FIELD CONVERTED FOR VOLTAGE AND PHASE DEPENDING ON ACTUAL SHIPPED CONFIGURATION. 4. UNIT SHALL BE MOUNTED APPROX, 12" AFF TO BOTTOM. 5. PROVIDE UNIT WITH INCLUDED FRAME FOR RECESSED INSTALLATION. 6. PROVIDE UNIT WITH SMHTSSNW SURFACE MOUNTING FRAME. 7. SET INTEGRAL TAMPER -PROOF THERMOSTAT TO 50°F. AIR TERMINAL SCHEDULE TAG SYSTEM MATERIAL FINISH/COLOR COMMENTS PHYSICAL CHARACTERISTICS EAV EXHAUST STEEL TBD - 4" 0 EXHAUST GOOSENECK RG -A RETURN STEEL TBD - 20" X 20" RETURN GRILLE SD -A SUPPLY STEEL TBD - 4" X 12" FACE, 6"0 NECK SD -B SUPPLY STEEL TBD - TOEKICK DIFFUSER, 6°0 NECK SD -C SUPPLY STEEL TBD - 4" X 10" FACE, 5"0 NECK SD -D SUPPLY STEEL TBD - 10" X 10" FACE, 8"0 NECK EXTERIOR AIR TERMINAL SCHEDULE TYPE MATERIAL FINISH/COLOR COMMENTS PHYSICAL CHARACTERISTICS ROOF CAP STEEL TO MATCH ROOF - BROAN #634 10-1/4" X 10-3/4" WITH INTEGRAL BACKDRAFT DAMPER AND BIRD SCREEN WALL CAP (RANGE EXH) STEEL BY OTHERS I - BROAN #647 9" X 9" WITH 7"0 CONNECTION WALL CAP (BATH EXH) STEEL BY OTHERS - BROAN #843BL 9" X 9" WITH 6'0 CONNECTION WALL CAP (DRYER VENT I ALUMINUM BY OTHERS - BROAN #855AL 6-1/2" X 6-1/2" WITH 4"0 CONNECTION LOUVER L-1 ALUMINUM BY OTHERS - 18" X 8" GREENHECK ESD -202 WITH VCD-23 LOW LEAKAGE CONTROL DAMPER, TFB24 ACTUATOR, AND DRIVE -CC -11 -!FEL -0 DRIVE ARRANGEMENT LOUVER L-2 ALUMINUM BY OTHERS - 18" X 8" GREENHECK ESD -202 WITH VCD-23 LOW LEAKAGE CONTROL DAMPER, TFB24 ACTUATOR, AND DRIVE-CC-11-1FEL-0 DRIVE ARRANGEMENT OA INTAKE WALL CAP STEEL BY OTHERS - BROAN #641FA 9" X 9" WITH 6"0 CONNECTION CVK (CONCENTRIC VENT) PVC TO MATCH ROOF - YORK #1CT0302 / 1CT0303 CONCENTRIC VENT KIT. PROVIDE FOR ALL GAS-FIRED EQUIPMENT. SIZE INLET/OUTLETS PER EQUIPMENT REQUIREMENTS, 1 2 5 GENERAL NOTES: 1. ALL NOTES, SPECIFICATIONS, AND SYMBOLS ON THIS DRAWING APPLY TO ALL HVAC DRAWINGS F0.3 THIS PROJECT. 2. HVAC CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING, CORING AND PATCHING. WORK TO BE PERFORMED BY WORKERS SKILLED IN THE MATERIAL BEING CUT AND PATCHED. 3. FIELD VERIFY ALL DUCTWORK AND PIPE SIZES, AND EXACT LOCATIONS. 4. PROVIDE ALL WORK IN COMPLIANCE WITH ALL LOCAL, STATE AND FEDERAL CODES. OBTAIN ALL REQUIRED PERMITS. 5. FIRESTOP ALL FLOOR/CEILING AND ROOF/CEILING PENETRATIONS THROUGH ASSEMBLIES THAT REQUIRE A FIRE RESISTANCE RATING 6. WHERE BRANCH DUCT SIZES ARE NOT SHOWN, THEY SHALL BE THE SAME SIZE AS THE DIFFUSER NECK. 7. ALL DIFFUSERS SHALL BE EQUIPPED WITH A FACE -MOUNTED AIR VOLUME CONTROL DAMPER. 8. INSTALL ALL EQUIPMENT IN STRICT CONFORMANCE WITH MANUFACTURER'S INSTRUCTIONS AND RECOMMENDATIONS. 9. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE THE WORK OF THIS CONTRACT WITH THE WORK OF ALL OTHER TRADES PRIOR TO THE FABRICATION OR INSTALLATION OF ANY WORK. 10, THE DRAWINGS ARE SCHEMATIC IN NATURE. THE CONTRACTOR SHALL PROVIDE ALL OFFSETS, FITTINGS, HANGERS, ANCHORS, SUPPORTS, WIRING, AND ACCESSORIES FOR A COMPLETE AND OPERATIONAL INSTALLATION. REFER TO EQUIPMENT INSTALLATION DETAILS FOR MORE INFORMATION, 11. LOCATIONS OF EACH TYPICAL WALL PENETRATION, FURNACE FLUE EXHAUST, OUTSIDE AIR INTAKE, AND TOILET EXHAUST SHALL BE ALIGNED AT SIMILAR ELEVATIONS BY TYPE AT ALL APARTMENTS. 12. MUCH OF THE DUCTWORK ON THIS PROJECT IS INTENDED TO BE CONCEALED WITHIN ARCHITECTURAL SOFFITS. COORDINATE THE INSTALLATION OF ALL CONCEALED DUCTWORK WITH THE GENERAL CONTRACTOR. 13, ALL TRANSFER DUCTS SHALL BE 6" AFF UNLESS NOTED OTHERWISE, 14. GENERAL CONTRACTOR TO COORDINATE WITH MECHANICAL CONTRACTOR SOFFIT LAYOUT. 15. LOUVERED DOORS AT MECHANICAL ROOMS SHALL BE BY G.C., WITH OPEN SURFACE AREA COORDINATED WITH MECHANICAL AIR REQUIREMENTS. 16. COORDINATE HEIGHT OF THERMOSTATS WITH ADJACENT LIGHT SWITCHES. THE VERTICAL CENTER LINE OF THE THERMOSTATS AND LIGHT SWITCHES SHALL BE EQUAL, 6 7 SYMBOLS AND LEGENDS: NOTE: ALL SYMBOLS MAY NOT BE USED IN THIS PROJECT ABBREVIATIONS AND TAGS SYMBOL DESCRIPTION AD ACCESS DOOR AFF ABOVE FINISHED FLOOR CFM CUBIC FEET PER MINUTE (El EXISTING EC ELECTRICAL CONTRACTOR FPM FEET PER MINUTE FC FLEXIBLE CONNECTION GC GENERAL CONTRACTOR (L) LINED MBH THOUSAND BTU/HOUR NC NORMALLY CLOSED NO NORMALLY OPEN NTS NOT TO SCALE OA OUTSIDE AIR OED OPEN END DUCT PC PLUMBING_CONTRACTOR PKGD PACKAGED TAKE -OFFS SA SUPPLY AIR SUPPLY/RETURN/ o OA OUTSIDE AIR LPR LOW PRESSURE REFRIGERANT HPR HIGH PRESSURE REFRIGERANT I COM BU YCION Ali,€ FAN -18"0 II r10 p i SUPPLY AIR CONICAL TEE REMOVAL KEYNOTE OINSTALLATION KEYNOTE ` REMOVE TO THIS POINT $ CONNECTION TO EXISTING DUCTWORK SYMBOLS AND TAGS SYMBOL DESCRIPTION DESCRIPTION VOLUME DAMPER -- SD SMOKE DAMPER --- FD FIRE DAMPER --- AAD AUTOMATIC AIR DAMPER --- BDD BACKDRAFT DAMPER ROUND DUCT IN INCHES AIRFLOW DIRECTION FLAT OVAL DUCT IN INCHES DUCT ELEVATION TRANS: SQUARE TO ROUND 4-IL)ACOUSTIC -- FC FLEX CONNECTOR R REGISTER,GRILLE,DIFFUSER T = TYPE NECK = NECK SIZE C T D DROP IN DUCT NECK 4- D-..- 4- CFM SUPPLY/RETURN/ o 1-1/2 TIMES BRANCH SIZE AIR TERMINAL UNIT T =UNIT TYPE MAX = MAXIMUM CFM MIN = MINIMUM CFM I MAX TAKE -OFFS T MIN 24x10 10"11 SUPPLY/RETURN/ o FAN POWERED AIR TERMINAL UNIT T=UNIT TYPE MAX = PRIMARY MAX. CFM MIN. = PRIMARY MIN. CFM FAN = FAN CFM EXHAUST AIR MAX L 10° T. MIN k- FAN -18"0 II r10 p i SUPPLY AIR DUCTWORK LEGEND SYMBOL DESCRIPTION DESCRIPTION �.•-' DUCT SECTION - SUPPLY DUCT SECTION - RETURN A WIDTH AxDEPTHB B IM A" 0 ROUND DUCT IN INCHES (1111, AxB0 FLAT OVAL DUCT IN INCHES THERMOSTAT TRANS: SQUARE TO ROUND 4-IL)ACOUSTIC THERMAL LINING R RISE IN DUCT C 4- R -► D DROP IN DUCT 4- D-..- 4- 24x10 12x8 SUPPLY/RETURN/ o 1-1/2 TIMES BRANCH SIZE EXHAUST AIR 12x8 TAKE -OFFS 24x10 10"11 SUPPLY/RETURN/ o 1-1/2 TIMES BRANCH SIZE EXHAUST AIR 4 L 10° TAKE -OFFS k- -18"0 II r10 p i SUPPLY AIR CONICAL TEE TAKE -OFFS Co L 10° s d ` VD 18"0 10"O SUPPLY AIR LATERAL TAKE -OFFS I L 10" 0 !i LONG RADIUS R 90° ELBOW �A R=w + %� / LONG RADIUS R 45° ELBOW R=W j JL5- OR 11&. WO° ELUOwTURNING VANES VANES 24x10 8x10 12x10 2410 TUPELO/ AIR TAKE -OFFS IMO 16x10 12x10 8x10 16x10 18x10 24x10 8x10 124,10 16X10 8x10 24x10 SUPPLY AIR 16X10 `. 