Loading...
HomeMy WebLinkAboutGeorge Jameson HallL) C.! L•, • PENTHOUSE ROO FI ABATEMENT PLAN SEALE:I/4' = I' -D'1 • Ir ExIS11NG FLOcP GP-. TE 0,31,14 h. Aitoill 46. 411 • • .0741, ilk A PENTHOUSE ELEVATOR MACHINE ROOM ABATEMENT PLAN SCALE1111' = 1'4' L J 1 s L1L3WAR)lt WPM A 1 C=_= C — --= 1 }11 VA'K)R 42 1 C==== C— —= 1 1.111TAIOR #t C C P FLOORS 1 THROUGH 6 ABATEMENT PLAN MP.} KId1.E'1/4' = • LI}7A'R]l3 10 REYr '.''1 1 C= —= 7 C=—== 1 BAWD] t #2 1 C = — = _ C = — = = 1 LIL.VATAlt GROUND FLOOR ABATEMENT PLAN SCALE1]Rkl = 7r—rye 1.51341_ T) R 10 noir C = == = _ _ _ — = 7 C = — 7 L1LAR)It 11}VAR]lt #1 SR]l1AGE BASEMENT ABATEMENT PLAN SCIbLE11/4' = 1'-1Y -L -L ASBESTOS ABATEMENT NOTES: 1. THE NOTES AND DETAILS PRESENTED HERE AND INCLUDED IN SPEC I Fl CATIC N SECTION 028213 .ARE APPLICABLE TO DRAWING AR -101. 2, THE CONTRACTOR SHALL PERFORM ALL CONTRACT 'WO RK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS, ASBESTOS ABATEMENT OPERATIONS SHALL BE PERFORMED AS PER THE PROvISICI N S AND CONDITIONS USTED IN THE NEW YORK STATE DEPARTMENT OF LABOR (NYS DOL) INDUSTRIAL CODE RULE NO, .56 (CITED AS 12 NYCRR PART 5 C) AND ALL APPLICABLE STATE, FEDERAL AND LOCAL CODES, 3. ASBESTOS CONTAINING AND ASBESTOS CONTAMINATED MATERIALS TO BE REMOVED SHALL INCLUDE THE FC LLOW ING: A. ASBESTOS—CORED ELEVATOR HOISTWAY DOOR SLABS: REMOVE 51=1 WT1 ASBESTOS CORED ELEVATOR HOISTWAY DCOR SLABS { 4D5 Sc UARE FEET TOTAL) FROM THE BASEMENT LEVEL THROUGH THE ITB FLOOR LEVEL HOISTWAY DOOR SLAB ABATEMENT OPERATIONS SHALL BE PERFORMED AS PER THE REQUIREMENTS OF 12 NYC RR PART 56 AND THE CORNELL UNIVERSITY CAMPUS—WIDE VAR LANCE FILE NO. 14-0035 INCLUDED IN ATTACHMENT A OF SPECIFICATION SECTION 028.213. B. ASBESTOS—CORED ELEVATOR CAB DOOR SLABS: REMOVE 4 (CITY) ASBESTOS CORED ELEVATOR CAB DOOR SLABS (54 SF TOTAL) FROM THE TWO ELEVATOR CABS, MOVE THE GIVEN ELEVATOR CAB TO ITS LOWEST ACCESSIBLE FLOOR FOR REMOVAL WORK. CRIB DOOR SLAB ABATEMENT OPERATIONS SHALL BE PERFORMED AS PER THE REOUIREMENTS OF 12 NYCRR PART 56 AND THE CORNELL UNIVERSITY CAMPUS—WIDE VARIANCE FILE NO. 14— DG35 INCLUDED IN ATTACHMENT A DF SPECI FICATI ON SECTION 028213. C. ASBESTOS CONTAI 11 INC FLOOR TILE (VAT) : REMOVE APPROXIMATELY 7.5 SO UARE FEET OF VAT FROM M THE EAS EM ENT LEVEL ELEVATOR LOBBY AT THE NEW ELEVATOR OPENING LOCAl1ON, REMOVAL AREA SHALL BE 1.5 TILES OUT FROM THE WALL BY 5' WIDE, CENTERED ON NEW OPENING AND REMOVED TO NEAREST FULL TILE ON EACH END CIF 5' LIMIT. VAT REMOVAL SHALL BE PERFORMED IN MINOR—PROJECT NEGATIVE PRESSURE TENT WORK AREA HAVING AN ATTACHED AIRLOCK FOR ACCESS/EGRESS AS PER THE REQUIREMENTS OF 12 NYCRR PART 56-11.3 FOR MINOR ASBESTOS PROJECTS, D. A SUMED ASBESTOS CONTAINING WIRE WRAP AND TRANSITE CONTACT DISCS: REMOVE APPROXIMATELY 40 SQUARE FEET DF "ASSUMED" ASBESTOS CONTAINING WIRE WRAP AND TRAN5ITE CONTACT DISCS FROM THE EIGHT (8) CONTROL PANEL/MOTDRJTRANSFDRMER/SWITCH GEAR UNITS LOCATED IN THE PENTHOUSE LEVEL ELEVATOR MACHINE ROOM 1ESTIMATED 5 SF FOR EACH OF THE B UNITS). REMOVAL SHALL BE PERFORMED IN A SMALL—PROJECT N EG TIVE PRESSURE TENT WORK AREA HAVING AN ATTACHED AIRLOCK FOR ACCESS/EGRESS WITH A REMOTE DECONTAMINATION UNIT BEING UTI U ZED AS PER THE REO U I REMENTS OF 12 NYCRR PART 56. E. ASSUMED ASBESTOS CONTAINING BRAKE SHOES: REMOVE APPROXIMATELY 4 SQUARE FEET OF -A5S La M ED" ASBESTOS CONTAINING BRAKE SHOES FROM THE 2 ELEvATOR MOTDR UNITS LOCATED IN THE PENTHOUSE LEVEL ELEVATOR MACHINE ROOM. REMOVAL SHALL BE PERFORMED IN THE SAME SMALL—PROJECT NEGATIVE PRESSURE TENT WORK AREA REFERENCED IN ITEM D ABOVE AS PER THE REQUIREMENTS OF 12 NYCRR PART 515, F. ASBESTOS CONTAIN INE CAULK: REMOVE APP RO x I MATELY 1 SQUARE FORT OF E xTERI DR ASBESTOS CONTAINING CAULK PRESENT AROUND THE PERI M ETEP CIF THE WEST WALL LOUVER_ REMOVAL LOUVER ITSELF AS NECESSARY TO ASSURE COMPLETE CAULK REMOVAL, CAULK REMOVAL SHALL BE PERFORMED AS PER THE REOUIREMENTS O F 12 NYC RR PART 56-11.1 FOR IN—PLANT OPERATIONS, C. H. ASSUMED ASBESTOS CONTAINING ASPHALT—RASED ROO F1 NG MATERIALS: REMOVE APPROXIMATELY 45 SOUARE I- EE I OF ASSUMED ASBESTOS CONTAINING ROOFING MATERIALS FROM THE PENTHOUSE ROOF AS NECESSARY FOR THE INSTALLATION OF THE NEW EOUI PM ENT ROOF HATCH.. ASSUMED ASBESTOS ROOFING MATERIALS INCLUDE FELT—PAPER FACING ON ISO—BADRD AND ROOF DECK VAPOR BARRIER. ROOFING REMOVAL SHALL BE PERFORMED AS PER THE REQUIREMENTS DF 12 NYCRR PART 56-11.1 FOR IN—PLANT OPERATIONS, 4, THE CONTRACTOR SHALL SUBMIT A WRITTEN WORK PLAN FOR ASBESTOS ABATEMENT OPERATIONS FOR REVIEW AND APPROVAL AS PER THE REQUIREMENTS OF SPECIFICATIONS SECTION ❑2 13, 1.5. 5, THE CONTRACTOR SHALL COORDINATE THE SCHEDULED WORK WITH THE OWNER, OWNERS REPRESENTATIVE, AND ALL OTHER TRADES. 6. THE CONTRACTOR SHALL MAINTAIN SECURITY IN EACH WORD AREA AND FOR THE OVERALL BUILDING AT ALL TIMES. 7_ THE LOCATION OF REMCI TE DECONTAMINATION ENCLOSURE SYSTEMS, WASTE DU MISTERS, AND TRAILERS MUST BE APPROVED BY THE OWNER AND OWNERS REPRESENTATIVE PRIOR TO THE START OF THE PROJECT. B. COORDINATE HOOK—UP OF WATER SOURCE/SERVICE FOR ABATEMENT WORK AND DECONTAMIN.Al10N PURPOSES WITH THE OWNER, PROVIDE AND UTILIZE AN ELECTRIC WATER HEATER FOR THE PROJECT. TEMPORARY WATER CONNECTIONS SHALL BE MIRE BY THE CONTACTOR AND MAINTAINED IN A LEAK FREE STATE AT ALL TIMES. B_ UNDER NO CIRCUMSTANCES SHALL CONTAMINATED LIO U IDS OR DEBRIS ENTER THE EXISTING SEWER SYSTEM_ ALL WASTEWATER SHALL BE FILTERED THROUGH A SYSTEM WITH AT LEAST 5,0 MICRON PARTICLE SIZE COLLECTION CAPABILITY, THE CONTRACTOR SHALL BE RESPONS ISLE FOR ANY WASTEWATER PERMITS REQUIRED TD PERFORM HIS WORK UNDER THIS CONTRACT_ ANY COST ASSOCIATED WITH WASTE WATER PERMITS SHALL BE INCLUDED IN HIS BID. 10, ABATEMENT CONTRACTOR SHALL RECEIVE APPROVAL FOP EACH WORK AREA BASED ON APM INSPECTION TO ASSURE ALL OPENINGS AND PENETRATIONS HAVE BEEN SEALED PROPERLY AND ALL WORK .AREA PREPARATION IS COMPLETE BEFORE ANY ABATEMENT IS UNDERTAKEN_ 11. PRE—CLEAN NON—MOVABLE ITEMS PRIOR TO ISOLATING/PROTECTING VIA CRITICAL BARRIER INSTALLATION. 12. ALL AIR MONITORING REQUIRED TD SA11 S FY THE REOUIREMENTS DF 12 NYCRR PART 56 SHALL BE PERFORMED BY A THIRD PARTY INDEPENDENT ENVIRONMENTAL CONSULTANT HIRED DIRECTLY BY THE OWNER. THE CONTRACTOR SHALL COORDINATE WITH THE THIRD PARTY CONSULTING FIRMS DNS ITE ARM, AIR MONITORING AND ANALYSIS TO SATISFY OSHA REQUIREMENTS SHALL BE THE CONTRACTORS RESPONSIBILITY. LEGEND AND KEYED NOTES SYMBOL DESCRIP f1DN 0 ENCINEMUCi h. :n �� .al..1 ELEVATOR HOISTWAY DOOR SLAB WITH ASBESTOS CORE TO BE R EMCVED — 30 DOORS / 405 SF .13V 1..1c. kr !I Fmk, .31.5 ELEVATOR CAB DOOR SLAB WITH ASBESTOS CORE TO BE LEMONED — 4 DOORS / 54 SF 0, ExTERIOR ASBESTOS CAULK FROM WALL LDL ER FRAME TO BE REMOVED — 1 SF CAULK ��� MEMf RANEAZI BED P E ADO EDN IN AI�IR I kAA IS Y D FELT PAPER FACING AND ROOF DECK vAPOR BARR IER BEN BATH EPDM ELEVATOR CONTROL PANAEL/SWITCH C EAFVTP.ANSF0RM ER/ MOTOR UNIT WITH ALUM ED ASBESTOS CONTAINING WIRE WRAP, TRANSITE CONTACT DISCS, 1D/DR BRAKE SHOES TO 9E REM OVED — APPROXIMATELY 4-4- SDUARE FEE TOTAL 4144 ASBESTOS CONTAINING FLOOR TILE TO BE REMO IED — 7.5 SF 4 2' V 0' 1- 2' 3' 4' 8' 12' 16' GRAPHIC SCALD [/4 = L'-04 5I.1 L 0 Architectural' .1...',:•. 74•.. •r.:: ' 4 .••y r Res rces !! 0 ENCINEMUCi h. :n �� .al..1 16.45 RYAN CLARK ril: iI re .13V 1..1c. kr !I Fmk, .31.5 . I DAMS ala IS Ji.c. a cl NY 13]53 G 5 4'.75"2 ADELTA ..w+ i.. ..,.,!:1:1,-..1: Fm.ri Tig F?::':":??..! &!*:. x7 6::•1 2:•'..! 8H! i'—'r: mr.W ril:•: ». ..... •llr u•xx•rirr:n•II:rr:x= 10 4 g 2 5 1-5 10 GO ..c.,, ,...., r.h co Q .0 . .- s _ ., \ Sk •. 4 { IL K , r 4� f �L� •� k� N o ' ill lk MP, wed far Erid 11.18.2016 Lie! , L'a.. 1,!I 1 . .13.x.x. lip lk.15 Ori rr. ASb i_UILO sAbat 331S]'3Ti B,,-••, I,. DLI.]. 32'.e! J., Iycl L'. No , 1 ]Jytx. r,IJ5c, 04.06 }mcr nt• s ii 1., L'I! ri1]« 11!1{- J!Ir]i• L!K RC. c, J• A 1 e{Ic, Fa :•ec.: Clr ISI. No: L).r,71:15 b y. S7Y]]° t7r: I! I. No: ARIOI 0 CORNELL UNIVERSITY GEORGE JAMESON HALL FACILITIES CONTRACTS ELEVATOR REPLACEMENT 121 HUMPHREYS SERVICE BUILDING ITHACA, NEW YORK 14853-3701 ADDENDUM NO. 2 January 10, 2017 This Addendum contains changes to the requirements of the Contract Documents and Specifications. Such changes are to be incorporated into the Construction Documents and shall apply to the work with the same meaning and force as if they had been included in the original document. Wherever this Addendum modifies a portion of a paragraph of the specifications or a portion of any Drawing, the remainder of the Paragraph or Drawing shall remain in force. NOTE: Provisions of all Contract Documents apply. Item 1. A second site visit has been scheduled for January 13, 2017 at 9:30am. Contractors to meet at the Front Lobby of George Jameson Hall. NOTE: Questions will not be answered at this meeting or addressed in another Addendum. Item 2. INSTRUCTIONS TO BIDDERS, INS-1, 3.b. DELETE “…not later than 2:00 PM on January 17, 2017.” REPLACE with “…not later than 2:00 PM on January 18, 2017.” Item 3. RFI Questions and Clarifications See attached RFI Log (Items 9 - 12) Attachments: RFI Log (Items 1 - 12) ****END OF ADDENDUM**** George Jameson Hall Elevator Replacement Date: January 9, 2017 RFI Form RFI/Page/ Response Dwg./Spec./Rep.Section/Design Team Index Number Paragraph/Topic RFI Response 1 N/A N/A Are there special provisions for pre-payment for the elevator equipment? Elevator sub-contractors generally require one third payment prior to fabrication. The Contractor needs to determine and will be responsible for any "prepayment" for services. 2 N/A N/A Can we field measure the elevator shafts before construction?Yes. 3 N/A N/A Will the fire alarm be disabled during the project?Yes. 4 N/A N/A How thick is the basement wall that needs to be opened for the new door? 10 inches. 5 N/A N/A How heavy is the elevator machine?Approximately 4,500 pounds, each. 6 N/A N/A Is there a facility wide variance on the hoistway doors for asbestos abatement? No. 7 N/A N/A Does the roof have a warranty?Yes. The warranty is through Carlisle and was installed by Weathermaster in 2005. 8 INS & BF INS-2 and BF-3 Can you clarify the phasing of the project?See Addendum No. 1, Items 2 and 3. 9 E-501 Detail 1 Print E-501, detail 1, shows a note “To Remote Lobby Panel” and then “for Remote CRT and Remote Communication Unit”. Power for this is not shown anywhere on the drawings, nor locations. Is this provided by elevator contractor or Electrical contractor? If the electrical contractor, then more information is needed. See E-201 for more information. 10 E-201 Detail C1, Note 7 I was informed that the TMDF (Print E-201, Detail C1, note 7), is no longer located in this location due to flood damage. Please provide actual location. Location was unable to be determined at this point in the bid phase. 11 E-201 Detail A4, Note 7 Will the new elevator controllers provided by the elevator contractor need tele/com data wiring? Print E-201, Detail A4, note 7 gives a vague description of what is needed. Need more information. Yes, see E-201 for more information. 12 Can we schedule an additional site visit?See Addendum No. 1, Item 1. Aichitecluial Re some e s 505 Fianklin Set Buffalo, NY14202 303 West 13th Sthet New Yofl NY 10014 716 883-5566 716 883-5569 fax mai@ am hife acom RYAN BIGGS CLARK DAMS r.�•c,•�i�� •n., r. �4y5r+iYG FN :, FEPIEN1c r�ri'�'�:: ri':1 �ri'I: ti'rri rr:Zr: inr1.. it (.1. •.N�:: ti ti 1.592 ,SLti ] i jd ric 53 r } (i;i5 1'732 866 L1, t. p r ;ytr &M. 11. w ±kL 7( 18!1 (i.i .251 .66i:!ij ]max: ea?.'Xi1..(€ .] L L7a .1: Jaya it ail IL.i-e: .1iy .i.i b:1 Y..V.tl1!lin !❑ nc..uti 1rxi Covi)..rr lioi. t ns Vasm1 ]3s my: }ugh Ir?viii0'� I. ? 3 06, Ipx v e [ 0 7 - [kft:i a ha hie ] 1 a ]ld 14? 3 08 - F1E5 nt31c} Z1Sfd George Ja m e so n Hall 44 Sisson P]ace, Ithac a , NY14850 S101 De sig 11 Da , [ No rg � a kti9 l Pk] n and De. rel 1% . r� himctura] AR -E01 .-301 A-102 A -ca 01 A1):otosAbe t }m- i3tPlans and Nr, to I h g d P99r3,s Ho iitw .r y €s e rua n rad Do tails � k v.9 to r De th i ]3d1 112 V 'CIO rnh 1 i A rnaa r3 t If} vi)..lihro ugh Pbnrh u< y vie [ r3 c3 P nrh um? o f lrxi 5r�1 r3r. I vi 1 GO VI? 108 - litho use. ir0{iI . rmb-o ii'4and GO)1k LuINotaxs Ii; M I ra o r ni t3,. - i ]r3 r� Fdtica n ir2{) I 0 1.7.E. r11. 11 Ho o r Fir] rl, - Ni? W WO rk ir400 0ni5 I1r1 s Dia r 6F 211 m I.4i3I 0110 gmr31 E-402 Rek rDirgrams - Niyw WO r11 ira{3I i� to I;;.6{3I y'.5' hod 1Lk(:s 1 i Arnaar3tIfsve1to irDvi*?10S-F.kvertorib on3 lrxi AnipntI vaIrI IreVC' 108- k'ilooir1 1}ovk'i rE1.9g2 it Diagram-Incmoiitioi1 1}o VII o k' :1 rn r Dia 3 r31 - x! WO ik P:1.01 1'a LtiFJ l Demo lido n rr it P19 r3,s 11-201 Ihatii9lFilo ok'1'larns Po nth o u a nd Rifthi 1 •FR3 a 113 nG PIA rl 1 fqArnaantIJ<kveIGo Ire Vx}108-on3 1 i M•1? n r• Ire VC, CO 1.1? vi*' 108 - v- k' ilo o HI PirojectIocation :,...::.:.• . • .' <kri •Orr . ••... •• •r • •'r + �� .'!JYl1Yf • •i'Nf•••••• CORNELL UNIVERSITY GEORGE JAMESON HALL FACILITIES CONTRACTS ELEVATOR REPLACEMENT 121 HUMPHREYS SERVICE BUILDING ITHACA, NEW YORK 14853-3701 ADDENDUM NO. 1 January 9, 2017 This Addendum contains changes to the requirements of the Contract Documents and Specifications. Such changes are to be incorporated into the Construction Documents and shall apply to the work with the same meaning and force as if they had been included in the original document. Wherever this Addendum modifies a portion of a paragraph of the specifications or a portion of any Drawing, the remainder of the Paragraph or Drawing shall remain in force. NOTE: Provisions of all Contract Documents apply. Item 1. Table of Contents, Page 3, Drawing List ADD Drawing AR-101, “Asbestos Abatement Plans and Notes”. Item 2. INSTRUCTIONS TO BIDDERS, INS-2 7. START OF WORK, a. DELETE “…shall be completed no later than August 17, 2017.” REPLACE with “…the first elevator shall be completed by August 4, 2017, the second elevator shall be completed by August 11, 2017, and the Certificate of Occupancy shall be obtained from the Authority Having Jurisdiction by August 18, 2017.” Item 3. Bid Form BF-3, Item 3: DELETE “…complete the project no later than August 17,2017.” REPLACE with “…the first elevator shall be completed by August 4, 2017, the second elevator shall be completed by August 11, 2017, and the Certificate of Occupancy shall be obtained from the Authority Having Jurisdiction by August 18, 2017.” Item 4. Section 01 35 29 General Health & Safety: Part 1.3, ASBESTOS, B. ADD Limited Pre-Renovation Asbestos Survey Report to end of specification section, attached. DRAWINGS Item 5. Cover Page DELETE in its entirety. REPLACE with new Cover Page, attached. NOTE: New Cover Page adds Drawing AR-101 to the Drawing List. George Jameson Hall Elevator Replacement Addendum No. 1 January 9, 2017 Page 2 Item 6. Drawing AR-101 ADD Drawing AR-101. Item 7. RFI Questions and Clarifications See attached RFI Log (Items 1 - 8) Attachments: Limited Pre-Renovation Asbestos Survey Report Cover Page AR-101, Asbestos Abatement Plans and Notes RFI Log (Items 1-8) ****END OF ADDENDUM**** Cornell University Limited Pre-Renovation Asbestos Survey Report Performed for the George Jameson Hall (High Rise 1 – Building 3201) Elevator Modernization Project Cornell University Ithaca, New York Campus Prepared for: Mr. Dale Houseknecht, Asbestos Project Coordinator Cornell University Maintenance Management 116 Humphreys Service Building, Ithaca, NY 14853 Prepared by: 860 Hooper Road Endwell, NY 13760 Phone: 607-231-6600 Fax: 607-231-6640 www.delta-eas.com Delta Project No. 2016.078.176 Cornell Work Order No. 9371614 Field work performed by: Michael J. Staudt, November 16, 2016 Report prepared by: Michael J. Staudt Report reviewed by: Stephen Prislupsky 2 860 Hooper Road Endwell, NY 13760 Tel: 607.231.6600 Fax: 607.231.6650 www.delta-eas.com TABLE OF CONTENTS 1.0 INTRODUCTION .......................................................................................... 3 2.0 ASBESTOS SURVEY AND SAMPLING PROCEDURES AND METHODS ................. 5 3.0 SURVEY FINDINGS AND CONCLUSIONS......................................................... 12 4.0 INACCESSIBLE AREAS ................................................................................ 14 Appendix A, ASBESTOS BULK SAMPLE REPORT FORM .......................................... 15 Appendix B, LABORATORY ANALYTICAL RESULTS ................................................. 16 Appendix C, DELTA ENGINEERS, COMPANY AND PERSONNEL CERTIFICATIONS ....... 17 Appendix D, LABORATORY CERTIFICATIONS ......................................................... 18 Appendix E, SAMPLE LOCATION DRAWINGS ......................................................... 19 Appendix F, CORNELL 4D DATABASE SAMPLE RESULTS ....................................... 20 Appendix G, PREVIOUS DELTA BULK SAMPLE INFORMATION .................................. 21 Appendix H, PREVIOUS SAMPLE INFORMATION FROM OTHER CONSULTANTS .......... 22 Appendix I, PHOTO LOG...................................................................................... 23 3 860 Hooper Road Endwell, NY 13760 Tel: 607.231.6600 Fax: 607.231.6650 www.delta-eas.com 1.0 INTRODUCTION: Delta Engineers, Architects, & Land Surveyors (Delta) was contracted by Cornell University to provide a Limited Pre-Renovation Asbestos Survey at George Jameson Hall (High Rise 1 Bldg. 3201) in support of the upcoming Elevator Modernization Project. The survey addressed all accessible Rooms/Spaces included in the project renovation areas and associated suspect building materials with the potential to be impacted by the upcoming Project. The areas addressed as a part of this Survey were based on a review of the 100% Submission Drawing Set (dated 10/28/2016) provided by the Cornell Project Manager Marc Maser. The initial stage included a review of past Delta sample information, sample information from other Consultants, and Cornell 4D Database information for the Building. Cornell 4D Database information and bulk sample results through previous Delta/Cornell Consultant sampling efforts have been incorporated into this Survey and associated Survey Report where applicable. Please reference Appendix F for previous Delta sample information, Appendix G for the Cornell 4D Database information and Appendix H for the sample information from other Consultants. On November 16th, 2016, Delta Certified Inspector Michael J. Staudt conducted a walkthrough of the George Jameson Hall elevator renovation area spaces/rooms to identify the various accessible suspect materials present. Based on a visual inspection of the affected areas along with a review of the referenced drawing set and existing sample information, a total of twenty (20) bulk samples were collected representing nine (9) separate suspect homogenous building materials. Six (6) of the samples collected were non-friable organically bound (NOB) representing three (3) homogenous materials. The remaining fourteen (14) samples were “friable” non-NOB representing six (6) homogenous materials. In addition to the samples collected above, other suspect homogenous materials were observed but not sampled as they were addressed through previous sampling efforts. For these materials, the results from the Cornell 4D Database information and previous Delta/Cornell Consultant Surveys have been incorporated into this report. The suspect homogenous building materials identified and/or sampled in the affected elevator upgrades renovation areas included the following: Homogenous Area (HA) Suspect Building Material 01 Hoist way Door Insulation 02 Gray/Brown Mastic from Gray Rubber Floor - Elevator Cab 03 Brown Board Flooring under Gray Rubber Floor - Elevator Cab 04 Elevator Cab Door Insulation 05 Tan Cloth w/ Foil Covering from Fiberglass Drain Pipe Insulation 06 Gray Fitting Insulation from Roof Drain Fiberglass Pipe Insulation 07 Exterior Gray Caulk from Louver/Vent - Elevator Machine Room 08 Tan/Green Mastic from Carpet - Elevator Hallway Lobby Floor 09 Red 6" x 6" Quarry Tile Flooring - Ground Floor Elevator Hallway Lobby 10* Assumed Suspect Cloth Wiring, Switchgear 11* Assumed Suspect Brake Shoes, Elevator Motor 4 860 Hooper Road Endwell, NY 13760 Tel: 607.231.6600 Fax: 607.231.6650 www.delta-eas.com Homogenous Area (HA) Suspect Building Material 12* Assumed Suspect Transite Disks, Switchgear 13** Pipe Fitting Insulation – Domestic Cold Water 14** Pipe Fitting Insulation – Domestic Hot Water 15** Gypsum Board 14311-01*** Joint Compound 2012.004.199-01**** Pipe Fitting Insulation 2012.004.199-02**** Sheetrock 2012.004.199-03**** Joint Compound 2016.078.153-04**** Black Mastic from Gray and Black Mottled 12"X12" Floor Tile 2016.078.153-05**** White Hard Pack Pipe Insulation - Chase way 2016.078.153-06**** Gray Duct Sealant 2016.078.153-10**** Tan Mastic from 4" Brown Cove Base 2016.078.153-14**** White Cloth w/ Foiled/Black Mastic Wrap from Fiberglass Pipe Insulation 2016.078.153-15**** Red Fire Stop Caulk 2016.078.153-17**** Gray and Black Mottled 12"X12" Floor Tile * – Material assumed to be Asbestos Containing, present on active system & could not be sampled ** – Material listed in Cornell 4-D Database *** – Material previously sampled by other Consultant **** - Material previously sampled by Delta Specific information required by 12 NYCRR Part 56-5.1, (f) – “Building/Structure Asbestos Survey Information” to be included in this pre-renovation report is as follows: 1) Building Name/Address: George Jameson High Rise 1, Building 3201 Cornell University Campus Ithaca, NY 14850 2) Owner’s Name/Address: Cornell University Humphreys Service Building Ithaca, NY 14853 3) Owner’s Agent: Mr. Dale Houseknecht 4) Survey Performed By: Delta Engineers, Architects, & Land Surveyors 860 Hooper Road Endwell, NY 13760 5) Certified Inspectors: Michael J. Staudt Certificate No. 07-08367 6) Date of Survey: November 16th, 2016 7) Laboratory: America Science Team New York, Inc. 117 East 30th Street, New York, NY 10016 5 860 Hooper Road Endwell, NY 13760 Tel: 607.231.6600 Fax: 607.231.6650 www.delta-eas.com 2.0 ASBESTOS SURVEY AND SAMPLING PROCEDURES AND METHODS: 2.1 Survey requirements Requirements to perform Pre-Demolition/Pre-Renovation Asbestos Surveys are based on the following State and Federal Regulations. Occupational Safety and Health Administration (OSHA): OSHA survey requirements and sampling protocols are included in 29 CFR Part 1910.1001(j) (2) & (j) (8) and 29 CFR Part 1926.1101(k), (5): 29 CFR Part 1910.1001(j)(2), Installed Asbestos Containing Material: Employers and building owners are required to treat installed TSI and sprayed on and troweled-on surfacing materials as ACM in buildings constructed no later than 1980 for purposes of this standard. These materials are designated "presumed ACM or PACM", and are defined in paragraph (b) of this section. Asphalt and vinyl flooring material installed no later than 1980 also must be treated as asbestos-containing. The employer or building owner may demonstrate that PACM and flooring material do not contain asbestos by complying with paragraph (j) (8) (iii) of this section. 29 CFR Part 1910.1001(j) (8), Criteria to rebut the designation of installed material as PACM: 1910.1001(j)(8)(i) - At any time, an employer and/or building owner may demonstrate, for purposes of this standard, that PACM does not contain asbestos. Building owners and/or employers are not required to communicate information about the presence of building material for which such a demonstration pursuant to the requirements of paragraph (j)(8)(ii) of this section has been made. However, in all such cases, the information, data and analysis supporting th e determination that PACM does not contain asbestos, shall be retained pursuant to paragraph (m) of this section. 1910.1001(j) (8) (ii) - An employer or owner may demonstrate that PACM does not contain asbestos by the following: 1910.1001(j)(8)(ii)(A) - Having a completed inspection conducted pursuant to the requirements of AHERA (40 CFR 763, Subpart E) which demonstrates that no ACM is present in the material; or 1910.1001(j) (8) (ii) (B) - Performing tests of the material containing PACM which demonstrate that no ACM is present in the material. Such tests shall include analysis of bulk samples collected in the manner described in 40 CFR 763.86. The tests, evaluation and sample collection shall be conducted by an accredited inspector or by a CIH. Analysis of samples shall be performed by persons or laboratories with proficiency demonstrated by current successful participation in a nationally recognized testing program such as the National Voluntary Laboratory Accreditation Program (NVLAP) or the National Institute for Standards and Technology (NIST) or the Round Robin for bulk samples administered by the American Industrial Hygiene Association (AIHA) or an equivalent nationally-recognized round robin testing program. 1910.1001(j)(8)(iii) -The employer and/or building owner may demonstrate that flooring material including associated mastic and backing does not contain asbestos, by a determination of an industrial hygienist based upon recognized analytical techniques showing that the material is not ACM. 29 CFR Part 1926.1101(k) (5), Criteria to rebut the designation of installed material as PACM: 1926.1101(k)(5)(i) - At any time, an employer and/or building owner may demonstrate, for purposes of this standard, that PACM does not contain asbestos. Building owners and/or employers are not required to communicate information about the presence of building material for which such a demonstration pursuant to the requirements of paragraph (k)(5)(ii) of this section has been made. However, in all such cases, the information, data and analysis supporting the determination that PACM does not contain asbestos, shall be retained pursuant to paragraph (n) of this section. 1926.1101(k) (5) (ii) – An employer or owner may demonstrate that PACM does not contain more than 1 percent asbestos by the following: 1926.1101(k)(5)(ii)(A) - Having a completed inspection conducted pursuant to the requirements of AHERA (40 CFR Part 763, Subpart E) which demonstrates that the material is not ACM; or 6 860 Hooper Road Endwell, NY 13760 Tel: 607.231.6600 Fax: 607.231.6650 www.delta-eas.com 1926.1101(k) (5) (ii) (B) - Performing tests of the material containing PACM which demonstrate that no ACM is present in the material. Such tests shall include analysis of bulk samples collected in the manner described in 40 CFR 763.86. The tests, evaluation and sample collection shall be conducted by an accredited inspector or by a CIH. Analysis of samples shall be performed by persons or laboratories with proficiency demonstrated by current successful participation in a nationally recognized testing program such as the National Voluntary Laboratory Accreditation Program (NVLAP) or the National Institute for Standards and Technology (NIST) or the Round Robin for bulk samples administered by the American Industrial Hygiene Association (AIHA) or an equivalent nationally-recognized round robin testing program. 1926.1101(k)(5)(iii) - The employer and/or building owner may demonstrate that flooring material including associated mastic and backing does not contain asbestos, by a determination of an industrial hygienist based upon recognized analytical techniques showing that the material is not ACM. EPA National Emissions Standard for Hazardous Air Pollutants (NESHAPs): (NESHAPs) regulates asbestos under “40 CFR Part 61, Subpart M - National Emission Standard for Asbestos”. Subpart M regulates demolition and/or renovation of “facilities” that may contain asbestos-containing materials (ACMs). “Facilities,” as defined by NESHAPs, includes any institutional, commercial, public, industrial, or residential structure or building, except residential buildings having four or fewer units. ACMs are defined in NESHAPs as materials containing more than 1 percent asbestos. Section 61.145 states: 61.145 Standard for demolition and renovation. (a) Applicability. To determine which requirements of paragraphs (a), (b), and (c) of this section apply to the owner or operator of a demolition or renovation activity and prior to the commencement of the demolition or renovation, thoroughly inspect the affected facility or part of the facility where the demolition or renovation operation will occur for the presence of asbestos, including Category I and Category II nonfriable ACM. It should be noted that 40 CFR Part 1 Subpart M, NESHAPS has no cut-off date exempting survey requirements. New York State Department of Labor (NYS DOL): Guidelines followed for the inspection are those established by the NYS DOL’s Industrial Code Rule 56 (Cited as 12 NYCRR Part 56, as amended, adopted January 11, 2006; effective September 5, 2006). The specific survey, sampling and reporting requirements included in 12 NYCRR Part 56-5.1(e) – “Building/Structure Asbestos Survey Requirements” include: 56-5.1 Asbestos Survey Requirements for Building/Structure Demolition, Renovation, Remodeling and Repair (a) Asbestos Survey Required. An owner or an owner’s agent, except the owner of one and two- family dwellings who contracts for, but does not direct or control the work, shall cause to be conducted, an asbestos survey completed by a licensed asbestos contractor using inspectors certified in compliance with Section 56-3.2(d), to determine whether or not the building or structure, or portion(s) thereof to be demolished, renovated, remodeled, or have repair work, contains ACM, PACM or asbestos material. This asbestos survey shall be completed and submitted as indicated in Subdivision (g) of this Section, prior to commencing work. All such asbestos surveys shall be conducted in conformance with the requirements of Subdivision (e) of this Section. 