Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
_ALL Volume 2 Conformed Set 98
123 5 891011121314151617181920 6.18.1 L M N P Q O R S T Q.1 Q.6 R.3 20.2 02 0205 0508 08 R.5 20.3 R.4 Elev P.0 B0070 Mechanical B0063 Rapid Prototyping Lab B22 Shaft SHB01 Areaway SHB03 Areaway SHB04 Egress Stair W B0001 Egress Stair N B0002 Teams Pod Build Area B56 Teams Pod Design Area B52 Teams Pod Design Area B23 Staff Office B36 Exhibition B0040A Telecom B34 South Corridor B0042West Corridor B0040 West Vestibule B01 Emerson Manufacturing Teaching Lab B40 Storage B40B CAD/CAM Lab B38 Staff Office B40A Student Orgs. Office B50 Elec B0064 Elec B0065 Projects Storage B32 Vending B39 Teams Pod Design Area B15 Teams Pod Design Area B19 Teams Pod Build Area B14 Teams Pod Build Area B18 Team Conference B04 Team Conference B02 Swanson Director B06 Teams Pod Design Area B10 Elec B35 Shower Room B30 ? ? PIPE CHASE A 2" CHWS UP 4" CHWR UP 2" HWS UP 3" HWR UP 1 1/4" DR UP PIPE CHASE C 2" CHWS UP 4" CHWR UP 2 1/2" HWS UP 3" HWR UP 1 1/4" DR UP PIPE CHASE H 4"CHWR UP 4"HWR UP 1 1/4" DR UP PIPE CHASE E 2 1/2" CHWS UP 4" CHWR UP 2 1/2" HWS UP 3" HWR UP 1 1/4" DR UP 4" RHHWS&R UP 6"CHWS&R UP 4"HWS&R UP H06 FCU H06 FCU H12 FCU H12 FCU H06 FCU H02 FCU HR02 FCU H06 FCU H06 FCU H06 FCU HR06 FCU H12 FCU H02 FCU HR02 FCU H06 FCUH06 FCU H06 FCU SEE M-5000 FOR ENLARGED MECHANICAL ROOM PLAN (E)8" CAMPUS CHWS&R (E)8" CAMPUS CHWS&R 6" HWS&R 4" RHHWS&R VP06 FCU H06 FCU 2" CHWS&R UP VP02 FCU 8' FT-A 5' FT-A 5' FT-A 5' FT-A 4' FT-A 4' FT-A 4' FT-A 4' FT-A 4' FT-A 4' FT-A 4' FT-A 4' FT-A 10' FT-B 10' FT-B 10' FT-B 6' FT-A 3' FT-A 4' FT-A 4' FT-A 4' FT-A 1" DR UP B-11 VAVS B-7 VAVS 1 1/4" DR UP 1 1/4" DR UP VP06 FCU 1 1/4" DR UP 3/4" HWR UP 3/4" HWS DN 3/4" HWS UP 3/4" HWR UP 1 1/4" DR DN 1" DR UP 1 1/4"DR1 1/4" DR 1" DR 3/4" HWR DN 1 1/4" DR UP 3/4" HWS UP 3/4" HWS DN1 1/4"DR1 1/4"DR3/4" HWR DN 3/4" HWS DN 3/4" HWR DN VP12 FCU VP12 FCU 3/4" HWR UP TO 1ST FLOOR 1" HWS DN TO BASEMENT FLOOR 3/4" HWS DN 3/4" HWS DN 3/4" HWR DN 3/4" HWR DN PIPE CHASE B 4" CHWR UP 2 1/2" HWR UP 1 1/4" CHWS 5" CHWR 3" HWR 1 1/4" CHWS 4" CHWR 2 1/2" HWR 2" HWS 3" HWR 1 1/4" CHWS&R 3/4" HWR (TO FINTUBE) 4" CHWR 2 1/2" HWR 1 1/4" DR 3/4" CHWS&R 