12x10 TAKE -OFFS ` 8x10 18x10 24x16 OR •'-4+ SUPPL"RETURN/ 12x10 EXHAUST AIR. TAKEOFFS w/ REGISTER/GRILLE! 12x10 DIFFUSER 20x20 i zoxlo 20x10. 90^ VERTICAL SPLIT OFF PLAN viEwl 20x20 20x10 } S 20X10 DUCT TURNING DUCT COWN 20x12 1�,.... III SUPPLY DIFFUSER, REGISTER OR GRILLE Fr ' N RETURN REGISTER OR GRILLE EXHAUST REGISTER OR GRILLE CONTROL/SYMBOLS LEGEND SYMBOL DESCRIPTION s TEMPERATURE SENSOR DUCT SMOKE DETECTOR CID HUMIDISTAT THERMOSTAT QG THERMOSTAT WITH GUARD STATIC PRESSURE SENSOR FT-' FIN RADIATION (TYPE) , W/W ENCL. WALL TO WALL ENCLOSURE VISUAL FIDELITY NOTE: THIS DRAWING SET CONTAINS COLOR DESIGN INTENT AND TO EASE INTERPRETATION. IF THIS DRAWIN IN MONOCHROME OR GRAYSCALE PLEASE CONTACT KENNEDY M THE NUMBER LISTED TO THE RIGHT FOR A COLOR PRINTED SET. 8 10 Architecture Planning Interior Design 217 North Aurora Street Ithaca NY 14850 p 607.273.7600 f 607.273.0475 ENNEDY I4 CONfittAt:4 / / COMFORT STREET ROCHESTER, NEW YORK 146'20 555-232-2800 THESE DOCUMENTS AND ALL IDEAS, ARRANGEMENT, DESIGNS AND PLANS INDICATED THEREON OR PRESENTED THEREBYARE OWNED AND REMAIN THE PROPERTY OF KENNEDY MECHANICAL INC. AND NO PART THEREOF SHALL BE UTILIZED BY ANY PERSON, FIRM, OR CORPORATION FOR ANY PURPOSE WHATSOEVER EXCEPT WITH THE SPECIFIC WRITTEN PERMISSION OF KENNEDY MECHANICAL INC. ALL RIGHTS RESERVED Baumer Mechanical Design Services 625 Panorama Trail, Building 2, Suite 210 Rochester, NY 14625 585.313-5819 WARNING: It is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration. REVISION SCHEDULE NAME DATE OWNER CHANGES F E SEP 2014 STONE QUARRY APARTMENTS STONE QUARRY APARTMENTS, LL C z 0 B 2 F- DATE: 7/18/2014 PROJECT: 2012059 OTHER: DRAWN BY: KAG/JTB MECHANICAL - GENERAL NOTES, A LEGEND, SCHEDULES M001 STONE QUARRY APARTMENTS STONE QUARRY APARTMENTS, LLC ITHACA, NY 08/14/14 Scale: 1/8" = 1'-0" 2012059 -SK1 14x6 14x6 14x6 14x6--- '250 250 250 250 rm PARTIAL APARTMENT BLDG. FLOOR PLAN - CORRIDOR EXHAUST REVISION (H-SK1) 1/8" = 1'-0" NOTE: ROUTING SHOWN IS TYPICAL FOR CORRIDOR EXHAUST AT ALL THREE FLOORS HOLTARCH1TECTS RC, 2.17 N, Au rzTo f::!(1!..lnc, \IY 16S5C, 3r=$0727760(! t607 27:1•OAM KENNEDY V14**,,,K44,1 /1 CattentrITRIZT WaYEATER,14159,17,K hfai) 565-2szAra, torf-qvuiHh 75 Tiln gv, � u� � �� � �� �� � 10 � = FOR ALROOFING AND FLASHING REQUIREMENTS. REFER TO ARCHITECTURAL PLANS PROVIDE ALUMINUM ROOF JACK WITH Bx[mon»F7oAMPBR, PRIME AND PAINT WITH HIGH QUALITY PAINT CUSTOM COLOR SELECTED AND APPROVED BY ARCHITECT. DUCT MOUNTED VOLUME DAMPER AS CALLED FOR ON DRAWINGS INTEGRAL VOLUME DAMPER AS CALLED FOR ON SCHEDULES ROUND OR RECTANGULAR AS SPECIFIED ON DRAWINGS � Arch.te���� _ Planning �-n����U��K� -_. .^ .,. .�� Interior Design ^^ '~^~^ ^~^^ 217 North Aurora Street Ithaca NY 14850 p 607.273.7600 f 607.273.0475 CUT AND PATCH DRYWALL LID AS REQUIRED TO INSTALL DUCTWORK. PROVIDE SHEET METAL FIRESTOP FOR DUCT SUPPORT COMBUSTION AIR INLET AINTSTUICLASTPAECDEU.CTWCRK PLENUM BOX LENGTH AND WIDTH EQUAL TO DUCT CONNECTION SIZE FLA3H|NGITYpj PROVIDE WEATHER TIGHT INSTALLATION 12" CLEARANCE SHALL BE MAINTAINED ABOVE HIGHEST ANTICIPATED SNOW LEVEL. MAXIMUM NOT TO EXCEED 24' ABOVE ROOF. SEAL ALL ANNULAR SPACES AT CEILING WHERE DIFFUSER BOOT OCCURS AS LISTED IN ENERGY STAR REQUIREMENTS ENNEDY �tkl0t41044.*0=vf 4. 4,0r 1,..*.6.*14 T'ieth //COMFORT S7REfT ROCHESTER, NEW YORK 14620 PROVIDE FIRE STOP PENETRATION SYSTEM IN ACCORDANCE WITH ASTM E814. INSTALL SYSTEM PER MANUFACTURERS' INSTALLATION REQUIREMENTS SEAL ALL ANNULAR SPACES AT CEILING WHERE REGISTER BOOT OCCURS AS LISTED IN ENERGY STAR REQUIERMENTS COORDINATE ALL ROOF PENETRATION WORK WITH ROOFING CONTRACTOR. NOTE 1. DISTANCE FROM TOP OF VENT TO BOTLOM OF AIR INLET SHALL ESE DOCUMENTS AND AU. IDEAS, DESIGNS AND PLANS INDICATED THEREON OR PRESENTED THERL-13Y ARE oVvNEoAND REMNN PROPERTY OF KNNOY MCIIANICAI. INC. ANL' NO PART TIIEREOF SHALL BE UTIUZED BY ANY PERSON, CORPORATION FOR ANY PURPOSE WHATSOEVER EXCEPT PECIFIC WRJTTEN PERMISSION OF KENNEDY CHICAL INC. AU. RIGHTS RP_SERVED 2. COORDINATE INSTALLATION OF VENTS WITH OWNER. VENTS SHALL BE SYMMETRICAL. LINE UP ALL VENT PENETRATIONS HORIZONTALLY 3. PAINT EXTERIOR VENT AND COMBUSTION AIR PIPING WITH EXTERIOR FLAT PAINT. COLOR TO BE SELECTED BY ARCHITECT. 4. THIS DETAIL SHALL APPLY TO BOILERS AND FURNACES. 5' COORDINATE CUTTING AND PATCHING OF ROOF WITH GENERAL CONTRACTOR 6. LOCATE ALL ROOF PENETRATIONS ON REAR FACE OF ROOF. TRANSITION AND OFFSET AS REQUIRED. 1. DUCT AND DIFFUSER SIZE AND TYPE AS SHOWN ON DRAWINGS. TYPICAL EXHAUST ROOF JACK DETAIL /- T`/c TYPICAL CEILING/SIDE WALL REGISTER INSTALLATION� || DETAIL �[lN���JT[4[`U��TF1�T8|| ~~.,~--.....~,^,. ~^-..^ �|� DIFFUSER DETAIL ..`~^-'...^ Baumer Mechanical Design Services 625 Panorama Trail, Building 2,Suite em Rochester, NY 14625 585-3115819 PITCH HORIZONTAL FLUE PIPING 3ACK TOWARDS FURNACE PITCH HORIZONTAL FLUE PIPING BACK TOWARDS FURNACE ROUTE FURNANCE FLUES UP THROUGH ROOF TO CONCENTRIC VENT TERMINATION ROUTE FURNANCE FLUES UP TRHOUGH ROOF TO CONCENTRIC VENT TERMINATION SUPPLY AIR DUCT SIZE AS NOTED ON PLANS RETURN AIR DUCT SIZE AS NOTED ON PLANS WARNING: It is a violation of New York State Law for a person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Arhitect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration. 