HomeMy WebLinkAboutStone Quarry Apartments - Mechanical6
7
8
9
10
FURNACE
SCHEDULE - NATURAL GAS
TAG
LOCATION
MAX
CFM
ESP
(in. wc)
OA
CFM
AFUE
MOTOR
UNIT WIDTH
(IN:)
COOLING- DX EVAP. COL.
HEATING
MCA
WEIGHT
COMMENTS
DESIGN EQUIPMENT
VOLT
PH
HP
O.A.T.D.B.
E.A.T.D.B.
L.A.T.D.B.
TMBH
SMBH
MODEL
STAGES
FUEL
MIN. INPUT (MBH)
MIN. OUTPUT (MBH)
MAX. INPUT (MBH)
MAX. OUTPUT (MBH)
FURN-A
ALL DWELLING UNIT FURNACES
600
.9
0
96
115
1
ECM
14.5
N/A
80
67
17.9
12.8
MC18A3XC1
1
NAT. GAS
N/A
N/A
40
38
9.5
113
12,3,4,5,6,7,8,9,10
YORK TM9E040A10MP11
FURN-B
HOUSE FURNACE
1600
.6
350
96
115
1
ECM
19.875
N/A
88.4
67
46.0
33.6 FC48C3XC1
2 NAT. GAS
52
50
80
77
11.5
136
1,2,3,4,6,7,8,9
YORK TM9V080C16MP11C
1. PROVIDE COMPATIBLE 5+2 DAY PROGRAMMABLE THERMOSTAT TO ACCOMMODATE CONTROL VOLTAGE AND FURNACE CONTROL BOARD.
2. PROVIDE UNIT WITH SIDE FILTER RACK AND 2" PLEATED FILTER MINIMUM MERV 8.
3. PROVIDE UNIT WITH CONCENTRIC VENT KIT.
4. PROVIDE UNIT WITH CONDENSATE NEUTRALIZER KIT.
5. CAPACITIES INDICATED FOR COOLING BASED ON ARI CONDITIONS AT 95°F OUTDOOR AND 80°F DB/67°F WB. INDOOR AT 400 CFM/TON. STATIC
PRESSURE IS BASED ON COOLING WITH WET COIL.
6. FURNACE/EVAPORATOR COIL/AIR COOLED CONDENSER SYSTEM SHALL BE ARI CERTIFIED AND ENERGY STAR LISTED. ALL ENERGY STAR
PRODUCTS SHALL BE VERIFIABLE ON THE ENERGY STAR WEB SITE.
7. PROVIDE UNIT WITH ECM FAN MOTOR AND SINGLE STAGE GAS VALVE.
8. COOLING COIL, DIRTY FILTER, AND CONSTANT AIRFLOW REGULATOR ARE ALL TO BE INCLUDED AS EXTERNAL STATIC PRESSURE LOSS.
9. FURNACES SHALL BE CONFIGURED AS FOLLOWS: DOWNFLOW UNITS AT TOWNHOMES, UPFLOW UNITS AT APARTMENT BUILDING.
10. OUTSIDE AIR REQUIREMENT AT APARTMENT AND TOWNHOME UNITS SHALL BE SATISFIED THROUGH OPERABLE WINDOWS AND BUILDING INFILTRATION.
CEILING RECESSED DUCTLESS SPLIT AIR CONDITIONING SYSTEM
TAG
LOCATION
MAX
CFM
ESP
(in. wc)
OA
CFM
AFUE
MOTOR
UNIT WIDTH
COOLING - DX EVAP. COIL
ELECTRICAL
WEIGHT
COMMENTS
HEATING
STAGES
TYPE
I
WEIGHT
COMMENTS
DESIGN EQUIPMENT
VOLT PH
HPMCA
O.A.T.D.B.
E.A.T.D,B,
L.A.T_D.B.
TMBH
SMBH
MODEL
STAGES
SOURCE
MIN. INPUT (MBH)
MIN. OUTPUT (MBH)
MAX, INPUT (MBH)
MAX. OUTPUT (MBH)
DSS -A
CORRIDORS AT APARTMENT BUILDING, PUMPS IN ROOF RECESS] 247
FURN-B 4.0
75
44.5
230 I 1
-
23.625
1
26.3
208 1,2
YORK YCJF48S41S2
1,2,3,5,6 ,
CS KE12NB41
1
ELECTRIC
1 N/A
N/A
13.6
13.6
15 1
r
35.3 123456789
PANASONIC KE12NB41 (AHRI#5052304)
1. PROVIDE LCD WIRELESS -TYPE TEMPERATURE (BUILT-IN) WITH IC THERMOSTAT (BY SAME MFG.)
2. PROVIDE UNIT WITH INTEGRAL FILTER.
3. CAPACITIES INDICATED FOR COOLING BASED ON ARI CONDITIONS AT 95°F OUTDOOR AND 80°F DB/67°F WB. INDOOR AT 400 CFM/TON. STATIC
4. PRESSURE IS BASED ON COOLING WITH WET COIL.
5, FURNACE/EVAPORATOR COIL/AIR COOLED CONDENSER SYSTEM SHALL BE ARI CERTIFIED AND ENERGY STAR LISTED. ALL ENERGY STAR
PRODUCTS SHALL BE VERIFIABLE ON THE ENERGY STAR WEB SITE.
AIR-COOLED CONDENSING UNIT SCHEDULE
TAG
LOCATION
SERVICE
NOM. CAPACITY
TONS
ARI
SEER
AHRI MBH
AHRI REF #
COMPRESSOR
ELECTRICAL
WEIGHT
COMMENTS
DESIGN EQUIPMENT
STAGES
TYPE
VOLT
PH
MCA
ACC -1
OUTSIDE, AS INDICATED
FURN-A
1.5
14.7
17.6
7142705
1
SCROLL
208
1
12
133
1,2
YORK YCJF18S41S1
ACC -2
OUTSIDE, AS INDICATED
FURN-B 4.0
14.5
44.5
5434466
1
SCROLL ? 208
1
26.3
208 1,2
YORK YCJF48S41S2
1. PROVIDE UNIT WITH 5 MINUTE RESTART TIME DELAY.
2. PROVIDE UNIT WITH TXV KIT.
FAN SCHEDL
LE
TAG
LOCATION
SERVICE
CFM
ESP
(in. wc)
BLADE
TYPE
MAX FAN
RPM
DRIVE
TYPE
MOTOR
WATTS
HP
VOLT
PH
CONTROL
MAX
SONES
COMMENTS
DESIGN EQUIPMENT
EF -1
ALL DWELLING UNITS EXCEPT HALF -BATHS
EXHAUST
90/30
0.10
FC
580
DIRECT
6.2
-
120
1
SWITCH
<0.3
1,2,3,4,5
PANASONIC FV-05-11VKSL
EF -2
ALL DWELLING UNITS - HALF -BATHS ONLY, CORRIDORS
EXHAUST
80
0.10
FC
829
DIRECT
14.7
-
120
1 1 SWITCH
<0.3
1,2,3,5,6 ,
PANASONIC FV-05-11VK1
EF -3
ALL NON -DWELLING UNIT LOCATIONS
EXHAUST
80
0.10
FC
829
DIRECT
14.7
-
120
1 I SWITCH
<0.3
1,2,3,4,5 \
PANASONIC FV-08VQ5
1. PROVIDE UNIT WITH UNIT MOUNTED FAN SPEED CONTROLS. ADJUSTED TO AIRFLOW INDICATED AND PERMANENTLY
MARKED AFTER FINAL AIR BALANCE. CONTROL MOUNTED IN FAN CASING.
2, PROVIDE UNIT WITH INTEGRAL DISCONNECT.
3. PROVIDE UNIT WITH ROOF JACK BACKDRAFT DAMPER OR HOODED WALL CAP AS CALLED FOR ON PLANS.
4. FAN SHALL BE WIRED TO ELECTRICAL CIRCUIT TO OPERATE CONTINUOUSLY AT 30 CFM AND 80 CFM DURING OCCUPIED MODE.
5. PROVIDE PANASONIC PN#, PC-RD05C4 RADIATION DAMPER AT ALL APARTMENT UNIT LOCATIONS.
6. FAN SHALL BE WIRED TO ELECTRICAL CIRCUIT TO OPERATE CONTINUOUSLY AT CORRIDORS, AND WIRED TO A SWITCHED CIRCUIT AT TOILET ROOMS.
ELECTRIC WALL HEATER SCHEDULE
TAG
LOCATION
TYPE
CFM
AIR
HEATING ELEMENT
COMMENTS
DESIGN EQUIPMENT
KW
VOLT
PH
CUH-L1
LOBBY
RECESSED
45
2
208
1
1,2,3,4,5,7
QMARK HT2024SS
CUH-51
STAIRWELLS (2)
SURFACE
45
2
208
1
1,2,3,4,6,7
QMARK HT2024SS
1. UNIT SHALL BE COMPLETE WITH METAL BACKBOX SUITABLE FOR SURFACE OR RECESSED -MOUNTING.
2. UNIT SHALL INCLUDE FAN DELAY, THERMAL CUTOUT, DISCONNECT SWITCH AND INTEGRAL TAMPER -PROOF THERMOSTAT.
3. UNIT TO BE FIELD CONVERTED FOR VOLTAGE AND PHASE DEPENDING ON ACTUAL SHIPPED CONFIGURATION.
4. UNIT SHALL BE MOUNTED APPROX, 12" AFF TO BOTTOM.
5. PROVIDE UNIT WITH INCLUDED FRAME FOR RECESSED INSTALLATION.
6. PROVIDE UNIT WITH SMHTSSNW SURFACE MOUNTING FRAME.
7. SET INTEGRAL TAMPER -PROOF THERMOSTAT TO 50°F.
AIR TERMINAL SCHEDULE
TAG
SYSTEM
MATERIAL
FINISH/COLOR
COMMENTS
PHYSICAL CHARACTERISTICS
EAV
EXHAUST
STEEL
TBD
-
4" 0 EXHAUST GOOSENECK
RG -A
RETURN
STEEL
TBD
-
20" X 20" RETURN GRILLE
SD -A
SUPPLY
STEEL
TBD
-
4" X 12" FACE, 6"0 NECK
SD -B
SUPPLY
STEEL
TBD
-
TOEKICK DIFFUSER, 6°0 NECK
SD -C
SUPPLY
STEEL
TBD
-
4" X 10" FACE, 5"0 NECK
SD -D
SUPPLY
STEEL
TBD
-
10" X 10" FACE, 8"0 NECK
EXTERIOR AIR TERMINAL SCHEDULE
TYPE
MATERIAL
FINISH/COLOR
COMMENTS
PHYSICAL CHARACTERISTICS
ROOF CAP STEEL
TO MATCH ROOF
-
BROAN #634 10-1/4" X 10-3/4" WITH INTEGRAL BACKDRAFT DAMPER AND BIRD SCREEN
WALL CAP (RANGE EXH) STEEL
BY OTHERS I -
BROAN #647 9" X 9" WITH 7"0 CONNECTION
WALL CAP (BATH EXH)
STEEL
BY OTHERS
-
BROAN #843BL 9" X 9" WITH 6'0 CONNECTION
WALL CAP (DRYER VENT I
ALUMINUM
BY OTHERS -
BROAN #855AL 6-1/2" X 6-1/2" WITH 4"0 CONNECTION
LOUVER L-1 ALUMINUM
BY OTHERS
-
18" X 8" GREENHECK ESD -202 WITH VCD-23 LOW LEAKAGE CONTROL DAMPER, TFB24 ACTUATOR, AND DRIVE -CC -11 -!FEL -0 DRIVE ARRANGEMENT
LOUVER L-2
ALUMINUM
BY OTHERS
-
18" X 8" GREENHECK ESD -202 WITH VCD-23 LOW LEAKAGE CONTROL DAMPER, TFB24 ACTUATOR, AND DRIVE-CC-11-1FEL-0 DRIVE ARRANGEMENT
OA INTAKE WALL CAP
STEEL
BY OTHERS -
BROAN #641FA 9" X 9" WITH 6"0 CONNECTION
CVK (CONCENTRIC VENT)
PVC
TO MATCH ROOF
-
YORK #1CT0302 / 1CT0303 CONCENTRIC VENT KIT. PROVIDE FOR ALL GAS-FIRED EQUIPMENT. SIZE INLET/OUTLETS PER EQUIPMENT REQUIREMENTS,
1
2
5
GENERAL NOTES:
1. ALL NOTES, SPECIFICATIONS, AND SYMBOLS ON THIS DRAWING APPLY TO ALL HVAC DRAWINGS F0.3 THIS PROJECT.
2. HVAC CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING, CORING AND PATCHING. WORK TO BE PERFORMED BY WORKERS SKILLED IN THE
MATERIAL BEING CUT AND PATCHED.