3/4" HWS&R 3/4" DR 4" HWS&R 6"CHR 6"CHR2 1/2" HWR 4" CHWR 1 1/4"DR 2"DR 2"DR 1" HWR DN 3/4" HWS DN 3/4" CHWS&R 1 1/4" DR 2" CHWS&R 1" DR 1 1/2" CHWS&R 1" DR 3/4" HWS DN 3/4" HWR DN 3/4" HWR DN 3/4" HWS DN 3/4" HWS DN 2 1/2" HWR UP 4" CHWR UP 1 1/4" DR UP 4" CHWR 2 1/2" CHWS 2 1/2" HWR&S 1 1/4" DR 8 FT-A 12 FT-A 12 FT-A 3/4" RHHWS&R MATCHLINE SEE /1 M-2100B MATCHLINE SEE /1 M-2100B 3/4" RHHWS&R A M-5000 South Corridor B0042 East Corridor B0041 Cage Storage B0043 Cage Storage B0045 Cage Storage B0046 Cage Storage B0047 Cage Storage B0048 Cage Storage B0049 Cage Storage B0050 Cage Storage B0051 Custodial B0061 Women B0023 Men B0022 OPEN STAIR NW B0005 3/4" PUMPED CONDENSATE RETURN 4" LPS 3/4" PUMPED CONDENSATE RETURN 4" LPS 1 1/4" CHWS&R 1 1/4" HWS&R 3/4"DR HH04 FCU 1" CHWS&R 1" HWS&R 3/4" DR IN PIPE ENCLOSURE BENEATH WINDOWS 1" CHWS&R 1" HWS&R IN PIPE ENCLOSURE BENEATH WINDOWS 1" CHWS&R 1" HWS&R 3/4" DR IN PIPE ENCLOSURE BENEATH WINDOWS 1" CHWS&R 1" HWS&R 3/4" DR IN PIPE ENCLOSURE BENEATH WINDOWS 2" HWS&R UP 3/4" HWS&R TO FINTUBE 8' FT-C 8' FT-C 2"DR1 1/2"DR 3/4" CHWS&R 3/4" DR 3/4" CHWS&R 3/4" DR 3/4" CHWS&R 3/4" DR 1 1/4" CHWS 5" CHWR 3" HWR 3/4" CHWS&R 3/4" DR 1 1/4" HWS&R TO FINTUBE 1 1/4" HWS&R TO FINTUBE 2" HWS&R UP/DN 3/4" HWS&R TO FINTUBE 7' FT-C 2" DR DN TO SINK 1 1/4"DR 3/4" CHWS&R UP 3/4" HWS&R UP 3/4" DR UP TO FANCOIL 1 1/4"DR 4" CHWR 2 1/2" HWR 1 1/4"DR 3/4" CHWS&R 3/4" DR 3/4"DR3/4" CHWS&R 3/4" DR 1 1/4"DR 3/4"DR3/4"DR3/4" CHWS&R 3/4" DR 1 1/4" CHWS&R 3/4" DR 1-H02 1-H06 3-H12 CHW- 14.5 GPM - 1 1/4" DR- 3/4" 4" RHHWS&R 3/4" RHHWS&R TO VAV 3/4" CHWS&R 3/4"DR3/4"DR3/4"DR3/4" CHWS&R3/4" CHWS&R 1 1/4"DR5"CHR1 1/4"CHS1 1/4" CHWS&R 1 1/4" HWS&R 3/4" DR 1 1/4" CHWS&R DN 1 1/4" HWS&R DN 3/4" DR DN 3/4" CHWS&R 3/4" CHWS&R 3" RHHWS&R 3" RHHWS&R 3/4" HWS&R 3/4" HWS&R3/4" HWR 3/4"HWS1 1/4"DR3/4" HWS&R TO FINTUBE 3/4" HWS&R TO FINTUBE 1" HWR TO FINTUBE 1" HWRS DN TO BASEMENT FLOOR 1" HWS&R TO FINTUBE 2"PROCESS CHWS&R 4"CHR4"CHR 1 1/4"DR3/4" CHWS&R 1" HWS&R TO FINTUBE 1" HWR TO FINTUBE 1" HWR TO FINTUBE 3/4" HWS&R TO FINTUBE 3/4" HWS&R TO FINTUBE 3/4" HWR TO FINTUBE 3/4" HWR TO FINTUBE DR DN TO MOP SINK 1 1/4"DR 1 1"CHWS&R 2"PROCESS CHWS&R FINTUBE TO BE MOUNTED AGAINST UNDERSIDE OF