2" PVC COMBUSTION AIR INTAKE & EXHAUST PIPING 2" PVC COMBUSTON AIR SUPPLYINTAKE & EXHAUST PIPING PROVIDE REFRIGERANT PIPING BETWEEN EVAPPORATOR COIL AND A COOLED CONDENSING UNIT PER MANUFACTURER'S RECOMMENDATIONS ROUTE DUCT TO TERMINATION LOCATION SHOWN ON PLANS PROVIDE REFRIGERANT PIPING BETWEEN EVAPPORATOR COIL AND AR COOLED CONDENSING UNIT PER MANUFACTURER'SRECOMMENDATIONS REVISION SCHEDULE DATE CAULK AND SEAL JOINT AIRTIGHT RETURN AIR TO TRANSFER VIA LOUVERED DOORS, OPEN SURFACE AREA TO BE COORDINATED WITH DOOR SELECTION RETURN AIR DUCT SIZE AS NOTED ON PLANS €4 FINAL CONNECTION BY PLUMBING CONTRACTOR Ida FINAL CONNECTION BY K-7 PLUMBING CONTRACTOR CAULK AND SEAL JOINT AIRTIGHT RETURN AIR GRILLE REFER TO SIZES INDICATED ON PLANS ��^FINAL CONNECTION DY T--7 PLUMBING CONTRACTOR ��uFINAL CONNECTION DY KY PLUMBING CONTRACTOR PRIMARY CONDENSATE DRAIN CONNECTION PROVIDE 9D DEGREE LONG TURN ELBOW, PART NUMBER LT9D. AS MANUFACTURED BY IN-O-VATE TECHNOLOGIES PRIMARY CONDENSATE DRAIN CONNECTION WALL PROVIDE BLOCK SUPPORT FORRETURN AIR DUCTWORK NOTES: -DRYER VENT SHALL BE INSTALLED IN ACCORDING WITH THE REQUIREMENTS OF THE MECHANICAL CODE OF NEW YORK STATE -REFER TO ISOMETRIC VIEW THIS PAGE FOR MORE DETAIL PROVIDE DRAW BAND CONNECTION DRYER FINAL CONNECTION BY PLUMBING CONTRACTOR PROVIDE UL LISTED FLEXIBLE METAL DUCTWORK CONNECTION TO DRYER 1/2" THICK NEOPRENE VIBRATION ISOLATION PAD FLUE CONDENSATE NEUTRALIZER KIT SUPPORT BASE (BY SAME MFG AS FURNACE) SUPPLY AIR DUCT SIZE AS NOTED ON PLANS FINAL CONNECTION BY PLUMBING CONTRACTOR FLUE CONDENSATE NEUTRALIZER KIT TYPICALAPARTMENT FURNACE .~....~___.� DRYER VENT DETAIL LECFSSE Cqmstnud|cm '75Thruway Pask Drive VVeS Henrietta, NY145B(3 0 ~° 2012059 HVAC DETAILS A STACKED WASHER DRYER UNIT (TYP. OF 5) ISOMETRIC VIEW AT LAUNDRY AREA U��U ��������K �K V 10 El 01 N 1.0 ®APARTMENT BLDG. ROOF PLAN - HVAC 1/8" = 1'-0" FLUES FOR DOMESTIC. WATER HEATERS -COORDINATE WITH PLUMBING CONTRACTOR ACC -1 ACC -1 ACC -1 ACC -1 ACC -1 Architecture Planning Interior Design 217 North Aurora Street Ithaca NY 14850 p 607.273.7600 f 607.273.0475 At Nit 0,1,4„ Oh'ttalt 11 COMFORT STREET ROCHESTER, NEW YORK 14620 565-232-2800 Th UMENTS.AND . ALL IDEAS,ARRANGEMENT, D PLANS INDICATED THEREON OR. EREBY ARE OWNED AND REMAIN THE OF KENNEDY MECHANICAL INC. AND NO PART SHALL BE UTILIZED BY ANYPERSON, MRM, OR TION FOR ANY PURPOSE WHATSOEVER EXCEPT SPECIFIC WRJTTEN PERMISSION OF. KENNEDY HANICAL.INC. ALL RIGHTS RESERVED C Baumer Mechanical Design Services 625 Panorama Tral, Building 2, Suite 210 Rochester, NY 14625 585-3135819 WARNING: It is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration. REVISION SCHEDULE NAME DATE STONE QUARRY APARTMENTS DATE: 7/18/2014 PROJECT: 2012059 OTHER: DRAWN BY: G/JTB APARTMENT BLDG. ROOF/ATTIC PLAN - HVAC M103 4 5 6 7 8 9 10 B A 0 N c) 1 2 4 5 6 7 10 NO WALL TRANSFER LOCATION ( UNDERCUT THE DOOR? T 7'-9" 12x6 B: 7'-3" 125 T: 8'-10" B: 8'-4" 16x12 TRANSFER 6" A F F 16,e12 TRANSFER 6"A.F.F NEW SOFFIT ♦ T: 7-9" B: T-3" T: V-10" B: 8'-4" 16,02 TRANSFER 6" A F F T: T_9" ..NEW SOFFIT ... 7'.-;" T: T-9" B: 7-3" T: 7'-9' B: 7'-4' T: 8'-10" B: 8'-4" 0x41 16x12 TRANSFER 6` A.:F.F T: 8'-10" B: 8'-4" 16x12 TRANSFER WA:FF T: T-9„ 1� 125 B: 7'-3" NEW SOFFIT 12x6 T: 7'-9" 125 B: T3" B: 8,-4" T: 8'-11" B: 8'-4" T: 8'-11" B: 8'-4" 12x6 I.I THIRD FLOOR HVAC PLAN DRAWING NOTES 0 1 PROVIDE SHEET METAL PLENUM SAME SIZE AS EVAPORATOR CONNECTION. 2 FURNACE ACCESS AREA. KEEP FREE OF OBSTRUCTION. 3 7" EXHAUST DUCT DOWN TO RANGE HOOD.PROVIDE A DUCT TRANSITION AS REQURIED TO MAKE THE FINAL CONNECTION TO THE RANGE HOOD. RANGE HOOD IS PROVIDED BY OTHERS. 4 PROVIDE WALL CAP OUTLET. THE WALL CAP OUTLET SHALL BE A HOODED TYPE SELECTED FROM THE SIDING MANUFACTURERS STANDARDS. THE HOOD SHALL BE VINYL CONSTRCTION WITH A BACKDRAFT DAMPER. COLOR SHALL BE SELECTED BY THE ARCHITECT. COORDINATE EXACT LOCATION WITH THE ARCHITECT ELEVATIONS. 5 DUCTWORK SHALL BE INSTALLED IN THE SOFFITS. TEST THE DUCTWORK BEFORE THE SOFFITS ARE CLOSED UP. COORDINATE WTH APPLICABLE TRADES. 6 PROVIDE 7" KITCHEN EXHAUST DUCT THROUGH SIDEWALL ON THE 1ST/2ND FLOORS. 25 T:7'-9' NEW SOFFIT 7,-3" 1602 TRANSFER TA.F.F:- 16x12 TRANSFER 6" A.F.F.. OA INTAKE WALL CAP T: 7'-9" B: T-3" B: T-9" T: 8) 10' 12x6 . B:8'-3" 12 16x12 TRANSFER 6' A F. URN -A T: 8'-10" B: 8'-3" T:7' -1O" B: 7'-2" 16x12 SEER 6" A.F F TYPICAL TOWNHOME ROOF PLAN - HVAC 1/8" 11-0" SE Construction 1 ve: ®APARTMENT BLDG. THIRD FLOOR P N - HVAC 1/8" = 11-0" 10 Architecture Planning Interior Design 217 North Aurora Street Ithaca NY 14850 p 607.273.7600 f 607.273.0475 ENNEDy OtANKAt COurtA* T' 1 / COMFORT STREET ROC TER, NEW YORK 14620 565-232-2500 THESE DOCUMENTS AND ALL IDEAS, ARRANGEMENT, DESIGNS AND PLANS INDICATED THEREON OR PRESENTED THEREBY ARE OWNED AND REMAIN THE 'ROPERT( OF KENNEDY MECHANICAL INC. AND NO. PART 'HEREOFSHALL .BE UTILIZED BY ANY PERSON, FIRM, OR ORPORATION FOR ANY PURPOSE WHATSOEVER EXCEPT WITH THE SPECIFIC WRJTTEN PERMISSION OF KENNEDY MECHANICAL INC. ALL RIGHTS RESERVED Baumer Mechanical Design Services 625 Panorama Trail, Building 2, Suite 210 Rochester: NY 14625 585-313-5819 WARNING: It is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration. REVISION SCHEDULE NAME DATE AUG 2014 STONE QUARRY APARTMENTS J J APARTMENTS DATE: 7/18/2014 PROJECT: 2012059 OTHER: DRAWN BY: G/JTB G F E D C APARTMENT BLDG./TH THIRD FLOOR AND A ROOF /ATTIC PLANS - HVAC M102 10 CL NO WALL TRANSFER LOCATION UNDERCUT THE DOOR? F- F- 6ci 16x12 TRANSFE 6" A F F T: 7-9" 12x6 B: 7'29" 125 I 12x6 T: 8'-10" 125 B: 9-4" kkrkkkkkkkkkkk". NEW SOFFIT T. T-9" 8: 7'-3" URN -A 12x6 T: 7-9" B: 7-3" 12x6 T: 7'-9" 8: T-4" T. 9-10" 8:8-4" 80 16x12 TRANSFER 6" A F F 125 d 11 II 1.1 ITF T:8' -ll" a 81-4" .) 16x12 TRANSFER 25 T:7'-9 NEW SOFFIT 12 "1 T: T-9" 125 B: T-3" 18x12 TRANSFER TAFF 52111 N - NEW SOFFIT T: T-9" B: 7-3" 10x4 2 125 9-4" T:8'-11" B: 8'-4" 7"0 T: 9-11" B: 9-4" T: 8011" B: 9-4" NEW SOFFIT 12x6 125 T: 7'-9" NEW SOFFIT B: 7'-3" 12x6 11 16x12 TRANSFER T: 8:8-4" 16x12 TRANSFER 6" A F F OA INTAKE WALL CAP T: 9-3" B: 7'-9" 1 8o 7 -1 127, 007. 7: 9-10" 8'-3" 125 T: T-9" B: T-4" k T: 7-10" 16x12 TRANSFER TAFF 16x12 TRANSFER 6,1 TAFF ni APARTMENT BLDG. SECOND FLOOR PLAN - HVAC 1/8" = 11-0" 12x6 125 2 4 5 SECOND FLOOR HVAC PLAN DRAWING NOTES PROVIDE SHEET METAL PLENUM SAME SIZE AS EVAPORATOR CONNECTION, 2 FURNACE ACCESS AREA. KEEP FREE OF OBSTRUCTION. 7" EXHAUST DUCT DOWN TO RANGE HOOD.PROVIDE A DUCT TRANSITION AS REQURIED TO MAKE THE FINAL CONNECTION TO THE RANGE HOOD. RANGE HOOD IS PROVIDED BY OTHERS, 4 PROVIDE WALL CAP OUTLET, THE WALL CAP OUTLET SHALL BE A HOODED TYPE SELECTED FROM THE SIDING MANUFACTURERS STANDARDS. THE HOOD SHALL BE VINYL CONSTRUCTION WITH A BACKDRAFT DAMPER. COLOR SHALL BE SELECTED BY THE ARCHITECT, COORDINATE EXACT LOCATION WITH THE ARCHITECT ELEVATIONS. 