Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
_ALL Volume 2 Conformed Set 92
F/SF/SF/SF/SF/SF/SF/SF/SF/SF/SF/SF/SF/S 12 456 88.1 8.910.1 2.6 A B C D E F G H J K L 02 0205 0508 08 Faculty Office 473 Hybrid Lab - SIOS (Space) Lab 454 392 SF Hybrid Lab - Future Hire 466 788 SF Hybrid Lab - Unassigned 472 901 SF Office-Students 452 Hybrid Lab - SEAK Space 462 413 SF Support 476 Elev F.4 40071 Shaft SH410 Faculty Office 451 Faculty Office 453 Faculty Office 455 Sm. Conference 457 Faculty Office 461 Faculty Office 463 Sm. Conference 465 Office-Lecturer 469 Faculty Office 471 Office-Students 468 Office-Students 460 Elec 40063 Shaft SH403 Shaft SH405 Shaft SH406 Egress Stair S 40004 South Corridor 40042 Circulation 40044 Hybrid Lab - Spacecraft Systems 450 788 SF Hybrid Lab - Future Hire 458 781 SF V04 FCU V03 FCU V03 FCU V03 FCU V03 FCU V03 FCU V03 FCU V04 FCU V04 FCU V04 FCU V10 FCU V10 FCU HR02 FCU HR02 FCU V10 FCU V10 FCU V10 FCU V10 FCU V10 FCU H03 FCU 60 ZRT 30 ZRT 80 ZRT TYP. OF 5 TYP. OF 2 90 ZRT CD 220 CFM CD 220 CFM 4-14 VAVS 4-23 VAVS (3) 4" TAP W/CAP 4-8 VAVE (3) 4" TAP W/CAP (3) 4" TAP W/CAP TYP. OF 530 ZRT CR 440 CFM 4-7 VAVE CR 200 CFM CD 200 CFM 16"x8"SA 14"x8"EA 4-18 VAVS 4-9 VAVE 4-11 VAVR 4-11 VAVE (3) 4" TAP W/CAP CR 430 CFM 4-10 VAVE 4-12 VAVR CR 220 CFM 4-12 VAVE 24"x8"EA 14"x8"EA 4-14 VAVE(2) 4" TAP W/CAP 24"x8"EA 4-16 VAVE V10 FCU 14"x6"SADUCT SHAFT 1 16X8 SAD UP/DN DUCT SHAFT 5 44X20 EAD UP/DN 18X18 RAD UP/DN 54X20 SAD UP/DN DUCT SHAFT 6 20X22 RAD UP/DN 20X44 SAD UP/DN 20X22 EAD UP/DN DUCT SHAFT 7 20X15 RAD UP/DN 20X25 EAD UP/DN 20X34 SAD UP/DN DUCT SHAFT 4 30X24 SAD UP/DN 30X26 EAD UP/DN 30X30 SPRAY BOOTH EX UP/DN GENERATOR COOLANT UP/DN MATCHLINE SEE /1 M-2004A MATCHLINE SEE /1 M-2004A HH08 FCU 16x12 SAD UP/DN 4-25 VAVS CD 100 CFM CD 100 CFM 12"x5"SA WG 200 CFM 14"x8"EA 14"x8"EA 24"x8"EA 12"x5"RA14"x8"SA12"x8"EAHR02 FCU CD 215 CFM CD 215 CFM 4-19 VAVS CD 220 CFM 4-20 VAVS 12"x8"SA 90 ZRT 24"x8"SA 12"x8"EA12"x5"RA12"x6"SA14"x8"EA12"x8"EACR 480 CFM 4-15 VAVE CR 430 CFM 4-13 VAVE 14"x8"EA22"x8"EA 12"x8"EACD 240 CFM CD 240 CFM CD 215 CFM CD 215 CFM 12"x8"SA 4-21 VAVS 22"x8"SA 12"x8"SA 4-22 VAVS 12"x8"SACR CR CR 5 FT-C 14"x8"EA 14"x8"EA12"x5"SA 10" ENGINE EXHAUST WITH 4" INSULATION UP TO ROOF. (E)GRUMMAN LAB EXHAUST UP FINTUBE TO BE MOUNTED AGAINST UNDERSIDE OF LANDING Sheet Title Approved Checked Drawn Job Number Date Sheet Information Revisions MEP FP ME Engineers 29 West 38th Street, 5th Floor New York, NY 10018 t 212.447.6770 f 212.447.6615 STRUCTURAL ENGINEER/ SUSTAINABILITY CONSULTANT Thornton Tomasetti 51 Madison Ave. New York, N.Y. 10010 t 917.661.7800 f 917.661.7801 LIGHTING CONSULTANT Lumen Architecture 214 W 29th Street Suite 1005 New York, NY 10001 t 212.564.6469 f 917.591.2524 LANDSCAPE ARCHITECT Trowbridge Wolf Michaels 1001 West Seneca Street Suite 101Ithaca, NY 14850 t 607.277.1400 f 000.000.0000 162345 A E B C D 162345 A E B C D Copyright © 2013 Perkins+Will 227 West 29th Street, 7th Flr. New York, NY 10001 t: 212 505-5955 f: 212 505-1648 CIVIL ENGINEER TG Miller PC 203 North Aurora Street Ithaca, NY 14850 t 607.272.6477 f 607.273.6322 AV / ACOUSTICS The Sextant Group 244 Madison Avenue Suite 