7 860 Hooper Road Endwell, NY 13760 Tel: 607.231.6600 Fax: 607.231.6650 www.delta-eas.com (b) Exemptions to Asbestos Survey Requirements: The asbestos survey required by this Subdivision (a) of this Section shall not be required for the following classes of buildings or structures: (1) An agricultural building; (2) Buildings or structures for which original construction commenced on or after January 1, 1974; (3) A structure certified in writing to be structurally unsound by a licensed Professional Engineer, Registered Architect, Building Inspector, Fire Inspector or other official of competent jurisdiction. (See Section 56-11.5) (c) Building/Structure Demolition. If a building/structure asbestos survey is not required or performed per Subdivision (b) of this Section, and the building/structure is certified to be unsound or slated for contracted demolition, the building/structure shall be assumed to contain asbestos, and shall be demolished per this Part, unless the building/structure is adequately certified to be free of asbestos containing material. Acceptable documentation for certification shall be a previous thorough building/structure asbestos survey, abatement records or other documentation acceptable to the Commissioner or his or her representative. (d) Responsibility to Comply. No exemption to the requirement to conduct an asbestos survey shall exempt any person, asbestos contractor, property owner or business entity from the inspection or asbestos survey requirements of EPA, OSHA, and any other applicable section of this Part. (e) Building/Structure Asbestos Survey Requirements. The asbestos survey shall include a thorough inspection for and identification of all PACM, suspect miscellaneous ACM, or asbestos material throughout the building/structure or portion thereof to be demolished, renovated, remodeled, or to have repair work. The required inspection shall be performed by a certified asbestos inspector, and, at a minimum, shall include identification of PACM, suspect miscellaneous ACM or asbestos material by all of the following methods: (1) The review of building/structure plans and records, if available, for references to asbestos, ACM, PACM, suspect miscellaneous ACM or asbestos material used in construction, renovation or repair; and (2) A visual inspection for PACM and suspect miscellaneous ACM throughout the building/structure or portion thereof to be demolished, renovated, remodeled, or repaired. For the purpose of this Part, all PACM and suspect miscellaneous ACM visually assessed shall be treated and handled as ACM and shall be assumed to be ACM, unless bulk sampling is conducted as per this Section, standard EPA and OSHA accepted methods, including multi-layered systems sampling protocols; the subsequent analyses are performed by a laboratory that meets the requirements of Section 56-4.2 of this Part; and the analyses satisfies both ELAP and federal requirements, including multi-layered sample analyses, to document non-asbestos containing material. (f) Building/Structure Asbestos Survey Information. (1) The asbestos survey shall, at a minimum, identify and assess with due diligence, the locations, quantities, friability and conditions of all types of installations at the affected portion of the building/structure relative to the ACM, suspect miscellaneous ACM, PACM or asbestos material contained therein. The following list is not inclusive of all types of ACMs, it only summarizes typical 8 860 Hooper Road Endwell, NY 13760 Tel: 607.231.6600 Fax: 607.231.6650 www.delta-eas.com ACMs. The certified asbestos inspector is responsible for identification and assessment of all types ACM, PACM, suspect miscellaneous ACM and asbestos material within the affected portion of the building/structure: PACM (i) Surfacing Treatments: (a) Fireproofing; (b) Acoustical Plaster; (c) Finish Plasters; and (d) Skim Coats of Joint Compound. (ii) Thermal System Insulation: (a) Equipment Insulation; (b) Boiler, Breeching, Boiler Rope, Duct, or Tank Insulation, Cement or Mortar Used for Boilers and Refractory Brick; (c) Piping and Fitting Insulations including but not limited to, Wrapped Paper, Aircell, Millboard, Rope, Cork, Preformed Plaster, Job Molded Plaster and coverings over fibrous glass insulation. SUSPECT MISCELLANEOUS ACM (i) Roofing and Siding Miscellaneous Materials: (a) Insulation Board; (b) Vapor Barriers; (c) Coatings; (d) Non-Metallic or Non-Wood Roof Decking (e) Felts; (f) Cementitious Board (Transite); (g) Flashing; (h) Shingles; and (i) Galbestos. (ii) Other Miscellaneous Materials: (a) Dust and Debris; (b) Floor Tile; (c) Cove Base; (d) Floor Leveler Compound; (e) Ceiling Tile; (f) Vermiculite Insulation (g) Gaskets, Seals, Sealants (including for condensate control); (h) Vibration Isolators; (i) Laboratory Tables and Hoods; (j) Chalkboards; (k) Pipe Penetration Packing or Other Firestopping Materials (l) Cementitious Board; (m) Electrical Wire Insulation; (n) Fire Curtains; (o) Fire Blankets; (p) Fire Doors; (q) Brakes and Clutches; (r) Mastics, Adhesives and Glues; 9 860 Hooper Road Endwell, NY 13760 Tel: 607.231.6600 Fax: 607.231.6650 www.delta-eas.com (s) Caulks; (t) Sheet Flooring (Linoleum); (u) Wallpaper; (v) Drywall; (w) Plasterboard (x) Spackling/Joint Compound; (y) Textured Paint; (z) Grout; (aa) Glazing Compound; and (ab) Terrazzo. (2) All ACM, PACM, suspect miscellaneous ACM, or asbestos material reported under Paragraph (1) of this Subdivision shall include the location of the materials, an estimate of the quantities, types, friability and condition of the identified materials to be treated and handled as ACM. For the purpose of this Part, all PACM and suspect miscellaneous ACM visually assessed shall be treated and handled as ACM and shall be assumed to be ACM, unless bulk sampling is conducted as per this Section, standard EPA and OSHA accepted methods, including multilayered systems sampling protocols; the subsequent analyses are performed by a laboratory that meets the requirements of Section 56-4.2 of this Part; and the analyses satisfies both ELAP and federal requirements, including multi-layered sample analyses, to document non-asbestos containing material. (3) The building/structure asbestos survey shall also include the building/structure name, address, the building/structure owner’s name and address, the name and address of the owner's agent, the name of the firm performing the asbestos survey and a copy of the firm’s current asbestos handling license, the names of the certified inspector(s) performing the survey and a copy of the current asbestos handling certificate for each inspector utilized, the dates of the asbestos survey, a listing of homogeneous areas identifying which ones are ACM, all laboratory analyses reports for bulk samples collected, and copies of the appropriate certifications for the laboratory used for analysis of samples taken during the asbestos survey. (g) Transmittal of Building/Structure Asbestos Survey Information. One (1) copy of the results of the building/structure asbestos survey shall be immediately transmitted by the building/structure owner as follows: (1) One (1) copy of the completed asbestos survey shall be sent by the owner or their agent to the local government entity charged with issuing a permit for such demolition, renovation, remodeling or repair work under applicable State or local laws. (2) The completed asbestos survey for controlled demolition (as per Subpart 56-11.5) or pre-demolition asbestos projects shall also be submitted to the appropriate Asbestos Control Bureau district office. (3) The completed asbestos survey shall be kept on the construction site with the asbestos notification and variance, if required, throughout the duration of the asbestos project and any associated demolition, renovation, remodeling or repair project. (h) Removal Required. If the building/structure asbestos survey finds that the portion of the building/structure to be demolished, renovated, remodeled, or have repair work contains ACM, 10 860 Hooper Road Endwell, NY 13760 Tel: 607.231.6600 Fax: 607.231.6650 www.delta-eas.com PACM, suspect miscellaneous ACM assumed to be ACM, or asbestos material, which is impacted by the work, the owner or the owner’s agent shall conduct, or cause to have conducted, asbestos removal performed by a licensed asbestos abatement contractor in conformance with all standards set forth in this Part. All ACM, PACM, suspect miscellaneous ACM assumed to be ACM, or asbestos material impacted by the demolition, renovation, remodeling or repair project shall be removed as per this Part, prior to access or disturbance by other uncertified trades or personnel. No demolition, renovation, remodeling or repair work shall be commenced by any owner or the owner’s agent prior to the completion of the asbestos abatement in accordance with the notification requirements of this Part. For multi-phased work, the access restriction for uncertified trades or personnel applies to each intermediate portion of the entire project. Upon completion of the intermediate portion of the asbestos project, other trades or personnel may access that portion of the work site. For demolition projects that are exempt from asbestos survey requirements due to being structurally unsound, the demolition is considered an asbestos project and shall proceed as per Section 56-11.5. (1) All building/structure owners and asbestos abatement contractors on a demolition, renovation, remodeling, or repair project, which includes work covered by this Part, shall inform all trades on the work site about PACM, ACM, asbestos material and suspect miscellaneous ACM assumed to be ACM at the work site. (i) Bidding. Bids may be advertised and contracts awarded for demolition, remodeling, renovation, or repair work, but no work on the current intermediate portion of the project shall commence on the demolition, renovation, remodeling or repair work by any owner or agent prior to completion of all necessary asbestos abatement work for the current intermediate portion of the entire project, in conformance with all standards set forth in this Part. (j) Unidentified and Unassessed Asbestos. When any construction activity, such as demolition, remodeling, renovation or repair work, reveals PACM or suspect miscellaneous ACM that has not been identified by the asbestos survey per this Part, or has not been identified by other inspections as per current OSHA or EPA requirements, all activities shall cease in the area where the PACM or suspect miscellaneous ACM is found and the Asbestos Control Bureau shall be notified by telephone by the building/structure owner or their representative, followed with a written notice in accordance with the notification requirements of this Part. Unassessed PACM or suspect miscellaneous ACM shall be treated and handled as ACM and assumed to be ACM, unless proven otherwise by standard EPA and OSHA accepted methods, including multi-layered systems sampling protocols; subsequent analyses performed by a laboratory that meets the requirements of Section 56-4.2 of this Part; and the analyses satisfies both NYS ELAP and federal requirements, including multi-layered sample analyses, to document non-asbestos containing material. 2.2 Sample Analysis Bulk sample analysis was performed by American Science Team New York Inc., an independent laboratory approved/accredited by the NYS Department of Health (ELAP), the American Industrial Hygiene Association (AIHA), and the National Voluntary Laboratory Accreditation Program (NVLAP). 11 860 Hooper Road Endwell, NY 13760 Tel: 607.231.6600 Fax: 607.231.6650 www.delta-eas.com Samples collected during the course of this survey fell into one of two categories. The first category includes non-friable organically bound (NOB) materials. These materials are those which have an organic binder in their matrix and include items such as floor tiles, sheet flooring, mastics, glazings, caulks and roofing materials. The second category includes non-NOB “friable” materials including parging, sheetrock, joint compound, wall insulations, and wallboard. Analysis of all “NOB” materials was initially performed by Polarized Light Microscopy (PLM) following the New York State Department of Health ELAP 198.6 Gravimetric Reduction Methodology. If a given sample was reported as non-asbestos following this analysis, it was then analyzed by Transmission Electron Microscopy (TEM) following the NYS DOH ELAP 198.4 Methodology. Analysis of all “non-NOB” materials was performed by Polarized Light Microscopy (PLM) following the EPA 600/M4/82/020 and the NYS DOH ELAP 198.1 Methodologies. 2.3 Materials not sampled There were several materials present at the site which were not considered “suspect” by the inspector and were not sampled. These included various fiberglass, foam, vinyl, silicone, wood/cellulose products and concrete/cinder block/brick components. 12 860 Hooper Road Endwell, NY 13760 Tel: 607.231.6600 Fax: 607.231.6650 www.delta-eas.com 3.0 SURVEY FINDINGS AND CONCLUSIONS 3.1) George Jameson Hall Elevator Modernization Project Pre-Renovation Asbestos Survey, Non-Asbestos Materials – Based on results from previous Delta Sampling efforts, results from previous sampling efforts of other Consultants, results from the Cornell 4D Database, and results reported for samples collected during this Survey of accessible suspect materials within the George Jameson Hall Elevator Modernization Renovation spaces, the following materials were identified as non-asbestos: Homogenous Area (HA) Non- Asbestos Building Material 02 Gray/Brown Mastic from Gray Rubber Floor - Elevator Cab 03 Brown Board Flooring under Gray Rubber Floor - Elevator Cab 05 Tan Cloth w/ Foil Covering from Fiberglass Drain Pipe Insulation 06 Gray Fitting Insulation from Roof Drain Fiberglass Pipe Insulation 08 Tan/Green Mastic from Carpet - Elevator Hallway Lobby Floor 09 Red 6" x 6" Quarry Tile Flooring - Ground Floor Elevator Hallway Lobby 13** Pipe Fitting Insulation – Domestic Cold Water 14** Pipe Fitting Insulation – Domestic Hot Water 15** Gypsum Board 14311-01*** Joint Compound 2012.004.199-01**** Pipe Fitting Insulation 2012.004.199-02**** Sheetrock 2012.004.199-03**** Joint Compound 2016.078.153-04**** Black Mastic from Gray and Black Mottled 12"X12" Floor Tile 2016.078.153-05**** White Hard Pack Pipe Insulation - Chase way 2016.078.153-06**** Gray Duct Sealant 2016.078.153-10**** Tan Mastic from 4" Brown Cove Base 2016.078.153-14**** White Cloth w/ Foiled/Black Mastic Wrap from Fiberglass Pipe Insulation 2016.078.153-15**** Red Fire Stop Caulk ** – Material listed in Cornell 4-D Database *** – Material previously sampled by other Consultant **** - Material previously sampled by Delta 3.2) George Jameson Hall Elevator Modernization Project Pre-Renovation Asbestos Survey, Asbestos-Containing Materials – Based on results from previous Delta Sampling efforts, results from previous sampling efforts of other Consultants, results from the Cornell 4D Database, and results reported for samples collected during this Survey of accessible suspect materials within the George Jameson Hall Elevator Modernization Renovation spaces, the following materials were identified as being asbestos-containing: Homogenous Area (HA) Asbestos Containing Material 01 Hoist way Door Insulation 04 Elevator Cab Door Insulation 07 Exterior Gray Caulk from Louver/Vent - Elevator Machine Room 13 860 Hooper Road Endwell, NY 13760 Tel: 607.231.6600 Fax: 607.231.6650 www.delta-eas.com Homogenous Area (HA) Asbestos Containing Material 10* Assumed Suspect Cloth Wiring, Switchgear 11* Assumed Suspect Brake Shoes, Elevator Motor 12* Assumed Suspect Transite Disks, Switchgear 2016.078.153-17**** Gray and Black Mottled 12"X12" Floor Tile * – Material assumed to be Asbestos Containing, present on active system & could not be sampled **** - Material previously sampled by Delta A breakdown of asbestos-containing materials by Homogeneous Area is as follows: A) Elevator Hoistway Door Core Insulation, HA 01: The asbestos-containing material is present in the elevator hoistway door slabs on each of the eight floors. There are 2 hoistway door slabs per elevator on each of the 8 levels, with each slab having approximately 13 square feet of interior asbestos core insulation. Based on this, the total amount of the asbestos containing hoistway door core insulation is approximately 416 square feet (4 hoistway door slabs per floor at 8 floors at 13 sf each). B) Elevator Cab Door Core Insulation, HA 04: This asbestos containing material is present in the cab door slabs for each of the elevator cabs, with each slab having approximately 13 square feet. Based on this, the total amount of the asbestos containing elevator cab door core insulation is approximately 52 square feet (4 cab door slabs at 13 sf each). C) Exterior Gray Caulk from Louver/Vent - Elevator Machine Room, HA 07: This asbestos containing caulk is present on the exterior perimeter of the frames for the two elevator machine room wall louvers. A total of approximately 1 square foot of this asbestos containing caulk is present on the exterior louver frames (two qty 18” x 18” louvers @ average 1” caulk application width). D) “Assumed” Cloth Wiring, HA 10*: Suspect wire wrap is present on the wiring associated with the elevator room switchgear and control panels. Due to the fact that the elevator system was active/energized at the time of the Survey, it could not be sampled. This cloth wire wrap must be assumed asbestos containing until proven otherwise through sampling and analysis. E) “Assumed” Elevator Motor Brake Shoes, HA 11*: These “assumed” asbestos containing elevator motor brake shoes are present on each elevator system (2 sets total). Due to the fact that the elevator system was active/energized at the time of the Survey, the brake shoes could not be sampled but were visually identified as being suspect transite. F) “Assumed” Switchgear Transite Discs, HA 12*: These “assumed” asbestos containing transite discs are present in the elevator switchgear units. A total of 4 discs were observed to be present. Due to the fact that the elevator system was active/energized at the time of the Survey, the switchgear discs could not be sampled but were visually identified as being suspect transite. 14 860 Hooper Road Endwell, NY 13760 Tel: 607.231.6600 Fax: 607.231.6650 www.delta-eas.com G) Gray and Black Mottled 12"X12" Floor Tile, HA 2016.153.153-17****: This asbestos containing gray and black mottled 12”x12” floor tile (VAT) was observed to be present in the basement corridor at the elevator Lobby. The mastic associated with this floor tile was reported as being non-asbestos. The potential impact to this VAT as a part of the elevator modernization project was unknown at the time of the Survey but it is included here for reference. It should be noted that the Elevator Machine Room Roof will be impacted by the Project via the installation of a Roof Hatch (as delineated on Drawing U-101 Detail D4). Although this roof section was accessible and visually inspected as a part of this Survey, it was not sampled based on the following:  As per Cornell Policy, all roof system cutting and patching operations must be performed by the Cornell Roof Shop and no Roof Shop Representative was present at the time of the survey. The existing roof was observed to be a newer EPDM system but the presence of suspect asphalt based flashings, tars or vapor barriers beneath could not be verified (or sampled) without cutting/coring the roof. Based on this, all suspect asphalt based roofing materials that may be present beneath the existing EPDM system must be assumed asbestos containing until proven otherwise through sampling and analysis. 4.0 INACCESSIBLE AREAS This Pre-Renovation Asbestos Survey was limited to ONLY those spaces included Elevator Modernization renovation areas. Associated rooms, spaces and areas which were visible and accessible were inspected and sampled as a part of this survey. Inaccessible areas such as wall cavities, fixed/hard ceiling plenum spaces and enclosed pipe chases were not included as a part of this Survey. Any suspect materials present in areas not accessible or not included as a part of this Survey shall be assumed ACM when encountered, until tested. 15 860 Hooper Road Endwell, NY 13760 Tel: 607.231.6600 Fax: 607.231.6650 www.delta-eas.com APPENDIX A Asbestos Bulk Sample Report Form Material Asbestos PLM Result TEM Result Bulk Sample Description / Details Type Type % Asbestos % Asbestos 2016.078.176 -01A 01 BM Hoist way Door Insulation, North Elevator - Basement Lobby Hallway Misc.57.1%NA 2016.078.176 -01B 01 BM Hoist way Door Insulation, North Elevator - Basement Lobby Hallway Misc.NA/PS NA 2016.078.176 -01C 01 6 Hoist way Door Insulation, South Elevator - 6th Floor Lobby Hallway Misc.NA/PS NA 2016.078.176 -02A 02 Cab Gray/Brown Mastic from Gray Rubber Floor - North Elevator Cab Misc.ND ND ND 2016.078.176 -02B 02 Cab Gray/Brown Mastic from Gray Rubber Floor - South Elevator Cab Misc.ND ND ND 2016.078.176 -03A 03 Cab Brown Board Flooring under Gray Rubber Floor - North Elevator Cab Misc.ND ND NA 2016.078.176 -03B 03 Cab Brown Board Flooring under Gray Rubber Floor - South Elevator Cab Misc.ND ND NA 2016.078.176 -04A 04 Cab Elevator Cab Door Insulation - North Elevator Misc.66.7%NA 2016.078.176 -04B 04 Cab Elevator Cab Door Insulation - South Elevator Misc.NA/PS NA 2016.078.176 -05A 05 PH Tan Cloth w/ Foil Covering from Fiberglass Drain Pipe Insulation - Elevator Machine Room Misc.ND ND NA 2016.078.176 -05B 05 PH Tan Cloth w/ Foil Covering from Fiberglass Drain Pipe Insulation - Elevator Machine Room Misc.ND ND NA 2016.078.176 -06A 06 PH Gray Fitting Insulation from Roof Drain Fiberglass Pipe Insulation - Elevator Machine RM TSI ND ND NA 2016.078.176 -06B 06 PH Gray Fitting Insulation from Roof Drain Fiberglass Pipe Insulation - Elevator Machine RM TSI ND ND NA Chrysotile Chrysotile Number of Samples Analyzed: PLM - 16 / TEM - 4 Project: George Jameson Hall Elevator Modernization Project - Pre-Renovation Asbestos Survey 860 Hooper Road, Endwell, NY 13760 Tel: 607.231.6600 Fax 607.231.6640 Client: Cornell University Delta Proj. No.: 2016.078.176 Asbestos Inspector: Michael J. Staudt HA* www.delta-eas.com Floor Dates Sampling Performed: 11/16/2016 Date of Report: 11/22/2016 Laboratory: AmeriSci Labs Number Work Order No.: 9371614 Number of Samples Collected: 20 Asbestos Bulk Sample Report Form Building Code: 3201 Sample Cornell University George Jameson Hall Elevator Modernization Project Pre-Renovation Asbestos Survey 1 of 2 Material Asbestos PLM Result TEM Result Bulk Sample Description / Details Type Type % Asbestos % Asbestos Number of Samples Analyzed: PLM - 16 / TEM - 4 Project: George Jameson Hall Elevator Modernization Project - Pre-Renovation Asbestos Survey 860 Hooper Road, Endwell, NY 13760 Tel: 607.231.6600 Fax 607.231.6640 Client: Cornell University Delta Proj. No.: 2016.078.176 Asbestos Inspector: Michael J. Staudt HA* www.delta-eas.com Floor Dates Sampling Performed: 11/16/2016 Date of Report: 11/22/2016 Laboratory: AmeriSci Labs Number Work Order No.: 9371614 Number of Samples Collected: 20 Asbestos Bulk Sample Report Form Building Code: 3201 Sample 2016.078.176 -06C 06 PH Gray Fitting Insulation from Roof Drain Fiberglass Pipe Insulation - Elevator Machine RM TSI ND ND NA 2016.078.176 -07A 07 PH Exterior Gray Caulk from Louver/Vent - Elevator Machine Room Misc.2.3%NA/PS 2016.078.176 -07B 07 PH Exterior Gray Caulk from Louver/Vent - Elevator Machine Room Misc.NA/PS NA/PS 2016.078.176 -08A 08 6 Tan/Green Mastic from Carpet - Elevator Hallway Lobby Floor Misc.ND ND ND 2016.078.176 -08B 08 5 Tan/Green Mastic from Carpet - Elevator Hallway Lobby Floor Misc.ND ND ND 2016.078.176 -09A 09 G Red 6" x 6" Quarry Tile Flooring - Ground Floor Elevator Hallway Lobby Misc.ND ND NA 2016.078.176 -09B 09 G Red 6" x 6" Quarry Tile Flooring - Ground Floor Elevator Hallway Lobby Misc.ND ND NA TSI - Thermal System Insulation Misc - Miscellaneous Material Trace / < 1% - Non-asbestos by definition Chrysotile HA - Homogenous Area ND - No Asbestos Detected NA - Not Analyzed by Methodology NA/PS - Not Analyzed, Positive Stop Cornell University George Jameson Hall Elevator Modernization Project Pre-Renovation Asbestos Survey 2 of 2 16 860 Hooper Road Endwell, NY 13760 Tel: 607.231.6600 Fax: 607.231.6650 www.delta-eas.com APPENDIX B Laboratory Analytical Results d@ffiq ,{ AuenLScr Delta Engineers Attn: Stephen Prislupsky 860 Hooper Road Endwell, NY 13760 AmeriSci New York 1 17 EAST 3OTH ST. NEW YORK, NY 10016 TEL: (212) 679-8600 . FAX: (212) 679-3114 PLM Bulk Asbestos Report Date Received tUtTlLl AmerisciJob # 2L6tt3O64 Date Examined 11117116 P.O. # ELAP #11480 Page 1 of 4 RE:2016.078.176; Cornell University; George Jameson Hall - Elevator Replacement Pre-Renovation Asbestos Survey - Client Prolect No.: 9371614 Client No. / HGA Lab No.Asbestos Present Total % Asbestos 2016.078.176-014 216113064-01 yes 01 Location: Fl. BM - Basement - Lobby Hallway - North Elevator - Hoist Way Door lnsulation Analyst Description: Grey, Homogeneous, Fibrous, Bulk Material Asbestos Types: Chrysotile 57.1 o/o Other Materia!: Cellulose 30 %, Non-fibrous 12.9 % 57.1 o/o (by NYS ELAP 198.1) by Valeriu Voicu on 11117116 2016.078.176-018 216113064-02 01 Location: Fl. BM - Basement - Lobby Hallway - North Elevator - Hoist Way Door lnsulation Analyst Description: Bulk Material Asbestos Types: Other Material: NfuPS 2016.078.176-01C Analyst Description: Bulk Material Asbestos Types: Other Material: 216113064-03 Location: Fl. 6 - 6th Floor - Lobby Hallway - South Elevator - Hoist Way Door lnsulation NA/PS 01 2016.078.176-02A 216113064-04 IVo NAD 02 Location: Fl. Cab - North Elevator Cab - Gray / Brown Mastic From Gray Rubber Floor (by NYS ELAP 198.6) by Valeriu Voicu on 11117116 Analyst Description: Brown/Grey, Heterogeneous, Non-Fibrous, Bulk Material Asbestos Types: Other Material: Non-fibrous 15.2 o/o 2016.078.176-028 216113064-05 IVo 02 Location: Fl. Cab - South Elevator Cab - Gray / Brown Mastic From Gray Rubber Floor Analyst Description: Brown/Grey, Homogeneous, Non-Fibrous, Bulk Material Asbestos Types: Other Material: Non-fibrous 16.7 % NAD (by NYS ELAP 198.6) by Valeriu Voicu on 11117116 See Reporting notes on last page AmeriSci Job #: 21611306/- Client Name: Delta Engineers Page 2 of 4 PLM Bulk Asbestos Report 2016.078.176; Cornell University; George Jameson Hall - Elevator Replacement Pre-Renovation Asbestos Survey - Client Project No.: 9371614 Client No. / HGA Lab No. Asbestos Present Total % Asbestos 2016.078.176-03A 216113064-06 IVo NAD 03 Location: Fl. Cab - North Elevator Cab - Brown Board Flooring Under Gray Rubber (by NYS ELAP 198.1) Floor by Valeriu Voicu on 11117116 Analpt Description: Brown, Homogeneous, Fibrous, Bulk Material Asbestos Types: Other Materia!: Cellulose 95 %, Non-fibrous 5 % 2016.078.176-038 216113064-07 IVo NAD 03 Location: Fl. Cab - South Elevator Cab - Brown Board Flooring Under Gray Rubber (by NYS ELAP 198.1) Floor by Valeriu Voicu on 11117116 Analyst Description: Brown, Homogeneous, Fibrous, Bulk Material Asbestos Types: Other Material: Cellulose 97 %, Non-fibrous 3 % 2016.078.176-04A 216113064-08 Yes 66.7 o/o 04 Location: Fl. Cab - North Elevator - Elevator Cab Door lnsulation (by NYS ELAP 198.1) by Valeriu Voicu on 11117116 Analyst Description: Grey, Homogeneous, Fibrous, Bulk Material Asbestos Types: Chrysotile 66.7 o/o Other Material: Cellulose 25 %, Non-fibrous 8.3 % 2016.078.176-048 216113064-09 NA/PS 04 Location: Fl. Cab - South Elevator - Elevator Cab Door lnsulation Analyst Description: Bulk Material Asbestos TyPes: Other Material: 2016.078.176-05A 05 216113064-10 IVo NAD Location: Fl. PH - Elevator Machine Room - Tan Cloth W/ FoilCovering From (by NYS ELAP 198.1) Fiberglass Drain PiPe lnsulation Analyst Descri ption : Si lver/Tan, Heterogeneous, Fibrous, Bulk Material Asbestos Types: Other Material: Cellulose 60 %, Fibrous glass 5 %, Non-fibrous 35 % by Valeriu Voicu on 11117116 2016.078.176-058 216113064-11 No NAD 0S Location: Fl. PH - Elevator Machine Room - Tan Cloth W/ Foil Covering From (by NYS ELAP 198.1) Fiberglass Drain Pipe lnsulation by Valeriu Voicu on 11117116 Analyst Descri ption : Silver/Tan, Heterogeneous, Fi brous, Bulk Material Asbestos Types: Other Material: Cellulose 55 %, Fibrous glass 5 %, Non-fibrous 40 o/o See Reporting notes on last Page AmeriSci Job #: 216113064 Client Name: Delta Engineers Page 3 of 4 PLM Bulk Asbestos Report 2016.078.176; Cornell University; George Jameson Hall - Elevator Replacement Pre-Renovation Asbestos Survey - Client Project No.:9371614 Glient No. / HGA Lab No. Asbestos Present Total % Asbestos 2016.078.176-064 216113064-12 lVo NAD 06 Location: Fl. PH - Elevator Machine Room - Gray Fitting lnsulation From Roof Drain (by NyS ELAP 19g.1) Fiberglass Pipe lnsulation by Valeriu Voicu on 11117116 Analyst Description: Grey, Homogeneous, Fibrous, Bulk Material Asbestos Types: Other Material: Cellulose Trace, Fibrous glass 30 o/o, Non-fibrous 70 % 2016.078.176-068 216113004-13 No NAD 06 Location: Fl. PH - Elevator Machine Room - Gray Fitting lnsulation From Roof Drain (by NyS ELAp 1gg. j) Fiberglass Pipe lnsulation by Valeriu Voicu on 11117116 Analyst Description: Grey, Homogeneous, Fibrous, Bulk Material Asbestos Types: Other Material: Cellulose Trace, Fibrous glass 25 yo, Non-fibrous 75 % 2016.078.176-06C 216113064-14 /Vo NAD 06 Location; Fl. PH - Elevator Machine Room - Gray Fitting lnsulation From Roof Drain (by NYS ELAp 198.1) Fiberglass Pipe lnsulation by Valeriu Voicu on 11117116 Analyst Description: Grey, Homogeneous, Fibrous, Bulk Material Asbestos Types: Other Material: Cellulose Trace, Fibrous glass 30 %, Non-fibrous 70 % 2016.078.176-07A 216113064-15 yes 2.3 o/o 07 Location: Fl. PH - Elevator Machine Room - Exterior Gray Caulk From Louver / Vent (by NYS ELAP 198.6) by Valeriu Voicu on 11117116 Analyst Description: Greyffan, Homogeneous, Non-Fibrous, Bulk Material Asbestos Types: Chrysotile 2.3 % Other Material: Non-fibrous 8.2 o/o 2016.078.176-078 216113064-16 07 Location: Fl. PH - Elevator Machine Room - Exterior Gray Caulk From Louver / Vent Analyst Description: Bulk Material Asbestos Types: Other Material: NA/PS 2016.078.176-08A 216113064-17 No NAD 08 Location: Fl. 6 - Elevator - Hallway Lobby - Floor - Tan / Green Mastic From Carpet (by NYS ELAP 198.6) by Valeriu Voicu on 11117116 Analyst Description: Tan/Green/Grey, Heterogeneous, Non-Fibrous, Bulk Material Asbestos Types: Other Material: Non-fibrous 25 o/o See Reporting notes on last page AmeriSci Job #: 2161130il Client Name: Delta Engineers Page 4 of 4 PLM Bulk Asbestos Report 2016.078.176; Cornell University; George Jameson Hall - Elevator Replacement Pre-Renovation Asbestos Survey - Client Project No.: 9371614 Glient No. / HGA Lab No.Asbestos Present Total % Asbestos 2016.078.176-088 216113064-18 /vo 08 Location: Fl. 5 - Elevator - Hallway Lobby - Floor - Tan / Green Mastic From Carpet Analyst Description: Tan/Green/Grey, Heterogeneous, Non-Fibrous, Bulk Material Asbestos Types: Other Material: Non-fibrous 19.8 % NAD (by NYS ELAP 198.6) by Valeriu Voicu on 11117116 2016.078.176-094 216113064-19 A/o 09 Location: Fl. G - Ground Floor - Elevator - Hallway Lobby - Red 6" x 6" Quarry Tile Flooring Analyst Description: Grey, Homogeneous, Non-Fibrous, cementitious, Bulk Material Asbestos Types; Other Material: Cellulose Trace, Non-fibrous 100 % NAD (by NYS ELAP 198.1) by Valeriu Voicu on 11117116 2016.078.176-098 216113064-20 No 09 Location: Fl. G - Ground Floor - Elevator - Hallway Lobby - Red 6" x 6" Quarry Tile Flooring Analyst Description: Grey, Homogeneous, Non-Fibrous, cementitious, Bulk Material Asbestos Types: Other Material: Cellulose Trace, Non-fibrous 100 % NAD (by NYS ELAP 198.1) by Valeriu Voicu on 1'1117116 Reporting Notes: Analyzed by: Valeriu Voicu -NADiNSD =no asbestos detected; NA =not analyze{ NfuPs=not analyzed/positive stop, (SOF-V) = Sprayed On Fireproofing containing Vermiculite; (SM-V) = Surfacing Material containing Vermicullte; PLM Bulk Asbestos Analysis by EPA 6OOIM4-82-O2O per 40 CFR 763 (NVLAP 2OOb46-0), ELAp PLM Method '198'1 for NY friable samples, wttich includes the identification and quantitation of vermiculite or 198.6 for NOB samples or EpA 400 pt ct by EPA 6001M4-82-020 (NY ELAP Lab 11480); Note:PLM is not consistently reliable in detecting asbestos in floor coverings and similar non-friable organically bound materials. NAD or Trace results by PLM are inconclusive, TEM is currently the only method that can be used to determine if this material can be considered or treated as non asbestos-containing in NY State (also see EPA Advisory for floor tile, FR 59,146,3g970,g/1/g4) National lnstitute of Standards and Technology Accreditation requirements mandate that this report must not be reproduced except in full without the approval of the lab.This PLM report relates oNLY to the items tested. AIHA-LAP, LLc Lab lD 102843, Rt cert AAL-094, cT cert pH-0186, Mass cert AAoo0054. Reviewed By:END OF REPORT oo)oo o(u ooo ocq)c oo. o)t (I)oa os8=6!!OF.oth r)o.iaaUq.O> oF-E* *g ? a a ? E g ? e e ?{22zzzz3>2222qb !=ooltoQotio>OJfo. iitqF!,iiipsiiiiiliii$; EEEEEH;;;HcEccsi i S $ i i i i iosio_&inaio&i$H SE E E fr {qcoo-srE,-g"€ € 5: b E s { fr # # #AAEFEitrE'E':E.EEtz;trtrbE66.=EiEr;;tgEiEi#i i i:i:ii s's",t'.: e e I & r e a E E & 'E'E*i*:;*;406(5s,;EEg-g-gn^ E g e e E E E E E E E E Ef f ,E*F*F S S E - a 5 s E,E=5.5E,E,i:"it lElEi€ i€ i: t: iE is isEEqEs E b"E"E E E A =, t t e ? e ooo(r -sC)6+.rr,2rr-r!::-=;;;00z=6ss;pbbEEEEE9gEEleEEBE8FFE*..eo i. i.E s;rE=E *E *€ =E *F -F s,9ss s,9=# =#E =;"6 6 E 5 € € i; i i i = iEEE;€;;EEEEEEEss E gE3;$E$= <YmY<' T b s Ee E* EB€ B€ g€ g€i s* eE eE eg sE sg eE se sE s€ e: u: E: E€ E: fr aE Ie EE t; aE a; tE t; ee EE EE EE EE EE EET E T E; 5 i ; , o , o , o , ;? 5 tr E E 5, E tr E tr E,rJ = il: N: c\l(o N-o N-o N-o c,l_o c.t-o dr-o N, N' i(, N' an, i(' i(zz'6!.!(p(u(I,(tr--fIfII(D m (o O O O O O C, o_ o_ o_ L d o_ o_trtrtrtrtrtrtrtrtrtrtrtrtrtrtrtr EEEEEEEE55E555TBETfE'Erqi!6EEEEEEEEEEEEEeouoooooouuuuuuoes eg ss sB eS 9S 5S 5g 9e -9: 5s 5: 5s 5p 5E 5 l! o o (ot- dF-c @ oC\ o s .9co ED o E a! ED G E c .9 6 :lt g CL E .E at, o.9SE 3.e5.o tr =tn(\,E+ s,!cootrz- s9ot tt'=(,J lE<oolo'o E Nooo).!u $II (ot-(f)o)ozoo).o.L(Lc .oo I q)tla aIao _oOa =<JCo.9 #EoAC'6P>'it ^.EFII<EoPr\cgfrH -o o*(Ellh''{T--fi5>Efi t_o'r.IG-tr6 EEL- -E61 oIooo t .9o = (, I o '6 o at, E .!c 3 (, I oo !oE (go ! g a. E(!o =oLo cl q)c oo dit- c;t-c @ oN 2oo<._c@o)oc(')ul -O95no #ai-oEoo-z'o= ?E90c ;(D Eo 3o'5 ot oo(ooooo_oo-oooEoC(o E o o Ex o E !o .Eg o) oc o o o (o co ,-<tDaE6 oo (,)g'-E.2a6-->5occo(oo)r9 =oo it) lUdF-c Lo9oOEE(o.Eg!O .