5 DUCTWORK SHALL BE INSTALLED IN THE SOFFITS. TEST THE DUCTWORK BEFORE THE SOFFITS ARE CLOSED UP. COORDINATE WITH APPLICABLE TRADES, 6 PROVIDE 7" KITCHEN EXHAUST DUCT THROUGH SIDEWALL ON THE 1ST/2ND FLOORS. 7 BATHROOM EXHAUST DUCT UP THROUGH ROOF. 8 13x20 SUPPLY DUCT DOWN FROM FURNACE PLENUM TO FLOOR BELOW. 16512 TRANSFER 16512 TRANSFER 6.-10" A F F 20520 TRANSFER 6" A F F 16X12 TRANSFER 20520 TRANSFER 12x5 120 r;-? TYPICAL TOWNHOME SECOND FLOOR PLAN - HVAC 1/8" = 1'-0" 6 i 7 12x4 120 8 9 • ••• •• •••••••••••••„- geogottlipooll0g0000+010000000b,00,400,000,100fterhge,00040000.14*0 ,00.004tigiotwsp0,011.60060, 1,01,015$6SIMIT LECt•ESSEt Construciton • 75 Thrtiv\ra•\../ Etyrit. I West Henriett.a, NY.1 /1,586 ......... i. •„0.0,0`000''' •a:" I I'401** Architecture Planning Interior Design 217 North Aurora Street Ithaca NY 14850 p 607.273.7600 f 607.273.0475 KENNEDy 04totANC4(0,.$05*At 041 Al AS ,tt,Ithrt$ $./ttet $$$$$1 Alt$ft 11 COMFORT STREET ROCHESTER, NEW YORK 14620 585-232-2 -00 DOCUMENTS AND ALL IDEAS, ARRANGEMENT, DESIGNS AND PLANS INDICATED T11EREON OR PRESENTED THEREBY ARE OWNED AND REMAIN THE PROPERlY OF KENNEDY MECHANICAL INC. AND NO PART ThEREOF SHALL BE UTIUZED BY ANY PERSON, FIRM, OR . CORPORATION FOR ANY PURPOSE W1-IATSOEVER EXCEPT WITH THE SPECIFIC WRITTEN PERMISSION OF KENNEDY MECHANICAL INC. ALL RIGHTS RESERVED Baumer Mechanical Design Services 625 Panorama Trail, Building 2, Suite 210 Rochester, NY 14625 585-313-5819 WARNING: It is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration. REVISION SCHEDULE NAME DATE F 15 AUG 2014 STONE QUARRY APARTMENTS STONE QUARRY APARTMENTS, L ITHACA, NY DATE: 7/18/2014 PROJECT: OTHER: 2012059 10 DRAWN BY: KAG/JTB APARTMENT BLDG./TH SECOND FLOOR PLANS - HVAC M101 A 10 CUH-S1 4 T 4x6 14x1 150 t ;;; 250 4x6 14x6 -- 250 250 12x6 100 5"0 T:7'-9" 12 B: 7-3" T:7'-9" 12 B: 7'-3" STACKED 4" DRYER EXHAUST VENTS (6j SEE DETAIL M300 T: 7'-t0". 8. 7,-2" 0"x8" 16"x8' 16x12 TRANSFER 6" A F F T: 8'-9" B: 8'-5" LOUVER L-2 16,8 T: 7-10" B: 7-2" T: 7'-10' 8: 7'-2" T: 7'-9" B: 7'-3" 20"x8" LOUVER L- 16x8 16x12 TRANSFER 6"AFF T: 8.-10" B: 8'-4" T: 7'-9" B: T-3" 125 T: 8'-11" B: 8'-4 T: T-9" B:7'-3" 125 B: 8'x.1" T 8'-10" B: 8'-4" 15,02 TRANSFER 6": ARE 2 FIRST FLOOR HVAC PLAN DRAWING NOTES PROVIDE SHEET METAL PLENUM SAME SIZE AS EVAPORATOR CONNECTION. FURNACE ACCESS AREA. KEEP FREE OF OBSTRUC1 ION. 7" EXHAUST DUCT DOWN TO RANGE HOOD.PROVIDE A DUCT TRANSITION AS REQURIED TO MAKE THE FINAL CONNECTION TO THE RANGE HOOD. RANGE HOOD IS PROVIDED BY OTHERS. 4 PROVIDE WALL CAP OUTLET. THE WALL CAP OUTLET SHALL BE A HOODED TYPE SELECTED FROM THE SIDING MANUFACTURERS STANDARDS. THE HOOD SHALL BE VINYL CONSTRCTION WITH A BACKDRAFT DAMPER. COLOR SHALL BE SELECTED BY THE ARCHITECT. COORDINATE EXACT LOCATION WITH THE ARCHITECT ELEVATIONS. S DUCTWORK SHALL BE INSTALLED IN THE SOFFITS. TEST THE DUCTWORK BEFORE THE SOFFITS ARE CLOSED UP. COORDINATE WITH APPLICABLE TRADES. 6 PROVIDE 7" KITCHEN EXHAUST DUCT THRU SIDEWALL ON THE IST/2ND FLOORS. 7 LOUVER L-1 TO OPENI WHEN FAN ON F-2 RUNS OCCUPIED MODE 124 VOLT CIRCUIT). 8 13x20 SUPPLY DUCT DOWN FROM FURNACE PLENUM ON SECOND FLOOR 9 DUCTWORK LOCATED IN AN UNCONDITIONED SPACE SHALL BE INSULATED. Request: Date Required: LECESSE is proposing to vent Apartment end units #118 & #225 out the sidewall of the Mechanical Room in lieu of the roof. The reason for this is that the roof is extremely tight and inaccessible above these two units. Appropriate sidewall termination kits will be used as required. Please confirm if this is acceptable. Requested by: Ashley Tarasco LECESSE Construction Services Response: Vents as per attached acceptable Architecturally. No comment on mechanical function or design. Direct Vent furnace Side Wall Vent Kit (0170K00000S) Installation Instructions T: T-9" B: 7'-3" 125 T. 7'-9" B: 7'-3" T: 8,-11" B: 8'-4" 16x12 TRANSFER 6- A.F F. T: 8'-10" B: 8'-4" 16,12 TRANSFER 6"A.FF T:8-10" B: 6"O DUCT UP TO FLOOR ABOVE FO DUCT UP TO FLOOR ABOVE 2X6 \I T: T-9" 125 B: 7'-3" OA INTAKE WALL CAP URN -A 10x4 75._M 10X10 T: 8'-3` B: 7'-9" FURN-A CUH-S1 T: 8'-10" B: 8'-4" FURN- 5+0 DUCT UP TO FLOOR ABOVE 18"x8 18"x8" RFE'i!' .-10x41 T: 7'-9" B: 7-3" 18"x8" T: T-10" B: 7-2" TRANSFER 6" A. F. F 16,12 TRANSFER 6"AFF ---10x4 6"0 DUCT UP TO FLOOR ABOVE 6"0 DUCT UP TOFLOOR ABOVE APARTMENT BLDG. FIRST FLOOR PLAN HVAC 1/8" = 1I-0" ACC -1 ACC -1 TYPICAL TOWNHOME FIRST FLOOR PLAN - HVAC 1/8" = TAFICHITECTS Architecture Planning Interior Design 217 North Aurora Street Ithaca NY 14850 p 607.273.7600 f 607273.0475 NEDY t T'Ugl / / COMFORT STREET ROCHESTER, NEW YORK 14620 585-232-2500 THESE DOCUMENTS. AND ALL IDEAS. ARRANGEMENT, DESIGNS AND PLANS INDICATED THEREON OR. PRESENTED THEREBY ARE OWNED AND REMAIN THE PROPERTY or KENNEDY MECHANICAL INC. AND NO PART THEREOF SMALL BE UTILIZED BY ANY PERSON. MRM, OR CORPORATION FOR ANY PURPOSE WHATSOEVER:EXCEPr WITH THE SPECIFIC WRITTEN PERMISSION OF KENNEDY MECHANICAL INC. ALL RIGHTS RESERVED Baumer Mechanical Design Services 625 Panorama Trail, Building 2, Suite 210 Rochester, NY 14625 585-313-5819 WARNING: It a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration. REVISION SCHEDULE NAME DATE 15 AUG 2014 STONE QUARRY APARTMENTS RTMENTS, LL STONE QUARRY AP DATE: 7/18/2014 PROJECT: 2012059 OTHER: DRAWN BY: G/J T B 6 7 9 10 APARTMENT BLDG./TH FIRST A FLOOR PLANS - HVAC M100 ENERGY STAR QUALIFIED HOMES, REQUIREMENTS: 1. CONTRACTORS SHALL BE ACCA-QUALIFIED OR H -QUITO THROUGH ADVANCED ENERGY OR NYSERDA AND COMPLY WITH ENERGY STAR QUALIFIED HOMES, VERSION 3 (REV. 7), HVAC SYSTEM QUALITY INSTALLATION RATER CHECKLIST AND REQUIREMENTS NOTED BELOW. SECTION 1: REVIEW OF ENERGY STAR V3 REV 07 HVAC SYSTEM QUALITY INSTALLATION CONTRACTOR CHECKLIST 1. COMPLETE AND COLLECT FOR RECORDS HVAC SYSTEM QUALITY INSTALLATION CONTRACTOR