3. FIELD VERIFY ALL DUCTWORK AND PIPE SIZES, AND EXACT LOCATIONS.
4. PROVIDE ALL WORK IN COMPLIANCE WITH ALL LOCAL, STATE AND FEDERAL CODES. OBTAIN ALL REQUIRED PERMITS.
5. FIRESTOP ALL FLOOR/CEILING AND ROOF/CEILING PENETRATIONS THROUGH ASSEMBLIES THAT REQUIRE A FIRE RESISTANCE RATING
6. WHERE BRANCH DUCT SIZES ARE NOT SHOWN, THEY SHALL BE THE SAME SIZE AS THE DIFFUSER NECK.
7. ALL DIFFUSERS SHALL BE EQUIPPED WITH A FACE -MOUNTED AIR VOLUME CONTROL DAMPER.
8. INSTALL ALL EQUIPMENT IN STRICT CONFORMANCE WITH MANUFACTURER'S INSTRUCTIONS AND RECOMMENDATIONS.
9. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE THE WORK OF THIS CONTRACT WITH THE WORK OF ALL OTHER TRADES
PRIOR TO THE FABRICATION OR INSTALLATION OF ANY WORK.
10, THE DRAWINGS ARE SCHEMATIC IN NATURE. THE CONTRACTOR SHALL PROVIDE ALL OFFSETS, FITTINGS, HANGERS, ANCHORS, SUPPORTS,
WIRING, AND ACCESSORIES FOR A COMPLETE AND OPERATIONAL INSTALLATION. REFER TO EQUIPMENT INSTALLATION DETAILS FOR MORE
INFORMATION,
11. LOCATIONS OF EACH TYPICAL WALL PENETRATION, FURNACE FLUE EXHAUST, OUTSIDE AIR INTAKE, AND TOILET EXHAUST SHALL BE
ALIGNED AT SIMILAR ELEVATIONS BY TYPE AT ALL APARTMENTS.
12. MUCH OF THE DUCTWORK ON THIS PROJECT IS INTENDED TO BE CONCEALED WITHIN ARCHITECTURAL SOFFITS. COORDINATE THE
INSTALLATION OF ALL CONCEALED DUCTWORK WITH THE GENERAL CONTRACTOR.
13, ALL TRANSFER DUCTS SHALL BE 6" AFF UNLESS NOTED OTHERWISE,
14. GENERAL CONTRACTOR TO COORDINATE WITH MECHANICAL CONTRACTOR SOFFIT LAYOUT.
15. LOUVERED DOORS AT MECHANICAL ROOMS SHALL BE BY G.C., WITH OPEN SURFACE AREA COORDINATED WITH MECHANICAL AIR
REQUIREMENTS.
16. COORDINATE HEIGHT OF THERMOSTATS WITH ADJACENT LIGHT SWITCHES. THE VERTICAL CENTER LINE OF THE THERMOSTATS AND LIGHT
SWITCHES SHALL BE EQUAL,
6 7
SYMBOLS AND LEGENDS:
NOTE: ALL SYMBOLS MAY NOT BE USED IN THIS PROJECT
ABBREVIATIONS AND TAGS
SYMBOL
DESCRIPTION
AD
ACCESS DOOR
AFF
ABOVE FINISHED FLOOR
CFM
CUBIC FEET PER MINUTE
(El
EXISTING
EC
ELECTRICAL CONTRACTOR
FPM
FEET PER MINUTE
FC
FLEXIBLE CONNECTION
GC
GENERAL CONTRACTOR
(L)
LINED
MBH
THOUSAND BTU/HOUR
NC
NORMALLY CLOSED
NO
NORMALLY OPEN
NTS
NOT TO SCALE
OA
OUTSIDE AIR
OED
OPEN END DUCT
PC
PLUMBING_CONTRACTOR
PKGD
PACKAGED
TAKE -OFFS
SA
SUPPLY AIR
SUPPLY/RETURN/
o
OA
OUTSIDE AIR
LPR
LOW PRESSURE REFRIGERANT
HPR
HIGH PRESSURE REFRIGERANT
I
COM BU YCION Ali,€
FAN
-18"0
II r10 p
i
SUPPLY AIR
CONICAL TEE
REMOVAL KEYNOTE
OINSTALLATION
KEYNOTE
`
REMOVE TO THIS POINT
$
CONNECTION TO EXISTING
DUCTWORK SYMBOLS AND TAGS
SYMBOL
DESCRIPTION
DESCRIPTION
VOLUME DAMPER
-- SD
SMOKE DAMPER
--- FD
FIRE DAMPER
--- AAD
AUTOMATIC AIR DAMPER
--- BDD
BACKDRAFT DAMPER
ROUND DUCT IN INCHES
AIRFLOW DIRECTION
FLAT OVAL DUCT IN INCHES
DUCT ELEVATION
TRANS: SQUARE TO ROUND
4-IL)ACOUSTIC
-- FC
FLEX CONNECTOR
R
REGISTER,GRILLE,DIFFUSER
T = TYPE
NECK = NECK SIZE
C
T
D
DROP IN DUCT
NECK
4- D-..- 4-
CFM
SUPPLY/RETURN/
o
1-1/2 TIMES BRANCH
SIZE
AIR TERMINAL UNIT
T =UNIT TYPE
MAX = MAXIMUM CFM
MIN = MINIMUM CFM
I MAX
TAKE -OFFS
T MIN
24x10
10"11
SUPPLY/RETURN/
o
FAN POWERED AIR
TERMINAL UNIT
T=UNIT TYPE
MAX = PRIMARY MAX. CFM
MIN. = PRIMARY MIN. CFM
FAN = FAN CFM
EXHAUST AIR
MAX
L 10°
T. MIN
k-
FAN
-18"0
II r10 p
i
SUPPLY AIR
DUCTWORK LEGEND
SYMBOL
DESCRIPTION
DESCRIPTION
�.•-'
DUCT SECTION - SUPPLY
DUCT SECTION - RETURN
A
WIDTH AxDEPTHB
B
IM A" 0
ROUND DUCT IN INCHES
(1111, AxB0
FLAT OVAL DUCT IN INCHES
THERMOSTAT
TRANS: SQUARE TO ROUND
4-IL)ACOUSTIC
THERMAL LINING
R
RISE IN DUCT
C
4- R -►
D
DROP IN DUCT
4- D-..- 4-
24x10
12x8
SUPPLY/RETURN/
o
1-1/2 TIMES BRANCH
SIZE
EXHAUST AIR
12x8
TAKE -OFFS
24x10
10"11
SUPPLY/RETURN/
o
1-1/2 TIMES BRANCH
SIZE
EXHAUST AIR
4
L 10°
TAKE -OFFS
k-
-18"0
II r10 p
i
SUPPLY AIR
CONICAL TEE
TAKE -OFFS
Co L 10° s d
`
VD
18"0
10"O
SUPPLY AIR
LATERAL
TAKE -OFFS
I L 10" 0 !i
LONG RADIUS R
90° ELBOW
�A
R=w
+
%�
/
LONG RADIUS R
45° ELBOW
R=W
j JL5-
OR
11&.
WO° ELUOwTURNING
VANES
VANES
24x10
8x10 12x10
2410
TUPELO/ AIR
TAKE -OFFS
IMO
16x10
12x10
8x10
16x10
18x10
24x10
8x10 124,10
16X10
8x10
24x10
SUPPLY AIR
16X10
`.
12x10
TAKE -OFFS
`
8x10
18x10
24x16
OR
•'-4+
SUPPL"RETURN/
12x10
EXHAUST AIR.
TAKEOFFS w/
REGISTER/GRILLE!
12x10
DIFFUSER
20x20
i
zoxlo
20x10.
90^ VERTICAL
SPLIT OFF
PLAN viEwl 20x20 20x10 }
S
20X10
DUCT TURNING
DUCT COWN
20x12
1�,....
III
SUPPLY DIFFUSER,
REGISTER OR GRILLE
Fr
'
N
RETURN
REGISTER OR GRILLE
EXHAUST
REGISTER OR GRILLE
CONTROL/SYMBOLS LEGEND
SYMBOL
DESCRIPTION
s
TEMPERATURE SENSOR
DUCT SMOKE DETECTOR
CID
HUMIDISTAT
THERMOSTAT
QG
THERMOSTAT WITH GUARD
STATIC PRESSURE SENSOR
FT-'
FIN RADIATION (TYPE)
,
W/W ENCL.
WALL TO WALL ENCLOSURE
VISUAL FIDELITY NOTE: THIS DRAWING SET CONTAINS COLOR
DESIGN INTENT AND TO EASE INTERPRETATION. IF THIS DRAWIN
IN MONOCHROME OR GRAYSCALE PLEASE CONTACT KENNEDY M
THE NUMBER LISTED TO THE RIGHT FOR A COLOR PRINTED SET.
8
10
Architecture
Planning
Interior Design
217 North Aurora Street
Ithaca NY 14850
p 607.273.7600 f 607.273.0475
ENNEDY
I4 CONfittAt:4
/ / COMFORT STREET
ROCHESTER, NEW YORK 146'20
555-232-2800
THESE DOCUMENTS AND ALL IDEAS, ARRANGEMENT,
DESIGNS AND PLANS INDICATED THEREON OR
PRESENTED THEREBYARE OWNED AND REMAIN THE
PROPERTY OF KENNEDY MECHANICAL INC. AND NO PART
THEREOF SHALL BE UTILIZED BY ANY PERSON, FIRM, OR
CORPORATION FOR ANY PURPOSE WHATSOEVER EXCEPT
WITH THE SPECIFIC WRITTEN PERMISSION OF KENNEDY
MECHANICAL INC. ALL RIGHTS RESERVED
Baumer Mechanical Design Services
625 Panorama Trail, Building 2, Suite 210
Rochester, NY 14625
585.313-5819
WARNING: It is a violation of
New York State Law for any
person, unless acting under the
direction of a licensed Architect,
to alter this document in any way.
If a document bearing the seal of
an Architect is altered, the
altering Architect shall affix to
such document his seal and the
notation "altered by" followed by
his signature, the date of such
alteration, and a specific
description of the alteration.