= o. oO ovEI5Ebq el 5AO)V; a-- 8b 5(5of>6o>o0)95 '=o- <cu'=FE 5.e-oc'E =o(EE '=Eto:pso-o-dg ai> OE or€ s?GC>o>c GEI,oEs(gooo)g(Dooco(EEooo6 og Eo ,tho oc uJF o - (Y)<$J6tLN 9PEo =-o(l,6fia^-5o-;E =oo)Or 14-o-c<OJE4o.+E< =*g ;:o--o'6-O<_5o- E1>ulo-rz6IotA]>2z;-oO@ Lsla6 B8ONi5, tJc(Ln- =(L;<3='nZix>Co5(D-aE->nQ J6 3E ?E dE 16. IE(> uP:6:o)y6 :>YL*9/(o;=:O),E rE,JiL o) .E (E E a o og oo at, .o,6o o.o oooo_oth o,E o oz I z o c o)ooL oo ==oo o'6 .>(Uc(E. oooo-oo<: o'o ocr o) E(E C'fo' o Io)J>-(u-=-iEreloU(otsE)o:pt9(6a.)-o2-olo9Olytr(E:o)i':i? lb !t'oi3(o) :C , '--g,f0)l-o )o rcro i(E'-crOrfa :o =!o E o (,) ,c .E(, coo G.Eo. (E o)''6. €:5.'@, il E:@' hi: =ol Crtro.>'lo),ci'-l'6 I crO( =t'iorjC( oi9,cL(OJ rLj c(o<oi(I)';>lg-; O-(u)<r! ?rL=olU):vL ldro\jrCV< Io)o(U-LIi,-o,. N,->PP=6!oDCoI2<=ZI .-=(,1oIGDEzo-o))>-E?"s DC-(o -t'!orCn.C i'E)a ,E2-rdi :oto),o lp)ol9io,o:-o,o.o 'o;c:I:ot<,.z: --l6lorar!r(Uig :o:>3:io),2, o la. @ O) (L' J lrJ o C( .o6<=.!,r,orb!o6ryi lm.:o-!,<i EJ B:l E1,..<El o!o.: o:cl-((o( -.!FU (f, (9cE-E'o1(oI{t IJJ II D-, =qfLu- u. E-((l)o-gT =UJFuioo.E(Uth6ozfzo;ozo<? @o) (L J lJl oo -9o. E(ua o -o(! E I o 3oz o' -:c(,o) (L J IIJ . o. 8,,ll-o-osf 8.. RI,o!ei(@< $i>:o,o,-(C, Il<,iItr I lur ilXrloi =l(Ll sDa'6a>:\{0_ s.ia.,o, ls.IH<:-vI f,+m((:{\=(lL:.=\gCbqaa .eEE( Ed<uo>>!F-6= =tr(u'=]E9t (o oNa oN o L (D (Eo od) EEothIo ;o EoN 6E zzozoz.cts8=6 lrtllo ozozos28;=#d oz o@,ridil N F-|tr)oidii o) o) oooo LL tLo-gtr,i-- t.tooJfoa (o (oxx (o (o E!Eoiot't -o -o-oooo)J o(53orB(o"(oII oo(5(5 9mouJ o) LIJ'9bpbo-otL od u_oF-Eco< o=ooRo oo ItL EEooEEooUUOaOJ'(J o0)o_ o.AE\E I3o3o iEE9elL I.Loo ='Eoa(o(!wEr..EN-@-!':6rb io90E(, (, EE(r,oFF 3€8€8tL I.L -o -o-o -oooJJ< >c0 ><@o@(U0)?3?89(O=(O=(OF- :Y F- .:! Ns!r!- d'c(i,a;5E5E5<oEdE@5P5'r'5Gt LlJ N LlJ N (o ro jj TL I.L tr .9o oo 83r- 9o Qor NoNo(,)(o(L o "9SE 3.ef ll tr.xU,(! E:3osz- s9ot Il'= QJ(E<oaDttt -o c os -.2 o 99k-bg at, o 9== PE,EEE BAr>D- \r(oIrcr)o)oz!oq)'dL(Lc .9o I o) LJa aI U'oo3=<JEo.oo=EYo8':u-P>tEEFLL<EOP o*8 lt o*flfp.<: J€ )<m#Urtso asG-tr6 =Ed5 oo)Looo 5oLo cf 0)cLoO d,N dNq (o oN o3r< '6 :rt ar, I oc E.g<o {tLoo{'.c@o)oc(*)uJ FOe6NO #id-oEoo-z'5=2bo^ E (ooN(o Ef Ga -j Eo-c.9 = Ili5li(Elol (ol (Jl tol (Et ftEld.(Ell3liElIEI E slEl* t:lololst-lalolr JEl (illili:l i ili'l 1;l t iln;l iil : :l :Irlil8t:l(Ul=t-l.olf J:l iililltl Etl Lril r,l :il sll srl oil u ;l :rl :,l O lol=lal-sloloIO1at:laloII IU It( z I I Cs Lr L 0t{ g sg Ec! .9+uo c;I co Eo Iil Iul !ul -!1l :il t)l a ,l i,l c:l rr,l .ll orl -crl -crl :iltJ>ilo t?l9t: lal(Ut>l.l=loILlmt_\J>loILlo z I(Iu L 0t + d sc L CI 5 ctr'tr oo LJ- 15L Gom e 3oLm Iel !ul -!Jl u;l {;l ? :lu,)l c)l c:l tr.l .rl oll -cllr,l -:lti{ eil eil €lcil lJoIElololr.r--lpI(5loIdll-l=loILlco -lol (6I>to)l =lEIol =lclol (El =lalcl EIol -ololol bl (Ul>tol u.r I o .9lr d)=m (o aoo ooo -ooo -ooo ooo GOtr5o= .EEso-o o Gc ooc ooc ooc ooc ooc ooc ooc o CL F .E'tro (E = o .9. = o .o o .9. o .o o .q C) .o o .o = o .9. olt E3z -9 CL EGo o d) o o o No dINo (f)o d) cf)o so I @t- @No (o oN I (oN dt-o (o oN I (ot- dt-o (o oN I (ot\ df.-o (o oc! I (ot* dF-o (o oN I (o F- dI-o (o oN I (o F- dt\o (o oc! I (ot- dt-o (o oC\ o (!o lLrlrllol-clwlC\I id E tE o (Etr F o: o ) st-o r) ,) 3 Z 5 tt 'd Lc .ac ccLc co IJ -tolIl >a ;lst il 6t El HtOl ol 0rlE,l ol _ol .el-1El FEIEI oct3hl(oYl.al:^ olti 9tF-'gl8glfi=lollo(oq(f)c!No(o:oFo(ot- P z jo =octu Eoot Loo-ooro(o @ r{' G}o io rF rF @ $Iitt <EF{3\' 'r3F-l"o FaIAEF{; <H N o o)o,oo- 6'e !trs6 E'0o!l g,6t N o N oo)o(L ElEl,l,lfl* flflflflnn i t:o loo lo=l=olac lct-o loro- lo-r lo_a l^o ltto l(trq, Io,L ILo l(t)a l-oI lir = l- c tco lo o l(Er l=ut lac lc - Ft_ _pEleE EolEo tL .=lll- .! OEIOEc>lo> EEEls. ls lElir l[ lo-l.s ls l8 clfi l? lFulP lE l.s El# l# ls *ls ls lE Elg, lP l5 Elg ls lE slE IE IH EE E le= si;;l; EIas Lo lol-lelo tcL (.tooo o -9lr ooo I(L -rL r(L -o_ r(L I o_ r(L (o lO (,CI ,E .9o= .EE50-(, o(U c oo E ooc ooc ooc ooc oo C)oc ooc ooc oo E ooc o TL F IE 's-o G = o.9 ci .q C) .at,aF 6F U)F ci .q = o .o = o .9 = o .9 o.o (.) .9. o€ E z -g EL E lE(t, d)so tr)o @|r)o (oo dt(oo o(oo F-o (Dt-o @o dl@o o)o d]o)o I (ot- @t*o (o oN I (oN dt-o (o oc! I (ot- dF-o (o oN I (ot- a;No (o oN I (or- @t\o (o oN I (o T\ dt-o (o oc\ I (ot- cit-o (o oN I (o N @r-o (o oc{ I (ot- @No (o oc{ I @N @No (o o C\t I (oN dt-o (o oN I (ot- Fdt-o @ oN LI=lol-clslGll at i=t,tr e(E oz o- tro o ocl3hl@Yl.olR$lr- Sl8plril:=lo(oqcr)c!No(o JoFo(ot- P z =-o) =Ec uJ E$ot Loo-ooIo(o @ r+ G)o l,A TF @ F c\t +h <EF{3\\= f-{;taINEF{; <H 17 860 Hooper Road Endwell, NY 13760 Tel: 607.231.6600 Fax: 607.231.6650 Website: www.deltaengineers.com APPENDIX C Delta Engineers, Architects, & Land Surveyors Company and Personnel Certifications New York State – Department of Labor Division of Safety and Health License and Certificate Unit State Campus, Building 12 Albany, NY 12240 ASBESTOS HANDLING LICENSE Delta Engineers & Architects & Land Surveyors, P.C. 860 Hooper Road Endwell, NY 13760 FILE NUMBER: 05-0851 LICENSE NUMBER: 29322 LICENSE CLASS: RESTRICTED DATE OF ISSUE: 09/08/2016 EXPIRATION DATE: 09/30/2017 Duly Authorized Representative – David J Chambers: This license has been issued in accordance with applicable provisions of Article 30 of the Labor Law of New York State and of the New York State Codes, Rules and Regulations (12 NYCRR Part 56). It is subject to suspension or revocation for a (1) serious violation of state, federal or local laws with regard to the conduct of an asbestos project, or (2) demonstrated lack of responsibility in the conduct of any job involving asbestos or asbestos material. This license is valid only for the contractor named above and this license or a photocopy must be prominently displayed at the asbestos project worksite. This license verifies that all persons employed by the licensee on an asbestos project in New Yor k State have been issued an Asbestos Certificate, appropriate for the type of work they perform, by the New York State Department of Labor. Eileen M. Franko, Director SH 432 (8/12) For the Commissioner of Labor 18 860 Hooper Road Endwell, NY 13760 Tel: 607.231.6600 Fax: 607.231.6650 Website: www.deltaengineers.com APPENDIX D Laboratory Certifications ,....,-,,\ ^fl n /11' National Voluntary INIVLIAPJ Laboratory Accreditatlon Program -\l SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 AmeriSci New York DBA: AmeriSci New York Il7 E.30th Street New York, NY 10016 Mr. Paul Mucha Phone: 212-679-8600 Fax: 212-679-27 ll Email : pmucha@amerisci.com http ://www.amerisci.com ASBESTOS FIBER ANALYSIS Bulk Asbestos Analysis Code l8/A0l r 8/403 Airborne Asbestos Analysis t8tA02 NVLAP LAB CODE 200546-0 Description EPA 600/lvl4-82-020: Interim Method for the Determination of Asbestos in Bulk lnsulation Samples EPA 600/R-93ll16: Method for the Determination of Asbestos in Bulk Building Materials Description U.S. EPA's "Interim Transmission Electron Microscopy Analytical Methods-Mandatory and Nonmandatory-and Mandatory Section to Determine Completion of Response Actions" as found in 40 CFR, Part763, Subpart E, Appendix A. For the National V' Effective 20 I 6-07-0 I through 20 I 7-06-3 0 Page I of I United States Department of Commerce National lnstitute of Standards and Technology Gertificate of Accreditation to ISO/IEC 17025:2005 NVLAP LAB CODE: 200546-0 AmeriSci New York New York, NY is acaedited by the National Voluntary Laboratory Accreditation Program for specific services, listed on fhe Scope of Accreditation, for: Asbestos Fiber Analysis This laboratory is acuedited in accordance with the recognized lntemational Standard ISO/IEC 17025:2005. This accreditation demonstrates technical competence for a defined scope and the operation of a laboratory quality management system (refer to joint ISOJLAC-IAF Communique dated January 2009). 2016-07 -01 through 201 7 -06-30 nt'Vqo'offirEffective Dates 19 860 Hooper Road Endwell, NY 13760 Tel: 607.231.6600 Fax: 607.231.6650 Website: www.deltaengineers.com APPENDIX E Bulk Sample Location Drawings 20 860 Hooper Road Endwell, NY 13760 Tel: 607.231.6600 Fax: 607.231.6650 Website: www.deltaengineers.com APPENDIX F Cornell 4D Database Information 4D Samples ListSampleMaterial NameSystem NameRoom #Material StatusTestResultNorth Campus High Rise #13201Sample Comments2/11/2013as ofSampleDate6442A5/30/2000CaulkNoWindows1G12Negative6442B5/30/2000CaulkNoWindows1G14Negative6304D4/12/2000CaulkYesDoors/Hdwr/Keys1G00CEPositiveInterior caulk around aluminum door frame6305A4/12/2000CaulkYesDoors/Hdwr/Keys1G00CDPositiveExterior caulk around aluminum door frame65618/1/2000CaulkNoDoors/Hdwr/KeysIG00CHNegativeSide entrance, door caulk199557/16/2008Ceiling-Sprayed-onYesCeiling 1534Positive3 of 3, above closet ceiling199537/16/2008Ceiling-Sprayed-onYesCeiling 1354Positive1 of 3, above closet ceiling199547/16/2008Ceiling-Sprayed-onYesCeiling 1464Positive2 of 3, above closet ceiling6428C5/30/2000Drop-In TileNoCeiling 1603BNegative6477A6/13/2000Fitting-DCWYesDom. Cold Water 1B12CNegative6477B6/13/2000Fitting-DCWYesDom. Cold Water 1100TDNegative103952/27/2002Fitting-DCWYesDom. Cold Water 1300TENegativefitting on copper, lines are fiberglass103942/27/2002Fitting-DHWYesDom. Hot Water1300TENegativefitting on copper, lines are fiberglass103932/27/2002Fitting-DHWYesDom. Hot Water1600TANegativefitting on copper, lines are fiberglass103922/27/2002Fitting-DHWYesDom. Hot Water1600TANegativefitting on copper line are fiberglass6479A6/13/2000Fitting-glycolNoAir Sys. S & R (HVA16P0UNegative6477D6/13/2000Fitting-glycolNoAir Sys. S & R (HVA16P0UNegative6477C6/13/2000Fitting-glycolNoAir Sys. S & R (HVA16P0UNegative6426A5/30/2000Gypsum BoardNoCeiling 1600TANegative6426B5/30/2000Gypsum BoardNoCeiling 1600TBNegative6426D5/30/2000Gypsum BoardNoCeiling 1612Negative6427A5/30/2000Gypsum BoardNoCeiling 1600CANegative6427C5/30/2000Gypsum BoardNoCeiling 1603Negative6427D5/30/2000Gypsum BoardNoWall 1603Negative6429A5/30/2000Gypsum BoardNoWall 1500TANegative6429B5/30/2000Gypsum BoardNoWall 1500TENegative6429D5/30/2000Gypsum BoardNoCeiling 1500CANegative6430C5/30/2000Gypsum BoardNoWall 1542Negative6431A5/30/2000Gypsum BoardNoCeiling 1561Negative6431D5/30/2000Gypsum BoardNoWall 1400TANegative6432A5/30/2000Gypsum BoardNoWall 1400TBNegative6432C5/30/2000Gypsum BoardNoCeiling 1400LNegative 4D Samples ListSampleMaterial NameSystem NameRoom #Material StatusTestResultNorth Campus High Rise #13201Sample Comments2/11/2013as ofSampleDate6433A5/30/2000Gypsum BoardNoWall 1423Negative6434A5/30/2000Gypsum BoardNoWall 1300CFNegative6435A5/30/2000Gypsum BoardNoCeiling 1300CDNegative6435C5/30/2000Gypsum BoardNoWall 1321Negative6435D5/30/2000Gypsum BoardNoWall 1312Negative6436B5/30/2000Gypsum BoardNoWall 1200TENegative6436C5/30/2000Gypsum BoardNoCeiling 1200TFNegative6437A5/30/2000Gypsum BoardNoWall 1200CANegative6437B5/30/2000Gypsum BoardNoCeiling 1200LNegative6437D5/30/2000Gypsum BoardNoWall 1221Negative6438A5/30/2000Gypsum BoardNoWall 1212Negative6438D5/30/2000Gypsum BoardNoCeiling 1100TENegative6439A5/30/2000Gypsum BoardNoWall 1100TDNegative6439B5/30/2000Gypsum BoardNoWall 1100CGNegative6439D5/30/2000Gypsum BoardNoCeiling 1100CDNegative6440A5/30/2000Gypsum BoardNoWall 1121Negative6440B5/30/2000Gypsum BoardNoWall 1151Negative6440D5/30/2000Gypsum BoardNoWall 1G16Negative6441A5/30/2000Gypsum BoardNoCeiling 1G00TBNegative6441B5/30/2000Gypsum BoardNoWall 1G00CFNegative6432D5/30/2000Gypsum BoardNoWall 1400CFNegative6434C5/30/2000Gypsum BoardNoCeiling 1300TFNegative6434D5/30/2000Gypsum BoardNoWall 1300CFNegative6433B5/30/2000Gypsum BoardNoWall 1411Negative6428A5/30/2000Gypsum BoardNoWall 1604Negative6430B5/30/2000Gypsum BoardNoCeiling 1500CHNegative6304B4/12/2000Gypsum BoardNoCeiling 11G00LNegativeComposite6304C4/12/2000Gypsum BoardNoCeiling 11G00LNegativeField6458D6/7/2000MasticYesCeiling 1506Negative6052B10/27/1999MasticNoFloor 1612Negative1/8 ' bead around edges of parquet flooring6052A10/27/1999MasticNoFloor 1612Negativeblack rubbery under parquet flooring101802/8/2002Misc., OtherNoDoors/Hdwr/Keys1600CANegative1 of 3 for fire door insulation 4D Samples ListSampleMaterial NameSystem NameRoom #Material StatusTestResultNorth Campus High Rise #13201Sample Comments2/11/2013as ofSampleDate101812/8/2002Misc., OtherNoDoors/Hdwr/Keys1600CANegative2 of 3 for fire door insulation101822/8/2002Misc., OtherNoDoors/Hdwr/Keys1600CANegative3 of 3 for fire door insulation1525412/10/2004Misc., OtherYesDoors/Hdwr/Keys1500CBPositivedoor fill, north suite door with small louver sample taken in space 1500cb1525512/10/2004Misc., OtherYesDoors/Hdwr/Keys1300CEPositivedorr fill, north suite door1525612/10/2004Misc., OtherYesDoors/Hdwr/Keys1200CDPositivedoor fill, north suite door6458C6/7/2000Spline TIleNoCeiling 1206Negative6458A6/7/2000Spline TIleNoCeiling 1506Negative6458B6/7/2000Spline TIleNoCeiling 1506Negative6428D5/30/2000Vinyl Composition SheetiNoFloor 1604ANegative6428B5/30/2000Vinyl TileYesFloor 1603APositive5769A3/30/1999Vinyl TileYesFloor 1B00CBPositive12x12 tan / brown spec( space boocb)6441C5/30/2000Vinyl TileYesFloor 1G00EANegative6441D5/30/2000Vinyl TileYesFloor 1B00CBPositive6433D5/30/2000Vinyl TileYesFloor 1405Positive6431B5/30/2000Vinyl TileYesFloor 1505Positive 21 860 Hooper Road Endwell, NY 13760 Tel: 607.231.6600 Fax: 607.231.6650 Website: www.deltaengineers.com APPENDIX G Previous Delta Sample Results Material Asbestos PLM Result TEM Result Bulk Sample Description / Details Type Type % Asbestos % Asbestos 2012.004.199 -01A 01 G 2" Pipe Fitting Insulation - Rm 1611, Pipe Chase Misc ND ND NA 2012.004.199 - 01B 01 G 2" Pipe Fitting Insulation - Rm 1615A, Pipe Chase Misc ND ND NA 2012.004.199 - 01C 01 G 2" Pipe Fitting Insulation - Rm 1614A, Pipe Chase Misc ND ND NA 2012.004.199 - 02A 02 6 Sheetrock - Ceiling, Rm 1611 Misc ND ND NA 2012.004.199 - 02B 02 6 Sheetrock - Ceiling, Rm 1603A Misc ND ND NA 2012.004.199 - 02C 02 4 Sheetrock - Ceiling, Rm 1405 Misc ND ND NA 2012.004.199 - 03A 03 6 Joint Compound - Ceiling, Rm 1611 Misc ND ND NA 2012.004.199 - 03B 03 6 Joint Compound - Ceiling, Rm 1603A Misc ND ND NA 2012.004.199 - 03C 03 4 Joint Compound - Ceiling, Rm 1405 Misc ND ND NA 2012.004.199 - 04A 04 6 Brown Cove Base Mastic - Rm 1611 Misc ND ND ND 2012.004.199 - 04B 04 6 Brown Cove Base Mastic - Rm 1603A Misc ND ND ND 2012.004.199 - 04C 04 5 Brown Cove Base Mastic - Rm 1505 Misc ND ND ND Delta Proj. No.: 2012.004.199Client: Cornell University Work Order No./Service Request No.: 5177950/S107414 Date Sampling Performed: 08/01/12 Date of Report: 08/06/12 Laboratory: AmeriSci Labs Asbestos Bulk Sample Report Form Asbestos Inspector: Robert Mosher Number of Samples Collected: 29 Number of Samples Analyzed: PLM-29, TEM-12 Number HA*Floor Project: George Jamison Hall, High Rise No. 1 Kitchen Project "Limited" Pre- Renovation Asbestos Survey Building Code: 3201 Sample 860 Hooper Road Endwell, NY 13760 Tel: 607.231.6600 Fax: 607.231.6650 Website: www.deltaengineers.com AN ISO 9001:2008 CERTIFIED COMPANY Cornell University George Jamison Hall Kitchen Renovations Project Limited Pre-Renovation Asbestos Survey Page 1 of 3 Material Asbestos PLM Result TEM Result Bulk Sample Description / Details Type Type % Asbestos % Asbestos Delta Proj. No.: 2012.004.199Client: Cornell University Work Order No./Service Request No.: 5177950/S107414 Date Sampling Performed: 08/01/12 Date of Report: 08/06/12 Laboratory: AmeriSci Labs Asbestos Bulk Sample Report Form Asbestos Inspector: Robert Mosher Number of Samples Collected: 29 Number of Samples Analyzed: PLM-29, TEM-12 Number HA*Floor Project: George Jamison Hall, High Rise No. 1 Kitchen Project "Limited" Pre- Renovation Asbestos Survey Building Code: 3201 Sample 860 Hooper Road Endwell, NY 13760 Tel: 607.231.6600 Fax: 607.231.6650 Website: www.deltaengineers.com AN ISO 9001:2008 CERTIFIED COMPANY 2012.004.199 - 05A 05 6 2"x2" Tan w/ spots ceramic tile grout - Rm 1611 Misc ND ND NA 2012.004.199 - 05B 05 6 2"x2" Tan w/ spots ceramic tile grout - Rm 1611 Misc ND ND NA 2012.004.199 - 06A 06 6 2"x2" Tan w/ spots ceramic tile mortar bed - Rm 1611 Misc ND ND NA 2012.004.199 - 06B 06 6 2"x2" Tan w/ spots ceramic tile mortar bed - Rm 1611 Misc ND ND NA 2012.004.199 - 07A 07 6 Window Caulk - Rm 1611 at Brick Misc Chrysotile Trace 1.9% 2012.004.199 - 07B 07 6 Window Caulk - Rm 1611 at Brick Misc NA/PS Trace NA/PS 2012.004.199 - 08A 08 6 Door Caulk - Hallway at Rm 1611 Door Misc Chrysotile Trace 1.9% 2012.004.199 - 08B 08 6 Door Caulk - Hallway at Rm 1611 Door Misc NA/PS Trace NA/PS 2012.004.199 - 09A 09 6 12"x12" Tan w/ Brown Specks Floor Tie - Rm 1603A Misc Chrysotile ND 2.9% 2012.004.199 - 09B 09 5 12"x12" Tan w/ Brown Specks Floor Tie - Rm 1505 Misc NA/PS ND NA/PS 2012.004.199 - 09C 09 4 12"x12" Tan w/ Brown Specks Floor Tie - Rm 1405 Misc NA/PS ND NA/PS 2012.004.199 - 10A 10 6 Black Mastic from 12"x12" Tan w/ Brown Specks Floor Tile - Rm 1603A Misc ND ND ND Cornell University George Jamison Hall Kitchen Renovations Project Limited Pre-Renovation Asbestos Survey Page 2 of 3 Material Asbestos PLM Result TEM Result Bulk Sample Description / Details Type Type % Asbestos % Asbestos Delta Proj. No.: 2012.004.199Client: Cornell University Work Order No./Service Request No.: 5177950/S107414 Date Sampling Performed: 08/01/12 Date of Report: 08/06/12 Laboratory: AmeriSci Labs Asbestos Bulk Sample Report Form Asbestos Inspector: Robert Mosher Number of Samples Collected: 29 Number of Samples Analyzed: PLM-29, TEM-12 Number HA*Floor Project: George Jamison Hall, High Rise No. 1 Kitchen Project "Limited" Pre- Renovation Asbestos Survey Building Code: 3201 Sample 860 Hooper Road Endwell, NY 13760 Tel: 607.231.6600 Fax: 607.231.6650 Website: www.deltaengineers.com AN ISO 9001:2008 CERTIFIED COMPANY 2012.004.199 - 10B 10 5 Black Mastic from 12"x12" Tan w/ Brown Specks Floor Tile - Rm 1505 Misc ND ND ND 2012.004.199 - 10C 10 4 Black Mastic from 12"x12" Tan w/ Brown Specks Floor Tile - Rm 1405 Misc ND ND ND 2012.004.199 - 11A 11 6 White Door Caulk - Rm 1603A at Door on Sheetrock Misc ND ND ND 2012.004.199 - 11B 11 5 White Door Caulk - Rm 1505 at Door on Sheetrock Misc ND ND ND 2012.004.199 - 11C 11 4 White Door Caulk - Rm 1405 at Door on Sheetrock Misc ND ND ND HA - Homogenous Area ND - No Asbestos Detected NA - Not Analyzed by Methodology NA/PS - Not Analyzed, Positive Stop TSI - Thermal System Insulation Misc. - Miscellaneous Material Trace / < 1% - Non-asbestos by definition Cornell University George Jamison Hall Kitchen Renovations Project Limited Pre-Renovation Asbestos Survey Page 3 of 3 Client: 10/27/2016 Material Asbestos PLM Result TEM Result Type Type % Asbestos % Asbestos 01A 01 6 Miscellaneous ND ND NA 01B 01 6 Miscellaneous ND ND NA 02A 02 6 Miscellaneous ND ND NA 02B 02 G Miscellaneous ND ND NA 03A 03 6 Miscellaneous 1.6%NA/PS 03B 03 6 Miscellaneous NA/PS NA/PS 04A 04 B Miscellaneous ND ND ND 04B 04 B Miscellaneous ND ND ND 05A 05 6 TSI ND ND NA 05B 05 5 TSI ND ND NA 05C 05 1 TSI ND ND NA 06A 06 6 Miscellaneous ND ND ND 06B 06 6 Miscellaneous ND ND ND 07A 07 6 Miscellaneous ND ND NA 07B 07 5 Miscellaneous ND ND NA Chrysotile Cornell University 2016.078.153 - Asbestos Bulk Sample Report Form Sample HA* 2016.078.153 - White Mudset/Grout from 4"X4" White Ceramic Wall Tile - Room 1600TB 2016.078.153 - 2016.078.153 - www.delta-eas.com Date of Report: 10/31/2016 9323795 Floor Laboratory: AmeriSci New York Number of Samples Collected: 54 Date Sampling Performed: 860 Hooper Road, Endwell, NY 13760 Tel: 607.231.6600 Fax 607.231.6640 Delta Proj. No.: 2016.078.153 Asbestos Inspector: Shawn May Number Number of Samples Analyzed: PLM - 48 / TEM - 23 Building Code: 3201 Work Order No.: Bulk Sample Description / Details Project: George Jameson High Rise 1 Bathroom Renovations - Limited Pre- Renovation Asbestos Bulk Sampling Gray Mudset/Grout from 1"X1" Gray Ceramic Floor Tile - Room 1G00TA 2016.078.153 - White Caulk from Hand Paper Towel Dispenser - Room 1600TB 2016.078.153 - White Caulk from Hand Paper Towel Dispenser - Room 1600TB White Mudset/Grout from 4"X4" White Ceramic Wall Tile - Room 1600TB Gray Mudset/Grout from 1"X1" Gray Ceramic Floor Tile - Room 1600TB 2016.078.153 - Black Mastic from Gray and Black Mottled 12"X12" Floor Tile - Room 1B00JB 2016.078.153 - Black Mastic from Gray and Black Mottled 12"X12" Floor Tile - Room 1B00JA 2016.078.153 - White Hard Pack Pipe Insulation - Room 1600TB Chase way 2016.078.153 - White Hard Pack Pipe Insulation - Room 1500TD Chase way 2016.078.153 - White Hard Pack Pipe Insulation - Room 1100TE Chase way 2016.078.153 -Gray Duct Sealant - Room 1600TA 2016.078.153 -Gray Duct Sealant - Room 1600TA 2016.078.153 - White Mudset/Grout from 4"X4" White Ceramic Wall Tile - Room 1603B 2016.078.153 - White Mudset/Grout from 4"X4" White Ceramic Wall Tile - Room 1500TD Cornell University G. Jameson High Rise 1 Bathrooms Asbestos Survey Page 1 of 4 Client: 10/27/2016 Material Asbestos PLM Result TEM Result Type Type % Asbestos % Asbestos Cornell University 2016.078.153 - Asbestos Bulk Sample Report Form Sample HA* www.delta-eas.com Date of Report: 10/31/2016 9323795 Floor Laboratory: AmeriSci New York Number of Samples Collected: 54 Date Sampling Performed: 860 Hooper Road, Endwell, NY 13760 Tel: 607.231.6600 Fax 607.231.6640 Delta Proj. No.: 2016.078.153 Asbestos Inspector: Shawn May Number Number of Samples Analyzed: PLM - 48 / TEM - 23 Building Code: 3201 Work Order No.: Bulk Sample Description / Details Project: George Jameson High Rise 1 Bathroom Renovations - Limited Pre- Renovation Asbestos Bulk Sampling White Mudset/Grout from 4"X4" White Ceramic Wall Tile - Room 1600TB07C074 Miscellaneous ND ND NA 07D 07 3 Miscellaneous ND ND NA 07E 07 2 Miscellaneous ND ND NA 07F 07 1 Miscellaneous ND ND NA 07G 07 G Miscellaneous ND ND NA 08A 08 6 Miscellaneous ND ND NA 08B 08 5 Miscellaneous ND ND NA 08C 08 4 Miscellaneous ND ND NA 08D 08 3 Miscellaneous ND ND NA 08E 08 2 Miscellaneous ND ND NA 08F 08 1 Miscellaneous ND ND NA 08G 08 G Miscellaneous ND ND NA 09A 09 6 Miscellaneous ND ND ND 09B 09 5 Miscellaneous ND ND ND 09C 09 4 Miscellaneous ND ND ND 2016.078.153 - White Mudset/Grout from 4"X4" White Ceramic Wall Tile - Room 1400TA 2016.078.153 - White Mudset/Grout from 4"X4" White Ceramic Wall Tile - Room 1300TC 2016.078.153 - White Mudset/Grout from 4"X4" White Ceramic Wall Tile - Room 1200TA 2016.078.153 - White Mudset/Grout from 4"X4" White Ceramic Wall Tile - Room 1100TA 2016.078.153 - White Mudset/Grout from 4"X4" White Ceramic Wall Tile - Room 1G14B 2016.078.153 - Gray Mudset/Grout from 1"X1" Gray Ceramic Floor Tile - Room 1603 2016.078.153 - Gray Mudset/Grout from 1"X1" Gray Ceramic Floor Tile - Room 1500TD 2016.078.153 - Gray Mudset/Grout from 1"X1" Gray Ceramic Floor Tile - Room 1400TA 2016.078.153 - Gray Mudset/Grout from 1"X1" Gray Ceramic Floor Tile - Room 1300TC 2016.078.153 - Gray Mudset/Grout from 1"X1" Gray Ceramic Floor Tile - Room 1200TA 2016.078.153 - Gray Mudset/Grout from 1"X1" Gray Ceramic Floor Tile - Room 1100TA 2016.078.153 - Gray Mudset/Grout from 1"X1" Gray Ceramic Floor Tile - Room 1G14C 2016.078.153 -White Tub/Sink Caulk - Room 1603 2016.078.153 -White Tub/Sink Caulk - Room 1500TD 2016.078.153 -White Tub/Sink Caulk - Room 1400TA Cornell University G. Jameson High Rise 1 Bathrooms Asbestos Survey Page 2 of 4 Client: 10/27/2016 Material Asbestos PLM Result TEM Result Type Type % Asbestos % Asbestos Cornell University 2016.078.153 - Asbestos Bulk Sample Report Form Sample HA* www.delta-eas.com Date of Report: 10/31/2016 9323795 Floor Laboratory: AmeriSci New York Number of Samples Collected: 54 Date Sampling Performed: 860 Hooper Road, Endwell, NY 13760 Tel: 607.231.6600 Fax 607.231.6640 Delta Proj. No.: 2016.078.153 Asbestos Inspector: Shawn May Number Number of Samples Analyzed: PLM - 48 / TEM - 23 Building Code: 3201 Work Order No.: Bulk Sample Description / Details Project: George Jameson High Rise 1 Bathroom Renovations - Limited Pre- Renovation Asbestos Bulk Sampling White Mudset/Grout from 4"X4" White Ceramic Wall Tile - Room 1600TB09D093 Miscellaneous ND ND ND 09E 09 2 Miscellaneous ND ND ND 09F 09 1 Miscellaneous ND ND ND 09G 09 G Miscellaneous ND ND ND 10A 10 B Miscellaneous Non-asbestos Trace Trace 10B 10 B Miscellaneous Non-asbestos Trace Trace 11A 11 5 Miscellaneous ND ND NA 11B 11 4 Miscellaneous 1.5%NA 11C 11 3 Miscellaneous NA/PS NA 11D 11 2 Miscellaneous NA/PS NA 11E 11 1 Miscellaneous NA/PS NA 11F 11 G Miscellaneous NA/PS NA 12A 12 4 Miscellaneous ND ND ND 12B 12 3 Miscellaneous ND ND ND 13A 13 4 Miscellaneous ND ND ND Chrysotile White Mudset\Grout from 4" White Ceramic Cove Base - Room 1G14C 2016.078.153 - Tan Mottled 12"X12" Floor Tile - Room 1400TA Chaseway Closet 2016.078.153 - Tan Mottled 12"X12" Floor Tile - Room 1300TC Chaseway Closet 2016.078.153 - Yellow Mastic from Tan Mottled 12"X12" Floor Tile - Rm 1400TA Chaseway Closet White Mudset\Grout from 4" White Ceramic Cove Base - Room 1200TA 2016.078.153 - White Mudset\Grout from 4" White Ceramic Cove Base - Room 1100TA 2016.078.153 - 2016.078.153 - 2016.078.153 - 2016.078.153 - White Mudset\Grout from 4" White Ceramic Cove Base - Room 1400TA White Mudset\Grout from 4" White Ceramic Cove Base - Room 1300TC 2016.078.153 -White Tub/Sink Caulk - Room 1200TA 2016.078.153 -White Tub/Sink Caulk - Room 1100TA 2016.078.153 - 2016.078.153 - White Mudset\Grout from 4" White Ceramic Cove Base - Room 1500TD 2016.078.153 -White Tub/Sink Caulk - Room 1G14C 2016.078.153 - Tan Mastic from 4" Brown Cove Base - 1B00JB 2016.078.153 - Tan Mastic from 4" Brown Cove Base - 1B00JA White Tub/Sink Caulk - Room 1300TC Cornell University G. Jameson High Rise 1 Bathrooms Asbestos Survey Page 3 of 4 Client: 10/27/2016 Material Asbestos PLM Result TEM Result Type Type % Asbestos % Asbestos Cornell University 2016.078.153 - Asbestos Bulk Sample Report Form Sample HA* www.delta-eas.com Date of Report: 10/31/2016 9323795 Floor Laboratory: AmeriSci New York Number of Samples Collected: 54 Date Sampling Performed: 860 Hooper Road, Endwell, NY 13760 Tel: 607.231.6600 Fax 607.231.6640 Delta Proj. No.: 2016.078.153 Asbestos Inspector: Shawn May Number Number of Samples Analyzed: PLM - 48 / TEM - 23 Building Code: 3201 Work Order No.: Bulk Sample Description / Details Project: George Jameson High Rise 1 Bathroom Renovations - Limited Pre- Renovation Asbestos Bulk Sampling White Mudset/Grout from 4"X4" White Ceramic Wall Tile - Room 1600TB13B133 Miscellaneous ND ND ND 14A 14 3 Miscellaneous ND ND ND 14B 14 3 Miscellaneous ND ND ND 15A 15 3 Miscellaneous ND ND ND 15B 15 3 Miscellaneous ND ND ND 16A 16 2 Miscellaneous ND ND ND 16B 16 2 Miscellaneous ND ND ND 17A 17 B Miscellaneous 2.4%NA/PS 17B 17 B Miscellaneous NA/PS NA/PS Chrysotile Yellow Mastic from Tan Mottled 12"X12" Floor Tile - Rm 1300TC Chaseway Closet 2016.078.153 - White Cloth with Foiled/Black Mastic Wrap from Fiberglass Pipe Insulation - 2016.078.153 - 2016.078.153 - 2016.078.153 - 2016.078.153 - 2016.078.153 - 2016.078.153 - 2016.078.153 - 2016.078.153 - Gray and Black Mottled 12"X12" Floor Tile - Room 1B00JA White Cloth with Foiled/Black Mastic Wrap from Fiberglass Pipe Insulation - Red Fire Stop Caulk - Room 1300TD Chaseway Red Fire Stop Caulk - Room 1300TD Chaseway White Mastic from White Wall Panel - Room 1200TB White Mastic from White Wall Panel - Room 1200TB HA - Homogenous Area ND - No Asbestos Detected NA - Not Analyzed by Methodology NA/PS - Not Analyzed, Positive Stop TSI - Thermal System Insulation Misc - Miscellaneous Material Trace / < 1% - Non-asbestos by definition Gray and Black Mottled 12"X12" Floor Tile - Room 1B00JB Cornell University G. Jameson High Rise 1 Bathrooms Asbestos Survey Page 4 of 4 22 860 Hooper Road Endwell, NY 13760 Tel: 607.231.6600 Fax: 607.231.6650 Website: www.deltaengineers.com APPENDIX H Previous Sample Information from other Consultants Asbestos Pre-Renovation Survey Report George Jameson Hall ECMC Project No. 14311 Walls and Ceilings Project Cornell University WO # - 7128318 Cornell University Building Code: 3201 Ithaca, New York Report Date: October 7, 2014 ENVIRONMENTAL COMPLIANCE MANAGEMENT CORPORATION 5 6.0 SUMMARY OF FINDINGS No building records pertaining to the presence or absence of ACM were available for review at the time of the survey. The survey included the collection and analysis of 5 bulk samples that identified the following: No samples were identified as ACM (containing greater than 1% asbestos) as defined by the OSHA under 29 CFR 1926.1101. Table 6.1 summarizes the bulk samples collected, which includes the analytical results. Table 6.1 - Asbestos Bulk Sample Summary SAMPLE NUMBER MATERIAL DESCRIPTION SAMPLE LOCATION % ASBESTOS CONTENT 14311-01A Joint compound 1ST floor Above Door to Suite #4 0.3% Asbestos 14311-01B Joint compound 2nd Floor Suite #3 Bathroom Closet 0.5% Asbestos 14311-01C Joint compound 3rd Floor North Stairwell NAD 14311-01D Joint compound 4th Floor Cubby Hole to the Right of Room 1406 NAD 14311-01F Joint compound 5th Floor Suite #1 Corridor 0.8% Asbestos NAD = No Asbestos Detected Trace Asbestos = <0.25% Asbestos Content NA/PS = Not Analyzed/Positive Stop 23 860 Hooper Road Endwell, NY 13760 Tel: 607.231.6600 Fax: 607.231.6650 Website: www.deltaengineers.com APPENDIX I Photo Log 24 860 Hooper Road Endwell, NY 13760 Tel: 607.231.6600 Fax: 607.231.6650 Website: www.deltaengineers.com HA 01 – Hoist way Door Insulation, Asbestos Containing HA’s 02 & 03 – Gray/Brown Mastic from Gray Rubber Floor & Brown Board Flooring under Gray Rubber Floor from Elevator Cab, Both Non-Asbestos 25 860 Hooper Road Endwell, NY 13760 Tel: 607.231.6600 Fax: 607.231.6650 Website: www.deltaengineers.com HA 04 – Elevator Cab Door Insulation, Asbestos Containing HA 05 – Tan Cloth w/ Foil Covering from Fiberglass Drain Pipe Insulation - Elevator Machine Room, Non-Asbestos 26 860 Hooper Road Endwell, NY 13760 Tel: 607.231.6600 Fax: 607.231.6650 Website: www.deltaengineers.com HA 06 – Gray Fitting Insulation from Roof Drain Fiberglass Pipe Insulation - Elevator Machine Room, Non-Asbestos HA 07 – Exterior Gray Caulk from Elevator Machine Room Wall Louver, Asbestos Containing 27 860 Hooper Road Endwell, NY 13760 Tel: 607.231.6600 Fax: 607.231.6650 Website: www.deltaengineers.com HA 08 –Tan/Green Mastic from Carpet - Elevator Hallway Lobby Floor, Non-Asbestos HA 09 –Red 6" x 6" Quarry Tile Flooring - Elevator Hallway Lobby, Non-Asbestos 28 860 Hooper Road Endwell, NY 13760 Tel: 607.231.6600 Fax: 607.231.6650 Website: www.deltaengineers.com Non Suspect Concrete, Brick, & Metal in Elevator Shaft Suspect Cloth-covered Wiring 29 860 Hooper Road Endwell, NY 13760 Tel: 607.231.6600 Fax: 607.231.6650 Website: www.deltaengineers.com Suspect Brake Shoes from Elevator Motor Suspect Transite Disks from Switchgear George Jameson Hall Elevator Replacement Date: January 9, 2017 RFI Form RFI/Page/ Response Dwg./Spec./Rep.Section/Design Team Index Number Paragraph/Topic RFI Response 1 N/A N/A Are there special provisions for pre-payment for the elevator equipment? Elevator sub-contractors generally require one third payment prior to fabrication. The Contractor needs to determine and will be responsible for any "prepayment" for services. 2 N/A N/A Can we field measure the elevator shafts before construction?Yes. 3 N/A N/A Will the fire alarm be disabled during the project?Yes. 4 N/A N/A How thick is the basement wall that needs to be opened for the new door? 10 inches. 5 N/A N/A How heavy is the elevator machine?Approximately 4,500 pounds, each. 6 N/A N/A Is there a facility wide variance on the hoistway doors for asbestos abatement? No. 7 N/A N/A Does the roof have a warranty?Yes. The warranty is through Carlisle and was installed by Weathermaster in 2005. 8 INS & BF INS-2 and BF-3 Can you clarify the phasing of the project?See Addendum No. 1, Items 2 and 3. Architectural Resources 505 Franklin Street Buffalo, NY 14202 303 West 13th Street New York, NY 10014 716 883-5566 716 883-5569 fox rnoil@archres.com RYAN BIGGS CLARK DAMS r.xc,•.i�r.a ., . .'