CHECKLIST IN ITS ENTIRETY, ALONG WITH DOCUMENTATION ON VENTILATION SYSTEM, FULL LOAD CALCULATIONS, AHRI CERTIFICATE AND BALANCING REPORT. IT IS THE CONTRACTOR'S RESPONSIBILITY TO COMPLETE THE CHECKLISTS IN THEIR ENTIRETY AS THE RATER WILL BE RESPONSIBLE TO VERIFY INPUTS SUCH AS DESIGN TEMPS, U VALUES, # OF OCCUPANTS, SQUARE FOOTAGE, ORIENTATION, ETC. IT IS THE CONTRACTOR'S EXCLUSIVE RESPONSIBILITY TO ENSURE THE SYSTEM DESIGN AND INSTALLATION COMPLY WITH THE CONTRACTOR CHECKLIST SPECIFICATIONS, THE RATER WILL USE THE ENERGY STAR V3 HVAC QI RATER CHECKLIST TO VERIFY THE INPUTS FROM THE HVAC CONTRACTOR CHECKLIST SUCH AS EQUIPMENT MODEL NUMBERS, EFFICIENCIES,CAPACITIES; REFRIGERANT CHARGE TEST METHOD; STATIC PRESSURES; VENTILATION; TESTING & BALANCING, ETC, 2. REVIEW THE FOLLOWING PARAMETERS RELATED TO SYSTEM COOLING DESIGN, SELECTION, AND INSTALLATION FROM HVAC CONTRACTOR CHECKLIST: A. OUTDOOR DESIGN TEMPERATURES ARE EQUAL TO 1% AND 99% ACCA MANUAL) DESIGN TEMPERATURES FOR CONTRACTOR -DESIGNATED DESIGN LOCATION. B. HOME ORIENTATION MATCHES ORIENTATION OF RATED HOME. C. NUMBER OF OCCUPANTS EQUALS NUMBER OF OCCUPANTS IN RATED HOME. THE NUMBER OF OCCUPANTS AMONG ALL HVAC SYSTEMS IN THE HOME SHALL BE EQUAL TO THE NUMBER OF RESNET-DEFINED BEDROOMS PLUS ONE. OCCUPANTS LISTED FOR SYSTEMS FOR WHICH THE HEADER OF THE CONTRACTOR CHECKLIST INDICATES THAT IT IS DESIGNED TO HANDLE TEMPORARY OCCUPANT LOADS SHALL BE PERMITTED TO EXCEED THIS LIMIT. D. CONDITIONED FLOOR AREA IS WITHIN PLUS OR MINUS 10% OF CONDITIONED FLOOR AREA OF RATED HOME. E. WINDOW AREA IS WITHIN PLUS OR MINUS 10% OF CALCULATED WINDOW AREA OF RATED HOME, F. PREDOMINANT WINDOW SHGC IS WITHIN 0.1 OF PREDOMINANT VALUE IN RATED HOME. PREDOMINANT IS DEFINED AS THE SHGC VALUE USED IN THE GREATEST AMOUNT OF WINDOW AREA IN THE HOME, G. LISTED LATENT COOLING CAPACITY EXCEEDS DESIGN LATENT HEAT GAIN. H. LISTED SENSIBLE COOLING CAPACITY EXCEEDS DESIGN SENSIBLE HEAT GAIN. LISTED TOTAL COOLING CAPACITY IS 95-115% (OR 95-125% FOR HEAT PUMPS IN CLIMATE ZONES 4-8) OF DESIGN TOTAL HEAT GAIN, OR HEAT NOMINAL SIZE: FOR COOLING SYSTEMS THE NEXT LARGEST NOMINAL PIECE OF EQUIPMENT MAY BE USED THAT IS AVAILABLE TO SATISFY THE LATENT AND SENSIBLE REQUIREMENTS. SINGLE -SPEED SYSTEMS GENERALLY HAVE OEM NOMINAL SIZE INCREMENTS OF 1/2 TON. MULTI -SPEED OR MULTI -STAGE EQUIPMENT MAY HAVE OEM NOMINAL SIZE INCREMENTS OF ONE TON. THEREFORE, THE USE OF THESE ADVANCED SYSTEM TYPES CAN PROVIDE EXTRA FLEXIBILITY TO MEET THE EQUIPMENT SIZING REQUIREMENTS. J. HVAC MANUFACTURER AND MODEL NUMBERS ON INSTALLED EQUIPMENT, CONTRACTOR CHECKLIST, AND AHRI CERTIFICATE OR OEM CATALOG DATA ALL MATCH. IN CASES WHERE THE CONDENSER UNIT IS INSTALLED AFTER THE TIME OF INSPECTION BY THE RATER, THE HVAC MANUFACTURER AND MODEL NUMBERS ON INSTALLED EQUIPMENT CAN BE DOCUMENTED THROUGH THE USE OF PHOTOGRAPHS PROVIDED BY THE HVAC CONTRACTOR AFTER INSTALLATION IS COMPLETE. K. USING REPORTED LIQUID LINE OR SUCTION LINE PRESSURE, CORRESPONDING TEMPERATURE (AS DETERMINED USING PRESSURE/TEMPERATURE CHART FOR REFRIGERANT TYPE) MATCHES REPORTED CONDENSER OR EVAPORATOR SATURATION TEMPERATURE (PLUS OR MINUS 3 DEGREES). IF CONTRACTOR HAS INDICATED THAT AN OEM TEST PROCEDURE HAS BEEN USED IN PLACE OF A SUB -COOLING OR SUPER -HEAT PROCESS AND DOCUMENTATION HAS BEEN ATTACHED THAT DEFINES THIS PROCEDURE, THEN THE BOX FOR "N/A" SHALL BE CHECKED FOR THIS ITEM. L. CALCULATED SUB -COOLING OR SUPERHEAT VALUE EQUALS REPORTED TARGET SUB -COOLING OR SUPERHEAT TEMPERATURE. IF CONTRACTOR HAS INDICATED THAT AN OEM TEST PROCEDURE HAS BEEN USED IN PLACE OF A SUB -COOLING OR SUPER -HEAT PROCESS AND DOCUMENTATION HAS BEEN ATTACHED THAT DEFINES THIS PROCEDURE, THEN THE BOX FOR "N/A" SHALL BE CHECKED FOR THIS ITEM. RATER -VERIFIED SUPPLY AND RETURN DUCT STATIC PRESSURE SHALL BE LESS THAN 110% OF CONTRACTOR RECORD VALUES. 4. SUBMIT CONTRACTOR PREPARED REPORT INDICATING THE ROOM NAME AND DESIGN AIRFLOW FOR EACH SUPPLY AND RETURN REGISTER TO RATER FOR RECORD. IN ADDITION, FINAL BALANCING REPORT INDICATING ROOM AIRFLOWS MEASURED AND DOCUMENTED ON BALANCING REPORT THROUGH ONE OF THE FOLLOWING OPTIONS: 1. MEASURED AND DOCUMENTED BY THE CONTRACTOR. 2. MEASURED BY RATER USING SECTION 804.2 OF THE MORTGAGE INDUSTRY NATIONAL HERS STANDARD, DOCUMENTED BY RATER, AND VERIFIED BY RATER TO BE WITHIN THE GREATER OF +/-20% OR 25 CFM OF DESIGN AIRFLOW. HVAC CONTRACTOR HOLDS CREDENTIALS NECESSARY TO COMPLETE THE HVAC SYSTEM QI CONTRACTOR CHECKLIST. THE RATER MUST CONFIRM THE CONTRACTOR HOLDS THE CREDENTIALS. SECTION 2: DUCT QUALITY INSTALLATION 1. INSTALL DUCTWORK CONNECTIONS AND ROUTING WITHOUT KINKS OR SHARP BENDS. COORDINATE WITH THE FRAMER, PLUMBER, AND ELECTRICIAN FOR EFFECTIVE DUCT INSTALLATION. 2. INSTALL FLEXIBLE DUCTWCRK WITHOUT EXCESSIVE COILS OR LOOPS UNLESS NEEDED FOR ACOUSTICAL CONTROL. COORDINATE WITH THE FRAMER, PLUMBER, AND ELECTRICIAN FOR EFFECTIVE DUCT INSTALLATION. BALANCING DAMPERS OR PROPER DUCT SIZING SHALL BE USED INSTEAD OF LOOPS TO LIMIT FLOW TO DIFFUSERS. WHEN BALANCING DAMPERS ARE USED, THEY SHALL BE LOCATED AT THE TRUNK TO LIMIT NOISE UNLESS THE TRUNK WILL NOT BE ACCESSIBLE WHEN THE BALANCING PROCESS IS CONDUCTED. IN SUCH CASES, OPPOSED BLADE DAMPERS OR DAMPERS THAT ARE LOCATED IN THE DUCT BOOT ARE PERMITTED, FLEXIBLE DUCTWORK SHALL NOT BE INSTALLED IN UNCONDITIONED CAVITIES SMALLER THAN THE OUTER DUCTWORK DIAMETER. FLEXIBLE DUCTWORK SHALL NOT BE INSTALLED IN CONDITIONED CAVITIES SMALLER THAN THE INNER DUCTWORK DIAMETER. INSTALL DUCTS TO PREVENT COMPRESSION OF DUCT OR DUCT INSULATION. 