REVISION SCHEDULE
NAME
DATE
OWNER
CHANGES
F
E
SEP 2014
STONE QUARRY APARTMENTS
STONE QUARRY APARTMENTS, LL
C
z
0 B
2
F-
DATE:
7/18/2014
PROJECT:
2012059
OTHER:
DRAWN BY:
KAG/JTB
MECHANICAL -
GENERAL NOTES, A
LEGEND,
SCHEDULES
M001
STONE QUARRY APARTMENTS
STONE QUARRY APARTMENTS, LLC
ITHACA, NY
08/14/14
Scale: 1/8" = 1'-0"
2012059
-SK1
14x6 14x6 14x6 14x6---
'250 250 250 250
rm PARTIAL APARTMENT BLDG. FLOOR PLAN - CORRIDOR EXHAUST REVISION (H-SK1)
1/8" = 1'-0"
NOTE: ROUTING SHOWN IS TYPICAL FOR CORRIDOR EXHAUST AT ALL THREE FLOORS
HOLTARCH1TECTS RC,
2.17 N, Au rzTo f::!(1!..lnc, \IY 16S5C,
3r=$0727760(! t607 27:1•OAM
KENNEDY
V14**,,,K44,1
/1 CattentrITRIZT
WaYEATER,14159,17,K hfai)
565-2szAra,
torf-qvuiHh
75 Tiln gv,
�
u�
�
��
�
��
��
�
10
�
=
FOR ALROOFING AND FLASHING
REQUIREMENTS. REFER TO
ARCHITECTURAL PLANS
PROVIDE ALUMINUM ROOF JACK
WITH Bx[mon»F7oAMPBR,
PRIME AND PAINT WITH HIGH
QUALITY PAINT CUSTOM COLOR
SELECTED AND APPROVED BY
ARCHITECT.
DUCT MOUNTED
VOLUME DAMPER
AS CALLED FOR
ON DRAWINGS
INTEGRAL VOLUME
DAMPER AS CALLED
FOR ON SCHEDULES
ROUND OR RECTANGULAR
AS SPECIFIED ON DRAWINGS
�
Arch.te���� _
Planning �-n����U��K�
-_. .^ .,. .��
Interior Design
^^ '~^~^ ^~^^
217 North Aurora Street
Ithaca NY 14850
p 607.273.7600 f 607.273.0475
CUT AND PATCH DRYWALL LID
AS REQUIRED TO INSTALL
DUCTWORK.
PROVIDE SHEET METAL FIRESTOP FOR
DUCT SUPPORT
COMBUSTION AIR INLET
AINTSTUICLASTPAECDEU.CTWCRK
PLENUM BOX LENGTH AND
WIDTH EQUAL TO DUCT
CONNECTION SIZE
FLA3H|NGITYpj
PROVIDE WEATHER TIGHT
INSTALLATION
12" CLEARANCE SHALL BE
MAINTAINED ABOVE
HIGHEST ANTICIPATED
SNOW LEVEL. MAXIMUM
NOT TO EXCEED 24' ABOVE
ROOF.
SEAL ALL ANNULAR SPACES
AT CEILING WHERE DIFFUSER
BOOT OCCURS AS LISTED IN
ENERGY STAR
REQUIREMENTS
ENNEDY
�tkl0t41044.*0=vf 4. 4,0r 1,..*.6.*14 T'ieth
//COMFORT S7REfT
ROCHESTER, NEW YORK 14620
PROVIDE FIRE STOP PENETRATION
SYSTEM IN ACCORDANCE WITH ASTM
E814. INSTALL SYSTEM PER
MANUFACTURERS' INSTALLATION
REQUIREMENTS
SEAL ALL ANNULAR SPACES AT
CEILING WHERE REGISTER BOOT
OCCURS AS LISTED IN ENERGY STAR
REQUIERMENTS
COORDINATE ALL ROOF PENETRATION WORK WITH ROOFING
CONTRACTOR.
NOTE
1. DISTANCE FROM TOP OF VENT TO BOTLOM OF AIR INLET SHALL
ESE DOCUMENTS AND AU. IDEAS,
DESIGNS AND PLANS INDICATED THEREON OR
PRESENTED THERL-13Y ARE oVvNEoAND REMNN
PROPERTY OF KNNOY MCIIANICAI. INC. ANL' NO PART
TIIEREOF SHALL BE UTIUZED BY ANY PERSON,
CORPORATION FOR ANY PURPOSE WHATSOEVER EXCEPT
PECIFIC WRJTTEN PERMISSION OF KENNEDY
CHICAL INC. AU. RIGHTS RP_SERVED
2. COORDINATE INSTALLATION OF VENTS WITH OWNER. VENTS SHALL
BE SYMMETRICAL. LINE UP ALL VENT PENETRATIONS HORIZONTALLY
3. PAINT EXTERIOR VENT AND COMBUSTION AIR PIPING WITH EXTERIOR
FLAT PAINT. COLOR TO BE SELECTED BY ARCHITECT.
4. THIS DETAIL SHALL APPLY TO BOILERS AND FURNACES.
5' COORDINATE CUTTING AND PATCHING OF ROOF WITH GENERAL CONTRACTOR
6. LOCATE ALL ROOF PENETRATIONS ON REAR FACE OF ROOF. TRANSITION AND OFFSET AS REQUIRED.
1. DUCT AND DIFFUSER SIZE AND TYPE AS SHOWN ON DRAWINGS.
TYPICAL EXHAUST ROOF JACK DETAIL
/-
T`/c
TYPICAL CEILING/SIDE WALL
REGISTER INSTALLATION� ||
DETAIL
�[lN���JT[4[`U��TF1�T8||
~~.,~--.....~,^,. ~^-..^
�|� DIFFUSER DETAIL
..`~^-'...^
Baumer Mechanical Design Services
625 Panorama Trail, Building 2,Suite em
Rochester, NY 14625
585-3115819
PITCH HORIZONTAL
FLUE PIPING 3ACK
TOWARDS FURNACE
PITCH HORIZONTAL
FLUE PIPING BACK
TOWARDS FURNACE
ROUTE FURNANCE FLUES UP
THROUGH ROOF TO
CONCENTRIC VENT
TERMINATION
ROUTE FURNANCE FLUES UP
TRHOUGH ROOF TO
CONCENTRIC VENT
TERMINATION
SUPPLY AIR DUCT SIZE AS
NOTED ON PLANS
RETURN AIR DUCT SIZE AS
NOTED ON PLANS
WARNING: It is a violation of
New York State Law for a
person, unless acting under the
direction of a licensed Architect,
to alter this document in any way.
If a document bearing the seal of
an Architect is altered, the
altering Arhitect shall affix to
such document his seal and the
notation "altered by" followed by
his signature, the date of such
alteration, and a specific
description of the alteration.
2" PVC COMBUSTION AIR
INTAKE & EXHAUST PIPING
2" PVC COMBUSTON AIR
SUPPLYINTAKE & EXHAUST PIPING
PROVIDE REFRIGERANT PIPING
BETWEEN EVAPPORATOR COIL AND A
COOLED CONDENSING UNIT PER
MANUFACTURER'S
RECOMMENDATIONS
ROUTE DUCT TO TERMINATION
LOCATION SHOWN ON PLANS
PROVIDE REFRIGERANT PIPING
BETWEEN EVAPPORATOR COIL AND AR
COOLED CONDENSING UNIT PER
MANUFACTURER'SRECOMMENDATIONS
REVISION SCHEDULE
DATE
CAULK AND SEAL
JOINT AIRTIGHT
RETURN AIR TO TRANSFER
VIA LOUVERED DOORS,
OPEN SURFACE AREA TO BE
COORDINATED WITH DOOR
SELECTION
RETURN AIR DUCT SIZE
AS NOTED ON PLANS
€4 FINAL CONNECTION BY
PLUMBING CONTRACTOR
Ida FINAL CONNECTION BY
K-7 PLUMBING CONTRACTOR
CAULK AND SEAL
JOINT AIRTIGHT
RETURN AIR GRILLE REFER
TO SIZES INDICATED ON
PLANS
��^FINAL CONNECTION DY
T--7 PLUMBING CONTRACTOR
��uFINAL CONNECTION DY
KY PLUMBING CONTRACTOR
PRIMARY CONDENSATE DRAIN
CONNECTION
PROVIDE 9D DEGREE LONG TURN
ELBOW, PART NUMBER LT9D. AS
MANUFACTURED BY IN-O-VATE
TECHNOLOGIES
PRIMARY CONDENSATE DRAIN
CONNECTION
WALL
PROVIDE BLOCK SUPPORT
FORRETURN AIR
DUCTWORK
NOTES:
-DRYER VENT SHALL BE INSTALLED IN ACCORDING
WITH THE REQUIREMENTS OF THE MECHANICAL
CODE OF NEW YORK STATE
-REFER TO ISOMETRIC VIEW THIS PAGE FOR MORE
DETAIL
PROVIDE DRAW BAND CONNECTION
DRYER
FINAL CONNECTION BY
PLUMBING CONTRACTOR
PROVIDE UL LISTED FLEXIBLE METAL
DUCTWORK CONNECTION TO DRYER
1/2" THICK NEOPRENE
VIBRATION ISOLATION PAD
FLUE CONDENSATE
NEUTRALIZER KIT
SUPPORT BASE (BY SAME MFG
AS FURNACE)
SUPPLY AIR DUCT SIZE AS
NOTED ON PLANS
FINAL CONNECTION BY
PLUMBING CONTRACTOR
FLUE CONDENSATE
NEUTRALIZER KIT
TYPICALAPARTMENT FURNACE .~....~___.�
DRYER VENT DETAIL
LECFSSE Cqmstnud|cm
'75Thruway Pask Drive
VVeS Henrietta, NY145B(3
0
~°
2012059
HVAC DETAILS A
STACKED WASHER DRYER UNIT (TYP. OF 5)
ISOMETRIC VIEW AT LAUNDRY AREA
U��U
��������K �K V
10
El 01
N
1.0
®APARTMENT BLDG. ROOF PLAN - HVAC
1/8" = 1'-0"
FLUES FOR
DOMESTIC. WATER
HEATERS
-COORDINATE
WITH PLUMBING
CONTRACTOR
ACC -1
ACC -1
ACC -1
ACC -1
ACC -1
Architecture
Planning
Interior Design
217 North Aurora Street
Ithaca NY 14850
p 607.273.7600 f 607.273.0475
At Nit 0,1,4„ Oh'ttalt
11 COMFORT STREET
ROCHESTER, NEW YORK 14620
565-232-2800
Th
UMENTS.AND . ALL IDEAS,ARRANGEMENT,
D PLANS INDICATED THEREON OR.
EREBY ARE OWNED AND REMAIN THE
OF KENNEDY MECHANICAL INC. AND NO PART
SHALL BE UTILIZED BY ANYPERSON, MRM, OR
TION FOR ANY PURPOSE WHATSOEVER EXCEPT
SPECIFIC WRJTTEN PERMISSION OF. KENNEDY
HANICAL.INC. ALL RIGHTS RESERVED
C
Baumer Mechanical Design Services
625 Panorama Tral, Building 2, Suite 210
Rochester, NY 14625
585-3135819
WARNING: It is a violation of
New York State Law for any
person, unless acting under the
direction of a licensed Architect,
to alter this document in any way.
If a document bearing the seal of
an Architect is altered, the
altering Architect shall affix to
such document his seal and the
notation "altered by" followed by
his signature, the date of such
alteration, and a specific
description of the alteration.
REVISION SCHEDULE
NAME
DATE
STONE QUARRY APARTMENTS
DATE:
7/18/2014
PROJECT:
2012059
OTHER:
DRAWN BY:
G/JTB
APARTMENT
BLDG.
ROOF/ATTIC
PLAN - HVAC
M103
4
5
6
7
8
9
10
B
A
0
N
c)
1
2
4
5
6 7
10
NO WALL
TRANSFER LOCATION
( UNDERCUT
THE DOOR?