.. i'iG FNC)tI:FEPIEN1c 111,1.1.1:: m a.%r b.11: Vol . .:I I. 1;. it �•ri::•.N�:: ti { •h. :: tis :i 4592 P I•Y IS 1 `x3 315 :585 rd?i: 6O' .231.66(ifj !x.'':'.'1.31.:565 I E; rio?r: 1,r:•:. {?:.'! i ::I {=:: .::-i':: Cover Sheet Overall Plans Overall Plays Basement Level Through Level 0.5 Level 06, Level 07 - JAIechanicaI and Level 08 - Penthouse Design Data, General Notes, Partial Plans and Detail} George Jameson Hall 44 Sisson Place, Ithaca, NY 14850 Issued for Bid 11.18_2016 A] r 564_06 Ele c1iical E-CO1 E-101 E- 201 E-400 E- 401 E-402 E-501 E- 601 Enlarged Plans FI aistway Section and Details Eleva1ar Fixtures. Details, and EIevaiions Syn- bols List and General Notes Overall Floor Plans - Demolition Overall Floor Plans - New Work One Line Diagram One Line Diagram Riser Diarira In s - New Work Details Schedule} Baserneni Level to Level 08 - Penthouse Baserneni Level 10 Level 08 - Elevator Roorn Basement Level is Level 08 - Elevator Room Power Riser Dia. rain - Demolition Power Riser Diagram - New Work Penthouse and Partial Basement Plan Plumbing P- 101 Partial Deemofition Floor Plans P-201 Partial Floor Plans 6aselnen1 Level io Level 08 - Elevator Room Baserneni Level 11) Level 08 - Elevator Room ....•4f!rr:+�IIJ 1,C'•:•`:::r� I : • ..•.k} !J /JYWYf :..sr'9fff %Yfff/t iff/ff ' B J'. L ELEVATOR LOBBY Ground Level 3;:,1'..1. / TRANSFORMER GENERATOR MECHANICAL ENP /0— D11 STAIR IJP I J ELECTRICAL JANITOR 1 UP 1 STA1 R UP LI LOBBY LEVEL 4— IJPPER? I.C)'w'EF: LOBBY LEVEL - Basement Level LINEN STORAGE ESP ELEVATOR LOBBY -- 1 I -- 1 ELEVATOR LEVATOR #2 #1 z 0 f Ground Level 3;:,1'..1. / TRANSFORMER GENERATOR MECHANICAL ENP /0— D11 STAIR IJP I J ELECTRICAL JANITOR 1 UP 1 STA1 R UP LI LOBBY LEVEL 4— IJPPER? I.C)'w'EF: LOBBY LEVEL - Basement Level LINEN STORAGE ESP ELEVATOR LOBBY -- 1 I -- 1 ELEVATOR ELEVATOR #2 #1 ------- - STORAGE JANITOR IJP UP STO R AGE EXP STO RAGE BAN Ei . EH T LEVE L UPPER B.2.L1.iEMEH f I.EVE1. I 4 -� Drawings Legend A3 )1( 011 JP STAI R r L ▪ —ELEVATOR LOBBY C.' 'B alga TOF �J Levels 02 and 04 - Typical STA.! R IJP 1 011 -tc<— u / ELEVJ'.TIOH HIJ?,.1.BEN N'I te01 SHEET HUMBER REFEREH CE LABE L SEC.TIOI1 HUMBER SHEET HUMBER REFERENCE L DETAIL 11IJ}.r:BE F~ SHEET HUMBER MAGNETIC 11 ()RIF! PRO.IECT I!()RTFI R orn rI u rn e qtr C'1 1 V Eic-'(;)E: • : General Notes ELE}./'.TION f:.ARF` SECTIOI'I DETAII. ROOM HA!:r:E.IlIJ!Lr:BEF: A11.D CE 11.111C. FIN1*H CANB C YPS BOARD ACT AC..OUSTIC. CEII.IHC; TII.E EXP EXPOSED RA 'lI IG F:E YH()TE C)(.)F2 TAG, H ORTFI AF;F;C)W E E\ /'.TI()H MAFF: HEW CONSTF2UCTK)11 EXIS TIN C. C'C.11 STF:IJCTION DEMOLITION OF: R E TWO HOUR FIRE RJ'.TIHC? A. AI.1. DIE,i.E1'1 SIOI'IS ARE TO THE FINIS FIE !TI FAC:E OF S UR FACES UH L ESN OTHER'A' I3E 11 ()TED f YPICA.I. I. EVE!. UP PE FtiII.Oih'E F2 TYP ICAI. I.EVEI. B. TFIE C•OH TRACTOR IS HOT T() SCALE FR. Api IHuS CSP. i ETAII.S. 1.•ir. I' JP STAIR 3 DH L - -J IIJP J4_111 t ELEV ATOR LOBBY C',WB � I STAIR IJP UPPERII.OiI5'EF: TYPICAI. I.EVEI. --I-- TYPICA.I. I.EV EI. 1 Levels 01, 03, and 05 - Typical 3r7.. 1.•;r. LI C. TFIE C:OH TRACTOR 1.iFIAI.1. BE RESP0I1 SIBL E FOR THE P F:()TECTIO11 OF ALL C. )11 DI11OI1 S AIS F7 M -ATE F;IAL 'INITF1111 THE PR(.)PC.)SEic COI1 STF:IJCTIOH AREA. TH E k.OHTRACTOF.' S hHAI.I. DESIGN AJ1D 111 STALL ADEQUATE SF1OP.IHC. AHD BRJ'.CIHG FOR STRUCTIJF2AI. OR R EO•rA1. FA y.S. D. TFIE CON TF:AC ..TQR SHAI.1. PE RFOF:?,?. ALL C.:IJTTI I'IG. PATC1-11 NC- RE PAIRING: A_S R EQIJIREi T() P ER FC)Rrti 1'.1.1. OF THE WOR F 111DE.-...ATED OH THE E. S EAL J'.I.L FLOOR. WALL LII! C. EII. IHC, P EH ETRJ'.TIO11S AN A F.ESIJL T OF J'.N 1 ;J1'ORK �LSS C .:IATE. MTh! THIS P ROJEC :T T() f:AAIHTAIH R. TII ICS . H ()TIF Y 'NH E F 'S R EP F:E E11 TATIV E OF J'.I1•Y 1.II1 PF:OTECTEi PEN ETRJ'.TIO11S F FOL: PR E•k.IC It CORS TF;UCTK)H. ?�.J'.II1TJ'.II I FIRE RATING'S AT WAI.I.S AND SE BAF;F;IERN AT AI.I. TIMES. F. P F;()'L! IME 11 !TU!&:ES C.EI'IT PAINT ()Il ALL H FRA!:r:11'IC, SIJ PP()F:TINC TFIE F;(.X)F AT TH E EQIJIPw.EHT F:(X)F FIAfl-'H.C(.X.)REIIlATE WITH C'(..))E II1F()Rrr:AFIOI1 FOR FEQUIREry RATIN G. C.. TEMPC)F;AF.'Y SAFEC,IJAF•nS III C.OMPI.IAI10E WITH ()SFIA STA.FI AREN J'.P.E 10 BE PR()VIMED ::]URTHE EY.ECUTIOI1 OF AI.I. SC(.)PED WC)F:F'. I.E.. R()(.)F FJ'.I.I. PROTECTION H. REF ET; TO THE FI.4LE.2.LR 7C)IJS MATERIJ'.I.S REPOFT IHCI.IJF.3Ei) IH TFIE SPECIFICATIOH P .CI /•.C,E FP OHT• END r) -..)C UMEI1 TS FOR F1.6Lr A.F; <)IJS P.ATER IHFOR! ),ATI0I1. IF ASBESTOS C)F: C.)TFIE R S US PECT ?,?.ATE RIALS AR E EH C.OU HTE RE D. CEASE 0PERATF:)I'I S IE,e'.!!:EDIATEL Y AND H OTIF Y TFIE ()WH E R. F;EFEF2EHC E THE FIA AJz, Y)IJi !:r:r .TEF2IAI. F7 RA II I GS FOR ASBEST()5 J'.BATEMEHT HC}TES. aETAILS J'.HD F;EC .JIP.EMEHF Code Information APPI.ICJ'.BI. E BUIL DING C..O.)E: • r:iI ; HEW YORE' STATE IJI1IFOR!Lk: BUILDING CC)DE USE AH. OCC UPJ'.H CY CLASS1FICAT • R RESIDEHTIAI.: DORM! CI.ASSIFICA.TIO11 OF 'NOR F: • ALTERATION LEVI L FIFE RESISTANCE EATING', REOIJIF:EMEHTS FOR EXISTII1(7 BUILDING EI.EMEHT CTABI.E (,:)1. IBS: 2:i15) • EXTERIOR All D INTER FDP. LFIG WALLS: 2 FIOURS • INTER IC I'10H 1.0A D•B EAF:IN C '*r LL L S: HO RJ'.TIH • ROOF SIJPPC.)RTINC; 1RA}.r:111G: 1 HC)IJF • FI.O RS: 2 HOUR • ROOF: 1 HOIJF2 o Architectural 3G3 fl•JI:{•;1. 51 :.•':a... }-_ r• 7L•••. 1 =1 :s i•k::: ':.C., ..- r Resources i••1 i ENGliNEEP K $II..:•: (..':1'77 IM '1:•:1[ 2f. h.•11•r.7•w (..r.:7:A%I.;.1 ",r.:rrr• .•:a4,r :.}a:}:r •:}::. !S:.i: •}• L.{ K1•. � At RYAN BIGGS CLARK DAMS 4592 Jc'ti1..r1P;-:.7_: Sk..r�c arf,ic=s F..:iS. H•Y 13153 31.E L•`'5'5 4,':i �h„ •yam �.Y $ iEi He:<r;: {I? R { Err:M. i. 11c}•k'Y•::ik 1'?•11;i Ff?i: 6v7.2.31.:'1M;iO F..1x.: •5::.;.7.2. 1 .6:551 5'1'' 1::'-k...W.-.;:{}!ti.1.f,ti:S.t..:rr: z 0 f 0 Zic Illi CD L E CD C ') IV SCriA k 44.1 y 1 ' 1 •. — r }rt5DB1 • 40 Issued for Bid 11.18.2016 F.'0Vi5!:2r:'• 11.:•. r ..:rt.:!!..r•: D•:a-fe General Overall PIa171 B.)S_!•: Ii! :: 1.{}....f.; T: -:!\:•i:•:.'-: I f, . c+! (iF. A r .I.:;~ Hc:: it •i.(i C:L...:.` H..: ml:...........!.: ?:.r: RPS 4r r! (+1 11.r: G.101 R B fi L 1 1 L MECHANICAL ROOM ENMIHC 11 ROOF HATCFI A BOV E STAI PENTHOUSE ACCESS L— LOBBY 4."4.r.• UP ELEVA.TO R OVER H EAD Level 07 - Mechanical UPPER MECHANICAL ROOM >.< STAIR UP I.IHE R(1'..)F EL(.X L TER RACE KITCHEN DIA Ur RESTROOM COAT ROOM I-:•-•.•-•• STAIR TER RACE HALL HOUSE LOUNGE CWB TERRAC E ELEVATOR LOBBY ;i5'13 I.IHE Cf ROOF BELY JANITOR CtOSET 1 TE R'RACE ESTROOM I 71H—> I • 11 UP TER'RAC E HALL_ STAIR r UPPER LOUNGE 1..1+i7)1•1>` TER RACE TER'RAC E Level 06 - Lounge LEVEL UPPERf1.0:PiER. 3:37 _J_ —1— I.IHE BEI.();/5' EXISTING', ROOF FIATCFI T PENTHOUSE Aft ROOF CUR B Level 08 - Penthouse - '•::!!" MECF1.6..111C.A.I. P Ell TFI.:DWE 968' • 1 114" 966' • UP PE R I.EV El. IJPPER LEVEL (i5 STAIR UP PE R LEV El. I.OvEF I. EVEI. IJPPER LEVEL 1.1'..)'NEE.' LEVEL f..i3 UPPER LEV El. Ij I.OvEF I. EVEL 4.4 STAIR 1.1PP (i 1 (i I UP PE R LEV I. I.OvEF I.EVEI. ELEVATOR ELEVATOR 41-1 Building Section ELEVATOR PIT U PPER (POU N LE 1E1. UP PER E .EMEIIF LEVEL 1.•froW • 9.5T • 5 114" 939' • 2 •N ra. 924' • ef.• .518- 911' • 89T • 1::j 884' • ef.• .518- 8.71'• 2•Nig' • L+)••ec..i FAT • • 2' %-jiir — o Architectural f:C•5 ry.11::•;1. 1 :.•':a... IL•r•• 7...••••• I ].., 'rit,s' iNk::: 1?.(:., ‘‘(:— ::16 ;JKi .....e.6 ';' 5 •'_•'Z';•i r Resources l...io:•1 be ....... . •.: :••:••••.::•::: lg.! W:iiiii,R.:••••:;:ir, Titiunx -y „ • . ii ...... ENGiNEERiNG 0..2,(......:71.....:•:.:-...h......z.:.v... ( .:•.:1:A %pie. ne.: r.,..• L'elXv '..12:}:0 •:.}::1 !nn 1 : .}.....{..{1.. N:!:... • • • .e.• f•Whir All; RYAil BIGGS CLARK DAVIS ,.., ,..,,,...... 4392P.:7. -:.1:i IA::::ne-uF•!?ic+s Fciis. IIT 1315S' 7i1 .5 e.8 5 AL' 55'. rfl n'e,. .„ , k . • . „•,:x. „ 17 :••::.4: :: :.....•.:•:•:.: •••••:•.•:••.: . .4. ... .... :4:: •••.•:•:::..::••• ••••:•.::•:. 84.C; F14.X.:PElf R Err:M.6i. 11 r:•'4. '1'•:.'i k 1 l'•!?i'. &IF1.231.64.!:;:•7; F.: 7.2I .MI E••-ri:.'W. r:•:.': Wc+l:.: •-woee.:.loi!•::)-fec.:s.:cr: W'.: R co -4- _V z u 0 F e 5 d__% 1 == == .i.:•. --mug um cri 0.1 a) o (Uf ..ir,......A --...., ...ta g...... ,,. , t,.-- ..or .. _. • SA - 44.1 t. - ..:1' • •IA i 1 ' 41:1 • d' 1 •S D BA • % R VrIttg. """. • • l . 40 Issued for Bid 11.18_2016 11.3. Level 08 - Penthouse - '•::!!" MECF1.6..111C.A.I. P Ell TFI.:DWE 968' • 1 114" 966' • UP PE R I.EV El. IJPPER LEVEL (i5 STAIR UP PE R LEV El. I.OvEF I. EVEI. IJPPER LEVEL 1.1'..)'NEE.' LEVEL f..i3 UPPER LEV El. Ij I.OvEF I. EVEL 4.4 STAIR 1.1PP (i 1 (i I UP PE R LEV I. I.OvEF I.EVEI. ELEVATOR ELEVATOR 41-1 Building Section ELEVATOR PIT U PPER (POU N LE 1E1. UP PER E .EMEIIF LEVEL 1.•froW • 9.5T • 5 114" 939' • 2 •N ra. 924' • ef.• .518- 911' • 89T • 1::j 884' • ef.• .518- 8.71'• 2•Nig' • L+)••ec..i FAT • • 2' %-jiir — o Architectural f:C•5 ry.11::•;1. 1 :.•':a... IL•r•• 7...••••• I ].., 'rit,s' iNk::: 1?.(:., ‘‘(:— ::16 ;JKi .....e.6 ';' 5 •'_•'Z';•i r Resources l...io:•1 be ....... . •.: :••:••••.::•::: lg.! W:iiiii,R.:••••:;:ir, Titiunx -y „ • . ii ...... ENGiNEERiNG 0..2,(......:71.....:•:.:-...h......z.:.v... ( .:•.:1:A %pie. ne.: r.,..• L'elXv '..12:}:0 •:.}::1 !nn 1 : .}.....{..{1.. N:!:... • • • .e.• f•Whir All; RYAil BIGGS CLARK DAVIS ,.., ,..,,,...... 4392P.:7. -:.1:i IA::::ne-uF•!?ic+s Fciis. IIT 1315S' 7i1 .5 e.8 5 AL' 55'. rfl n'e,. .„ , k . • . „•,:x. „ 17 :••::.4: :: :.....•.:•:•:.: •••••:•.•:••.: . .4. ... .... :4:: •••.•:•:::..::••• ••••:•.::•:. 84.C; F14.X.:PElf R Err:M.6i. 11 r:•'4. '1'•:.'i k 1 l'•!?i'. &IF1.231.64.!:;:•7; F.: 7.2I .MI E••-ri:.'W. r:•:.': Wc+l:.: •-woee.:.loi!•::)-fec.:s.:cr: W'.: R co -4- _V z u 0 0 = Zic iteli toll CD I. E CD > c = IV cri 0.1 a) o (Uf ..ir,......A --...., ...ta g...... ,,. , t,.-- ..or .. _. • SA - 44.1 t. - ..:1' • •IA i 1 ' 41:1 • d' 1 •S D BA • % R VrIttg. """. • • l . 40 Issued for Bid 11.18_2016 11.3. DEP:',..7!t::li::::r: D7.1F•fe General Overall Plan i.c,,,,qi cz, Lc+....E.! (i.... . ke:c,%7:i-,...ni:::•zy.. :..),•:..j ice.yei ck; • A !' .1:.-:!7: 11•:::: C:L.'•.:-:!' H •'. n :.......!.: ?:..,-: R RS I.irr!(+1 1: G.102 A L EXI ST ELEVATOR SH AFT 1 C8x11.5 CONC WALL REMOVAL EXIST 10" CDNC WALL PLAN AT ELEVATOR HMT SCALE: 1/4" = 1'-O" H RTES: 1. SEE 3/5101 FOR ELEVATI ON S. 2, SEE 5/S101 FOR OPENING IN EXISTING CON CRETE (SIM )_ 3. CIXDI DINATE OP EN INC SIZE AND LDC All ON WITH ARCHITECTURAL DRAWINGS. T/SLAB LOBBY AND idli APARTMENT LEVEL (856'-6 5/8"±) (4) 1./2'10 ADHESIVE ANCHORS MI N Ba EMBED EA END T/SLAB FOU NDA11ON AL AND BASEMENT LEVEL ($47P-811±) EXIST SLAB 311 r r 2 1 EXIST 4 CMU wALL EXIST 6" CONC SLAB (SLOPED SLAB MIN DEPTH 6") l H SSEN 4x 1 /4 x 16"LG 25.-5 1/2-± (4) LDC S DIST WALL CORNER 1/2"11 ADHESIVE ANCHOR MIN 6a EM BED AT 12'0C EXIST 8' CON SLAB CREINF NOT SHOWN) (2) L.5x4x5/16 (LLV) MASON R Y U NTEL 1'- L ELEVATION AT NEW OPENING SCALE; 1/2n = -CI PLAN DPNG SEE PLAN FOR SU P PLEM EN TAR Y FRAMING AT DPNG (N DT SHOWN) SECI1ON r CDRE DRILL AT CORNER (00 NOT HIT REINF) STEP 1: INSTALL SUPPLEMENTARY FRAMING. STEP 2: CORE DRILL EACH CORNER (6" MINIMUM DIAMETER). STEP 3: SAWCUT TO TANGENT OF COR ES, A N D DO NOT OVER CUT CORNERS. OPENING T EXISTING SLAB NOT TO SCALE EXIST REINF DAR 1 CBx11. - 3 SAWCUT ANO REMOVE EXIST CONC SLAB AT RDOF H4TCH (WHERE SH AD ED) AFTER STEEL 15 INSTALLED. SEE 5/S101 PLAN AT ELEVATOR SHAFT ROOF SCALE: 1/4" = 1'- 0" NOTES: 1. T/STEEL (B/SLAC) ELEVATION (9$5'-1 Q 5/6"±), 2. T/STEEL TO MATCH EXI SIT N C B /SLAB UNLESS NOTED OTHERwI5E. FIELD vERI FY. 3. SEE 5/5101 FOR OPEN INC I N EXI S 11 N G SLAB. 4. G00RDIN A TE OPENING SIZE AND LOCATIGN '111TH A RCHI TECTURAL DRAW NG 5. 5. SEE 7/9101 FDR C GN CRETE CURB AT ROOF HATCH. EXI ST 10" C ON C WALL INFILL wIT FI 10" CMU FULLY CR DU TED BETWEEN ELEVATOR FR AME AND EXIST CONC WALL AFTER FRAME IS I N PLACE (CONTRACTOR'S DP11ON TO USE CAST IN PLACE CON IN PLACE OF 10" CMU ) EXIST 5" SLAB ON GRADE SAWCUT AND REM DVE EXIST CON C WALL AFTER CHANNEL HAS BEEN INSTALLED DU TLI N E OF ELEVATOR ENTRANCE FRAME L.3):3 x1 /4 GALv W/ 1 /2µ0 EXP BOLT AT 2'-011 DC EXIST 1D" CO1t-iIi 1/2'. COMPRESSIBLE Fl LL 2 1 ABBREVIATIONS LEGEND ADDL - ADDITIONAL AD J - ADJACENT L - AN CLE APPROx - PPROxIMATE ARCH - ARCHITECT RCHITECIIJRAL - BOTTOM OF - BUILDING - BEARING - BASE PLATE - CANI1LEVER - CONTROL, CCN TRACTION, CONSTRUCTION JOINT - CEN TERLINE - CONCRETE MIP( UNITS(S) - CON CRETE - CONTINUOUS - COLUMN - COLD -FORMED METAL FRAMI N G - CORE}I N ATE - DIAMETER - DIMENSION - DOWN - DITTO - DRAWN G - EACH - EACH FACE - EXPANSION LJDINT - ELECTRICAL - ELEVATION - ELEvATDF - ENGINEER - EMBEDDED - EOU AL - EDU IPM ENT - EACH SIDE - EACH WAY - EXISTING - EXPANSION B/ BLD G BRG BP CANT C,J CMU CONC CONT COL CFM F COIRD 0 DIM DN do O EA EF EJ ELEC EL ELE v EN GR EM BD E0 EQUIP ES EW EXIST EXP EXT - EXTERIOR EGO - EDGE OF DECK E05 - EDGE OF SLAB FD - FLOOR O R AI N FON - FOUNDATION FTG - FOOTING GA - GAUGE GALV - GALVANIZED HSS - HOLLOW STEEL SECTION HDRIZ - HORIZONTAL HI - HIGH HP - HIGH POINT HVAC - HEATING/EEN11LA11NG/ AIR CONDITIONING INFO - INFORMATION INT - INTERIOR INV - INVERT K - KIPS LO - LONG LLH - LONG LEG HGRIZITIL LLV - LONG LEG VERTICAL LOC - LOCATION LW - LIMIT WEIGHT LVL - LAM INATED VEN EER LUMBER LO - LOW MANUF- MANUFACTURER MAX MECH MIN MI SC MO NA N IC N OM Nw 00 DD OP N OPP F. - i++l A XIMUM - MECHANI CAL - MINIMUM - MI SCELLANEC4J - MASONRY OPENING - NOT APPLICABLE - NOT IN CONTRACT - NOMINAL - N OR IAL WEIGHT - ON CENTER - DU TSI DE DIAMETER - OPENING - OPPOSITE - PLATE PELF - POWDER -ACTUATED FA STEN EFS PE - PROFESSICNAL ENGINEER PERP -PERPENDICULAR PLF - POUNDS PER UNEAL FORT PSF - POUNDS PER SQUARE FOOT P51 - POUNDS PER SQUARE INCH PCF - POUND PER CUBIC FOOT PC -PRECAST PSL - PARALLEL STRAND LUM8 ER PT - PRESSI_JR E TREATED R - RADIUS RD - ROOF DRAI N RDP - REGISTERED DESIGN PROFESSI DNA L READ - REQUIRED REINF - REINFORCING OR REINFORCED REV - REVISION OR REVISED R0 - RCU GH OPENING SI M - SIMILAR SPA - SPACE STD - STAN DAR D SF - SOUARE FEET S5 -STAINLESS STEEL 5Th - STEEL 50 - SQUARE T/ - TOP OF TYP - TYPICAL UN - UNLESS NOTED OTHERWISE VERT - VERTICAL 511 F - VERIFY IN F1 ELD w/ - w1 TH wP - WORK POINT wwR -' ELM WE RE]NFCRCEIIENT J - WALL CONTROL CR CONSTRUCTION JOINT EXIST SLOPED CONC SLAB (IR EINF NOT SH OWN ) CONNECTION ANGLE EA SIDE OF BEAM SHIM T1GHT TO UNDERSIDE OF EXIST SLAB 9Tf REMO VE EXIST CMU AT NEW HSS POCKET_ AFTER HSS HAS BEEN PLACED REPOINT AROUND HES INFILL EXIST 4" CM U (1 } #4 EACH SIDE VERT R EINF ELEVATOR ENTRANCE FRAM E SEALANT ON EXPOSED 51 DES 11 HSS8x4x1/4 x 16 LG W/ 1/4n END It EA END. BUILD 11GHT TO DIST MASONRY EXIST BRICK BEAM BEARING IN MASONRY WALL SCALE: .3/4" = 1-0" CON C CURB (1).#4 CONT . d #4 AT 1'-O"Cx DRILL AND ADHESIVE ANCHOR 4 INTO EXIST SLAB • .i SAWCUT AND REMOVE EXIST 5L45 AT NEW ROOF HATCH. SEE 2/5101 AND 5/S101 EXIST 6" MIN THICKNESS SLAB, SLOPED R EINF NOT SH OUITll N OTE: AT CURB CORNERS 2•-p" PROVIDE m#4 CORNER BAR 3 f SEE PLAN { CHAMFER CORNER T/CURES (SEE ARCH DW+S) T/DIST SLAC (VAR IES) 1 til DESIGN DATA NOTES 1. GEN ER AL: D ESI PRO VISIONS ................. ' ' ' ' ' ... 18 H EAI YORK STATE UNIFORM CODE N YSU RISK CATEGORY......................................................................................II TERRIIN/ExPOSURE CATEGORY' " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " B 2. U VE LOADS: FLOORS AND ROOFS H AVE BEEN DESIGNED TO SUP PORT THE UNIFORMLY DISTRI B U TED LIVE LO AD NOTED BEL w, UNIFORMLY DISTRIBUTED LIVE LOADS: ROOF: UNI FORM GROUND SNOW LOAD (F) 40 psf UNIFORM FLAT -ROOF SNOW LOAD (P f)....... .............. 28 psf SNOW EXPOSURE FACTOR (ce) ........................................................... 1 THERMAL FACTORO O .. 1 IMPORTANCE FACTOR (I s)................................................................. 1 (DRIFTED, U N 8 ALANCED, AND SLOPED- ROOF SLIDING SNOW I N ACCORDANCE WITH AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE) STANDARD 7-10.) FLOORS: (CORRIDORS/LOBBIES)..............................................................100 psf APARTIENTS........................................................................0 psf 3. DEAD LOAD: RDCF; (PENTHOUSE ELEVATOR EQUIPMENT RDCF) .......................................... 0 psf FLOORS; (LOBBY LEVEL)......................................................................115 psf PORTON OF ABOVE DEAD LOAD CONSIDERED FOR MECHANICAL EQUIPMENT AND PIPI N G SUSPENDED FROM 5TRUCTU RAL FRAMING: RDDF:..............................................................................................6 psf FLOORS: ............. .10 psf (CONCENTRATED LOADS SHALL BE UMITED TO THOSE WHICH INDUCE MOMENTS AND SHEARS IN MEMBERS NOT GREATER THAN THOSE INDUCED BY THE NOTED UNIFORMLY D ISTRI BU TED LOADS.) 4. STRU C TU R LL M ATERI .L STRENGTHS: STRU C TU R LL AN D MI5CELLAN EDU S STEEL ROLLED STEEL W SHAPES................................ASTM A 992 ROLLED STEEL C SHAPES ................................ASTM A 36, OR ASTM A 572, GRADE 50. ROLLED STEEL PLATES AND ANGLES ....................ASTM A 36, OR ASTM A 572, GRADE 50. HOLLOW STRUCTURAL SECTIONS (HSS ASTM A 500, GRADE E OR C FOR CONNECTIONS, PROVIDE HIGHER GRADE AS REQUIRED FOR CAPACITY, CON CRETE; CURBS............................................................................ f . = 3, 500 psi PERCENT ENTRAINED AIR.................................................4.5 (± 1,5) MASONRY: CONCRETE BLOCK: ......... ................ STM C 90, WITH AvERAGE NET COMPRESSIvE STRENGTH OF 2,000 psi_ MORTAR: ..................................... ASTM C 270, TYPE S. UNIT MASONRY:......... ............... ASTM C '9Q CH U (2,0N psi) AND TYPE 5 MORT' f rn = 2,000 psi.. GROUT:.............. ..... ........... ..... ASTM C 476, COMPRESSIVE STRENGTH OF 2,500 pei, 8 TO 11 -INCH SLUMP_ REINFORCING STEEL FOR MASONRY;......................................ASTM A 615, GRADE 80 GENERAL NOTES 1. DIMENSIONS TD, OF, AND IN EXISI1NG STR UC11JRE SHALL BE VERIFIED IN FIELD BY CONTRACTOR. 2. D0 NOT SCALE DRAW! NGS. CONTRACTOR SHALL NOTIFY ENGINEER OF ANY DISCREPANCIES IN DI M EN SI ON S BETWEEN EXISTING CON D Ill ON S AND /OR ARCH ITECTU R At DRAWINGS A N D THE STRUCTURAL DRAWINGS_ 3. DO NOT CHANGE SIZE CR SPACING OF STRUCTURAL ELEMENTS. 4. DETAILS SHOWN ARE TYPICAL. SIM ILAR DETAILS APPLY TO SIMILAR CONDITION UNLESS OTHERti.1SE INDICATED. 5. THE NOTES ON THIS DRAW N C ARE TYPI CAL U N LESS OTHERWISE INDICATED_ 5. CON TRACTOR SH ALL N O11 FY THE ENGIN EER I N WI TING OF PROPOSED O EVI ATIONS OR SUDSTT TU TIONS FROM DI MENSION SF M ATERIALS, OR ECU IPM EN T SHOWN ON THE DRAw1 N CS ANO MAKE ONLY THOSE DEVIATI ON5 OR SUBSTITlJT1ONS ACCEPTED BY ENGINEER. 7. THESE DRAWINGS DO NOT INCLUDE NECESSARY COMPONENTS FOR CONSTRUCTION SAFETY. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR CONSTRUCTION SAFETY. 8. REFER TO H A ZARO DU S M ATER I ALS REPORTS I N CLU EEO IN THE SP ECIFI C All ON P ACK AGE FRONT-END DOCUMENTS FCR HAZAR D0&J5 MATERIALS INFORM ATI DN. IF ASBESTOS OR OTH ER SUSPECT MATERIALS ARE ENCOUNTERED,. CEASE OP ER ATI ON S IMM EDI ATELY AND NOTIFY THE OWNER_ REFERENCE THE H AZARD DU S MATERIAL D R A 1 N GS FOR ASBESTOS ABATEMENT N DIES, DETAILS ANO RECUI REM EN TS. MASONRY NOTES 1. FILL BEAM POCKETS 1 TH MASONRY AFTER BEAM 1 S ERECTED_ CAST IN PLACE CONICRETE NOTES 1. CAST CONCRETE ON SLOPED SURFACES BEGINNING AT LOWEST ELEVATION AND CONTINUING MONOUTHICALLY TOWARD HIGHER ELEVA11DNS UNTIL INTENDED POUR IS COMPLETED_ LINTEL NOTES 1. WELD TDGETH ER BACK-TO-BACK U N TELS, M AXI Ni U M WELD SPACING SH ALL NOT EXCEED 18 INCHES ON CEN TER, 2. E EAR LINTELS A M INI MU M OF 8 INCHES EACH END UNLESS N OTEO OTH ER MI SE, 3. U N TELS FOR ELEVATOR DOORS ARE SI ZED FOR THE O D0R OPENING AND ASS1JM E TH E D DDR WILL B E IN STALLED WHILE THE WALLS ARE BUILT. I F THE CON TRACTOR CHOOSES TO LE AVE A LAR GER WALL OPENING TO A CCDM M DO A TE ELEVATOR I NSTALLAII ON, TH E U N TEL MUST BE REDESIGNED_ CONTRACTOR SH ALL SUFlM IT PROP DSED NEVI SECS LINTEL FOR REVIEW PRICK TO CONSTRUCTION. STRUCTURAL AL STEEL NOS 1. CONNECTION DESIGN BY FABRICATOR WILL BE SUBJECT TO REVIEW BY ENGINEER. USE MINIMUM OF FOUR 3/4 -INCH -DIAMETER A.325 IBOLTS_ 2. DO NOT PLACE HOLES THROUGH STRUCTURAL STEEL MEMBERS EXCEPT AS SHOWN AND DETAILED DN STRUCTURAL DRAWINGS, 3. STEEL BEAMS BEARING ON MASONRY SHALL HAvE A MINIMUM OF 4 INCHES OF BEARING, PRO VIDE BEARING PLATES 1111 TH WALL ANCHORS U N LESS NOTED OTHERWISE. 4. WHERE FILLET WELD SIZES ARE NOT SPECIFICALLY NOTED, THE FABRICATOR SH ALL D ETAI L A MINIMUM SIZE FILLET WELD IN ACCORDANCE WITH AWS STANDARDS. THE ACTUAL SIZES SH ALL EE SH OWN ON THE SHOP DRAWN G5, STRUCTURAL AL OeSERVAT1ON NOTES 1. THE REGISTERED DESIGN PROFESSIONAL WILL MAKE VISITS TO THE SITE AT APPROPRIATE INTERVALS FOR 11 -IE PURRDSE OF OBSERVING THE CONSTRUCTION FOR GENERAL C ON FDRM.!NCE KITH THE CONTRACT DOCUMENTS_ THE FOLLOW NG UST I N C LUDES SOM E AP PROPRIITE 11 ICED FOR VI SI TING THE SITE. THE CONTACTOR SH ALL NO11 FY TH E R ECI STERED DESI ON PROFESSIONAL AT LEAST 43 H DU RS PRIOR TD PERFORM INC THESE ACTIVITIES 50 THAT SITE VISITS CAN BE SCHEDU LED, - I N I T1 AL ERECT ON OF STRU C TUR AL STEEL. - INITIAL PLACEMENT OF REINFORCING BARS AND GROUTING OF CDNCRETE MASONRY WALLS. - OTHER TIMES AS REQUIRED DUE TD FIELD CONDITIONS OR SPECIAL CONSTRUCTION TYPES. 2. THE REGISTERED DESIGN PROFESSIONAL MAY VISIT THE SITE AT TIMES OTHER THAN THOSE LISTED IN NOTE 1. 3. THE R EGISTERED DESI GN PROFESSIONAL VC_ PREPARE A Fl ELS) OBSERVATION REPORT FOR EACH SITE vl SI T M A DE TO DBSER VE CONSTRUCTION. P ART II OF E ACH REPORT 15 FOR CON TRACTOR VERI Fl CATION AN D 1 S MANDATORY. PART II MU ST B E C OMPLETED (SIGNED BY THE CONTRACTOR VERIFYING THAT THE REQUIRED ACTION WAS TAKEN AN D USTI NG THE DATE COMPLETED) IND RETURNED TO THE ENGINEER IN A TIMELY MANNER. til Arthitectored '111': : .!I:)I:,'+Ita.Yrhi .Yjti :,+=:Ilam':t•' }.V., IS 0 :%: 1 '::, 1:71• r:I :•1 . hL'Jt' 1 3 : lty: ei UMI} ENC:KEEIZ:NC. •Zicama. C^, 1. :1,:,// RYAN Re i ; 'ncefr+ •_ mD7i. nanrw}vw•y.n, BIGGS CLARK -1.. }I:FFYI'J11 .4592 r{::c:i.,:;!C; :::K.Y.:k :1:?\'.... fl•ti :.:?- E?'::.1' Y4.' !. Wm.' F::467.231.60:3:i F;}iG: 6C7.23 E?i1L7..: ?: .:!1:;,.0!;)•c=.•:n,t:Cc?I 45i•!'+b: fr7r`h'.:•!'':l„•{-.',:1.::.,?:7 J..I:.1:Dr: :.Y F;}S. 2.15 r ;.n:er: Y::iS 13:J,'(i I .40.'i o 0D 0 L 0 DAVIS R %IIYa-114K R.:Y.7.j 1•dY 13'153 OS 4732 :.!?..1.;!.''''.:',...:'.:':' 1 2 • ki 0 Z'a0 411 44 ICI) S'•••.7j Issued 11.18.2016 RI? rtisf•:s 1. 0 dil 0 r ri 1%-1. 1c_.4'- • ti .. 'ICL! 'f •. - L' � •• 1/� Al gill, for Bid IA::::. C'i::f;:?it:?i :`:}•:li{} Structural Design Data, General Notes. Partial PIcinls, and Details A..1!.. Jt:r I1 : .564.:::.5 (.1.1r:! F.J: ) I L:l'rY•: }'r'..: R -S S':C ,!'1•!:: Smg10 1 1 • C • 5 A PENTHOUSE ROO FI ABATEMENT PLAN SEALE:114' = L' -D'' I.J1' 41.41 • 441 ExIS11N4 FLAcP GP -ATE VI • • 41. .0741, 41 PENTHOUSE ELEVATOR MACHINE ROOM ABATEMENT PLAN SCALE1111' = L I 1 ELEVATOR LOBBY A 1 C = _ = C — --= 1 ELEVATOR #2 1 C==== C— —= 1 ELEVATOR #1 C C P FLOORS 1 THROUGH 6 ABATEMENT PLAN MP.} K1d1.E11/4' = • ELEVATOR LOBBY 1 ==— = =—== 1 ELEVATOR #2 1 C=—== C= —= 1 ELEVATOR #1 GROUND FLOOR ABATEMENT PLAN SCALE1]1kl = 7r -rye 1 ELEVATOR LOBBY C = = = = = — = ELEVATOR ELEVATOR #1 STGR ,AGE BASEMENT ABATEMENT PLAN SCOLE11/4' = 1'-1Y _L _L 4 ASBESTOS ABATEMENT NOTES: 1. THE NOTES AND DETAILS PRESENTED HERE AND INCLUDED IN SPEC I Fl CATIO N SECTION 028213 A E APPLICABLE TO DRAWING AR -101. 2, THE CONTRACTOR SHALL PERFORM ALL CONTRACT 'WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS, AS H ESTOS ABATEMENT OPERATIONS SHALL BE PERFORMED AS PER THE PROvISIONS IND CONDITIONS USTED IN THE NEW YORK STATE DEPARTMENT OF LABOR (NYS DOL) INDUSTRIAL CODE RULE NO, .55 (CITED AS 12 NYCRR PART 5 C) AND ALL APPLICABLE STATE, FEDERAL AND LOCAL CODES, 3. ASBESTOS CONTAINING AND ASBESTOS CONTAMINATED MATERIALS TO BE REMOVED SHALL INCLUDE THE FOLLOWING: A. ASBESTOS—CORED ELEVATOR HOISTWAY DOOR SLABS: REMOVE .30 (CITO ASBESTOS CORED ELEVATOR HOISTWAY DOOR SLABS { 405 Sc UARE FEET TOTAL) FROM 1 THE BASEMENT LEVEL THROUGH THE IT -I FLOOR LEVEL HO ISTWAY DOOR SLAB ABATEMENT OPERATIONS SHALL BE PER FORMED AS PER THE REQUIREMENTS OF 12 I fYC F! R PART 56 AND THE CORNELL UNIVERSITY CAMPUS—WIDE VAR LANCE FILE NO.. 14-0035 INCLUDED IN ATTACHMENT A OF SPECIFICATION SEC11ON 028.213. B. ASBESTOS—CORED ELEVATOR CAB DOOR SLABS: REMOVE 4 (CITY) ASBESTOS CORED ELEVATOR CAB DOOR SLABS (54 SF TOTAL) FROM THE TWO ELEVATOR CABS, MOVE THE GIVEN ELEVATOR CAB T3 ITS LOWEST ACCESSIBLE FLOOR FOR REMOVAL WORK. CAB DOOR SLAB ABATEMENT OPERATIONS SHALL BE PERFORMED AS PER THE REOUIREMENTS OF 12 NYCRR PART 56 AND THE CORNELL UNIVERSITY CAMP US—WIDE VARIANCE FILE NO. 14— DG35 INCLUDED IN ATTACH TVI ENT A DF SPECIFICATION SECTION 028213. C. ASBESTOS CONTAINING FLOOR TILE (VAT) : REMOVE APPROXIMATELY 7.5 SO UARE FEET OF VAT FROM THE ,BAS EM ENT LEVEL ELEVATOR LOBBY AT THE NEW ELEVATOR OPENING LOCATION, REMOVAL AREA SHALL BE 1.5 TILES OUT FROM THE WALL BY 5' WIDE, CENTERED ON NEW OPENING AND REMOVED TO NEAREST FULL TILE ON EACH END CIF 5' LIMIT. VAT REMOVAL SHALL BE PERFORMED IN MINOR—PROJECT NEGATIVE PRESSURE TENT WORK AREA HAVING AN ATTACHED AIRLOCK FOR ACCESS/EGRESS AS PER THE REQUIREMENTS OF 12 NYCRR PART 56-11.3 FOR MINOR ASBESTOS PROJECTS. D. ASSUMED ASBESTOS CONTAINING WIRE WRAP AND TPI NSITE CONTACT DISCS: REMOVE APRROXIMATELY 40 SQUAME FEET DF "ASSUMED" ASBESTOS CONTAINING WIRE WRAP AND TRAN5ITE CONTACT DISCS FROM THE EIGHT (8) CONTROL RANEL/MDT°RJTRANSFGRMER/ SWITCH GEAR UNITS LOCATED IN THE PENTHOUSE LEVEL ELEVATOR MACHINE ROOM 1ESTIMATED 5 SF FOR EACH DF THE B UNITS). REMOVAL SHALL BE PERFORMED IN A SMALL—PROJECT NEGATIVE PRESSURE TENT WORK AREA HAVING AN ATTACHED AIRLOCK FOR ACCESS/EGRESS WITH A REMOTE DECONTAMINATION UNIT BEING UTI UZED AS PER THE REOUIREMENTS OF 12 NYCRR PART 56. E. ASSUMED ASBESTOS CONTAINING BRAKE SHOES: REMOVE APPROXIMATELY 4 SQUARE FEET OF -ASSUMED" ASBESTOS CONTAINING BRAKE SHOES FROM THE 2 ELEVATOR MOTOR UNITS LOCATED IN THE PENTHOUSE LEVEL ELEVATOR MACHINE ROOM. REMOVAL SHALL BE PERFORMED IN THE SAME SMALL—PROJECT NEGATIVE PRESSURE TENT WORK AREA REFERENCED IN ITEM D ABOVE AS PER THE REQUIREMENTS OF 12 NYC P R PART 56, F. ASBESTOS CONTAIN INC CAULK: REMOVE APR RO x I MATELY 1 SQUARE FORT OF E xTERI DR i S B ESTOS CONTAINING CAULK PRESENT AROUND THE PERIMETER' OF THE WEST WALL LOUVER. REMOVAL LOUVER ITSELF AS NECESSARY TO ASSURE COMPLETE CAULK REMOVAL, CAULK REMOVAL SHALL BE PERFORMED AS PER THE REQUIREMENTS OF 12 NYC RR PART 56-11.1 FOR IN—PLANT OPERATIONS. C. H. ASSUMED ASBESTOS CONTAINING ASPHALT—RASED ROOFING MATERIALS: REMOVE APPROXIMATELY 45 SO UARE 1- EE I OF ASSUMED ASBESTOS CONTAINING ROOFING MATERIALS FROM THE PENTHOUSE ROOF AS NECESSARY FOR THE INSTALLATION OF THE NEW EOUIP6IENT ROOF HATCH. ASSUMED ASBESTOS ROOFING MATERIALS INCLUDE FELT—PAPER FACING ON ISO—BADRD AND ROOF DECK VAPOR BARRIER. R 4FING REMOVAL SHALL BE PERFORMED AS PER THE REQUIREMENTS DF 12 NYCRR PART 56-11.1 FOR IN—PLANT OPERATIONS. 4. THE CONTRACTOR SHALL SUBMIT A WRITTEN WORK PLAN FOR ASBESTOS ABATEMENT OPERATIONS FOR REVIEW AND APPROVAL AS PER THE REQUIREMENTS OF SPECIFICATIONS SECTION 028213, 1.5. 5, THE CONTPACTO R SHALL COORDINATE THE SCHEDULED WORK WITH THE OWNER, OWNERS REPRESENTATIVE, AND ALL OTHER TRADES. ES. 6. THE CONTRACTOR SHALL MAINTAIN SECURITY IN EACH WORD AREA AND FOR THE OVERALL BUILDING AT ALL TIMES. 7_ THE LOCATION OF REMOTE DECONTAMINATION ENCLOSURE SYSTEMS, WASTE LI U MPSTERS, AND TRAILERS MUST BE APPROVED BY THE OWNER AND OWNERS REPRESENTATIVE PRIOR TO THE START OF THE PROJECT. B_ COORDINATE I-IDOK—UP OF WATER SCI URCElSERVICE FOR ABATEMENT WORK AND DECONTAMINATION PURPOSES WITH THE OWNER, PROVIDE AND UTILIZE AN ELECTRIC WATER HEATER FOR THE PROJECT. TEMPORARY WATER CONNECTIONS SHALL BE MADE BY THE CDNTITOR AND MAINTAINED IN A LEAK FREE STATE AT ALL TIMES. B. UNDER NO CIRCUMSTANCES SHALL CONTAMINATED LIOUIDS OR DEBRIS ENTER THE EXISTING SEWER SYSTEM_ ALL WASTEWATER SHALL BE FILTERED THROUGH A SYSTEM WITH AT LEAST 5,0 MICRON PARTICLE SIZE COLLECTION CAPABILITY', THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY WASTEiV TER PERMITS REQUIRED TD PERFORM HIS WORK UNDER THIS CONTRACT_ ANY COST ASSOCIATED WITH WASTE WATER PERMITS SHALL BE INCLUDED IN HIS BID. 10, ABATEMENT CONTRACTOR SHALL RECEIVE APPROVAL FOP EACH WORK AREA IED ON APM INSPECTION TO ASS U P E ALL OPENINGS AND PENETRATIONS HAVE BEEN SEALED R RO P ER LY AND ALL WORK AREA PREPARATION IS COMPLETE BEFORE ANY ABATEMENT IS UNDERTAKEN_ 11. PRE—CLEAN NON—MOVABLE ITEMS PRIOR TO ISOLATING/PROTECTING VIA CRITICAL BARRIER INSTALLATION. 12. ALL AIR MONITORING REQUIRED TD SATISFY THE REQUIREMENTS DF 12 NYCRR PART 56 SHALL BE P ER FO R MED BY A THIRD PARTY INDEPENDENT ENVIRONMENTAL CONSULTANT HIRED DIRECTLY BY THE OWNER. THE CONTRACTOR SHALL COORDI NATE WITH TI -IE THIRD PARTY CONSULTING FIRMS ONSITE ARM. AIR MONITORING AND ANALYSIS TO SATISFY OSHA REQUIREMENTS SHALL BE THE CONTRACTORS RESPONSIBILITY. LEGEND AND F EYE NOTES SYMBOL DESCRIPTION c1 -.11....1110.47•!.:.:e.: '.x.ti:-.: rr .. :?...x.:...::-.._%:' +l...k::....X :{./1 0 Sk•:.7•:::)!'d{_k ELEVATOR HO ISTWAY DOOR SLAB WITH ASBEST RE TO BE REMOVED — 30 DOORS / 405 SF r r.: •.:Y......!... r! :>:: Jr.•rze.. ...45- BIGGS ELEVATOR CAB DOOR SLAB WITH ASBESTOS CORE TO BE REMOVED — 4 DOORS / 54 SF L, ExTERIOR ASBESTOS CAULK FROM WALL LDL EP FRAME TO BE REMOVED — 1 SF CAULK ��� MEMS EDEATO BED R ECZ EDN IN I R I MATELY RD FELT PAPER FACING AND ROOF DECK vAPDR BARR TER BENEATH EPDM ........... lig:11:1:uc1 Rc.sr. 1::x•! !-46.• Y{{!: 1:17(4; 16: cr::.!1{ E6:)5 Y{r.i.: x•7o-So-.:11!x•nrx.{cr.. ELEVATOR CONTROL PANAEL/SWITCH G EAFVTP.ANSFDRM ER/ HIQTOR UNIT WITH ASSUMED ASBESTOS CONTAINING WIRE WRAP, TRANSITE CONTACT DISCS, AND/DR BRAKE SHOES TO 9E REMOVED — APPROXIMATELY SDUAR E FEE TOTAL irca ,- z 0 ASB ESTOS CONTAINING FLOOR TILE TO BE REMOVED — 7.5 SF 4 2' V 0' 1- 2' 3' 4' El- 12' 16 - GRAPHIC SCALD L/4' = til , 11,,,,. ...„....... Architectural }_'•^:. H_.. •rcr, :+i c.'. 1:'t--. 7:-.4.. !..k .err : I {l 1L -I!1;1•.`..,6:. '1?:..I:I:'!•'i':i:{' r Resources I L c1 -.11....1110.47•!.:.:e.: '.x.ti:-.: rr .. :?...x.:...::-.._%:' +l...k::....X :{./1 0 Sk•:.7•:::)!'d{_k ENC;NEER 7rkr.:•.'1"f1I RYAN CLARK -.:.1•.rrclr.:.n r r.: •.:Y......!... r! :>:: Jr.•rze.. ...45- BIGGS DAVIS •ue•:r• x.: ...7J. _IL.r.'.:!?: fy:r::x 1::::' . IIT 13153 :i 1 E. :orir} 4732 ATA ........... lig:11:1:uc1 Rc.sr. 1::x•! !-46.• Y{{!: 1:17(4; 16: cr::.!1{ E6:)5 Y{r.i.: x•7o-So-.:11!x•nrx.{cr.. irca ,- z 0 c `err' tell Clii E o 11, IA >. > C s rin a) 0 CD 0 ni7c:: 56 0 _ ,.. \ Sk • 1 _ {.1 I.. K 1 r N . sit '' ill PA 1I Issued for Bid 11.18.2016 Asbestos Abate Plans and N :3y} ar :•!?( !. 1.'» ': ! o1 1?:?::4:; me -it es !': I'{ -?:'?;:c: {= A : r .IC2?:. H::::: :,5d. r5 C.[•.'?!? HC2: :.'.5 :::: •a ': ?:.y. i .I' SN-[-!' H:.. ARAI k:• B fi L 3 A® KM --10"--ionommonowN „.„ f 1 f f l k f 1 f `k f f f k f f �f f r} f r f�i l UP rL 44 1... ■..I .......1 1......1 .......1 1......1 .......1 1......1 i.. ■. ■.1 UM EXISTIN C: FL':)OF CRATE • TYPICr2-.1. CI CI r- - UM • 38 Level 08 - Penthouse ELEVATO R LOBBY C:. 0 w ELEVATO R #2 m ELEVATOR #1 I Typical Level 01 to 06 1i,1 N 1'..':' P f J 1 ELEVATOR L0BB Y w KM I .4 1 ELEVAT Ea R nL 1I L- 7 ELEVATO R #1 19 Ground Level ELEVATOR LOB BY A5 EM C)PP m ELEVATOR EI.EVAT()R PIT - 19 LI ELEVATO R #1 EI.EVAT()R PIT 1114111 8..10%7 STO RAE Basement Level li.i" N 1 • 1 ELEVATOR LOBBY 43.71 � 33 = = = 1 Tr - EI ELEVATOR Athi EI.EVAT()R PIT L IFLI 32 ELEVATO R #1 Athi EI.EVAT()R PIT J STO RAE Basement Level - Demo EkISTINCAST IN PLACE COO CRETE 3 4 E :ISTINC PAINTED BRICK WALL ELEVATOR I f Typical Level Elevation 14- N 1'..'; EI.E1rAT()R II2. ax 1 12 r- -i L_ -_J 1 1 14 LJ I.5 3 EI.EW.T()R j 1 Ground Level Elevation EXISTING BEN CFI r() RE P:A111 EI.EVA.TC'R F2 EIST111C', P.2...111 FED CONCRETE EIS TING. BR ICI". ENIS TING~ TII.E 856 • LI fir$ TI o Architectural f:G3 fi 1:.;;I. S1 :•.:a... }=. r•• Y. ••. 1 =Y :s i•k::: ':.C., c- %... :{ii;:-: 16 ,5 ..'..6.6 :•'' } ? r Resources .i '_•_;O:' be I I '.---.-%-17-15 IS Miiiiipli.}:EN0iN G11..}•: (..':1'if lM .l:•:1[ 2r. -..:r.,..• .•:7Sv :.72:}:0 RYAN CLARK Sk..rlc arf?1C+S 6:7; He:<r;}C'r Ff?i: F::::)..: •:9:..;.7.231 E.. r:.