GENERAL NOTES:
1. THE FOLLOWING ASBESTOS CONTAINING / ASBESTOS CONTAMINATED MATERIALS ARE NOT SHOWN BUT SHALL BE REMOVED AT
ALL LOCATIONS WHERE PRESENT ON THE 4TH FLOOR:
A. WALL MOUNTED BOARDS AND THEIR ASSOCIATED MASTIC/ADEHSIVE. REFERENCE DRAWING AR -0000 NOTE 7-F FOR
ABATEMENT INFORMATION AND REQUIREMENTS.
B. DOOR SLABS WITH ASSUMED ASBESTOS CONTAINING CORE MATERIAL. REFERENCE DRAWING AD -0140 FOR 4TH FLOOR
DOORS TO BE REMOVED. REFERENCE DRAWING AR -0000 NOTE 7-G FOR ABATEMENT INFORMATION AND REQUIREMENTS.
C. SINK BRACE MASTIC. REFERENCE DRAWING AR -0000 NOTE 7-J FOR ABATEMENT INFORMATION AND REQUIREMENTS.
D. WINDOWS / WINDOW SYSTEMS. REFERENCE DRAWING AR -0000 NOTE 7-P FOR ABATEMENT INFORMATION AND
REQUIREMENTS.
E. CURTAIN WALL SYSTEM. REFERENCE DRAWING AR -0000 NOTE 7-Q FOR ABATEMENT INFORMATION AND REQUIREMENTS.
2. ASBESTOS CONTAINING FLOOR TILE (VAT) SHOWN ON DRAWING AR -0005 REPRESENTS THE CONFIRMED LOCATIONS OF VAT AND
MAY NOT REPRESENT ALL LOCATIONS WHERE VAT IS PRESENT ON THE 4TH FLOOR. THE CONTRACTOR SHALL BE RESPONSIBLE
FOR THE REMOVAL OF ALL 9" X 9" FLOOR TILE PRESENT ON THE 4TH FLOOR. REFERENCE DRAWING AR -0000 NOTE 7-A FOR
ADDITIONAL VAT ABATEMENT INFORMATION AND REQUIREMENTS.
3. ASBESTOS CONTAINING PIPE AND PIPE FITTING INSULATION (TSI) SHOWN ON DRAWING AR -0005 REPRESENT THOSE 4TH FLOOR
SPACES WHERE THE MATERIAL IS CONFIRMED TO BE PRESENT. TSI IS ALSO ASSUMED TO BE PRESENT IN CONCEALED
WET -WALLS, PIPE CHASES, AND HARD CEILING PLENUM SPACES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL
OF ALL ASBESTOS CONTAINING PIPE AND PIPE FITTING INSULATION PRESENT ON THE 4TH FLOOR. REFERENCE MECHANICAL
DEMOLITION DRAWINGS MD -2004A / MD2004B AND PLUMBING DEMOLITION DRAWING PD -2004 FOR EXISTING 4TH FLOOR PIPING
LOCATIONS. REFERENCE DRAWING AR -0000 NOTE 7-B FOR ADDITIONAL TSI ABATEMENT INFORMATION AND REQUIREMENTS.
LEGEND AND KEYED NOTES
SYMBOL
MATERIAL/ITEM TO BE REMOVED
0
SPACE / ROOM / AREA WITH CONFIRMED ASBESTOS CONTAINING PIPE / PIPE FITTING INSULATION TO BE REMOVED
r////A
•
LOCATION OF CONFIRMED ASBESTOS CONTAINING FLOOR TILE TO BE REMOVED
NOT IN CONTRACT
••••••••••
KEYED NOTES LEGEND:
SYMBOL
0
ASBESTOS CONTAINING TAN CAULK AT STAIR STRINGER TO WALL JOINT TO BE REMOVED
O
STAIRWELL/CORRIDOR DOOR WITH ASBESTOS CONTAINING WINDOW GLAZING COMPOUND. ENTIRE DOOR/SIDE-LIGHT
TO BE REMOVED
FOURTH FLOOR ABATEMENT PLAN
SCALE: 3/32" =1'-0"
NORTH
40030
O
0
400CL4
O
LiPSO
GRU
ALL
AN
LL
0 5'-4" 10'-8"
21'-4"
SCALE: 3/32" = 1'-O"
Cornell University
Facilities Services
102 Humphreys Service Building
Ithaca, NY 14853
No. 1 Revision
Project Name
' Date
UPSON HALL RENOVATION
CORNELL UNIVERSITY
124 HOY ROAD, ITHACA, NY 14850
ITHACA
Seal
NEW YORK
ADELTA
ENGINEERS, ARCHITECTS, & LAND SURVEYORS
860 Hooper Road
Endwell, New York 13760
Tel: 607.231.6600
Fax: 607.231.6651
Email: mail@deltaengineers.com
Web: www.deltaengineers.com
Scale
AS SHOWN
Project No.
2015.030.059
UNAUTHORIZED ALTERATION OF THIS
DRAWING IS A VIOLATION OF THE
NEW YORK STATE EDUCATION LAW,
SECTION 7209, SUBDIVISION 2.
Date
03/24/2015
Drawing Title
FOURTH FLOOR
ABATEMENT PLAN
Drawing No.
AR -0005