4, FLEXIBLE DUCTWORK SHALL BE SUPPORTED AT MANUFACTURER RECOMMENDED INTERVALS BUT AT A DISTANCE LESS THAN OR EQUAL TO 5 FT. TO PREVENT SAGGING, INSTALL SUPPORTS AT LEAST ONE INCH WIDE. INSTALL SUPPORTS WITHOUT COMPRESSING THE DUCT AND THE DUCT INSULATION. BUILDING CAVITIES SHALL NOT BE USED AS SUPPLY OR RETURN DUCTS UNLESS THEY MEET ITEMS 3.2, 3.3, 4.1, AND 4.2 OF THE HVAC SYSTEM QUALITY INSTALLATION RATER CHECKLIST. AVOID USING BUILDING CAVITIES AS DUCTS DUE TO THE DIFFICULTY OF PROPERLY AIR SEALING AND INSULATING THEM. IF BUILDING CAVITIES ARE USED, INSTALL INSULATION WITHOUT MISALIGNMENTS, COMPRESSIONS, GAPS, OR VOIDS IN ALL CAVITIES USED FOR DUCTS. IF NON -RIGID INSULATION 15 USED, INSTALL A RIGID AIR BARRIER OR OTHER SUPPORTING MATERIAL TO HOLD INSULATION IN PLACE. SEAL ALL SEAMS, GAPS, AND HOLES OF THE AIR BARRIER WITH CAULK OR FOAM. 6. HVAC DUCTS, CAVITIES USED AS DUCTS, AND COMBUSTION AIR INLETS AND OUTLETS MAY PASS PERPENDICULARLY THROUGH EXTERIOR WALLS BUT SHALL NOT BE RUN WITHIN EXTERIOR WALLS UNLESS PROVIDED WITH AT LEAST R-6 CONTINUOUS ,NSULATION ON EXTERIOR SIDE OF THE CAVITY, ALONG WITH AN INTERIOR AND EXTERIOR AIR BARRIER WHERE REQUIRED BY THE THERMAL ENCLOSURE SYSTEM CHECKLIST. INSTALL INSULATION WITHOUT MISALIGNMENT, COMPRESSIONS, GAPS, OR VOIDS IN ALL BUILDING CAVITIES WITH DUCTS OR CAVITIES USED AS DUCTS. IF NON -RIGID INSULATION IS USED, INSTALL A RIGID AIR BARRIER OR OTHER SUPPORTING MATERIAL TO HOLD INSULATION IN PLACE. SEAL ALL SEAMS, GAPS, AND HOLES OF THE AIR BARRIER WITH CAULK OR FOAM. 7, QUANTITY AND LOCATION OF SUPPLY AND RETURN DUCT TERMINALS SHALL MATCH CONTRACTOR BALANCING REPORT. 8. BEDROOMS SHALL BE PRESSURE -BALANCED USING ANY COMBINATION OF TRANSFER GRILLES, JUMPER DUCTS, DEDICATED RETURN DUCTS, AND/OR UNDERCUT DOORS TO EITHER: A) PROVIDE ONE SQUARE INCH OF FREE AREA OPENING PER 1 CFM OF SUPPLY AIR, AS REPORTED ON THE CONTRACTOR -PROVIDED BALANCING REPORT: OR B) ACHIEVE A RATER -MEASURED PRESSURE DIFFERENTIAL LESS THAN OR EQUAL TO 3 PA (0.012 IN. W.C.) WITH RESPECT TO THE MAIN BODY OF THE HOUSE WHEN BEDROOM DOORS ARE CLOSED AND THE AIR HANDLER IS OPERATING. FOR PROVIDING FREE AREA, REFER TO THE BALANCING REPORT PROVIDED BY THE HVAC CONTRACTOR FOR THE BEDROOM AIR FLOWS TO SIZE THE TRANSFER GRILLES AND/OR JUMPER DUCTS. INSTALL AND SEAL PROPERLY SIZED TRANSFER GRILLES DURING FRAMING. BOTH OPENINGS OF THE TRANSFER GRILLE MUST HAVE THE REQUIRED FREE AREA. IF TRANSFER GRILLES ARE NOT USED, INSTALL AND SEAL JUMPER DUCTS DURING FRAMING. BOTH OPENINGS AND DUCTS MUST HAVE THE REQUIRED FREE AREA. FOR ACHIEVING A RATER -MEASURED PRESSURE DIFFERENTIAL, EPA RECOMMENDS THAT TRANSFER GRILLES, JUMPER DUCTS, OR DEDICATED RETURNS BE INSTALLED, TEST THE PRESSURES OF EACH BEDROOM. FOR HVAC SYSTEM WITH MULTI -SPEED FANS, THE HIGHEST DESIGN FAN SPEED SHALL BE USED WHEN VERIFYING THIS REQUIREMENT. 9. HVAC CONTRACTOR SHALL BE AVAILABLE WHEN RATER IS CONDUCTING THIS TEST. SECTION 3: DUCT INSULATION 1. ALL TRUNK DUCTS IN UNCONDITIONED SPACE SHALL BE INSULATED. SEAL ALL SEAMS, GAPS, AND HOLES OF ALL TRUNK DUCT CONNECTIONS BEFORE INSTALLING INSULATION, PREFERABLY WITH MASTIC. INSTALL INSULATION WITHOUT MISALIGNMENT, COMPRESSION, GAPS, OR VOIDS AROUND ALL CONNECTIONS AND EXPOSED DUCTWORK. SEAL DUCTINSULATION TO BOOT TO PREVENT ACCUMULATION OF CONDENSATION. 2. INSTALL INSULATED DUCTWORK, BOXES, AND BOOTS IN ALL UNCONDITIONED ATTIC SPACES TO MEET THE PRESCRIPTIVE PATH. INSTALL ALL DUCTS IN UNCONDITIONED SPACES WITHOUT COMPRESSING THE INSULATION. PRESCRIPTIVE PATH: SUPPLY DUCTS IN UNCONDITIONED ATTIC SHALL HAVE GREATER THAN OR EQUAL TO R-8 INSULATION. ALL OTHER SUPPLY DUCTS AND ALL RETURN DUCTS IN UNCONDITIONED SPACE SHALL HAVE GREATER THAN OR EQUAL TO R-6 INSULATION. INSTALL INSULATED DUCTWORK, BOXES, AND BOOTS IN ALL UNCONDITIONED SPACES. INSTALL ALL DUCTS IN UNCONDITIONED SPACES WITHOUT COMPRESSING THE INSULATION. 2 SECTION 4: DUCT LEAKAGE DUCT LEAKAGE SHALL MEET OR EXCEED THE FOLLOWING CRITERIA: 1, TOTAL RATER -MEASURED DUCT LEAKAGE = 8 CFM25 (CFM25 = CFM @ 25 PASCALS AIR PRESSURE) PER 100 SQ, FT. OF CONDITIONED FLOOR AREA (CFA). A. SEAL ALL SEAMS, GAPS, AND HOLES OF ALL TRUNK DUCT CONNECTIONS BEFORE INSTALLING INSULATION, PREFERABLY WITH MASTIC. B. INSTALL INSULATION WITHOUT MISALIGNMENTS, COMPRESSIONS, GAPS, OR VOIDS AROUND ALL CONNECTIONS AND EXPOSED DUCT WORK C. SEAL DUCT INSULATION IN PLACE. D. EPA RECOMMENDS TESTING DUCTS ONLY AFTER COMPLETING A VISUAL INSPECTION OF PROPER DUCT SEALING, ENERGY STAR QUALIFIED HOMES, REQUIREMENTS (CON'T) 2. RATER -MEASURED DUCT LEAKAGE TO OUTDOORS = 4 CFM25 PER 100 SQ. FT. OF CONDITIONED FLOOR AREA. A. SEAL ALL SEAMS, GAPS, AND HOLES OF ALL TRUNK DUCT CONNECTIONS BEFORE INSTALLING INSULATION. MASTIC IS RECOMMENDED FOR SEALING B. INSTALL INSULATION WITHOUT MISALIGNMENT, COMPRESSION, GAPS, OR VOIDS AROUND ALL CONNECTIONS AND EXPOSED DUCT WORK. C. SEAL DUCT INSULATION IN PLACE. D. EPA RECOMMENDS TESTING DUCTS ONLY AFTER COMPLETING A VISUAL INSPECTION OF PROPER DUCT SEALING. ADDITIONAL TESTING, QUALIFICATION AND INSTALLATION GUIDELINES TO MEET FOR LEAKAGE CRITERIA A DUCT LEAKAGE SHALL BE DETERMINED AND DOCUMENTED BY A RATER USING A RESNET-APPROVED TESTING PROTOCOL DURING ROUGH -IN (S 4 CFM25 PER 100 SQ. FT. OF CFA WITH AIR HANDLER AND ALL DUCTWORK, BUILDING CAVITIES USED AS DUCTWORK, & DUCT BOOTS INSTALLED. IN ADDITION, ALL DUCT BOOTS SEALED TO FINISHED SURFACE, RATER -VERIFIED AT FINAL) AND AFTER ALL COMPONENTS OF THE SYSTEM HAVE BEEN INSTALLED (E.G., AIR HANDLER AND REGISTER GRILLES). LEAKAGE LIMITS SHALL BE ASSESSED ON A PER -SYSTEM BASIS, RATHER THAN PER RESIDENT UNIT, WHERE COMMON SYSTEMS ARE USED. TESTING OF DUCT LEAKAGE TO THE OUTSIDE CAN BE WAIVED, HOWEVER THIS MUST BE CONFIRMED BY THE RATER FOR EACH PROJECT IF ALL DUCTS AND AIR HANDLING EQUIPMENT ARE LOCATED WITHIN THE HOME'S AIR AND THERMAL BARRIERS, AND ENVELOPE LEAKAGE HAS BEEN TESTED TO BE LESS THAN OR EQUAL TO HALF OF THE PRESCRIPTIVE PATH INFILTRATION LIMIT FOR THE CLIMATE ZONE WHERE THE HOME IS TO BE BUILT. B. FOR ALL HOMES OR UNITS THAT SERVE LESS THAN 1,200 SQ. FT. OF CONDITIONED FLOOR AREA (CFA), TOTAL MEASURED DUCT LEAKAGE SHALL BE = 8 CFM25 PER 100 SQ. FT. OF CFA AND MEASURED DUCT LEAKAGE TO OUTDOORS SHALL BE = 5 CFM25 PER 100 SQ. FT. OF CFA. C. IF TOTAL DUCT LEAKAGE IS = 4 CFM25 PER 100 SQ. FT. OF CONDITIONED FLOOR AREA, OR = 5 CFM25 PER 100 SQ FT. OF CONDITIONED FLOOR AREA FOR HOMES