} : r-:•:ii:l.,i(-::`•::1•G!..S..:.7.Ui A'il::'-k"fr.•f.:.10i!k.1.f,ti.1S....:rf: r} I 0 I Zic 1 / f f f f cf k \ ,. k L ti \. x k�I L %. f 1f 1 1 r r r f f WI ScriA 44.1 yF1 , }ISDBA • A IPA NI, Issued for Bid 11.18.2016 1 .3 FI..... r . ::r;.'•!.!..r•: 13 it ... ... I'{" I 13 ���•r1yJ1 Arc hite11ural EnIorr ed Plans Br); :fi[.r: i L1'fc2::.. 1 ze4c :.:.1 • Pfr..`ri.•tiise• A r .1:::•17:11•:.7 ti164.ii41 I3 .]..!•: ?:'•r: RPS f i i 1 ' I J - f f� f I LI-' I ELEVATOR I f Typical Level Elevation 14- N 1'..'; EI.E1rAT()R II2. ax 1 12 r- -i L_ -_J 1 1 14 LJ I.5 3 EI.EW.T()R j 1 Ground Level Elevation EXISTING BEN CFI r() RE P:A111 EI.EVA.TC'R F2 EIST111C', P.2...111 FED CONCRETE EIS TING. BR ICI". ENIS TING~ TII.E 856 • LI fir$ TI o Architectural f:G3 fi 1:.;;I. S1 :•.:a... }=. r•• Y. ••. 1 =Y :s i•k::: ':.C., c- %... :{ii;:-: 16 ,5 ..'..6.6 :•'' } ? r Resources .i '_•_;O:' be '0 IS Miiiiipli.}:EN0iN G11..}•: (..':1'if lM .l:•:1[ 2r. -..:r.,..• .•:7Sv :.72:}:0 RYAN CLARK Sk..rlc arf?1C+S 6:7; He:<r;}C'r Ff?i: F::::)..: •:9:..;.7.231 E.. r:.} : r-:•:ii:l.,i(-::`•::1•G!..S..:.7.Ui A'il::'-k"fr.•f.:.10i!k.1.f,ti.1S....:rf: ER.NK h..11 }.;.w f..r.:1:A%pie. •:}::. 15:11: .}•L•{ K1•. BIGGS DAMS 4352. Jc• tip;::: R; -:.7-i F..:iS. N•Y 1315.3 31:1 LY}.} 4:' 2 R { 2.31.LI . ; .6651 I 0 Zic 1 1 WI ScriA 44.1 yF1 , }ISDBA • A IPA NI, Issued for Bid 11.18.2016 R{}•r !};::-:, FI..... r . ::r;.'•!.!..r•: D•:a-fe ... ... 13 Arc hite11ural EnIorr ed Plans Br); :fi[.r: i L1'fc2::.. 1 ze4c :.:.1 • Pfr..`ri.•tiise• A r .1:::•17:11•:.7 ti164.ii41 I3 .]..!•: ?:'•r: RPS f ... .... I 18 f f� f I LI-' -. k - 3 ;1 ... I ...„.._____,--L13 f_ 33 k\ EE•rATC)R 1- I " Basement Level Elevation ELEVATOR F2 CY' JC a.1.7. • g• Keynote Legend RE!!:O.)\ E EXISTIHC• GEARED FI()I]TII1 l EOLIIPMEHT • PE.' 'L!ID€ GE. F;I.ESS ELE\ .TOR.' HOIS TING ?,AJ'.CFII I'!E Y .bLSS`. C. ::IATE) EQUIP !:!:EH T II I CLUE:411 EMERGE E Int Y BR.bLF:E DEFLECTOR SHEAVE ▪ REM:O ▪ E EXISTIN { r EL E\ J'.TQF; C I1TF;()L L EF; • PROVIDE EL EV AT()F.' k.OI1TROL SYS.FEM RE!!:()V E EXISTIN G FlO.)ISTYrAY FIC)()R PANEL S Y H/.f? DW.ARE • f}f?O•r I DE 1-H()ISTW.4L1 WORS AHD ASSOCIATED h RE!!:O',rE EXISTIN C} ELEVJ'.TOR CAB 111 ITS ENTIRETY •• ELE•VJ'.TOR PLJ'.TF()R!Lk: T() F.'EM.AIH • PE..0V I: E E LEVATOR' CAB • S EE I IITE F:IOF; CAB E L E•VJ•.TIOHS r} RE!!:()\ E EXIS TIN C P SITI()I1 IN iICJ'.T()R Y BACK BO? • PP. O'1IDE ELEVATOR f}(.?.I f IOI1 INE ICATOR WITH BAC.:F' BC) ()../EP.SIMO FACE PLATE T() COVER AJ.I. •Y I: S • SEE EI.E•r ATC.)'i7. DET.AII. ▪ EXISTIN G PIT EQLIIFMEH f SPECIFIED TO BE REPLACED • PROVIDE f}IT EQUIP P:E IST PR()fir I: E FLASFI PATCH BY .SLJREf:RETE OR EQIJJ'.I. AS R EG LJIREL AT ;NAL L P. EM()•Y rk.I..APE.A FOR A FL IJ SI -I TRANSITION V ITH .2...1 JADE HT F LOCST. SLAB. PRO•r I: E VC f FI.()OR TII.E IHFI I.I. r() MA.TCF1 EXISTING Y IIERE REK.':OY ED BY AB,I•.TEME1'!T J..H.) JA.S f?EOU!RED AT WALL AREA UP T() ELEW..T()R 511.1. ci RE!:r:C)'f E EXISTIN { r EL E\.I.TOR E LIIP? EI I f II) LONGER LIFT L II.ED J•.S PART OF TFIE r r:(.)0ER11 LYATIC)N IN ITS ENTIRETY IIT• LIMING ING, BIJT 110T LIMITED T() E L EC TT? ICAI. CONDUITS. ;A'IRE• WAYS CON TR()I. 1 I RIH0 Y EQLIIP?, .ENT • PA.TC.FIi F ir..nr )r PEN ETRJ'.TIOHS IH FL C.X)f?S Y ;A'AL L 5 LEFT BY RE?,hC.}' rkJ. S T() !MAIN TJ'.IH FIRE f?J'.TIH & MATCH EXISTING ADJACENT S UP. FACE FIN ISIIES I r PE.'0 Ii E E LEVATOR' LJ'.HEI1 C SILL •SEE LANDING SII.I. DETJ'.II. I I E?:13TIHG E L E•VJ..T()R I.A.N SEN G nu TO REMAIN 12 S.6..01 CUT A1'17 RE:Lr:OV E BRICK FC'R IN STAL L ATIO11 C)F I 1 E• ' LOBBY PANEL. • SA.FEC IJJ..R !"J BRIC'F' FOR P(.)TENTIA1. USE IF HEEDED FOR 11-1 FILL AT LC)BBY I.EVEL • Pf?(.)•vI: E ELE\ AT()R EMERGENCY LOBBY PANEL • S EE 'ETAII. 1 .S PR()VIi E BRAILLE Ii:]EHTIFI0ATIC)H PI.AC. F:DS • TYPICAL. EACH SIDE OF EH FR. HCEB • SEE DETAIL r. :k.•I 1 4 RE?titOv E EXISTIN { r 'a1 AI.L SIGN. CE IN ITS EH TIRETY Y f IJRH OVER ER TO ("M HER 1 r} RE},r:O'/E EXISTIN C HAL L FIXTURE IN ITS E 1•ITIRETT • PR()•vI::]E FLUSH r:AOUI1 TE:71 FI {TLIRE II IC I.LI II IC BACF'BC)?:.• CI.JT AHD T()(.)11-1. Ill BR ICJ': AS f?EQLJIRED F()R BJ'.CKBCO INS fALJ.ATIC '1 1 6 PR()V Ii E E L EV/'.TOR IDENTIF ICATI()N SIGH AGE • TY PICA!. EACII S 17E OF E HTRAFIC E JA?,.B • SEE !DETAIL C.4 A• S'.} 1 i Pr:OVI :}E ELE•VA.TQR EH FRANCE FRA!:r:E. FIC)IkT'a1.bLT 7()()RS. AI1.bLSSCI� IJ'.TE HAP. r)'2VARE AT BJ'.S EMEN f LEVEL L I J EXISTII lk� E L E•r AT()R DIVIDER ER BEA!.!: T() RE?, .AIN • TIP I{= AL AT Ear: H LEVEL ▪ I PROVIDE FIAII FAIL - SEE DETAILS 01 f JA.• 1 E:2 AII7 71.1 • 1:.12. 2 EXISTIH0 SUMP DRAIN T() REir%AII'I IN EI.EVAFOR PIT J LINE C'F EQUIP?,M.ENI. RC)(.)F FIATC FI J..BC)VE 25 EXISTING E LEC' TT: ICAL EOIJI Pr:dE HT • SEE ELECTRIC/..L :7f?J•.',r111GS ▪ . PR()iIE E ELEVJ'.T()R FRA.NSFOR!.1:ER INCI.IJE IHC• IRINC? AND C()11:11..11T T() EI.EVA.T()R CONTROLLER 7:' EXISTING ' R()(:)F .ACCESS HATCH FO R E MAIN sf PREP.�LRE Y PrkJ NT MJ'.CHI HE RC'fW. FI.()CSP, f{1 EXISTII lk� R()(.)F AC.CES.i LADDER TO RE?ti.AII1 31 Pr.'()VIDE EQUIP? ENT Pf.)OF HATCFI • SEE .PEf:IFICATI()NS - .SEE STR UCTI.JR.AI. DRAWINGS F()R SLAB ??%C.? EFICrk:FFi)IIS • PROVIDE 1 FI()UR RATE? HTIJ?Lr:ESC:ENT PAINT OH .4L1. FRAf: INC: RE}tir:O.?' E EXISTINC:•• STEEL ALIC'.LE • PATCH AIIPAINT TO !:r:. FC H EXISTING:•• AHD MAIMFAIN HOISUA'AY RATING' 33 SA; ' CUT AHD RE?ti.O'1E IN PLff.'E f:OFICRETE J'.H.} PR(.)•vI: E .1.'6- r: CAPEIHIH FOR EI.EV ATC R !7/50F.: E 1 lTRAI ICE •• PrkJ HT TO MATCH E>1 I3TINC, J..lJAC.ENT • C.()(.? EI1 ATE OPENING LOCATI()N i{ti'ITFI EL E•k' ATOR C()IITRACTC.?R AlI I.00.ATIO11 OF : (....OT?S ABOVE • SEE STRUCTU RAI DF.'.2.L 'IIIGS. 34 PROVIDE IDIS UL ATEFD MANI:: F•. OFF PANEL E1. SI? Er) TO COVER EXISTIN C; I.OU•V ER • •V ER IFT SIr:E 11� FIEL) - SEE BI.I.II K OF F El. EETAIL .S5 PF:OVI: E CMI.J IN FILL A5 REQLIIRED TO M.2.L11-1T.$IH 17..2.LTINC. AFTER INSTAI.I.J•.TI()N CSF EN TR.ALI'!CE FR.ALf:AE 36 C.IJ F BAC. F. EXISTING, RC.X)F SY STE .r: A5 REC .JIF ED FOR TFIE IN STrkJ.I.:.TION OF CON CRETE CURB A.11. RC.X)F EOIJIP!:r:EN T FIATCFI • REPr}•.IR II I FII.1. E PEEN. ROOF SYSTEM AS REQUIRED r0 V:• .11I TAI 1H A. • 'EATIIERTIGH F INS TJA.LJ.ATI()11 111 E 1..11 E CC)'1E RE 7 UH ER. THE EN! STING ROOF ' '.ARRAH II RE}J:C)\ E EXISTH G FIRE SERV ICE FIXTURE 111 ITS ENTIRETY • PAT:: H .SLS REG .JIR ED T() M.ATCII EXISTING ADJACENT 38 REL:C)'L..E EXISTII'ID PROVIDE GUARD WIFH T0EF'IC r..AT PERI}.r:ETER OF OP ENING • IN0LI.J]I•VE ()F STAIR 0IJ.6LR:.:17.J'.ILII'!G aI REL C. •l..TE TACKB0ARE AS )ORDINJ..TED 5'1'ITH C)WlIER .0 PAP::H A5 REQUIRE .SLI I ] PJ.II IT FC t,r.+�.TC hl EXISTII IG 42 AREA ()F FLOOR 111.E A.BATE7,?. EH T • SEE ABATE},r:E NT OF:A' ti'IN CS 43 PR()rr IEE TAP ER Er] 11'lSULATK)lI 44 PR()V I)E GUARD RAIL • S EE E EFJ'.II.S f:1 A•r},iI E C).;;;.2 -...1:...i2. 45 PRC.) IDE RLIBBER BASE TC.) K:ATCh1 EXISTII,IG 46 RE?.P.O E EXISTH C ALL L FIXTURE • R ET. III EXIST! Ha BA.C'1'B0Y • P F:O IEE SLIRF.gLC.E !L1:0Ull FED HA1.1. STATIC.}H • PATCH AHD PAlHT AS REQIJIRFO MATCH EXISTIH J•.EJAC.:E 1 lT • SEE DETAIL Br? A 5+:} 1 hr' EYISTIHG EXPOSED BRIO.... ELEVATOR. ENTRANCE JAMS r0 REMAIN • REPI.A.CE EXISTING lFILL A REC)LIIT EE SEE ELE\/A.T()R ENTR.bL1'!C.E .IA!:r:B DET.AI1. 48 PROVIDE PIT LAi DER •SEE PIT I.A.E. E R )ETJ'.11. A 1 (A.• 49 RE LI:C.?' E EXISTIN C:•• PIT LJ'.C)EER • PATCH .21.11D PAINT AHCh1()R R E„A()•VAI. J'.R EA XS RED..11P. ED T() MATCH E?{!STING J'.?}JA.C.:E HT rX i EXISTING f:dETAI. EI.E•VATC P EHTRJ'.11 CE .IAMB 1'0 RE MAJ I 1 • PREPARE J'.N D PAINT F() EXISTING r} I EXISTING Eft AIN PIPE • SEE PI.IJMB11I G :: r:A''YIN S 52 PR()V IEEE 11,1 FII.1. AT I.()U•VER RE?..()V A1. • SEE DETAII. 6(1? A• I(2 it k J o Architectural f:G3 fi 1:.;;I. S1 :•.:a... }=. r•• Y. ••. 1 =Y :s i•k::: ':.C., c- %... :{ii;:-: 16 ,5 ..'..6.6 :•'' } ? r Resources .i '_•_;O:' be '0 IS Miiiiipli.}:EN0iN G11..}•: (..':1'if lM .l:•:1[ 2r. -..:r.,..• .•:7Sv :.72:}:0 RYAN CLARK Sk..rlc arf?1C+S 6:7; He:<r;}C'r Ff?i: F::::)..: •:9:..;.7.231 E.. r:.} : r-:•:ii:l.,i(-::`•::1•G!..S..:.7.Ui A'il::'-k"fr.•f.:.10i!k.1.f,ti.1S....:rf: ER.NK h..11 }.;.w f..r.:1:A%pie. •:}::. 15:11: .}•L•{ K1•. BIGGS DAMS 4352. Jc• tip;::: R; -:.7-i F..:iS. N•Y 1315.3 31:1 LY}.} 4:' 2 R { 2.31.LI . ; .6651 z 0 f 0 Zic Illi CD L E CD cL WI ScriA 44.1 yF1 , }ISDBA • A IPA NI, Issued for Bid 11.18.2016 R{}•r !};::-:, FI..... r . ::r;.'•!.!..r•: D•:a-fe Arc hite11ural EnIorr ed Plans Br); :fi[.r: i L1'fc2::.. 1 ze4c :.:.1 • Pfr..`ri.•tiise• A r .1:::•17:11•:.7 ti164.ii41 C:Le.:.` N... .]..!•: ?:'•r: RPS 4r#G : 1'l.r: A -1O1 J k:• J'. L C.CiH TIH1JOUJ PR ESSLIRE f fi: EATE 7 ;A .05 EL (.)C:1•:1I10, AT PER IMETEF. FEf?MII'I.2.LTIOI'I BAR r RIGID II'ISUI.ATIOH Ef}Y:,?. C.011C..P.ETE CURB • EE STRLk : RAA'IHGS FLASFI INTO EXI.TIH C; EPS.!: !Lr:Eiri, ERANE AS REOIJI RE ry T() !:r:AIN TAI I^! WJ'.R: F.'AIITY TC)P OF CUP. F 5.6?...i 5?: jir Curb Dail 1 1i"x 1'• E?:IkT111C. RIGID II'ISUI.A.TF;)H PROVIDE R:IkCI! II'S UI.J'.TIC)11 1.0 V:ATC..FI EY. ISTII1C A5.IJ'.CEHT lX P RESP UP. E TREATED ;A'CX?D BLOCK IHc , E IkTll lk C()FICRETE Stair Elevation 114" I'• Ci - 8 a a I.ICHF SWI fC:H • SEE El. ECTR F •AI. i ET.�LII. EI.E'ti .LTC}f DCX -R. FR:J'.ME PIT STOP SWITCFI • SEE EL ECTR F .AL DETAIL S. NI l'>: 1?2- FI.J'.T STOC STEEL. PAJIHT FIN ISFIE5 FLO()R EY.FiTIFIC PITS E PILI . .2\11(A-4 BEAM EI.EVATCP. X11.1. a a G a h k .1 x. 1 f A 4- I.()I1C,. EEI1 T 163 • e.' PLATE BR.AC..KET • SECURE WI11h1 rir • Ff)I.TS.' C)UBI.E H1JTFEi 2 I t. X 1; &EH T PLATE BR.2.LC. KETS. 1111. SECURE TO STEEL ':1 ITFI 5.'8" BC)I.TS. is()LJBI.E H UTTE ry PROVIDE PI STOP SW'ITCFI 3,•4` I.i0L ID S TEEI. RUNG ThIRLJ - IiE E.A.P.S J'.I,I D Y5'EL > AL L A.R()U ND. PAINT WITFI I C I •!il.I P S UR. FAC::ES AT TOP ()F P. UH C:;. PYP. PIT Wrkl. L ELEVJ'.T()F. PITACCESS I..2...ER 1('f' X I I2 &ENT F1..ATE BRACKETS • PAIN f PIT FI.C)R Pit Ladder Detail 3; ,l ,. I . !:; !:r:IH. -z HORSE LOUNGE h 7I El 41 PENTHOU SE TC2; C):`'..r ~ s J�f3 • 1 I ;+1" 1.(i : i • Pfar':`?i••.:i 111 1$ MECHANICAL ROOM 1;3 ELEVATOR LOBBY STORAGE ELEVATOR LOBBY 111 1 1 13 El ELEVATOR LOBBY 1;5 ELEVATOR LOBBY 1$ ELEVATOR LOBBY ELEIQATOR PIT Elevator Hoistway Section - Typical I.c}r'ffi I.0}rf�i u- • 93.1 • 2 'S:$" I.0}rfi' •.' L 8i1I'•2 5:$ E.:!!::.?::` I.I:c't{� 3 84:r • $" Eie • 2- C.I. EAP OVERHEAD TC.)TAI. TPAY EI. DIST AI+l7.E f'If DEPTH if -Nu FIC)IS-r.A Y 4 EXIST! 1•IC . EXP()S E D BRICK ELEVATOR EN TRAI•lC.:E f'.�LII I FABLE CJ'.LJL V. ON EPOS E D SITE • PREF}J'.f?E Y f}.AII1f 3M FIRE BA.fi: RIEF SEI.I.J'.H T C. U1. K. OR EQU.A I. 1.7.0V IDE :3(.4 x 1 V-1.- STEEL BAR STOCF IN FII.I. AT H EAD .AICD JAMBS • RE PLACEIS H I�,t .AS REC .JIR E:.1 • PREPARE AN. PAINT LINE OF NEW STEEI. BAP. STOCK IN FILL J'.T HEAD FIOIST'a1 AY DOOR PAN E L EXI. f INCA ELEVATOR SII.I. Elevator Entrance Jamb Detail NOSING 1 1(2" S ECTK)I1 1 1 i' ::}IAS, ETER SCHEDU LE d:i PIPE C''UAfi:DRAII. f'()ST EE1O11 1 1i;•F. ETER SCHEULE: PIPE HI.AII€RAIZ. BF.ACKET BEYC)11D EKISTI HCS TREAD EXIST! i .TR 1110 .ER TAC F. '}1 EI.) PCIS T III 1() SLEEVE SLEEVE WEIDE )fC)}; r:$" Ni.OU 1 lTII Ik PIATE 3;cf• THRLJ BOLT C; (.)H NEf:TI()11 Penthouse Railing Details • 7 +..: L.S..: :N 1 !:::..; '-f}''y.f'A PI ' • LI.. r. 1?' 9 51a 1 "'Z. 1 Av Door Head Detail J 11. 4 tip••+-•, �+y„ b.c:.!•:: l•4 AN is F. =.s..}••ik:k :. }i..p_T . Door Jamb Detail EXTEP:1()R Keynote Legend RE r r:O'L E EXI.TIH C GEARED FI()ISTIFIC EQLIIPMEH F • PP. (V IDE GEARL ESS EL E VJ..TOF. HOISTI 11G MACHINE & An(.K.IATED EQUIP}M EH T II I CI.IJFiH {: EmEF.(E Ef?f'.F:E All 5FEFI.ECTOR FIE .VE RErr:f).r E EXISTII1{ FI()ISTYS'AY )C }fi: P..!...1%1 ELS Y FI.AP:FWVARE • f}f?(.)•VIE E FI()ISTYS'. T C)(:PS J'.H DfLSSC I.�LTE hl.�Lf? '�5'.�LRE h RE MOVE EXI7iT111 Cr E L E•VATOR CAB III ITS EH TIRETY • ELEVATOR PL A.TFOR!'•". TO RE MAI IA • PRCHI E EL E k '.TC)R C. A.B. • S.E E INTERIOR CAE EL E• /ATIC)11 S PROVIDE CAR Tr.)P GUAR) f?A.II. •• BASIS OF )ESI0•I1:• URTEC •fk}f} OF CAP? FI.AN: RAIL r, ,(LJ11TED TO UH !SIP. UT C. HJ'.N NEI.S f}F.(.)V IDE E L E'VATC)R 1../..117A11 G SI I.L •SEE LANDING DING SII.I. _)ETJ'.II. A I::2 1 PROVIDE E BR.AII.I.E IDE NTIFICV..TIC}I1 f}I..AC.AR: S • TYPICA!. EA.Chl SINE OF EN FP. rkJ,I CE .IAr,?, E - SEE TAII. C.5..A-'k.:' 1 Ifr PROVIDE E L EVATQR IDE NTIFICJ'.TIC)N SIGNAGE • TY PIP:. 1. E. CFI n ISE OF E IHTR.A110E .IAM. E. •SEE METAIL C.11; A• rx::' 1 8 PROVIDE EI.EVA.TC)P EHfRA.Hf:E FP.r ,i.E. FIC)ISTYS'.2...i AI1. .4L SOCI.ATE ) HAP. AT BAS EM,EI1f I.EVEI. 15 EYE:1111C EI.EVATOR DIVIDER. BEAM TO P.EM.AIII • T1PIC.AL AT EACH LEVEL .31 PF .)1r Ii E EQLJIPMEN f ROOF HATCH • SEES PECIFICATIONS •SEE STRLJCTU RAI. Df;AWI1,1 CS Fcr. L r P,.0)IF !CATION S • f'f:O•VI DE 1 Hk}LJF. RAT ED IN TUM E.CE NT P.LJ 11T 011 ALL F Rr}LM:IIAG REV:C r E EXISTING STEEL AHC~LE • PATCII AND PAIN TO Kr:ATCFI EXI.T111C A.ND !:!:A.111 TAI HOIST'WJ'.Y R:r\TINC. 35 PROVIDE C!V LJ IH FILJ. AS P EQLJIRED T<) M.rLINT.AIH F..2.LTINC' AFTER IH TA.I.I..ATI()N OF EN TR•AFICE 3f.. CIJT BAC F E?il STING P. (.>'.?F SY STEM AS REOLIIRED FOP. THE 111 STJ'.L L ATIC)N C)F C. OH CRETE C:• UP. E . I E R:C IOF EQLIIP?,i.EN f FIf.JC H • RE PAIRi111F IL L SYSTEM AS. R. EOIJ IRE D FO !Lr:?•1 I1TAJ I' J'. •5A'EJ'.TFIERTIC H f INS TJ'.I.I.ATIOH II C(.> PL IAIHCE ;A'ITH.AND COVER. ED LJ11 DER. THE EXISTII,I G. RCX)F ;A'ARR.AHTY d I PROVIDE 1 IIC)UP. IH TUF,J.ESCE 11T PAIN T ON STfi:LJCTLIR. I. d s` PF.C)'r 1! E PIT I.. E DEF. • S EE P IT I..2 -..DDE DE1.2\11. Al r. • 1:::,? EXISTIN C? STRI IHC'E R POST TJ'.CF` WEIR POST INTO SLEEVE SLEEVE WELDED T() ! ).()U11 TING, P LATE 3a` fhlf?U BCLr C.:OHHECFICOH ep 0 W 1 uJ W 1 I " DIAMETER: SOH E f1JL E +f:r P IPE C:;t1h.f:Dfi:J'.11. • WELD T() I.ATE 1/4" TCOE BOAR • *EL DED TO POSTS 11+1" x d•' EA - 1: .A -1 i:i :313' E> P.bLI lS ICS! I BOLTS Penthouse Guard Detail EX'S TING ' CON CRETE FI.C)(.)F. .5:•'' • 5 1/4" E :IkTIFIC L CC)I1STR: UCTI()N EXIkTIHG METAI. I.CJVEF I" 11h11CK II I LJI.ATEC] BL AN F. OF PAN El. AI15 FR.E SEF 111 BED OF S EALANT. !&:ECHJ'.1lIC FASTENE! [() FF.2LME Blank Off Panel 1 1;"N 1••': 5 EXTER IOP E IkTll l C> 5'S.�LL L CC)11STR: UC:'TIOH F AC E BF .F • M,. TCH EY IkTIHG COL OR AS AP PROVE EY AR C.FIITECF AI R?^L'r C)f BARRIER: • BSS li C. F DESIGN'. HE11P.1 .SIR BLOC'::k; ;15'B C)f: EaLJAI. R()V IE•E ( I CORP. UC. TE::) W.An(.)H RY STRAP A.Nf:FKC)Rn AT E•A{:H SIDE ()F BF:ICF fr I1 7 C!Lr:U 111 FILL J J L Wall Inn' Detail 1 I . •1" !:!:A.K. Elevator Door Siff HOISTYS'AY 1..2...11D1110 Y}OF S ▪ FI ITIS H ED F I.(X)R:. S REQLJIP ED FIC)r..1 TYS'AY (X)R EEYC)N 5 E L E•V J'.TOR S II.L • MATCH FIN IkFIE::] FLOOR EL EV.2.LTIC..X1 C ROUT SOL 15 Y5'? H ()II. SH RIM F. GRC)LJf 5 a' 1. . J•flFIESIVE AT 24' O.C. !")- ri Y. 1...0' C,rkJ.•ti AN l E5 STE EI. AI1C .I E EXI.S`.TIN C1x FIC)ISTWA r FIT ;A'Al. L f:()I 1STf:Uk:•f F;)H EF?C:''E C)F EI.E1rATOP: PI.ATFC)RM I1r'•I !:; it o Architectural f:G3 fi .:;1. 51 _.''Fit•S• i :3I• I'--:- i•k::: ':.rr, \l':- %.:14. : {i'.: 16 iF .....e.6 ; } ? r Resources -: .i '_•_io :' be . li ENOiN ERAK Gh .:4+: {:.•a'ir 1t1 '1:• ai cr. h..u..z.:. ",r.:rrr• .+::4,r :.ya:}:r � RYAN CLARK vi....;,,:SIUG 4352 Sk::'![ 7-fri[=s + n* „ it k.'yam USEi He:<.:r.e'r Err:M. i. I1c}4•Y•:3 ff?i: 6v7.231.:y3;i:'7i FC2x.: •:c...7.23 E': r-:•:ri:l.,R-::`•::1•G!..s.::•::cri 5'1'{i.:: •-k'•fr .-.;:{}:!ti.1.f+ti:s.t. v f.`.:1::1::I..iy •:}::. irirc: BIGGS DAMS S }I:1 J! 11.-1. Jc' ti1,.r i fi:;-:.7'i Fc.iis. I1•Y 13153 31.E ..1.435 A!:' 5: �Y R { l; I'?•11; 1 .6:55 I t:rr: z 0 f 0 Zic CD L E CD c0 IV CriA S 1 r+ y F Issued for Bid 11.18.2016 Arc hite11ural FI.Istway Sec tion and Details A r .1::;7: 1-4•/.7. i164.ii C:L.•+:.` N:.. C]..!':?:.•f: RPS A-102 B fi L 8 Sir rAIEI.SECTI()11 OVER'S liED PANEL FRAME TO COVER WALL OPE11111GS P F.'()VIDE STN IL E S TEEL 1..f.)B151 P.2...11 El. ELECTRIC/I. ONDUIT • EAI. P EH ETR ATIO11 TO MAIN FAIN RATING COM Will !CATION( TAIH LESS STEEL PANEL EXISTI114.; BRICK WALL CON STRUCTI()N P ER !METER nurr TIFIC B RACKETS E L EV.6..TOR STAHDBY r()'A'ER PA.11E1. H (.)TE: 1. CFIARACTER S SFIAL L BE EH AV IH T.1..111L ESS STE EL . 2. Cf.X.)1M111/..TE PAH E L DEPTFI 'MTH E01.11Pr....1.EHT IIII &;NM I. CAVITY. Elevator Emergency Lobby Panel FRONT COVER Ccipocily: Ccir C' DDO 1;• D 0 D r. F !REF! GHT E RS OPE R. 0 N SE PA CE CASINET • 0 0 0 0 KEYED LOCI:: BRU SFIE SW...1111.En %TEEL FACE. P LATE r. Typical Car Operating Panel 3- IN SIDE P.g...11E1. DIGITAL CAR r()SIT1011 111DICATOF: WITH DIRECT1()11.2...1. EN.ERG:E11CY I. ICFIT TELEPFIONE PEAV ER F IREFIC;FITE RS ()rER CABIN ET 1.0C1ABLE SERVIC.E CABIllET • R. E FE R. TO n PECIFICATI()NS FOR EOU IMEHT 111S IF:E FUL L H EIGFIT HI 1.4C:'.E PNO• ;A'AY VOICE HIC./..T1011 SY STEM IFFI INS TRUC.71.011 •10.•11.2...C.E • SEE ELECTRICAL INC.S 1.()C.1". CATCH I.E) L AMP TO Ill DIC. ATE THAT HOP. MAI POWER FIA.% FAII. ED 1.EL r()INDIC.A.rE ()F ELEVAT()F: OH STA.11DBY POW ER ELECT()F.' BUTTONS FOR SEL ECTIVE 3 POS ITK)11 FIRE R. SWITCH FIRE SERV ICE I.ED IN DIC.ATOR ELEVATOR C.().1:1:Al..1111CAT1()HS FAILURE I 12- _J_ 3 Position indicator Detail 3- 0 0 D 0 a T.1..111 LESS STEEL FACEPLATE I. ED ILL 1.1?•AllIATED AR(.Y RESISTANT SPAHH E FIEAD SCR EWS • TYPICAL Car Lantern Detail 3- - 1 '•.1 :%4 TER,IHAI. LAHDII-IC • B.6..SEMEHT P.45 TENF.N.S F.?4::•.‘•f0•VF. I.E F' II!NCATOR RETAIN EXIST INC, EACV.EC)X F()F.' KE Y SWITC.FIV.:: IF REQUIRED H0'ACCE YSW1TCFIES 0 EU)/ ATO 1 0 0 r BACK BOx LED 11.1.1..W.111 AFE VAN DAL R ESISTANT FA!.:TEN ER S • TYPICk.l. ()VERS !YE STEE L FA.CEPI.A.TE General Notes ELEV.g...TOF: DETA.ILS Mr'. EH SI011 S 011 THIS PA.:.7•E /.RE SCHEMATIC 111 DESIG'.11 D Shle.)ULD B E 'VE RIFIE IFFI THE M4ItJFACTURER. ALt FIX TUF: ES 'A HALL BE F.'0';E:7) P TO OREIH 2. F INTURES. 'INFIERE AP PL ICABL E SFIOUL EE FILLET OUT ELEVATOR SP EC IFIC 111 FORMATIC)11 • AL L WOR. DIN SFIALL BE E FIGRAVEDUHI.E (.)1' HEF:WriE H0FE 111 DRA*111 C•S OR SP EC 1E1%7..2\ TON S. 3. ALL FIXTURES SI -1.6..1.1. USE .'/A11D.A.I. REI[AI1F F.6..1.iTE HERS 1..1111.E()TH E R'NIS E 11()TED. POWDE R EPDXY BI.AC CFIARACTER.ETC.FIED IN () STAHL ESS SI' EEL . SAFIS -ERIF c:'•()TFIIC (FIELVETIC.A EM 1 eKil.D'? nr.4.1111.EsN STE El. 114 B.h.CKGP.01..111D FASTEN TO FRA?•AE 'MTh! l'Ae•AP EP. RES IRTAAT FA!•!TEN ERS Elevator identification Placard 3 -- Hall Call Fixture - Surface Mounted 3- - o Architectural 3C3 rv.11:.:;i• 1 :.::a... IL..••• Y..••••• I ].11 'rit•s• 1:bl•:_4i,_-:_ iNk::: l':•.(:., .4:— %.14. :{;;:-: .:' 16 ;JKi :Y:66 ::- 5 •'.•'z'•:i . .. . c.i..?...:(....:..:74.....:•:.:-...h......:.:......(.....:1:A%pie. ....... . „:„......::•::::„.,.. c.:##•!imp•:••••:;:ip, l'i Liu ny -y .. • . ii ...... ENC:iNEERAG ne.re.,..• ...1x.... ..12:}:0 • :.}::1 !nn 1 : ... L.{ ..{1.. N:!:••••••.• e{tthir All; RYAN BIGGS ' CLARK DAVIS ,.., .,,,...... 4:552 .1c.r.-1::::F1 R:. -.-:.r.: 1.ik::::ne:%'.1F•feiC+S Fciis. NY 13153 f ' " r ., ... n:::.. „„ ,..,. . • . .. :::„......::::„.„:„. A .......„:„:„.•::::„::„.::„. 8 F14.:c.:pcif r 1 :Oa 1.1?i.. 6::i7.231.:.'16(i0 R.:Y.: •5::.;.7.2. I E••-ri:.'W. r:•:.': W'.:Wc+b:.-...........w..1c..!......1.1.:.c.:s.c.z:i-r: mil V. I. F. I gi. 1 i .. • — > .. 1-07 I -a 1 122 d a 0 an a a 1 0 41 la •:::. b III. I id 1 0 1;lu 1 I.." a a a D 0 •D• •zi ae. Cla 0 D I ..ir,......A ...ta .. • 44.1 i. - ..:''' • II:i. . ' *I • d' 1 6 D BA • % R tArZttg- """. • • 1 . _121— Position indicator Detail 3- 0 0 D 0 a T.1..111 LESS STEEL FACEPLATE I. ED ILL 1.1?•AllIATED AR(.Y RESISTANT SPAHH E FIEAD SCR EWS • TYPICAL Car Lantern Detail 3- - 1 '•.1 :%4 TER,IHAI. LAHDII-IC • B.6..SEMEHT P.45 TENF.N.S F.?4::•.‘•f0•VF. I.E F' II!NCATOR RETAIN EXIST INC, EACV.EC)X F()F.' KE Y SWITC.FIV.:: IF REQUIRED H0'ACCE YSW1TCFIES 0 EU)/ ATO 1 0 0 r BACK BOx LED 11.1.1..W.111 AFE VAN DAL R ESISTANT FA!.:TEN ER S • TYPICk.l. ()VERS !YE STEE L FA.CEPI.A.TE General Notes ELEV.g...TOF: DETA.ILS Mr'. EH SI011 S 011 THIS PA.:.7•E /.RE SCHEMATIC 111 DESIG'.11 D Shle.)ULD B E 'VE RIFIE IFFI THE M4ItJFACTURER. ALt FIX TUF: ES 'A HALL BE F.'0';E:7) P TO OREIH 2. F INTURES. 'INFIERE AP PL ICABL E SFIOUL EE FILLET OUT ELEVATOR SP EC IFIC 111 FORMATIC)11 • AL L WOR. DIN SFIALL BE E FIGRAVEDUHI.E (.)1' HEF:WriE H0FE 111 DRA*111 C•S OR SP EC 1E1%7..2\ TON S. 3. ALL FIXTURES SI -1.6..1.1. USE .'/A11D.A.I. REI[AI1F F.6..1.iTE HERS 1..1111.E()TH E R'NIS E 11()TED. POWDE R EPDXY BI.AC CFIARACTER.ETC.FIED IN () STAHL ESS SI' EEL . SAFIS -ERIF c:'•()TFIIC (FIELVETIC.A EM 1 eKil.D'? nr.4.1111.EsN STE El. 114 B.h.CKGP.01..111D FASTEN TO FRA?•AE 'MTh! l'Ae•AP EP. RES IRTAAT FA!•!TEN ERS Elevator identification Placard 3 -- Hall Call Fixture - Surface Mounted 3- - FRONT WALL Interior Cab Elevations SIAN 1 F:51. NSk:: ()PERATII1G PAH E L ST/.IHI.E .TEEL RETURIA P.A.N E L l'EXTURED STAkIFILESS STEEL CAR D(X)RS TER r.,1.1H.1..1. 1.1.‘11D111C:; • LEVE L RESISTAHT FA.STEN E RS • TYPICAL Q ElI C.RAiE fl PICT(>:.7:RA.PFI HOISI-WAY ACCESS LE Viv).112 H ES HALL CALL ru.H BurroH • TVPICA.I. U.: Hall Call fixtures - Flush Mounted 3- Eo EQ EQ E0 1.11 MAX. TENTLI RE LD T.A.111 LESS STEEL PAN E L • n'r CAL .............._.,..„,...--- 1:;':i:' REVEAL S WALL I:TYPICAL:1 STAIN I. ESS STEEL FIANDRAIL • TYPICAL. STAN LESS STE El. BLIFyi.PER. z— STAIN LESS STEEL B.4.SE BrailIe Signage 5 1R FR I'VE PI 11S BACT.CROUll STAINLESS FEEL C HARACTER. RAIE 32 F Cf.)1-11C: L VETICA EfullBOL irRovIE W111-1 BRAI 1.I.E) :1. R ES•13TAI1T F.A.TEH EP. • TYPICk.l. .TAIHLESS STE El. FACE PLATE • TY PICk.l. P RovIEE OVERS !ZED FACEPLATE AF LOBBY LEVEL TO COVER REMOVAL% U.)661111%1 TER !..e:EDI.g...TE I.A.11:-)111c:'. • (XFIEF: Flf.)()F.'S 1 1::•1" MAY.. EQ EO EQ EQ E b FE4F J.I.I. o Architectural 3C3 rv.11:.:;i• 1 :.::a... IL..••• Y..••••• I ].11 'rit•s• 1:bl•:_4i,_-:_ iNk::: l':•.(:., .4:— %.14. :{;;:-: .:' 16 ;JKi :Y:66 ::- 5 •'.•'z'•:i ----,, c.i..?...:(....:..:74.....:•:.:-...h......:.:......(.....:1:A%pie. ....... . „:„......::•::::„.,.. c.:##•!imp•:••••:;:ip, l'i Liu ny -y .. • . ii ...... ENC:iNEERAG ne.re.,..• ...1x.... ..12:}:0 • :.}::1 !nn 1 : ... L.{ ..{1.. N:!:••••••.• e{tthir All; RYAN BIGGS ' CLARK DAVIS ,.., .,,,...... 4:552 .1c.r.-1::::F1 R:. -.-:.r.: 1.ik::::ne:%'.1F•feiC+S Fciis. NY 13153 f ' " r ., ... n:::.. „„ ,..,. . • . .. :::„......::::„.„:„. A .......„:„:„.•::::„::„.::„. 8 F14.:c.:pcif r 1 :Oa 1.1?i.. 6::i7.231.:.'16(i0 R.:Y.: •5::.;.7.2. I E••-ri:.'W. r:•:.': W'.:Wc+b:.-...........w..1c..!......1.1.:.c.:s.c.z:i-r: mil R co -4- _V z u 0 I gi. 1 0 = Zic Illi 61 a) I. E CD > c III. I id 1 0 1;lu 1 I.." = IV i ..ir,......A ...ta .. • 44.1 i. - ..:''' • II:i. . ' *I • d' 1 6 D BA • % R tArZttg- """. • • 1 . FRONT WALL Interior Cab Elevations SIAN 1 F:51. NSk:: ()PERATII1G PAH E L ST/.IHI.E .TEEL RETURIA P.A.N E L l'EXTURED STAkIFILESS STEEL CAR D(X)RS TER r.,1.1H.1..1. 1.1.‘11D111C:; • LEVE L RESISTAHT FA.STEN E RS • TYPICAL Q ElI C.RAiE fl PICT(>:.7:RA.PFI HOISI-WAY ACCESS LE Viv).112 H ES HALL CALL ru.H BurroH • TVPICA.I. U.: Hall Call fixtures - Flush Mounted 3- Eo EQ EQ E0 1.11 MAX. TENTLI RE LD T.A.111 LESS STEEL PAN E L • n'r CAL .............._.,..„,...--- 1:;':i:' REVEAL S WALL I:TYPICAL:1 STAIN I. ESS STEEL FIANDRAIL • TYPICAL. STAN LESS STE El. BLIFyi.PER. z— STAIN LESS STEEL B.4.SE BrailIe Signage 5 1R FR I'VE PI 11S BACT.CROUll STAINLESS FEEL C HARACTER. RAIE 32 F Cf.)1-11C: L VETICA EfullBOL irRovIE W111-1 BRAI 1.I.E) :1. R ES•13TAI1T F.A.TEH EP. • TYPICk.l. .TAIHLESS STE El. FACE PLATE • TY PICk.l. P RovIEE OVERS !ZED FACEPLATE AF LOBBY LEVEL TO COVER REMOVAL% U.)661111%1 TER !..e:EDI.g...TE I.A.11:-)111c:'. • (XFIEF: Flf.)()F.'S 1 1::•1" MAY.. EQ EO EQ EQ E b FE4F J.I.I. o Architectural 3C3 rv.11:.:;i• 1 :.::a... IL..••• Y..••••• I ].11 'rit•s• 1:bl•:_4i,_-:_ iNk::: l':•.(:., .4:— %.14. :{;;:-: .:' 16 ;JKi :Y:66 ::- 5 •'.•'z'•:i r Resources l•'.i.5:•1 be c.i..?...:(....:..:74.....:•:.:-...h......:.:......(.....:1:A%pie. ....... . „:„......::•::::„.,.. c.:##•!imp•:••••:;:ip, l'i Liu ny -y .. • . ii ...... ENC:iNEERAG ne.re.,..• ...1x.... ..12:}:0 • :.}::1 !nn 1 : ... L.{ ..{1.. N:!:••••••.• e{tthir All; RYAN BIGGS ' CLARK DAVIS ,.., .,,,...... 4:552 .1c.r.-1::::F1 R:. -.-:.r.: 1.ik::::ne:%'.1F•feiC+S Fciis. NY 13153 f ' " r ., ... n:::.. „„ ,..,. . • . .. :::„......::::„.„:„. A .......„:„:„.•::::„::„.::„. 8 F14.:c.:pcif r 1 :Oa 1.1?i.. 6::i7.231.:.'16(i0 R.:Y.: •5::.;.7.2. I E••-ri:.'W. r:•:.': W'.:Wc+b:.-...........w..1c..!......1.1.:.c.:s.c.z:i-r: R co -4- _V z u 0 0 = Zic Illi 61 a) I. E CD > c = IV cri 0) a) o (Of ..ir,......A ...ta .. • 44.1 i. - ..:''' • II:i. . ' *I • d' 1 6 D BA • % R tArZttg- """. • • 1 . Issued for Bid 11.18_2016 11.3. DEP:Y.7:i: Arc hiteclural EleYat01' Fixtures, Details and Elevations A. !' .1:•••!:: H.:.-:: •5:.'.4.(I:.'. C:L....:-:!. H :....-.. :.......!.:?:er: F.. rS 1.ir,wr: 1: A-501 1 0 f.. c f_.. A -I ELECTRICAL SYMBOLS LIST BASIC MATERIALS AND METHODS SY OI- 5E6DRIPrIL-4 1P--L-P4-7.C•04ED,, HOME RUN TO FAMELUO U- LETTERIII' NUMBERS V.,IDICJtiTF• PANEL, NUMBERS INDICATE CIRCUITS. NLEMBER OF GROWS EQUALS N UMBER OF CIRCUITS.. CIRCUIT SHALL BE 2i AMP 120 VOLT, 2 -*12 1 -*12 IN Y.4" .0, UNLESS NOTED OT11EI WISE. O ANC' E CEC CUIT WILING S12•1 AND NEJ6BLIt TO 3.1ATCH HOmERUN. if?E'R TO SPEC'; FDP RACEWAY TYPE. 5PECEAJ:, PLJRPQSEs RECEPT.E. PRQVIONn PROPER VOL TAE, C''.. ASSS, •CL JF RENT 1 AT1 16' AND NEMA CONFM:RATICN AS REQUIRED B'( LBRAND-F CaRCUIT AND/OR MATCH CAP ON EQUIPMENT BEING FURNISHED BY OTHERS. PROVIDE' COPD AND CAP. S bfi TGQQQLE SI+fiETC;I1, YOLTASE fA 1NOLC; AT ED ON FIXTURE SCHEDULE, SUBSCRIPTS I JE4CA T E= TYPE: 3 - THREE WAY SWITCH 4» FOUR WAY SWITCH QS - OCCUPANCY SENSOR c,b, 0 - SWETC -INC, DESIGNAT ONS NLJMf EF OF LETTERS EQUALS NC_ or GANGED SWITCHES EIUPLX RECEPTACLE, 20 AMP 12S VOLT SUHSC IPTS INI /CATS TYPE OC - OVER CO ,INTER 1A'P - WEATHER PROOF GFI - GROUND FAULT INTERUPT Ug -. UNDER THE COUNTER P _ PLOT LIGHT TV - COORDINATE MOUNTNG HEIGHT WETH ARCHITECT. SHALL BE MOUNTED tN FSR -PAS -1O0 WALL aO. ill DUPLEX RECEPTACLE, 20 AMP, 125 VOLT CIECT TO AN EMERGENCY CIRCUIT COMBINATION FUSED DISCONNECT SWITCH Am. MAGNETIC STARTER AMP RIVING ING AS .INIX A4TED ON ELEG.TRIC EQUIPMENT AND CONTROL SCHEDULE HORN/STROBE ALARM SIGNAL DUAL -TECHNOLOGY OCCUPANCY SENSOR, LITERS UESLC +TATE TYPE. PROVIDE .ALL OCCUPANCY' SENSORS WITI.1 RELAYS/ COI TACTS FOSS CIONS"CIT€Dry TO 8 . (COORDINATE INATE WETH OCUPANCY SENSOR PA.ANLIFACTURER FOR OPTIMAL SENSOR L.GcATIONS WITHIN EACH ROOM)1 H - HALLWAY 11 • I4TJ ASONLC Dy -P SINGLE RE`C:P. TA.CjI. E 20 AMP, 125 VO1..T 0 JUNCTION BOX 4 MPLVE GONNEC'rF NE To E IuirKENT ® SOLED HALF' ARFI:CMS) INDICATES l8 VOLT RCL]T TO SIN Lir POLE, CIRCUIT BRErAKERES). UNLESS NOTED G rF ERW' E. spRN.,(L:rR WAt1l ]=L.C>1N S 'TCF SOLED F•LJL.L AF.•OW INEECATES 2ce VOLT CIRCUR. TO MULTI -POLE CIRCUIT E/REAKI; P UNI...ESS NOTED QTNERWr'ESE. Fa,CP V TEL/IATA DROP POWER DISTRIBUTION AND CONTROL Y ok ?E5URIPTIC'4 F JI$E.0 IdNE:CT SWITCH ACNP RATING kNDICAT U ON ELECTRIC EQUIPMENT PM CONTROL SCHEIDULE 1=1 (:) MOTOR CONNECTSON, REFER TO Ei-EcTF EQUIPME"IT AND CONTROL SCHEDULE F`QR SIZE, FATE QF RISE HEAT E FFE TOR COMBINATION FUSED DISCONNECT SWITCH Am. MAGNETIC STARTER AMP RIVING ING AS .INIX A4TED ON ELEG.TRIC EQUIPMENT AND CONTROL SCHEDULE HORN/STROBE ALARM SIGNAL F MOTOR STARTER. RIFER TO ELECTRIC EQ JIPME\IT AND CONTROL SCkl 1D.iJLE. FOR SIZE. AND:TYPE. 2011203 VOLT PANELBOA1 D 1 Mir u 4 GH ENCLOSED CIRCUIT BREER Ts 1 FIRE ALARM SYNOCt. IDESCRIPTICIA F AIPARLIAL PULL STATION 1=1 SMOKE DETECTOR El FATE QF RISE HEAT E FFE TOR 3 r HORN/STROBE ALARM SIGNAL F E c] TING F'L.LCTR:CA OR r CIIPMic. LT' DR t VICE', DASHED LIGHT' IS EXISTING TO a REMOVED. VED. b'iSU IL S/.I4A L .Q.EV giN u 4 WALL MOUNTED El'ittnENECY Lum NARE WJTH I3:ATTE RT PACK TAPER SWITCH Ts ® 471 spRN.,(L:rR WAt1l ]=L.C>1N S 'TCF FIFE ALARM pisarp., PANEL REMOTE DUCT SMOKE= DETECTOR TEST STATEN OWHEkE POSSIBLE LE= Ca 11c OLVicE=S -ItI LFFIER. IFDUNT ALL AT AGCESSiI LE HEIGHT) Fa,CP MI FAIN SHUT DOWN WI nUC+T SMOXE. DE1ECTOR WATER FLOW SW'TICH EMI FIRE ALARM RELEASE; ME ELEVATOR CAPTL{RE EN ENTEE1,.EE NT CO -IOL MGIILILE INTELU GEENT MONTOR MDGLILE IIE '::a GENERAL CONSTRUCTION SYMBOLS SYM8C i_ DESCRIPTION tE) E ISTINO Dcmc TO nom <ER E JSTINJG DEV; TO BE RE=LOCATED hI«110. MLO NIC ot• OF'CI ENI.. PH. PP F}. #�I{ , SP. SW. T1 TSP PYP. UC up: VAV v. WP �.tJ REFERENCE TO F RAW:NO NOTE 3 r REFERENCE RENCE TO DEMOLITION ITION MOTE .r1,, ----- Li.r E c] TING F'L.LCTR:CA OR r CIIPMic. LT' DR t VICE', DASHED LIGHT' IS EXISTING TO a REMOVED. VED. EXISTING WIRING OR EQUIPMENT, SOLID LIGHT IS ExiSTING :'O REmAJN OR EXIS1 iNG -0 I? 1E 3 ELociatEi , Issued for Bid 1 ].18.2016 RevL WALL MOUNTED El'ittnENECY Lum NARE WJTH I3:ATTE RT PACK HEAVY SOLID IS NEW :fp FINISHED CEILING ABBREVIATIONS LUMINAIRES SYMBOL ❑e5 t1 'T]Of F. ri L4 • • CEILING h'IOLINTED LUMINAIRE_ UPPER CASE LETTERS INDICATE FIXTURE TYPE ON L:HE:UUL.E.:,. 1.010.1..K CASE. L,E.FT'EFS JNRFE.POE: SWITCWINq XPQNATiQN, . hI«110. MLO NIC ot• OF'CI ENI.. PH. PP F}. #�I{ , SP. SW. T1 TSP PYP. UC up: VAV v. WP �.tJ # FA P 9 WALL MOUNTED LUMINAIRE. UPPER O,E LETTERS INDICATE FIXTURE TYPE ON SCHEDULE. LOWER CASE= LETTER INDICATES SWITCHING DESIGNATION. 1-r NIPPIIIIRP CD 471) Rini tl _ r, O :.(2.• Issued for Bid 1 ].18.2016 RevL WALL MOUNTED El'ittnENECY Lum NARE WJTH I3:ATTE RT PACK Dceptiol Cole ® ED CEILING MOUNTED EMT LUMINA3E FINISHED CEILING ABBREVIATIONS 4 jR31{ v. z I IpTI Y11 I `*lol=5f. r4F90klp'fdEN A. ;- AFF AWC. BMGE3 CS CLO, O On E EMT, I Eto I=C,F,,I FR CND- HDA i:,HARD,OFF HP. . LS B MERE r. ABOVE FINISHED FLOOR ABOVE riNiSHED. GRADE AMr,I ICfl1J WM nAoE r. IRIULUNs • MIN CRO NCI. OAR r. CIRCUIT E]REAFCER CELING CC) LRT : CRITICAL BRPNCH EQUIP NT GROUND.r+lE $t:r+tG . ; E .IIPMEAT BRANCH FAN COIL & IT• FUME HDOG GRGNJI GROUND FAULT INTERRUP1ING. /'iJTG HO P❑WE1' KIL,UWAT1 LIFE SAFETY BRANCH WAIN GIE.0 JI I3RE Ek hI«110. MLO NIC ot• OF'CI ENI.. PH. PP F}. #�I{ , SP. SW. T1 TSP PYP. UC up: VAV v. WP �.tJ MICROWAVE MAN LLL ONLY NOT IN CON.IRAO 33DL .TED DYER coUNTER HEIGHT OWNER FURNISHES, CONTRACTOR INSTALLED. PANE1. PHASE POWER PJNEi POLE �11~Of REFRIGERATOR SP.ACE SWITCH Jy3�y TELE OMMUNICATIONS MAN MOUND L7I' TWISTED SHIELDED PAIJR TYPICAL 1vIOUNTED UNDER .COUNTER HEr HT orcE S OTHERwiSE END' ATEt VARIABLE AJR VOLUME YOL.T lard`AIHr PROOV ? -SOLE A .NM E l BRANCH CIRCUITING IDENTIFICATION 2 a•1• FIXTURE TYPE N1115.1BER INDICATES CIRCUIT SWITCH LEG r....NumaER INDICATES CIRCUIT NUMBER NOTE= 1 Tf IOAL J` ON ALL L VI 1 .Af'U EWQMt�JNS MOUNTING HEIGHT A/r. MSG.. INFO. 1 F -CEI CIRCUIT NUMBER PANEL DESICt.IAT1O,N WIN Nom" AFF TO BOTTOM OF FEND ADD MA €♦MUM OF Il B� AFF TO TOP OF LENS WALL PHONE_:`::: FFN1$1-ED FLOOR HORU/L,IQH I---- ::: 1 r RFCE=FTSI F� TEL/COMM-1 } :..: } T 1.-6" WARNING & SIGNAL • FIXTURE/SIGNS CENTERED .