Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
_Conformed Set Volume 1 401
Tectonic Copyrig h t 2007LEVEL 010"LEVEL 0212' - 4"QQ.1LEVEL 0323' - 4"LEVEL 0434' - 4"LEVEL 0546' - 2"LEVEL 0659' - 4"LEVEL PH ROOF78' - 5"LEVEL 00-13' - 0"19'-1"13'-2"11'-10"11'-0"11'-0"12'-4"13'-0"12'-9"EXISTING59'-2" TRAVEL DISTANCEEXISTING 4'-6" PIT DEPTHELEVATOR P.P.:EXISTING ELEVATOR CABAND SHAFT TO REMAIN.ELEVATOR TO RECEIVENEW DRIVER AND CABFINISHES.8'-7"60070Elev. Machine Room456CA1A-710011'-7 1/2"NEW ELEVATOR12'-4"4' - 6"4' - 6"456CA1A-7100NEW SHAFT OPENING10'-8"NEW SHAFT OPENING8'-2"35'-1 3/4"NEW ELEVATOR4' - 6"4' - 6"LEVEL 010"LEVEL 0212' - 4"456LEVEL 0323' - 4"LEVEL 0434' - 4"LEVEL 0546' - 2"LEVEL 0659' - 4"LEVEL PH ROOF78' - 5"LEVEL 00-13' - 0"19' - 1"13' - 2"11' - 10"11' - 0"11' - 0"12' - 4"13' - 0"15'-2" MIN. 16' - 10 13/16" OVERHEAD2 LEVELS BEYOND EXISTING59' - 2" TRAVEL DISTANCENEW FIXED LADDERHOIST BEAMREF. STRUCT.ELEVATOR F.P.:NEW TRACTION FREIGHTELEVATOR - 4500 LB CAPACITY,MACHINE ROOM-LESS, 200 FPM,HOSPITAL / SERVICENEW4' - 0" PIT DEPTH9'-0" CAB HEIGHTCUT NEW OPENING INSLAB LEVELS 04, 05 & 06NEW ELEVATOR DOORS, .FRONT AND REAR OPENINGON LEVEL 00CAB POSITION AT HIGHESTLEVEL.CAB OVERRUN8' - 9 13/16"INSPECTOR GUARDRAIL ATCAB ROOFEXISTING4' - 6" PIT DEPTHA-7102A5SimRAISE PIT SLAB LEVELNEW SUMP PITSHEET METAL CANT, TYPAT SLAB PROJECTIONS INHOISTWAYNEW SHAFT OPENINGEXISTING ELEVATOR SHAFT9QQ.1B5A-7100VIF4'-1" CAB DEPTHVIF6'-4" CAB WIDTHEXISTING ELEVATORPROVIDE SHEET METAL CANTAT HOISTWAY PROJECTIONS,TYPLEGENDEXISTING WALLSNEW CONSTRUCTIONNOTES: PROVIDE 2 HR FIRE RATING AT ALL NEWELEVATOR SHAFT WALLS.456CA1A-71005'-9"8'-11 1/2"VIF10'-8" EXISTING SHAFT OPENINGVIF8'-2" EXISTING SHAFT OPENING8'-2" MIN.11'-7 1/2" HOISTWAY WIDTH6'-1"9'-4 1/2"NEW ELEVATOR0"21M4' - 6"4' - 6"PROVIDE SHEET METAL CANT ATHOISTWAY PROJECTIONS, TYP456BCA1A-710060073Elev. ControlSH601Shaft60'-7"CAB OVERRUNNEW ELVATOR CONTROL ROOMEXISTING CMU WALL456CA1A-71005' - 9"8' - 11 1/2"10'-8"NEW ELEVATOR-13'-0"21MREAR OPENNING4' - 6"4' - 6"4' - 6"4' - 6"FRONT PIT OPENNING456CA1A-71004' - 6"4' - 6"NEW ELEVATOR23'-4"456CA1A-710046'-2"4' - 6"4' - 6"NEW ELEVATOR01/2"1"2"SheetTitleApprovedCheckedDrawnJob NumberDateSheet InformationRevisionsMEP FPME Engineers29 West 38th Street, 5th FloorNew York, NY 10018t 212.447.6770f 212.447.6615STRUCTURAL ENGINEER/SUSTAINABILITY CONSULTANTThornton Tomasetti51 Madison Ave.New York, N.Y. 10010t 917.661.7800f 917.661.7801LIGHTING CONSULTANTLumen Architecture214 W 29th Street Suite 1005New York, NY 10001t 212.564.6469f 917.591.2524LANDSCAPE ARCHITECTTrowbridge Wolf Michaels1001 West Seneca Street Suite 101Ithaca, NY 14850t 607.277.1400f 000.000.0000162345AEBCD162345AEBCDCopyright © 2013 Perkins+Will227 West 29th Street, 7th Flr.New York, NY 10001t: 212 505-5955f: 212 505-1648CIVIL ENGINEERTG Miller PC203 North Aurora StreetIthaca, NY 14850t 607.272.6477f 607.273.6322AV / ACOUSTICSThe Sextant Group244 Madison Avenue Suite 311New York NY 10016t 877.684.2311f 412.323.8538CODE CONSULTANTCode Consultants ProfessionalEngineers, PC215 West 40th Street 15th FloorNew York, NY 10018t 212.216.9596f 212.216.96194/7/2015 5:24:31 PMc:\temp\Upson Hall _ ARCH_sobeskic.rvtA-7100ELEVATOR CORE -PLANS, SECTIONS& DETAILSCAS/WCMDC/CW031549.00002/27/2015RWGUpson HallRenovation124 Hoy Rd, Ithaca, NY 14850CornellUniversity215 Park Avenue South4th FloorNew York, NY 10003t 212.251.7000f 212.251.7111www.perkinswill.com 1/4" = 1'-0"B5ELEVATOR P.P. - SECTION 1/4" = 1'-0"C3ELEVATOR F.P. - LEVEL 02 1/4" = 1'-0"A4ELEVATOR F.P. - LEVEL 04 1/4" = 1'-0"A1ELEVATOR F.P. - SECTION 1/4" = 1'-0"A5ELEVATOR P.P. - PLAN, TYP. 1/4" = 1'-0"B3ELEVATOR F.P. - LEVEL 01 1/4" = 1'-0"C4ELEVATOR F.P. - LEVEL 06 1/4" = 1'-0"A3ELEVATOR F.P. - LEVEL 00 1/4" = 1'-0"D3ELEVATOR F.P. - LEVEL 03 1/4" = 1'-0"B4ELEVATOR F.P. - LEVEL 05NO ISSUE DATE1 100% DD DOCUMENTS 14/08/282 50% CONSTRUCTIONDOCUMENTS14/11/073 BID SET 15/02/275 ADDENDUM NO 5 15/04/08