LANDING FINTUBE TO BE MOUNTED AGAINST UNDERSIDE OF LANDING PIPE HW AROUND BEAM (TYP.) 3/4"CHWS&R 3/4"CHWS&R Sheet Title Approved Checked Drawn Job Number Date Sheet Information Revisions MEP FP ME Engineers 29 West 38th Street, 5th Floor New York, NY 10018 t 212.447.6770 f 212.447.6615 STRUCTURAL ENGINEER/ SUSTAINABILITY CONSULTANT Thornton Tomasetti 51 Madison Ave. New York, N.Y. 10010 t 917.661.7800 f 917.661.7801 LIGHTING CONSULTANT Lumen Architecture 214 W 29th Street Suite 1005 New York, NY 10001 t 212.564.6469 f 917.591.2524 LANDSCAPE ARCHITECT Trowbridge Wolf Michaels 1001 West Seneca Street Suite 101Ithaca, NY 14850 t 607.277.1400 f 000.000.0000 162345 A E B C D 162345 A E B C D Copyright © 2013 Perkins+Will 227 West 29th Street, 7th Flr. New York, NY 10001 t: 212 505-5955 f: 212 505-1648 CIVIL ENGINEER TG Miller PC 203 North Aurora Street Ithaca, NY 14850 t 607.272.6477 f 607.273.6322 AV / ACOUSTICS The Sextant Group 244 Madison Avenue Suite 311 New York NY 10016 t 877.684.2311 f 412.323.8538 CODE CONSULTANT Code Consultants Professional Engineers, PC 215 West 40th Street 15th Floor New York, NY 10018 t 212.216.9596 f 212.216.9619 C:\Users\edgar.avila\Documents\Upson Hall_MECH_PLUMB_FP_Josue.Avila.rvtM-2100A MECHANICAL PIPING CONSTRUCTION PLAN - LEVEL 00 PART A MEE MEE 031549.000 11/07/2014 MEE Upson Hall Renovation 124 Hoy Rd, Ithaca, NY 14850 Cornell University 215 Park Avenue South 4th Floor New York, NY 10003 t 212.251.7000 f 212.251.7111 www.perkinswill.com NO ISSUE DATE 1 BID SET 15/02/27 2 Addendum No. 3 15/03/31 GENERAL NOTES 1. SEE PHASING NOTES ON LEGEND SHEETS 2. CONDENSATE DRAIN PIPE SHALL BE PITCHED AT 1/8" PER FOOT. 3. DRAWINGS ARE DIAGRAMMATIC IN NATURE, AND ARE PROVIDED TO CONVEY THE DESIGN INTENT. REGARDLESS OF HOW INDICATED, ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH ALL MANUFACTURER'S RECOMMENDATIONS AND AS REQUIRED TO PROVIDE NEC, SERVICE AND MAINTENANCE CLEARANCES. PROVIDE ADDITIONAL OFFSETS AND FITTINGS AS REQUIRED FOR DUCTWORK AND PIPING. 4. REFER TO SPECS FOR INSULATION REQUIREMENTS ON DUCTWORK AND PIPING. ALL CONCEALED DUCTWORK AND PIPING SHALL BE INSULATED PER ENERGY CODE. 5. ALL EXPOSED DUCTWORK SHALL BE PAINTED AS PER ARCHITECT SPECIFICATION AND NOT INSULATED. ALL CONCEALED DUCTWORK SHALL BE INSULATED AS PER SPECIFICATIONS. 