•• AAE DOOR xxIT • PULL. LIGHT ••••••••• STATION ...T_STAT SWITCH ... _ TAF' OF. 41-0- OIT 1, MOU TN G H EF HTS TO CENTER OF OW LETS UNLESS E OTHERMSE NOTED. IN MASONRY CONSTRUCTION TJ-{ AaovE IV1Q1J N1T1140 HMHTSHAI, , BE UL FOR REFERENQE TQ .WEST KOCK QR 1 RI QK coJ €No THE ABOVE MOUNTING HOGFITS SHALL. BE ADHERED TO UNLESS SPECIFICALLY NOTED OR DET LED OTHERWISE ON THE DRAWINGS OR. SPE IFI ATEC•NS 4 5 GENEFIAL DEMOLITION NOTES: A. WHEN EXISTING CONSTI ICTIOI4, WHCH IS TO REMAIN, €E DAMAGED Dt.I INC THE COURSE OF I EMOLITION AsS A RESULT OF THE CONTRACTOR'S WORK, IT SHALL .BE REPAIRED 1 DJOR REPLACED WITH SIMILAR OR 1_UKE MATERIALS, AS MUCH AS UC - AS POSSIBLE,.SUBJECT TO THE OWNERS APPRDVAL. t . THr COATRACTOR LS 1 PONSIBLE: rOR. THE REmOvAL .ANI] REP•LACEMENT ExLSTING CONSTRUCTION rr+1 THE WYA-e CI= NEW WORK. PROTCCT BUILDIriGa AND FURNIS1 IINSS ]TOM DAMAGE.. C, COORDINA E PHASING O:• WORK WITH OWNER'S REPRESENTATIVE. D. COORDINATE ALL SHUTDOWNS WFTH UNIVERSITY HRFOR TO DEI4IOLFTONF, ALL FIRE ALARM SHUTDOWNS SHALL BE SCHEDULED THROUGH CUSTOMER SERVICE WITH AT LEAST 24 HOURS NOTICE BEFORE WORT{ IS TO BE STARTED. E. EXISTING CONDITIONS ARE. TA1<y N1: FROM FIELD OBSERVATIONS AND PRIOR CONSTR IOTIONI DOCUMENTS WHEN AVALA1 LE HECT DOCRN1OONI IDENTIFY ERi NAND EBIES TAT LL FT 1EOLIIN WORK- COMPENSATION WILLBE DFODTOA OR AUStY UNFAJt'lIt.I ITY WITH SITE corct-r-oNts THAT ARE VISIBLE QRilE.AaLY CONSTRUED OY EXF RIENCEQ OBSERVERS. THIS CONTRf TOR P RTCIPATE EN SURVEY OF THE EXITING ELEC-RICA SYSTEMS. MIE CONTRACTOR GHr LL DISCONNECT AND CAP AL SE VICE LINES TO BE DISCONNECTED FOR THOSE SERVICES 'WHICH NORMALLY ARE INCL UD€O IN HIS F{'?IS ELI? OF WORK. FARTICLJLA3 . CARE SHALL BE TAKEN TO AVOID CREATING HAZARD OR CAUSING DISRUPTION IN ADJO NG JAREAAS. NOT ALL DEVICES T.E•RMINATEON51 J1JNQTJQN JOKES AND WIRING HAVE BEEN SHOWN. F. REFI "'I'D PLUMBING CONTACT DRAWINGS AND $PE CJFiCATJONS FOIN I=X T .OU:ANTITIIf S AND LOCATIONS OF ALL PLUMBING EQ1.JIFMENT BEING ABANDONED OR RE]~VDV€SJF WHICH WILL REOURE CE-ENERGIZATION, REMOVAL MED BLANKS -DFP BY THE CONTRACTOR.. G.. EXISTING FIRE ALARM SYSTEM SHALL BE i<EPT OPERATIONAL. DURING THE CONSTRUCTDN# PERIM THE BUILC G UNDER RENOVATION MAY OE DISCOIVECTED FROM SERVICE DURING THE HOURS THE CONTRACTOR IS WORKING, AT TI -E DISCRETION OF THE FIRE DEPARTMENT AND THE OWNER'S REPRESENTATNE c BUT MIDST BE PLACED BOCK ON LINE DURING OTHER PERIODS. APPROVAL TO BE IN WRITNO, H- THE E LST€NC• ELECTRICAL EQUIPMENT AND GYPS DEMOLITICN AREA SHALL BE DEMOUSHED i2LONG WITH ALL FE1:DER ANL) CONDUITS. S. BASK TO PAINT OF OLJRC:E -UNLE S -i £KIN' E J urELL ALL i1 U115 SHO I'N ON THE f EMi1LIT1QN DRAWINGS SHALL EIE DISCONNECTED AND REMOVED EJNLESS NOTED OTHERWESE, WA€.LI ORES, I ACKEIOXES AND CONDUIT SHALL BE REUSED AS I ETERM:NEO BY CONTRACTOR, ALL UNUSED CONDUITS SHALE. BE REMOVED. I E CONNECT AND M.AKE SAFE 'ANY EQUIPMENT TO BE REMOVED EIY OTHERS. COORC N+€ATE 1 E1/4AOVAL OF EQLJFPMENT WITK OTHER TRADES PRIOR TO DEMOLITIONS. I. MAW AIN ,AND. RESTORE, E, JE JN I E RUP•rth Y REMC V1LS OR :4 I A5 Ft Of NEW {CNS 7 R J ' TION F ALL C1F♦CLJETS, CONDUITS AND FEEQEE S PASSING TJ IE OU 331 AtiP SERVING UN }ISTUF.BED .AFLAC .' 3I.1OW J OR NOT S IOWN1, J. 1, L. r LISTING CONDUITS sTuME.15 T O;JGH .FI,.00R EERvING ITEMS TO Far. REMOVED piblo. NOT SHOWr.E OR REQEJU ED TO 'BE REUSED, SHALL BE C J T crr FLusH WITH SLAB LEVEL WITH CONCRETE. K. IN ANY AREA # EQLIagNG THE PERFORMANCE FORWIANCE CF 1Y TIRADE'S WORK. THIS CONTRACTOR SHALL CAREFULLY REi OVE AND STORE ANY OR ALL, ELECTRICAL ITEMS IN PATH OF WORK, REINSTALLING AND RECONNECT€NIC • SANE .AS REOUERED, IN ACCORDANCE WITH THE PLANS ANDJOR AS DIRECTED AFTER CQMPLETON OiF' OTI-IER TRACE'S WORE( IN THAT AREA. L, IS: NIEC1,'MAD E SAFE } REMOVE ALL 1EMPORA.RY I JD Ai A I:NEIL WIRc viITHIN THE SPACE. M. BRANCH Gf CthT WIRING. TO DEVICES IN AREAS OF DEMOLITION SHALL BE DISCONNECTED, MADE SAFE AND REMOVED COMPLETELY BACK TO THE P? 1ELBOA D. THE CDNDTR TOR SHALL. NOT ABNCON BRANCH CIRCUIT'`IF�HVO N E)STFNEG WALLS AND CEIL ICS, MAINTAIN THE CONTINUITY OF BRANCH 0 ROUT ZING TO 'ANY AREAS WHICH ARE TO REMAIN. BUT ARE .AFFECTED BY -ME DEMOLITION DR NEW CONSTRUCTION. DLSCO IEC1' AND PE rOW PANEL,., FEE=DERS AND f R H CIRCUITS HACK TO. POINT Oi sOURCL PRIOR TO THE sT RT OF OEMOUTIDN, CONTRACTOR SHALL FIELD VERIFY ALL BRAAdQI4 t C13ITS AND MA5l'iTAEN THOSE CIRCUITS THAT EXTEND OUTSIDE OF THE SCOPE OF WORK O. AFTER RENOVATING EXISTENG ELECTR CAL WORK, THE CONTRACTOR SHALL ENSURE THAT ALL REMAINING ANIJ NEW EQUIPMENT WILL OPERATE F RCFERLY. P. ELECTRICAL CO (TRACTOR TO . EAii3VE ALL TEL/DATA WIRfNIC RACK TO SOURCE WHERE A DEVICE OR EQUPJ,lENT IS D,aLLED TO RE I]EAiOLISHEE _ GENERAL NOTES: A. SLEEVE AI'LID SEAL ALL WALL ANMD FLOOR PENETRATIONS. PROVIDE FIRESTOFPING FOR ALL FRE -RATED PENETRATEONS.. UTILIZE REMOVAEL1= FIRESTOPPING MATERIAL AT FABLE TRAY PENETRATIONS_ PROVIDE ,ACOUSTICAL SEALANT FOR ALL ION RATED PENETRAT€ONS, AL FIRE RATINGS SHALL EIE !MINT/MED- a. MAINTAIN SERVICE CLEARANCES OF A..L EQU;PME INT- ]. :0ORF}INATE ACT 10C.ATION OF AL.L. CON JIT ROUTES, EQUIPMENT AND DEVICES WITH FXISTING. CON€O1TLONS PRIOR TO CONSTRUCTION. D. MINIMUM OONDLJ:T SIZE SHALL BE 3/4" r OR POWER. CIV UiTS LSC]L E=. PROVIDE NYLON PULLS1`RING IN ALL EMPTY •CC)NI)LE-TS.. F. FIRE ALARM' SIGNALING APPLIANCES SHALL RE MOUNTED SUCH THAT TIE ENTIRE LENS IS NOT LESS THAN $O INCHES /ND Nor GREATER THAN 96 INCHES ABOVE THE Fll'OSHED FLOOR. G. CIRC I TlNO TO O;VICES?EQEJIPMENET SHALL BE 2-412AWG 1-112EO <'.ft LTIPLE HOME RUNS Ir+k SAME CONDUIT MAY SNARE SAME EQUIPMENT OLJ.M FOR EACH 20 AMPERE Cf# CEJIT UNLESS OTHERWISE IA T=D, ALL CIRCUITS STALL 'AVE SEPARATE NEUTRALS (OIRCU:TS SHALL NOT SHARE NEUTRALS)._ H. PROVIDE GGNQJITfWIRING CCCIRCUITINIG) AND REQUIRED EQUIPMENT CONNECTIONS TO ALL 13EV>?S1v•S/EQUIPMENT. CONNECT TO CIRCUITS) .AS INDICATED. ALL WORK AND MATERIALS SMALL BE IN ACCORDANCE WITH THE REFERENCE STANDARD EDfTON+E DF NEPA CODES, AS CITED BY THE FLEE CODE OF NEW YORK STATE,. BUILDING CODE OF NEW YORK STATE AND CORNELL UNIVERSITY DESfQI+E STANDARDS_ Jr ALL CONDUIT'S AND Si...IPPORTS SHALL 13E A4S `FEHT To D C AS POSSIBLE. K. PROVIDE PEJLLBOX r -ON EVERY 1$1:14 OF BENDS FOR TEL/DATA AND * Ck¢ OF BENDS FOR POWER CJ)N1F •LATS, L. ALL ELECTRICAL DEVICES (RECEPTACLES, SMTC IES, FIRE ALARM, ETC. SHALL BE A1JGr€t HORIZONTALLY AND VERTICALLY, CONTRACTOR TO SC E1EE)ULE AND COORDINATE PROJECT WALK THROUGH WITH OWNER'S REPRESENTATIVE AND ENGINEER Pit€DR TO CDMMENDEMENT OP ANY DEVICE ROUGH -IN FOR FINALIZATION Of' ALICNMENTS, M. REFER TO THE HAZARDOUS MATERIALS. REPORTS INCLUDED IN THE SPE; C FIGATION PACKAGE FRONT-END DOCUMENTS TS PCR FEAZARDOUS MATERIAL . INF ATION. FF. AS ESTOS OR OTHER SUSPECT MATERIALS ARE EKOUNTRED, CEASE OP . A.TIONS IMMEDIATELY ARIDN�QTEFY THE OWNER. REFERENCE THE HAZARDOUS MATERIAL. DRAWINGS FOR ASBESTOS A ATEMENT �k NOTES, DETAILS 1 REQUIREMENTS. FRIDil EDGE OF BASE MAX_ A.rthitetfurcri :;%: .•:•,::-..:11.4 ,=:qI::, 3(1:4 ha„• 7I6 I ..i&ii011iio ,s5i.u.15111n MIL17. }..:>.:,,,,..tiY•;,.v:::'J.'.2::•,yv;': C vl r.'.51:.k ! a7.•:2 WtO .• x:•MI:ii Ir& how v1•{ 1 MI -°?;-11M; flu 3k3-71:54 f. ftNGirhIE iki-_,.Li l Er. l r:*i,u 1: IMllr.kr IikFr: 1rusk.I 4i It A .41 RYAN Resources a 12, E iNG ii iY, , C.QI15u cei;u sir: Cc F•i•WGxI iis}fu;ii amrrclr2htttytur• BIGGS CLARK cicp•Y¢FA 1S 5 ..dnb sl e i-14 pe Ender'], Nmrr W2; 607.231,1.6CF! For A07.23 Erna: rnbM:Idcalic-cas.corri kY : www.ddta•. i.ux Jordon es F is,. 31.5 :.r.. ITC,C1CI Yak 137W i.Oil C , 1:-, (1.) Z ti a ...1. DI 4. 711KYIS} R. NY 1315? 4155.47n. rA_ :'.'i::ti::^i,:„ {-Qn IfCK 0 Seal Zlim 0 In VI E •14) a c ID MIMI. NIPPIIIIRP CD 471) Rini tl _ r, O :.(2.• Issued for Bid 1 ].18.2016 RevL No. Dceptiol Cole ELECTRICAL 5ymboi$ Lit inrwd Gel -Ina -II Note$ .it Jab IU: 5 _ 6 ;Elim' No: Drovn by: 3fR/W:RG shoes No: E-OO1 f.. c A L 208.T/12CV 100KWJI25KVA 3�.8 PF OMAN GENERATOR : Titifil4ESPORMER CiENERATOR : Go.i. • r. : .Sso :•. CE : •. • : •‘' NiECHAHICAL • GO5 : STAIN 01 • • - ......... --'t2OCIA L- DISTPANEL, 3600A DIST. PANEL tE5 ELCTRECA1 PANU. L1-Bf1-13 (E) -R4:41:Ectk.1-2-eL.AE) . 1'1 EII F • •CE5 stoRAGe G I LINEN STORAGE . 12 ELEVATOR LOWY • ELEVATOR GO' (E) STORAGE ; LJP •:: %I— MOUNTED ELEV- 7.-3?,FF'ORT RikiLS Basement Floor Plan - Electrical Demolition • • ‘• •• • • • f . • STAIR • :.r •!... MECHANICAL ROOM EXHAUST -FAN FED CE) !MOM •ICRE PENTHOUSE ACCESS 11-0131W Level 07- Mechanical Hoar Plan - Electrical Demolition STOIRAG ... GC2 • : • SIAM : • • • : : • E.:2 : • • . UP •••••• : : DEMOLITION NOTES: 1 DSCONNECT AND REli•IOVE ALL EXISTING FEEDER CONNECTIONS TO ELEVATORS, 2 DISCONt4ECT, REMOVE AND RDNSTALL 1/2g CONDUIT AND WIRING TO ALLOW FOR INSTALLATION OF NEW ELEVATOR °PEEING_ 1=XTEND CONDUIT AND WIRE AS REQUIRED MD PROVIDE ADDITIONAL, StilaPCRTS AS REQUIRED. ikATC4 EYJS'7INJD 'ATM W171 -111q CONDUIT_ UPPER MECFEANECAL ROOM 2 :SIAM uP• DE4 3 ELEVAiOR I jj. .141419'. CWB • • 'ELEVATOR ' }lel...reefer ELEVATOR: t UP Ground Floor Plan - Electrical Demolition C I I m 1-,11 --(E) ELEVATOR LOBBY 1'1 EIEVATOR . . •• •• " • • • • ..... ELEVATOR First Floor Pion - Electrical Demolition 1Iw = ;: • . Fi(E) ELEVATOR LOBBY GWE ri_EVATOR E1.EVATOR #1 Second Floor Plan - Electrical Demolition 1 = • \ i:E) ELEVATOR LOBBY ELEVATOR ELEVAT1DR 002 : ' • Third Floor Pion - Electrical Demolition lee.= r -Cr ; . . 1---• ELEVATOR •LoitrtY . .• 401 • ELEVATOR ELEVATOR 411 Fourth Floor Plan - Electrical Demolition .EXI-IAJT .P ELEVATOR •(E) tom •••••••••••• ELEVATOR 11 GWR 5 IELEVATOR *1 Fifth Floor Plan - Electrical Demolition 1/1j." 1 LC!' I.E'orATOR LOBBY C•W GA113 9E) ELEVAT051 02 Shdh Floor Pion - Electrical Demolition 1/8"=11-0" %her FAN . . . EXI:.STINU UGHT:W8 CONTROL SRMJIN TO 5.4-17.7frCi 1-2 ..L (E} "1 DN ELEV. AtOR 1;014•1•ROLEJ. ELEV-2A .e•-• k M1 LT% CD • . • • • ••. • • • • ELEVATOR .. .,_ L..11.. ci. 7 ,C011TROI_Irk-- 1 COCO .11" .• I. Li) i_ tr....,.. PENTROLISE s ELEV-'1B DSS 1 —J Level 08 - Penthouse Plan - Electrical Demolition I '-r/' . • . . . . . . . • r 1 . . A.rthitet hired Resources 114 •.::i ..i:...I::, r'. i4 :1(1:.75••:;I:ii :•.,..v. %I'D& Nu. 1:Xc1MI gl 7 I 6-!...,P_1-1.,.(4 71 11-.SN3-.71:St ILD. ;iy :••• i r !:. k :{. :41.:•••;• MINO •••II...II...1 NGirhIEERiNG E.-6,ah,e.y.,.a.......,..2,....0 W 1 i.:*iia..: E.c..e..:. Iludisrkr I %I..Frc *rusk. I Lc F..1.•1.N:{41 .D5r.'.D.1.511.1..:•t:. isU.1.5;K MIL13. ht 454.1 awa4:.(2:roulr.px.r. RYAN BIGGS CLARK DAVIS E.E.,• 11.5011JY .1. ri.iveri IffK 459-2 Jordon Ra= StanboleesFuls,. NY 13152 .... 31.5 455.47n. :), • ,:..:,.:;,,,..„......„...:::.,...,::„.,..:,.: .., ,.........::: ,.,.....:..:„::„. , 1-100Pe PC,CICI Endwd, Ncrw Yak 137W T2; 607.231.66C0 For 1.07.23i.0i.1 Ern: rnaMdolic-cas.corri ieeliti: MrAddra...e.-M&M CI = Z.* 0 In VI C III . E 43) 1 Lf) _%.e 0 Mil =I >' ID MIMI. NIPPIIIIRP CD '0.) 471) Z 0 0 t. 6 a Seal _ el • .i.• ..1.4"1...1,. :r. • :1— • LX ? ! J . 1:1 • . elal Ci.71•T ...f:/...l• . -<5.. :3:•2• ! „...___, Et. .... . . Issued for Bid 11.18.201 6 . . ••••••••••• ..... . Reviles No. Do-scePtiol Do]e . . ELECTRICAL OVerail FICICif Pi0131$ - Demolition .1i.p..ke-n!Eni ..15•Nioi t•p LI W- Divd?Oi R•On'in jab. H.:3 : .56.06 ..E!..ir li.a.n1 No: ..... .... 0mi...in by: LifF.fmRG Shod NO: E. 1 101 1 O 2OEIY/12.CV 100KWJI25KVA 30, .S PF DNAP GENERATOR • • f.. c A [T 'RANSFORPAER T GENERATOR Fri MECHANECAL GO5 : L'J DN STAIN co • • -120OA •• DIST, {E)P.A.JEL y:..•18C(.F1 DIST. PANEL (E} dE ISItcTRICAIL c -em PANU ,�- E1-8 (E) LEL la Hr R3 S11TOR ••• L P' G3 : WIF STORAGE ▪ •012 20A -1P GD1 G,, L1 $TOFRAOE cIr • ELEVATOR ELEVATOR # f STORAGE. LJa . JANROJA Ci2 ' 1 GENERAL NOTES: A_ C ORsbINATE MOUNTIN.0 H ICHTS AND LOCATIONS OF LIGHT FIXTJJRES AND CONTROLS OLS Ike EELEVATDR PIT WITH ESL Vr Dr< COI TI A TOI_ B. WOKE DETECTORS SHOWN OUTSIDE ELEVATOR DOORWAY SHALL LIE USED FOR ELEVATOR RECALL. C_ OONDUkT ROUTES FDR TELEPHONE, POWER, AND FRE ALARM TRT ORIGINATE IN MErC14AHICAL/EL ECTRECAL SPACES OF BASEMENT T SHALL BE ROUTED THROLKill THOSE= SPACES TO CORRIDOR AN) ROUTED IN EXPOSED CORRIDOR CEILING TO ELEVATOR SHAFT FOR VERT:CAL. RIS - DRAWING NOTES: MOUNT 1.1EP.T DETECTOR WITHIN 2r -Q" OF SPRINKLER HEAD. COORDINATE FINAL. LOCATION IN FELD. f ' PROVIDE A CONTROL MODULE TO NOTIFY THE ELE1JATOR CONTROLLER UPON KAT DETECTOR ACTJVATIO I' 4V THLN THE MACI4NE ROOM_ MODULE MUST BE INSTALLED WITHIN' 3 FEET OF THE CONTACT USED FOR ELEVATOR QQJ'ITF LLgR. EL. W TOR CAB PHONE. MODEL SHA1.1 ESE R ATf1 MICROTECH R11:10'9X7XX SERIES ▪ SYSTEM. CODRDFNATE F 4L LOCATIE IN WITH ELEVATOR I ANUIFACCTURE , TR SFOF 1ER PROV]E G BY ELEVATOR CONTRACTOR. ELECTRICAL CONTRAC•FOI TO PROVIDE WIRING FROM FUSED. DISCONNECT T. TRANSFORr, _F ,SID TERMINATE.. ALL 'WIRING TO LFIVAT•OR AFTER - Hr TRANSFORME.R. SIAL 8L • FROVJDFD EKY Ti -IL , 70 OONT] AT1)R. F] IFY E'. ACT L10-tAT3ON Or TE AAJ FOPPI.tr: I] J FI 'L. D W THI ELEVATOR OONTI TOI. PROVIDE HEW FUSES IN EXISTING FUSED DISCONNECT SWITCH. ELEVATOR CAE) UGHTNG DISCONNECT CT SWITCH FED FROM PANEL LP2, NEW ELEVATOR TEL/DATA CO IL CATION LINES TO EXTENDED TO Emmy I'M IL1,..1-21-11.)11:i LIST# IUL.J Hurl PANEL - ELEVATOR LOMB ` PHONE- MODEL STALL EIE RATH MICROTECH SliART RESOLE SYSTEM. COORDINATE FINAL. LOCATMIN F1.FVATOR MANI.IFAC:TL.I1ff. . S ORAD [ai'l i GC2 UP DRAWINGNOTESCONTINUED: LEVEL OS - PENTHOUSE P ION.E. MODEL 3.#-1A•`L F ATF-: b CRDTECH 2300-63OMR SYSTEM, COORDINATE ft:JAL LOCATION 1Y1TH ELEVATOR MANUFACTURER_ g ALL UGH1 B.JC 1 THIS SPACE SHALL ESE FE=D FROM A 20A -1P EREAK FROM ITh. JIJEL LP , MOUNT 3 -WAY SWITCH ADJACENT TO EACH PIT LADDER. MOUNT 3 -WAY SWITCH ADJACENT TO EACH HOOF OPENING. 013 F1 SD"AF.NTIRJEL • • ; '"' • UPPER F3ASEM�.Nr LEND. Basement Floor Plan - Electrical New Work 119' _ -' PENTHOUSE ACCESS ACC:tH •EES) •L?F•�P} 1 MECHANiCAL ROOM E'?• EXHAUS F FAN FED FROM .HERE UPPER MECFEANECAL ROOM Level 07 - Mechanical Noor Plan - Electrical New Work SIAM .0 VP CIN .. 's ' :• ELEVATOR -, LOBBY LLI (E) :. .• --t•-•%•• .: • ELEVATOR ELEVATOR #2 #1 UP Ground Floor Plan - Electrical New Work 1/.9' -, 1 I jI . •k. r • (E }�' EuVAIiOR LoR4Y &W'EI EIEVATOR ELEVATOR #2 f T First Floor Plan - Electrical New Work 1Iw = 1'-G' { E) ELEVATOR LOBBY • EtEVATOR .'1 C;LeiR E ATDR •£• • Second Floor Plan - Electrical New Work 1 �S' = I LE} I ELEVATOR LOBBY QWB ELEVATOR ELEVATOR #2 T Third Floor Pion - Electrical New Work 1(Er = 1'-�' • LEVATOR LOBBY : .GWB ELEVATOR 2 ELEVATOR 411' • C U Fourth Floor Plan - Electrical New Work 1/8' Ogg J iF. Fl EXSTINQ LIGHTING CONTROLS TO REMAIN I .. 5 ELVATOK j CiWB ELEVATOR ELEVATOR #2 #1 Fifth Floor Plan - Electrical New Work 1 +QII •x'7'11 ELEVATOR LORRY GIs ELEVATOR ELEVATOR It T Sixth Floor Pion - Electrical New Work 1.1.Y= 11-0" I-N.20A-1P 100A LEV 1 CE)- E.) 1 ELEV-2 DSS 1 +........54....4...... Li to BO) E)En (ER) Ido) ) ELEY-T Level 08- Penthouse Plan - Electrical New Work I C .... A.rthitetfural :1vy,., .:0::. :i' is kr..... 716*°?1-.:1(4 M ir.011.i8f r}Si.u.15141n MIL17. /5 A. } :..„:,,,,.. :v4114Y vl r 5o.k !-EFF '6ho .. x:.:;1,ii Y.A. how 1 c 1 C 1111 2.4i3tiJ!1.:it ENGFEEFiNG iki-_...LQl fr7¢u1i..7119 .to.11,4,a..: IIWlr.kr IikFrt Irusk.I 4i It A .41 RYAN Resources I IL. CQIu'1' t1l;r. sir: L i I ids7iu;ii amrrcr#itttytur. BIGGS CLARK CIC.,•Yi 1S SeLdnbolees Its tiY.; .. ..::... ::'� iv: $ 71-I, pe Endures]. Nmrr W2; 607,231..5,M For .407.23i.0,5.1 Ernlrl iee _ _: rnb dcallc-cas.corri '.:"eF re..dita'J•. F71111Y Jordon F Isr 31.5 ,, :.r.r:::: ITG Yak 137W M&X311 C 15 ti a '' ,..____, DI h 771KYIS} R. NY 1315w 415.5.47n. rA_ '.'y::ti.:^',.i r.1 &CK {ti{ CI 1411111 Seal ZIRR 0 .� I E iv ID MIMI. PPM tl el 1n 1 . f' -<5....3..S! Et. . , Issued for Bid 11,18.2016 Reviles No. Dcol Dole ELECTRICAL Qv rc[I Floor PIcinS - w wince. 4.1;45r#-nT..15.,.0i fp L I LiV J rr R rI i Air ;alp Imo: 5506 IienI No: 0mvn by: ,JfF/ :RG Shoo NO: E-201 1 0 f.. c A -I &A, aP LPEP-Pl 0BY/12OV 3P.12CA.141.4 LIP' 208Yro=o) KILO ELEVATOR . 100A MOTOR II n x„, LEVEL 08 - PENTHOUSE 4 200A MSP. TRANSFER Y�ITOH LEVEL 08 - PENT1-1 1SE 5 • LEVEL 07 - MECHJ JEC L FLOOR • LEVEL D7 - MECHANICAL FLOOR L'2-6 20.5:Y/12O\ p -1C# �+Iro 5IX 1H FLOOR S XTFs :FLOOR 4Y-#+FY�4Y14+MFFM4Y-i+FY�4 MF4 �+4Y-#YY-M 414Y WY YYM+WY+*Yy+l*Yy.4 * i FY+1*Ya.Y +.4YW aMFYY4Ylrt*YF#4Mli�+F1Ft+FY�Y+YY+YY�i�iFF4+4F.#YlY•#W##YFY i-W+Y•iY��F 4FY YIY•t YN�1�MFF�MFF+#W.*. 1FF+I+YFY-WY*4FY i�yY•F iI YM�i+FY1t Y+F.Y*YF i�iY+t+FY-YiY� • ##M++Y 4iNF4.MN**F4MF 44444.FMN.+yMF4Y.#YN1+*M ..Y H40.1.1. .+W4 +44i~.1 W+*+Wl it W+.+ W+"H 00.1 .F.1iMF4 4iO4~.-4FY.FALWVYF.Y 4FILFYY+#W4' WF Y+YF Y•YY-+4FMY YFY+I YY 4 4Y-+*Y.YyFM M.YFrtiW.44W 4.YF+1+Y+#MFF t4FY4 W+#MWMMFF##W4.MFF M MFF Y•+YFt+FFY YIY.Yi.#MFF+4.Y4+YMI�MFI tYIY•++YF44.0.1 MFFrt+FYIYY YrtiY4 i+YW#4F•.Y+W,YYM1+YYFY•iY4.SY-.Y YFMt+YF+iYFM4FYt+M�YiYFt4FYiyY+Y+FM.- fFTF= FLOOR 2OBYJ120V 37.225.6.. sJLC� FIFTH FLOOR a4+a*a.++.�aaLmaaaa{�a}.Ya.�+a.am.a.aar't•m'Y_}+.Y+.a*aaaa�ii-'Y-Faa+a+.aa�.+aaanma+aai.+a+nm}aaaaaaammawaa}'�aYa'a.a.+.a...am,Y'?•TmYam+4-aa+.a+aa+'iy't+Y+aY+aaaaa+_+_.+Yayaatap.mamma.ma..aaarea.a Yma+}map.a-mtll}aa.aay y'++t+4+.laaaa+as+am.tfavaalataaa+.m+aaaafa+.ma}a.4•gay+.am.a.aa.maaTm.7y't+Va.aa.aa.aa+rm+.aYa+atiayya+amm+amm..aaaYi-'ta.mm'ta.4mapaaa+aaa.ra+aay.maa-mp.a..maa.am.Ya.m+raa.ay*ul.mmy+.ma.aaaam.aiaa}mamaY+am+aaaaa+Ya.aaiaa+amfaaayaaa.ma..fat`maYa.4a.+l+.a}.maay.aaipmiaa FOURTH FLOOR 2.0.5Yf12O\ 13.130A. roLO -1-3 2.(grill2CA 3° 22!.4 J1L0I FOURTH FLOOR THERE! FLOOR -NERD FLOOR SECOND FLOOR 208YJ120 s8.Dok r.,Lo SECOND FLOOR -----------------------------_---_-a-------a-------------a---------a---:-a-.-------------a------ml mm ---------ma-----_--------- -.m- mm.m--------------------------a----=----a-.-.-=-a----aa-------------a-------_-------a-a-.-_-_mrnm------------------------.-_-_-.,___. E9RST FLOOR. L1..1 08Y/ 1 DV 3P.22•7:•k "AO FIRST FLOOR +1Y++FYI+WYE+MW".FYWiAW#YW.PMYF#4Ya4MIaY*y+Y4Y+YMIaYHFl+YFF+aW.4.WIW*YF4iP.V.VV Y+F44+141++FY4YYa%MIa4AW4Y4-4 .Fiy+tYYa+YYY WrY+WtY+44.PY14Y4•YYY++LWrYMF4}Ya!4.W.A.+IY+aYY+aYY`+1.~fiya{FFY++IYM+14WF+IY+FWD+tlaYYYatAW...V4Y4•Y.W..IYY1Y.W.YY+4}Y4Y4+MI+FMYaYY+YyMFFIFIYYhyYMF4-+IY+YY`i*44f4Ml#44 .44+F4YY4YWMMFFWiIW.FM It YFYi4+M+Ya..F+IY4Y14+YYa4*MIrtYyaY.PYF++I YYYa+1WMYW.Yiyy YOFF4YY+I+FBF.4Y4iM.F4YY4YF.AWIi+FY+YYa.FY14WW.P4Y+a YYYFM.PWYWMFYYa+aiYala+yaY IYF.•4444.YV.F.W.4MIa4rt1a4.YaF{iYaYMF4+.+IY4YYa+Y144..WV.W.4Y44Wiya{YYa4Y44t+1YW4Yt N.W4YYN++Y4•YiyaM.M.P4Yly IF • GROUND FLOOR j TAP I 1.00A_ 3P L }- L 3P.225.4. Ili'{} LP -5 3P,A MLO IND-ICATES (3)167 KVA, PCB CONTRAINATED OIL -FILLED, SINGLE P#1ASE, 13.2 XV PRIMARY. 120V SECONDARY Tf ANSFOR RS. O.PBLE• TRAY F'R5 LOOP RPCC E Pc c 208Y ONLON Glk'N { 1 LOOP SWITCH 2 SI FARE L • l -1 i15 Kv sv rck r C;,-1 238Y/120V 1 t (6) 4JGAWC L1 -E COY/12 V SPARE PE 80DA. F L1J - On On •Lak - LrJ • r 0 Ere 4E O 1I*) MSO 193 t # . /I r fl ..44 fl fl fJ 13-112 '12,1 1 \119 I I I 1 i P L EM 4QO 1. 2C8Y /1WWV. {OI OENCY PANEL J ARD) f ATS, 400A 208Y/ 20V 1Cti KW ` 2O YJ'20V 441 INDOOR EN GENERATOR 4130,4. 3P GROUND FLOOR f 0 oLFTDoCA LOOP S 'ITCH SWITDHnOARCI DISTt ]BL]T!ON OTIcJ 31600A, 2oJ�Y/12c v} SASBEN�r ASELAF,NT L 1 2 3 I C A.rthitetfurcri :1vy,., ,=:1)1::, 3'1TAW• i7rt• 71(-!;n1-1 .1.{ rs5i.u.15141n MIL13. �I ,:..„:,,,,..„......„.:::„...„......,..:,.:,,,.........:::::„.,.....:..:„:„:„.4„ :v4114Y v1 r' .51:.k ! -12E2 x: I1i rk, how v'1{liC.14 M; 17iiSk3-71.:i? jlai i, FNGirhIE riaiiko iki-_,.L4l fi7¢u1iri71 .1,0111.4,a 1:56il77 IIWlr.kr IikFrt Irusk.I 4i It A .41 RYAN Resources IL. E iNG CQIIS1' 1;ri Cc vie L !,id iis}fu;ii amrrclr#ttttytur. BIGGS CLARK cic4• 1S seLdnbe_de 11155 „..,_,,,pe Endures], Nm r W2; 607,231,66CF! Fox' 1.07.23 Erna: rn' lrldcallc-cas.corri INe : ww' delta.. Uri FA 111Y JQrdn es FblSr 315 ParCICI Yak 137W i . C ul - (1) a .f. . DI F' 711KYIS} I NY 13153 4155.47n. rA_ 1 .Q -n 1 IfrK . Eppppip CI Seal .41.*0In IIIII III 1. CD E > 1 NIPPIIIIRP PPMy tl .'14-4' D.- 1- • 1 . 7. f' r{;;#1'' 4•}L!C' Issued for Bid 11.18.2016 3ev krs No. Dc pticn Dole ONE UNE ILIAC RAri Power FIser °Iawa rn - Der-iolmon A Ir ;alp Ha: .524.16 ClianI No: 0mvn by: .LfF/1 :RG Shoe! NO: 1 0 f.. c A -I 5 A. aP LPV-PI '20.5Y/12OV 3P.12CA.1�1.4 LIP. 208Yro=o) '. xii KILO r ' 1 tV- I ELF"VATOR 1.1 MOTOR LEVEL 08 - F' NTE- OUSE 11:10A 1013A E=I 4 --tea MM...MMW...-......M.IM.M.M a .!.w..a a.M- WM.TM.M .-W ._, ....M.---W--------T-----.._-M.M-.!-..M.1...1 42 UOTOR ICDA Cg 5 2AUTOMATIC JL aITOMAATIC ••• T ,ISFE17 LEVEL. - ME €I JE AL FLOORL...4�Y..Y�4-k .a,4,.4-It�I. r-..W*M.FIA -I. h�A .* I. 14W A .A.1„ .. ka,.1,. 0„M� ka,4,.4.�,4.1. „ *I+„t WAHMWOr „tAWMF. * AWM-A L 0� PEPJTf O ZJ /12O\ P -1C# �+Iro SIS fli FLOOR YM•t+FY�YYi4+MFFMiY+i+FY�t+# *+'tM4'+.* PYYl YYii+YYF+yY*1.W..4 *i*+Y+Iy+MY+.Y YYW �+YYYYW#4Y+#YiY 1�+F1Ft+FY�Y+YY+YY�i�iFF4+4FYtYlY•t+Y4t4FY i-W+Y•*M'"+4FY YIY•tYN�1�MFF�MFF+#W..* 1FF+I+YFY-WY*4FYY*Y•F.Y YM�i+FY1tY+F Y*YF 1�iY+t+FY-YiY� 4##M++Y 4..NFV WA*4+.F 01i1FY 4 +.4+4+ IMV#YN1++. .YN1.M.h+W..+01W 4-~*+S+*+YH YW++ W+"H ++*.F+ 1,-PW4 +4-# +.0.WlY..Y.Y++YY+#YM' W+.1-1 Y•YY-+Y+YY Y.Y+I+Y14 M +*YLYHY MW+**W. WW1. +M+Y+#MFF.1-WW W..4 F1FTN FLOOR 201 YJ 120V 37.225A. LJLC) a{says.aa+.aaa&aaaas{&aa}aYa.aaa.aaa.aaYmat`aaY-}+.Y+.a*aaaaaaii-'Y-Fas++aaaaama+aaa.ma+Dai.aa+na}aaaaasamamam{am-t'ma+YampaaY+.ammam.Y'{'TamYma+4-+a+.a+aa+mam'iDam'{aY+aY+aaaas+_+_.+{a.yas{af.a.aaa.ama.a+aaraa.a Yma+tmamaammtII}aa.aay y'a+ta4+.1aeras+aa+aama{faYaai+t+aa+.am+aasafa+.ma}a,4may+.amma.aa.amaa Tam.,amm'taVasaa.+a.aJmayma aYa+amayya+mma+teams Yi-'{mmm'{m4•aama+aa+ FOURTH FLOOR THERE! FLOOR• • SECOND FLOOR 3P_1CC . Nu) -1..3 € Y11:u' 3° 2v.4 AILD 2O8YJ120 LiP_DokF LO -----------------------------_---_-a-------a-------------a-------a_a-a _:_a-.---------- MM.MM ---ter--------------a-----_----_-_-.M-----a-------a-------------------------=---_a-.-.-_-a---aa------ RBST FLOOR. L1..1 208Y/120V 3'.22 . LlL O +IY++FYI+YY�+.4aYhY+iYY�4YY�}...}F#YYa{M.aYy+1+YYYaY W�YFW+hYF+a MHM+I+FYy+FFYiY+Miyy Y+.4Y+IYI++.YYYYa �4MM{4NYYYa+YYa�Fiya}YYa+YYY}14Y+M�}Y+44}YI4YY•YYY+f WrYMF4 FYa!M+F�FY+IY+aYY++YM`+1MM}iya{FFV++IYM+14 �F+IY+YFY+}I+YYYa}iY�+�}�w.YY•YMM�4 YYIY�ri YY+4}Y4Y4+MI+F MH YY+YyMFFIFIYYohYY+Y+iYY+YM`i*W YiYl{YYa}+YMYiy�#YY�MMM�FiW�tMy}iaFYiyFM+Ya�F+IY4Y14+YY+�F YISrtYY•Y�YF++1Y•YYY"l hY�YYeaYiyy YY}FY YY+1iy+�Y44iMSFYYYYYF+iY4i+.Y+ GROUND FLOOR INDICATES (3) 167 KVA, PCB CONTAMINATED OIL -FILLED, SINGLE 141ASE, 13.2 XV PRIMARY. 120V SECONDARY Tf ANSFOR RS. C.b.BLE. TRAY F'R5 LOOP swrrChL F PCC 4SOV s KF1tiI R: RPDC ZDBv �iFf;IR. ONLON G&W LODP SWITCH • 2 SPARE f • L_ L nAh.hn± n.n.n.„ .. EIR5 iS Kv sverck T 2 rd CC -1 COY /120V (6) 4(GAWC SPARE SPIE L }- L ?P.§:T11.2 3P.225.4. ISL{} } LP 2OaX/12ov MLO 4_ lrJ Ir}lin lin {ij - LEJ • iC1 i RPO 5 DRAWING NOTES!- 0-) '-) ROUTE CABLING ]N ELEVATOR SHAFT. TRI S.ORMER PROVIDED BY ELEVATOR CCNTRACTIDR. ELECTRICAL CONTIAO`MtZ TO PPCEVIDE WIRING FROM FEJSFD DI CONNECT TO TRANSFORMER AND TERMINATE. ALL ' RHsIG TO ELEV r TOR AFTER THE TRANSFORMER SHALL BE PROVIDED BY THE ELEVATOR CONTRACTOR.. PROV3DE 100A ENCLOSED CIRCLIiT BREAKER IN LEVEL OJT - FENTI RUSE. PROVIDE DRE ER WITH SKINT TI [P CAPABLITIES FOR .CONNECTONS TO. BE MADE WITI4 THIS PROJECT.. PROYtE STkCKER OR SIGNAGE EVERY 5L VERTiCALL Y FOR. CONDUIT LOCATED WITHIN ELEVATOR SHAFT WHERE IT ]S VISIBLE FROM TI -IE ENTRY BOORS AT .EACH LEVEL. IT SHALL INDICATE THAT .rHE CONDUIT' 6 W.Wit4G 11.1.E ELEVATOR SYSTEMS, LEVEL 07 - NCHICQL FLOOR S }CTI- FLOOR t+YF#..W Y+Y-Y444+.Y+'}Y14+YW Vii++IFF+Yi+.i YWYVii}YMF++.W4+.Yrt4+y+YMY YW+.Y14YYW4+.WY+YH-1YMI+YY.YY14+Yi4Y YW FIFTH FLOOR .�.ra+aay.aaaa. a.aaa.aaYa.a. a.aY*a}..a1+.aa.aaaa�a1-'t.afaY+as+aaaas+Ya.yasias+�afaasyasa.aa CD FOURTH FLOOR THIF FLOOR SECOND FLOOR FIRST FLOOR 4 Y14 �h+F�F { MFa Y YYF M }ha Y YY� } YY�++iYa M.� Y YFF �• YY+F YY� Y YY• 4 M1+Y rt1a rt YaF { iY�Y MFh+�+1Y Y YYa+Y14 {+h�� Y+F�+Y4h Y iya { YYa Y YY D 4.7 .49 LW LLI 01- a_ I Ir r r PANEL1 ARD) ATS, +O'A 20LY/120V GROUND FLOOR loo Kvi 1 :NDOCIR NERATOR f CoLFTDoOn LOOP SWITCH SWITCHnOAR J DiSTI ]BL]T!ON SECTION 11600A, OAEfCf T 1 2 3 A.rthitetfurcri :1vy,., .:qI::, i7rt+� 7I6 I li&d.011ii8f j}5i.u.151I1n MIL13 �I /5 L :v4114Y vI r'..51s.k ! -12E2 rk, Nu.. 1 CCi -!..!P -1-.11M; 1111 .SN3-.5!1.:i? Fr NGirhIE iki-_,A,41 E. -6,a ibl P:,1 1: IMllr.kr IikFrt Irusk.I 4i It A .41 RYAN Resources 1 a IA RING iri71,,C .1..c ' i;ri 561.2 Cc F•i•WGxd iis}fu:ii amrrclr#itttcovr. BIGGS CLARK CIC.,• 1S SeLdnboI e " D 11155 1-1 ,pe Endures], Nmrr W2; 6O7.231,66CF! Fox' f .23i.Oil Erna: rn' lrldcallc-cas.corri INI41: www.ddta•. Vi FA 111Y JQrdn es Fblsr ,.........:::: ITC,C1CI Yak 137W C ul - a DI F' 7111{Y1S} Rc NY 13153 rA_ :..:.,.....:..:„:„:„. {.Qn ix 1 IfrK ,:.„ Eppppip CI Seal .41.*0In IIIII III ri. CD E > II�..I 1111 PPMti tl 1- •.f. O li .(1:1. Issued for Bid 11.18.2016 Reviles No. Dc ptiol Cole ELECTRICAL Power Ri$er Dir gro rrt New Wnrir A Ir ;alp IU: .564.06 i�lienl= Na: Dru n by: JFF Shoel NO: E-401 EEEEEEEE 1 D f.. c A L -I 1zoV, 20.A j 41P.:411•I CE) F Lr1 1 1 1 11 Ij Ij I I HAEME]1T !j I GROUND Ij J-13ST FLOOR Ij I i SECOND FLOOR I' 1 j THIRD FLOOR (F.-) TF.] CEx iF) CF} E) fr) CE) {EJ €E) LE) .CE) {E H CU 'EI {) 1) FOURTH FLOOR II I' f . TH FLOOR II I � 1 j aiLTH FL CIE . n (E) L'J4 ?rr fL�yl CE) LFyr (E F 5C 4E3 a4 M CE) {E] (E). Ij 1 11_EVEL 07 - ECF':APICAL FLOOR BATTER ES II I I LEVEL. O8 - PE'Nit=houSE Ij (E) :EJ (E). LE) .IF) I j FOR DJ RAMI 1ATIC PURPOSES ONLY. (E.) (E., (E ' 5 4 : frl � y r r l [ 1 (E) YEi {El CE) {f) 1 115OOLIB CE I j REFER TO FLOOR PLAN FOR EXACT QUANTITY Or DE1v1ICES AND LOCATIONS. FIRE ALARM GENERAL . T . a 1_ PROVIDE TEMI ar 4M' HEAT DETECTION FOR ENTIRE CONSTRUCTEON AREA :I -OR DURATION OF THIS PROJECT. FIRE ALARM DEMOLITION NOTES: 1❑ DISCONNECTED AND REMOVE Ek]STINO FIRE ALARM DEVICES AND ALL WIRING/CONDUITS B ACK TO EXISTING F: OI 7200 FA :P OR TO hWAREST EXISTING TO REMAIN JUNCTION BOX OR FIRE ALARM DEVICE.. 1 FIRE ALARM DIAGRAMMATIC RISER DIAGRAM - DEMOLITION $CALff; NOIR' 120V. 2Q(E) GROUT •JB0O JB FCI 7 2 Op 1 , I'I , I I -BMENT GROUND II j FIRST FLOOR u {E3 (E) (E) (E) (F __J - L__s-L L__. .(E) EE) CE)E? (e) BATTE .ES II I T1••IIfD FLOOR JI I, 'I I FOURTH FLOOR -LE) cE) (E) (E} CE) F••n c)"•' ••F l; E) LE) D (0 II ' I FI= TH FLOOR I I I iXTH FL PFR. I, I a Cr a - El cn (E) (L) E) IE) (E) E? {E) j l {E) j LEVEL 07 - MECF-i ICAL ROOM a I i LEVEL OB - PENTHOUSE (E) (E) 1;E) C E) (E) €El (E) {E) RE] (E.) {El CE] ! !REFER DIAGRAMMATIC iATIC PLJRPOSES ONLY- (ElI ,REF EIS TO ruborPLAN roR EXACT 01.1AACTITY OF DEVICES SAND LL CATCi N S_ ..r ..r. , vr.. r...:r...:r r... FIRE ALARM DRAWING NOTES: ▪ FIRE ALARM AIWRES5ABLE CIRCUIT EXTENDING BACK TO MAIN FIRE ALARM CONTROL PANEL. ▪ TYPICAL AUXILIARY ADDRESSABLE CIRC.JIT FROM FIRE ALARM CONTROL PAt.EL. IT €S ACCEPTABLE TO EX TEN? OFF E (STING ADDRESSABLE LOOPS OF Far .k,ARJwi SYSTE: F . Ft FIRE ALARM DIAGRAMMATIC RISER DIAGRAM - NEW WORK SO .. •; NONE 2 FIRE ALARM NOTES: 14 DEVCC S SHOWN ARE DIACR OWN, OY. AOR EXACT LOCATIONS AND CR NTITIES FLOOR PLh15. C. ALL WIRING SHALL BE CLASS A WIRING, REFER TO SECTION 2k831O2 OF THE SPECIFICATIOF# FOR A1XJ1TIONAL FIRE ALARM SYSTEM REQUIREMENTS_ ALL FIRE ALARM SYSTEM RACEWAY SIS lam] ouITRY: REOLIIKPAR4TS S1I+ALI, BE EN ACCORDANC W.TEi J M'M NT MANL.FrJaA1iJ"4.IJ`s l 5 RECOIAMENOKDON6 AND ALL, OCIMS THAT MAT APPI. Y- D. akaLtis MST BE Li ICIUELY EIEr'1TFflED AND LABELED, AND A PERMANENT, ACCURATE RECORD OF THE IDENTIFICATION AND USE OF EACH ABLE 'MUST BE MADE AT THE TIME OF INSTALLATION_ LAE LNG fS TO BE. DONE WITH PERMANENT M1 R1 ERS ON •CL_ MYL_AR TAPE. THE TAPE L BE LONG EKOUG -I 187: 1 WF APP.EO ROEJr+I ) TL CABLE IT WILL WRAP OVER IT.SELF„PROTECTISs0 THE WRITING. E. FAV3 AHD OTHER PANELS SHALL BE; .MOUNTED W€T:-I CLw.1 R E5 FOR. OBSERVATION AND TEST ,IG. ALL OTHER FRE ALARM JUNCTION BOXES SHALL BE MARKED FOR IDENMCATKAA. F. PROVIDE 12OV„ 2IJA 17EOICATED BRANCH CIRCUITS FROM THE LOCAL AREA LIFE SAFETT PANELBGARD TO CQ TROL PANELS, TERMAL CABINE=TS) ETC. AS REQL)JF . TI -IE CIRCUIT BREAfCER SF#LtL1_ BE CLEARLY MARKED ')FILE ALARM CLRCUIT CONTROL" IN THE PANELBOARD DIRECTORY_ G, SPACE DETE.CTORS IN J CORDANCE. WFF#i TCS MANUFACTURERS RECOMMENDED ED 0ISTN'K E. PROVIDE CITIDNA11. DI;3ECTOf 5 TRIP La REQLJ]RF. H. ALL LOW VCL 'AL PERE ALARM QUITS NAY OCCUPY A COMMON CONDUIT, RUN AC ROWF AND CONTROL WIRING (FAN SHUTDOWN, ETC.). ] SEPARATE CONDUIT, DO NUT RUN WITH ANY OTHER. FIRE ALARM SYSTEM WIRING 1N A CONIIACIN CONDUIT. L ALL CONDUIT, MO TNG BOA AND PANELS SHALL BE HUNQ AfiD FASTENELI WLT.- TITTINGS TO ENSURE. .1- SIT1vE C.KILINOENG THHC1JGHO1.J: ; E ENTIRE 'SYSTEM. J. TRANSPOSING CHANT INC COLOR OOt'NG OF: WIRES IS NOT PE1 b,1kTTED., ALL CONOLkOTORS IN CONDUIT GON'rAmG 1,A0RE THAN O WIRE SHALL BE LABELED ON EAH 1D wITF, ''E-• K. CONDUCTORS IN CABINETS SHALL BE'FORMEL AND HARNESSEEI 3O THAT EACH DROPS OFF DIRECTLY OPPOSITE ITS TERMINAL, L. ALL W3IF AIG SHALL SE CHECKED JNND TESTED Ti ENSURE THAT THERE ARE JC GROUNDS, OPENS, DR SHORTS. Mi, WINO COU19.. fir ES 'SHALL CONSISTEHT. THAOIj �OU4 1` T THE. SYSTEM .AAL,4LL0W FOR EASY IDENTIFICATION OF IIATIN . INDICATING A'I..LD .1 11 FIBRY CONTROL CMCLITS. N. THE FIRE ALCM RISER DENOTES THE CIENERAL ARRANGEMENT OF THE SYSTEMWITH TYP1GAL DEVL S .AND MINIM ULJ 'QUANTITIES OF TERMINAL CABINETS & POWER BOOSTERS. PROVIDE A 1 ITIOUAL TER! IAL CABINETS, BOOSTERS, ETC;. AS R QJIIED TO PROVIDE A COMPLETE AND O WHArIONAL SYS I EM, O. ALL FIRE: ALARM SYSTEM JUNCTION HORS 5.14Al BE P.AIN1'ED REO WITH • S15 CL LETTE=RING INDICATING "FIRE E ALARM SYSTEM". P. WIRING INIDIDATED ON THE F}SER DLAgR M I5 DIAGRAMMATIC ONLY. IT IS NOT INTENDED TO INDICATE ROL:.3TIND QR QJl4NTLTY OF WIRES REQL 1 D PROVIDE WIRING FOR A COM LETE B TEM AS REQUIRED SY SYSTEM MANUFACTURER_ ANY EXTEN0 FllQl: ALAN 5Y T M DEVICES SHALL KMAIN IN OPt A�'I N UNTILTF{ 4 SYS'T'EM AND DEVICE HAVE BEEN TI ED AND TESTED. R. NOT ALL INTMCOMECT'ANG WIRING 5 INDICATED,i.e, AS BET'IEEN ELEVATOR LOBBY SMOKE DETECTORS CJD ELEVATOR CONTROLLER, ETC. S. REFER TO FLOOR PLANS FOR EQUIPMENT- LOCATLONS. T. PROVIDE MONITOR MODULES FOR LNCKCAT!ON AT FIRE ALARM CCNTROL PANEL OF TJ- •FIRE PUMP RUNNING, FIRE F'UMR FAULT D FIRE PUMP POWER LOSS. U. PROVIDE CONTROL FLAY MODULES F -DR I•LEAT ',MC -TORS LOCATED IN ELEVATOR M1OI•IINE ROOMS ICOR SHIM TRP CONTROL or THE .I I ON NECT w31'OHE . •SERVING TI4ELEVATORS. PROVIDE= ALL INTE�CONI OT 1G ADDRESSABLE MODULES, ETC. V. GENERATOR SHS E:AVE A REVIOYE SIGNAL DEVICE TED INTO THE FERE ALARM ANNUNCIATOR. THE ALARM SI AL.3. IKA.TIn "ENGINE R; J? NG". {- ci.ei4m1KroR 511 1.1 F!Alue. A 1IOT L T41f41, V 1E D INTO f Fis,iE: ALARM ANNUNOIAtpk. Ti'. $ICF +ad. $H/.L.. IrOP NDBMN, Y. NOT ALL EXISTING DEVES EQUIPMENT E' SROWN FOR CLARITY Of' NEW WORK TO BE PROVIDED, 2_ ALL NEW DEVICES SHALL BE ..ADDRESSABLE_ l4AL PROVIDE DEVICE LASELNC AS PER COVIELL LahJIVERSITY :STANDARD 2B3100_ Fire Alarm Mounting and Spacing Guide 1. MANUAL FIRE ALARM BOXES;1ti1OUNTINO HEIGHT 42-4-B INCHES TO HANDLE, LOCATE NO MORE THIN •5 FEET FROM THE ENTRANCE TO AN EXH LO=CATE ON THE LATCH SIDE OF DOOR. IF PO ALE. SCIXES ARE TO. BE CO1$1, [CU ODBSTRJO>'1, ACi{1 S ULE. SPOT TYPE HEAT AND BmEIXE OETEOTOF FOR SMOOTH CEILI s. ALL {POINTS ON TF- cRii,R1( SHALL HAVE A DETECTOR WITHIN 0.7 'ONE'S THE: @ETECTOR SPM TNG. SRA: IS 30 FEET EyOR S KE DETECTORS AND 5.0 FEET FOR •HE AT DETECTORS. PROVIDE A SPACING OF 3 FEET OR MORE •F ROMMI SUPPLY AND RE1 VNN+l DIFFUSERS.. COCERDJNA FF motipEs HY MEANS OF THE REFLECTED CEILING PLAN, CIF DESLGN CDIE JLTIQNS OTHER THAN SMOOTH CEILINGS OR CEILING HEIGHTS OVER 12 FEET ARE ENCOUNTERED,SHOW CONLITIQNS AFC O VE REASONS FEIR COVERAGE E DESIGN.} 3, DOOR RELEASE:SMOKE 'DETECTION PROVIDING AREA COVERAGE DN EITHER SIDE OF THE DOORS MAY BE USED FOR. DOOR RELEASE. SdM01<E DETECTORS# -I H ARE PROVED FOR DOOR .RELEASE ONLY,. SHALL O J THE CENTER LNE OF DOQF(wAY MD, 140T MORE THAN 5 FEET FROM DOOR - 2. 4, ELE=VATOR RECALL` ELEVATOC RECALL SHALL RE I~ Y LOBBY, MACHINE ROOM, ..0N) k 1JISTWAY SMOKE DETECTORS ONLY.. LOBBY DETECTORS S 'SHALL BE ND MORE 1-i-baN 21 FEET FROM' CENTERLINE 'OF ELEVATOR DOOR. (HOISTWAY SMOKE DETECTORS FOR ELEVATOR RECALL ARE ON_Y PEOUFEED WHERE THE TOP OF THE HOISTWAY S SPRIEJKLERED.k - ELEVATOR .SHUTD P*: F SPRINKLER H=JAS ARE LOCATED IN. THE ELEVATOR 144!yI-1INE # CQM ❑ p15TIA'AY 7O'r OPE FIAT QErt C Qr $1-10 144, E)E: Imo'}+ 1 I WITHIN z SRT Or A -F SPRINKLE W _ I5. VISUAL AND COORBNATION AUDIBLE/VISUAL NDTFICATEDN' APPUISCES" TOTE ENTIRE LI=DS SHALL BE WMTHI;hS &O INCHES -S5 INCHES ABOVE THE FLOOR. DEPENDING 0*1 CEILING HEIGHT. HIGHER MOUNTING IS PREFE1ED. VLSIBLE APPLIANCES SHALL BE LOCATED NOT MORE THAN 15 FEET FROM EDND DF THE CORRIDOR 1NITH A EPARATIOFJ NOT GREATER TON 1 FEET BETWEEN APPLIANCES IN CORRIDORS. LOCATE AN' , FF'UJ NCE OPPOSITE EACH ACCESS DOOR. TO ASI EXIT. STAIR SO -MAT IT WILL BE I d LE 'TO PEONS ENTERING. TLB= FLOOR FR01y THE EMT STIR. 7, AUDIBLE NOT:FICATLON APPJANCES' TOP OF DEVICE NOT LESS THAN iC J11CME5 0240V.E FLOOR OR NOT LESS THAN D INCHES BELOW CEiUN . $_ FIRE ALARM. -CONTROL PALS. AMUNCIAtOO PANELS, WJ4REIEN STATIONS, Ertl;. MOUNT Ul ACCESSIBLE LOCATION APPROXIMATELY 5 FEET :N HEIGHT TO PANEL DISPLAY READOUT_ ALL PANELS SHALL HAVE 36 'INCHES OF WORKING CLEARANCE' N FRONT OF PANE_ ')- REMOTE TEST STATIONS FOR DUCT € ETE :OFRS AND SEAM PE -MOTORS; M01LNT I PPROXIMI!ATELY MCI H[ -1 IN AN ACI=56LSE .114Q Q0:4590-1V-P5LtX At N. 10. AD DP ES5AflLE CONTROL DEVICES SHALL_ 8E. LOCATED INM-IN 3 FEET Or THE CONTROLLED OLLED DEVFCE, SUCH AS VENTILATION F'P OR ELEVATOR GDNTROLLER..ADD ES5AT LE MONITOR DEVICES SHALL BE LOCATED ADJACENT TO 1' DNITORED DEVICE. 3 d 1 5 FEEDER SCHEDULE FEEDER NAME OVERCURHENLT DEVICE EATING CDPPE'R CON I L.JC'I C S •CC €DU;T(FOR CU IJIHSNG) F711.1JY Jordon es F ISr ,, :stir:i`. ITS Yak 137W CF! C (1.) ti a PHASE NEUTRAL GROUND OL.1.41TITY SIZE NOTES iiii III r. E > ID MIMI. S0 3l NIPPIIIIRP Rini tl . . (3) *SAWG (1) *8,AWO CD .