T 7'-9" 12x6
B: 7'-3" 125
T: 8'-10"
B: 8'-4"
16x12
TRANSFER
6" A F F
16,e12
TRANSFER
6"A.F.F
NEW SOFFIT ♦ T: 7-9"
B: T-3"
T: V-10"
B: 8'-4"
16,02
TRANSFER
6" A F F
T: T_9"
..NEW SOFFIT ... 7'.-;"
T: T-9"
B: 7-3"
T: 7'-9'
B: 7'-4'
T: 8'-10"
B: 8'-4"
0x41
16x12
TRANSFER
6` A.:F.F
T: 8'-10"
B: 8'-4"
16x12
TRANSFER
WA:FF
T: T-9„ 1�
125 B: 7'-3" NEW SOFFIT
12x6
T: 7'-9" 125
B: T3"
B: 8,-4"
T: 8'-11"
B: 8'-4"
T: 8'-11"
B: 8'-4"
12x6 I.I
THIRD FLOOR HVAC PLAN DRAWING NOTES 0
1 PROVIDE SHEET METAL PLENUM SAME SIZE AS EVAPORATOR CONNECTION.
2 FURNACE ACCESS AREA. KEEP FREE OF OBSTRUCTION.
3 7" EXHAUST DUCT DOWN TO RANGE HOOD.PROVIDE A DUCT TRANSITION AS REQURIED TO MAKE THE FINAL CONNECTION TO THE RANGE HOOD. RANGE HOOD IS PROVIDED BY
OTHERS.
4 PROVIDE WALL CAP OUTLET. THE WALL CAP OUTLET SHALL BE A HOODED TYPE SELECTED FROM THE SIDING MANUFACTURERS STANDARDS. THE HOOD SHALL BE VINYL
CONSTRCTION WITH A BACKDRAFT DAMPER. COLOR SHALL BE SELECTED BY THE ARCHITECT. COORDINATE EXACT LOCATION WITH THE ARCHITECT ELEVATIONS.
5 DUCTWORK SHALL BE INSTALLED IN THE SOFFITS. TEST THE DUCTWORK BEFORE THE SOFFITS ARE CLOSED UP. COORDINATE WTH APPLICABLE TRADES.
6 PROVIDE 7" KITCHEN EXHAUST DUCT THROUGH SIDEWALL ON THE 1ST/2ND FLOORS.
25 T:7'-9'
NEW SOFFIT
7,-3"
1602
TRANSFER
TA.F.F:-
16x12
TRANSFER
6" A.F.F..
OA INTAKE WALL CAP
T: 7'-9"
B: T-3"
B: T-9"
T: 8) 10' 12x6 .
B:8'-3" 12
16x12
TRANSFER
6' A F.
URN -A
T: 8'-10"
B: 8'-3"
T:7' -1O"
B: 7'-2"
16x12
SEER
6" A.F F
TYPICAL TOWNHOME ROOF PLAN - HVAC
1/8" 11-0"
SE Construction
1 ve:
®APARTMENT BLDG. THIRD FLOOR P N - HVAC
1/8" = 11-0"
10
Architecture
Planning
Interior Design
217 North Aurora Street
Ithaca NY 14850
p 607.273.7600 f 607.273.0475
ENNEDy
OtANKAt COurtA* T'
1 /
COMFORT STREET
ROC TER, NEW YORK 14620
565-232-2500
THESE DOCUMENTS AND ALL IDEAS, ARRANGEMENT,
DESIGNS AND PLANS INDICATED THEREON OR
PRESENTED THEREBY ARE OWNED AND REMAIN THE
'ROPERT( OF KENNEDY MECHANICAL INC. AND NO. PART
'HEREOFSHALL .BE UTILIZED BY ANY PERSON, FIRM, OR
ORPORATION FOR ANY PURPOSE WHATSOEVER EXCEPT
WITH THE SPECIFIC WRJTTEN PERMISSION OF KENNEDY
MECHANICAL INC. ALL RIGHTS RESERVED
Baumer Mechanical Design Services
625 Panorama Trail, Building 2, Suite 210
Rochester: NY 14625
585-313-5819
WARNING: It is a violation of
New York State Law for any
person, unless acting under the
direction of a licensed Architect,
to alter this document in any way.
If a document bearing the seal of
an Architect is altered, the
altering Architect shall affix to
such document his seal and the
notation "altered by" followed by
his signature, the date of such
alteration, and a specific
description of the alteration.
REVISION SCHEDULE
NAME
DATE
AUG 2014
STONE QUARRY APARTMENTS
J
J
APARTMENTS
DATE:
7/18/2014
PROJECT:
2012059
OTHER:
DRAWN BY:
G/JTB
G
F
E
D
C
APARTMENT
BLDG./TH THIRD
FLOOR AND A
ROOF /ATTIC
PLANS - HVAC
M102
10
CL
NO WALL
TRANSFER LOCATION
UNDERCUT
THE DOOR?
F- F-
6ci
16x12
TRANSFE
6" A F F
T: 7-9" 12x6
B: 7'29"
125 I
12x6 T: 8'-10"
125 B: 9-4"
kkrkkkkkkkkkkk".
NEW SOFFIT
T. T-9"
8: 7'-3"
URN -A
12x6
T: 7-9"
B: 7-3" 12x6
T: 7'-9"
8: T-4"
T. 9-10"
8:8-4"
80
16x12
TRANSFER
6" A F F
125 d
11 II 1.1 ITF
T:8' -ll"
a 81-4" .)
16x12
TRANSFER
25 T:7'-9
NEW SOFFIT
12 "1
T: T-9" 125
B: T-3"
18x12
TRANSFER
TAFF
52111
N -
NEW SOFFIT
T: T-9"
B: 7-3"
10x4
2
125
9-4"
T:8'-11"
B: 8'-4"
7"0
T: 9-11"
B: 9-4"
T: 8011"
B: 9-4"
NEW SOFFIT
12x6
125
T: 7'-9"
NEW SOFFIT B: 7'-3"
12x6 11
16x12
TRANSFER
T:
8:8-4"
16x12
TRANSFER
6" A F F
OA INTAKE WALL CAP
T: 9-3"
B: 7'-9"
1 8o 7 -1 127,
007. 7: 9-10"
8'-3" 125
T: T-9"
B: T-4"
k
T: 7-10"
16x12
TRANSFER
TAFF
16x12
TRANSFER
6,1 TAFF
ni APARTMENT BLDG. SECOND FLOOR PLAN - HVAC
1/8" = 11-0"
12x6
125
2
4 5
SECOND FLOOR HVAC PLAN DRAWING NOTES
PROVIDE SHEET METAL PLENUM SAME SIZE AS EVAPORATOR CONNECTION,
2 FURNACE ACCESS AREA. KEEP FREE OF OBSTRUCTION.
7" EXHAUST DUCT DOWN TO RANGE HOOD.PROVIDE A DUCT TRANSITION AS REQURIED TO MAKE THE FINAL CONNECTION TO THE RANGE HOOD. RANGE HOOD IS PROVIDED BY
OTHERS,
4 PROVIDE WALL CAP OUTLET, THE WALL CAP OUTLET SHALL BE A HOODED TYPE SELECTED FROM THE SIDING MANUFACTURERS STANDARDS. THE HOOD SHALL BE VINYL
CONSTRUCTION WITH A BACKDRAFT DAMPER. COLOR SHALL BE SELECTED BY THE ARCHITECT, COORDINATE EXACT LOCATION WITH THE ARCHITECT ELEVATIONS.
5 DUCTWORK SHALL BE INSTALLED IN THE SOFFITS. TEST THE DUCTWORK BEFORE THE SOFFITS ARE CLOSED UP. COORDINATE WITH APPLICABLE TRADES,
6 PROVIDE 7" KITCHEN EXHAUST DUCT THROUGH SIDEWALL ON THE 1ST/2ND FLOORS.
7 BATHROOM EXHAUST DUCT UP THROUGH ROOF.
8 13x20 SUPPLY DUCT DOWN FROM FURNACE PLENUM TO FLOOR BELOW.
16512
TRANSFER
16512
TRANSFER
6.-10" A F F
20520
TRANSFER
6" A F F
16X12
TRANSFER
20520
TRANSFER
12x5
120
r;-? TYPICAL TOWNHOME SECOND FLOOR PLAN - HVAC
1/8" = 1'-0"
6 i 7
12x4
120
8
9
• ••• •• •••••••••••••„-
geogottlipooll0g0000+010000000b,00,400,000,100fterhge,00040000.14*0 ,00.004tigiotwsp0,011.60060,
1,01,015$6SIMIT
LECt•ESSEt Construciton •
75 Thrtiv\ra•\../ Etyrit. I
West Henriett.a, NY.1 /1,586
.........
i.
•„0.0,0`000'''
•a:"
I
I'401**
Architecture
Planning
Interior Design
217 North Aurora Street
Ithaca NY 14850
p 607.273.7600 f 607.273.0475
KENNEDy
04totANC4(0,.$05*At 041
Al AS ,tt,Ithrt$ $./ttet $$$$$1 Alt$ft
11 COMFORT STREET
ROCHESTER, NEW YORK 14620
585-232-2
-00
DOCUMENTS AND ALL IDEAS, ARRANGEMENT,
DESIGNS AND PLANS INDICATED T11EREON OR
PRESENTED THEREBY ARE OWNED AND REMAIN THE
PROPERlY OF KENNEDY MECHANICAL INC. AND NO PART
ThEREOF SHALL BE UTIUZED BY ANY PERSON, FIRM, OR .
CORPORATION FOR ANY PURPOSE W1-IATSOEVER EXCEPT
WITH THE SPECIFIC WRITTEN PERMISSION OF KENNEDY
MECHANICAL INC. ALL RIGHTS RESERVED
Baumer Mechanical Design Services
625 Panorama Trail, Building 2, Suite 210
Rochester, NY 14625
585-313-5819
WARNING: It is a violation of
New York State Law for any
person, unless acting under the
direction of a licensed Architect,
to alter this document in any way.
If a document bearing the seal of
an Architect is altered, the
altering Architect shall affix to
such document his seal and the
notation "altered by" followed by
his signature, the date of such
alteration, and a specific
description of the alteration.
REVISION SCHEDULE
NAME
DATE
F
15 AUG 2014
STONE QUARRY APARTMENTS
STONE QUARRY APARTMENTS, L
ITHACA, NY
DATE:
7/18/2014
PROJECT:
OTHER:
2012059
10
DRAWN BY:
KAG/JTB
APARTMENT
BLDG./TH
SECOND FLOOR
PLANS - HVAC
M101
A
10
CUH-S1
4
T
4x6 14x1
150 t ;;; 250
4x6 14x6 --
250 250
12x6
100
5"0
T:7'-9" 12
B: 7-3"
T:7'-9" 12
B: 7'-3"
STACKED 4" DRYER
EXHAUST VENTS (6j
SEE DETAIL M300
T: 7'-t0".
8. 7,-2"
0"x8"
16"x8'
16x12
TRANSFER
6" A F F
T: 8'-9"
B: 8'-5"
LOUVER L-2
16,8
T: 7-10"
B: 7-2"
T: 7'-10'
8: 7'-2"
T: 7'-9"
B: 7'-3"
20"x8"
LOUVER L-
16x8
16x12
TRANSFER
6"AFF
T: 8.-10"
B: 8'-4"
T: 7'-9"
B: T-3" 125
T: 8'-11"
B: 8'-4
T: T-9"
B:7'-3" 125
B: 8'x.1"
T 8'-10"
B: 8'-4"
15,02
TRANSFER
6": ARE
2
FIRST FLOOR HVAC PLAN DRAWING NOTES
PROVIDE SHEET METAL PLENUM SAME SIZE AS EVAPORATOR CONNECTION.