311 New York NY 10016 t 877.684.2311 f 412.323.8538 CODE CONSULTANT Code Consultants Professional Engineers, PC 215 West 40th Street 15th Floor New York, NY 10018 t 212.216.9596 f 212.216.9619 C:\Users\edgar.avila\Documents\Upson Hall_MECH_PLUMB_FP_Josue.Avila.rvtM-2004B MECHANICAL CONSTRUCTION PLAN - LEVEL 04 PART B MEE MEE 031549.000 11/07/2014 MEE Upson Hall Renovation 124 Hoy Rd, Ithaca, NY 14850 Cornell University 215 Park Avenue South 4th Floor New York, NY 10003 t 212.251.7000 f 212.251.7111 www.perkinswill.com NO ISSUE DATE 1 BID SET 15/02/27 2 Addendum No. 3 15/03/31 GENERAL NOTES 1. SEE PHASING NOTES ON LEGEND SHEETS 2. CONDENSATE DRAIN PIPE SHALL BE PITCHED AT 1/8" PER FOOT. 3. DRAWINGS ARE DIAGRAMMATIC IN NATURE, AND ARE PROVIDED TO CONVEY THE DESIGN INTENT. REGARDLESS OF HOW INDICATED, ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH ALL MANUFACTURER'S RECOMMENDATIONS AND AS REQUIRED TO PROVIDE NEC, SERVICE AND MAINTENANCE CLEARANCES. PROVIDE ADDITIONAL OFFSETS AND FITTINGS AS REQUIRED FOR DUCTWORK AND PIPING. 4. REFER TO SPECS FOR INSULATION REQUIREMENTS ON DUCTWORK AND PIPING. ALL CONCEALED DUCTWORK AND PIPING SHALL BE INSULATED PER ENERGY CODE. 5. ALL EXPOSED DUCTWORK SHALL BE PAINTED AS PER ARCHITECT SPECIFICATION AND NOT INSULATED. ALL CONCEALED DUCTWORK SHALL BE INSULATED AS PER SPECIFICATIONS. 6. ALL VAV BOX AND FAN COIL HOUSING SHALL BE LINED AS PER ACOUSTICAL ENGINEERS REPORT. 7. BRANCH DUCT SIZES TO AIR DEVICES ARE EQUAL TO AIR DEVICE NECK SIZE, UNLESS NOTED OTHERWISE. 8. PROVIDE AN ACCESSIBLE, MANUAL VOLUME DAMPER AT EVERY BRANCH DUCT AND FOR EVERY INLET/OUTLET. PROVIDE MANUAL VOLUME DAMPER UPSTREAM OF ALL ZONE REGISTER TERMINALS. 9. ROUND SUPPLY DUCT SIZES TO VAV BOXES ARE EQUAL TO CONNECTION SIZE UNLESS NOTED OTHERWISE. 10. PROVIDE RECOMMENDED STRAIGHT DUCT INLET LENGTHS FOR ALL SOUND ATTENUATORS AND VAV BOXES. 11. ALL VAV BOXES SHALL BE INSTALLED ABOVE CEILINGS. 12. COORDINATE WITH ALL TRADES TO MAINTAIN ACCESS CLEARANCE TO EQUIPMENT. 13. CONTRACTOR TO FIELD COORDINATE ACCESS PANELS IN FINISH CEILING TO MAINTAIN ACCESS TO EXISTING DUCT MOUNTED ACCESS DOORS. SUBMIT PROPOSED ACCESS PANEL LOCATIONS FOR APPROVAL PRIOR TO INSTALLATION. 14. ALL DUCTS PENETRATING 1-HOUR RATED CONSTRUCTION SHALL BE EQUIPPED WITH AN APPROVED FIRE DAMPER AND INSTALLED AS PER DETAIL. 15. ALL DUCTS PENETRATING RATED SHAFTS AND 2-HOUR RATED CONSTRUCTION SHALL BE EQUIPPED WITH AN APPROVED FIRE SMOKE DAMPER AND INSTALLED AS PER DETAIL. 16. ALL PIPING PENETRATION 1-HOUR AND 2- HOUR RATED CONSTRUCTION SHALL BE INSTALLED AS PER DETAIL. 17. ALL DIFFUSERS SHALL BE HARD DUCTED AS PER DETAIL. 18. ALL PIPING FOR VERTICAL FAN COIL UNITS IS TO BE LOCATED WITHIN PIPE ENCLOSURE BELOW WINDOWS. 19. CONTROL VALVES SHALL BE PROVIDED FOR EACH PIECE OF HYDRONIC EQUIPMENT. SEE DETAIL SHEETS FOR PIPING CONFIGURATION. 19. REFER TO ARCHITECTURAL DRAWINGS FOR DESIGN GUIDELINES FOR LAYOUT AND PLACEMENT OF ALL EXPOSED INFRASTRUCTURE INCLUDING PIPING, SPRINKLERS, CONDUIT, DUCTWORK, CABLE TRAYS, LIGHTING AND CEILING DEVICES. CONSULT ARCHITECT IF ANY QUESTIONS ARISE ABOUT DESIGN INTENT. KEYNOTES# 1/8" = 1'-0"1 MECHANICAL CONSTRUCTION PLAN - LEVEL 04 PART B