*1DEQ 1 i 113 10 5OA, SP L3) *GAWG - CI) *10E0 1 I T" : EIOA YP i i3.} 415.AWG .. (1) 4.1OEG 1 t•-VV2 '11• ELECTRICAL Ris.er DidgrcLrrS- New Work A Ir ;ab Hu: 564i16 3ElienI No: Oro An by: ,if R/1 :ROI Shod NO: E-402 70A, L3) *SAWG c1k *8AhiG W '1DEO 1 1-'5172 '1 CO '10 , {3} # 04WO ( 1) * 4 -AWG ( 1) *SEG 1 1..V2. '1 . 10A, ;3) * AW (0 *8E0 1 1-1/2 c1 t1D6A..30 L 3) *1A'ALO 1} *1AW E 1) *SEC 1 1-1 2. '1 .TD.QA, ..P. (3.). 1J'6.' �• . c1). *.I5E . .1 • 7- /.2. "1. 125A, 3P ( 3) •1A' 'G. (1) *1AWG ( 1) *BEG 1 1-1.12 "1 • 1254, 31:' (3) 4i;114.161.G - (1) 40BEG 1 1-172 31 tSOA. 3R C,.3? *210AW 1.1') 4.2/0AWG (1) *15E6 1 c1 t5OAJ 31 (3) .211:11011G ' l) 6EG• 1 2" 200AF 3P L 3) *#? 0AWO (1) 4/OAWO L 9 * 2EC 1 2-1/2 1' Co22M, 3P (34'2PGAIfL'O . (1) 42/0AWG 11) *SELF 1 2-1/2 " 250A 3P ('3). *25OI(CMIL .0) *25Dr(CMIL (T•), *2CG 1 4" el-ODA. 3P (3) *50OKOMIL ( 1) * 500KGMIL ('D *2EG 1 el S1 6001 5P 2 SETS QF t.3 II 530KCIAIL. 2 SETS OF (1) *3•5OKCMIL 2 SETS OF C1) *EG 2.800A, 3"' 3P 2 SETS OP' C3) *5lXKCMIL 2 SETS OF 1;1) *50CKCFIMIL. 2 SETS. OF C1 .01/OEC S1 ::,10A, •L3) *10AWG . A.1).*IDAW. • • L ? *1L)EO :1 3..."4.1` 30A, 3P (3) *101A1NG - W '1UE:C 1 1 3/4k 300A. 3P r3). 45QOKCMIL (1) *&00KCMIL (T) *2E6 1 4.:1 500.05 3P 2 SETS. OF C3? 4330K IMIL 2 SETS OF { 1.) *.3S( CI IL 2 SETS OF (1) it/DEG 2 S1 10 GOA, 3#' (3) *•3AW0 (9 4.1.8EG 1 1-1/4H 250.JAT 3P C3). *250KCMIL CD *23D.KCMIL 0)- *4EG 1 3" 200A. 3P (3). 63tGAL G •,1.) * (OAWG (1) itEC 1 2-112x1 CI 1.11'.4p '(3 •*12. WQ 11) M.2AWC '1: 11?E.c 1. .11l al 15A. 3P L3) * 12AWG - L) *12EO 1 i r 35A, L3) *1 AWO (1) ISAWC Ll•} lic8EC 1 11' 250A, 3P : (.3). *2 IIKOMIL• .(1) *251:1KOMIL fit) *41"0 1 1 3"1 Power Feeder Schedule SITS: LEVEL Oil - PE_E11 I HOUSE ELEVATOR CONTROLLER ORO4tN r-LOOR DRAWINGNOTES: ROUTE CABLING IN ELEVATOR SFS FT. WIRING FROM ELEVATOR ROOM AND € ROLIND F'LO0R BASE STATION TO ELEVATOR PI c 1 E SHALL BE (2) 24 AWG' TWISTED., SF ELDER Pos. DETAIL NOTES: AL FROViDE A COMPLETE A'JD FULLY O '1x1 ATIONA L 'STEM. PREFER TO THE FLOOR PLANS. FOR ADI€ FTICt4AI,. INFORMATION MD DEVICE LDC ATJONS. 8. A COOMUN CATION KAJLLP E DEVICE SHALL EAE pczovictc.. CALL TO ELEVATOR ilC.._ 1" Y A 1 o, 1tiIl5.JIiL. BASEMENT WART RESCUE XJ -ERI+ H TM.rIDF1 I PHONINF E= DOSING NG MAIN I�I�1L7F; " TELEPHONE DIST ti1Y�• RAVE COMMUNICATION DIAqRAMI.viATICRISER DRAG Y .NEW WORK ..nnnn�_wwnJ..n.nnn.n.n.n.n.n.n.n.n.n.n.n..n.n.n.n.n.n.n.n.n.n.n.n.n.n.n.n.n.n.n.n.n.n.n.n.n.n..n.n.n.n.n.n.n.n.n.n.n..n.n.n.n.n..n.n.n.n.n.n.n.n.n..n...n.n.n..n.nn.n.n.n.n.n.n.n.n.. SCALE:'N NE I C A.rthitethire :1vy,., .i...1 :i' is kr...... 7I(5 ..i&mo11ii8f JsSi.u.L51F1n MIL17. �I /5 A. „..:>.:,,,,.. 1 :v4114Y vl :, r\{L.P.....k ! a7.•:? '6.ko '• x: .;1,1i Ylrk, Nu... vi c 1 iC,i -°?1-.11M; 7711.Sk3-.5'1.:i? 1•4464q;C'' vii ENGirhIE iki-1.;:_41 ENE,1 ori r.:*iia..: IMllr.kr IikFr: Irusk.I 4i It A,s„ J Resources a IL. RING ie.. -1 CQIIS...2,...; u sir: Cc F•i•WGxI iis}fu;ii awax..0 itttya}r. N BIGGS CLARK cic4• Yi 1S S ..onb .SI r " !:: ... II: s ...„.:::'J.•:2::•,i':: $ 71-10,pe Endures], Nmrr T;.5O7.231, Fox' 1.07.231.Oi1 Erna: rn1m ldcalic-cas.corri We : Fine dTC1•.£ F711.1JY Jordon es F ISr ,, :stir:i`. ITS Yak 137W CF! C (1.) ti a DI h 771KYIS} R. NY 13153 rA_ •., .::^•i r'1 {.Q3i1 k 41 r • '- `air <•JS IrrK !: CI Seal .41.*0tail iiii III r. E > ID MIMI. NIPPIIIIRP Rini tl . . rf'i 1 D f.. c 3 A L NORMAL FL�yy,��ER SUPPLY. -I TRAF'fR smicH I E T °L EMERG NCY SUPPLY AUXILLARY CONNECT (OPEN FOR NORMAL POWER) PISS€DEAL CONNECT CL U5L 1.0 4O' SE.CUNL PRIOR 'ICI T F AN IR IN EITHER DIRECTION. AN OPENOPENI IIMMEMATELY AFTER TRAN$FEP ). a (4) 412 Ati O WIRES TO ELEVATOR O• MTROL NORMAL ELEVATOR POWER FEEDER To 1 LIIL.DING EmERGENCY 1.ICHTlt SYSTEM FUSED SAFETY 1-1:ASCOININECI SIMICH v... 1. j ITYPICAL.} 0 ELEVATOR CONTROL }1 30 ELEVATOR CO IT1 OL *2 12CIV EMERGENCY LIGF•TRNG PANEL TO CONTROL * 1 TO CONTROL 46 2 ]••••••rorz INf IVII1LJAL Cr 1.k.HTINC; AIN FAN TO REMOTE 1-1:11Y PANEL,=—FOR REMOTE CRT ANIJ REMOTE COMMIJNICAT€ON L FNIT TYPIGAE EMERGENCY POWER WIRING (MULTIPLE ELEVATORS) TYPICAL 4-LN3 -1T 4 } PANEL NUMBER BRANCH BREAKER NkfMBEI GROE.RWING PIN .QUI TDP OR TO LEFT OF OUTLET ON HORIZONTALLY MOUNTED RECEPTACLES RECEPTACLE. OO#.LOF Erf CI-UTECT IYY LABEL VERIFY COLOR WITH MINER., ADHERE TO COVER ?L4Tt US1I4G CONTACT CENT - FACTORY .ADHESIVE WILL NOT BE SUF tUENT. ACTUAL CILGUI1' 1NrOF P lATQN $RALL LL t E A.! €NS1 ALLE€] APJD NDT NE'CEES,4RILY THE SIE CIRCUrr NUMBER AS1- W J ON THE PLANS_ DETAILNOTES A PROVIDE GREEN ORDUND WIRE IN ALL. RECEPTACLE CIRCUM S. CONNECT TO GROUND EUS. IN PANEL. B. DO NOT INSTALL RECEPTACLES, LES, COMPkJTEFOR TELEPHONE CUTLETS BALI£ TO BACK, €I 'STALL IN ADJACENT STUD CAVITIES, TO REDUCE SOUND TRANSM SSIGN. TYPICAL RECEPTACLE IDENTIFICATION MF 2 TYPICAL PER —ELEVATOR CONTROLLER 3 qa' EMT. d 1/T' FL EK€BLE METAL -- COr+FI UI•E ditIA.XIMthot 6' LENGT€h -' 112'1 FLEXIBLE METAL CONDUIT 1gAX1MJM 6' LENGTH \—TYMCA& 2'x4' LL 1FNARE a" EMT T ®TYPICAL BRANCH CIRCUIT WIRING FOR CEILiNG. MOUNTED LUMINAIRES EQUIPMENT "INSERT T DES N TI N" FEEDER: 'INSERT FEEDER DESIGNATION" FED FROM: "INSERT SOURCE DESIGNATION" TYPEPPL : "INSERT- NORMAL, EQUIPMENT EMERGENCY, LIEF. SAFETY EMERGENCY PPLICABL FEa VOLTAGE: t'NN E T APIDLICAI3LE VOLTAGE . 1 V r 48017.77V ETC_" COLOR CODING: A-BLA • : C -BLUE, NEUTRAL -W1 1TEx GROUND -GREEN, A• BROWN, E ORANGE, a YELLOW, NEUTRAL -CRAY, CUND- TEEN KIT A. FROVJE CUSTOM NAMEPLATE AS INDICATED FOR ALL FANELBOA DS, SWITCHBOARDS. SWITCHGEAR, ETC, 13; NAVEPLATE SHALL BE ENGRAVED (WHITE LETTERNG BLACK. BACKGROUND]. AND ATTACHED TO THE EQUIPMENT W@T-1 AZS 5CREW'B, LETTERL IQ aNALL BE 1(4" HIGH EXCEPT .WARNING LINE TQ EIE '�. SPACE ETWEE�J LINES SH R E 1f ] I A . MINIMUMSIC U EE 1'l"H X ITV_ C. PROVIDE SAMPLE 11AJ PLIATE FOR APPROVAL. EQUIPMENT NAMEPLATE DETAIL 1175 5 5• A.rthitethired1 :1vy,., ,=:qI::,r' 3(1:4 krw•irk, 7I6-VP;ti11M; I .1&,ri0,i, rs5i.u.15141,:4i MIL17. :•,,Ai:V!.;I /5 Aii. }:r:>.:,c'.<^„ :v4114Y vI 5,4!-172 WtO '• 75,:;I:i Nu..; IurcliC.1 7111 -2N3 ENOFEERiNG iki-_,.Li l ff7¢u1iri71k, h r:*i,u': IIWIr.kr IikFM. Vi uarl It AI.1 RYAN Resources a -71:S? IA CQIIS1' ..,u sir: Cc F•i•WGxI idsUas;K annrrac#1tt r BIGGS CLARK cic4• Vi 1S se..onboi e " iy ."1 .... It s ....::....• 2::', iv; 5$0.Hoope Endures], Nor W2; 607, 31.6,M For 1.07.23 Erna: rnb lrldcallc-cas.corri FA I.ux Jordon es FblSr 't :.r.r:::: ParCICI Yak 137W i . 5.1 C Lf) ti a DI F' 711KYIS} Rcoo NY 13153 rA_ •.'y::ti::n !-LI 1 IfrK vi {ti{ a Mil Seal Zit 0In .11111 111 1. 1111) E > 1 11111 MIMI. -PPM MUM t. _ r, 1- •ix.f. ^ .• f' {�i#1r? °'7w.(21. 4'}L! Issued for Bid 11,18.2016 Rev No. Dc pticn Dole ELECTRICAL Air ;ali Fu: 56206 IienF Na: 0mvn by: JfR/1 :RG shoel NO: E-501 1 a f.. c 2. A -I 1 d 1 5 EQUIPMENT SCHEDUL NOTES: 1. FED FROM AG U-1. LUMINAIRE SCHEDULE --'Fr --rl-PAYA11- -ASMI. -7111-hY-Alrrrlllrr-RAI -'Firth-lFP. -AWr\-AWAIIIIrr? ELECTRIC EQUIPMENT ANC CONTROL SCHEDULE rMM1 rAW FFFM7-rr- pomm NNU-J--rrrAworrAWArrw11IIrrAUYr-r- DESCI IPiIc'1 GENERAL NOTE 1. ALL DEVICES PROVIDED BY THE DIV€SIOri 26 CONTRACTOR. 2. ITEM K.UMEIER INDICATES EQUIF1IENT NIT ER 3. ALL DEVICES BF ALL BE SURFACE MOUNTED (LESS OTHERWISE NOT:11 4. PP1V€LE OVERLOADS. SSE REQUIRED.. . 4Y THE [ IV1SI 22/2 U NTF 181CI - 5. "AaP ENJDI :ATF.S C:ONTROI. DFVICfS IS LOCATED. AT THE LNIT. 6. I'NFy € DICAT€S NDN-F'L[SJ, 7, "Ili" tiklDrCATEE BNTECRAL WITH INIT. LAP E QUIPIVTENT MnLN1] J POWER S LJ CEF PROTECTION & WIRING NEMA DEVkCEITYPE MD ONTRD1, • ITEM IDTU METALLFX MODELz 4V72'L'4y4-1 R-LNW-L 835-1-16EL-X • MANE NOUN' L ?CAIIC]f~# HP KW _ F'+�I t SYS OLS MCA Qr SE'S3Ehi Aid€ S P'ANEL_ yr CON€1 UL CENTER CIRCUIT E CR or 11kU11 FOR PUS, FOWFR WIR�VG FROM tC CONT] QL �r� F NE1 UNIT POWER WRING FROM CCNTRQL UtT TQ EGUIPMEN• 1 I- .4 MANUAL MOTOR STARTER MMJLUAL. MOTOR STARTER WFTH RELAY �f] tj - m . 4 f : teJ : a • 0 • . 0 COMEIATI J REDUCED VOLTAGE STARTER COMBINATION STARTER IJAR/FU (F) SIZE .6D LISTABLE SPEED oRriE Li 4,• r1} th W 1i 1.1.1w in ADJUSTABLE SPEED DRIVE WITH REDUNDANT ASD FACKAGED CONTROL Ur €T FE1FNI8HLL F3Y OTHERS DUPLEX PUMP OTHERS. FIFE ALARM FAN SHUTDOWN !REWIRED - SUPPLY 1J JC SMOKE DETECTOR Wf REMOlt TEST STATION RETURN DUCT SMOKE L7 .T LO1 OFA 'V REMOTE. TET STATION iE L / I V CONNECTION; CONNECT TO CON1ROL XF.IR B'rt THEFNIDSTAT CONNECTION AQUASTAT CONNECTI }f MOTORIZED DAMPER •OaNNECTI START/STOP F JSE L fETONS VIAND/OFF AUTO SELECTOR SWTCH CONTROL DEVICE LOC:A-PON SAFETY S 'FTCH 4 II'EM la SWITCH A S FkJ E Si E iCC- WEATHER PROD ` REF, NOTES PHASE 1 G CUND j CONDUIT : P€ -I, r GROUND I NDU<T -_.... - Al .. ..... , . .. r.. k'A. .. k '.. ? • ... �. 17 • •20A 1 1$ .=. F ' . ._..4:i.A _** I. 1. J .. 4 . X1.. f w .— _ _.. _ _ _ _r� _ • EQUIPMENT SCHEDUL NOTES: 1. FED FROM AG U-1. LUMINAIRE SCHEDULE --'Fr --rl-PAYA11- -ASMI. -7111-hY-Alrrrlllrr-RAI -'Firth-lFP. -AWr\-AWAIIIIrr? R11-A.11-r *YRE•' rMM1 rAW FFFM7-rr- pomm NNU-J--rrrAworrAWArrw11IIrrAUYr-r- DESCI IPiIc'1 Ear R. & CAT. i, No. LAP rrrl---rrrMl-?rpm, VOL.TA0E} ALLA$T MnLN1] J 9-AKWem 1111 1411 UNIT 1nt�.11.S rFIC]NCY 1-AWYA- rum. f if` F,I.QE NOTES Li 1X41 'SURFACE MOLN1 ED VAPORTIGHT } METALLFX MODELz 4V72'L'4y4-1 R-LNW-L 835-1-16EL-X LED •#2C'f277V ELECTRONIC SURFACE M LN NTING 32 69.7-77.4X OR APPROVED EQUAL FROM L1THON€A PHILIPS PANELBOARD SCHEDULE . ,dWEL Ih1F �RMIT3fF P.IPME I OE1M LUCA E U]N TYPE VOLTAGE # ,41'If4[ �U RATIrIc MAN AMPERE RATIN [F ,i) Y��� MOUF,IT BRANCI CIRCUIT DEVICES TOTAL NU CF : GROUTS NOTES ': €}]3Tr BRANCI-I CIR. INLQ MCB 1 GUJ''IT/T ` ;TRIM FL $� -F U PALE VOLT 44WIRE F £PARE SPACE ELECTRICAL AL Schedu Ie� Ait;al.Hu: 551(16 IienF Na: Cmvin by: JfF/ :RG LP2 PENTHOUSE X 2O8f120 3 4 }DD $OA. 2 X 1 i 1 30A 2 . 17 •20A 1 1$ i L 1 2 3 A.rthitethire :Ivy, ,=:1)1::, 3(1:4A i7rt• 716 I .1&,60IiI ,s5i.u.15111n MIL17. �I /5 Aii. }:r:>.:,c'.<^„....:::'J.'.2::i': C 1 :v4114Y v1 r'.'.4 !a72 k0 .. x ,:;I:1i rk, Nu.. v'1c1iC,ia -!;n1 -11M; 11iiSN3- NG€ E iki"I.;.4 fNah,e l r:*i,u r: IIWlr.kr IikFr. *ruwI 4i It A .41 RYAN Resources J 1:St IA RING Yi i C eLiu4ini[i sir: Cc vie L -.I iis}fu;ii amrrcir#itttytur BIGGS CLARK CIC.,• 1.1.5F711.1JY 1S se..dnbeAlre " iy ."1 ... It s '�• 7 i-1 ,pe Endures], Nmrr W2; 607.231,66014 Fox' f>07.23i. Erna: rnb lrldcallc-co Wet; Meerf.ddta•. Jordon F Isf 31.5 't :.f.f:i`. ITY•00 Yak 137W i.1 C Lf) r4 - ,_ .0.) ti a DANT rr 711KYIS} Rc NY 13153 4155.47n. rA_ '.. .:.:..{ti{,,,,, .corri S{-Q `X ! 1 la 11 IffK i {{ ti mpppip CI Mil Seal Z.* 0In .1111 CD E › 1 a c NIPPIIIIRP Rini t. 1— •.f. 7• f' {�i#1r? -<5.. 3.L! Issued for Bid 11,18.2016 3 EYi3ICIN. No. Dcepticn 0 01e ELECTRICAL AL Schedu Ie� Ait;al.Hu: 551(16 IienF Na: Cmvin by: JfF/ :RG Shod NO: E-601 1 0 f.. c A -I ()E.XHAJ..?ST F, +Il4 ! 1 Level v.nitigvw Nun •-. I . DemoI ti .n n 1. -Cr • !tTQR J ........ !sr? (E )123(6 .- GEC :III2A Partial Basement Plan - HVAC Demolition L E; iSE6LIT SYSTEM HEAT RFIA.IP 1a (E)2C.<1O LEE ELEVATOR ELEVATOR LOBBY �aDl..i (E)26x6 ELEVATOR #1 CEJ 12E1E1 uP JANITOR • G.$ 1.0. 5 GENERAL NOTES: A. EXISTING CONDIT€Ott ARE TAKEN FROM FIELD OBSERVATIONS AND PRIOR CONSTRUC-PON DCCUMENTS AND .ARE NOT GUARANTI ED. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS. ALLOWANCE. WILL. BE MADE FOR AriF}ITI D d. COSTS DUE TO CONTRACTORS FAILURE TO ERIF E LISTIF1C CONDIT€OMS AND DIMENSIDNS_ la_ DAMAGE TO EXISTINO SYSTNS M UIPMENT. PrPINC, DUCTWORK. K. 4CNTFOL s ASIDACCESSORIES) SHOWN TO REMAN AS A RESULT OF THE CONTRACTORS WORK IS THE RESPONSIBUTY OF THE CONTRACTOR TO REPAIR IND/OR REPLACE WITH SIMILAR OR LI#<E MATERIALS AT NO AJNJITBONAL COST TO THE OWNER. C. IT IS THE i ESPONSIHILIT'd DF THE CONTRACTOR TO DISPOSE OF ALL DEMOLITION DEBRIS AND hMA"s EF 1/1LS OFF SETE IN A PROPER i,E,G.A4, MANNER, ER, �- THE DEMQLITI C w:Ncs SHOW ars cNERAL- MA)O QUOPLENIT, AND DUCTWORK I EPACVA1.S. •THE INTENT €S NOT To II)ENTIFY ALL. MISCE L_L.,4SJEDL:S DUCTWORK,. DUCTWORK ACCESSORIES, SUPPORTS, CONTROLS, CONTROL ACCESSORIES, CON1ROL WIRING, CONDUIT, IT, CONTROL PNEUMATIC TUBING AN' ACCESSORIES TO BE DISCONNECTED RC REMOVED BUT 15 THE. REQUIREMENTS UNDER TI -HS CONTRACT. NO CriUIP.MENT OR DUCTWORK SWILL L DE A3picoNcEt IN PLACE UNLESS OTHERWISE NOTED ON T1 -1E €D1AWINCS.. E. IT IS THE RESPONSIBILITY DF THIS CONTRACT TO PATCH AND FINISH AI. Lv EXI T1N DLJcTwO K PENETRATION THROUGH FLOORS. AND WALLS AFTER DE +JOUTION•. F. EXISTING TEMPERATURE ONTF DL EQIJ1FWiENT, ACCESSORIES, PNEUMATIC TUBING, WIRJNt OR CONDUIT THAT Ma NOT 'BE UTILkZED FOR THE INSTALLATION OR DPERATFON OF THE NEW TEMPERATURE CONTROL SYSTEM SHALL BE DISCONNECTED AND 'REMOVED.. NO EQUIPIEP+1T ACCESSORIES, PNEUMATFC TUBING WIRING OR ccNDu:T SHALL E SDC � IN PFL,A0E. l+ L, REMOVCD "rC] tkA1Lr4C CONTIROL . S"STEM. A I F THERE Axp-popATED. FONTS TO az D LIMENFTE I IN k EFOR FORMAT AT AND COFFEES LISTF POUTED TO THE FACILITIES DEPARTMENT ANV .COR1E TO THE PROJECT AND PLANNING MANAGER AND: ENGINEER. BEFORE DISCONNECTING POWER AND/OR COI, UMCAT3ONS OF DDC HARDWARE IN THE FIELD, ALL DDC DEVEES TO BE DEMOLISHED WILL BE 'CLEARED OF ALARMS, GRAPHICS, TRENDS, UNBLINDLEO POINTS, PROGRAM, USER GROUPS,. EVE NT /SCHEDULES, REPORTS S AND SYSTEM PROFILE. REFER TO T] -IE 1- A2ARIDOL1S MATERLALS RLPORTS INCLUDED kki "CJS SPECIFICATION PAI DACE FRON1 END 1X'C 'MEN7s Foil HAZARDOUS MATERIAE. INFO Ml TI t _ F1~ ASBESTOS OR OTHER SUSPECT h ATEI A .S An ENCOUNTERED, OU .TERED, CEA$ OPERATIONS NS IMMEDEATELY APO NOTIFY WE OWNER, REFERENCE THZ kiAZA DOUS MATERIAL DRAW1NC-S FOR ASBESTO / ATEMENT NOTES, GETA€LS AND REGURIEMENTS. DEMOLIT/ N NOTES: ti 2I J DISCONNECT M.IIJ REMOVE EXISTING EXHAUST FANS ASSOCIATED LOUVER, CONTROLS, AND CONTROL ACCESSORIES. DISCONNECT CT A REMOVE EXISTIN DUCT.WORF(, DUCTWORK ACCESSORIES, CONTROL_S1 ,4ND CONTROL ACCESSORIES. 'EXISTING LOUVER SHSA. MANN. 3 REFER TO ARCHITECTURAL PLANS FOR FURTHER REQ:JIREMEf TS. DRAWING NOTES: , k DISC SECT AND. EKIENL) .EXISTING DUC-t14OR3 , ASSOCIATED DUCTWORK A,CCESSORIES.. JI} BRANCH DL]CTWORK AS RE €IERED TO. AAca sMCDATr INSTALLATION of NEW . ELVAT1R DOOR CPEiiINQ Ate} ASSIDCIA'1Tt] WALL. SUPPORTS. PA NF`W DLJC•1 WOF 1< TO MATC1- 1=X15TiNO FIh1SI Es. COORDINATE ' TH AMCHkTECTIJF AL PLANS FOR REGUIRED CLEARANCE. ArtNtecturol !.v;. 3031.5.,A Y I I hrrti rs5i.u..514k MIL17. ' +sem Y.'='.,..,,:Y:".{•• C : F:1:1.,I, vI ..:-,-..$:,,..1 Y'. 1;.IyV.;v'1•t 10:A4 C.-:::&3-;':••!9.1.9. !tti!. 710 $ vARAiv f NG€MEFiNG .o.,..: iki-Ii.:,Q1 E.-6,a,.,e. W IS:,1.: IIW1r.kr IikFr. !...1rusk. 4i he: AISII RYAN Resources $••!i5v9 kc. i cQIrSu4fn,[i S6i3.1} I Cc F•i•WGxI iis}fu;ii •rr.•x-0r+i,oi.t kxr• BIGGS r CLARK r6G• 11592 S;r rslr.$ :t::i:r:,:,,.:':,,. L71-100per Endures], Ncrw W2; 607,231 Epi,. .23i. Ernat rn' lrldcallc-cas.corri kYet; WFirre dta.. h.0 r11 W Jordon F IS,. 315 I..r>T '..:.r.>::::,:.: ITC,CKI Yak 137W 'il C Lf) DAVIS F• ..•115'1'.'11.1U R. H ( 131.533 455.47,,2. A .:::„.:,{:5 A }. S r� CI Seal .41.* 0 In VII III 1. CD E > ID11514014116 fl03 —_ — Arr- r -A+ .'. . '• '''l Z.FY 5 . 12%72.f1. I. I. __ Et. .... Issued for Bid 11.18.2016 Rev No. Dolc ptiol 0 o]e HVAC Enlarged PI it Peciittpixp a Pcirtici Bawrient Ait;ab.Imo: •564.06 IienF Na: OroAn by: 15F Shod NO: M -1O1 c A L 1 2 3 PUMP SERVED Ely DUPL,..77.:4 3/ 4 1 -IP SUMP PUMPS TRANSFORMER •c•Lie : GENERATOR nas : (E) VALVES — MECHANICAL .0.}.5. • • ' . • STAR • co ...... FN • ELECTRICAL • — (2) {E)Y..1" R LiNEN• : stockaE. GM • (2) E.E52" 1 -Ne •••• ••• (E).2.1F Ow— ..••• • ▪ Ir • I. I. — • I. JARETOR Li• .ELVA-7170 :* .4-;4444....444•540,1.19M:Yre t•• er:49 "▪ : ,V I V I, 11,7 I Ye,erree I • • : • ... : t". (E)411 .• • • ...... • • : •—.7(.81JRIEID) 66:3 1.•• : 71-5 .‘• • •,.—• • REMOVE —I • —(041' FD .2.V.21fCW LEVATOR STORAGE • STORA.GE LF 5 STORAGE Basement Floor Plan - Demolition v:cr D (mu rP 0 (E)31' RD PENTHOUSE • — REMOVE FP P PING *ID SPRINKLER HEAD Level 08 - Penthouse Pion - Demolition ••5 ... STAIR ... UP : •• REMOVE 211 FP ANC BRAN011 PPM AND SPRINKLER 5T ArtNtecturoi !I!.:.::•F:clial:r 303 !Q... :.' I 1 .1.{riaiik1EhNiC...Liukt.,:u .DSn'.LNI.S114.•:-L".. MIL13. Ij .... .61‘ ... .. . • .k. • :ii .1..5.7 A ‘1‘,%1;. 111.10. r..:re 10.-li c• -M -;':••!•o9. ;16-8M•M:r? Rigiv:•:;•:—..1 V..ci.40 •;;:E: :•.• 2 r :301. NGirIERiNG LOA 1.:*iia. 1: 'wince I %I..FE't !ji rusk. ht 4541 RYAN Resources 4 :1:•• )612Y} I Lc F•x•LN:{4t1 isU.1.1;K was.coriirstirstrtr• BIGGS CLARK DAVIS mil •9X r:l 114. F ..•.•.1.112.0 11592 IcgdPri Rc= se..onboi e.es %is,. Ny 1315:3 31.5•055.4.752 •:. •., •.:. . r e;11:!.1!:: ;i ... / ..:6. ,40,' .. 'i'2•: %.:.z...!..%:i:%.:-.4.•;.:•.!:.4.:.•:..:*.:.!•:i. :... .....%::..: :!:.:••:...:'.:!{:. 5$0 I -100p e r ITC,C10 Endwd, No..w Yak 137W T2; 617.231.1.6C0 For 1.07.23i.Oil Ern: rromMdolic-cas.corri INI41: 'INleirreAdta...e..QC1.Tri Eppppip a = Zit 0 In ill C 111 ri. E cui Lf) , 0 CI la, =I >'• 11111 MINA in NIPPIIIIRP 1:1) CD Z 0 0 tl 6 cl Seal . ..k..0 * { • r IX ) .--.. .-='' i• .... 0.7"q7:....2: •''.• • ..% ---;•—:•,--- , .. ' Et .... Issued for Bid 1 1 ,1 8.201 6 Reviles No . Do-sceptiol Do]e • PLUMBING Polio Dernolitiort Floor Picins .1i.p.5e-n!Eni .•Eyqoi fp Lev6IW- Divd?Oi Rin•Oin ..Ir jab Hu: 564.06% lisi-111.•1o: ..... 0mi...in by: zp. Shod No: pi_101 c 0 f .. c A -I (E). SUMP PUMP SERVED B r DUPLEX 3f 4 FP SUMP PUMPS T#CAN O:R11.ER GENERATOR (E) VALVES .r.r i14EQHANICAL 1 EL4C~TRICAL UPRIGHT SPRINKLER HEAD TO MATCH EX ST WG - ,\ {2) CE)3411` R LINEN ST .RAGE 2) {E)2' Ha' C1=}21' cW ... : JANITOR :...NAY.... 01 • (DV' STORAGE : • G18 : C E)4" FID ELEVATOR ELEVATOR # iT STOWE 01' F '.S.FMF.NTI.F?VEI. "•• s. . SIORAGE GENERAL FIRE PROTECTIONNOTES: A. DRAWINGS DO NOT INDICATE' ALL OFFSETS, Sl -EKES ISI ELEVATION, ETC. WHICH MAY BE REWIRED. THE CONTRACTOR TOR SHALL MAKE SUCH CHANGES • IN PINNO' O' AND LOCATION OF EQUIPMENT.. ETC. TO ACCOMMODATE WORK, OBSTACLES, AND WORK OF OTHER CONTRACTORS, B. DISPOSE OF ALL, WASTE MATERIALS CAUSED 8Y WORK OF TJrl1S CONTRACTOR- LECALLY DISPOSE ALL mATERI.A.LS TO A LOQATLON OFF SITE - COORDINATE. ANO SCHEDULE WORK MLID SHUTDOWNS MATH THE OWNER AND OTHER TRADES PR#OR TO CONSTRUCTION. B. ALL COSTS FOR CUTTLMFG, PATCHING, AND P?dNTLNG. DF EXISTING WALLS, CEILINGS MID FLOURS TO ,CCOMMDDA E THE INS.TALLATION or WL' 2K SHALL 1 1 E RE PDNS]8€1 rr CCN-113ACTOR UNLESS €r4 ICATED OTHERWISE. MATERIALS I`Dk OF E}4I5TNG SURFACES .HALL MATCH THE EXISTING SkJ;I FAi ES. E. THIS CONTRACTOR IS € ESPON BLE FOR ALL PATCHIN OF EXISTING OR NEW FIRE PF OOfNO %MOH IS IDFGTU# BEO OR REMOVED DLRiNG THE COURSE OF .ANY DEMOUTION OR INSTALLATION OF NEW WORK THAT IS PART of THIS CONTRACT_ F. DO NOT DRILL,•CORE OR CUT Air PORTION or EXIT CO UMrJS, BEAMS, 'JOISTS OR 13FWDG1NG RtES- ..... • UPPER BASEMEN- I.Fva. Basement Floor Plan LiP CL)3:' RD MODIFY RD AS Y' Rf QUEREJD 10 CHANGE RAJNJ CUTLET lk'41'QUS14 sD•D 211. 1I TAM UP UPRIGHT. PrI F-T.HEjFRI GLER HEAD TO ROOF HPT(:F3, G'E'E']E TO 'A' DEAWINC PROVIDE DRIP PAN UNDER PIP1NO. REFER TO DETAIL A4/P201: PROVIDE 4h IW ELLE Gm DRIP - PAM ,AND CONNECT TO 3" 57. REFER TO DETAIL AA5?P201. --(E)3" ST DN ST Level - Penthouse Plan 1,21..= 110' 2 UPRIGHT SPRINKLER HEAD. TO MATH -(E) 3 d GENERAL NOTES: A- THESE J'JC}TES ARE r FPUCABLE TO THE FULL 'SET OF CONTRACT DOUMENTS- B, QCLGTING• COND T1ONS ARE TAKEN FROM FIELD OBSERVATIONS AND PRIOR CONSTRUCTION DOCUMENTS WHEN AVAILABLE. THE L(JLA ION SHC W J MUST BE 'CONSIDERED APPROXIMATE. OTHER 8L?CIFi WDF < MAY eX]ST, HOWEVER,. LC;CAT]CIN AND $ZE AJ r NOT SENTL y. KNOWN vi ST> ONCL Y. E€4CrOk1l Ac E TO v1$11` sITL FRIOR TO' FAIL? TO 'REVIEW F CISTJ I CON.DITIONE AND comeipii SCORE OF WORK. C. WHEN •E}£ISTJNG CONSTRUCT ON IS DAMAGED DURING WORK BY 'MS CONTRACTOR,. RE AF AND/AND/OR REPLACE E VST I I SIMILAR MATERfPLS AS MUCH AS POSSIOLE, SUBJECT TO OWNER REPRESENTATIVE APPROVAL. D, I ISPOS1.. CW X11..1.. L}E MOt.IT1QN Ni{.)/DR OTHER WASTE MAT€:I ALS CAUSED BY WORK OF TRIS' CONTRACTOR. LEGALLY DISPOSE AL1 IATER#J .S TO A LOCATION OFF S]TE. E.. COORDINATE AND SCHEDLLE WORK AND SHUTDOWNS WITH THE OWNER Af.CI OTHER TRADES PRIOR TO DEMOLITION. - .ALL 1r; ISTLN PW'INO TO RE.AJN $ IA1,L QE 'ECGNNECTE0 'to ACTIVE SI ACE PrF1 ,0: G, ALL FIE'ENG TO EE REMOVED, SHALL BE REMOVED € ACK TO ACTIVE PIPING AND CAFFED. VALVE AND CAP ALL WATER PIPING. REMOVE ALL INACTIVE' PIPING UNLESS NOTED. H. ALL .PIP€ IC ' TO. 1 REMOVED AND LOCATED Vp'€THIN A WALL TO RENIAPil MAY EIE ABANDONED IN PLACE ]UNLESS NOTED, REMOVE PIPING BACK TO 4E i NID THE FINISHED WALL SURFACE AND CAP. E. PATCH HO•_.ES IN EXISTING NSTRUCTION LEFT I3Y THE REPAOVAL. CF PIPING OR EOUIPIQIT W/TH MATERIALS TO MATCH EXISTING CONSTRUCTION. MA1NT,4r FIRE/SivlOgE RATING. J. DEMOLITION SHALL INCLUDE, BUT. NOT. EIE LINETEI . TC: PIPING, VALVE'S, FLXTL IRES, EQUIPMENT. HANEERS I SUPPORTS, AND INSULATION EXCEPT ASOEsTOS, K. REMOVE EXISTING CONSTRUCTION IN TE -IE. WAY OF NEW WORK. PROTECT 3UILDiNG AND FCJRN15HENGS FROM DAMAGE. L. WHERE NEW WORK fS TO BE INSTALLED ABOVE AN EXISTING CE1LINCad PROViCE rCiR THE REMOVAL 'OF THE CEILING, U N C OMPL.ET3ClN OF WCRiC, REPAIR AIF ALL DAMACL`:O Cf'1 INS SL.FJWACE S, REPLACE ALL DAMAGED TILES, M. SLEEVE A?ID SEAL ALL WALL AND FLOOR PENETRATIONS. PROVIDE FRF#ESTOPPING FOR ALL PENETRATIONS, N. mAJNTAJN SERVICE CLEARANCES OF ALL EQUIPMENT. ASE OTHER TRADES OF THE REQUIRED SERVICE .CLEARANCES. 0. .A0,_ THRL? .JnLEVATOf WAL.L TO EE FIRE STDPPD- REFER. TO THE FA2ARDOL.L5 MATERIALS REPORTS INCLUDED ]N THE SFECIFICATIONS PACKAGE FRONT-END DOCUMENTS FOR HAZARDOUS MATERIAL ENFORMATrON. IF ASBESTOS OR OTHER SUSPECT MATERIALS ,ARE ENCOUNTERED, CEASE CIPERAT]DNS IMMEDIATELY DIA'TELY M CONTACT THE OWNER. REFERENrCE THE HAZARDOUS. ]MATERIAL DRAW roR AS EST AGATE=MF NT NOTES, DETAJLS AND ''4EOLIREIVIENTS. P. PPE. INSULATION S J~Ti N C]F HIGFE DENSITY 1NSULA1ION AT HANGER INSULATION SHIELD rnTrD T1'rf EA1FED ROD - 5 JPPORT /FROM STRUCTURE DETAIL NOTES! CLEVIS EIA1JGEI PITCH DRIP PAN WITI-I rP€ = SANITARY/STORM FINN GAL •Af I2EO SPACER INSERT SIMILAR TO INSIJLA'TIDN SALE \-ARRANG2r DRAIN THOUGH CONFIGURATION AT ENDS TO SUIT DFAJNAOE Plr lr —#1 EWID-RAN A. th IP PAN SHALL BE F6 GAUGE OA VAXS ED SHEET META.- MAKE WATER -TIGHT BY BRAZING SEAMS AND APPLYENG COLD GALVANIZING (NON-FL.MMABLE, SMOKE RATED FFBERGLASE ALSO ACCEPTABLE). B. TERMINATE RAIN PIF11 O AT 'V' q'MIN1MUM) ABOVE NEAREST FLOOR DRAIN. PIPING DRAIN PAN DETAIL. NO SCALE 1 5 FP PLUMBING SYMBOL LIST SYMBOL DESCF PTION V � EXISTING WORK TO RE REMOVED r:9114. JQrdpr3 %Isr f.. : .r.,::: ITC,00 Yak 137W i.1 C - in ti ;l POINT CF CONNECTION Ei POINT CF DISCONfEC71ON NTS NOT TO SCALE 4E) n CET) E IST'NN.C. EXISTING TO REMAIN .. Arr. A DVL c' IN3G.1-IE=D FLOOD 13F1- EELBW FINISHED FLOOR VTR VENT THI LJ I OOJi GC GENERAL COW1RACTOE M3; ME GH.AMCAL CONTRACTOR :PC EG PLUMBING c914TRAOTOI ELETRLCALCONTRACT EXIST IG PIPING (E) COLD WATER PIPiF ( C110 } HOT WATER PIPING OM)- .. ------L— •- -.-- HOT . WATER : IR .JLAT G PlJINO •(€-IWJ j SAllifikRY SEWER P 'PING :. ..._._._... SAN ..._._._... ---------- . VE=NT ..EPPING ELBOW DOWN 0 45° 010-•F'SLT —0 ELBOW UP SOTTO. fTEE CONNECTION TOP TEE CONNECTION —Li-- n I P" 1:k Pr CTINU ATIDN • CPAP PR PLUG DECK PLATE CEANOUT CDPJ�O.. L ' LWALL PLATE CLEANOUT C WPOO] CLEANOUT -(005 v.r.n...... .............E ............. 0 _ FIRE. PROT T]Or. $V]L 0-P). LrPFI IIT F RINI L.ER HEAD 13' AR CAP -1 •I FUNNEL CALL HECK VA VL '-' IA' DRAIN : [Fi Tt]1' F11r INDIRECT WASTE DRAIN DETAIL - STORM NO SCALE 5• I C: .... ArtNtecturol !I!.:•::. 303 'lIc.- .1.{ jsSi..-...SIFk MIL17. .,• Y.'.:!'• isY:". . Ai: . F:1.:114:7 :: I •1:5 A ` 511n1 Y'.xI;. I.VA 1%.:rr 1[F};$ :- ti !l f16•8 f ENGI EEFiNG r.0iiii8f ih'i-I.L.:0 E.v.iiriNi LOA 1.4,a. 'Mime IikFrt �rusk. 4'. It AISII RYAN Resources .¢i•M:? ko. 1Iu'u tri:u ]613'1} 1 Cc F•x•I I iistfu:ii aaf.r-0ciirdwtcorr• BIGGS $ CLARK r0'n •!+ll 11592 S;r'irsl a ..;..!:i:r:t:2:•:'!•:,• MO HcOper Endures], Nma T=: 6137.231.56014 Fox' f .231. Erna: rnb lrldcallc-cas.corri WO); ti' Firre,dafiCi'. r:9114. JQrdpr3 %Isr f.. : .r.,::: ITC,00 Yak 137W i.1 C - in ti ;l DAVIS F• ..•+.'.'1'.'11.1U Rc NY 13153 :1:.:.::':-:'•:14:. .Q x y 1 {J. a Seal Zit 0 In ill 111 N. E > r� 11111 MIMI. MUM PPM tl ___. C:.''' :': { 1. Yl. 0/S7' rf •,t Issued 1 ].18.2016 3 EYf31MS . . for Bid No. Dceptiol 0 01e P LUMII N Portal Floor P]Qf$ JFK-nenT, &rtp Leviid LiV i3rr R rI i Air ;ab. Fes: .564..06.. 3�Iien1 No: Dmv n by: ;P: shoal No: P-201 GEORGE JAMESON HALL TABLE OF CONTENTS ELEVATOR REPLACEMENT Page 1 Instructions to Bidders Bid Form General Conditions and Exhibits Exhibit A Change Order Exhibit A-1 Change Order Documentation Instructions Construction Contract Change Order Request Construction Contract Change Order Summary Exhibit B Schedule of Values for Contractor Payments Exhibit C Final Release Exhibit D Application and Certificate for Payment Exhibit E Guarantee Exhibit F – Form I Contractor’s Affirmative Action Plan Use of MBE/WBE Vendors Exhibit F – Form II Contractor’s Affirmative Action Plan Summary of Bid Activity with MBE and WBE Subcontractors and Vendors Exhibit F – Form III Affirmative Action Workforce Report Exhibit F – Form IV Minority – Women Utilization Report Exhibit G Labor Rate Breakdown Exhibit H Stored Materials Invoicing Documentation Exhibit I Contractor Performance Evaluation DIVISION 1 - GENERAL REQUIREMENTS Section 01 11 00 Summary of the Work Section 01 14 00 Work Restrictions Section 01 25 00 Substitutions and Product Options Section 01 31 19 Project Meetings Section 01 31 50 Electronic Project Management Section 01 32 16 Construction Schedules Section 01 33 00 Submittal Procedures Section 01 35 29 General Health & Safety Section 01 35 43 General Environmental Requirements Section 01 35 44 Spill Control Section 01 41 00 Regulatory Requirements Section 01 42 00 References Section 01 45 00 Quality Control Section 01 50 00 Temporary Facilities and Controls Section 01 51 00 Temporary Utilities Section 01 51 23 Heat During Construction Section 01 57 13 Soil Erosion and Sediment Control Section 01 66 00 Storage and Protection Section 01 73 29 Cutting, Patching and Repairing Section 01 77 00 Project Close Out Section 01 78 22 Fixed Equipment Inventory Section 01 78 23 Operating and Maintenance Data Section 01 78 36 Warranties and Bonds Section 01 78 39 Record Documents GEORGE JAMESON HALL TABLE OF CONTENTS ELEVATOR REPLACEMENT Page 2 DIVISION 02 – EXISTING CONDITIONS 028213 Asbestos Abatement DIVISION 04 – MASONRY 042000 Unit Masonry DIVISION 05 – METALS 051200 Structural Steel 055000 Metal Fabrications DIVISION 07 – THERMAL AND MOISTURE PROTECTION 077200 Roof Accessories 078400 Firestopping DIVISION 08 – OPENINGS 089119 Fixed Louvers DIVISION 09 – FINISHES 099123 Interior Painting 099646 Intumescent Paint DIVISION 14 – CONVEYING EQUIPMENT 142100 Traction Elevators DIVISION 21 – FIRE SUPPRESSION 210500 Basic Fire Suppression Requirements 210553 Fire Protection Identification 210554 Painting 211300 Fire Suppression Sprinkler Systems DIVISION 22 – PLUMBING 220500 Basic Plumbing Requirements 220553 Plumbing Identification 220700 Insulation 221010 Piping Systems and Accessories DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING 230500 Basic Mechanical Requirements 233100 Sheet Metal and Ductwork Accessories Construction DIVISION 26 – ELECTRICAL 260500 Basic Electrical Requirements 260501 Basic Materials and Methods 260526 Grounding 262000 Electric Distribution 263213 Automatic Transfer Switch 265000 Lighting DIVISION 28 – ELECTRONIC SAFETY AND SECURITY 283102 Analog Addressable Fire Alarm System GEORGE JAMESON HALL TABLE OF CONTENTS ELEVATOR REPLACEMENT Page 3 DRAWING LIST G-001 Cover Page G-101 Overall Plans Basement Level Through Level 05 G-102 Overall Plans Level 06, Level 07 – Mechanical, and Level 08 – Penthouse S-101 Design Data, General Notes, Partial Plans and Details A-101 Enlarged Plans Basement Level to Level 08 – Penthouse A-102 Hoistway Section and Details A-501 Elevator Fixtures, Details, and Elevations AR-101 Asbestos Abatement Plans and Notes E-001 Symbols List and General Notes E-101 Overall Floor Plans – Demolition Basement Level to Level 08 – Elevator Room E-201 Overall Floor Plans – New Work Basement Level to Level 08 – Elevator Room E-400 One Line Diagram Power Riser Diagram - Demolition E-401 One Line Diagram Power Riser Diagram – New Work E-402 Riser Diagrams – New Work E-501 Details E-601 Schedules M-101 Enlarged Plans Penthouse and Partial Basement Plan P-101 Partial Demolition Floor Plans Basement Level to Level 08 – Elevator Room P-201 Partial Floor Plans Basement Level to Level 08 – Elevator Room END OF DOCUMENT CORNELL UNIVERSITY GEORGE JAMESON HALL FACILITIES CONTRACTS ELEVATOR REPLACEMENT 121 HUMPHREYS SERVICE BUILDING ITHACA, NEW YORK 14853-3701 POST BID BULLETIN NO. 1 January 31, 2017 This Post Bid Bulletin contains changes to the requirements of the Contract Documents and Specifications. Such changes are to be incorporated into the Construction Documents and shall apply to the work with the same meaning and force as if they had been included in the original document. Wherever this Post Bid Bulletin modifies a portion of a paragraph of the specifications or a portion of any Drawing, the remainder of the Paragraph or Drawing shall remain in force. NOTE: Provisions of all Contract Documents apply. Item 1. INSTRUCTIONS TO BIDDERS, INS-2. Item 7,a and BID FORM, BF-3, Item 3,a ADD “The Contractor will have full access to the building on May 29, 2017.” ITEM 1 DEDUCT AMOUNT $( ) Item 2. Section 01 11 00, Summary of Work, Item 1.1,A DELETE Item 4 in its entirety. Item 3. Drawings G-101, G-102, S-101, AR-101, AR-102, A-102, A-501, E-101, M-101, P-101, P-201 DELETE in their entirety. REPLACE with Revision 1 Drawings G-101, G-102, S-101, AR-101, AR-102, A-102, A- 501, E-101, M-101, P-101, P-201 dated January 27, 2017, attached. ITEM 2 & 3 DEDUCT AMOUNT $( ) Attachments: Drawings G-101, G-102, S-101, AR-101, A-101, A-102, A-501, E-101, M-101, P-101, P-201 IN THE SPACES ABOVE, PROVIDE THE AMOUNT TO BE DEDUCTED FROM EXECUTED BID FORM, DATED JANUARY 18, 2017, FOR THE ABOVE STATED MODIFICATIONS. PLEASE PROVIDE RESPONSE NO LATER THAN 12:00 NOON ON FEBRUARY 7, 2017. Company Signature Printed Name and Title Date ****END OF POST BID BULLETIN**** SECTION MARKDETAIL MARKDRAWING KEYNOTEDOOR TAGSECTION NUMBERSHEET NUMBERREFERENCE LABELDETAIL NUMBERSHEET NUMBERREFERENCE LABELNORTH ARROWPROJECT NORTHRoomname###ROOM NAME, NUMBER AND CEILING FINISHGWBGYPSUM WALL BOARDACTACOUSTIC CEILING TILEEXPEXPOSEDNameElevationELEVATION MARKA-201D2D1ELEVATION MARKELEVATION NUMBER(S)SHEET NUMBERNEW CONSTRUCTIONEXISTING CONSTRUCTIONDEMOLITION OR REMOVALS###1A-101SIM1A101SIM101TWO HOUR FIRE RATINGGWBMAGNETIC NORTHTRANSFORMERG07MECHANICALG05GENERATORG06ELECTRICALG08LINENSTORAGEG12JANITORG13G02STORAGEG17STORAGEG16STORAGEG15G03JANITORG10ELEVATORLOBBYG01UPDNUPUPA3G-102STAIR02STAIR01UPPER BASEMENT LEVELBASEMENT LEVELA-101C3ELEVATOR#2ELEVATOR#1EXPEXPEXP1UPDNUPDNUPELEVATORLOBBY001ELEVATOR#2ELEVATOR#1A3G-102STAIR01STAIR02UPPER/LOWER LOBBY LEVELLOBBY LEVELGWBA-101D3UPDNDNUPELEVATORLOBBY101STAIR02STAIR01UPDNELEVATOR#2ELEVATOR#1A3G-102TYPICAL LEVELUPPER/LOWER TYPICAL LEVELGWBA-101A2UPDNDNUPELEVATORLOBBY201UPDNELEVATOR#2ELEVATOR#1A3G-102STAIR01STAIR02UPPER/LOWER TYPICAL LEVELTYPICAL LEVELGWBA-101A2A. ALL DIMENSIONS ARE TO THE FINISHED FACE OF SURFACES UNLESS OTHERWISE NOTEDB. THE CONTRACTOR IS NOT TO SCALE DRAWINGS OR DETAILS.C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL CONDITIONS ANDMATERIALS WITHIN THE PROPOSED CONSTRUCTION AREA, THE CONTRACTOR SHALLDESIGN AND INSTALL ADEQUATE SHORING AND BRACING FOR STRUCTURAL ORREMOVAL TASKS.D. THE CONTRACTOR SHALL PERFORM ALL CUTTING, PATCHING, REPAIRING AS REQUIREDTO PERFORM ALL OF THE WORK INDICATED ON THE DRAWINGS.E. SEAL ALL FLOOR, WALL AND CEILING PENETRATIONS AS A RESULT OF ANY WORKASSOCIATED WITH THIS PROJECT TO MAINTAIN RATINGS. NOTIFY OWNER'SREPRESENTATIVE OF ANY UNPROTECTED PENETRATIONS FROM PREVIOUS CONSTRUCTION.MAINTAIN FIRE RATINGS AT WALLS AND SMOKE BARRIERS AT ALL TIMES.F.PROVIDE INTUMESCENT PAINT ON ALL NEW FRAMING SUPPORTING THE ROOF AT THEEQUIPMENT ROOF HATCH. COORDINATE WITH CODE INFORMATION FOR REQUIREDRATING.G. TEMPORARY SAFEGUARDS IN COMPLIANCE WITH OSHA STANDARDS ARE TO