FURNACE ACCESS AREA. KEEP FREE OF OBSTRUC1 ION.
7" EXHAUST DUCT DOWN TO RANGE HOOD.PROVIDE A DUCT TRANSITION AS REQURIED TO MAKE THE FINAL CONNECTION TO THE RANGE HOOD. RANGE HOOD IS PROVIDED BY
OTHERS.
4 PROVIDE WALL CAP OUTLET. THE WALL CAP OUTLET SHALL BE A HOODED TYPE SELECTED FROM THE SIDING MANUFACTURERS STANDARDS. THE HOOD SHALL BE VINYL
CONSTRCTION WITH A BACKDRAFT DAMPER. COLOR SHALL BE SELECTED BY THE ARCHITECT. COORDINATE EXACT LOCATION WITH THE ARCHITECT ELEVATIONS.
S DUCTWORK SHALL BE INSTALLED IN THE SOFFITS. TEST THE DUCTWORK BEFORE THE SOFFITS ARE CLOSED UP. COORDINATE WITH APPLICABLE TRADES.
6 PROVIDE 7" KITCHEN EXHAUST DUCT THRU SIDEWALL ON THE IST/2ND FLOORS.
7 LOUVER L-1 TO OPENI WHEN FAN ON F-2 RUNS OCCUPIED MODE 124 VOLT CIRCUIT).
8 13x20 SUPPLY DUCT DOWN FROM FURNACE PLENUM ON SECOND FLOOR
9 DUCTWORK LOCATED IN AN UNCONDITIONED SPACE SHALL BE INSULATED.
Request: Date Required:
LECESSE is proposing to vent Apartment end units #118 & #225 out the sidewall of the Mechanical Room in lieu of the roof. The
reason for this is that the roof is extremely tight and inaccessible above these two units. Appropriate sidewall termination kits will be
used as required.
Please confirm if this is acceptable.
Requested by: Ashley Tarasco
LECESSE Construction Services
Response:
Vents as per attached acceptable Architecturally. No comment on mechanical function or design.
Direct Vent furnace
Side Wall Vent Kit (0170K00000S)
Installation Instructions
T: T-9"
B: 7'-3" 125
T. 7'-9"
B: 7'-3"
T: 8,-11"
B: 8'-4"
16x12
TRANSFER
6- A.F F.
T: 8'-10"
B: 8'-4"
16,12
TRANSFER
6"A.FF
T:8-10"
B:
6"O DUCT UP
TO FLOOR ABOVE
FO DUCT UP
TO FLOOR ABOVE
2X6 \I T: T-9"
125 B: 7'-3"
OA INTAKE WALL CAP
URN -A
10x4
75._M
10X10
T: 8'-3`
B: 7'-9"
FURN-A
CUH-S1
T: 8'-10"
B: 8'-4"
FURN-
5+0 DUCT UP
TO FLOOR ABOVE
18"x8
18"x8"
RFE'i!'
.-10x41
T: 7'-9"
B: 7-3"
18"x8"
T: T-10"
B: 7-2"
TRANSFER
6" A. F. F
16,12
TRANSFER
6"AFF
---10x4
6"0 DUCT UP
TO FLOOR ABOVE
6"0 DUCT UP
TOFLOOR ABOVE
APARTMENT BLDG. FIRST FLOOR PLAN HVAC
1/8" = 1I-0"
ACC -1
ACC -1
TYPICAL TOWNHOME FIRST FLOOR PLAN - HVAC
1/8" =
TAFICHITECTS
Architecture
Planning
Interior Design
217 North Aurora Street
Ithaca NY 14850
p 607.273.7600 f 607273.0475
NEDY
t T'Ugl
/ / COMFORT STREET
ROCHESTER, NEW YORK 14620
585-232-2500
THESE DOCUMENTS. AND ALL IDEAS. ARRANGEMENT,
DESIGNS AND PLANS INDICATED THEREON OR.
PRESENTED THEREBY ARE OWNED AND REMAIN THE
PROPERTY or KENNEDY MECHANICAL INC. AND NO PART
THEREOF SMALL BE UTILIZED BY ANY PERSON. MRM, OR
CORPORATION FOR ANY PURPOSE WHATSOEVER:EXCEPr
WITH THE SPECIFIC WRITTEN PERMISSION OF KENNEDY
MECHANICAL INC. ALL RIGHTS RESERVED
Baumer Mechanical Design Services
625 Panorama Trail, Building 2, Suite 210
Rochester, NY 14625
585-313-5819
WARNING: It a violation of
New York State Law for any
person, unless acting under the
direction of a licensed Architect,
to alter this document in any way.
If a document bearing the seal of
an Architect is altered, the
altering Architect shall affix to
such document his seal and the
notation "altered by" followed by
his signature, the date of such
alteration, and a specific
description of the alteration.
REVISION SCHEDULE
NAME
DATE
15 AUG 2014
STONE QUARRY APARTMENTS
RTMENTS, LL
STONE QUARRY AP
DATE:
7/18/2014
PROJECT:
2012059
OTHER:
DRAWN BY:
G/J T B
6
7
9
10
APARTMENT
BLDG./TH FIRST A
FLOOR PLANS -
HVAC
M100
ENERGY STAR QUALIFIED HOMES, REQUIREMENTS:
1.
CONTRACTORS SHALL BE ACCA-QUALIFIED OR H -QUITO THROUGH ADVANCED ENERGY OR NYSERDA AND COMPLY WITH ENERGY STAR QUALIFIED HOMES, VERSION
3 (REV. 7), HVAC SYSTEM QUALITY INSTALLATION RATER CHECKLIST AND REQUIREMENTS NOTED BELOW.
SECTION 1: REVIEW OF ENERGY STAR V3 REV 07 HVAC SYSTEM QUALITY INSTALLATION CONTRACTOR CHECKLIST
1. COMPLETE AND COLLECT FOR RECORDS HVAC SYSTEM QUALITY INSTALLATION CONTRACTOR CHECKLIST IN ITS ENTIRETY, ALONG WITH DOCUMENTATION ON VENTILATION
SYSTEM, FULL LOAD CALCULATIONS, AHRI CERTIFICATE AND BALANCING REPORT. IT IS THE CONTRACTOR'S RESPONSIBILITY TO COMPLETE THE CHECKLISTS IN THEIR ENTIRETY
AS THE RATER WILL BE RESPONSIBLE TO VERIFY INPUTS SUCH AS DESIGN TEMPS, U VALUES, # OF OCCUPANTS, SQUARE FOOTAGE, ORIENTATION, ETC. IT IS THE CONTRACTOR'S
EXCLUSIVE RESPONSIBILITY TO ENSURE THE SYSTEM DESIGN AND INSTALLATION COMPLY WITH THE CONTRACTOR CHECKLIST SPECIFICATIONS, THE RATER WILL USE THE
ENERGY STAR V3 HVAC QI RATER CHECKLIST TO VERIFY THE INPUTS FROM THE HVAC CONTRACTOR CHECKLIST SUCH AS EQUIPMENT MODEL NUMBERS,
EFFICIENCIES,CAPACITIES; REFRIGERANT CHARGE TEST METHOD; STATIC PRESSURES; VENTILATION; TESTING & BALANCING, ETC,
2. REVIEW THE FOLLOWING PARAMETERS RELATED TO SYSTEM COOLING DESIGN, SELECTION, AND INSTALLATION FROM HVAC
CONTRACTOR CHECKLIST:
A. OUTDOOR DESIGN TEMPERATURES ARE EQUAL TO 1% AND 99% ACCA MANUAL) DESIGN TEMPERATURES FOR
CONTRACTOR -DESIGNATED DESIGN LOCATION.
B. HOME ORIENTATION MATCHES ORIENTATION OF RATED HOME.
C. NUMBER OF OCCUPANTS EQUALS NUMBER OF OCCUPANTS IN RATED HOME. THE NUMBER OF OCCUPANTS AMONG ALL HVAC
SYSTEMS IN THE HOME SHALL BE EQUAL TO THE NUMBER OF RESNET-DEFINED BEDROOMS PLUS ONE. OCCUPANTS LISTED
FOR SYSTEMS FOR WHICH THE HEADER OF THE CONTRACTOR CHECKLIST INDICATES THAT IT IS DESIGNED TO HANDLE
TEMPORARY OCCUPANT LOADS SHALL BE PERMITTED TO EXCEED THIS LIMIT.
D. CONDITIONED FLOOR AREA IS WITHIN PLUS OR MINUS 10% OF CONDITIONED FLOOR AREA OF RATED HOME.
E. WINDOW AREA IS WITHIN PLUS OR MINUS 10% OF CALCULATED WINDOW AREA OF RATED HOME,
F. PREDOMINANT WINDOW SHGC IS WITHIN 0.1 OF PREDOMINANT VALUE IN RATED HOME. PREDOMINANT IS DEFINED AS THE
SHGC VALUE USED IN THE GREATEST AMOUNT OF WINDOW AREA IN THE HOME,
G. LISTED LATENT COOLING CAPACITY EXCEEDS DESIGN LATENT HEAT GAIN.
H. LISTED SENSIBLE COOLING CAPACITY EXCEEDS DESIGN SENSIBLE HEAT GAIN.
LISTED TOTAL COOLING CAPACITY IS 95-115% (OR 95-125% FOR HEAT PUMPS IN CLIMATE ZONES 4-8) OF DESIGN TOTAL HEAT
GAIN, OR HEAT NOMINAL SIZE: FOR COOLING SYSTEMS THE NEXT LARGEST NOMINAL PIECE OF EQUIPMENT MAY BE USED THAT
IS AVAILABLE TO SATISFY THE LATENT AND SENSIBLE REQUIREMENTS. SINGLE -SPEED SYSTEMS GENERALLY HAVE OEM
NOMINAL SIZE INCREMENTS OF 1/2 TON. MULTI -SPEED OR MULTI -STAGE EQUIPMENT MAY HAVE OEM NOMINAL SIZE
INCREMENTS OF ONE TON. THEREFORE, THE USE OF THESE ADVANCED SYSTEM TYPES CAN PROVIDE EXTRA FLEXIBILITY TO
MEET THE EQUIPMENT SIZING REQUIREMENTS.
J. HVAC MANUFACTURER AND MODEL NUMBERS ON INSTALLED EQUIPMENT, CONTRACTOR CHECKLIST, AND AHRI CERTIFICATE OR
OEM CATALOG DATA ALL MATCH. IN CASES WHERE THE CONDENSER UNIT IS INSTALLED AFTER THE TIME OF INSPECTION BY
THE RATER, THE HVAC MANUFACTURER AND MODEL NUMBERS ON INSTALLED EQUIPMENT CAN BE DOCUMENTED THROUGH THE
USE OF PHOTOGRAPHS PROVIDED BY THE HVAC CONTRACTOR AFTER INSTALLATION IS COMPLETE.
K. USING REPORTED LIQUID LINE OR SUCTION LINE PRESSURE, CORRESPONDING TEMPERATURE (AS DETERMINED USING
PRESSURE/TEMPERATURE CHART FOR REFRIGERANT TYPE) MATCHES REPORTED CONDENSER OR EVAPORATOR SATURATION
TEMPERATURE (PLUS OR MINUS 3 DEGREES). IF CONTRACTOR HAS INDICATED THAT AN OEM TEST PROCEDURE HAS BEEN
USED IN PLACE OF A SUB -COOLING OR SUPER -HEAT PROCESS AND DOCUMENTATION HAS BEEN ATTACHED THAT DEFINES THIS
PROCEDURE, THEN THE BOX FOR "N/A" SHALL BE CHECKED FOR THIS ITEM.
