Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
_ALL Volume 2 Conformed Set 94
F/SF/S F/S F/SF/SF/SF/SF/S F/SF/SF/SF/SF/SF/SF/SF/SF/S F/S F/S 123 5 891011121314151617181920 6.18.1 L M N P Q O R S T Q.1 Q.6 R.3 20.2 02 0205 0508 08 R.5 20.3 R.4 Hybrid Lab - Autonomous Systems Lab (ASL) 550 Faculty Office 551 Hybrid Lab - ASL Robot Testing 542 Computational Lab - Ferrari 529 Research Storage 522 Egress Stair N 50002 Elev P.5 50070 Faculty Office 543 Faculty Office 547 Sm. Conference 549 Office-Students 552 Office-Students 546 Roof Access Area 50072 Faculty Service Center 540 Shaft SH507 West Corridor 50040 South Corridor 50042 Shaft SH503 Shaft SH509 Office-Students 541 Research Conference 531 Informal Collaboration 537 NE Corridor 50041 Open Stair NE 50003 Elec 50062 Telecom 528 Unisex 50020 Men 50022 Women 50023 Custodial 50061 DUCT SHAFT 3 16X12 RAD DN 20X12 SAD DN DUCT SHAFT 10 26X20 EAD DN 20X20 RAD DN 40X20 SAD DN DUCT SHAFT 13 48X24 SAD UP 38X22 RAD UP DUCT SHAFT 8 20X16 EAD UP/DN 20X18 FUTURE DUCT UP/DN 20X16 RAD UP/DN 20X35 SAD UP/DN DUCT SHAFT 9 55X18 SAN DN 22X18 RAD DN 24X18 EAD UP/DN 45X25 SAD UP 35X20 TEX UP/DN V06 FCU V03 FCU V03 FCU V03 FCU V04 FCU HR02 FCU HR02 FCU V12 FCU V12 FCU V10 FCU V10 FCU V10 FCU H06 FCU H06 FCU H03 FCU V06 FCU TYP. OF 10 40 ZRT 60 ZRT 80 ZRT CR 560 CFM DUCT SHAFT 15 20X16 EAD UP/DN 12X12 RAD UP/DN 20X30 SAD UP/DN 50 ZRT 80 ZRT TYP. OF 3 Hybrid Lab - Unassigned 525 HR06 FCU 75 ZRT 75 ZRT EG 450 CFM 5-1 VAVE 5-2 VAVE 16"x8"EA EG 450 CFM DUCT SHAFT 14 34X24 SAD DN 26X24 RAD DN 36' FT-A 12' FT-A 3' FT-A DUCT SHAFT 13 24X18 SAD DN 20X18 RAD DN DUCT SHAFT 2 24x10 SAD DN 30X14 RAD UP 45"x25"SA H06 FCU 5-2 VAVS 5-1 VAVS CD 220 CFM CD 470 CFM 25"x12"SACD 180 CFM 12"x6"SA CD 180 CFM 22"x14"RA CR 220 CFM CR 470 CFM 5-1 VAVR 5-2 VAVR 20"x12"RACR 180 CFM 5-4 VAVE 5-3 VAVE 5-3 VAVS 14"x8"SA 14"x8"SA CD 270 CFM CD 270 CFM 5-4 VAVR CR 540 CFM 5-5 VAVS 14"x8"RA 5-9 VAVS MATCHLINE SEE /1 M-2005B MATCHLINE SEE /1 M-2005B 50 ZRT 7 FT-C 40"x20"SA 20"x20"RA 26"x20"EA 26X20 EAD DN 20X20 RAD DN 40X20 SAD DN 32"x12"SA 14"x8"EA 14"x8"EA12"x5"SACR CR CR 30"x14"RA VD 12"x5"SA 24"x10"SA 30 ZRT 16"x8"SA 14"x8"SA12"x6"SA12"x6"SA 14"x8"RABMS CONTROL PANEL COORDINATE EXACT LOCATION WITH IT 120 ZRT 6"øEA FINTUBE TO BE MOUNTED AGAINST UNDERSIDE OF LANDING 5-3 VAVR 5-4 VAVS NESTED FITTING 20"x10"EA48"x24"SA 38"x22"RA 26"x24"RA (3)HORITZONTAL FSDs Sheet Title Approved Checked Drawn Job Number Date Sheet Information Revisions MEP FP ME Engineers 29 West 38th Street, 5th Floor New York, NY 10018 t 212.447.6770 f 212.447.6615 STRUCTURAL ENGINEER/ SUSTAINABILITY CONSULTANT Thornton Tomasetti 51 Madison Ave. New York, N.Y. 10010 t 917.661.7800 f 917.661.7801 LIGHTING CONSULTANT Lumen Architecture 214 W 29th Street Suite 1005 New York, NY 10001 t 212.564.6469 f 917.591.2524 LANDSCAPE ARCHITECT Trowbridge Wolf Michaels 1001 West Seneca Street Suite 101Ithaca, NY 14850 t 607.277.1400 f 000.000.0000 162345 A E B C D 162345 A E B C D Copyright © 2013 Perkins+Will 227 West 29th Street, 7th Flr. New York, NY 10001 t: 212 505-5955 f: 212 505-1648 CIVIL ENGINEER TG Miller PC 203 North Aurora Street Ithaca, NY 14850 t 607.272.6477 f 607.273.6322 AV / ACOUSTICS The Sextant Group 244 Madison Avenue Suite 