BEPROVIDED DURING THE EXECUTION OF ALL SCOPED WORK, I.E., ROOF FALL PROTECTIONH.REFER TO THE HAZARDOUS MATERIALS REPORTS INCLUDED IN THE SPECIFICATIONPACKAGE FRONT-END DOCUMENTS FOR HAZARDOUS MATERIAL INFORMATION. IFASBESTOS OR OTHER SUSPECT MATERIALS ARE ENCOUNTERED, CEASE OPERATIONSIMMEDIATELY AND NOTIFY THE OWNER. REFERENCE THE HAZARDOUS MATERIAL DRAWINGSFOR ASBESTOS ABATEMENT NOTES, DETAILS AND REQUIREMENTS.APPLICABLE BUILDING CODE:•2016 NEW YORK STATE UNIFORM BUILDING CODEUSE AND OCCUPANCY CLASSIFICATION:•R-2 RESIDENTIAL: DORMITORYCLASSIFICATION OF WORK:•ALTERATION LEVEL 2FIRE RESISTANCE RATING REQUIREMENTS FOR EXISTING BUILDING ELEMENTS(TABLE 601, IBC 2015)•EXTERIOR AND INTERIOR LOAD BEARING WALLS: 2 HOURS•INTERIOR NON LOAD-BEARING WALLS: NO RATING•ROOF SUPPORTING WALLS/FRAMING: 1 HOUR•FLOORS: 2 HOURS•ROOF: 1 HOURClient No:Drawn by:Sheet No:A|r Job No:1234512345ABCDABCDRevisionsSeal4592 Jordan RoadSkaneateles Falls, NY 13153315 685 4732860 Hooper RoadEndwell, New York 13760Tel: 607.231.6600Fax: 607.231.6651Email: mail@delta-eas.comWeb: www.delta-eas.comGeneralG-101564.06RPSIssued for Bid11.18.2016Cornell UniversityGeorge Jameson HallIthaca, New York 14850Overall PlansDrawings Legend 3/32" = 1'-0"A1Basement Level 3/32" = 1'-0"C1Ground Level 3/32" = 1'-0"A3Levels 01, 03, and 05 - Typical 3/32" = 1'-0"C3Levels 02 and 04 - TypicalBasement Level Through Level 05General NotesCode InformationNo. Description Date1 Post-Bid Bulletin 1/27/17 UPDNDNUPUPDNUPKITCHENG38RESTROOMG37COATROOMG39JANITORCLOSETG42RESTROOMG41ELEVATORLOBBYG35HALLG36HALLG40HOUSELOUNGEG43UPPERLOUNGEG44TERRACETERRACETERRACETERRACETERRACETERRACETERRACEBALCONYLINE OF ROOF BELOWA3G-102UPPER/LOWER LEVEL 06LEVEL 06ELEVATOR#2ELEVATOR#1STAIR02STAIR01GWBGWBA-101A2DNUPMECHANICALROOMG46UPPERMECHANICALROOMG47PENTHOUSEACCESSLOBBYG45DNA3G-102STAIR01STAIR02LINE OF ROOF BELOWUPEXISTINGROOF HATCHABOVEELEVATOROVERHEADUPA3G-102LINE OF ROOF BELOWA-101C2PENTHOUSE800ROOF CURBEXISTINGROOF HATCHBasement Level847' - 8"Elevator Pit840' - 2"Ground Level856' - 6 5/8"Level 01871' - 2 5/8"Level 03897' - 10 5/8"Level 06939' - 2 5/8"Level 02884' - 6 5/8"Level 05924' - 6 5/8"Level 04911' - 2 5/8"Level 08 - Penthouse957' - 5 1/4"Level 07948' - 6 5/8"Roof966' - 6 5/8"PENTHOUSEMECHANICALUPPER LEVEL 05LOWER LEVEL 05UPPER LEVEL 03LOWER LEVEL 03UPPER LEVEL 01LOWER LEVEL 01UPPER GROUND LEVELUPPER BASEMENT LEVELUPPER LEVEL 02LOWER LEVEL 02UPPER LEVEL 04LOWER LEVEL 04UPPER LEVEL 06LOWER LEVEL 06UPPER LEVEL 07ELEVATORPIT202ELEVATOR#2ELEVATOR#1STAIR02STAIR01Top Of Curb968' - 1 1/4"1Client No:Drawn by:Sheet No:A|r Job No:1234512345ABCDABCDRevisionsSeal4592 Jordan RoadSkaneateles Falls, NY 13153315 685 4732860 Hooper RoadEndwell, New York 13760Tel: 607.231.6600Fax: 607.231.6651Email: mail@delta-eas.comWeb: www.delta-eas.comGeneralG-102564.06RPSIssued for Bid11.18.2016Cornell UniversityGeorge Jameson HallIthaca, New York 14850Overall Plans 3/32" = 1'-0"A1Level 06 - Lounge 3/32" = 1'-0"C1Level 07 - Mechanical 3/32" = 1'-0"D3Level 08 - PenthouseLevel 06, Level 07 - Mechanical,and Level 08 - Penthouse 3/32" = 1'-0"A3Building SectionNo. Description Date1 Post-Bid Bulletin 1/27/17 Client No:Drawn by:Sheet No:A|r Job No:1234512345ABCDABCDRevisionsSeal4592 Jordan RoadSkaneateles Falls, NY 13153315 685 4732Design Data,General Notes,Partial Plans, andDetailsS-101564.06RMSIssued for Bid11.18.2016Cornell University George Jameson Hall Ithaca, New York 14850No.DescriptionDateStructural860 Hooper RoadEndwell, New York 13760Tel: 607.231.6600Fax: 607.231.6651Email: mail@delta-eas.comWeb: www.delta-eas.comABBREVIATIONS LEGEND UPELEVATOR#2ELEVATOR#1ELEVATORLOBBYUPELEVATOR#2ELEVATOR#1ELEVATORLOBBYG01ELEVATOR#2ELEVATOR#1ELEVATORLOBBYB01STORAGE1B12Client No:Drawn by:Sheet No:A|r Job No:1234512345ABCDABCDRevisionsSeal4592 Jordan RoadSkaneateles Falls, NY 13153315 685 4732Asbestos AbatementPlans and NotesAR-101564.06SMPIssued for Bid11.18.2016Cornell University George Jameson Hall Ithaca, New York 14850Basement Level Through PenthouseLevel and Penthouse RoofNo.DescriptionDate860 Hooper RoadEndwell, New York 13760Tel: 607.231.6600Fax: 607.231.6651Email: mail@delta-eas.comWeb: www.delta-eas.com1Post-Bid Bulletin1/27/17 ELEVATOR#2ELEVATOR#1ELEVATORLOBBYG01STORAGEG15ELEVATOR PIT840'-2"A-101A5404019ELEVATOR PIT840'-2"66225050A2A-10231148ELEVATOR#2ELEVATOR#1ELEVATORLOBBY001A-101B5A2A-102194447474747311311522734UP29EQ EQC5A-102386"444425EXISTING FLOORGRATE - TYPICAL288112226262421C1A-1022121511' - 0"A3G-102ELEVATOR#2ELEVATOR#1ELEVATORLOBBY101A-101C54040A2A-102194747311474731136..433129EQ EQBasement Level847' - 8"V.I.F.8' - 6"ELEVATOR #2EXISTINGPAINTEDCONCRETE46133Ground Level856' - 6 5/8"V.I.F.12' - 6"ELEVATOR #2ELEVATOR #1EXISTING TILE BASEEXISTING BENCH TO REMAINEXISTING BRICK WALL123715394' - 0"5513163314131613161316V.I.F.8' - 0"ELEVATOR #2ELEVATOR #1EXISTING PAINTED BRICK WALL1440401553135313Client No:Drawn by:Sheet No:A|r Job No:1234512345ABCDABCDRevisionsSeal4592 Jordan RoadSkaneateles Falls, NY 13153315 685 4732860 Hooper RoadEndwell, New York 13760Tel: 607.231.6600Fax: 607.231.6651Email: mail@delta-eas.comWeb: www.delta-eas.comArchitecturalA-101564.06RPSIssued for Bid11.18.2016Cornell UniversityGeorge Jameson HallIthaca, New York 14850Enlarged Plans 1/4" = 1'-0"C3Basement Level 1/4" = 1'-0"D3Ground Level 1/4" = 1'-0"C2Level 08 - Penthouse 1/4" = 1'-0"A2Typical Level 01 to 06 1/4" = 1'-0"D2Roof LevelKeynote Legend1 REMOVE EXISTING GEARED HOISTING EQUIPMENT - PROVIDE GEARLESS ELEVATORHOISTING MACHINE & ASSOCIATED EQUIPMENT INCLUDING EMERGENCY BRAKE ANDDEFLECTOR SHEAVE2 REMOVE EXISTING ELEVATOR CONTROLLER - PROVIDE ELEVATOR CONTROL SYSTEM3 REMOVE EXISTING HOISTWAY DOOR PANELS & HARDWARE - PROVIDE HOISTWAY DOORSAND ASSOCIATED HARDWARE4 REMOVE EXISTING ELEVATOR CAB IN ITS ENTIRETY - ELEVATOR PLATFORM TO REMAIN -PROVIDE ELEVATOR CAB - SEE INTERIOR CAB ELEVATIONS5 REMOVE EXISTING POSITION INDICATOR & BACK BOX - PROVIDE ELEVATOR POSITIONINDICATOR WITH BACK BOX & OVERSIZED FACE PLATE TO COVER ALL VOIDS - SEEELEVATOR DETAIL D3/A-5016 REMOVE EXISTING PIT EQUIPMENT SPECIFIED TO BE REPLACED - PROVIDE PIT EQUIPMENT8 REMOVE EXISTING ELEVATOR EQUIPMENT NO LONGER UTILIZED AS PART OF THEMODERNIZATION IN ITS ENTIRETY INCLUDING BUT NOT LIMITED TO ELECTRICAL CONDUITS,WIRE-WAYS, CONTROL WIRING & EQUIPMENT - PATCH/FIRESTOP PENETRATIONS INFLOORS & WALLS LEFT BY REMOVALS TO MAINTAIN FIRE RATINGS & MATCH EXISTINGADJACENT SURFACE FINISHES11 EXISTING ELEVATOR LANDING SILL TO REMAIN12 SAW CUT AND REMOVE BRICK FOR INSTALLATION OF NEW LOBBY PANEL - SAFEGUARDBRICK FOR POTENTIAL USE IF NEEDED FOR INFILL AT LOBBY LEVEL - PROVIDE ELEVATOREMERGENCY LOBBY PANEL - SEE DETAIL A1/A-50113 PROVIDE BRAILLE IDENTIFICATION PLACARDS - TYPICAL EACH SIDE OF ENTRANCE JAMB -SEE DETAIL C5/A-50114 REMOVE EXISTING WALL SIGNAGE IN ITS ENTIRETY & TURN OVER TO OWNER15 REMOVE EXISTING HALL FIXTURE IN ITS ENTIRETY - PROVIDE FLUSH MOUNTED HALL CALLFIXTURE INCLUDING BACKBOX- CUT AND TOOTH-IN BRICK AS REQUIRED FOR BACKBOXINSTALLATION16 PROVIDE ELEVATOR IDENTIFICATION SIGNAGE - TYPICAL EACH SIDE OF ENTRANCE JAMB -SEE DETAIL C4/A-50119 EXISTING ELEVATOR DIVIDER BEAM TO REMAIN - TYPICAL AT EACH LEVEL21 PROVIDE HANDRAIL - SEE DETAILS C1/A-102 AND D1/1-10222 EXISTING SUMP DRAIN TO REMAIN IN ELEVATOR PIT24 LINE OF EQUIPMENT ROOF HATCH ABOVE25 EXISTING ELECTRICAL EQUIPMENT - SEE ELECTRICAL DRAWINGS26 PROVIDE ELEVATOR TRANSFORMER INCLUDING WIRING AND CONDUIT TO ELEVATORCONTROLLER27 EXISTING ROOF ACCESS HATCH TO REMAIN28 PREPARE & PAINT MACHINE ROOM FLOOR29 EXISTING ROOF ACCESS LADDER TO REMAIN31 PROVIDE EQUIPMENT ROOF HATCH - SEE SPECIFICATIONS - SEE STRUCTURAL DRAWINGSFOR SLAB MODIFICATIONS - PROVIDE 1 HOUR RATED INTUMESCENT PAINT ON ALLFRAMING34 PROVIDE INSULATED BLANK OFF PANEL SIZED TO COVER EXISTING LOUVER - VERIFY SIZE INFIELD - SEE BLANK OFF PANEL DETAIL B5/A-10236 CUT BACK EXISTING ROOF SYSTEM AS REQUIRED FOR THE INSTALLATION OF CONCRETECURB AND ROOF EQUIPMENT HATCH - REPAIR/INFILL EPDM ROOF SYSTEM AS REQUIREDTO MAINTAIN A WEATHERTIGHT INSTALLATION IN COMPLIANCE WITH, AND COVEREDUNDER, THE EXISTING ROOF WARRANTY37 REMOVE EXISTING FIRE SERVICE FIXTURE IN ITS ENTIRETY - PATCH AS REQUIRED TO MATCHEXISTING ADJACENT38 REMOVE EXISTING GUARDRAIL AND PROVIDE GUARD WITH TOEKICK AT PERIMETER OFOPENING - INCLUSIVE OF STAIR GUARD/RAILING39 RELOCATE TACKBOARD AS COORDINATED WITH OWNER40 PATCH AS REQUIRED AND PAINT WALL TO MATCH EXISTING43 PROVIDE TAPERED INSULATION44 PROVIDE GUARD RAIL - SEE DETAILS C1/A-102 AND C5/A-10246 REMOVE EXISTING HALL FIXTURE - RETAIN EXISTING BACKBOX - PROVIDE SURFACEMOUNTED HALL STATION - PATCH AND PAINT AS REQUIRED TO MATCH EXISTINGADJACENT - SEE DETAIL B2/A-50147 EXISTING EXPOSED BRICK ELEVATOR ENTRANCE JAMB TO REMAIN - REPLACE EXISTINGMETAL INFILL AS REQUIRED - SEE ELEVATOR ENTRANCE JAMB DETAIL48 PROVIDE PIT LADDER - SEE PIT LADDER DETAIL A1/A-10249 REMOVE EXISTING PIT LADDER - PATCH AND PAINT ANCHOR REMOVAL AREAS ASREQUIRED TO MATCH EXISTING ADJACENT50 EXISTING METAL ELEVATOR ENTRANCE JAMB TO REMAIN - PREPARE AND PAINT TO MATCHEXISTING51 EXISTING DRAIN PIPE - SEE PLUMBING DRAWINGS52 PROVIDE MASONRY INFILL AT LOUVER REMOVAL - SEE DETAIL B6/A-102Basement Level to Level 08 -Penthouse 1/4" = 1'-0"A5Basement Level Elevation 1/4" = 1'-0"B5Ground Level Elevation 1/4" = 1'-0"C5Typical Level Elevation111No. Description Date1 Post-Bid Bulletin 1/27/17 2 1/2" X 1/2" BENT PLATEBRACKETS. PAINT. SECURETO STEEL WITH 5/8" BOLTS,DOUBLE NUTTEDELEVATOR PIT ACCESS LADDERPIT FLOORELEVATOR SILLV.I.F.7' - 6"EXISTING PIT SEPARATION BEAMTYP.3' - 0" MAX.TYP.1' - 0" MAX.3" x 1/2" FLAT STOCK STEEL,PAINTELEVATOR DOOR FRAMEFINISHED FLOOR3/4" DIA. SOLID STEEL RUNG THRUSIDEBARS AND WELD ALL AROUND,PAINT WITH NON-SLIP SURFACES ATTOP OF RUNG, TYP.PIT WALL2 1/2" X 1/2" BENT PLATEBRACKETS - PAINTMIN.4' - 0"8" MAX.4 x 4 x 1/2 x 4" LONG, BENTPLATE BRACKET - SECURE WITH5/8" BOLTS, DOUBLE NUTTEDMAX.8"MIN.16"LIGHT SWITCH - SEEELECTRICAL DETAILSPROVIDE PIT STOP SWITCH ESWITH LABELS FOR EACHELEVATOR47" A.F.F.1' - 6" A.F.F.PROVIDE PIT STOP SWITCHES WITH LABELS FOR EACHELEVATOREXTERIOREXISTING WALLCONSTRUCTIONFACE BRICK - MATCHEXISTING COLOR ASAPPROVED BYARCHITECTAIR/VAPOR BARRIER -BASIS OF DESIGN:HENRY AIR-BLOC 06WB OR EQUAL4" CMU*PROVIDE (2) CORRUGATED MASONRY STRAPANCHORS AT EACH SIDE OF BRICK AND CMU INFILLTOP OF CURB967'-0 5/8"CONTINUOUS PRESSURE TREATEDWOOD BLOCKING AT PERIMETERTERMINATION BAREPDMCONCRETE CURB - SEESTRUCTURAL DRAWINGSEXISTING RIGID INSULATION2X PRESSURE TREATEDWOOD BLOCKINGEXISTING CONCRETE SLAB1" RIGID INSULATION6"FLASH INTO EXISTING EPDMMEMBRANE AS REQUIRED TOMAINTAIN WARRANTYPROVIDE RIGIDINSULATION TO MATCHEXISTING/ADJACENTLevel 08 - Penthouse957' - 5 1/4"6"4"3' - 6"1/4" TOE BOARD - WELDED TO POSTSEXISTING CONCRETE FLOOR1 1/2" DIAMETER SCHEDULE 40 PIPEGUARDRAIL - WELD TO BASE PLATEEQEQ1/4" x 4" x 4" BASE PLATE WITH(4) 3/8" EXPANSION BOLTSBasement Level847' - 8"Elevator Pit840' - 2"Ground Level856' - 6 5/8"Level 01871' - 2 5/8"Level 06939' - 2 5/8"Level 02884' - 6 5/8"Level 08 - Penthouse957' - 5 1/4"Level 07948' - 6 5/8"Roof966' - 6 5/8"Top Of Curb968' - 1 1/4"PENTHOUSE800MECHANICALROOMG46ELEVATORLOBBYG35HOUSELOUNGEG43ELEVATORLOBBY201ELEVATORLOBBY101ELEVATORLOBBY001STORAGEG15ELEVATORLOBBYG01ELEVATORPIT202333349444CLEAR OVERHEAD16' - 10" V.I.F.TOTAL TRAVEL DISTANCE91' - 6 5/8" V.I.F.PIT DEPTH7' - 6" V.I.F.3631413PIT LADDER ONOPPOSITE PIT WALL148EXISTING ELEVATOR SILLHOISTWAY DOOR PANELPROVIDE 3/4" x 1 1/2" STEEL BAR STOCKINFILL AT HEAD AND JAMBS - REPLACE/SHIMAS REQUIRED - PREPARE AND PAINT3M FIRE BARRIER SEALANT CAULK, OR EQUALEXISTING EXPOSED BRICKELEVATOR ENTRANCEHOISTWAY3/8" MAX.LINE OF NEW STEEL BAR STOCK INFILL AT HEADPAINTABLE CAULK ON EXPOSED SIDE -PREPARE & PAINTLevel 08 - Penthouse957' - 5 1/4"Level 07948' - 6 5/8"Roof966' - 6 5/8"Top Of Curb968' - 1 1/4"3' - 6"C5A-102C4A-1021' - 0"8"2"34" - 38" TO NOSING42" TO NOSING1 1/2"1 1/2"SECTIONELEVATION1 1/2" DIAMETERSCHEDULE 40 PIPEGUARDRAILPOST BEYOND1 1/2" DIAMETERSCHEDULE 40 PIPEHANDRAILBRACKET BEYONDTACK WELD POSTINTO SLEEVE3/8" THRU BOLTCONNECTIONSLEEVE WELDED TO 6" x 8"MOUNTING PLATEEXISTING STRINGEREXISTING TREADTACK WELD POSTINTO SLEEVESLEEVE WELDED TO 6" x 8"MOUNTING PLATE3/8" THRU BOLTCONNECTIONEXISTING STRINGERPOST1" THICK INSULATED BLANKOFF PANEL AND FRAMESET IN BED OF SEALANT,MECHANICALLYFASTENED TO FRAME1/2"EXISTING METAL LOUVEREXISTING WALLCONSTRUCTIONEXTERIORClient No:Drawn by:Sheet No:A|r Job No:1234512345ABCDABCDRevisionsSeal4592 Jordan RoadSkaneateles Falls, NY 13153315 685 4732860 Hooper RoadEndwell, New York 13760Tel: 607.231.6600Fax: 607.231.6651Email: mail@delta-eas.comWeb: www.delta-eas.comArchitecturalA-102564.06RPSIssued for Bid11.18.2016Cornell UniversityGeorge Jameson HallIthaca, New York 14850Hoistway Section andDetails 3/4" = 1'-0"A1Pit Ladder Detail 1 1/2" = 1'-0"B6Wall Infill Detail 1 1/2" = 1'-0"D1Curb Detail 1 1/2" = 1'-0"C5Penthouse Guard DetailKeynote Legend1 REMOVE EXISTING GEARED HOISTING EQUIPMENT - PROVIDE GEARLESS ELEVATORHOISTING MACHINE & ASSOCIATED EQUIPMENT INCLUDING EMERGENCY BRAKEAND DEFLECTOR SHEAVE3 REMOVE EXISTING HOISTWAY DOOR PANELS & HARDWARE - PROVIDE HOISTWAYDOORS AND ASSOCIATED HARDWARE4 REMOVE EXISTING ELEVATOR CAB IN ITS ENTIRETY - ELEVATOR PLATFORM TOREMAIN - PROVIDE ELEVATOR CAB - SEE INTERIOR CAB ELEVATIONS9 PROVIDE CAR TOP GUARD RAIL - BASIS OF DESIGN: WURTEC TOP OF CAR HANDRAIL MOUNTED TO UNISTRUT CHANNELS31 PROVIDE EQUIPMENT ROOF HATCH - SEE SPECIFICATIONS - SEE STRUCTURALDRAWINGS FOR SLAB MODIFICATIONS - PROVIDE 1 HOUR RATED INTUMESCENTPAINT ON ALL FRAMING36 CUT BACK EXISTING ROOF SYSTEM AS REQUIRED FOR THE INSTALLATION OFCONCRETE CURB AND ROOF EQUIPMENT HATCH - REPAIR/INFILL EPDM ROOFSYSTEM AS REQUIRED TO MAINTAIN A WEATHERTIGHT INSTALLATION INCOMPLIANCE WITH, AND COVERED UNDER, THE EXISTING ROOF WARRANTY41 PROVIDE 1 HOUR INTUMESCENT PAINT ON STRUCTURAL MEMBERS48 PROVIDE PIT LADDER - SEE PIT LADDER DETAIL A1/A-102 1/4" = 1'-0"A2Elevator Hoistway Section - Typical 3" = 1'-0"D4Elevator Entrance Jamb Detail 1/4" = 1'-0"C1Stair Elevation 1 1/2" = 1'-0"C4Penthouse Railing Details 1 1/2" = 1'-0"B5Blank Off Panel11111No. Description Date1 Post-Bid Bulletin 1/27/17 2STAINLESS STEEL CHARACTER,RAISE 1/32" SANS-SERIF GOTHIC(HELVETICA SEMI-BOLD)(PROVIDE WITH BRAILLE)DRIVE PINSBLACK BACKGROUND2 1/2"5'-0" A.F.F.4"3"1STAINLESS STEEL #4 BACKGROUNDFASTEN TO FRAME WITH TAMPERRESISTANT FASTENERSPOWDER EPOXY BLACK CHARACTER, ETCHEDINTO STAINLESS STEEL, SANS-SERIF GOTHIC(HELVETICA SEMI-BOLD)5"5"ELEVATORINSIDE PANELFRONT COVERNOTE:1. ALL CHARACTERS SHALL BE ENGRAVED IN STAINLESS STEEL.2. COORDINATE PANEL DEPTH WITH EQUIPMENT INSIDE & WALL CAVITY.PANEL SECTION24"14"12"22"BRUSHED STAINLESSSTEEL FACE-PLATEKEYED LOCK12AUTOLED LAMP TO INDICATE THATNORMAL POWER HAS FAILEDFULL HEIGHT HINGELOCK CATCHPROVIDE STAINLESSSTEEL LOBBY PANELFIRE SERVICE LED INDICATOR3 POSITION FIRE RECALL KEY SWITCHELEVATOR STANDBY POWERELEVATOR STANDBYPOWER PANELTWO-WAY VOICE COMMUNICATIONSYSTEM WITH INSTRUCTION SIGNAGE -SEE ELECTRICAL DRAWINGSLED LAMP TO INDICATE SELECTIONOF ELEVATOR ON STANDBY POWERMANUAL SELECTOR BUTTONSFOR SELECTIVE OPERATIONELEVATORS ARE ON STANDBYPOWER WHEN LITECOMMUNICATION/STAINLESS STEEL PANELEXISTING BRICK WALLCONSTRUCTIONPERIMETER SUPPORTINGBRACKETSOVERSIZED PANEL FRAMETO COVER WALL OPENINGSV.I.F.8 3/4"ELEVATOR COMMUNICATIONS FAILUREELECTRICAL CONDUIT -SEAL PENETRATION TOMAINTAIN RATINGFIRE SERVICE INDICATORLOBBY/INTERMEDIATE LANDING - ALL OTHER FLOORS42" A.F.F.CVANDAL RESISTANTFASTENERS - TYPICAL26"5 1/4"LIN FIRE EMERGENCY, DO NOT USEELEVATOR.ENGRAVED PICTOGRAPHUSE EXIT STAIRSHOISTWAY ACCESSKEYSWITCHESTERMINAL LANDING - LEVEL 642" A.F.F.CVANDAL RESISTANTFASTENERS - TYPICAL26"5 1/4"LIN FIRE EMERGENCY, DO NOT USEELEVATOR.ENGRAVED PICTOGRAPHUSE EXIT STAIRSHALL CALL PUSH BUTTON- TYPICALNORTHSOUTHSTAINLESS STEEL FACEPLATE- TYPICALPROVIDE OVERSIZEDFACEPLATE AT LOBBY LEVELTO COVER REMOVALS1. ELEVATOR DETAILS & DIMENSIONS ON THIS PAGE ARE SCHEMATIC IN DESIGNAND SHOULD BE VERIFIED WITH THE MANUFACTURER. ALL FIXTURES SHALL BEAPPROVED BY ARCHITECT PRIOR TO ORDERING AND INSTALLATION.2. FIXTURES, WHERE APPLICABLE, SHOULD BE FILLED OUT WITH ELEVATOR SPECIFICINFORMATION - ALL WORDING SHALL BE ENGRAVED UNLESS OTHERWISE NOTED INDRAWINGS OR SPECIFICATIONS.3. ALL FIXTURES SHALL USE VANDAL RESISTANT FASTENERS UNLESS OTHERWISE NOTED.LED ILLUMINATEDARROWSVANDAL RESISTANTFASTENERS - TYPICALPROVIDE BACKBOXLED INDICATORV.I.F.+/- 3 1/2"V.I.F.+/- 2' - 0"OVERSIZED STAINLESS STEELFACEPLATELED ILLUMINATED ARROWSVANDAL RESISTANT SPANNERHEAD SCREWS - TYPICALSTAINLESS STEEL FACEPLATEALARMDOORCLOSEDOOROPENPUSH TOHELPCALL35" A.F.F.FIREFIGHTERSOPERATION31B5DIGITAL CAR POSITION INDICATORWITH DIRECTIONAL ARROWEMERGENCY LIGHTTELEPHONE SPEAKERCKEY LOCKFIREFIGHTERS OPERATIONCABINETL60"10 1/2"LOCKABLE SERVICE CABINET -REFER TO SPECIFICATIONS FOREQUIPMENT INSIDESERVICECABINETCapacityCar No.42G6ELEVATOR #2 ONLY2' - 8" MAX.REAR WALLSIDE WALL(TYPICAL)FRONT WALLTEXTURED STAINLESSSTEEL CAR DOORSCAR OPERATING PANELSTAINLESS STEELHANDRAIL - TYPICALSTAINLESSSTEEL BASE4"4"2' - 8" MAX.16" MAX.16" MAX.1/2" REVEALTEXTURED STAINLESSSTEEL PANEL - TYPICALSTAINLESS STEELRETURN PANELSTAINLESS STEELTRANSOMSTAINLESS STEELBUMPER1' - 0"6"1' - 0"6"EQEQEQEQEQEQEQEQEQ4"VANDAL RESISTANTFASTENERS (TYP.)42" A.F.F.CL5 1/4"V.I.F.2' - 2"IN FIRE EMERGENCY, DO NOT USEELEVATOR.ENGRAVED PICTOGRAPHUSE EXIT STAIRSTERMINAL LANDING - BASEMENTHOISTWAY ACCESS KEYSWITCHNORTHRETAIN EXISTING BACKBOX FORKEY SWITCH IF REQUIREDClient No:Drawn by:Sheet No:A|r Job No:1234512345ABCDABCDRevisionsSeal4592 Jordan RoadSkaneateles Falls, NY 13153315 685 4732860 Hooper RoadEndwell, New York 13760Tel: 607.231.6600Fax: 607.231.6651Email: mail@delta-eas.comWeb: www.delta-eas.comArchitecturalA-501564.06RPSIssued for Bid11.18.2016Cornell UniversityGeorge Jameson HallIthaca, New York 14850Elevator Fixtures, Detailsand Elevations 3" = 1'-0"C5Braille Signage 3" = 1'-0"C4Elevator Identification Placard 1 1/2" = 1'-0"A1Elevator Emergency Lobby Panel 3" = 1'-0"B3Hall Call Fixtures - Flush MountedGeneral Notes 3" = 1'-0"D3Position Indicator Detail 3" = 1'-0"C3Car Lantern Detail 3" = 1'-0"B1Typical Car Operating Panel 1/2" = 1'-0"A3Interior Cab Elevations 3" = 1'-0"B2Hall Call Fixture - Surface Mounted11No. Description Date1 Post-Bid Bulletin 1/27/17 A1 Basement Floor Plan - Electrical Demolition 1/8" = 1'-0"E3 Ground Floor Plan - Electrical Demolition 1/8" = 1'-0"D3 First Floor Plan - Electrical Demolition 1/8" = 1'-0"C3 Second Floor Plan - Electrical Demolition 1/8" = 1'-0"B3 Third Floor Plan - Electrical Demolition 1/8" = 1'-0"A3 Fourth Floor Plan - Electrical Demolition 1/8" = 1'-0"E4 Fifth Floor Plan - Electrical Demolition 1/8" = 1'-0"C4 Sixth Floor Plan - Electrical Demolition F F SF S RAILS SUPPORT ON ELEV. MOUNTED LPP-P1 J T T ATS FACP J M ONAN GENERATOR 3Ø, .8 PF 100KW/125KVA 208Y/120V 1/4" = 1'-0"A4 1/8" = 1'-0"C1 1/8" = 1'-0" E-101 Demolition Overall Floor Plans - Elevator Room Basement Level to Level 08 - S S S S S S (E) (E) (E)(E) (E) (E) (E) (E) (E) (E) (E) M ACCU-1 (E) (E) (E) (E) (E) (E) (E) (E) FROM HERE FAN FED EXHAUST (E) (E) (E) REMAIN CONTROLS TO EXISTING LIGHTING DSS-1 ELEV-2A ELEV-1B CONTROLLER ELEVATOR J J M J (E)(E) (E) (E) J J J (E) (E) (E)(E) (ER) F F (E)(E) MTS (E) (E) S S (E) (E) CONTROLLER ELEVATOR FAN EXHAUST JM EM PANEL PANEL 1600A DIST. L1-B E1-B (E)(E) (E) (E) (E) (E) (E) DEMOLITION NOTES: 1 (ER) 1 M M MM M TMDF (E) PANEL DIST. 1200A 2 ELEVATOR LOBBY 201 GWB ELEVATOR LOBBY 001 GWB ELEVATOR LOBBY 301 GWB GWB ELEVATOR LOBBY 401 PENTHOUSE 800 GENERATOR G06 ELEVATOR LOBBY G01 ELECTRICAL DN JFR/MRG Level 08 - Penthouse Plan - Electrical DemolitionLevel 07- Mechanical Floor Plan - Electrical Demolition NOT USED. DISCONNECT AND REMOVE ALL EXISTING FEEDER CONNECTIONS TO ELEVATORS. 1 1/27/17Post-Bid Bulletin 1 1 564.06Cornell UniversityGeorge Jameson HallIthaca, New York 14850No.Description Date 315 685 4732 Skaneateles Falls, NY 13153 4592 Jordan Road Client No: Drawn by: Sheet No: A|r Job No: 1 2 3 4 5 1 2 3 4 5 A B C D A B C D Revisions Seal Issued for Bid 11.18.2016 NEER NGENG Capital DistrictSyracuseRochester 585.288.5590 Buffalo www.meengineering.com Mechanical/Electrical Engineering Consultants 150 N. CHESTNUT ST. ROCHESTER, NY 14604 M/E Project #: 160277 Web: www.delta-eas.com Email: mail@delta-eas.com Fax: 607.231.6651 Tel: 607.231.6600 Endwell, New York 13760 860 Hooper Road ELECTRICAL G08 TRANSFORMER G07 UP STAIR 01 G03 UP STAIR 02 JANITOR G13 STORAGE G17 STORAGE G15 LINEN STORAGE G12 DN MECHANICAL G05 STORAGE G16 G02 UP #2 ELEVATOR UP# 2 ELEVATOR # 1 ELEVATOR ELEVATOR LOBBY 101 GWB UP #2 ELEVATOR #1 ELEVATOR GWB #2 ELEVATOR #1 ELEVATOR UP #2 ELEVATOR #1 ELEVATOR DN UP #2 ELEVATOR #1 ELEVATOR GWB ELEVATOR LOBBY 501 UP #2 ELEVATOR #1 ELEVATOR ELEVATOR LOBBY G35 GWB UP DN #2 ELEVATOR #1 ELEVATOR PENTHOUSE ACCESS LOBBY G45 MECHANICAL ROOM G46 UPPER MECHANICAL ROOM G47 STAIR 02 STAIR 01 UP DN UPDN PENTHOUSE M-101 TSK 1/2" = 1'-0"C1 (E)LOUVER (E)RS&L (E)AAD(E)EXHAUST FAN Plan Penthouse & Partial Basement HEAT PUMP (E)SPLIT SYSTEM GENERAL NOTES: DEMOLITION NOTES: 3 2 1 2 3 3 1 PENTHOUSE 800 T Enlarged Plans HVAC Level 08 - Penthouse Plan - HVAC Demolition DRAWINGS FOR ASBESTOS ABATEMENT NOTES, DETAILS AND REQURIEMENTS. IMMEDIATELY AND NOTIFY THE OWNER. REFERENCE THE HAZARDOUS MATERIAL ASBESTOS OR OTHER SUSPECT MATERIALS ARE ENCOUNTERED, CEASE OPERATIONS PACKAGE FRONT END DOCUMENTS FOR HAZARDOUS MATERIAL INFORMATION. IF REFER TO THE HAZARDOUS MATERIALS REPORTS INCLUDED IN THE SPECIFICATION POINTS, PROGRAM, USER GROUPS, EVENT/SCHEDULES, REPORTS AND SYSTEM PROFILE. TO BE DEMOLISHED WILL BE CLEARED OF ALARMS, GRAPHICS, TRENDS, UNBUNDLED AND/OR COMMUNICATIONS OF DDC HARDWARE IN THE FIELD, ALL DDC DEVICES PROJECT AND PLANNING MANAGER AND ENGINEER. BEFORE DISCONNECTING POWER AND COPIES DISTRIBUTED TO THE FACILITIES DEPARTMENT AND COPIES TO THE SYSTEM AND THERE ASSOCIATED POINTS TO BE DOCUMENTED IN REPORT FORMAT CONDUIT SHALL BE ABANDONED IN PLACE. ALL REMOVED TEMPERATURE CONTROL AND REMOVED. NO EQUIPMENT, ACCESSORIES, PNEUMATIC TUBING, WIRING OR OPERATION OF THE NEW TEMPERATURE CONTROL SYSTEM SHALL BE DISCONNECTED WIRING OR CONDUIT THAT WILL NOT BE UTILIZED FOR THE INSTALLATION OR EXISTING TEMPERATURE CONTROL EQUIPMENT, ACCESSORIES, PNEUMATIC TUBING, DUCTWORK PENETRATIONS THROUGH FLOORS AND WALLS AFTER DEMOLITION. IT IS THE RESPONSIBILITY OF THIS CONTRACT TO PATCH AND FINISH ALL EXISTING NOTED ON THE DRAWINGS. NO EQUIPMENT OR DUCTWORK SHALL BE ABANDONED IN PLACE UNLESS OTHERWISE DISCONNECTED AND REMOVED BUT IS THE REQUIREMENTS UNDER THIS CONTRACT. WIRING, CONDUIT, AND CONTROL PNEUMATIC TUBING AND ACCESSORIES TO BE DUCTWORK ACCESSORIES, SUPPORTS, CONTROLS, CONTROL ACCESSORIES, CONTROL REMOVALS. THE INTENT IS NOT TO IDENTIFY ALL MISCELLANEOUS DUCTWORK, THE DEMOLITION DRAWINGS SHOW IN GENERAL MAJOR EQUIPMENT, AND DUCTWORK DEBRIS AND MATERIALS OFF SITE IN A PROPER LEGAL MANNER. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO DISPOSE OF ALL DEMOLITION WITH SIMILAR OR LIKE MATERIALS AT NO ADDITIONAL COST TO THE OWNER. WORK IS THE RESPONSIBILITY OF THE CONTRACTOR TO REPAIR AND/OR REPLACE AND ACCESSORIES) SHOWN TO REMAIN AS A RESULT OF THE CONTRACTORS DAMAGE TO EXISTING SYSTEMS (EQUIPMENT, PIPING, DUCTWORK, CONTROLS EXISTING CONDITIONS AND DIMENSIONS. MADE FOR ADDITIONAL COSTS DUE TO CONTRACTORS FAILURE TO VERIFY SHALL FIELD VERIFY ALL EXISTING CONDITIONS. NO ALLOWANCE WILL BE CONSTRUCTION DOCUMENTS AND ARE NOT GUARANTEED. THE CONTRACTOR EXISTING CONDITIONS ARE TAKEN FROM FIELD OBSERVATIONS AND PRIOR G. F. E. D. C. B. A. REFER TO ARCHITECTURAL PLANS FOR FURTHER REQUIREMENTS. LOUVER SHALL REMAIN. ACCESSORIES, CONTROLS, AND CONTROL ACCESSORIES. EXISTING DISCONNECT AND REMOVE EXISTING DUCTWORK, DUCTWORK LOUVER, CONTROLS, AND CONTROL ACCESSORIES. DISCONNECT AND REMOVE EXISTING EXHAUST FAN, ASSOCIATED 1 1/27/17Post-Bid Bulletin 1 564.06Cornell UniversityGeorge Jameson HallIthaca, New York 14850No.Description Date 315 685 4732 Skaneateles Falls, NY 13153 4592 Jordan Road Client No: Drawn by: Sheet No: A|r Job No: 1 2 3 4 5 1 2 3 4 5 A B C D A B C D Revisions Seal Issued for Bid 11.18.2016 NEER NGENG Capital DistrictSyracuseRochester 585.288.5590 Buffalo www.meengineering.com Mechanical/Electrical Engineering Consultants 150 N. CHESTNUT ST. ROCHESTER, NY 14604 M/E Project #: 160277 Web: www.delta-eas.com Email: mail@delta-eas.com Fax: 607.231.6651 Tel: 607.231.6600 Endwell, New York 13760 860 Hooper Road 1/4" = 1'-0"A4 1/8" = 1'-0"C4 P-101 ZPS Elevator Room Basement Level to Level 08 - (E)3" RD (E)3" ST DN 3" ST REMOVE (E)ST (E)4" (E)4" FD (BURIED) Basement Floor Plan - Demolition (E) VALVES 3/4 HP SUMP PUMPS SERVED BY DUPLEX (E) SUMP PUMP (2) (E)ƒ" R (2) (E)2" HW (E)2" CW HEAD SPRINKLER PIPING AND REMOVE FP (E)2" FP PENTHOUSE 800 STORAGE G16 STORAGE G17 STORAGE G15 G02 STAIR 02 JANITOR G13 ELEVATOR LOBBY G01 LINEN STORAGE G12 ELECTRICAL G08GENERATOR G06 TRANSFORMER G07 MECHANICAL G05 G03 STAIR 01 PLUMBING Plans Partial Demolition Floor Level 08 - Penthouse Plan - Demolition # 2 ELEVATORCW (E) 2•" (E) 2" FP 1 1/27/17Post-Bid Bulletin 1 564.06Cornell UniversityGeorge Jameson HallIthaca, New York 14850No.Description Date 315 685 4732 Skaneateles Falls, NY 13153 4592 Jordan Road Client No: Drawn by: Sheet No: A|r Job No: 1 2 3 4 5 1 2 3 4 5 A B C D A B C D Revisions Seal Issued for Bid 11.18.2016 NEER NGENG Capital DistrictSyracuseRochester 585.288.5590 Buffalo www.meengineering.com Mechanical/Electrical Engineering Consultants 150 N. CHESTNUT ST. ROCHESTER, NY 14604 M/E Project #: 160277 Web: www.delta-eas.com Email: mail@delta-eas.com Fax: 607.231.6651 Tel: 607.231.6600 Endwell, New York 13760 860 Hooper Road UP UP DN UP DN 1/4" = 1'-0"A1 1/8" = 1'-0"C1 P-201 ZPS Elevator Room Basement Level to Level 08 - PLUMBING (E)3" RD (E)3" ST DN ST (E)4" (E)4" FD EXISTING WORK TO BE REMOVED POINT OF CONNECTION POINT OF DISCONNECTION NTS NOT TO SCALE (E)EXISTING (ETR)EXISTING TO REMAIN AFF ABOVE FINISHED FLOOR BFF BELOW FINISHED FLOOR VTR VENT THRU ROOF GC GENERAL CONTRACTOR MC MECHANICAL CONTRACTOR PC PLUMBING CONTRACTOR EC ELECTRICAL CONTRACTOR (E)EXISTING PIPING COLD WATER PIPING (CW) HOT WATER PIPING (HW) HOT WATER RECIRCULATING PIPING (HWR) SANITARY SEWER PIPINGSAN ELBOW DOWN 45°OFFSET ELBOW UP BOTTOM/TEE CONNECTION TOP TEE CONNECTION "P" TRAP PIPE CONTINUATION CAP OR PLUG DECK PLATE CLEANOUT (DPCO) WALL PLATE CLEANOUT (WPCO) CLEANOUT (CO) VENT PIPING Basement Floor Plan 1"1" 1" CL FROM STRUCTURE THREADED ROD - SUPPORT DETAIL NOTES: A. B. TO SUIT DRAINAGE PIPING CONFIGURATION AT ENDS ARRANGE DRAIN TROUGH PIPING SANITARY/STORM INSULATION SADDLE INSERT SIMILAR TO GALVANIZED SPACER PIPE INSULATION INSULATION SHIELD CLEVIS HANGER WITH PIPE PITCH DRIP PAN AT HANGER DENSITY INSULATION SECTION OF HIGH A4 PIPING DRAIN PAN DETAIL NO SCALE 3" REFER TO DETAIL A4/P201. PROVIDE DRIP PAN UNDER PIPING. DETAIL A5/P201. AND CONNECT TO 3" ST. REFER TO PROVIDE 1‚" IW FROM DRIP PAN FUNNEL VALVE CHECK BALL A5 NO SCALE INDIRECT WASTE DRAIN DETAIL - STORM 1‚" IW DRAIN IW DRAIN (2) (E)2" HW (E)2" CW (2) (E)ƒ" R (E) VALVES 3/4 HP SUMP PUMPS SERVED BY DUPLEX (E) SUMP PUMP 1" AIR GAP FLOOR DRAIN. TERMINATE DRAIN PIPING AT 1" (MINIMUM) ABOVE NEAREST SMOKE RATED FIBERGLASS ALSO ACCEPTABLE). AND APPLYING COLD GALVANIZING (NON-FLAMMABLE, METAL. MAKE WATER-TIGHT BY BRAZING SEAMS DRIP PAN SHALL BE 18 GAUGE GALVANIZED SHEET DRAIN OUTLET TO CHANGE REQUIRED MODIFY RD AS MATCH (E) UPRIGHT SPRINKLER HEAD TO 2" MATCH (E) UPRIGHT SPRINKLER HEAD TO ROOF HATCH, REFER TO 'A' DRAWING FP FIRE PROTECTION SERVICE (FP) GENERAL FIRE PROTECTION NOTES: BEAMS, JOISTS OR BRIDGING RIBS. DO NOT DRILL, CORE OR CUT ANY PORTION OF EXISTING COLUMNS, THAT IS PART OF THIS CONTRACT. THE COURSE OF ANY DEMOLITION OR INSTALLATION OF NEW WORK OR NEW FIRE PROOFING WHICH IS DISTURBED OR REMOVED DURING THIS CONTRACTOR IS RESPONSIBLE FOR ALL PATCHING OF EXISTING EXISTING SURFACES SHALL MATCH THE EXISTING SURFACES. UNLESS INDICATED OTHERWISE. MATERIALS FOR RESTORATION OF OF WORK SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR WALLS, CEILINGS AND FLOORS TO ACCOMMODATE THE INSTALLATION ALL COSTS FOR CUTTING, PATCHING, AND PAINTING OF EXISTING OWNER AND OTHER TRADES PRIOR TO CONSTRUCTION. COORDINATE AND SCHEDULE WORK AND SHUTDOWNS WITH THE OFF SITE. CONTRACTOR. LEGALLY DISPOSE ALL MATERIALS TO A LOCATION DISPOSE OF ALL WASTE MATERIALS CAUSED BY WORK OF THIS ACCOMMODATE WORK, OBSTACLES, AND WORK OF OTHER CONTRACTORS. CHANGES IN PIPING AND LOCATION OF EQUIPMENT, ETC. TO ETC. WHICH MAY BE REQUIRED. THE CONTRACTOR SHALL MAKE SUCH DRAWINGS DO NOT INDICATE ALL OFFSETS, CHANGES IN ELEVATION, F. E. D. C. B. A. DESCRIPTION FP & PLUMBING SYMBOL LIST SYMBOL UPRIGHT SPRINKLER HEAD (E)STORM MECHANICAL G05 JANITOR G10 STAIR 01 G03 G02 STAIR 02 JANITOR G13 LINEN STORAGE G12 ELECTRICAL G08 GENERATOR G06 TRANSFORMER G07 ELEVATOR LOBBY G01 STORAGE G15 STORAGE G16 STORAGE G17 Partial Floor Plans Level 08 - Penthouse Plan # 2 ELEVATOR # 1 ELEVATOR PENTHOUSE 800 GENERAL NOTES: DRAWINGS FOR ASBESTOS ABATEMENT NOTES, DETAILS AND REQUIREMENTS. IMMEDIATELY AND CONTACT THE OWNER. REFERENCE THE HAZARDOUS MATERIAL ASBESTOS OR OTHER SUSPECT MATERIALS ARE ENCOUNTERED, CEASE OPERATIONS PACKAGE FRONT-END DOCUMENTS FOR HAZARDOUS MATERIAL INFORMATION. IF REFER TO THE HAZARDOUS MATERIALS REPORTS INCLUDED IN THE SPECIFICATIONS ALL PENETRATIONS THRU ELEVATOR WALL TO BE FIRE STOPPED. TRADES OF THE REQUIRED SERVICE CLEARANCES. MAINTAIN SERVICE CLEARANCES OF ALL EQUIPMENT. ADVISE OTHER FIRESTOPPING FOR ALL PENETRATIONS. SLEEVE AND SEAL ALL WALL AND FLOOR PENETRATIONS. PROVIDE REPLACE ALL DAMAGED TILES. COMPLETION OF WORK, REPAIR ALL DAMAGED CEILING SURFACES, CEILING, PROVIDE FOR THE REMOVAL OF THE CEILING. UPON WHERE NEW WORK IS TO BE INSTALLED ABOVE AN EXISTING PROTECT BUILDING AND FURNISHINGS FROM DAMAGE. REMOVE EXISTING CONSTRUCTION IN THE WAY OF NEW WORK. INSULATION EXCEPT ASBESTOS. VALVES, FIXTURES, EQUIPMENT, HANGERS, SUPPORTS, AND DEMOLITION SHALL INCLUDE, BUT NOT BE LIMITED TO: PIPING, CONSTRUCTION. MAINTAIN FIRE/SMOKE RATING. OF PIPING OR EQUIPMENT WITH MATERIALS TO MATCH EXISTING PATCH HOLES IN EXISTING CONSTRUCTION LEFT BY THE REMOVAL PIPING BACK TO BEHIND THE FINISHED WALL SURFACE AND CAP. REMAIN MAY BE ABANDONED IN PLACE UNLESS NOTED. REMOVE ALL PIPING TO BE REMOVED AND LOCATED WITHIN A WALL TO ALL INACTIVE PIPING UNLESS NOTED. PIPING AND CAPPED. VALVE AND CAP ALL WATER PIPING. REMOVE ALL PIPING TO BE REMOVED, SHALL BE REMOVED BACK TO ACTIVE ACTIVE SERVICE PIPING. ALL EXISTING PIPING TO REMAIN SHALL BE RECONNECTED TO OWNER AND OTHER TRADES PRIOR TO DEMOLITION. COORDINATE AND SCHEDULE WORK AND SHUTDOWNS WITH THE MATERIALS TO A LOCATION OFF SITE. CAUSED BY WORK OF THIS CONTRACTOR. LEGALLY DISPOSE ALL DISPOSE OF ALL DEMOLITION AND/OR OTHER WASTE MATERIALS APPROVAL. MATERIALS AS MUCH AS POSSIBLE, SUBJECT TO OWNER REPRESENTATIVE THIS CONTRACTOR, REPAIR AND/OR REPLACE WITH SIMILAR WHEN EXISTING CONSTRUCTION IS DAMAGED DURING WORK BY SCOPE OF WORK. PRIOR TO BID TO REVIEW EXISTING CONDITIONS AND CONFIRM PRESENTLY KNOWN. IT IS STRONGLY ENCOURAGED TO VISIT SITE SUCH WORK MAY EXIST, HOWEVER, LOCATION AND SIZE ARE NOT LOCATIONS SHOWN MUST BE CONSIDERED APPROXIMATE. OTHER AND PRIOR CONSTRUCTION DOCUMENTS WHEN AVAILABLE. THE EXISTING CONDITIONS ARE TAKEN FROM FIELD OBSERVATIONS DOCUMENTS. THESE NOTES ARE APPLICABLE TO THE FULL SET OF CONTRACT P. O. N. M. L. K. J. I. H. G. F. E. D. C. B. A. (E)2" FP (E)2•" CW 1 1 1/27/17Post-Bid Bulletin 564.06Cornell UniversityGeorge Jameson HallIthaca, New York 14850No.Description Date 315 685 4732 Skaneateles Falls, NY 13153 4592 Jordan Road Client No: Drawn by: Sheet No: A|r Job No: 1 2 3 4 5 1 2 3 4 5 A B C D A B C D Revisions Seal Issued for Bid 11.18.2016 NEER NGENG Capital DistrictSyracuseRochester 585.288.5590 Buffalo www.meengineering.com Mechanical/Electrical Engineering Consultants 150 N. CHESTNUT ST. ROCHESTER, NY 14604 M/E Project #: 160277 Web: www.delta-eas.com Email: mail@delta-eas.com Fax: 607.231.6651 Tel: 607.231.6600 Endwell, New York 13760 860 Hooper Road UP DN UP UP UPPER BASEMENT LEVELBASEMENT LEVEL UP