L. CALCULATED SUB -COOLING OR SUPERHEAT VALUE EQUALS REPORTED TARGET SUB -COOLING OR SUPERHEAT TEMPERATURE.
IF CONTRACTOR HAS INDICATED THAT AN OEM TEST PROCEDURE HAS BEEN USED IN PLACE OF A SUB -COOLING OR
SUPER -HEAT PROCESS AND DOCUMENTATION HAS BEEN ATTACHED THAT DEFINES THIS PROCEDURE, THEN THE BOX FOR "N/A"
SHALL BE CHECKED FOR THIS ITEM.
RATER -VERIFIED SUPPLY AND RETURN DUCT STATIC PRESSURE SHALL BE LESS THAN 110% OF CONTRACTOR RECORD VALUES.
4. SUBMIT CONTRACTOR PREPARED REPORT INDICATING THE ROOM NAME AND DESIGN AIRFLOW FOR EACH SUPPLY AND RETURN
REGISTER TO RATER FOR RECORD. IN ADDITION, FINAL BALANCING REPORT INDICATING ROOM AIRFLOWS MEASURED AND
DOCUMENTED ON BALANCING REPORT THROUGH ONE OF THE FOLLOWING OPTIONS: 1. MEASURED AND DOCUMENTED BY THE
CONTRACTOR. 2. MEASURED BY RATER USING SECTION 804.2 OF THE MORTGAGE INDUSTRY NATIONAL HERS STANDARD, DOCUMENTED BY
RATER, AND VERIFIED BY RATER TO BE WITHIN THE GREATER OF +/-20% OR 25 CFM OF DESIGN AIRFLOW.
HVAC CONTRACTOR HOLDS CREDENTIALS NECESSARY TO COMPLETE THE HVAC SYSTEM QI CONTRACTOR CHECKLIST. THE RATER MUST
CONFIRM THE CONTRACTOR HOLDS THE CREDENTIALS.
SECTION 2: DUCT QUALITY INSTALLATION
1. INSTALL DUCTWORK CONNECTIONS AND ROUTING WITHOUT KINKS OR SHARP BENDS. COORDINATE WITH THE FRAMER, PLUMBER, AND
ELECTRICIAN FOR EFFECTIVE DUCT INSTALLATION.
2. INSTALL FLEXIBLE DUCTWCRK WITHOUT EXCESSIVE COILS OR LOOPS UNLESS NEEDED FOR ACOUSTICAL CONTROL. COORDINATE WITH THE
FRAMER, PLUMBER, AND ELECTRICIAN FOR EFFECTIVE DUCT INSTALLATION. BALANCING DAMPERS OR PROPER DUCT SIZING SHALL BE
USED INSTEAD OF LOOPS TO LIMIT FLOW TO DIFFUSERS. WHEN BALANCING DAMPERS ARE USED, THEY SHALL BE LOCATED AT THE TRUNK
TO LIMIT NOISE UNLESS THE TRUNK WILL NOT BE ACCESSIBLE WHEN THE BALANCING PROCESS IS CONDUCTED. IN SUCH CASES, OPPOSED
BLADE DAMPERS OR DAMPERS THAT ARE LOCATED IN THE DUCT BOOT ARE PERMITTED,
FLEXIBLE DUCTWORK SHALL NOT BE INSTALLED IN UNCONDITIONED CAVITIES SMALLER THAN THE OUTER DUCTWORK DIAMETER. FLEXIBLE
DUCTWORK SHALL NOT BE INSTALLED IN CONDITIONED CAVITIES SMALLER THAN THE INNER DUCTWORK DIAMETER. INSTALL DUCTS TO
PREVENT COMPRESSION OF DUCT OR DUCT INSULATION.
4, FLEXIBLE DUCTWORK SHALL BE SUPPORTED AT MANUFACTURER RECOMMENDED INTERVALS BUT AT A DISTANCE LESS THAN OR EQUAL TO
5 FT. TO PREVENT SAGGING, INSTALL SUPPORTS AT LEAST ONE INCH WIDE. INSTALL SUPPORTS WITHOUT COMPRESSING THE DUCT AND
THE DUCT INSULATION.
BUILDING CAVITIES SHALL NOT BE USED AS SUPPLY OR RETURN DUCTS UNLESS THEY MEET ITEMS 3.2, 3.3, 4.1, AND 4.2 OF THE HVAC
SYSTEM QUALITY INSTALLATION RATER CHECKLIST. AVOID USING BUILDING CAVITIES AS DUCTS DUE TO THE DIFFICULTY OF PROPERLY AIR
SEALING AND INSULATING THEM. IF BUILDING CAVITIES ARE USED, INSTALL INSULATION WITHOUT MISALIGNMENTS, COMPRESSIONS, GAPS,
OR VOIDS IN ALL CAVITIES USED FOR DUCTS. IF NON -RIGID INSULATION 15 USED, INSTALL A RIGID AIR BARRIER OR OTHER SUPPORTING
MATERIAL TO HOLD INSULATION IN PLACE. SEAL ALL SEAMS, GAPS, AND HOLES OF THE AIR BARRIER WITH CAULK OR FOAM.
6. HVAC DUCTS, CAVITIES USED AS DUCTS, AND COMBUSTION AIR INLETS AND OUTLETS MAY PASS PERPENDICULARLY THROUGH EXTERIOR
WALLS BUT SHALL NOT BE RUN WITHIN EXTERIOR WALLS UNLESS PROVIDED WITH AT LEAST R-6 CONTINUOUS ,NSULATION ON EXTERIOR
SIDE OF THE CAVITY, ALONG WITH AN INTERIOR AND EXTERIOR AIR BARRIER WHERE REQUIRED BY THE THERMAL ENCLOSURE SYSTEM
CHECKLIST. INSTALL INSULATION WITHOUT MISALIGNMENT, COMPRESSIONS, GAPS, OR VOIDS IN ALL BUILDING CAVITIES WITH DUCTS OR
CAVITIES USED AS DUCTS. IF NON -RIGID INSULATION IS USED, INSTALL A RIGID AIR BARRIER OR OTHER SUPPORTING MATERIAL TO HOLD
INSULATION IN PLACE. SEAL ALL SEAMS, GAPS, AND HOLES OF THE AIR BARRIER WITH CAULK OR FOAM.
7, QUANTITY AND LOCATION OF SUPPLY AND RETURN DUCT TERMINALS SHALL MATCH CONTRACTOR BALANCING REPORT.
8. BEDROOMS SHALL BE PRESSURE -BALANCED USING ANY COMBINATION OF TRANSFER GRILLES, JUMPER DUCTS, DEDICATED RETURN DUCTS,
AND/OR UNDERCUT DOORS TO EITHER: A) PROVIDE ONE SQUARE INCH OF FREE AREA OPENING PER 1 CFM OF SUPPLY AIR, AS REPORTED
ON THE CONTRACTOR -PROVIDED BALANCING REPORT: OR B) ACHIEVE A RATER -MEASURED PRESSURE DIFFERENTIAL LESS THAN OR EQUAL
TO 3 PA (0.012 IN. W.C.) WITH RESPECT TO THE MAIN BODY OF THE HOUSE WHEN BEDROOM DOORS ARE CLOSED AND THE AIR HANDLER IS
OPERATING. FOR PROVIDING FREE AREA, REFER TO THE BALANCING REPORT PROVIDED BY THE HVAC CONTRACTOR FOR THE BEDROOM
AIR FLOWS TO SIZE THE TRANSFER GRILLES AND/OR JUMPER DUCTS. INSTALL AND SEAL PROPERLY SIZED TRANSFER GRILLES DURING
FRAMING. BOTH OPENINGS OF THE TRANSFER GRILLE MUST HAVE THE REQUIRED FREE AREA. IF TRANSFER GRILLES ARE NOT USED,
INSTALL AND SEAL JUMPER DUCTS DURING FRAMING. BOTH OPENINGS AND DUCTS MUST HAVE THE REQUIRED FREE AREA. FOR ACHIEVING
A RATER -MEASURED PRESSURE DIFFERENTIAL, EPA RECOMMENDS THAT TRANSFER GRILLES, JUMPER DUCTS, OR DEDICATED RETURNS BE
INSTALLED, TEST THE PRESSURES OF EACH BEDROOM. FOR HVAC SYSTEM WITH MULTI -SPEED FANS, THE HIGHEST DESIGN FAN SPEED
SHALL BE USED WHEN VERIFYING THIS REQUIREMENT.
9. HVAC CONTRACTOR SHALL BE AVAILABLE WHEN RATER IS CONDUCTING THIS TEST.
SECTION 3: DUCT INSULATION
1. ALL TRUNK DUCTS IN UNCONDITIONED SPACE SHALL BE INSULATED. SEAL ALL SEAMS, GAPS, AND HOLES OF ALL TRUNK DUCT CONNECTIONS BEFORE
INSTALLING INSULATION, PREFERABLY WITH MASTIC. INSTALL INSULATION WITHOUT MISALIGNMENT, COMPRESSION, GAPS, OR VOIDS AROUND ALL
CONNECTIONS AND EXPOSED DUCTWORK. SEAL DUCTINSULATION TO BOOT TO PREVENT ACCUMULATION OF CONDENSATION.
2. INSTALL INSULATED DUCTWORK, BOXES, AND BOOTS IN ALL UNCONDITIONED ATTIC SPACES TO MEET THE PRESCRIPTIVE PATH.
INSTALL ALL DUCTS IN UNCONDITIONED SPACES WITHOUT COMPRESSING THE INSULATION. PRESCRIPTIVE PATH: SUPPLY
DUCTS IN UNCONDITIONED ATTIC SHALL HAVE GREATER THAN OR EQUAL TO R-8 INSULATION.
ALL OTHER SUPPLY DUCTS AND ALL RETURN DUCTS IN UNCONDITIONED SPACE SHALL HAVE GREATER THAN OR EQUAL TO R-6
INSULATION. INSTALL INSULATED DUCTWORK, BOXES, AND BOOTS IN ALL UNCONDITIONED SPACES. INSTALL ALL DUCTS IN
UNCONDITIONED SPACES WITHOUT COMPRESSING THE INSULATION.
2
SECTION 4: DUCT LEAKAGE
DUCT LEAKAGE SHALL MEET OR EXCEED THE FOLLOWING CRITERIA:
1, TOTAL RATER -MEASURED DUCT LEAKAGE = 8 CFM25 (CFM25 = CFM @ 25 PASCALS AIR PRESSURE) PER 100 SQ, FT. OF CONDITIONED FLOOR AREA (CFA).
A. SEAL ALL SEAMS, GAPS, AND HOLES OF ALL TRUNK DUCT CONNECTIONS BEFORE INSTALLING INSULATION, PREFERABLY WITH
MASTIC.
B. INSTALL INSULATION WITHOUT MISALIGNMENTS, COMPRESSIONS, GAPS, OR VOIDS AROUND ALL CONNECTIONS AND EXPOSED DUCT
WORK
C. SEAL DUCT INSULATION IN PLACE.
D. EPA RECOMMENDS TESTING DUCTS ONLY AFTER COMPLETING A VISUAL INSPECTION OF PROPER DUCT SEALING,
ENERGY STAR QUALIFIED HOMES, REQUIREMENTS (CON'T)
2. RATER -MEASURED DUCT LEAKAGE TO OUTDOORS = 4 CFM25 PER 100 SQ. FT. OF CONDITIONED FLOOR AREA.
A. SEAL ALL SEAMS, GAPS, AND HOLES OF ALL TRUNK DUCT CONNECTIONS BEFORE INSTALLING INSULATION. MASTIC IS RECOMMENDED
FOR SEALING
B. INSTALL INSULATION WITHOUT MISALIGNMENT, COMPRESSION, GAPS, OR VOIDS AROUND ALL CONNECTIONS AND EXPOSED DUCT
WORK.