311 New York NY 10016 t 877.684.2311 f 412.323.8538 CODE CONSULTANT Code Consultants Professional Engineers, PC 215 West 40th Street 15th Floor New York, NY 10018 t 212.216.9596 f 212.216.9619 C:\Users\edgar.avila\Documents\Upson Hall_MECH_PLUMB_FP_Josue.Avila.rvtM-2005A MECHANICAL CONSTRUCTION PLAN - LEVEL 05 PART A MEE MEE 031549.000 11/07/2014 MEE Upson Hall Renovation 124 Hoy Rd, Ithaca, NY 14850 Cornell University 215 Park Avenue South 4th Floor New York, NY 10003 t 212.251.7000 f 212.251.7111 www.perkinswill.com GENERAL NOTES 1. SEE PHASING NOTES ON LEGEND SHEETS 2. CONDENSATE DRAIN PIPE SHALL BE PITCHED AT 1/8" PER FOOT. 3. DRAWINGS ARE DIAGRAMMATIC IN NATURE, AND ARE PROVIDED TO CONVEY THE DESIGN INTENT. REGARDLESS OF HOW INDICATED, ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH ALL MANUFACTURER'S RECOMMENDATIONS AND AS REQUIRED TO PROVIDE NEC, SERVICE AND MAINTENANCE CLEARANCES. PROVIDE ADDITIONAL OFFSETS AND FITTINGS AS REQUIRED FOR DUCTWORK AND PIPING. 4. REFER TO SPECS FOR INSULATION REQUIREMENTS ON DUCTWORK AND PIPING. ALL CONCEALED DUCTWORK AND PIPING SHALL BE INSULATED PER ENERGY CODE. 5. ALL EXPOSED DUCTWORK SHALL BE PAINTED AS PER ARCHITECT SPECIFICATION AND NOT INSULATED. ALL CONCEALED DUCTWORK SHALL BE INSULATED AS PER SPECIFICATIONS. 6. ALL VAV BOX AND FAN COIL HOUSING SHALL BE LINED AS PER ACOUSTICAL ENGINEERS REPORT. 7. BRANCH DUCT SIZES TO AIR DEVICES ARE EQUAL TO AIR DEVICE NECK SIZE, UNLESS NOTED OTHERWISE. 8. PROVIDE AN ACCESSIBLE, MANUAL VOLUME DAMPER AT EVERY BRANCH DUCT AND FOR EVERY INLET/OUTLET. PROVIDE MANUAL VOLUME DAMPER UPSTREAM OF ALL ZONE REGISTER TERMINALS. 9. ROUND SUPPLY DUCT SIZES TO VAV BOXES ARE EQUAL TO CONNECTION SIZE UNLESS NOTED OTHERWISE. 10. PROVIDE RECOMMENDED STRAIGHT DUCT INLET LENGTHS FOR ALL SOUND ATTENUATORS AND VAV BOXES. 11. ALL VAV BOXES SHALL BE INSTALLED ABOVE CEILINGS. 12. COORDINATE WITH ALL TRADES TO MAINTAIN ACCESS CLEARANCE TO EQUIPMENT. 13. CONTRACTOR TO FIELD COORDINATE ACCESS PANELS IN FINISH CEILING TO MAINTAIN ACCESS TO EXISTING DUCT MOUNTED ACCESS DOORS. SUBMIT PROPOSED ACCESS PANEL LOCATIONS FOR APPROVAL PRIOR TO INSTALLATION. 14. ALL DUCTS PENETRATING 1-HOUR RATED CONSTRUCTION SHALL BE EQUIPPED WITH AN APPROVED FIRE DAMPER AND INSTALLED AS PER DETAIL. 15. ALL DUCTS PENETRATING RATED SHAFTS AND 2-HOUR RATED CONSTRUCTION SHALL BE EQUIPPED WITH AN APPROVED FIRE SMOKE DAMPER AND INSTALLED AS PER DETAIL. 16. ALL PIPING PENETRATION 1-HOUR AND 2- HOUR RATED CONSTRUCTION SHALL BE INSTALLED AS PER DETAIL. 17. ALL DIFFUSERS SHALL BE HARD DUCTED AS PER DETAIL. 18. ALL PIPING FOR VERTICAL FAN COIL UNITS IS TO BE LOCATED WITHIN PIPE ENCLOSURE BELOW WINDOWS. 19. CONTROL VALVES SHALL BE PROVIDED FOR EACH PIECE OF HYDRONIC EQUIPMENT. SEE DETAIL SHEETS FOR PIPING CONFIGURATION. 19. REFER TO ARCHITECTURAL DRAWINGS FOR DESIGN GUIDELINES FOR LAYOUT AND PLACEMENT OF ALL EXPOSED INFRASTRUCTURE INCLUDING PIPING, SPRINKLERS, CONDUIT, DUCTWORK, CABLE TRAYS, LIGHTING AND CEILING DEVICES. CONSULT ARCHITECT IF ANY QUESTIONS ARISE ABOUT DESIGN INTENT. KEYNOTES# NO ISSUE DATE 1 100% DD DOCUMENTS 14/08/28 2 50% CONSTRUCTION DOCUMENTS 14/11/07 3 BID SET 15/02/27 4 Addendum No. 3 15/03/31 1/8" = 1'-0"1 MECHANICAL CONSTRUCTION PLAN - LEVEL 05 PART A