OR UNITS THAT HAVE LESS THAN 1,200 SQ. FT. OF CONDITIONED FLOOR AREA. THEN LEAKAGE TO OUTDOORS NEED NOT BE TESTED. D. WHERE DUCTWORK, DUCT BOOTS, PLENUMS AND OTHER DEVICES PENETRATE ANY BUILDING ELEMENT THE OPENINGS SHALL BE CUT NEATLY AND CLOSE TO THE ACTUAL SIZE OF THE DUCT, BOOT OR PLENUM TO MINIMIZE GAPS AND THE EXTENT OF SEALANT MATERIAL. WORK SHALL BE ACCOMPLISHED IN A NEAT AND WCRKMAN LIKE MANNER. DUCT BOOTS SEALED TO FLOOR, WALL, OR CEILING USING CAULK, FOAM, MASTIC TAPE, OR MASTI' PASTE. THIS SHALL BE COORDINATED BY ALL APPROPRIATE TRADES. POOR INSTALLATIONS WITH TOO MUCH TOLERANCE CAUSING EXCESSIVE SEALANT MATERIAL SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE GENERAL CONTRACTOR FOR CORRECTIVE ACTION TO BE TAKEN. E. DUCT CONNECTIONS, PARTIAL AND FULL CASED SECTIONS OF THE FAN COIL UNIT -FURNACE -HEAT PUMP UNIT, OR AIR HANDLING UNIT AND SERVICE DOORS OR ACCESS PANELS SHALL BE SEALED WITH PERMANENT MASTIC, HIGH QUALITY NON PERMEABLE FOAM, NEOPRENE, CORK GASKET OR HIGH QUALITY AIR TIGHT SEALING CAULK AT FIXED POINTS AND / OR UL RATED TAPE WHEN ACCESS IS REQUIRED. WHERE TAPE IS UTILIZED A SUFFICIENT AMOUNT OF ROLLS OF TAPE SHALL BE PROVIDED TO BE KEPT AT THE PROJECT AND TURNED OVER TO THE BUILDING OWNER TO RESEAL THE SERVICE POINTS AFTER CUTTING OR REMOVING THE TAPE PROVIDED TO MEET THE LEAKAGE TESTS. SECTION 5 - WHOLE BUILDING, HOME OR RESIDENT UNIT DELIVERED VENTILATION OR DEDICATED VENTILATION SYSTEM SHALL MEET OR EXCEED THE RATER -MEASURED VENTILATION RATE TO BE WITHIN 100-120% OF HVAC DESIGN VALUE PER THE FOLLOWING CRITERIA (AS LISTED IN THE HVAC CONTRACTOR CHECKLIST, 2.11): 1. RATER -MEASURED VENTILATION RATE IS SCHEDULED TO BE WITHIN 100-120% OF HVAC DESIGN VALUE. THE VENTILATION SYSTEM MUST BE COMPLIANT WITH ASHRAE 62.2-2010 (FOR REQUIRED VENTILATION QUANTITIES AND SEALING ALL HOLES, GAPS, AND SEAMS OF DUCTS AND THEIR CONNECTIONS) INCLUDING AS FOLLOWS: A. SUPPLY (SUCH AS AN INTAKE DUCT TO THE RETURN SIDE OF THE HVAC SYSTEM COUPLED WITH A MOTORIZED DAMPER AND CONTROL SYSTEM). B. EXHAUST (SUCH AS A CONTINUOUSLY OPERATING EXHAUST FAN). C. BALANCED (SUCH AS AN ERV OR HRV). 2. THE VENTILATION AIR FLOW AND LOCAL EXHAUST AIR FLOWS WILL BE MEASURED BY THE RATER USING A FLOW HOOD, FLOW GRID, ANEMOMETER (IN ACCORDANCE WITH AABC, NEBB OR ASHRAE PROCEDURES), OR SUBSTANTIALLY EQUIVALENT METHOD. ALL SYSTEMS SHOULD BE CONSTRUCTED ACCORDINGLY. SECTION 6 - THERMOSTAT AND HVAC UNIT CONTROLS: 1. THERMOSTAT, AIR FLOW IS PRODUCED WHEN THE CENTRAL HVAC INDOOR FURNACE OR FAN COIL EVAPORATOR FAN IS ENERGIZED. THIS IS ACCOMPLISHED BY SETTING THE THERMOSTAT TO "FAN" SELECTING THE COOLING OR HEATING MODE WILL INDEX THE COOLING OR HEATING PORTIONS OF THE SYSTEM TO PROVIDE EITHER COOLED OR HEATED AIR TO MEET THE ROOM OR UNIT THERMOSTAT SET POINT. THE RATER, AS PART OF THE TESTING WILL TURN THE SYSTEM ON TO COOL AND CHANGE THE SET POINT TEMPERATURE TO 3 DEGREES F BELOW THE AMBIENT TEMPERATURE, THE RATER WILL i HEN RETURN THE THERMOSTAT TO THE ORIGINAL SETTING. THE RATER WILL WAIT FOR A PERIOD OF TIME AS RECOMMENDED BY THE UNIT MANUFACTURER OR WAIT FOR THE SYSTEM PREPROGRAMMED CYCLE BETWEEN COOLING AND HEATING MODE AND SET THE SYSTEM ON TO HEATING AND CHANGE THE SET POINT TO 3 DEGREES F ABOVE THE AMBIENT. THE RATER WILL THEN RETURN THE THERMOSTAT TO THE ORIGINAL SETTING. THE RATER WILL VERIFY THAT THE HEATING AND COOLING SYSTEMS ARE WORKING PROPERLY BY MEASURING THE OUTPUT TEMPERATURE OF THE SYSTEMS DURING THE APPROPRIATE CYCLES. IN CASES WHERE THE CONDENSER UNIT OR OUTDOOR HEAT PUMP SECTION CAN ABSOLUTELY ONLY BE INSTALLED AFTER THE TIME OF INSPECTION BY THE RATER, THE RATER IS EXEMPT FROM VERIFYING THE COOLING MODE OR HEATING IF IT IS A HEAT PUMP UNIT. 2. ENERGY RECOVERY DEVICES OR CONTINUOUSLY OPERATING FANS, OTHER THAN BATHROOM OR TOILET ROOM FANS: IT IS IMPORTANT FOR HVAC CONTRACTORS AND ELECTRICIANS TO LOCATE THE OVERRIDE CONTROLS FOR CONTINUOUSLY OPERATING VENTILATION AND EXHAUST FANS IN A LOCATION EASILY ACCESSIBLE TO THE OCCUPANT. IT IS ALSO IMPORTANT TO PROPERLY LABEL THESE CONTROLS. IF CONTROLS ARE NOT PROPERLY LABELED, FANS MAY BE MISTAKENLY TURNED OFF. OVERRIDE CONTROL LOCATION RECOMMENDATIONS: LOCATION OF THE LABELED CONTROL NEAR THE THERMOSTAT CREATES A TYPE OF CONTROL CENTER FOR THE OCCUPANT. THIS ALLOWS ACCESS THE MAJORITY OF THE HVAC SYSTEM CONTROLS IN ONE LOCATION. THIS SETUP IS IDEAL FOR VENTILATION SYSTEMS, SUCH AS ERV'S and HRV'S THAT MAY BE LOCATED IN INACCESSIBLE PLACES. LOCATING A SWITCH OR SWITCHING BREAKER AT AN ELECTRICAL PANEL WITH A LABEL WOULD BE SUITABLE WHERE THERE ARE MULTIPLE CONTINUOUSLY RUNNING EXHAUST FANS, BATHROOM OR TOILET EXHAUST FANS MAY BE SPECIFIED FOR THIS PROJECT TO HAVE INTERNAL OVERRIDE SYSTEMS, EITHER ON THE ELECTRICAL SWITCH PLATE OR DEFINED IN THE MANUFACIURER'S MANUAL. THESE EXHAUST FANS MEET THE REQUIREMENTS AS LONG AS THE OVERRIDE IS ACCESSIBLE AND THE DOCUMENTATION IS REVIEWED BY THE RATER. THE SWITCHES OR CONTROL DEVICES SHOULD CLEARLY, PERMANENTLY AND PROFESSIONALLY LABELED FOR THE EQUIPMENT SERVED AND THE FUNCTIONS. IF REQUIRED ON PLANS OR ELSEWHERE IN THE SPECIFICATIONS THERE SHALL ALSO BE A PILOT LIGHT TO INDICATE EQUIPMENT IS ENERGIZED. 3. CONTINUOUSLY OPERATING VENTILATION AND EXHAUST FANS MUST INCLUDE READILY ACCESSIBLE OVERRIDE CONTROLS. 