C. SEAL DUCT INSULATION IN PLACE.
D. EPA RECOMMENDS TESTING DUCTS ONLY AFTER COMPLETING A VISUAL INSPECTION OF PROPER DUCT SEALING.
ADDITIONAL TESTING, QUALIFICATION AND INSTALLATION GUIDELINES TO MEET FOR LEAKAGE CRITERIA
A DUCT LEAKAGE SHALL BE DETERMINED AND DOCUMENTED BY A RATER USING A RESNET-APPROVED TESTING PROTOCOL DURING
ROUGH -IN (S 4 CFM25 PER 100 SQ. FT. OF CFA WITH AIR HANDLER AND ALL DUCTWORK, BUILDING CAVITIES USED AS DUCTWORK,
& DUCT BOOTS INSTALLED. IN ADDITION, ALL DUCT BOOTS SEALED TO FINISHED SURFACE, RATER -VERIFIED AT FINAL) AND
AFTER ALL COMPONENTS OF THE SYSTEM HAVE BEEN INSTALLED (E.G., AIR HANDLER AND REGISTER GRILLES). LEAKAGE LIMITS
SHALL BE ASSESSED ON A PER -SYSTEM BASIS, RATHER THAN PER RESIDENT UNIT, WHERE COMMON SYSTEMS ARE USED.
TESTING OF DUCT LEAKAGE TO THE OUTSIDE CAN BE WAIVED, HOWEVER THIS MUST BE CONFIRMED BY THE RATER FOR EACH
PROJECT IF ALL DUCTS AND AIR HANDLING EQUIPMENT ARE LOCATED WITHIN THE HOME'S AIR AND THERMAL BARRIERS, AND
ENVELOPE LEAKAGE HAS BEEN TESTED TO BE LESS THAN OR EQUAL TO HALF OF THE PRESCRIPTIVE PATH INFILTRATION LIMIT
FOR THE CLIMATE ZONE WHERE THE HOME IS TO BE BUILT.
B. FOR ALL HOMES OR UNITS THAT SERVE LESS THAN 1,200 SQ. FT. OF CONDITIONED FLOOR AREA (CFA), TOTAL MEASURED DUCT
LEAKAGE SHALL BE = 8 CFM25 PER 100 SQ. FT. OF CFA AND MEASURED DUCT LEAKAGE TO OUTDOORS SHALL BE = 5 CFM25 PER
100 SQ. FT. OF CFA.
C. IF TOTAL DUCT LEAKAGE IS = 4 CFM25 PER 100 SQ. FT. OF CONDITIONED FLOOR AREA, OR = 5 CFM25 PER 100 SQ FT. OF
CONDITIONED FLOOR AREA FOR HOMES OR UNITS THAT HAVE LESS THAN 1,200 SQ. FT. OF CONDITIONED FLOOR AREA. THEN
LEAKAGE TO OUTDOORS NEED NOT BE TESTED.
D. WHERE DUCTWORK, DUCT BOOTS, PLENUMS AND OTHER DEVICES PENETRATE ANY BUILDING ELEMENT THE OPENINGS SHALL BE
CUT NEATLY AND CLOSE TO THE ACTUAL SIZE OF THE DUCT, BOOT OR PLENUM TO MINIMIZE GAPS AND THE EXTENT OF SEALANT
MATERIAL. WORK SHALL BE ACCOMPLISHED IN A NEAT AND WCRKMAN LIKE MANNER. DUCT BOOTS SEALED TO FLOOR, WALL,
OR CEILING USING CAULK, FOAM, MASTIC TAPE, OR MASTI' PASTE. THIS SHALL BE COORDINATED BY ALL APPROPRIATE TRADES.
POOR INSTALLATIONS WITH TOO MUCH TOLERANCE CAUSING EXCESSIVE SEALANT MATERIAL SHALL BE IMMEDIATELY BROUGHT
TO THE ATTENTION OF THE GENERAL CONTRACTOR FOR CORRECTIVE ACTION TO BE TAKEN.
E. DUCT CONNECTIONS, PARTIAL AND FULL CASED SECTIONS OF THE FAN COIL UNIT -FURNACE -HEAT PUMP UNIT, OR AIR HANDLING
UNIT AND SERVICE DOORS OR ACCESS PANELS SHALL BE SEALED WITH PERMANENT MASTIC, HIGH QUALITY NON PERMEABLE
FOAM, NEOPRENE, CORK GASKET OR HIGH QUALITY AIR TIGHT SEALING CAULK AT FIXED POINTS AND / OR UL RATED TAPE WHEN
ACCESS IS REQUIRED. WHERE TAPE IS UTILIZED A SUFFICIENT AMOUNT OF ROLLS OF TAPE SHALL BE PROVIDED TO BE KEPT AT
THE PROJECT AND TURNED OVER TO THE BUILDING OWNER TO RESEAL THE SERVICE POINTS AFTER CUTTING OR REMOVING
THE TAPE PROVIDED TO MEET THE LEAKAGE TESTS.
SECTION 5 - WHOLE BUILDING, HOME OR RESIDENT UNIT DELIVERED VENTILATION OR DEDICATED VENTILATION
SYSTEM SHALL MEET OR EXCEED THE RATER -MEASURED VENTILATION RATE TO BE WITHIN 100-120% OF HVAC DESIGN VALUE PER THE
FOLLOWING CRITERIA (AS LISTED IN THE HVAC CONTRACTOR CHECKLIST, 2.11):
1. RATER -MEASURED VENTILATION RATE IS SCHEDULED TO BE WITHIN 100-120% OF HVAC DESIGN VALUE. THE VENTILATION
SYSTEM MUST BE COMPLIANT WITH ASHRAE 62.2-2010 (FOR REQUIRED VENTILATION QUANTITIES AND SEALING ALL HOLES, GAPS, AND
SEAMS OF DUCTS AND THEIR CONNECTIONS) INCLUDING AS FOLLOWS:
A. SUPPLY (SUCH AS AN INTAKE DUCT TO THE RETURN SIDE OF THE HVAC SYSTEM COUPLED WITH A MOTORIZED DAMPER
AND CONTROL SYSTEM).
B. EXHAUST (SUCH AS A CONTINUOUSLY OPERATING EXHAUST FAN).
C. BALANCED (SUCH AS AN ERV OR HRV).
2. THE VENTILATION AIR FLOW AND LOCAL EXHAUST AIR FLOWS WILL BE MEASURED BY THE RATER USING A FLOW HOOD,
FLOW GRID, ANEMOMETER (IN ACCORDANCE WITH AABC, NEBB OR ASHRAE PROCEDURES), OR SUBSTANTIALLY
EQUIVALENT METHOD. ALL SYSTEMS SHOULD BE CONSTRUCTED ACCORDINGLY.
SECTION 6 - THERMOSTAT AND HVAC UNIT CONTROLS:
1. THERMOSTAT, AIR FLOW IS PRODUCED WHEN THE CENTRAL HVAC INDOOR FURNACE OR FAN COIL EVAPORATOR FAN IS ENERGIZED.
THIS IS ACCOMPLISHED BY SETTING THE THERMOSTAT TO "FAN" SELECTING THE COOLING OR HEATING MODE WILL INDEX THE COOLING
OR HEATING PORTIONS OF THE SYSTEM TO PROVIDE EITHER COOLED OR HEATED AIR TO MEET THE ROOM OR UNIT THERMOSTAT SET
POINT.
THE RATER, AS PART OF THE TESTING WILL TURN THE SYSTEM ON TO COOL AND CHANGE THE SET POINT TEMPERATURE TO 3 DEGREES
F BELOW THE AMBIENT TEMPERATURE, THE RATER WILL i HEN RETURN THE THERMOSTAT TO THE ORIGINAL SETTING. THE RATER WILL
WAIT FOR A PERIOD OF TIME AS RECOMMENDED BY THE UNIT MANUFACTURER OR WAIT FOR THE SYSTEM PREPROGRAMMED CYCLE
BETWEEN COOLING AND HEATING MODE AND SET THE SYSTEM ON TO HEATING AND CHANGE THE SET POINT TO 3 DEGREES F ABOVE
THE AMBIENT. THE RATER WILL THEN RETURN THE THERMOSTAT TO THE ORIGINAL SETTING.
THE RATER WILL VERIFY THAT THE HEATING AND COOLING SYSTEMS ARE WORKING PROPERLY BY MEASURING THE OUTPUT
TEMPERATURE OF THE SYSTEMS DURING THE APPROPRIATE CYCLES.
IN CASES WHERE THE CONDENSER UNIT OR OUTDOOR HEAT PUMP SECTION CAN ABSOLUTELY ONLY BE INSTALLED AFTER THE TIME OF
INSPECTION BY THE RATER, THE RATER IS EXEMPT FROM VERIFYING THE COOLING MODE OR HEATING IF IT IS A HEAT PUMP UNIT.
2. ENERGY RECOVERY DEVICES OR CONTINUOUSLY OPERATING FANS, OTHER THAN BATHROOM OR TOILET ROOM FANS:
IT IS IMPORTANT FOR HVAC CONTRACTORS AND ELECTRICIANS TO LOCATE THE OVERRIDE CONTROLS FOR CONTINUOUSLY OPERATING
VENTILATION AND EXHAUST FANS IN A LOCATION EASILY ACCESSIBLE TO THE OCCUPANT. IT IS ALSO IMPORTANT TO PROPERLY LABEL
THESE CONTROLS. IF CONTROLS ARE NOT PROPERLY LABELED, FANS MAY BE MISTAKENLY TURNED OFF.
OVERRIDE CONTROL LOCATION RECOMMENDATIONS:
LOCATION OF THE LABELED CONTROL NEAR THE THERMOSTAT CREATES A TYPE OF CONTROL CENTER FOR THE OCCUPANT. THIS
ALLOWS ACCESS THE MAJORITY OF THE HVAC SYSTEM CONTROLS IN ONE LOCATION. THIS SETUP IS IDEAL FOR VENTILATION SYSTEMS,
SUCH AS ERV'S and HRV'S THAT MAY BE LOCATED IN INACCESSIBLE PLACES.
LOCATING A SWITCH OR SWITCHING BREAKER AT AN ELECTRICAL PANEL WITH A LABEL WOULD BE SUITABLE WHERE THERE ARE
MULTIPLE CONTINUOUSLY RUNNING EXHAUST FANS,
BATHROOM OR TOILET EXHAUST FANS MAY BE SPECIFIED FOR THIS PROJECT TO HAVE INTERNAL OVERRIDE SYSTEMS, EITHER ON THE
ELECTRICAL SWITCH PLATE OR DEFINED IN THE MANUFACIURER'S MANUAL. THESE EXHAUST FANS MEET THE REQUIREMENTS AS LONG
AS THE OVERRIDE IS ACCESSIBLE AND THE DOCUMENTATION IS REVIEWED BY THE RATER.
THE SWITCHES OR CONTROL DEVICES SHOULD CLEARLY, PERMANENTLY AND PROFESSIONALLY LABELED FOR THE EQUIPMENT SERVED
AND THE FUNCTIONS. IF REQUIRED ON PLANS OR ELSEWHERE IN THE SPECIFICATIONS THERE SHALL ALSO BE A PILOT LIGHT TO
INDICATE EQUIPMENT IS ENERGIZED.