6. ALL VAV BOX AND FAN COIL HOUSING SHALL BE LINED AS PER ACOUSTICAL ENGINEERS REPORT. 7. BRANCH DUCT SIZES TO AIR DEVICES ARE EQUAL TO AIR DEVICE NECK SIZE, UNLESS NOTED OTHERWISE. 8. PROVIDE AN ACCESSIBLE, MANUAL VOLUME DAMPER AT EVERY BRANCH DUCT AND FOR EVERY INLET/OUTLET. PROVIDE MANUAL VOLUME DAMPER UPSTREAM OF ALL ZONE REGISTER TERMINALS. 9. ROUND SUPPLY DUCT SIZES TO VAV BOXES ARE EQUAL TO CONNECTION SIZE UNLESS NOTED OTHERWISE. 10. PROVIDE RECOMMENDED STRAIGHT DUCT INLET LENGTHS FOR ALL SOUND ATTENUATORS AND VAV BOXES. 11. ALL VAV BOXES SHALL BE INSTALLED ABOVE CEILINGS. 12. COORDINATE WITH ALL TRADES TO MAINTAIN ACCESS CLEARANCE TO EQUIPMENT. 13. CONTRACTOR TO FIELD COORDINATE ACCESS PANELS IN FINISH CEILING TO MAINTAIN ACCESS TO EXISTING DUCT MOUNTED ACCESS DOORS. SUBMIT PROPOSED ACCESS PANEL LOCATIONS FOR APPROVAL PRIOR TO INSTALLATION. 14. ALL DUCTS PENETRATING 1-HOUR RATED CONSTRUCTION SHALL BE EQUIPPED WITH AN APPROVED FIRE DAMPER AND INSTALLED AS PER DETAIL. 15. ALL DUCTS PENETRATING RATED SHAFTS AND 2-HOUR RATED CONSTRUCTION SHALL BE EQUIPPED WITH AN APPROVED FIRE SMOKE DAMPER AND INSTALLED AS PER DETAIL. 16. ALL PIPING PENETRATION 1-HOUR AND 2- HOUR RATED CONSTRUCTION SHALL BE INSTALLED AS PER DETAIL. 17. ALL DIFFUSERS SHALL BE HARD DUCTED AS PER DETAIL. 18. ALL PIPING FOR VERTICAL FAN COIL UNITS IS TO BE LOCATED WITHIN PIPE ENCLOSURE BELOW WINDOWS. 19. CONTROL VALVES SHALL BE PROVIDED FOR EACH PIECE OF HYDRONIC EQUIPMENT. SEE DETAIL SHEETS FOR PIPING CONFIGURATION. 19. REFER TO ARCHITECTURAL DRAWINGS FOR DESIGN GUIDELINES FOR LAYOUT AND PLACEMENT OF ALL EXPOSED INFRASTRUCTURE INCLUDING PIPING, SPRINKLERS, CONDUIT, DUCTWORK, CABLE TRAYS, LIGHTING AND CEILING DEVICES. CONSULT ARCHITECT IF ANY QUESTIONS ARISE ABOUT DESIGN INTENT. KEYNOTES# 1 FINAL LOCATION OF FAN COIL UNITS IN TELECOM ROOMS SHALL BE SELECTED TO AVOID PLACING FAN COIL OVER ELECTRONIC EQUIPMENTS. SELECT AND SUBMIT FAN COIL AFTER FINAL ROOM LAYOUT IS CONFIRMED. CONSIDER PROVIDING A VERTICAL FAN COIL IF MORE APPROPRIATE FOR FINAL ROOM LAYOUT. 1/8" = 1'-0"1 MECHANICAL PIPING CONSTRUCTION PLAN - LEVEL 00 PART A