4. FUNCTION OF VENTILATION CONTROLS IS OBVIOUS (E.G. BATHROOM EXHAUST FAN) OR, IF NOT, CONTROLS HAVE BEEN LABELED. SECTION 7 - VENTILATION AIR INLETS AND SOURCES THE CONTRACTOR SHALL VERIFY LOCATIONS OF ALL CONTAMINATION SOURCE TERMINATIONS AND INSTALL AIR INLETS AT LEAST 10 FT. AWAY FROM ALL CONTAMINATION SOURCE TERMINATIONS AT VERTICAL WALL LOCATIONS AND INSTALL AIR INLETS AT LEAST 3 FT. AWAY FROM DRYER EXHAUSTS AND CONTAMINATION SOURCES EXITING THROUGH THE ROOF UNLESS MORE STRINGENT CRITERIA IS REQUIRED BY CODE OR INDICATED ON THE DESIGN DOCUMENTS. THE CONTRACTOR SHALL INSTALL AIR INLETS AT LEAST 4 FEET ABOVE GRADE OR ROOF DECK FOR THIS PROJECT. THE INLET SHALL HAVE RODENT AND INSECT SCREEN WITH A MAXIMUM OF 0.5" MESH SPACING. SCREENS SHALL BE ACCESSIBLE FOR CLEANING. THE VENTILATION AIR MUST COME DIRECTLY FROM OUTDOORS AND NOT FROM ATTICS, CRAWL SPACES, GARAGES OR OTHER DWELLINGS. DUCTWORK, HOODS, LOUVERS AND GRILLES USED FOR INTAKE SHALL BE INSTALLED IN A NEAT AND WORKMANLIKE MANNER AND BE SIZES THAT MAINTAIN THE PROPER FREE AREA FOR AIRFLOW AND LIMITING MOISTURE, SNOW AND DEBRIS CARRYOVER. ENERGY STAR QUALIFIED HOMES, REQUIREMENTS (CON'T) SECTION 8: LOCAL MECHANICAL EXHAUST 1. THE KITCHEN SHALL HAVE AN EXHAUST SYSTEM THAT EXHAUSTS DIRECTLY TO THE OUTDOORS AND SHALL OPERATE CONTINUOUSLY AT A RATE OF GREATER THAN OR EQUAL TO 5 AIR CHANGES PER HOUR BASED ON KITCHEN VOLUME OR OPERATE INTERMITTENTLY AT A RATE GREATER THAN 100 CFM. FANS THAT ARE USED AT A CONTINUOUS RATE SHALL BE RATED FOR CONTINUOUS USE. RECIRCULATING FANS ARE NOT ACCEPTABLE. 2. KITCHEN VOLUME SHALL BE DETERMINED BY DRAWING THE SMALLEST POSSIBLE RECTANGLE ON THE FLOOR PLAN THAT ENCOMPASSES ALL CABINETS, PANTRIES, ISLANDS, AND PENINSULAS AND MULTIPLYING BY THE AVERAGE CEILING HEIGHT FOR THIS AREA. CABINET VOLUME SHALL BE INCLUDED IN THE KITCHEN VOLUME CALCULATION. 3. EACH BATHROOM SHALL HAVE AN EXHAUST SYSTEM THAT EXHAUSTS DIRECTLY TO THE OUTDOORS AND SHALL OPERATE CONTINUOUSLY AT A RATE OF GREATER THAN OR EQUAL 20 CFM OR OPERATE INTERMITTENTLY AT A RATE GREATER THAN 50 CFM. FANS THAT ARE USED AT A CONTINUOUS RATE SHALL BE RATED FOR CONTINUOUS USE. 4. AN INTERMITTENT EXHAUST SYSTEM, WHERE PROVIDED, SHALL BE DESIGNED TO OPERATE AS NEEDED BY THE OCCUPANT. CONTROL DEVICES SHALL NOT IMPEDE OCCUPANT CONTROL IN INTERMITTENT SYSTEMS. 5. ALL FANS THAT SHARE A COMMON EXHAUST DUCT SHALL BE EQUIPPED WITH A BACK -DRAFT DAMPER. REMOVE ALL PACKING TAPE FROM BACK -DRAFT DAMPERS UPON INSTALLATION. 6. COMMON EXHAUST DUCTS SHALL NOT BE SHARED BY FANS IN SEPARATE DWELLINGS. 7. CLOTHES DRYERS SHALL BE VENTED DIRECTLY TO THE OUTDOORS, EXCEPT FOR VENT -LESS DRYERS EQUIPPED WITH A CONDENSATE DRAIN. VENT CLOTHES DRYERS IN ACCORDANCE WITH THE MECHANICAL CODE OF NEW YORK STATE. 8. DO NOT USE DEVICES THAT REMOVE LINT AND/OR BRING THE HEAT BACK INTO THE SPACE. 9. DO NOT EXHAUST DRYERS WITHIN 10 FEET OF AN AIR COOLED CONDENSING UNIT. 10. ALL EXHAUST FANS SHALL BE DIRECTLY DUCTED TO THE EXTERIOR WITH LITTLE OR NO RESTRICTION. 11. SEAL ALL SEAMS, GAPS, HOLES, AND CONNECTIONS TO THE EXTERIOR OF ALL EXHAUST DUCTS WITH MASTIC. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ENSURE A PROPER QUALITY INSTALLATION. THE EXHAUST DUCTWORK WILL BE TESTED FOR LEAKS AT THE END OF THE PROJECT AND THE CONTRACTOR IS RESPONSIBLE FOR THE RESULTS OF THE TEST. 12. CORROSION -PROOF RODENT/BIRD SCREENS INSTALLED AT ALL OPENINGS THAT CANNOT BE FULLY SEALED 3.2000(EXCEPTION: DRYER VENTS). SECTION 9: VENTILATION AND EXHAUST FAN RATINGS 1. ALL INTERMITTENT SUPPLY AND EXHAUST FANS SHALL BE RATED BY THE MANUFACTURER TO OPERATE AT LESS THAN OR EQUAL TO 3.0 SONES. EXEMPTION: FANS GREATER THAN 400 CFM. ALL CONTINUOUSLY OPERATING SUPPLY AND EXHAUST FANS SHALL BE RATED BY THE MANUFACTURER TO OPERATE AT LESS THAN OR EQUAL TC 1.0 SONES. BATHROOM FANS USED AS PART OF A WHOLE -HOUSE MECHANICAL VENTILATION SYSTEM SHALL BE ENERGY STAR QUALIFIED, UNLESS SPECIFIED FLOW RATE IS GREATER THAN 500 CFM. 4. ALL FANS REQUIRED TO BE ENERGY STAR QUALIFIED SHALL HAVE ENERGY STAR LOGO ON THE ASSOCIATED SUBMITTALS: HAND WRITTEN NOTATIONS ARE NOT ACCEPTABLE, 5. ALL FAN SUBMITTALS SHALL INCLUDE MANUFACTURER'S RATED SONES LEVEL AND SCHEDULED PERFORMANCE VALVES. SECTION 10: COMBUSTION APPLIANCES 1. AI.L COMBUSTION APPLIANCES SHALL BE MECHANICALLY DRAFTED OR DIRECT VENTED TO THE OUTDOORS. 2. FOR ATMOSPHERICALLY VENTED FIREPLACES, THE TOTAL NET RATED EXHAUST FLOW OF THE LARGEST EXHAUST FAN SHALL BE LESS THAN OR EQUAL TO 15 CFM PER 100 SQUARE FEET OF OCCUPIABLE SPACE. THE NET -EXHAUST FLOW IS DEFINED AS FLOW THROUGH AN EXHAUST SYSTEM MINUS THE COMPENSATING OUTDOOR AIRFLOW THROUGH ANY SUPPLY SYSTEM THAT IS INTERLOCKED WITH THE EXHAUST SYSTEM. 3. THE CONTRACTOR SHALL COORDINATE ALL UNVENTED COMBUSTION APPLIANCES WITH THE ENERGY STAR RATER. THE RATER IS REQUIRED TO PERFORM TESTS AND THE CONTRACTOR SHALL ASSIST AS REQUIRED. SECTION 11: FILTRATION 1. PROVIDE MINIMUM MERV 8 FILTERS IN ALL DUCTED MECHANICAL SYSTEMS. EXHAUST SYSTEMS DUCTED DIRECTLY TO THE OUTSIDE ARE NOT REQUIRED TO BE FILTERED, 2. FILTERS SHALL BE LOCATED SUCH THAT ALL RETURN AIR AND OUTSIDE AIR IS FILTERED UPSTREAM OF THE SUPPLY FAN. LOCATE FILTERS TO FACILITATE ACCESS AND SERVICE, MAINTAIN CLEARANCES FOR FILTER PULL. 4. PROVIDE 'PRE -FABRICATED FILTER HOUSING WITH GASKETS AND SEALS. HOUSING ACCESS DOOR MUST COMPLETE SEAL TO PREVENT BYPASS. SEAL DUCT CONNECTIONS TO PREVENT AIR LEAKAGE. FILTER HOUSING SHALL BE TRION AIR BEAR SUPREME OR APPROVED EQUAL. APPROVED EQUALS SHALL BE TESTED IN ACCORDANCE WITH ANSI/ASHRAE 52.2-2007 STANDARD TEST PROCEDURES AND BE UL LISTED. CONTRACTOR SHALL SUBMIT FILTERS AND HOUSING FOR REVIEW BY ENGINEER. 10 esi Hr n; i'e Architecture Planning Interior Design 217 North Aurora Street Ithaca NY 14850 p 607.273.7600 f 607.273.0475 11 COMFORT STREET ROCHESTER, NEW YORK 14620 585-232-2 THESE DOCUMENTS. AND All IDEAS, ARRANGEMENT, DE5IGN5 AND PLANS INDICATED THEREON OR. PRESENTED THEREBY ARE OWNED AND REMAIN THE PROPERTY OF KENNEDY MECHANICAL INC. AND NO PART THEREOFSHALL BE UTIIJZEDBY ANY. PERSON, FIRM, OR CORPORATION FOR ANY PURPOSE WHATSOEVER EXCEPT WITH THE SPECIFIC WRITTEN PERMISSION OF. KENNEDY MECHANICAL INC. All RIGHTS RESERVED Baumer Mechanical Design Services 625 Panorama Trail, Building 2, Suite 210 Rochester, NY 14625 585.313-5819 WARNING: It is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" fol'owed by his signature, the date of such alteration, and a specific description of the alteration. REVISION SCHEDULE NAME DATE STONE QUARRY APARTMENTS RTMENTS, L STONE QUARRY AP DATE: 7/18/2014 PROJECT: 2012059 OTHER: DRAWN BY: G/JTB ENERGY STAR QUALIFIED HOMES A REQUIREMENTS M002 10