3. CONTINUOUSLY OPERATING VENTILATION AND EXHAUST FANS MUST INCLUDE READILY ACCESSIBLE OVERRIDE CONTROLS.
4. FUNCTION OF VENTILATION CONTROLS IS OBVIOUS (E.G. BATHROOM EXHAUST FAN) OR, IF NOT, CONTROLS HAVE BEEN LABELED.
SECTION 7 - VENTILATION AIR INLETS AND SOURCES
THE CONTRACTOR SHALL VERIFY LOCATIONS OF ALL CONTAMINATION SOURCE TERMINATIONS AND INSTALL AIR INLETS AT LEAST 10 FT. AWAY
FROM ALL CONTAMINATION SOURCE TERMINATIONS AT VERTICAL WALL LOCATIONS AND INSTALL AIR INLETS AT LEAST 3 FT. AWAY FROM
DRYER EXHAUSTS AND CONTAMINATION SOURCES EXITING THROUGH THE ROOF UNLESS MORE STRINGENT CRITERIA IS REQUIRED BY CODE
OR INDICATED ON THE DESIGN DOCUMENTS.
THE CONTRACTOR SHALL INSTALL AIR INLETS AT LEAST 4 FEET ABOVE GRADE OR ROOF DECK FOR THIS PROJECT. THE INLET SHALL HAVE
RODENT AND INSECT SCREEN WITH A MAXIMUM OF 0.5" MESH SPACING. SCREENS SHALL BE ACCESSIBLE FOR CLEANING.
THE VENTILATION AIR MUST COME DIRECTLY FROM OUTDOORS AND NOT FROM ATTICS, CRAWL SPACES, GARAGES OR OTHER DWELLINGS.
DUCTWORK, HOODS, LOUVERS AND GRILLES USED FOR INTAKE SHALL BE INSTALLED IN A NEAT AND WORKMANLIKE MANNER AND BE SIZES
THAT MAINTAIN THE PROPER FREE AREA FOR AIRFLOW AND LIMITING MOISTURE, SNOW AND DEBRIS CARRYOVER.
ENERGY STAR QUALIFIED HOMES, REQUIREMENTS (CON'T)
SECTION 8: LOCAL MECHANICAL EXHAUST
1. THE KITCHEN SHALL HAVE AN EXHAUST SYSTEM THAT EXHAUSTS DIRECTLY TO THE OUTDOORS AND SHALL OPERATE CONTINUOUSLY AT
A RATE OF GREATER THAN OR EQUAL TO 5 AIR CHANGES PER HOUR BASED ON KITCHEN VOLUME OR OPERATE INTERMITTENTLY AT A
RATE GREATER THAN 100 CFM. FANS THAT ARE USED AT A CONTINUOUS RATE SHALL BE RATED FOR CONTINUOUS USE. RECIRCULATING
FANS ARE NOT ACCEPTABLE.
2. KITCHEN VOLUME SHALL BE DETERMINED BY DRAWING THE SMALLEST POSSIBLE RECTANGLE ON THE FLOOR PLAN THAT ENCOMPASSES
ALL CABINETS, PANTRIES, ISLANDS, AND PENINSULAS AND MULTIPLYING BY THE AVERAGE CEILING HEIGHT FOR THIS AREA. CABINET
VOLUME SHALL BE INCLUDED IN THE KITCHEN VOLUME CALCULATION.
3. EACH BATHROOM SHALL HAVE AN EXHAUST SYSTEM THAT EXHAUSTS DIRECTLY TO THE OUTDOORS AND SHALL OPERATE CONTINUOUSLY
AT A RATE OF GREATER THAN OR EQUAL 20 CFM OR OPERATE INTERMITTENTLY AT A RATE GREATER THAN 50 CFM. FANS THAT ARE USED
AT A CONTINUOUS RATE SHALL BE RATED FOR CONTINUOUS USE.
4. AN INTERMITTENT EXHAUST SYSTEM, WHERE PROVIDED, SHALL BE DESIGNED TO OPERATE AS NEEDED BY THE OCCUPANT. CONTROL
DEVICES SHALL NOT IMPEDE OCCUPANT CONTROL IN INTERMITTENT SYSTEMS.
5. ALL FANS THAT SHARE A COMMON EXHAUST DUCT SHALL BE EQUIPPED WITH A BACK -DRAFT DAMPER. REMOVE ALL PACKING TAPE FROM
BACK -DRAFT DAMPERS UPON INSTALLATION.
6. COMMON EXHAUST DUCTS SHALL NOT BE SHARED BY FANS IN SEPARATE DWELLINGS.
7. CLOTHES DRYERS SHALL BE VENTED DIRECTLY TO THE OUTDOORS, EXCEPT FOR VENT -LESS DRYERS EQUIPPED WITH A CONDENSATE
DRAIN. VENT CLOTHES DRYERS IN ACCORDANCE WITH THE MECHANICAL CODE OF NEW YORK STATE.
8. DO NOT USE DEVICES THAT REMOVE LINT AND/OR BRING THE HEAT BACK INTO THE SPACE.
9. DO NOT EXHAUST DRYERS WITHIN 10 FEET OF AN AIR COOLED CONDENSING UNIT.
10. ALL EXHAUST FANS SHALL BE DIRECTLY DUCTED TO THE EXTERIOR WITH LITTLE OR NO RESTRICTION.
11. SEAL ALL SEAMS, GAPS, HOLES, AND CONNECTIONS TO THE EXTERIOR OF ALL EXHAUST DUCTS WITH MASTIC. IT IS THE CONTRACTOR'S
RESPONSIBILITY TO ENSURE A PROPER QUALITY INSTALLATION. THE EXHAUST DUCTWORK WILL BE TESTED FOR LEAKS AT THE END OF
THE PROJECT AND THE CONTRACTOR IS RESPONSIBLE FOR THE RESULTS OF THE TEST.
12. CORROSION -PROOF RODENT/BIRD SCREENS INSTALLED AT ALL OPENINGS THAT CANNOT BE FULLY SEALED 3.2000(EXCEPTION: DRYER VENTS).
SECTION 9: VENTILATION AND EXHAUST FAN RATINGS
1. ALL INTERMITTENT SUPPLY AND EXHAUST FANS SHALL BE RATED BY THE MANUFACTURER TO OPERATE AT LESS THAN OR EQUAL TO 3.0
SONES. EXEMPTION: FANS GREATER THAN 400 CFM.
ALL CONTINUOUSLY OPERATING SUPPLY AND EXHAUST FANS SHALL BE RATED BY THE MANUFACTURER TO OPERATE AT LESS THAN OR
EQUAL TC 1.0 SONES.
BATHROOM FANS USED AS PART OF A WHOLE -HOUSE MECHANICAL VENTILATION SYSTEM SHALL BE ENERGY STAR QUALIFIED, UNLESS
SPECIFIED FLOW RATE IS GREATER THAN 500 CFM.
4. ALL FANS REQUIRED TO BE ENERGY STAR QUALIFIED SHALL HAVE ENERGY STAR LOGO ON THE ASSOCIATED SUBMITTALS: HAND WRITTEN
NOTATIONS ARE NOT ACCEPTABLE,
5. ALL FAN SUBMITTALS SHALL INCLUDE MANUFACTURER'S RATED SONES LEVEL AND SCHEDULED PERFORMANCE VALVES.
SECTION 10: COMBUSTION APPLIANCES
1. AI.L COMBUSTION APPLIANCES SHALL BE MECHANICALLY DRAFTED OR DIRECT VENTED TO THE OUTDOORS.
2. FOR ATMOSPHERICALLY VENTED FIREPLACES, THE TOTAL NET RATED EXHAUST FLOW OF THE LARGEST EXHAUST FAN SHALL BE
LESS THAN OR EQUAL TO 15 CFM PER 100 SQUARE FEET OF OCCUPIABLE SPACE. THE NET -EXHAUST FLOW IS DEFINED AS FLOW
THROUGH AN EXHAUST SYSTEM MINUS THE COMPENSATING OUTDOOR AIRFLOW THROUGH ANY SUPPLY SYSTEM THAT IS
INTERLOCKED WITH THE EXHAUST SYSTEM.
3. THE CONTRACTOR SHALL COORDINATE ALL UNVENTED COMBUSTION APPLIANCES WITH THE ENERGY STAR RATER. THE RATER
IS REQUIRED TO PERFORM TESTS AND THE CONTRACTOR SHALL ASSIST AS REQUIRED.
SECTION 11: FILTRATION
1. PROVIDE MINIMUM MERV 8 FILTERS IN ALL DUCTED MECHANICAL SYSTEMS. EXHAUST SYSTEMS DUCTED DIRECTLY TO THE
OUTSIDE ARE NOT REQUIRED TO BE FILTERED,
2. FILTERS SHALL BE LOCATED SUCH THAT ALL RETURN AIR AND OUTSIDE AIR IS FILTERED UPSTREAM OF THE SUPPLY FAN.
LOCATE FILTERS TO FACILITATE ACCESS AND SERVICE, MAINTAIN CLEARANCES FOR FILTER PULL.
4. PROVIDE 'PRE -FABRICATED FILTER HOUSING WITH GASKETS AND SEALS. HOUSING ACCESS DOOR MUST COMPLETE SEAL
TO PREVENT BYPASS. SEAL DUCT CONNECTIONS TO PREVENT AIR LEAKAGE. FILTER HOUSING SHALL BE TRION AIR BEAR
SUPREME OR APPROVED EQUAL. APPROVED EQUALS SHALL BE TESTED IN ACCORDANCE WITH ANSI/ASHRAE 52.2-2007
STANDARD TEST PROCEDURES AND BE UL LISTED. CONTRACTOR SHALL SUBMIT FILTERS AND HOUSING FOR REVIEW BY
ENGINEER.
10
esi Hr n; i'e
Architecture
Planning
Interior Design
217 North Aurora Street
Ithaca NY 14850
p 607.273.7600 f 607.273.0475
11 COMFORT STREET
ROCHESTER, NEW YORK 14620
585-232-2
THESE DOCUMENTS. AND All IDEAS, ARRANGEMENT,
DE5IGN5 AND PLANS INDICATED THEREON OR.
PRESENTED THEREBY ARE OWNED AND REMAIN THE
PROPERTY OF KENNEDY MECHANICAL INC. AND NO PART
THEREOFSHALL BE UTIIJZEDBY ANY. PERSON, FIRM, OR
CORPORATION FOR ANY PURPOSE WHATSOEVER EXCEPT
WITH THE SPECIFIC WRITTEN PERMISSION OF. KENNEDY
MECHANICAL INC. All RIGHTS RESERVED
Baumer Mechanical Design Services
625 Panorama Trail, Building 2, Suite 210
Rochester, NY 14625
585.313-5819
WARNING: It is a violation of
New York State Law for any
person, unless acting under the
direction of a licensed Architect,
to alter this document in any way.
If a document bearing the seal of
an Architect is altered, the
altering Architect shall affix to
such document his seal and the
notation "altered by" fol'owed by
his signature, the date of such
alteration, and a specific
description of the alteration.
REVISION SCHEDULE
NAME
DATE
STONE QUARRY APARTMENTS
RTMENTS, L
STONE QUARRY AP
DATE:
7/18/2014
PROJECT:
2012059
OTHER:
DRAWN BY:
G/JTB
ENERGY STAR
QUALIFIED
HOMES A
REQUIREMENTS
M002
10